ENCLOSURE 5 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CONTAINMENTHYDROGEN MONITORINGSYSTEM TECHNICALSPECIFICATION PAGES 9402150131 940204 PDR ADOt K 05000400 PDR
'ONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS LIMITING CONDITION FOR OPERATION 3.6.4.1 Two independent containment hydrogen monitors shall be OPERABLE.
APPLICABILITY:
MODES 1 and 2.
ACTION:
a..
With one hydrogen monito~ inoperable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT STANDBY within She next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b.
With both hydrogen monitors inoperable, restore at least one monitor to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE RE UIREMENTS 4.6.4.1 Each hydrogen monItor sha11 be demonstrated OPERABLE by the performance of
, an ANALOG CHANNEL OPERATIONAL TEST at least once per 31 days, and at least once per 92 days on a STAGGERED TEST BASIS by performing a CHANNEL CALIBRATION using sample gas containing:
a.
Two volume percent hydrogen, balance nitrogen; and-"--
b.
Six volume percent hydrogen, balance nitrogen.
SHEARON HARRIS - UNIT 1 3/4 6-30
CONTAINMENT SYSTEMS 3 4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS LIMITING CONDITION FOR OPERATION 3.6.4. 1 Two independent containment hydrogen monitors shall be OPERABLE.
APPLICABILITY:
MODES 1 and 2.
ACTION:
a.
b.
With one hydrogen monitor inoperable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
With both hydrogen monitors inoperable, restore at least one monitor to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.6.4. 1 Each hydrogen monitor shall be demonstrated OPERABLE by the performance of an ANALOG CHANNEL OPERATIONAL TEST at least once per 31 days, and at least once per 92 days on a
STAGGERED TEST BASIS by performing a
CHANNEL CALIBRATION using sample gas containing:
a.
Two volume percent
Six volume percent
SHEARON HARRIS - UNIT 1
3/4 6-30 Amendment No.