ML20062H668
| ML20062H668 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 07/27/1982 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Crane P PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML20062H672 | List: |
| References | |
| NUDOCS 8208160128 | |
| Download: ML20062H668 (4) | |
See also: IR 05000275/1982022
Text
'%
c
-
y
- ,[
-
,
JUL 2 71982
Docket flos. 50-275, 50-323
Pacific Gas and Electric Company
P. O. Box 7442
San Francisco, California 94120
Attention: fir. Philip A. Crane, Jr.
Assistant General Counsel
Gentlemen:
Subject: flRC Inspection of Diablo Canyon Units 1 and 2
This refers to the inspections conducted by fir. J. F. Burdoin of this office
on May 26-28 and June 28 - July 2,1982 of activities authorized by NRC
Construction Permit No. DPR-76 and CPPR-69 and to the discussions of our
findings with Mr. R. D. Etzler and other members of your staff on May 28
and July 2,1932.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
No items of noncompliance with flRC requirements were identified within
the scope of these inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Docunent Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold infomation contained therein within thirty days
of the date of this letter. Such application must be consistent with tiie
requirements of 2.790(b)(1).
/{h'
/
8200160129 820727
PDR ADOCK 05000275
O
R ]j
ggy'
V
"'c'>
,
,,
" * " ' > .BU
.EC JiARDT..
BISHOP...
.
cur >
7/23/82
7/2g/82
7/p/82
.
..
scrosuais,iese,wcyc2.o
OFFICIAL RECORD COPY
'm*3
. . - - -
-
-
-
^
.
,
-
.
'
.
~
' Pacific Gas and Electric Company
-2-
. JUL 2 71982-
.
.
. >
(Should you have any questions concerning this inspection, we'will be glad
!
'
to discuss them with you.
,
_
>
Sincerely,
!
,
t
i
i
T. W. Bishop, Chief
Reactor Construction Projects Branch
,
,
.
Enclosures:
.
,
Inspection Report
flos. 50-275/82-22'
'
^
50-323/82-11
cc w/ enclosures:
-
W. A. Raymond, PG&E
R. C. Thornberry, PG&E (Diablo Canyon)
bcc: DMB/ Document Control Desk (RIDS)
Distributed by RV:
Resident Inspector
State of CA (Johnson)'
Sandra Silver (Report only)-
Engelken(1tr)
,
-
,
e
,
4
,
1
.
k
,
9
P
1
'
,
- 4 .
l
s
I
h
t
r
e
,.
,
" <
.
d
,
.
'
- -,
, ,
-
' . ' -
- ,
.-
.,
-
o,
UNITED STATES
8"
),
NUCLEAR RE"ULATORY COMMISSION
's
- j
REGKW V
S
%,
,o'g
1450 MARIA LANE,SulTE 210
WALNUT CREEK, CALIFORNIA 94596
July 27,i982
.
Docket Nos. 50-275, 50-323
.
Pacific Gas and Electric Company
P. O. Box 7442
San Francisco, California 94120
Attention: Mr. Philip A. Crane, Jr.
Assistant General Counsel
Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Units 1 and 2
This refers to the inspections conducted by Mr. J. F. Burdoin of this office
on May 26-28 and June 28 - July 2,1982 of activities authorized by NRC
Construction Permit No. DPR-76 and CPPR-69 and to the discussions of our
findings with Mr. R. D. Etzler and other members of your staff on May 28
and July 2, 1982.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
No items of noncompliance with NRC requirements were identified within
the scope of these inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
,
l
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
!
application to withhold information contained therein within thirty days
l
of the date of this letter.
Such application must be consistent with the
j
requirements of 2.790(b)(1).
.
.
!
-.
%
Pacific Gas and Electric Company
-2-
July 27, 1982
'
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely,
'
t.t\\(1
'
T. W. Bishop, Chief
Reactor Construction Projects Branch
Enclosures:
Inspection Report
-
-
Nos. 50-275/82-22
50-323/82-11