OF OPERATING EXPERIENCE FOR OCTOBER 1993 Initial criticality for Cycle 11 was attained on November 3,       1993 at 1109.
OF OPERATING EXPERIENCE FOR OCTOBER 1993 Initial criticality for Cycle 11 was attained on November 3, 1993 at 1109.
The plant went off-line at 0731 to repair an EHC leak on November 5, 1993.       ,
The plant went off-line at 0731 to repair an EHC leak on November 5, 1993.
Return to power took place at 0944 on November 6, 1993.       On November 6 the turbine was taken off-line at 2105 to perform overspeed trip testing.       The l test failed, repairs were made, and the turbine was returned to service November 8 at 0534. At 1419, the turbine was taken off-line, the overspeed   -
Return to power took place at 0944 on November 6, 1993.
test was reperformed satisfactorily and the turbine was back on-line at 1705. l The outage officially ended at this time. Full power was reached by approxi- ;
On November 6 the turbine was taken off-line at 2105 to perform overspeed trip testing.
mately 2030 on November 13, 1993 and continued for the remainder of the month.   !
The l
test failed, repairs were made, and the turbine was returned to service November 8 at 0534.
At 1419, the turbine was taken off-line, the overspeed test was reperformed satisfactorily and the turbine was back on-line at 1705.
l The outage officially ended at this time.
Full power was reached by approxi-mately 2030 on November 13, 1993 and continued for the remainder of the month.
i l
i l
l l
l l
I a                                                                                             ,
I a
F E
F E
9312100174 931203 PDR R    ADOCK 05000255 pg
9312100174 931203 PDR ADOCK 05000255 R
__}}
pg}}

Latest revision as of 09:10, 17 December 2024

Revised Monthly Operating Rept for Oct 1993 for Palisades Nuclear Plant
ML20058G903
Person / Time
Site: Palisades 
Issue date: 10/31/1993
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18059A558 List:
References
NUDOCS 9312100174
Download: ML20058G903 (1)


Text

.

~

i

SUMMARY

OF OPERATING EXPERIENCE FOR OCTOBER 1993 Initial criticality for Cycle 11 was attained on November 3, 1993 at 1109.

The plant went off-line at 0731 to repair an EHC leak on November 5, 1993.

Return to power took place at 0944 on November 6, 1993.

On November 6 the turbine was taken off-line at 2105 to perform overspeed trip testing.

The l

test failed, repairs were made, and the turbine was returned to service November 8 at 0534.

At 1419, the turbine was taken off-line, the overspeed test was reperformed satisfactorily and the turbine was back on-line at 1705.

l The outage officially ended at this time.

Full power was reached by approxi-mately 2030 on November 13, 1993 and continued for the remainder of the month.