ML18011A296: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 2: Line 2:
| number = ML18011A296
| number = ML18011A296
| issue date = 02/04/1994
| issue date = 02/04/1994
| title = Proposed TS 3/4.6.4, Containment Sys Combustible Gas Control.
| title = Proposed TS 3/4.6.4, Containment Sys Combustible Gas Control
| author name =  
| author name =  
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ENCLOSURE 5 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CONTAINMENTHYDROGEN MONITORING SYSTEM TECHNICAL SPECIFICATION PAGES 9402150131   940204 PDR ADOt K 05000400 PDR
{{#Wiki_filter:ENCLOSURE 5 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CONTAINMENTHYDROGEN MONITORINGSYSTEM TECHNICALSPECIFICATION PAGES 9402150131 940204 PDR ADOt K 05000400 PDR


'ONTAINMENT SYSTEMS 3/4.6.4   COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS LIMITING CONDITION     FOR OPERATION 3.6.4.1   Two independent containment hydrogen monitors shall be   OPERABLE.
'ONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS LIMITING CONDITION FOR OPERATION 3.6.4.1 Two independent containment hydrogen monitors shall be OPERABLE.
APPLICABILITY:     MODES 1 and 2.
APPLICABILITY:
MODES 1 and 2.
ACTION:
ACTION:
a.. With one hydrogen monito~ inoperable, restore the inoperable monitor to OPERABLE   status within   30 days or be in at least HOT STANDBY within She next 6 hours.
a..
: b. With both hydrogen monitors inoperable, restore at least one monitor to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours.
With one hydrogen monito~ inoperable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT STANDBY within She next 6 hours.
SURVEILLANCE RE UIREMENTS 4.6.4.1 Each hydrogen monItor       sha11 be demonstrated OPERABLE by the performance of                                                 , an ANALOG CHANNEL OPERATIONAL TEST at least once per 31 days,     and at least once per 92 days on a STAGGERED TEST BASIS   by performing   a CHANNEL CALIBRATION using sample gas containing:
b.
: a. Two volume   percent hydrogen, balance nitrogen; and-"--
With both hydrogen monitors inoperable, restore at least one monitor to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours.
: b. Six volume percent hydrogen, balance nitrogen.
SURVEILLANCE RE UIREMENTS 4.6.4.1 Each hydrogen monItor sha11 be demonstrated OPERABLE by the performance of
SHEARON HARRIS   - UNIT 1             3/4 6-30
, an ANALOG CHANNEL OPERATIONAL TEST at least once per 31 days, and at least once per 92 days on a STAGGERED TEST BASIS by performing a CHANNEL CALIBRATION using sample gas containing:
a.
Two volume percent hydrogen, balance nitrogen; and-"--
b.
Six volume percent hydrogen, balance nitrogen.
SHEARON HARRIS - UNIT 1 3/4 6-30


CONTAINMENT SYSTEMS 3   4.6.4   COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS LIMITING CONDITION       FOR OPERATION 3.6.4. 1   Two   independent containment hydrogen monitors shall be     OPERABLE.
CONTAINMENT SYSTEMS 3 4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS LIMITING CONDITION FOR OPERATION 3.6.4. 1 Two independent containment hydrogen monitors shall be OPERABLE.
APPLICABILITY:       MODES 1   and 2.
APPLICABILITY:
MODES 1 and 2.
ACTION:
ACTION:
: a.     With one hydrogen monitor inoperable,       restore the inoperable monitor to OPERABLE status     within 30 days or be in at least HOT STANDBY within the next 6 hours.
a.
: b.      With both hydrogen monitors inoperable, restore at least one monitor to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next   6 hours.
b.
SURVEILLANCE REQUIREMENTS 4.6.4. 1   Each hydrogen monitor shall be demonstrated OPERABLE by the performance     of an ANALOG CHANNEL OPERATIONAL TEST at least once per 31 days, and at least once per 92 days on a STAGGERED TEST BASIS by performing a CHANNEL CALIBRATION using sample gas containing:
With one hydrogen monitor inoperable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours.
: a.     Two volume   percent hydrogen, balance nitrogen, and
With both hydrogen monitors inoperable, restore at least one monitor to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours.
: b.     Six volume percent hydrogen, balance nitrogen.
SURVEILLANCE REQUIREMENTS 4.6.4. 1 Each hydrogen monitor shall be demonstrated OPERABLE by the performance of an ANALOG CHANNEL OPERATIONAL TEST at least once per 31 days, and at least once per 92 days on a
SHEARON HARRIS     - UNIT 1             3/4 6-30                     Amendment No.}}
STAGGERED TEST BASIS by performing a
CHANNEL CALIBRATION using sample gas containing:
a.
Two volume percent
: hydrogen, balance nitrogen, and b.
Six volume percent
: hydrogen, balance nitrogen.
SHEARON HARRIS - UNIT 1
3/4 6-30 Amendment No.}}

Latest revision as of 06:32, 7 January 2025

Proposed TS 3/4.6.4, Containment Sys Combustible Gas Control
ML18011A296
Person / Time
Site: Harris 
Issue date: 02/04/1994
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18011A295 List:
References
NUDOCS 9402150131
Download: ML18011A296 (3)


Text

ENCLOSURE 5 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CONTAINMENTHYDROGEN MONITORINGSYSTEM TECHNICALSPECIFICATION PAGES 9402150131 940204 PDR ADOt K 05000400 PDR

'ONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS LIMITING CONDITION FOR OPERATION 3.6.4.1 Two independent containment hydrogen monitors shall be OPERABLE.

APPLICABILITY:

MODES 1 and 2.

ACTION:

a..

With one hydrogen monito~ inoperable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT STANDBY within She next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

With both hydrogen monitors inoperable, restore at least one monitor to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE RE UIREMENTS 4.6.4.1 Each hydrogen monItor sha11 be demonstrated OPERABLE by the performance of

, an ANALOG CHANNEL OPERATIONAL TEST at least once per 31 days, and at least once per 92 days on a STAGGERED TEST BASIS by performing a CHANNEL CALIBRATION using sample gas containing:

a.

Two volume percent hydrogen, balance nitrogen; and-"--

b.

Six volume percent hydrogen, balance nitrogen.

SHEARON HARRIS - UNIT 1 3/4 6-30

CONTAINMENT SYSTEMS 3 4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS LIMITING CONDITION FOR OPERATION 3.6.4. 1 Two independent containment hydrogen monitors shall be OPERABLE.

APPLICABILITY:

MODES 1 and 2.

ACTION:

a.

b.

With one hydrogen monitor inoperable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

With both hydrogen monitors inoperable, restore at least one monitor to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.4. 1 Each hydrogen monitor shall be demonstrated OPERABLE by the performance of an ANALOG CHANNEL OPERATIONAL TEST at least once per 31 days, and at least once per 92 days on a

STAGGERED TEST BASIS by performing a

CHANNEL CALIBRATION using sample gas containing:

a.

Two volume percent

hydrogen, balance nitrogen, and b.

Six volume percent

hydrogen, balance nitrogen.

SHEARON HARRIS - UNIT 1

3/4 6-30 Amendment No.