ML20058G903: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
~ | |||
i | i | ||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE FOR OCTOBER 1993 Initial criticality for Cycle 11 was attained on November 3, | OF OPERATING EXPERIENCE FOR OCTOBER 1993 Initial criticality for Cycle 11 was attained on November 3, 1993 at 1109. | ||
The plant went off-line at 0731 to repair an EHC leak on November 5, 1993. | The plant went off-line at 0731 to repair an EHC leak on November 5, 1993. | ||
Return to power took place at 0944 on November 6, 1993. | Return to power took place at 0944 on November 6, 1993. | ||
test was reperformed satisfactorily and the turbine was back on-line at 1705. l The outage officially ended at this time. Full power was reached by approxi- | On November 6 the turbine was taken off-line at 2105 to perform overspeed trip testing. | ||
mately 2030 on November 13, 1993 and continued for the remainder of the month. | The l | ||
test failed, repairs were made, and the turbine was returned to service November 8 at 0534. | |||
At 1419, the turbine was taken off-line, the overspeed test was reperformed satisfactorily and the turbine was back on-line at 1705. | |||
l The outage officially ended at this time. | |||
Full power was reached by approxi-mately 2030 on November 13, 1993 and continued for the remainder of the month. | |||
i l | i l | ||
l l | l l | ||
I a | I a | ||
F E | F E | ||
9312100174 931203 PDR | 9312100174 931203 PDR ADOCK 05000255 R | ||
pg}} | |||
Latest revision as of 09:10, 17 December 2024
| ML20058G903 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 10/31/1993 |
| From: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML18059A558 | List: |
| References | |
| NUDOCS 9312100174 | |
| Download: ML20058G903 (1) | |
Text
.
~
i
SUMMARY
OF OPERATING EXPERIENCE FOR OCTOBER 1993 Initial criticality for Cycle 11 was attained on November 3, 1993 at 1109.
The plant went off-line at 0731 to repair an EHC leak on November 5, 1993.
Return to power took place at 0944 on November 6, 1993.
On November 6 the turbine was taken off-line at 2105 to perform overspeed trip testing.
The l
test failed, repairs were made, and the turbine was returned to service November 8 at 0534.
At 1419, the turbine was taken off-line, the overspeed test was reperformed satisfactorily and the turbine was back on-line at 1705.
l The outage officially ended at this time.
Full power was reached by approxi-mately 2030 on November 13, 1993 and continued for the remainder of the month.
i l
l l
I a
F E
9312100174 931203 PDR ADOCK 05000255 R
pg