                                                            JUL 2 71982
y
                Docket flos. 50-275, 50-323
* ,[
                Pacific Gas and Electric Company
-
                P. O. Box 7442
,
                San Francisco, California 94120
JUL 2 71982
                Attention: fir. Philip A. Crane, Jr.
Docket flos. 50-275, 50-323
                              Assistant General Counsel
Pacific Gas and Electric Company
                Gentlemen:
P. O. Box 7442
                Subject: flRC Inspection of Diablo Canyon Units 1 and 2
San Francisco, California 94120
                This refers to the inspections conducted by fir. J. F. Burdoin of this office
Attention: fir. Philip A. Crane, Jr.
                on May 26-28 and June 28 - July 2,1982 of activities authorized by NRC
Assistant General Counsel
                Construction Permit No. DPR-76 and CPPR-69 and to the discussions of our
Gentlemen:
                findings with Mr. R. D. Etzler and other members of your staff on May 28
Subject: flRC Inspection of Diablo Canyon Units 1 and 2
                and July 2,1932.
This refers to the inspections conducted by fir. J. F. Burdoin of this office
                Areas examined during this inspection are described in the enclosed inspection
on May 26-28 and June 28 - July 2,1982 of activities authorized by NRC
                report. Within these areas, the inspection consisted of selective examinations
Construction Permit No. DPR-76 and CPPR-69 and to the discussions of our
                of procedures and representative records, interviews with personnel, and
findings with Mr. R. D. Etzler and other members of your staff on May 28
                observations by the inspector.
and July 2,1932.
                No items of noncompliance with flRC requirements were identified within
Areas examined during this inspection are described in the enclosed inspection
                the scope of these inspections.
report. Within these areas, the inspection consisted of selective examinations
                In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
of procedures and representative records, interviews with personnel, and
                will be placed in the NRC Public Docunent Room unless you notify this office,
observations by the inspector.
                by telephone, within ten days of the date of this letter and submit written
No items of noncompliance with flRC requirements were identified within
                application to withhold infomation contained therein within thirty days
the scope of these inspections.
                of the date of this letter. Such application must be consistent with tiie
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
                requirements of 2.790(b)(1).
will be placed in the NRC Public Docunent Room unless you notify this office,
        8200160129 820727                                                                 /
by telephone, within ten days of the date of this letter and submit written
        PDR ADOCK 05000275
application to withhold infomation contained therein within thirty days
        O                     PDR
of the date of this letter. Such application must be consistent with tiie
                                                                                        /{h'
requirements of 2.790(b)(1).
    "'c'> RV ]j            ggy'                                                    ,           ,,
/{h'
" * " ' > .BU         .  .EC JiARDT.. BISHOP...
/
    cur >     7/23/82       7/2g/82       7/p/82
8200160129 820727
            .                                           ..
PDR ADOCK 05000275
O
PDR
R ]j
ggy'
V
"'c'>
,
,,
" * " ' > .BU
.EC JiARDT..
BISHOP...
.
cur >
7/23/82
7/2g/82
7/p/82
.
..
scrosuais,iese,wcyc2.o
scrosuais,iese,wcyc2.o
                                          OFFICIAL RECORD COPY                               'm*3
OFFICIAL RECORD COPY
'm*3


                                                                                                                      -
. . - - -
                                                                  . . - - -                       -
-
                                                                                                        -
-
                                                                                                                            ^
-
^
.
,
-
.
.
                                                                                                                -
'
.
~
' Pacific Gas and Electric Company
-2-
. JUL 2 71982-
.
.
. >
(Should you have any questions concerning this inspection, we'will be glad
!
'
to discuss them with you.
,
_
>
Sincerely,
!
,
t
i
i
T. W. Bishop, Chief
Reactor Construction Projects Branch
,
,
,
                .
                    '
                                          .
  ~      '
              Pacific Gas and Electric Company              -2-                    . JUL 2 71982-
                                                                                              .        .                    .>
                                                                                                              '
          (Should you have any questions concerning this inspection, we'will be glad                                            !
              to discuss them with you.                ,
                                                                                                                    >
                                                                                                    _
                                                            Sincerely,                                                          !
,
                                                                                                                                t
                                                                                                                                ii
                                                            T. W. Bishop, Chief
,
                                                            Reactor Construction Projects Branch                              ,
.
.
              Enclosures:                                                                                 .                   ,
Enclosures:
              Inspection Report
.
                  flos. 50-275/82-22'           ^                                                                 '
,
                          50-323/82-11
Inspection Report
              cc w/ enclosures:                                                     -
flos. 50-275/82-22'
            W. A. Raymond, PG&E
'
              R. C. Thornberry, PG&E (Diablo Canyon)
^
              bcc: DMB/ Document Control Desk (RIDS)
50-323/82-11
              Distributed by RV:
cc w/ enclosures:
              Resident Inspector
-
              State of CA (Johnson)'
W. A. Raymond, PG&E
              Sandra Silver (Report only)-
R. C. Thornberry, PG&E (Diablo Canyon)
              Engelken(1tr)                                                       ,
bcc: DMB/ Document Control Desk (RIDS)
                                                                                                -
Distributed by RV:
                                                                                        ,
Resident Inspector
                                                                                                                        e
State of CA (Johnson)'
Sandra Silver (Report only)-
Engelken(1tr)
,
-
,
e
#
#
                                                                                                      ,
,
                          4
4
                                                      ,
,
1                                                             .
1
                    k
.
                                                                                ,
k
                                                                                                                          9     P
,
                                                                                                                              1
9
                                                                                                                              '
P
                                                                                            ,
1
                                              #4.
'
,
# 4 .
l
l
                                                                                                            s
s
                        I                                                   h
I
                                                                                                                              t
h
      r                                           e                                                                           ,.
t
            ,
r
    "<
e
                                                                                              .
,.
                                                                                                              .
,
                                    ,
" <
        d
.
                            - -,     , ,   -     '.'- -    :,
d
                                                                              '
,
                                                                                                  .-
.
'
- -,
, ,
-
' . ' -
:,
.-
.,
-


                o,                           UNITED STATES
o,
    8"           ),             NUCLEAR RE"ULATORY COMMISSION
UNITED STATES
  's           ;j                             REGKW V
8"
    S                                   1450 MARIA LANE,SulTE 210
),
      %,        ,o'g                  WALNUT CREEK, CALIFORNIA 94596
NUCLEAR RE"ULATORY COMMISSION
                                                    July 27,i982
's
                                                                                      .
;j
        Docket Nos. 50-275, 50-323
REGKW V
                                                                                          .
S
        Pacific Gas and Electric Company
%,
        P. O. Box 7442
,o'g
        San Francisco, California 94120
1450 MARIA LANE,SulTE 210
        Attention: Mr. Philip A. Crane, Jr.
WALNUT CREEK, CALIFORNIA 94596
                      Assistant General Counsel
July 27,i982
        Gentlemen:
.
        Subject:   NRC Inspection of Diablo Canyon Units 1 and 2
Docket Nos. 50-275, 50-323
        This refers to the inspections conducted by Mr. J. F. Burdoin of this office
.
        on May 26-28 and June 28 - July 2,1982 of activities authorized by NRC
Pacific Gas and Electric Company
        Construction Permit No. DPR-76 and CPPR-69 and to the discussions of our
P. O. Box 7442
        findings with Mr. R. D. Etzler and other members of your staff on May 28
San Francisco, California 94120
        and July 2, 1982.
Attention: Mr. Philip A. Crane, Jr.
        Areas examined during this inspection are described in the enclosed inspection
Assistant General Counsel
        report. Within these areas, the inspection consisted of selective examinations
Gentlemen:
        of procedures and representative records, interviews with personnel, and
Subject:
        observations by the inspector.
NRC Inspection of Diablo Canyon Units 1 and 2
        No items of noncompliance with NRC requirements were identified within
This refers to the inspections conducted by Mr. J. F. Burdoin of this office
        the scope of these inspections.
on May 26-28 and June 28 - July 2,1982 of activities authorized by NRC
Construction Permit No. DPR-76 and CPPR-69 and to the discussions of our
findings with Mr. R. D. Etzler and other members of your staff on May 28
and July 2, 1982.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
No items of noncompliance with NRC requirements were identified within
the scope of these inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
,
,
        In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
l
l      will be placed in the NRC Public Document Room unless you notify this office,
will be placed in the NRC Public Document Room unless you notify this office,
        by telephone, within ten days of the date of this letter and submit written
by telephone, within ten days of the date of this letter and submit written
!       application to withhold information contained therein within thirty days
!
l       of the date of this letter. Such application must be consistent with the
application to withhold information contained therein within thirty days
j       requirements of 2.790(b)(1).
l
of the date of this letter.
Such application must be consistent with the
j
requirements of 2.790(b)(1).
:
:
.
.
.
.
!
!
                                                                                        -.
-.


                  %
%
            '
Pacific Gas and Electric Company
              Pacific Gas and Electric Company       -2-             July 27, 1982
-2-
              Should you have any questions concerning this inspection, we will be glad
July 27, 1982
              to discuss them with you.
'
                                                      Sincerely,
Should you have any questions concerning this inspection, we will be glad
                                                  '              '
to discuss them with you.
                                                      t.t\(1
Sincerely,
                                                      T. W. Bishop, Chief
'
                                                      Reactor Construction Projects Branch
t.t\\(1
              Enclosures:
'
              Inspection Report
T. W. Bishop, Chief
                                                                                                  -
Reactor Construction Projects Branch
                                                                            -
Enclosures:
                  Nos. 50-275/82-22
Inspection Report
                      50-323/82-11
-
              cc w/ enclosures:
-
              W. A. Raymond, PG&E
Nos. 50-275/82-22
              R. C. Thornberry, PG&E (Diablo Canyon)
50-323/82-11
                                                .
cc w/ enclosures:
W. A. Raymond, PG&E
R. C. Thornberry, PG&E (Diablo Canyon)
.
l
l
l
l
.
.
  ,
,
)
)
i
i
!
!
i
i
    ' m , se                                                                             - .. . ,, -.- -
' m ,
se
-
.. . ,, -.-
-
}}
}}

Latest revision as of 22:57, 16 December 2024

Forwards IE Insp Repts 50-275/82-22 & 50-323/82-11 on 820526-28 & 0628-0702.No Noncompliance Noted
ML20062H668
Person / Time
Site: Diablo Canyon  
Issue date: 07/27/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20062H672 List:
References
NUDOCS 8208160128
Download: ML20062H668 (4)


See also: IR 05000275/1982022

Text

'%

c

-

y

  • ,[

-

,

JUL 2 71982

Docket flos. 50-275, 50-323

Pacific Gas and Electric Company

P. O. Box 7442

San Francisco, California 94120

Attention: fir. Philip A. Crane, Jr.

Assistant General Counsel

Gentlemen:

Subject: flRC Inspection of Diablo Canyon Units 1 and 2

This refers to the inspections conducted by fir. J. F. Burdoin of this office

on May 26-28 and June 28 - July 2,1982 of activities authorized by NRC

Construction Permit No. DPR-76 and CPPR-69 and to the discussions of our

findings with Mr. R. D. Etzler and other members of your staff on May 28

and July 2,1932.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

No items of noncompliance with flRC requirements were identified within

the scope of these inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Docunent Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold infomation contained therein within thirty days

of the date of this letter. Such application must be consistent with tiie

requirements of 2.790(b)(1).

/{h'

/

8200160129 820727

PDR ADOCK 05000275

O

PDR

R ]j

ggy'

V

"'c'>

,

,,

" * " ' > .BU

.EC JiARDT..

BISHOP...

.

cur >

7/23/82

7/2g/82

7/p/82

.

..

scrosuais,iese,wcyc2.o

OFFICIAL RECORD COPY

'm*3

. . - - -

-

-

-

^

.

,

-

.

'

.

~

' Pacific Gas and Electric Company

-2-

. JUL 2 71982-

.

.

. >

(Should you have any questions concerning this inspection, we'will be glad

!

'

to discuss them with you.

,

_

>

Sincerely,

!

,

t

i

i

T. W. Bishop, Chief

Reactor Construction Projects Branch

,

,

.

Enclosures:

.

,

Inspection Report

flos. 50-275/82-22'

'

^

50-323/82-11

cc w/ enclosures:

-

W. A. Raymond, PG&E

R. C. Thornberry, PG&E (Diablo Canyon)

bcc: DMB/ Document Control Desk (RIDS)

Distributed by RV:

Resident Inspector

State of CA (Johnson)'

Sandra Silver (Report only)-

Engelken(1tr)

,

-

,

e

,

4

,

1

.

k

,

9

P

1

'

,

  1. 4 .

l

s

I

h

t

r

e

,.

,

" <

.

d

,

.

'

- -,

, ,

-

' . ' -

,

.-

.,

-

o,

UNITED STATES

8"

),

NUCLEAR RE"ULATORY COMMISSION

's

j

REGKW V

S

%,

,o'g

1450 MARIA LANE,SulTE 210

WALNUT CREEK, CALIFORNIA 94596

July 27,i982

.

Docket Nos. 50-275, 50-323

.

Pacific Gas and Electric Company

P. O. Box 7442

San Francisco, California 94120

Attention: Mr. Philip A. Crane, Jr.

Assistant General Counsel

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units 1 and 2

This refers to the inspections conducted by Mr. J. F. Burdoin of this office

on May 26-28 and June 28 - July 2,1982 of activities authorized by NRC

Construction Permit No. DPR-76 and CPPR-69 and to the discussions of our

findings with Mr. R. D. Etzler and other members of your staff on May 28

and July 2, 1982.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of these inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

,

l

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

!

application to withhold information contained therein within thirty days

l

of the date of this letter.

Such application must be consistent with the

j

requirements of 2.790(b)(1).

.

.

!

-.

%

Pacific Gas and Electric Company

-2-

July 27, 1982

'

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

'

t.t\\(1

'

T. W. Bishop, Chief

Reactor Construction Projects Branch

Enclosures:

Inspection Report

-

-

Nos. 50-275/82-22

50-323/82-11

cc w/ enclosures:

W. A. Raymond, PG&E

R. C. Thornberry, PG&E (Diablo Canyon)

.

l

l

.

,

)

i

!

i

' m ,

se

-

.. . ,, -.-

-