Forwards IE Insp Repts 50-275/82-22 & 50-323/82-11 on 820526-28 & 0628-0702.No Noncompliance Noted
ML20062H668
Person / Time
Site: Diablo Canyon  
Issue date: 07/27/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20062H672 List:
References
NUDOCS 8208160128
Download: ML20062H668 (4)


See also: IR 05000275/1982022

Text

'%

c

-

y

  • ,[

-

,

JUL 2 71982

Docket flos. 50-275, 50-323

Pacific Gas and Electric Company

P. O. Box 7442

San Francisco, California 94120

Attention: fir. Philip A. Crane, Jr.

Assistant General Counsel

Gentlemen:

Subject: flRC Inspection of Diablo Canyon Units 1 and 2

This refers to the inspections conducted by fir. J. F. Burdoin of this office

on May 26-28 and June 28 - July 2,1982 of activities authorized by NRC

Construction Permit No. DPR-76 and CPPR-69 and to the discussions of our

findings with Mr. R. D. Etzler and other members of your staff on May 28

and July 2,1932.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

No items of noncompliance with flRC requirements were identified within

the scope of these inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Docunent Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold infomation contained therein within thirty days

of the date of this letter. Such application must be consistent with tiie

requirements of 2.790(b)(1).

/{h'

/

8200160129 820727

PDR ADOCK 05000275

O

PDR

R ]j

ggy'

V

"'c'>

,

,,

" * " ' > .BU

.EC JiARDT..

BISHOP...

.

cur >

7/23/82

7/2g/82

7/p/82

.

..

scrosuais,iese,wcyc2.o

OFFICIAL RECORD COPY

'm*3

. . - - -

-

-

-

^

.

,

-

.

'

.

~

' Pacific Gas and Electric Company

-2-

. JUL 2 71982-

.

.

. >

(Should you have any questions concerning this inspection, we'will be glad

!

'

to discuss them with you.

,

_

>

Sincerely,

!

,

t

i

i

T. W. Bishop, Chief

Reactor Construction Projects Branch

,

,

.

Enclosures:

.

,

Inspection Report

flos. 50-275/82-22'

'

^

50-323/82-11

cc w/ enclosures:

-

W. A. Raymond, PG&E

R. C. Thornberry, PG&E (Diablo Canyon)

bcc: DMB/ Document Control Desk (RIDS)

Distributed by RV:

Resident Inspector

State of CA (Johnson)'

Sandra Silver (Report only)-

Engelken(1tr)

,

-

,

e

,

4

,

1

.

k

,

9

P

1

'

,

  1. 4 .

l

s

I

h

t

r

e

,.

,

" <

.

d

,

.

'

- -,

, ,

-

' . ' -

,

.-

.,

-

o,

UNITED STATES

8"

),

NUCLEAR RE"ULATORY COMMISSION

's

j

REGKW V

S

%,

,o'g

1450 MARIA LANE,SulTE 210

WALNUT CREEK, CALIFORNIA 94596

July 27,i982

.

Docket Nos. 50-275, 50-323

.

Pacific Gas and Electric Company

P. O. Box 7442

San Francisco, California 94120

Attention: Mr. Philip A. Crane, Jr.

Assistant General Counsel

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units 1 and 2

This refers to the inspections conducted by Mr. J. F. Burdoin of this office

on May 26-28 and June 28 - July 2,1982 of activities authorized by NRC

Construction Permit No. DPR-76 and CPPR-69 and to the discussions of our

findings with Mr. R. D. Etzler and other members of your staff on May 28

and July 2, 1982.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of these inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

,

l

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

!

application to withhold information contained therein within thirty days

l

of the date of this letter.

Such application must be consistent with the

j

requirements of 2.790(b)(1).

.

.

!

-.

%

Pacific Gas and Electric Company

-2-

July 27, 1982

'

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

'

t.t\\(1

'

T. W. Bishop, Chief

Reactor Construction Projects Branch

Enclosures:

Inspection Report

-

-

Nos. 50-275/82-22

50-323/82-11

cc w/ enclosures:

W. A. Raymond, PG&E

R. C. Thornberry, PG&E (Diablo Canyon)

.