ML20070S239: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:*
{{#Wiki_filter:*
I h.*U c
I h.*U U 4, c
        .nU 4,
.n
* _-mo                                                                                                                                                                                                                                   .
_-mo (A
(A 1-
" N 1-. D (A co.
        "N
TABLE TS.3.5-2B (Page 5 of 9) j ON 04 W
      . D (A co.                                                         TABLE TS.3.5-2B (Page 5 of 9)
ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION 04
ON 04 W                               ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION
$o MINIMUM n$
  .      04
TOTAL NO.
        $o                                                                                                                                                   MINIMUM                                                                           .!
CHANNELS CHANNELS APPLICABLE ONN FUNCTIONAL UNIT OF CHANNELS.
n$
TO TRIP OPERABLE MODES ACTION
ONN      FUNCTIONAL UNIT TOTAL NO.
OF CHANNELS.
CHANNELS TO TRIP CHANNELS OPERABLE APPLICABLE MODES                     ACTION                                         ,
: a. ItD N
: a. ItD N
: 7. AUXILIARY FEEDWATER
7.
: a. Manual                                                           2                                                   1                   2     1,2,3                             3426
AUXILIARY FEEDWATER a.
: b. Steam Generator Lo-Lo                                         3/SG                                     2/SG in                       2/SG in   1,2,3                             24                                   1 Water Level                                                                                             any SG                       each SG                                                                             l 1
Manual 2
: c. Undervoltage on 4.16 kV Buses                                 2/ bus                                   1/ bus on                     2 on one 1, 2                             29 11 and 12''(Unit 2: 21 and-22)                                                                           both                         bus (Start Turbine Driven Pump                                                                               buses                                                                                                             '
1 2
only)
1,2,3 3426 b.
: d. Trip of Both. Main Feedwater Pumps
Steam Generator Lo-Lo 3/SG 2/SG in 2/SG in 1,2,3 24 1
: 1. Turbine Driven                                                 2                                                   2                   2     1, 2                             26                                     ,
Water Level any SG each SG l
: 2. Motor Driven                                                   2                                                   2                   2     1, 2                             26                                     ,
1 c.
t
Undervoltage on 4.16 kV Buses 2/ bus 1/ bus on 2 on one 1, 2 29 11 and 12''(Unit 2: 21 and-22) both bus (Start Turbine Driven Pump buses only) d.
: e. Safety Injection                                             See Functional Unit I above for all Safety Injection initiating functions and requirements.
Trip of Both. Main Feedwater Pumps
i
: 1. Turbine Driven 2
: f. ' Automatic Actuation. Logic                                       2                                                   1                   2   '1,'2, 3                           30                                     i and Actuation Relays                                                                                                                                                                   EQ$
2 2
                                                                                                                                                                                                                <mm                               i 04 td CD - tz2 .               y Ra e6 b
1, 2 26
w f
: 2. Motor Driven 2
                                              ...m..._.__ __.-__ _a  ._____....___2        ._.m_____.._____u_____________._-___.___._____2______.____.______                      _ _ . _ ____.__2____m_      _ _ _ _ _ _ _ _ _ _ _
2 2
1, 2 26 t
e.
Safety Injection See Functional Unit I above for all Safety Injection initiating functions and requirements.
i f.
' Automatic Actuation. Logic 2
1 2
'1,'2, 3
30 i
and Actuation Relays EQ$
<mm i
04 td CD - tz2.
y Ra e6 bw f
...m....
a 2
..m u
2 2
m


TABLE 3.5-2B (Page 8 of 9)
TABLE 3.5-2B (Page 8 of 9)
Action Statements
Action Statements i
* i                                  ACTION 25: With the number of OPERABLE channels                     ACTION 28: With the number of OPERABLE channels one less than the Total Number of                             one less than the Total-Number of Channels, restore the inoperable                             Channels, restore the inoperable channel to OPERABLE status within 6                           channel to OPERABLE status within 6 hours or be in at least HOT SHUTDOWN                         hours or be in at least HOT SHUTDOWN within the next 6 hours. Operation in                         within the next 6 hours. However, one HOT SHUTDOWN may proceed provided the                         channel may be bypassed for up to 8 main steam isolation valves are closed,                       hours for surveillance testing per if not, be in at least INTERMEDIATE                           Specification 4.1, provided the other SHUTDOWN within the following 6 hours.                         channel is OPERABLE.
ACTION 25: With the number of OPERABLE channels ACTION 28: With the number of OPERABLE channels one less than the Total Number of one less than the Total-Number of Channels, restore the inoperable Channels, restore the inoperable channel to OPERABLE status within 6 channel to OPERABLE status within 6 hours or be in at least HOT SHUTDOWN hours or be in at least HOT SHUTDOWN within the next 6 hours. Operation in within the next 6 hours.
However, one channel may be bypassed for up to 8 hours.for surveillance testing per Specification 4.1, provided           ACTION 29: With the number of OPERABLE channels                               ,
However, one HOT SHUTDOWN may proceed provided the channel may be bypassed for up to 8 main steam isolation valves are closed, hours for surveillance testing per if not, be in at least INTERMEDIATE Specification 4.1, provided the other SHUTDOWN within the following 6 hours.
the'other channel is OPERABLE.                                 less than the Total Number of Channels, operation in the applicable MODE may                               i proceed provided the following ACTION 26: With the number of OPERABLE channels                                 conditions are satisfied:
channel is OPERABLE.
one less than the Total Number of                                                                                                 '
However, one channel may be bypassed for up to 8 hours.for surveillance testing per Specification 4.1, provided ACTION 29: With the number of OPERABLE channels the'other channel is OPERABLE.
Channels, rectcre the incperable                               a. The inoperable channel (s) is placed checcel te OPEPf. ELE ctatuc .rithir 72                             in the tripped condition within 6 heurc cr be in at Iccc t MOT E!PRDO'..~"                           hours, and, within 6 Feur decla nithe7associhted Auxiliary? feddwa te r [ pump %noperable}ahd                   b. The Minimum Channels OPERABLE t'akeltheiaction required y                                       requirement is met; however, one
less than the Total Number of Channels, operation in the applicable MODE may i
                                                    - Specificatiots13(43 2.                                             inoperable channel may be bypassed.
proceed provided the following ACTION 26: With the number of OPERABLE channels conditions are satisfied:
one less than the Total Number of Channels, rectcre the incperable a.
The inoperable channel (s) is placed checcel te OPEPf. ELE ctatuc.rithir 72 in the tripped condition within 6 heurc cr be in at Iccc t MOT E!PRDO'..~"
hours, and, within 6 Feur decla nithe7associhted Auxiliary? feddwa te r [ pump %noperable}ahd b.
The Minimum Channels OPERABLE t'akeltheiaction required y requirement is met; however, one
- Specificatiots13(43 2.
inoperable channel may be bypassed.
at a time for up to 4 hours for surveillance testing of other.
at a time for up to 4 hours for surveillance testing of other.
ACTION 27: With the number of OPERABLE channels                                       channels per Specification 4.1       :c a .-i one less than the Total Number of                                                                       S2$
ACTION 27: With the number of OPERABLE channels channels per Specification 4.1
Channels, restore the inoperable                                                                               5E channel to OPERABLE status within 48                                                                           cc a hours or be in at least HOT SHUTDOWN                                                                           o ."             ,
:c a.-i one less than the Total Number of S2$
within the next 6 hours and close the                                                                         "."
Channels, restore the inoperable 5E channel to OPERABLE status within 48 cc a hours or be in at least HOT SHUTDOWN o."
cw associated valve.                                                                                             v .
within the next 6 hours and close the cw associated valve.
ra D3
v.
_ _ _ _- _ .      __  m-_                      _                                    _ _      - .        . . _ _ _ . ____m      . . _
ra D3 m-m


_ _ _ ~
_ _ _ ~
TABLE 3.5-2B (Page 9 of 9)
TABLE 3.5-2B (Page 9 of 9)
Action Statements ACTION 30: With the number of OPERABLE channels                                               c. All of the channels associated with one less than the Total Number of                                   tue redundant 4kV Safeguards Bus Channels, rectcre the incperable                                   are operable.
Action Statements ACTION 30: With the number of OPERABLE channels c.
cFc,nel tc OPEPl. ELE ctatun rithin 72 heurc cr be ir at lecct MOT S"LTDOL*               ACTION 33: If the requirements of ACTIONS 30 or 31 vithin the next S heurc cnd in at lecct                         cannot be met within the time INTEP"EDIATE S"LTDO"" tithin the                               specified, or with the number of 4+14eving 6 heurc declare (the                                 OPERABLE channels three less than the
All of the channels associated with one less than the Total Number of tue redundant 4kV Safeguards Bus Channels, rectcre the incperable are operable.
                                                  'assbelated?auxiliaryf feedwat'er: pump                         Total Number of Channels, declare the inoperable?anMtakeith'lactilornrequired e                                    associated diesel generator (s) kN SpediIicfp@nj3MC25 ~However, one                             inoperable and take the ACTION required channel may be bypassed for up to 8                             by Specification 3.7.B.                                 '
cFc,nel tc OPEPl. ELE ctatun rithin 72 heurc cr be ir at lecct MOT S"LTDOL*
hours for surveillance testing per Specification 4.1, provided the other               ACT-ION M - "ith the n=ber of OPEP1. ELE chcnnels
ACTION 33: If the requirements of ACTIONS 30 or 31 vithin the next S heurc cnd in at lecct cannot be met within the time INTEP"EDIATE S"LTDO"" tithin the specified, or with the number of 4+14eving 6 heurc declare (the OPERABLE channels three less than the
                                                                                                                                      ~
'assbelated?auxiliaryf feedwat'er: pump Total Number of Channels, declare the inoperable?anMtakeith'lactilornrequired associated diesel generator (s) e kN SpediIicfp@nj3MC25 ~However, one inoperable and take the ACTION required channel may be bypassed for up to 8 by Specification 3.7.B.
channel is OPERABLE.                                           ene lecc than the     2t:1 M=b e r o f Channelc, rectrre the incperchic ACTION 31: With the number of OPERABLE channels                                               channel te OPER^. ELE ctatuc cithir 72 one less than the Total Number of                               heurc cr be ir ct lecct HOT Suu7petm Channels, operation in the applicable                           uithir 6 heurc cnd ir at lecct MODE may proceed provided the                                   INTEF"EDI^.TE S""TDOL" .zithir the inoperable channel is placed in the                             felleuing 6 heurc.
hours for surveillance testing per Specification 4.1, provided the other ACT-ION M - "ith the n=ber of OPEP1. ELE chcnnels channel is OPERABLE.
ene lecc than the 2t:1 M=b e r o f
~
Channelc, rectrre the incperchic ACTION 31: With the number of OPERABLE channels channel te OPER^. ELE ctatuc cithir 72 one less than the Total Number of heurc cr be ir ct lecct HOT Suu7petm Channels, operation in the applicable uithir 6 heurc cnd ir at lecct MODE may proceed provided the INTEF"EDI^.TE S""TDOL".zithir the inoperable channel is placed in the felleuing 6 heurc.
bypassed condition within 6 hours.
bypassed condition within 6 hours.
ACTION 32: With the number of OPERABLE channels two less than the Total Number of Channels, operation in the applicable                                                                                   ,
ACTION 32: With the number of OPERABLE channels two less than the Total Number of Channels, operation in the applicable MODE may proceed provided the following conditions are satisfied:
MODE may proceed provided the following conditions are satisfied:                                                                               :o m a tn m >
:o m a tn m >
                                                                                                                                                            <: m en
<: m en a.
: a. One inoperable channel is placed in                                                                   $$
One inoperable channel is placed in the bypassed condition within 6 ee hours, and, o."
the bypassed condition within 6                                                                       ee hours, and,                                                                                           o ."
m.u b.
m .u
The other inoperable channel is
: b. The other inoperable channel is
* Y' placed in the tripped condition M
* Y' placed in the tripped condition                                                                         M within-6 hours, and,
within-6 hours, and,


.+.      .
.+.
h Attaciunent 2 Revised Technical Specification Pages l
h Attaciunent 2 Revised Technical Specification Pages l
1 l
1 l
Line 90: Line 113:
I h
I h
1 1
1 1
j l'
j 1..
                    . - - . --      . _,                                                      ..__.._________.______1..


f'                                                                                                                                                                                                                           _
f' j:
j:                                                                                                                                                                                                                     .
[:-
[:-
TABLE TS.3.5-2B (Page 5 of 9)
TABLE TS.3.5-2B (Page 5 of 9)
I
I
                                                                          -ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION MINIMUM TOTAL NO.               CHANNELS           CHANNELS                     APPLICABLE FUNCTIONAL UNIT                               OF CHANNELS             TO TRIP           OPERABLE                     MODES                     ACTION.
-ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION MINIMUM TOTAL NO.
f
CHANNELS CHANNELS APPLICABLE f
,                                              7. AUXILIARY FEEDiJATER l
FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION.
: a. Manual                                       2                   1                     2                     1,2,3                         26 l                                                 b. Steam Generator Lo-Lo                     3/SG               2/SG in           2/SG in                       1, 2, 3                       24 Water Level                                                   any SG             each SG
7.
: c. Undervoltage on 4.16 kV Buses             2/ bus             1/ bus on         2 on one                     1, 2                         29 L                                                       11 and 12 (Unit 2: 21 and 22)                                 both               bus (Start Turbine Driven Pump                                   buses only)
AUXILIARY FEEDiJATER l
: d. Trip of Both. Main ~Feedwater Pumps 1.' Turbine Driven                           2                   2                     2                     1, 2                         26 2.. Motor Driven                             2                   2                     2                     1, 2                         26
a.
: e. Safety Injection                       See Functional Unit I above for all Safety Injection initiating functions and requirements.
Manual 2
: f. Automatic Actuation' Logic                   2                   1                   '2                     1,2,3                         30 and Actuation Relays                                                                                                                                       >
1 2
om
1,2,3 26 l
                                                                                                                                                                                                                ,L k.
b.
                                                                                .    ..    .          ..    ,                                . . . .      . . - , , .      .  - , . . _ _ _ .        _ . _ . .      ,. w
Steam Generator Lo-Lo 3/SG 2/SG in 2/SG in 1, 2, 3 24 Water Level any SG each SG c.
Undervoltage on 4.16 kV Buses 2/ bus 1/ bus on 2 on one 1, 2 29 L
11 and 12 (Unit 2: 21 and 22) both bus (Start Turbine Driven Pump buses only) d.
Trip of Both. Main ~Feedwater Pumps 1.' Turbine Driven 2
2 2
1, 2 26 2.. Motor Driven 2
2 2
1, 2 26 e.
Safety Injection See Functional Unit I above for all Safety Injection initiating functions and requirements.
f.
Automatic Actuation' Logic 2
1
'2 1,2,3 30 and Actuation Relays om
,L k.
,. w


TABLE 3.5-2B (Page 8 of 9)
TABLE 3.5-2B (Page 8 of 9)
Action Statements t
Action Statements t
ACTION 25: With the number of OPERABLE channels                                             ACTION 28: With the number of OPERABLE channels-                                       I one less than the Total Number of                                                     one less than the Total Number of                                   ;
I ACTION 25: With the number of OPERABLE channels ACTION 28: With the number of OPERABLE channels-one less than the Total Number of one less than the Total Number of Channels, restore the inoperable Channels, restore the inoperable channel to OPERABLE status within 6 channel to OPERABLE status within 6
Channels, restore the inoperable                                                       Channels, restore the inoperable channel to OPERABLE status within 6                                                   channel to OPERABLE status within 6
- hours or be in at least HOT SHUTDOWN hours or be'in at least HOT SHUTDOWN within the next 6 hours, Operation in within the next 6 hours. However, one HOT. SHUTDOWN may proceed.provided the channel may be bypassed for up to b main steam isolation valves are closed, hours for surveillance testing per if not, be in at least INTERMEDIATE Specification 4.1, provided the other SHUTDOWN within the following 6 hours.
                                            - hours or be in at least HOT SHUTDOWN                                                   hours or be'in at least HOT SHUTDOWN                                 !
channel is OPERABLE.
within the next 6 hours,                       Operation in                           within the next 6 hours. However, one HOT. SHUTDOWN may proceed.provided the                                                 channel may be bypassed for up to b main steam isolation valves are closed,                                               hours for surveillance testing per if not, be in at least INTERMEDIATE                                                   Specification 4.1, provided the other                                 .
3 However, one channel may be bypassed for up to 8 hours for surveillance j
SHUTDOWN within the following 6 hours.                                                 channel is OPERABLE.                                                  .
testing per Specification 4.1, provided ACTION 29: With the number of OPERABLE channels thc other channel-is OPERABLE.
3 However, one channel may be bypassed for up to 8 hours for surveillance                                                                                                                       j testing per Specification 4.1, provided                           ACTION 29: With the number of OPERABLE channels thc other channel-is OPERABLE.                                                       less than the Total Number of Channels, operation in the applicable MODE may proceed provided the following                                       -
less than the Total Number of Channels, operation in the applicable MODE may proceed provided the following ACTION 26: With the number of OPERABLE channels conditions are satisfied:
ACTION 26: With the number of OPERABLE channels                                                               conditions are satisfied:
one less than the Total Number of Channels, declare the associated a.
one less than the Total Number of Channels, declare the associated                                                       a. The inoperable channel (s) is placed auxiliary feedwater pump' inoperable and                                                     in the tripped condition within 6-
The inoperable channel (s) is placed auxiliary feedwater pump' inoperable and in the tripped condition within 6-take the action required by hours, and, Specification 3.4.2.
,                                              take the action required by                                                                 hours, and, Specification 3.4.2.
b.
: b. The Minimum Channels OPERABLE requirement is met;.however, one
The Minimum Channels OPERABLE requirement is met;.however, one ACTION 27: With the number of OPERABLE channels
;                      ACTION 27: With the number of OPERABLE channels                                                                   , inoperable. channel may be bypassed                             ,
, inoperable. channel may be bypassed
;                                            . one less than the Total Number of                                                         'at a time for up to 4 hours for Channels', restore the inoperable                                                             surveillance testing of other                                 !
. one less than the Total Number of
channel to OPERABLE status within 48                                                         channels per Specification 4.1       :n e .-a                   t hours or be in at least HOT SHUTDOWN                                                                                             E2$
'at a time for up to 4 hours for Channels', restore the inoperable surveillance testing of other channel to OPERABLE status within 48 channels per Specification 4.1
                                            - within the next.6 hours and close the                                                                                                 3 M' associated valve.                                                                                                                                           i oo g o-M1 ,La2
:n e.-a t
                                                                                                                                                                                    - D Ut b
hours or be in at least HOT SHUTDOWN E2$
- within the next.6 hours and close the 3 M' l
associated valve.
oo g i
o-M1,La2
- D Ut b
w 9
w 9
- m.__ _. _.a     m   u s:.z_.- _. mm_._______________.__-u m ___._.. _m_ _ _ . ______-__;_        w       e   ,    .w - . + > -
m.
                                                                                                                          -        a     v   w     -n.- w-a   w c + ry ,s     -        y--ww     *
.a m
u s:.z.-
mm.
-u m
m w
e
.w
-. + > -
a v
w
-n.-
w-a w
c + ry
,s y--ww


                                ~
~
                                                                                                                                                                                                                                                                            ,~
,~
TABLE 3.5-2B (Page 9 of 9)
TABLE 3.5-2B (Page 9 of 9)
Action Statements                                                                                                                                             j ACTION 30: With the number of OPERABLE channels                                                             ACTION 33: If the requirements of ACTIONS 30 or 31 one less than the Total Number of                                                                                         cannot be met within the time Channels, declare the associated                                                                                         specified, or with the number of                                                                         ,
Action Statements j
auxiliary.feedwater pump inoperable and                                                                                   OPERABLE channels three less than the take the action required by                                                                                             Total Number of Channels, declare the Specification 3.4.2. However, one                                                                                         associated diesel generator (s) channel may be bypassed for up to 8                                                                                       inoperable and take the ACTION required                                                                   ,
ACTION 30: With the number of OPERABLE channels ACTION 33: If the requirements of ACTIONS 30 or 31 one less than the Total Number of cannot be met within the time Channels, declare the associated specified, or with the number of auxiliary.feedwater pump inoperable and OPERABLE channels three less than the take the action required by Total Number of Channels, declare the Specification 3.4.2.
hours for surveillance testing per                                                                                       by Specification 3.7.B.                                                                                   ;
However, one associated diesel generator (s) channel may be bypassed for up to 8 inoperable and take the ACTION required hours for surveillance testing per by Specification 3.7.B.
Specification 4.1, provided the other channel is OPERABLE.                                                                                                                                                                                                               i ACTION 31: With the number of OPERABLE chanr.els one less than the Total Number of Channels, operation in the applicable
Specification 4.1, provided the other channel is OPERABLE.
                                            . MODE may proceed provided the inoperable channel is placed in the bypassed condition within 6 hours.
i ACTION 31: With the number of OPERABLE chanr.els one less than the Total Number of Channels, operation in the applicable
l ACTION 32: With the number of OPERABLE channels two less than the Total Number of Channels, operation in the applicable MODE may proceed provided the following conditions ~are satisfied;
. MODE may proceed provided the inoperable channel is placed in the bypassed condition within 6 hours.
                                                                    ~
ACTION 32: With the number of OPERABLE channels l
: a.     One inoperable channel is placed in the bypassed condition within 6                                                                                                                                                                                           ,
two less than the Total Number of Channels, operation in the applicable MODE may proceed provided the following conditions ~are satisfied;
hours, and,
~
                                                                                                                                                                                                                                                                . pe -s s
a.
: b.     The other inoperable channel is                                                                                                                                                                               E 2 $i placed in the' tripped condition                                                                                                                                                                               55 within 6 hours, and,                                                                                                                                                                                           es oP         '
One inoperable channel is placed in the bypassed condition within 6 hours, and,
: c.     All of_the channels associated with                                                                                                                                                                             "'M the redundant 4kV Safeguards Bus                                                                                                                                                                               2?
. pe -s s b.
are operable.                                                                                                                                                                                                     @l
The other inoperable channel is E 2 $i placed in the' tripped condition 55 within 6 hours, and, es oP c.
__ _._ _ . . _ _ . . _ . ..._______m.__ -
All of_the channels associated with
                                                  .___a_.._________2  __.w ..__.m___.._ia -.ru _._.__ _ _ _ _ _ -  ~- -4   =_._ -
"'M the redundant 4kV Safeguards Bus 2?
                                                                                                                                  ,  _4. _ _ _ . _ . _ _ . _ _ _____      _____i___._______5u,___ _ __ _ _ . _ _ __ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ - _ _ _ _ _ .}}
are operable.
@l m.
a..
2
.w
.m
.. ia
-.ru
-4
=.
4.
_____i___._______5u,___ _ __ _ _. _ _ __ _ _. _ _ _ _ _ _. _ _ _ _ _ _ - _ _ _ _ _.
~-
-}}

Latest revision as of 09:09, 16 December 2024

Revised Tech Specs for 920921 LAR Proposing Changes to Surveillance Test Intervals & Allowed Outage Times for ESF & RPS Instrumentation
ML20070S239
Person / Time
Site: Prairie Island  
Issue date: 05/17/1994
From:
NORTHERN STATES POWER CO.
To:
Shared Package
ML20070S210 List:
References
NUDOCS 9405230293
Download: ML20070S239 (7)


Text

I h.*U U 4, c

.n

_-mo (A

" N 1-. D (A co.

TABLE TS.3.5-2B (Page 5 of 9) j ON 04 W

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION 04

$o MINIMUM n$

TOTAL NO.

CHANNELS CHANNELS APPLICABLE ONN FUNCTIONAL UNIT OF CHANNELS.

TO TRIP OPERABLE MODES ACTION

a. ItD N

7.

AUXILIARY FEEDWATER a.

Manual 2

1 2

1,2,3 3426 b.

Steam Generator Lo-Lo 3/SG 2/SG in 2/SG in 1,2,3 24 1

Water Level any SG each SG l

1 c.

Undervoltage on 4.16 kV Buses 2/ bus 1/ bus on 2 on one 1, 2 29 11 and 12(Unit 2: 21 and-22) both bus (Start Turbine Driven Pump buses only) d.

Trip of Both. Main Feedwater Pumps

1. Turbine Driven 2

2 2

1, 2 26

2. Motor Driven 2

2 2

1, 2 26 t

e.

Safety Injection See Functional Unit I above for all Safety Injection initiating functions and requirements.

i f.

' Automatic Actuation. Logic 2

1 2

'1,'2, 3

30 i

and Actuation Relays EQ$

<mm i

04 td CD - tz2.

y Ra e6 bw f

...m....

a 2

..m u

2 2

m

TABLE 3.5-2B (Page 8 of 9)

Action Statements i

ACTION 25: With the number of OPERABLE channels ACTION 28: With the number of OPERABLE channels one less than the Total Number of one less than the Total-Number of Channels, restore the inoperable Channels, restore the inoperable channel to OPERABLE status within 6 channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or be in at least HOT SHUTDOWN hours or be in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. Operation in within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

However, one HOT SHUTDOWN may proceed provided the channel may be bypassed for up to 8 main steam isolation valves are closed, hours for surveillance testing per if not, be in at least INTERMEDIATE Specification 4.1, provided the other SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

channel is OPERABLE.

However, one channel may be bypassed for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.for surveillance testing per Specification 4.1, provided ACTION 29: With the number of OPERABLE channels the'other channel is OPERABLE.

less than the Total Number of Channels, operation in the applicable MODE may i

proceed provided the following ACTION 26: With the number of OPERABLE channels conditions are satisfied:

one less than the Total Number of Channels, rectcre the incperable a.

The inoperable channel (s) is placed checcel te OPEPf. ELE ctatuc.rithir 72 in the tripped condition within 6 heurc cr be in at Iccc t MOT E!PRDO'..~"

hours, and, within 6 Feur decla nithe7associhted Auxiliary? feddwa te r [ pump %noperable}ahd b.

The Minimum Channels OPERABLE t'akeltheiaction required y requirement is met; however, one

- Specificatiots13(43 2.

inoperable channel may be bypassed.

at a time for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other.

ACTION 27: With the number of OPERABLE channels channels per Specification 4.1

c a.-i one less than the Total Number of S2$

Channels, restore the inoperable 5E channel to OPERABLE status within 48 cc a hours or be in at least HOT SHUTDOWN o."

within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and close the cw associated valve.

v.

ra D3 m-m

_ _ _ ~

TABLE 3.5-2B (Page 9 of 9)

Action Statements ACTION 30: With the number of OPERABLE channels c.

All of the channels associated with one less than the Total Number of tue redundant 4kV Safeguards Bus Channels, rectcre the incperable are operable.

cFc,nel tc OPEPl. ELE ctatun rithin 72 heurc cr be ir at lecct MOT S"LTDOL*

ACTION 33: If the requirements of ACTIONS 30 or 31 vithin the next S heurc cnd in at lecct cannot be met within the time INTEP"EDIATE S"LTDO"" tithin the specified, or with the number of 4+14eving 6 heurc declare (the OPERABLE channels three less than the

'assbelated?auxiliaryf feedwat'er: pump Total Number of Channels, declare the inoperable?anMtakeith'lactilornrequired associated diesel generator (s) e kN SpediIicfp@nj3MC25 ~However, one inoperable and take the ACTION required channel may be bypassed for up to 8 by Specification 3.7.B.

hours for surveillance testing per Specification 4.1, provided the other ACT-ION M - "ith the n=ber of OPEP1. ELE chcnnels channel is OPERABLE.

ene lecc than the 2t:1 M=b e r o f

~

Channelc, rectrre the incperchic ACTION 31: With the number of OPERABLE channels channel te OPER^. ELE ctatuc cithir 72 one less than the Total Number of heurc cr be ir ct lecct HOT Suu7petm Channels, operation in the applicable uithir 6 heurc cnd ir at lecct MODE may proceed provided the INTEF"EDI^.TE S""TDOL".zithir the inoperable channel is placed in the felleuing 6 heurc.

bypassed condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

ACTION 32: With the number of OPERABLE channels two less than the Total Number of Channels, operation in the applicable MODE may proceed provided the following conditions are satisfied:

o m a tn m >

<: m en a.

One inoperable channel is placed in the bypassed condition within 6 ee hours, and, o."

m.u b.

The other inoperable channel is

  • Y' placed in the tripped condition M

within-6 hours, and,

.+.

h Attaciunent 2 Revised Technical Specification Pages l

1 l

1 i

I h

1 1

j 1..

f' j:

[:-

TABLE TS.3.5-2B (Page 5 of 9)

I

-ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION MINIMUM TOTAL NO.

CHANNELS CHANNELS APPLICABLE f

FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION.

7.

AUXILIARY FEEDiJATER l

a.

Manual 2

1 2

1,2,3 26 l

b.

Steam Generator Lo-Lo 3/SG 2/SG in 2/SG in 1, 2, 3 24 Water Level any SG each SG c.

Undervoltage on 4.16 kV Buses 2/ bus 1/ bus on 2 on one 1, 2 29 L

11 and 12 (Unit 2: 21 and 22) both bus (Start Turbine Driven Pump buses only) d.

Trip of Both. Main ~Feedwater Pumps 1.' Turbine Driven 2

2 2

1, 2 26 2.. Motor Driven 2

2 2

1, 2 26 e.

Safety Injection See Functional Unit I above for all Safety Injection initiating functions and requirements.

f.

Automatic Actuation' Logic 2

1

'2 1,2,3 30 and Actuation Relays om

,L k.

,. w

TABLE 3.5-2B (Page 8 of 9)

Action Statements t

I ACTION 25: With the number of OPERABLE channels ACTION 28: With the number of OPERABLE channels-one less than the Total Number of one less than the Total Number of Channels, restore the inoperable Channels, restore the inoperable channel to OPERABLE status within 6 channel to OPERABLE status within 6

- hours or be in at least HOT SHUTDOWN hours or be'in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, Operation in within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. However, one HOT. SHUTDOWN may proceed.provided the channel may be bypassed for up to b main steam isolation valves are closed, hours for surveillance testing per if not, be in at least INTERMEDIATE Specification 4.1, provided the other SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

channel is OPERABLE.

3 However, one channel may be bypassed for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for surveillance j

testing per Specification 4.1, provided ACTION 29: With the number of OPERABLE channels thc other channel-is OPERABLE.

less than the Total Number of Channels, operation in the applicable MODE may proceed provided the following ACTION 26: With the number of OPERABLE channels conditions are satisfied:

one less than the Total Number of Channels, declare the associated a.

The inoperable channel (s) is placed auxiliary feedwater pump' inoperable and in the tripped condition within 6-take the action required by hours, and, Specification 3.4.2.

b.

The Minimum Channels OPERABLE requirement is met;.however, one ACTION 27: With the number of OPERABLE channels

, inoperable. channel may be bypassed

. one less than the Total Number of

'at a time for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for Channels', restore the inoperable surveillance testing of other channel to OPERABLE status within 48 channels per Specification 4.1

n e.-a t

hours or be in at least HOT SHUTDOWN E2$

- within the next.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and close the 3 M' l

associated valve.

oo g i

o-M1,La2

- D Ut b

w 9

m.

.a m

u s:.z.-

mm.

-u m

m w

e

.w

-. + > -

a v

w

-n.-

w-a w

c + ry

,s y--ww

~

,~

TABLE 3.5-2B (Page 9 of 9)

Action Statements j

ACTION 30: With the number of OPERABLE channels ACTION 33: If the requirements of ACTIONS 30 or 31 one less than the Total Number of cannot be met within the time Channels, declare the associated specified, or with the number of auxiliary.feedwater pump inoperable and OPERABLE channels three less than the take the action required by Total Number of Channels, declare the Specification 3.4.2.

However, one associated diesel generator (s) channel may be bypassed for up to 8 inoperable and take the ACTION required hours for surveillance testing per by Specification 3.7.B.

Specification 4.1, provided the other channel is OPERABLE.

i ACTION 31: With the number of OPERABLE chanr.els one less than the Total Number of Channels, operation in the applicable

. MODE may proceed provided the inoperable channel is placed in the bypassed condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

ACTION 32: With the number of OPERABLE channels l

two less than the Total Number of Channels, operation in the applicable MODE may proceed provided the following conditions ~are satisfied;

~

a.

One inoperable channel is placed in the bypassed condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and,

. pe -s s b.

The other inoperable channel is E 2 $i placed in the' tripped condition 55 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and, es oP c.

All of_the channels associated with

"'M the redundant 4kV Safeguards Bus 2?

are operable.

@l m.

a..

2

.w

.m

.. ia

-.ru

-4

=.

4.

_____i___._______5u,___ _ __ _ _. _ _ __ _ _. _ _ _ _ _ _. _ _ _ _ _ _ - _ _ _ _ _.

~-

-