ML20009H175: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:"           ~
{{#Wiki_filter:"
                                                                                                -LCS
~
  ~
-LCS lChLE CCPHQ
lChLE CCPHQ I         """
~
TIIE CINCINNATI GAS & ELECTRIC COMI'ANY-                               g:yJ" CINCIN N ATt OHIO 45201 i
I TIIE CINCINNATI GAS & ELECTRIC COMI'ANY-g:yJ" CINCIN N ATt OHIO 45201 i
L July 9, 1981 t-     m 9                 %
L July 9, 1981 t-m 9/%g U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement S-2,,*/g0 u
U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region III S-   /%g b' 2 ,,*/g0 0,3       .
0,3 b'
u Glen Ellyn, Illinois 60137 7                   Q1; Attention: James G. Keppler Regional Director                                   O'                 U d         s
Region III Glen Ellyn, Illinois 60137 7
Q1; Attention: James G. Keppler Regional Director O'
U d
Wm. H. Zimmer Nuclear Power Station - Clermont County) ml s


==Subject:==
==Subject:==
Wm. H. Zimmer Nuclear Power Station - Clermont County) ml Construction / Fuel-Load Schedule and Progress Update June, 1981.
Construction / Fuel-Load Schedule and Progress Update June, 1981.
Gentlemen:
Gentlemen:
Please be advised regarding the above-subject that this project is considered 96.4%
Please be advised regarding the above-subject that this project is considered 96.4%
Line 32: Line 35:
Attached are copies of the form showing actual dates and status of various activities.
Attached are copies of the form showing actual dates and status of various activities.
Please feel free to contact us if there are any questions or comments.
Please feel free to contact us if there are any questions or comments.
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By      [ & # _ == - --   =
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY
E. A. BORGMANN Senior Vice President EAB:bm                       '
[ & # _== - --
cc: Wm. H. Lovelace F. T. Daniels, NRC Resident Inspector.
=
By E. A. BORGMANN Senior Vice President EAB:bm cc: Wm. H. Lovelace F. T. Daniels, NRC Resident Inspector.
g '2 0 1981 Y 8108060371 810709
g '2 0 1981 Y 8108060371 810709
  -!.PDR ADOCK O$000358 CA                   PDR
-!.PDR ADOCK O$000358 CA PDR


ACTUAL DATES & STATUS DOCKET NO. 50-358     .
ACTUAL DATES & STATUS DOCKET NO. 50-358 8'.?R CONSTRUCTION MILESTONES AND ACTIVITIES 1
                                                                                                                                                                          ~
FOR STATUS DATE -
8'.?R CONSTRUCTION MILESTONES AND ACTIVITIES 1                                                                                   FOR                                           STATUS DATE -     g   1931 WM. H. ZD:MER NUCLEAR POWER STATION Activity     Activity       Est.
g 1931
I-J Numbers                 (Description & Account Numbers)                                                 Started       Ccmplete       Status 0 8005 _   flobilize                                                                                         g-71           6-71         Corpl.
~
0     8016 Tenden Tunnel & Backfill                                                                         10-72           5-73         Cc pl.
WM. H. ZD:MER NUCLEAR POWER STATION Activity Activity Est.
O     8155 Install Olesel Generator and Oil Tank Building (1220)                                             5-74           9-79         Ccrpl.
I-J Numbers (Description & Account Numbers)
              !0           8235 Install Condensate Water Storage Tank (2491-3310)                                                   6-74         10-75         Cc pl.
Started Ccmplete Status 0 8005 _
I i0          8245 Install Reactor Clean-Up Systen Demineralizers (2423-5110,5250,5410) (2427-5410)                   7-75         11-75         Ccmpl.
flobilize g-71 6-71 Corpl.
0     8265 Install RHR Pumps (2425-5110)                                                                       7-75         2-78         Co pl.
0 8016 Tenden Tunnel & Backfill 10-72 5-73 Cc pl.
i     0     8270 Install RHR Heat Excnangers (2425-5210)                                                           11-75         11-75         Compl.
O 8155 Install Olesel Generator and Oil Tank Building (1220) 5-74 9-79 Ccrpl.
0     8280 Construct Radioactive Waste Facility (1260)                                                       4-74         12-78         Comp 1.
!0 8235 Install Condensate Water Storage Tank (2491-3310) 6-74 10-75 Cc pl.
0    8315  Install Motor Control Centers (MCC's) and (808 Volt Unit Substation (4711-7470,7490)(4718-7470)   12-7s           5-78         Co pl.
Ii0 8245 Install Reactor Clean-Up Systen Demineralizers (2423-5110,5250,5410) (2427-5410) 7-75 11-75 Ccmpl.
0     8320 Install Instrumentation Air Sr tem (2652' ,                                                    .__6-76           4-79         Compl.
0 8265 Install RHR Pumps (2425-5110) 7-75 2-78 Co pl.
1 0     8330 Install Recirculating Piping (2641)                                                               11-72           5-79       Ccepl.
i 0
t 0     8341 Irstall Reactor Bjildino Closcif Cooling Water System (2673)                                       7-75         5-79         Comal.
8270 Install RHR Heat Excnangers (2425-5210) 11-75 11-75 Compl.
0     8350 Install HPCS, LPCS and ADS Systems (2647) 2648) & M S Relief Valves                               10-75           5-79         Coepl.
0 8280 Construct Radioactive Waste Facility (1260) 4-74 12-78 Comp 1.
0     8355 Install Standby Liquid Control System (c681) (2422)                                                 2-76           5-79         Corpl.
Install Motor Control Centers (MCC's) and (80 Volt Unit Substation (4711-7470,7490)(4718-7470) 12-7s 5-78 Co pl.
0     8370 Process Control & Logic Instrumentation Calibration (2470)                                         8-75         5-81 Est.     97%
0 8315 8
0     8400 Install 6.9KV Reserve Power Supply (4715)                                                         10- 75         6-77         Comp 1.
0 8320 Install Instrumentation Air Sr tem (2652'
.__6-76 4-79 Compl.
1 0
8330 Install Recirculating Piping (2641) 11-72 5-79 Ccepl.
t 0
8341 Irstall Reactor Bjildino Closcif Cooling Water System (2673) 7-75 5-79 Comal.
0 8350 Install HPCS, LPCS and ADS Systems (2647) 2648) & M S Relief Valves 10-75 5-79 Coepl.
0 8355 Install Standby Liquid Control System (c681) (2422) 2-76 5-79 Corpl.
0 8370 Process Control & Logic Instrumentation Calibration (2470) 8-75 5-81 Est.
97%
0 8400 Install 6.9KV Reserve Power Supply (4715) 10- 75 6-77 Comp 1.
s i
s i
e
e
                        =,
=,


g                 -                                              --  -
g
s
: p. --
: p . --       .
. I-J NUMBERS-(Description & Account Numbers)
gL
_ Activity'
_ Activity'     - Activity           Es t'.,     .M         Y-
- Activity Es t'.,
        . I-J NUMBERS-                  (Description & Account Numbers)                                                                    Complsted         Status
.M Y-gL s
              ~                                                                                                             StartTd                                            .
StartTd Complsted Status
(                                                                                                                                                                                       y i;
~
0-     8405     Install Conduit and Cable Trays (4750-7110, 7180. 7120)                                               2-73         5-81           Compl.
(
:k' 0'v3410               Install 6.8KV'and 4.16KV Auxiliary Switchgear (4712) 11-75       7-79           Comp 1.~
y i;
i         OL 8415           Install Cables (Instrumentation, Control and Power) (XXXX-7310 thru 7370)(XXXX-7210 thru 7270;         2-76       6-81 Est.       9S:
0-8405 Install Conduit and Cable Trays (4750-7110, 7180. 7120) 2-73 5-81 Compl.
:D ~'8420         Perform Copstruction Testing on Cables (Megger, Continuity, Etc.)                 CG&E                 2-76       7-81 E;t.       95%
:k' 0'v3410 Install 6.8KV'and 4.16KV Auxiliary Switchgear (4712) 11-75 7-79 Comp 1.~
0-     8425     Install Batteries and Chargers (4722-7550, 7560)                                                       4-76       2-77'         -Comp 1.
i OL 8415 Install Cables (Instrumentation, Control and Power) (XXXX-7310 thru 7370)(XXXX-7210 thru 7270; 2-76 6-81 Est.
O     G435     Install Processilm truments (2650-0000) (2470 0000)                                                     6-76       10-81 Est.       97%
9S:
  ;      0- "8520-       HPCS and LPCS_ Actuation and Partial Flow Test                                   CG8E                 5-81       8-81 Est.       50%       _
:D ~'8420 Perform Copstruction Testing on Cables (Megger, Continuity, Etc.)
0     5525     RCIC Actuation and Partial Flow Test                                               '"                  5-81Est     8-81 Est.         0%
CG&E 2-76 7-81 E;t.
      -0       8530       RHR System Actuation and Flow Test                                                 "-               25-81Est      8-81 Est         0%-s.
95%
0     8535       Stand-by !.1 quid Control System Actuation Flow Test                               "                10-79        9-81 Est.        40%
0-8425 Install Batteries and Chargers (4722-7550, 7560) 4-76 2-77'
8540    ' Recirculatio$ Pump Cold Flow and Vibration Test                                     =                81         8-81 Est.       -40%.
-Comp 1.
.{O'                                                                                                           '
O G435 Install Processilm truments (2650-0000) (2470 0000) 6-76 10-81 Est.
  !      0     8545       Integrated Diesei Generator Synchronizing Test                                     =                  5-81Est     9-81 Est.       29%                           I
97%
        -0     8550      Service Water System and Closed Water Systems Test                                  m' -             10-78.       81 Est.       46%                 ,
0- "8520-HPCS and LPCS_ Actuation and Partial Flow Test CG8E 5-81 8-81 Est.
f 0    8555      Battery Capacity Test                                                               "                11-78       .10-79           Compl.
50%
0 5525 RCIC Actuation and Partial Flow Test 5-81Est 8-81 Est.
0%
25-81Est 8-81 Est 0%-s.
-0 8530 RHR System Actuation and Flow Test 10-79 9-81 Est.
40%
0 8535 Stand-by !.1 quid Control System Actuation Flow Test 8540
' Recirculatio$ Pump Cold Flow and Vibration Test 81 8-81 Est.
-40%.
.{O'
=
0 8545 Integrated Diesei Generator Synchronizing Test 5-81Est 9-81 Est.
29%
I
=
f
-0 m' -
10-78. 81 Est.
46%
8550 Service Water System and Closed Water Systems Test 11-78
.10-79 Compl.
{.
{.
{     0     8570       DC Inverter / Diverter System Test                                                 "                10-80         8-81 Est.       81%
0 8555 Battery Capacity Test
0     8575       Control Rod Drive Hydraulic System Test                                             "                  4-79;      4 81           Compl.                ..
{
i- 0         8580   _ Feedwater and Condensate System Test (2 Elemmts)                                     "                10-79         8-81 Est.       75%
0 8570 DC Inverter / Diverter System Test 10-80 8-81 Est.
O 8585           Instrument Air System Tasj                                                         "
81%
7-79        2-81            Comp 1.
4-79; 4 81 Compl.
l      C     8590       Fire Protection System Test                                                         "
0 8575 Control Rod Drive Hydraulic System Test 10-79 8-81 Est.
6-79       8 .81 Est.       75%
75%
0 8595         ' Flammability Control System (HG)                                                     "
i- 0 8580
6-81Est   13 81 Est.         0% '
_ Feedwater and Condensate System Test (2 Elemmts) 7-79 2-81 Comp 1.
O 8585 Instrument Air System Tasj l
C 8590 Fire Protection System Test 6-79 8.81 Est.
75%
0 8595
' Flammability Control System (HG) 6-81Est 13 81 Est.
0% '
i M
i M
                                                                                                                        *                              ' ( j "1
' (
j "1
N
N
            .        /                 -
/


                                                                                                                                                ' ' ,i : 3     g
' ',i : 3 g
                                                                                                                                                              .(
I I-J Number.
I Activf2y        Activity        Est.
(Description & Account Numbers)
I-J Number.                 (Description & Account Numbers)                                                             Completed       Status
Activf2y Activity Est.
* Started cgs,E                                   9-50         10-31 Est. 73!
. (
O   8510    Reactor Building Vent System Test 4-77          7-78      Cenpl.
Started Completed Status O
O    8730   Speical Nuclear Material License Issued                 CG&E 9-75          11-77        Comp 1.
8510 Reactor Building Vent System Test cgs,E 9-50 10-31 Est.
0   8735   Applicant Sumbits Emergency Plan                         CG&E Applicant Submits Security Plan                          CG&E 9-75           5-77       Comp 1.__
73!
0    8740 9-75         12-77       Compl.
O 8730 Speical Nuclear Material License Issued CG&E 4-77 7-78 Cenpl.
0   8745   Applicant Submits Quality Assurance Program for Operations       rG&E _
0 8735 Applicant Sumbits Emergency Plan CG&E 9-75 11-77 Comp 1.
I,                                                                                                               8-81 Est. 10-81 Est.     Ot 0   8750   Applicant's Review and Approval of Test Results         CG&E 4-77         10-01 Est. 25:
9-75 5-77 Comp 1.__
0   8755   Applicant's Preparation of Power Ascension Test Progra;n         CG&E                                                               ,
0 8740 Applicant Submits Security Plan CG&E 0
Install Con *iol Room Consoles and Equipment (2475)(2471) 8-75          10-31 Est. 90 %
8745 Applicant Submits Quality Assurance Program for Operations rG&E 9-75 12-77 Compl.
l  0    8805 I
I, 8-81 Est.
Accumulation of Envir ,nmental ' Data (One (1) or Two (2) Years)                                                           Corpl.
10-81 Est.
)  0  6810 12-75           5-C0       Compl.
Ot 0
0   8820   Install and CSlibrate Nuclear Instrumentation (2474) 8-75     I   8-78       Comp 1.
8750 Applicant's Review and Approval of Test Results CG&E 4-77 10-01 Est.
0   8900   Install Primary Switchyard                               CG&E 4-74           6-81       Comp 1.
25:
0   8905   Install Of f-Gas Systems (2685) (2462)
0 8755 Applicant's Preparation of Power Ascension Test Progra;n CG&E 8-75 10-31 Est.
Install Condensate Suction Header to RCIC Systam (2642) (2634)                                 5-75           2-77     Corpl.
90 %
0  8240 5-71           6-71     Comp 8005 8015     Prepare Site (1100) 6-73          10-73      Compi 8015 8050     Install Reactor St.ilding Foundation (1211)
l 0
Install Drywell and Suppression Chamber and Reactar Pressure Vessel Pedestal (2213) (2411)   10-73            7-81 Est. 90%
8805 Install Con *iol Room Consoles and Equipment (2475)(2471)
8050 8200 10-73          9-79      Comp 1.
I
8055 6325     Construct Reactor Bulding and Integral Structures (1210) 10-73           6-78     Ccepl.
)
8060 8145     Construct Tt.rbine/ Generator Foundation (3514) 8-76           7-78     Comp 1.
0 6810 Accumulation of Envir,nmental ' Data (One (1) or Two (2) Years)
8035 8915     Install Off-Gas Stack (2466-3610) 9-73           5-70     Comp 1.
Corpl.
8075 8920     Install Secondary Heat Sinks (Cooling Towers)(3571) 12-73         11-74     Compl, 8115-8120       Install Contair. ment Penetrations (Sleeves in Liner) (2213-3770) e
12-75 5-C0 Compl.
              /
0 8820 Install and CSlibrate Nuclear Instrumentation (2474) 8-75 I
8-78 Comp 1.
0 8900 Install Primary Switchyard CG&E 4-74 6-81 Comp 1.
0 8905 Install Of f-Gas Systems (2685) (2462) 0 8240 Install Condensate Suction Header to RCIC Systam (2642) (2634) 5-75 2-77 Corpl.
5-71 6-71 Comp 8005 8015 Prepare Site (1100) 8015 8050 Install Reactor St.ilding Foundation (1211) 6-73 10-73 Compi 10-73 7-81 Est.
90%
8050 8200 Install Drywell and Suppression Chamber and Reactar Pressure Vessel Pedestal (2213) (2411) 8055 6325 Construct Reactor Bulding and Integral Structures (1210) 10-73 9-79 Comp 1.
10-73 6-78 Ccepl.
8060 8145 Construct Tt.rbine/ Generator Foundation (3514) 8-76 7-78 Comp 1.
8035 8915 Install Off-Gas Stack (2466-3610) 9-73 5-70 Comp 1.
8075 8920 Install Secondary Heat Sinks (Cooling Towers)(3571) 12-73 11-74
: Compl, 8115-8120 Install Contair. ment Penetrations (Sleeves in Liner) (2213-3770) e
/


                                                                                                                                                        .,. w Activiti   Activity.         Ests .-   '      5C
.,. w 5C Activiti Activity.
*I-J Numbers                               (Description & Account Numbers).                                     Startel   Complett         Status _       ,
Ests.-
                                                                                                                                                                  ?
*I-J Numbers (Description & Account Numbers).
! G1:40 6275     Inst'all Service Water Intake S'tructures (1280)                                                 8-74       78         Co pl.           -
Startel Complett Status _
' 3145 8910' ' ~ Install Condenser, Turbine Generator Feedwater and Piping)(Exclusive Piping (3531) (3511) of Condensate and              8-75   '
?
12-80         Comp 1.
! G1:40 6275 Inst'all Service Water Intake S'tructures (1280) 8-74 78 Co pl.
5-79        Compl
' 3145 8910' ' ~ Install Condenser, Turbine Generator and Piping)(Exclusive of Condensate and Feedwater Piping (3531) (3511) 8-75 12-80 Comp 1.
                  ~
--8150 I 8285' Install Feedwater and Condensate Water System (2623) (2634) 1-75 5-79 Compl
--8150 I 8285' Install Feedwater and Condensate Water System (2623) (2634)                                       1-75 5-76        8-78        Compl.
~
E55 8445     It..Lill Diesel Generator (2487-5160) 8165 8430   Install Drywell Air' Cooler System (2624)                                                       7-76         9-81 Est.       92%
E55 8445 It..Lill Diesel Generator (2487-5160) 5-76 8-78 Compl.
Install Containment Biological Shielding (2213-3750,2740,2720,2730)                               2-75     11-77         Comp 1
8165 8430 Install Drywell Air' Cooler System (2624) 7-76 9-81 Est.
: 8175 8180 11-75       76.       Comp 1.
92%
8200' 8300' Install Reactor Pressure Vessy ('On Site)-(2411-5310) 9-75     12-78         Compl..
: 8175 8180 Install Containment Biological Shielding (2213-3750,2740,2720,2730) 2-75 11-77 Comp 1 11-75 76.
8205 8230' Install Recirculating Pump (2412-5110)
Comp 1.
  -8210J 8325- Instsil Main Steam Lines to MSIV                                                                    9-75       :-77       ,C rpl.
8200' 8300' Install Reactor Pressure Vessy ('On Site)-(2411-5310) 9-75 12-78 Compl..
7-75        4-79        Compl, 8215 8465' Install Control Rod Drive Systeta (2414)(2684) 10-75       4-79.        Compl.
8205 8230' Install Recirculating Pump (2412-5110) 9-75
C220 8440   Install Reactor Internals (2411-5610) 2-76       10-78         Compl.
:-77
  .8245 8335     Install Reactor Clean-Up System Pipe, Fittings A Valves (2643-6540,5640)
,C rpl.
Install RHR Pipe, Fittings and Valves (2646-6510)                                                 10-75       10-78         Compl.
-8210J 8325-Instsil Main Steam Lines to MSIV 8215 8465' Install Control Rod Drive Systeta (2414)(2684) 7-75 4-79
,'3270 C360 Install Coolfi.9 Water Pipes and Controls (2621) (WS SYS)                                         11-72        1-8I        Compi.
: Compl, C220 8440 Install Reactor Internals (2411-5610) 10-75 4-79.
8275 '8470 11-75       3-81         Compl.
Compl.
8280 8605   Install Radioactive Waste System and Padiation Monitoring System (2682)(2686)(2683)(2387)(2685) 8300' 8450   Install Piping Conne'cted to Primary System Components (2640)                                     10-75       5-79       Comp 1.
2-76 10-78 Compl.
Install Pipe Hangers and Restraints All Systems (XXXX-6550,6450,6650,6750,2213.3910)               3-75      10-81 Est.        92%
.8245 8335 Install Reactor Clean-Up System Pipe, Fittings A Valves (2643-6540,5640)
78305 8475 Install Main Steam Pipe to Turbine Stop Valve (2631) LB Pipe                                       4-75       5-1-77       Comp 1.
,'3270 C360 Install RHR Pipe, Fittings and Valves (2646-6510) 10-75 10-78 Compl.
8310 8315 12-76       6-81       -Compi.
11-72 1-8I Compi.
8450 8500   Initial Flush of Systems (XXXX,6890) 5-78       7-78           Comp 1.
8275 '8470 Install Coolfi.9 Water Pipes and Controls (2621) (WS SYS) 11-75 3-81 Compl.
8500 8515   Perform Reactor Cold Hydrostatic Test                                                     ,
8280 8605 Install Radioactive Waste System and Padiation Monitoring System (2682)(2686)(2683)(2387)(2685) 8300' 8450 Install Piping Conne'cted to Primary System Components (2640) 10-75 5-79 Comp 1.
3-78       7 81 Est.       95%
3-75 10-81 Est.
8515 8600 Complete Base Line Inspections                       CG&E I
92%
u
78305 8475 Install Pipe Hangers and Restraints All Systems (XXXX-6550,6450,6650,6750,2213.3910) 8310 8315 Install Main Steam Pipe to Turbine Stop Valve (2631) LB Pipe 4-75 5-1-77 Comp 1.
;I _                                                                                                                                         ..
12-76 6-81
-Compi.
8450 8500 Initial Flush of Systems (XXXX,6890) 5-78 7-78 Comp 1.
8500 8515 Perform Reactor Cold Hydrostatic Test 3-78 7 81 Est.
95%
8515 8600 Complete Base Line Inspections CG&E Iu;I _
l.
l.
i 1
i 1
          ..      /                 -
/


56e'*0 Activity. Activity                                             Est.*                 F I-J Nusbe'rs_~
56e 0 Activity.
(Description,5 Account Numbers)             -Started    'Co.plet9                                            Status              ,{
Activity Est.*
CG&E   7-31 Est. 7 81'Est.                               ' 0% ~
F
      . 8'600 ~P700           -
,{
Perform Leak Rate Test Test Radioactive System and Radiation Monitoring System
-Started
                                                                                                              "    4-81 Est. 7-81 Est.                                       0%
'Co.plet9 Status I-J Nusbe'rs_~
8605''8615
(Description,5 Account Numbers)
                                                                                                              "    9-81 Est. 9-81 Est.                                         0%
Perform Leak Rate Test CG&E 7-31 Est.
8700 880C'               Integrated System Test
7 81'Est.
                                                                                                              "    8-/9         9-79                                 Compl.
' 0% ~
8740 8815               .Special Nuclear Material Delivered
. 8'600 ~P700 4-81 Est.
                                                                                                              "    10-81 Est. 11-81 Est.                                 -0%
7-81 Est.
8800 8950                 Applicant Submits Test Results-
0%
                                                                                                              "  '11-81 Est.'   3-82 Est.                                         0%
8605''8615 Test Radioactive System and Radiation Monitoring System 9-81 Est.
      ' 8950' 8990               Power Ascension I
9-81 Est.
0%
8700 880C' Integrated System Test 8-/9 9-79 Compl.
8740 8815
.Special Nuclear Material Delivered 10-81 Est.
11-81 Est.
-0%
8800 8950 Applicant Submits Test Results-
'11-81 Est.'
3-82 Est.
0%
' 8950' 8990 Power Ascension I
t t
t t
4 f
4 f
I '.
I '.
I I
I I
s..  -n                          ., .
l -~
l -~
f 4                           *
s..
            ,              ./
-n f
_ _ _ _ _ _ - - _ _ _ _ - - _ _ _ _ _ _ _ - - _ _ _ _}}
4
./
- -}}

Latest revision as of 07:49, 21 December 2024

Advises That Const/Fuel Load Schedule & Progress Update for June 1981 Is 96.4% Complete.Tables Showing Actual Dates & Status of Various Activities Encl
ML20009H175
Person / Time
Site: Zimmer
Issue date: 07/09/1981
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8108060371
Download: ML20009H175 (6)


Text

"

~

-LCS lChLE CCPHQ

~

I TIIE CINCINNATI GAS & ELECTRIC COMI'ANY-g:yJ" CINCIN N ATt OHIO 45201 i

L July 9, 1981 t-m 9/%g U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement S-2,,*/g0 u

0,3 b'

Region III Glen Ellyn, Illinois 60137 7

Q1; Attention: James G. Keppler Regional Director O'

U d

Wm. H. Zimmer Nuclear Power Station - Clermont County) ml s

Subject:

Construction / Fuel-Load Schedule and Progress Update June, 1981.

Gentlemen:

Please be advised regarding the above-subject that this project is considered 96.4%

complete as of June 30, 1981.

Attached are copies of the form showing actual dates and status of various activities.

Please feel free to contact us if there are any questions or comments.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY

[ & # _== - --

=

By E. A. BORGMANN Senior Vice President EAB:bm cc: Wm. H. Lovelace F. T. Daniels, NRC Resident Inspector.

g '2 0 1981 Y 8108060371 810709

-!.PDR ADOCK O$000358 CA PDR

ACTUAL DATES & STATUS DOCKET NO. 50-358 8'.?R CONSTRUCTION MILESTONES AND ACTIVITIES 1

FOR STATUS DATE -

g 1931

~

WM. H. ZD:MER NUCLEAR POWER STATION Activity Activity Est.

I-J Numbers (Description & Account Numbers)

Started Ccmplete Status 0 8005 _

flobilize g-71 6-71 Corpl.

0 8016 Tenden Tunnel & Backfill 10-72 5-73 Cc pl.

O 8155 Install Olesel Generator and Oil Tank Building (1220) 5-74 9-79 Ccrpl.

!0 8235 Install Condensate Water Storage Tank (2491-3310) 6-74 10-75 Cc pl.

Ii0 8245 Install Reactor Clean-Up Systen Demineralizers (2423-5110,5250,5410) (2427-5410) 7-75 11-75 Ccmpl.

0 8265 Install RHR Pumps (2425-5110) 7-75 2-78 Co pl.

i 0

8270 Install RHR Heat Excnangers (2425-5210) 11-75 11-75 Compl.

0 8280 Construct Radioactive Waste Facility (1260) 4-74 12-78 Comp 1.

Install Motor Control Centers (MCC's) and (80 Volt Unit Substation (4711-7470,7490)(4718-7470) 12-7s 5-78 Co pl.

0 8315 8

0 8320 Install Instrumentation Air Sr tem (2652'

.__6-76 4-79 Compl.

1 0

8330 Install Recirculating Piping (2641) 11-72 5-79 Ccepl.

t 0

8341 Irstall Reactor Bjildino Closcif Cooling Water System (2673) 7-75 5-79 Comal.

0 8350 Install HPCS, LPCS and ADS Systems (2647) 2648) & M S Relief Valves 10-75 5-79 Coepl.

0 8355 Install Standby Liquid Control System (c681) (2422) 2-76 5-79 Corpl.

0 8370 Process Control & Logic Instrumentation Calibration (2470) 8-75 5-81 Est.

97%

0 8400 Install 6.9KV Reserve Power Supply (4715) 10- 75 6-77 Comp 1.

s i

e

=,

g

p. --

. I-J NUMBERS-(Description & Account Numbers)

_ Activity'

- Activity Es t'.,

.M Y-gL s

StartTd Complsted Status

~

(

y i;

0-8405 Install Conduit and Cable Trays (4750-7110, 7180. 7120) 2-73 5-81 Compl.

k' 0'v3410 Install 6.8KV'and 4.16KV Auxiliary Switchgear (4712) 11-75 7-79 Comp 1.~

i OL 8415 Install Cables (Instrumentation, Control and Power) (XXXX-7310 thru 7370)(XXXX-7210 thru 7270; 2-76 6-81 Est.

9S:

D ~'8420 Perform Copstruction Testing on Cables (Megger, Continuity, Etc.)

CG&E 2-76 7-81 E;t.

95%

0-8425 Install Batteries and Chargers (4722-7550, 7560) 4-76 2-77'

-Comp 1.

O G435 Install Processilm truments (2650-0000) (2470 0000) 6-76 10-81 Est.

97%

0- "8520-HPCS and LPCS_ Actuation and Partial Flow Test CG8E 5-81 8-81 Est.

50%

0 5525 RCIC Actuation and Partial Flow Test 5-81Est 8-81 Est.

0%

25-81Est 8-81 Est 0%-s.

-0 8530 RHR System Actuation and Flow Test 10-79 9-81 Est.

40%

0 8535 Stand-by !.1 quid Control System Actuation Flow Test 8540

' Recirculatio$ Pump Cold Flow and Vibration Test 81 8-81 Est.

-40%.

.{O'

=

0 8545 Integrated Diesei Generator Synchronizing Test 5-81Est 9-81 Est.

29%

I

=

f

-0 m' -

10-78. 81 Est.

46%

8550 Service Water System and Closed Water Systems Test 11-78

.10-79 Compl.

{.

0 8555 Battery Capacity Test

{

0 8570 DC Inverter / Diverter System Test 10-80 8-81 Est.

81%

4-79; 4 81 Compl.

0 8575 Control Rod Drive Hydraulic System Test 10-79 8-81 Est.

75%

i- 0 8580

_ Feedwater and Condensate System Test (2 Elemmts) 7-79 2-81 Comp 1.

O 8585 Instrument Air System Tasj l

C 8590 Fire Protection System Test 6-79 8.81 Est.

75%

0 8595

' Flammability Control System (HG) 6-81Est 13 81 Est.

0% '

i M

' (

j "1

N

/

' ',i : 3 g

I I-J Number.

(Description & Account Numbers)

Activf2y Activity Est.

. (

Started Completed Status O

8510 Reactor Building Vent System Test cgs,E 9-50 10-31 Est.

73!

O 8730 Speical Nuclear Material License Issued CG&E 4-77 7-78 Cenpl.

0 8735 Applicant Sumbits Emergency Plan CG&E 9-75 11-77 Comp 1.

9-75 5-77 Comp 1.__

0 8740 Applicant Submits Security Plan CG&E 0

8745 Applicant Submits Quality Assurance Program for Operations rG&E 9-75 12-77 Compl.

I, 8-81 Est.

10-81 Est.

Ot 0

8750 Applicant's Review and Approval of Test Results CG&E 4-77 10-01 Est.

25:

0 8755 Applicant's Preparation of Power Ascension Test Progra;n CG&E 8-75 10-31 Est.

90 %

l 0

8805 Install Con *iol Room Consoles and Equipment (2475)(2471)

I

)

0 6810 Accumulation of Envir,nmental ' Data (One (1) or Two (2) Years)

Corpl.

12-75 5-C0 Compl.

0 8820 Install and CSlibrate Nuclear Instrumentation (2474) 8-75 I

8-78 Comp 1.

0 8900 Install Primary Switchyard CG&E 4-74 6-81 Comp 1.

0 8905 Install Of f-Gas Systems (2685) (2462) 0 8240 Install Condensate Suction Header to RCIC Systam (2642) (2634) 5-75 2-77 Corpl.

5-71 6-71 Comp 8005 8015 Prepare Site (1100) 8015 8050 Install Reactor St.ilding Foundation (1211) 6-73 10-73 Compi 10-73 7-81 Est.

90%

8050 8200 Install Drywell and Suppression Chamber and Reactar Pressure Vessel Pedestal (2213) (2411) 8055 6325 Construct Reactor Bulding and Integral Structures (1210) 10-73 9-79 Comp 1.

10-73 6-78 Ccepl.

8060 8145 Construct Tt.rbine/ Generator Foundation (3514) 8-76 7-78 Comp 1.

8035 8915 Install Off-Gas Stack (2466-3610) 9-73 5-70 Comp 1.

8075 8920 Install Secondary Heat Sinks (Cooling Towers)(3571) 12-73 11-74

Compl, 8115-8120 Install Contair. ment Penetrations (Sleeves in Liner) (2213-3770) e

/

.,. w 5C Activiti Activity.

Ests.-

  • I-J Numbers (Description & Account Numbers).

Startel Complett Status _

?

! G1:40 6275 Inst'all Service Water Intake S'tructures (1280) 8-74 78 Co pl.

' 3145 8910' ' ~ Install Condenser, Turbine Generator and Piping)(Exclusive of Condensate and Feedwater Piping (3531) (3511) 8-75 12-80 Comp 1.

--8150 I 8285' Install Feedwater and Condensate Water System (2623) (2634) 1-75 5-79 Compl

~

E55 8445 It..Lill Diesel Generator (2487-5160) 5-76 8-78 Compl.

8165 8430 Install Drywell Air' Cooler System (2624) 7-76 9-81 Est.

92%

8175 8180 Install Containment Biological Shielding (2213-3750,2740,2720,2730) 2-75 11-77 Comp 1 11-75 76.

Comp 1.

8200' 8300' Install Reactor Pressure Vessy ('On Site)-(2411-5310) 9-75 12-78 Compl..

8205 8230' Install Recirculating Pump (2412-5110) 9-75

-77

,C rpl.

-8210J 8325-Instsil Main Steam Lines to MSIV 8215 8465' Install Control Rod Drive Systeta (2414)(2684) 7-75 4-79

Compl, C220 8440 Install Reactor Internals (2411-5610) 10-75 4-79.

Compl.

2-76 10-78 Compl.

.8245 8335 Install Reactor Clean-Up System Pipe, Fittings A Valves (2643-6540,5640)

,'3270 C360 Install RHR Pipe, Fittings and Valves (2646-6510) 10-75 10-78 Compl.

11-72 1-8I Compi.

8275 '8470 Install Coolfi.9 Water Pipes and Controls (2621) (WS SYS) 11-75 3-81 Compl.

8280 8605 Install Radioactive Waste System and Padiation Monitoring System (2682)(2686)(2683)(2387)(2685) 8300' 8450 Install Piping Conne'cted to Primary System Components (2640) 10-75 5-79 Comp 1.

3-75 10-81 Est.

92%

78305 8475 Install Pipe Hangers and Restraints All Systems (XXXX-6550,6450,6650,6750,2213.3910) 8310 8315 Install Main Steam Pipe to Turbine Stop Valve (2631) LB Pipe 4-75 5-1-77 Comp 1.

12-76 6-81

-Compi.

8450 8500 Initial Flush of Systems (XXXX,6890) 5-78 7-78 Comp 1.

8500 8515 Perform Reactor Cold Hydrostatic Test 3-78 7 81 Est.

95%

8515 8600 Complete Base Line Inspections CG&E Iu;I _

l.

i 1

/

56e 0 Activity.

Activity Est.*

F

,{

-Started

'Co.plet9 Status I-J Nusbe'rs_~

(Description,5 Account Numbers)

Perform Leak Rate Test CG&E 7-31 Est.

7 81'Est.

' 0% ~

. 8'600 ~P700 4-81 Est.

7-81 Est.

0%

86058615 Test Radioactive System and Radiation Monitoring System 9-81 Est.

9-81 Est.

0%

8700 880C' Integrated System Test 8-/9 9-79 Compl.

8740 8815

.Special Nuclear Material Delivered 10-81 Est.

11-81 Est.

-0%

8800 8950 Applicant Submits Test Results-

'11-81 Est.'

3-82 Est.

0%

' 8950' 8990 Power Ascension I

t t

4 f

I '.

I I

l -~

s..

-n f

4

./

- -