ML18022A728: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 2: | Line 2: | ||
| number = ML18022A728 | | number = ML18022A728 | ||
| issue date = 10/26/1989 | | issue date = 10/26/1989 | ||
| title = Proposed Tech Specs Table 3.3-3, ESF Actuation Sys Instrumentation | | title = Proposed Tech Specs Table 3.3-3, ESF Actuation Sys Instrumentation | ||
| author name = | | author name = | ||
| author affiliation = CAROLINA POWER & LIGHT CO. | | author affiliation = CAROLINA POWER & LIGHT CO. | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ENCLOSURE 4 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT AFW MANUAL INITIATION TECHNICAL SPECIFICATION PAGES 8911010197 89102b PDR | {{#Wiki_filter:ENCLOSURE 4 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT AFW MANUAL INITIATION TECHNICAL SPECIFICATION PAGES 8911010197 89102b PDR ADOCK 05000400 P | ||
PNU | |||
Y~LR ENG'INEEREO SAFETY FEATURES ACTUATION SYSTEH INSTRUMENTATION | Y~LR ENG'INEEREO SAFETY FEATURES ACTUATION SYSTEH INSTRUMENTATION FUNCTIONAL UNIT 6. | ||
Auxiliary Feedwater a. | |||
Hanual Initiation 1J ~fog -J~vmpvmps g) TCebiur-dhVSiiPPu~~ | |||
TOTAL NO. | |||
CHANNELS OF CHANNELS | |||
'TO TRIP tfpUmp g/p VIP QA p HINIHUH CHANNELS OPERABLE g/PCO P a/mm APPLICASLE HOOES X,x 3 | |||
~7 ~A ACTION b. | |||
Automatic Actuation Logic and-Actuation Relays Steam Generator Mater Level--Low-Low 1) | |||
Start Hotor-Oriven Pumps 3/stm. | |||
gen. | |||
2/stm. | |||
gen. | |||
in any stm. | |||
gen. | |||
1,2,3 2/stm. | |||
gen. | |||
1, 2, 3 | |||
in each stm. | |||
gen. | |||
21 15k 2) | |||
Start Turbine-Drive'n Pump 3/stm. | |||
gen. | |||
2/stm. | |||
in any 2 stm. | |||
gen. | |||
gen. | |||
2/stm. | |||
gen. | |||
1, 2, 3 | |||
in each stm. | |||
gen. | |||
15k d. | |||
Safety Injection Start Hotor-Oriven Pumps e. | |||
Loss-of-Offsite Power Start Hotor-Driven Pumps and Turbine-Oriven Pump See Item l. above for all Safety Injection initiating functions and requirements. | |||
See Item 9. below for Loss of Offsite Power initiating functions and requirements. | |||
f. | |||
Trip of All Hain Feedwater Pumps Start Hotor-Oriven Pumps 1/pump 1/pump 1/pump 1, | |||
2 15" | |||
TABLE | TABLE 3.3-3 Continued ACTION STATEMENTS Continued) | ||
ACTION L9 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied: | ACTION L9 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied: | ||
a. | |||
The inoperable channel is placed in the tripped condition within j hour, and b. | |||
ACTION 20 - With less than the | The Minimum Channels OPERABLE requirement is met; | ||
ACTION 21 - With the | : however, one additional channel may be bypassed for up to 2 hours for surveillance testing of other channels per Specification 4.3.2. 1. | ||
ACTION 20 - With less than the Minimum Number of Channels OPERABLE, within l hour determine by observation of the associated permissive annunciator window(s) that the interlock is in its required state for the existing plant condition, or apply Specification 3.0.3. | |||
ACTION 21 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requi rement, be in at least HOT STANDBY within 6 hours and in at least HOT SHUTDOWN within the following 6 hours; | |||
: however, one channel may be bypassed for up to 2 hours for surveillance testing per Specification 4.3.2. 1 provided the other channel is OPERABLE. | |||
ACTION 22 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within 6 hours and in at least HOT SHUTDOWN within the following 6 hours. | ACTION 22 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within 6 hours and in at least HOT SHUTDOWN within the following 6 hours. | ||
ACTION 23 - With the number of OPERABLE channels | ACTION 23 - With the number of OPERABLE channels less than the Total Number of Channels, declare the ass cia e | ||
ACTION 24 - With'he | equipment inoperable and take the appropriate ACTION required in accordance with the specific equipment specification. | ||
ACTION 25 " During | ACTION 24 - With'he numbe~ of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours; | ||
SHEARON HARRIS - | : however, one channel may be bypassed for up to 2 hours for surveillance testing per Specification 4.3.2. 1 provided the other channel is OPERABLE. | ||
ACTION 25 " During CORE ALTERATIONS or movement of irradiated fuel within containment, comply with the ACTION statement of Specification 3.9.9. | |||
SHEARON HARRIS - UNIT 1 3/4 3-27 | |||
0 ~'}} | 0 | ||
~'}} | |||
Latest revision as of 04:49, 7 January 2025
| ML18022A728 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 10/26/1989 |
| From: | CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML18022A727 | List: |
| References | |
| NUDOCS 8911010197 | |
| Download: ML18022A728 (5) | |
Text
ENCLOSURE 4 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT AFW MANUAL INITIATION TECHNICAL SPECIFICATION PAGES 8911010197 89102b PDR ADOCK 05000400 P
PNU
Y~LR ENG'INEEREO SAFETY FEATURES ACTUATION SYSTEH INSTRUMENTATION FUNCTIONAL UNIT 6.
Hanual Initiation 1J ~fog -J~vmpvmps g) TCebiur-dhVSiiPPu~~
TOTAL NO.
CHANNELS OF CHANNELS
'TO TRIP tfpUmp g/p VIP QA p HINIHUH CHANNELS OPERABLE g/PCO P a/mm APPLICASLE HOOES X,x 3
~7 ~A ACTION b.
Automatic Actuation Logic and-Actuation Relays Steam Generator Mater Level--Low-Low 1)
Start Hotor-Oriven Pumps 3/stm.
gen.
2/stm.
gen.
in any stm.
gen.
1,2,3 2/stm.
gen.
1, 2, 3
in each stm.
gen.
21 15k 2)
Start Turbine-Drive'n Pump 3/stm.
gen.
2/stm.
in any 2 stm.
gen.
gen.
2/stm.
gen.
1, 2, 3
in each stm.
gen.
15k d.
Safety Injection Start Hotor-Oriven Pumps e.
Loss-of-Offsite Power Start Hotor-Driven Pumps and Turbine-Oriven Pump See Item l. above for all Safety Injection initiating functions and requirements.
See Item 9. below for Loss of Offsite Power initiating functions and requirements.
f.
Trip of All Hain Feedwater Pumps Start Hotor-Oriven Pumps 1/pump 1/pump 1/pump 1,
2 15"
TABLE 3.3-3 Continued ACTION STATEMENTS Continued)
ACTION L9 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
a.
The inoperable channel is placed in the tripped condition within j hour, and b.
The Minimum Channels OPERABLE requirement is met;
- however, one additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of other channels per Specification 4.3.2. 1.
ACTION 20 - With less than the Minimum Number of Channels OPERABLE, within l hour determine by observation of the associated permissive annunciator window(s) that the interlock is in its required state for the existing plant condition, or apply Specification 3.0.3.
ACTION 21 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requi rement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />;
- however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2. 1 provided the other channel is OPERABLE.
ACTION 22 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
ACTION 23 - With the number of OPERABLE channels less than the Total Number of Channels, declare the ass cia e
equipment inoperable and take the appropriate ACTION required in accordance with the specific equipment specification.
ACTION 24 - With'he numbe~ of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />;
- however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2. 1 provided the other channel is OPERABLE.
ACTION 25 " During CORE ALTERATIONS or movement of irradiated fuel within containment, comply with the ACTION statement of Specification 3.9.9.
SHEARON HARRIS - UNIT 1 3/4 3-27
0
~'