Advises That Const/Fuel Load Schedule & Progress Update for June 1981 Is 96.4% Complete.Tables Showing Actual Dates & Status of Various Activities Encl
ML20009H175
Person / Time
Site: Zimmer
Issue date: 07/09/1981
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8108060371
Download: ML20009H175 (6)


Text

" ~

-LCS

~

lChLE CCPHQ I """

TIIE CINCINNATI GAS & ELECTRIC COMI'ANY- g:yJ" CINCIN N ATt OHIO 45201 i

L July 9, 1981 t- m 9  %

U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region III S- /%g b' 2 ,,*/g0 0,3 .

u Glen Ellyn, Illinois 60137 7 Q1; Attention: James G. Keppler Regional Director O' U d s

Subject:

Wm. H. Zimmer Nuclear Power Station - Clermont County) ml Construction / Fuel-Load Schedule and Progress Update June, 1981.

Gentlemen:

Please be advised regarding the above-subject that this project is considered 96.4%

complete as of June 30, 1981.

Attached are copies of the form showing actual dates and status of various activities.

Please feel free to contact us if there are any questions or comments.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By [ & # _ == - -- =

E. A. BORGMANN Senior Vice President EAB:bm '

cc: Wm. H. Lovelace F. T. Daniels, NRC Resident Inspector.

g '2 0 1981 Y 8108060371 810709

-!.PDR ADOCK O$000358 CA PDR

ACTUAL DATES & STATUS DOCKET NO. 50-358 .

~

8'.?R CONSTRUCTION MILESTONES AND ACTIVITIES 1 FOR STATUS DATE - g 1931 WM. H. ZD:MER NUCLEAR POWER STATION Activity Activity Est.

I-J Numbers (Description & Account Numbers) Started Ccmplete Status 0 8005 _ flobilize g-71 6-71 Corpl.

0 8016 Tenden Tunnel & Backfill 10-72 5-73 Cc pl.

O 8155 Install Olesel Generator and Oil Tank Building (1220) 5-74 9-79 Ccrpl.

!0 8235 Install Condensate Water Storage Tank (2491-3310) 6-74 10-75 Cc pl.

I i0 8245 Install Reactor Clean-Up Systen Demineralizers (2423-5110,5250,5410) (2427-5410) 7-75 11-75 Ccmpl.

0 8265 Install RHR Pumps (2425-5110) 7-75 2-78 Co pl.

i 0 8270 Install RHR Heat Excnangers (2425-5210) 11-75 11-75 Compl.

0 8280 Construct Radioactive Waste Facility (1260) 4-74 12-78 Comp 1.

0 8315 Install Motor Control Centers (MCC's) and (808 Volt Unit Substation (4711-7470,7490)(4718-7470) 12-7s 5-78 Co pl.

0 8320 Install Instrumentation Air Sr tem (2652' , .__6-76 4-79 Compl.

1 0 8330 Install Recirculating Piping (2641) 11-72 5-79 Ccepl.

t 0 8341 Irstall Reactor Bjildino Closcif Cooling Water System (2673) 7-75 5-79 Comal.

0 8350 Install HPCS, LPCS and ADS Systems (2647) 2648) & M S Relief Valves 10-75 5-79 Coepl.

0 8355 Install Standby Liquid Control System (c681) (2422) 2-76 5-79 Corpl.

0 8370 Process Control & Logic Instrumentation Calibration (2470) 8-75 5-81 Est. 97%

0 8400 Install 6.9KV Reserve Power Supply (4715) 10- 75 6-77 Comp 1.

s i

e

=,

g - -- -

s

p . -- .

gL

_ Activity' - Activity Es t'., .M Y-

. I-J NUMBERS- (Description & Account Numbers) Complsted Status

~ StartTd .

( y i;

0- 8405 Install Conduit and Cable Trays (4750-7110, 7180. 7120) 2-73 5-81 Compl.

k' 0'v3410 Install 6.8KV'and 4.16KV Auxiliary Switchgear (4712) 11-75 7-79 Comp 1.~

i OL 8415 Install Cables (Instrumentation, Control and Power) (XXXX-7310 thru 7370)(XXXX-7210 thru 7270; 2-76 6-81 Est. 9S:

D ~'8420 Perform Copstruction Testing on Cables (Megger, Continuity, Etc.) CG&E 2-76 7-81 E;t. 95%

0- 8425 Install Batteries and Chargers (4722-7550, 7560) 4-76 2-77' -Comp 1.

O G435 Install Processilm truments (2650-0000) (2470 0000) 6-76 10-81 Est. 97%

0- "8520- HPCS and LPCS_ Actuation and Partial Flow Test CG8E 5-81 8-81 Est. 50% _

0 5525 RCIC Actuation and Partial Flow Test '" 5-81Est 8-81 Est. 0%

-0 8530 RHR System Actuation and Flow Test "- 25-81Est 8-81 Est 0%-s.

0 8535 Stand-by !.1 quid Control System Actuation Flow Test " 10-79 9-81 Est. 40%

8540 ' Recirculatio$ Pump Cold Flow and Vibration Test = 81 8-81 Est. -40%.

.{O' '

! 0 8545 Integrated Diesei Generator Synchronizing Test = 5-81Est 9-81 Est. 29% I

-0 8550 Service Water System and Closed Water Systems Test m' - 10-78. 81 Est. 46% ,

f 0 8555 Battery Capacity Test " 11-78 .10-79 Compl.

{.

{ 0 8570 DC Inverter / Diverter System Test " 10-80 8-81 Est. 81%

0 8575 Control Rod Drive Hydraulic System Test " 4-79; 4 81 Compl. ..

i- 0 8580 _ Feedwater and Condensate System Test (2 Elemmts) " 10-79 8-81 Est. 75%

O 8585 Instrument Air System Tasj "

7-79 2-81 Comp 1.

l C 8590 Fire Protection System Test "

6-79 8 .81 Est. 75%

0 8595 ' Flammability Control System (HG) "

6-81Est 13 81 Est. 0% '

i M

  • ' ( j "1

N

. / -

' ' ,i : 3 g

.(

I Activf2y Activity Est.

I-J Number. (Description & Account Numbers) Completed Status

  • Started cgs,E 9-50 10-31 Est. 73!

O 8510 Reactor Building Vent System Test 4-77 7-78 Cenpl.

O 8730 Speical Nuclear Material License Issued CG&E 9-75 11-77 Comp 1.

0 8735 Applicant Sumbits Emergency Plan CG&E Applicant Submits Security Plan CG&E 9-75 5-77 Comp 1.__

0 8740 9-75 12-77 Compl.

! 0 8745 Applicant Submits Quality Assurance Program for Operations rG&E _

I, 8-81 Est. 10-81 Est. Ot 0 8750 Applicant's Review and Approval of Test Results CG&E 4-77 10-01 Est. 25:

0 8755 Applicant's Preparation of Power Ascension Test Progra;n CG&E ,

Install Con *iol Room Consoles and Equipment (2475)(2471) 8-75 10-31 Est. 90 %

l 0 8805 I

Accumulation of Envir ,nmental ' Data (One (1) or Two (2) Years) Corpl.

) 0 6810 12-75 5-C0 Compl.

0 8820 Install and CSlibrate Nuclear Instrumentation (2474) 8-75 I 8-78 Comp 1.

0 8900 Install Primary Switchyard CG&E 4-74 6-81 Comp 1.

0 8905 Install Of f-Gas Systems (2685) (2462)

Install Condensate Suction Header to RCIC Systam (2642) (2634) 5-75 2-77 Corpl.

0 8240 5-71 6-71 Comp 8005 8015 Prepare Site (1100) 6-73 10-73 Compi 8015 8050 Install Reactor St.ilding Foundation (1211)

Install Drywell and Suppression Chamber and Reactar Pressure Vessel Pedestal (2213) (2411) 10-73 7-81 Est. 90%

8050 8200 10-73 9-79 Comp 1.

8055 6325 Construct Reactor Bulding and Integral Structures (1210) 10-73 6-78 Ccepl.

8060 8145 Construct Tt.rbine/ Generator Foundation (3514) 8-76 7-78 Comp 1.

8035 8915 Install Off-Gas Stack (2466-3610) 9-73 5-70 Comp 1.

8075 8920 Install Secondary Heat Sinks (Cooling Towers)(3571) 12-73 11-74 Compl, 8115-8120 Install Contair. ment Penetrations (Sleeves in Liner) (2213-3770) e

/

.,. w Activiti Activity. Ests .- ' 5C

  • I-J Numbers (Description & Account Numbers). Startel Complett Status _ ,

?

! G1:40 6275 Inst'all Service Water Intake S'tructures (1280) 8-74 78 Co pl. -

' 3145 8910' ' ~ Install Condenser, Turbine Generator Feedwater and Piping)(Exclusive Piping (3531) (3511) of Condensate and 8-75 '

12-80 Comp 1.

5-79 Compl

~

--8150 I 8285' Install Feedwater and Condensate Water System (2623) (2634) 1-75 5-76 8-78 Compl.

E55 8445 It..Lill Diesel Generator (2487-5160) 8165 8430 Install Drywell Air' Cooler System (2624) 7-76 9-81 Est. 92%

Install Containment Biological Shielding (2213-3750,2740,2720,2730) 2-75 11-77 Comp 1

8175 8180 11-75 76. Comp 1.

8200' 8300' Install Reactor Pressure Vessy ('On Site)-(2411-5310) 9-75 12-78 Compl..

8205 8230' Install Recirculating Pump (2412-5110)

-8210J 8325- Instsil Main Steam Lines to MSIV 9-75  :-77 ,C rpl.

7-75 4-79 Compl, 8215 8465' Install Control Rod Drive Systeta (2414)(2684) 10-75 4-79. Compl.

C220 8440 Install Reactor Internals (2411-5610) 2-76 10-78 Compl.

.8245 8335 Install Reactor Clean-Up System Pipe, Fittings A Valves (2643-6540,5640)

Install RHR Pipe, Fittings and Valves (2646-6510) 10-75 10-78 Compl.

,'3270 C360 Install Coolfi.9 Water Pipes and Controls (2621) (WS SYS) 11-72 1-8I Compi.

8275 '8470 11-75 3-81 Compl.

8280 8605 Install Radioactive Waste System and Padiation Monitoring System (2682)(2686)(2683)(2387)(2685) 8300' 8450 Install Piping Conne'cted to Primary System Components (2640) 10-75 5-79 Comp 1.

Install Pipe Hangers and Restraints All Systems (XXXX-6550,6450,6650,6750,2213.3910) 3-75 10-81 Est. 92%

78305 8475 Install Main Steam Pipe to Turbine Stop Valve (2631) LB Pipe 4-75 5-1-77 Comp 1.

8310 8315 12-76 6-81 -Compi.

8450 8500 Initial Flush of Systems (XXXX,6890) 5-78 7-78 Comp 1.

8500 8515 Perform Reactor Cold Hydrostatic Test ,

3-78 7 81 Est. 95%

8515 8600 Complete Base Line Inspections CG&E I

u

I _ ..

l.

i 1

.. / -

56e'*0 Activity. Activity Est.* F I-J Nusbe'rs_~

(Description,5 Account Numbers) -Started 'Co.plet9 Status ,{

CG&E 7-31 Est. 7 81'Est. ' 0% ~

. 8'600 ~P700 -

Perform Leak Rate Test Test Radioactive System and Radiation Monitoring System

" 4-81 Est. 7-81 Est. 0%

86058615

" 9-81 Est. 9-81 Est. 0%

8700 880C' Integrated System Test

" 8-/9 9-79 Compl.

8740 8815 .Special Nuclear Material Delivered

" 10-81 Est. 11-81 Est. -0%

8800 8950 Applicant Submits Test Results-

" '11-81 Est.' 3-82 Est. 0%

' 8950' 8990 Power Ascension I

t t

4 f

I '.

I I

s.. -n ., .

l -~

f 4 *

, ./

_ _ _ _ _ _ - - _ _ _ _ - - _ _ _ _ _ _ _ - - _ _ _ _