UNIT     Oconee Unit 3 DATE     02/09/76 DOCKET NO.     50-287 PREPARED BY       M. S. Tuchman OPERATING STATUS
UNIT Oconee Unit 3 DATE 02/09/76 DOCKET NO.
: 1. REPORTING PERIOD:     January 1           THROUGH       Januarv 31. 1976 GROSS HOURS IN REPORTING PERIOD:             744
50-287 PREPARED BY M. S. Tuchman OPERATING STATUS 1.
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):       871
REPORTING PERIOD:
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)                 NONE
January 1 THROUGH Januarv 31. 1976 GROSS HOURS IN REPORTING PERIOD:
: 4. REASONS FOR RESTRICTION (IF ANY)
744 2.
This Month       Year to Date         Cumulative
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):
: 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL                                       728.0             728.0           7872.3
871 3.
: 6. REACTOR RESERVE SHUTDOWN HOURS                   -                -                -
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
: 7. HOURS GENERATOR ON-LINE                       717.5             717.5           7666.2
NONE 4.
: 8. UNIT RESERVE SHUTDOWN HOURS                       -                -                -
REASONS FOR RESTRICTION (IF ANY)
: 9. GROSS THERMAL ENERGY GENERATED (MWH)1749471                   1749471           17667591
This Month Year to Date Cumulative 5.
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                       600740             600740           6045654
NUMBER OF HOURS THE REACTOR WAS CRITICAL 728.0 728.0 7872.3 6.
: 11. NET ELECTRICAL ENERGY GENERATED (MWH)                                       574925             574925           575'4'459
REACTOR RESERVE SHUTDOWN HOURS 7.
: 12. REACTOR SERVICE FACTOR                           97.9             97.9             79.6
HOURS GENERATOR ON-LINE 717.5 717.5 7666.2 8.
: 13. REACTOR AVAILABILITY FACTOR                     97.2             97.2             R7.4
UNIT RESERVE SHUTDOWN HOURS 9.
: 14. UNIT SERVICE FACTOR                             96.4             96.4             77.5
GROSS THERMAL ENERGY GENERATED (MWH)1749471 1749471 17667591 10.
: 15. UNIT AVAILABILITY FACTOR                         96.4             96.4             77.5
GROSS ELECTRICAL ENERGY GENERATED (MWH) 600740 600740 6045654 11.
: 16. UNIT CAPACITY FACTOR (Using Net                 88.7             88.7             66.8 Capability)
NET ELECTRICAL ENERGY GENERATED (MWH) 574925 574925 575'4'459 12.
: 17. UNIT CAPACITY FACTOR (Using Design Mwe)                               87.1             87.1   ,
REACTOR SERVICE FACTOR 97.9 97.9 79.6 13.
65.6             )
REACTOR AVAILABILITY FACTOR 97.2 97.2 R7.4 14.
: 18. UNIT FORCED OUTAGE RATE                           3.6               3.6           10.7 F
UNIT SERVICE FACTOR 96.4 96.4 77.5 15.
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
UNIT AVAILABILITY FACTOR 96.4 96.4 77.5 16.
: 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
UNIT CAPACITY FACTOR (Using Net 88.7 88.7 66.8 Capability) 17.
l REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICA1. X 100 Il0URS IN REPORTING PERIOD REACTOR AVAILABILITY FACTOR = HOUFS REACTOR L'AS AVAIIAfil.E TO OPERATE       00 110URS IN REPORTING PERIOD UNIT SERVICE FACTOR     = HOUPS CD:ERATOR ON 1.1NE           0 HOURS IN REPORTING PERIOD                                       l UNIT AVAILABILITY FACTOR = UOURS UNIT WAS AVATIADLE TO GE':EEATE HOURS IN REP 0kTING PERIOD UNIT CAPACITY FACTOR
UNIT CAPACITY FACTOR (Using Design Mwe) 87.1 87.1 65.6
                                            = NET ELECTRICAI. POWER CENERATg. )91218 Y 100 (N.!t Capability or Design (We-Net)J X 1100in. IN Rt:l%i.T'tu.
)
PERIOD UNIT FORCED OUTACE RATE - FORCED OUTAGE HOURS                                 X 100 HOURS GENEPo'. TOR ON 1.INE + FORCED OUTAGE HOURS
18.
UNIT FORCED OUTAGE RATE 3.6 3.6 10.7 F 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
l REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICA1. X 100 Il0URS IN REPORTING PERIOD REACTOR AVAILABILITY FACTOR = HOUFS REACTOR L'AS AVAIIAfil.E TO OPERATE 00 110URS IN REPORTING PERIOD UNIT SERVICE FACTOR
= HOUPS CD:ERATOR ON 1.1NE 0
HOURS IN REPORTING PERIOD l
UNIT AVAILABILITY FACTOR = UOURS UNIT WAS AVATIADLE TO GE':EEATE HOURS IN REP 0kTING PERIOD
= NET ELECTRICAI. POWER CENERATg. )91218 UNIT CAPACITY FACTOR Y 100 (N.!t Capability or Design (We-Net)J X 1100in. IN Rt:l%i.T'tu.
PERIOD UNIT FORCED OUTACE RATE - FORCED OUTAGE HOURS X 100 HOURS GENEPo'. TOR ON 1.INE + FORCED OUTAGE HOURS


DOCKET NO. 50-287 UNIT oconee Unit 3 DATE 02/09/76 AVERAGE DAILY UNIT POWER LEVEL MONTH         Janunrv 1976 AVERAGE DAILY POWER LEVEL                           AVERAGE DAILY POWER LEVEL DAY                   (MWe-net)                   DAY               (MWe-net)                 .
DOCKET NO. 50-287 UNIT oconee Unit 3 DATE 02/09/76 AVERAGE DAILY UNIT POWER LEVEL MONTH Janunrv 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
631                         17                     849 1
DAY (MWe-net) 1 631 17 849 2
543                         18                     849 2
543 18 849 3
59                         19                     RLo 3          _
59 19 RLo 4
571                         20                     847 4
571 20 847 5
730                         21                     RLA 5
730 21 RLA 6
22                     RL; 6                      822 827                         23                     RLL 7
822 22 RL; 7
833                         24                     Bas 8
827 23 RLL 8
841                         25                     846 9
833 24 Bas 9
844                         26                   846 10 844                         27                   R19                                                    j 11                                                              _
841 25 846 10 844 26 846 11 844 27 j
853                         28                   RLA 12 849                         29                   847 13 847                         30                     671 14 846                                               487                                                   l 15                                                  31 16                     844 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
R19 12 853 28 RLA 13 849 29 847 14 847 30 671 15 846 31 487 16 844 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 1007c line (or the restricted power level line). In such cases, the l
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 1007c line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
average daily unit power output sheet should be footnoted to explain the apparent anomaly.
l l


D CKET NO. 50-287 _
D CKET NO. 50-287 _
UNIT SHUTDOWNS         ,
UNIT SHUTDOWNS UNIT NAMii Oconee Unit 3 DATE _0_2]0_917_6 0
UNIT NAMii Oconee Unit 3 0
REPORT MONTil __ January __191.6 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.
DATE _0_2]0_917_6         - - _ _
DATE S-SCHEDULED (HOURS)
REPORT MONTil __ January __191.6 TYPE                                 METHOD OF F-FORCED   DURATION                   SHUTTING DOWN NO. DATE   S-SCHEDULED (HOURS)   REASON (1)       THE REACTOR (2)             CORRECTIVE ACTIONS / COMMENTS 20.90 1  760102          F                  B                 1             Unit was shutdown to add oil to reactor coolant pumps.
REASON (1)
1 760130         F       5.63       A                 3             Unit tripped due to loss of DC control                         ,
THE REACTOR (2)
power to the turbine controls.
CORRECTIVE ACTIONS / COMMENTS 1
(1) REASON                             (2) METilOD A EQUIPMENT l AILURE (LXPLAIN)         l-MANtfAt B- MAINT OR TEST.                     2-MANUAL C- RLI ULLING                             SCR AM D-RIGULATORY RESTRICTION               3 - AU TOM ATIC E-OPE R ATOR TR AINING AND               SCR AM LICE NSE EXAMINATION F- ADMINIST R AllVL G - OPE R ATION AL l'RROR ILXPLAIN)
760102 F
Il-OlllLR ILXPLAIN)
20.90 B
1 Unit was shutdown to add oil to reactor coolant pumps.
1 760130 F
5.63 A
3 Unit tripped due to loss of DC control power to the turbine controls.
(1) REASON (2) METilOD A EQUIPMENT l AILURE (LXPLAIN) l-MANtfAt B-MAINT OR TEST.
2-MANUAL C-RLI ULLING SCR AM D-RIGULATORY RESTRICTION 3 - AU TOM ATIC E-OPE R ATOR TR AINING AND SCR AM LICE NSE EXAMINATION F-ADMINIST R AllVL G - OPE R ATION AL l'RROR ILXPLAIN)
Il-OlllLR ILXPLAIN) l i


==SUMMARY==
==SUMMARY==
Unit was base-loaded during the month.
Unit was base-loaded during the month.
_ -____-____ - _____ ___ - - - - -}}
- - - - -}}

Latest revision as of 21:54, 1 January 2025

Monthly Operating Rept for Jan 1976
ML19317E708
Person / Time
Site: Oconee  
Issue date: 02/09/1976
From: Tuckman M
DUKE POWER CO.
To:
Shared Package
ML19317E701 List:
References
NUDOCS 7912180859
Download: ML19317E708 (3)


Text

'

UNIT Oconee Unit 3 DATE 02/09/76 DOCKET NO.

50-287 PREPARED BY M. S. Tuchman OPERATING STATUS 1.

REPORTING PERIOD:

January 1 THROUGH Januarv 31. 1976 GROSS HOURS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):

871 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)

NONE 4.

REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative 5.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 728.0 728.0 7872.3 6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENERATOR ON-LINE 717.5 717.5 7666.2 8.

UNIT RESERVE SHUTDOWN HOURS 9.

GROSS THERMAL ENERGY GENERATED (MWH)1749471 1749471 17667591 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 600740 600740 6045654 11.

NET ELECTRICAL ENERGY GENERATED (MWH) 574925 574925 575'4'459 12.

REACTOR SERVICE FACTOR 97.9 97.9 79.6 13.

REACTOR AVAILABILITY FACTOR 97.2 97.2 R7.4 14.

UNIT SERVICE FACTOR 96.4 96.4 77.5 15.

UNIT AVAILABILITY FACTOR 96.4 96.4 77.5 16.

UNIT CAPACITY FACTOR (Using Net 88.7 88.7 66.8 Capability) 17.

UNIT CAPACITY FACTOR (Using Design Mwe) 87.1 87.1 65.6

)

18.

UNIT FORCED OUTAGE RATE 3.6 3.6 10.7 F 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

l REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICA1. X 100 Il0URS IN REPORTING PERIOD REACTOR AVAILABILITY FACTOR = HOUFS REACTOR L'AS AVAIIAfil.E TO OPERATE 00 110URS IN REPORTING PERIOD UNIT SERVICE FACTOR

= HOUPS CD:ERATOR ON 1.1NE 0

HOURS IN REPORTING PERIOD l

UNIT AVAILABILITY FACTOR = UOURS UNIT WAS AVATIADLE TO GE':EEATE HOURS IN REP 0kTING PERIOD

= NET ELECTRICAI. POWER CENERATg. )91218 UNIT CAPACITY FACTOR Y 100 (N.!t Capability or Design (We-Net)J X 1100in. IN Rt:l%i.T'tu.

PERIOD UNIT FORCED OUTACE RATE - FORCED OUTAGE HOURS X 100 HOURS GENEPo'. TOR ON 1.INE + FORCED OUTAGE HOURS

DOCKET NO. 50-287 UNIT oconee Unit 3 DATE 02/09/76 AVERAGE DAILY UNIT POWER LEVEL MONTH Janunrv 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 1 631 17 849 2

543 18 849 3

59 19 RLo 4

571 20 847 5

730 21 RLA 6

822 22 RL; 7

827 23 RLL 8

833 24 Bas 9

841 25 846 10 844 26 846 11 844 27 j

R19 12 853 28 RLA 13 849 29 847 14 847 30 671 15 846 31 487 16 844 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 1007c line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

D CKET NO. 50-287 _

UNIT SHUTDOWNS UNIT NAMii Oconee Unit 3 DATE _0_2]0_917_6 0

REPORT MONTil __ January __191.6 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.

DATE S-SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS 1

760102 F

20.90 B

1 Unit was shutdown to add oil to reactor coolant pumps.

1 760130 F

5.63 A

3 Unit tripped due to loss of DC control power to the turbine controls.

(1) REASON (2) METilOD A EQUIPMENT l AILURE (LXPLAIN) l-MANtfAt B-MAINT OR TEST.

2-MANUAL C-RLI ULLING SCR AM D-RIGULATORY RESTRICTION 3 - AU TOM ATIC E-OPE R ATOR TR AINING AND SCR AM LICE NSE EXAMINATION F-ADMINIST R AllVL G - OPE R ATION AL l'RROR ILXPLAIN)

Il-OlllLR ILXPLAIN) l i

SUMMARY

Unit was base-loaded during the month.

- - - - -