ATTACHMENT ll TO JPN 91-014 REPLACEMENT TECHNICAL SPECIFICATION PAGES ACCIDENT MONITORING INSTRUMENTATION AMENDMENT (JPTS-89015) l l
ATTACHMENT ll TO JPN 91-014 REPLACEMENT TECHNICAL SPECIFICATION PAGES ACCIDENT MONITORING INSTRUMENTATION AMENDMENT (JPTS-89015) l l
l' New York Power Authority JAMES A. FITZPATRICK NUCLEAR POWER PLANT Docket No. 50 333 i
l' New York Power Authority JAMES A. FITZPATRICK NUCLEAR POWER PLANT Docket No. 50 333 i
                                                                                                                                                          -l
-l l.
: l.                                                                                                                                                           l 9104230288-91041s PDR           ADOCK 05000333 F                         PDR
l 9104230288-91041s PDR ADOCK 05000333 F
_ _ - . . . _ . , . . _ , _ ,                    _    _            __    ,  -.          - ,      .    . . _ _ _.      . . _ .    . _ . . . ~
PDR
... ~


JAFNPP 3.2 (cont'd)                                                                                       42 (cont'd)                                                           ,
JAFNPP 3.2 (cont'd) 42 (cont'd)
E                           Drywell Leak Detection                                                 E     Drywell Leak Detection The limiting conditions of operation for the instrumentation that           instrumentation shall be calibrated and checked as indicated in monitors drywell leak detection are given in Table 32-5.                     Table 42-5 F.                         (Deleted)                                                             F.   (Deleted)
E Drywell Leak Detection E
G.                           Recirculation Pump Trip                                               G. Recirculation Pump Trip The limiting conditions for operation for the instrumentation that           Instrumentation sha!! be functionally tested and calibrated as trip (s) the recirculation pumps as a means of limiting the                   indicated in Table 42-7 consequences of a failure to scram during an anticipated transient are given in Table 32-7.                                           System logic shall be functiona!!y tested as indicated in Table 42-7.
Drywell Leak Detection The limiting conditions of operation for the instrumentation that instrumentation shall be calibrated and checked as indicated in monitors drywell leak detection are given in Table 32-5.
H.                         Accident Monitoring instrumentation H. Accident Monitoring Instrumentation The limiting conditions for operation of the instrumentation that
Table 42-5 F.
                              . provides accident monitoring are given in Table 32-8'                       instrumentation shall be demonstrated operable by performance of a channel check and channel calibration as indicated in Table
(Deleted)
: 1.                         4kv Emergency Bus Undervoltage Trip                                         42-8.
F.
3                              The limiting conditions for opera' ion for the irstrumentation that prevents damage to electrical equipment or circuits as a result of either a degraded or loss-of-voltage condition on the emergency efectrical buses are given in Table 32-2.
(Deleted)
G.
Recirculation Pump Trip G.
Recirculation Pump Trip The limiting conditions for operation for the instrumentation that Instrumentation sha!! be functionally tested and calibrated as trip (s) the recirculation pumps as a means of limiting the indicated in Table 42-7 consequences of a failure to scram during an anticipated transient are given in Table 32-7.
System logic shall be functiona!!y tested as indicated in Table 42-7.
H.
Accident Monitoring instrumentation H.
Accident Monitoring Instrumentation The limiting conditions for operation of the instrumentation that
. provides accident monitoring are given in Table 32-8' instrumentation shall be demonstrated operable by performance of a channel check and channel calibration as indicated in Table 1.
4kv Emergency Bus Undervoltage Trip 42-8.
The limiting conditions for opera' ion for the irstrumentation that 3
prevents damage to electrical equipment or circuits as a result of either a degraded or loss-of-voltage condition on the emergency efectrical buses are given in Table 32-2.
Amendment No.1jiMS, ti!6 54
Amendment No.1jiMS, ti!6 54


                                                                                                                                                                ~
1
1 l
~
JAFNPP
l JAFNPP TABLE 3.2-8
  ,                                                                                                TABLE 3.2-8                                                   !
[
[                                                                                                                                                                 ;
i-ACCIDENT MONITORING INSTRUMENTATION i
i-ACCIDENT MONITORING INSTRUMENTATION i                                                                                                                                                             .
No.of Channels Minirnum No. of Mode in Which Provided by Operable Channels Instrument Must l
No.of Channels Minirnum No. of   Mode in Which Provided by   Operable Channels Instrument Must j                                           instrument                                                                                                           l Design         Required         be Operable     Action l                                                                                                                                                                 '
j instrument Design Required be Operable Action l
: 1.     Stack High Range Effluent Monitor                           2             1                 Note H       Note 8
1.
:                                                                                                                                                                j (17RM-53A)
Stack High Range Effluent Monitor 2
(17RM-538)
1 Note H Note 8 (17RM-53A) j (17RM-538) 2.
: 2.       Turbine Building Vent High Range Effluent Monitor           2                               Note H
Turbine Building Vent High Range Effluent Monitor 2
,                                                                                                                      1                              Note B
1 Note H Note B 1.
: 1.                                         (17RM-434A)                                                                                                           ;
(17RM-434A) i (17RM-4348) 3.
i (17RM-4348)                                                                                                           '
Radwaste Building Vent High Range Effluent Monitor.
: 3.       Radwaste Building Vent High Range Effluent Monitor .       2             1                 Note H       Note B
2 1
'                                          (17RM-463A)                                                                                                           :
Note H Note B (17RM-463A)
(17RM-4638)
(17RM-4638)
                                ' 4.     Containment High Range Radiation Monitor                     2             1                 Note H       Note A
' 4.
,                                          (27RM-104A)
Containment High Range Radiation Monitor 2
(27RM-1048) 5.'     Drywell Pressure (narrow range)                             2
1 Note H Note A I
'                                                                                                                      1                NoteJ         Note A     I
(27RM-104A)
                                          '(27PI-115A1 or 27PR-115A1)
(27RM-1048)
(27PI-11581 or 27PR-11581) i
I 5.'
: 6.       Drywell Pressure (wide range)   -
Drywell Pressure (narrow range) 2 1
2             1                 Note J       Note A     :
NoteJ Note A I
(27PI-115A2 or 27PR-115A2) i (27PI-11582 or 27PR-11582) '                                                                                            '
'(27PI-115A1 or 27PR-115A1)
: 7.       DrywellTemperature                                           2             1                 Note J       Note A j-                                       .(16-1TR-107) -
(27PI-11581 or 27PR-11581)
(16-1TR-108)                                                                                                           .
I i
f J
6.
Drywell Pressure (wide range) 2 1
Note J Note A (27PI-115A2 or 27PR-115A2) i (27PI-11582 or 27PR-11582) '
7.
DrywellTemperature 2
1 Note J Note A j-
.(16-1TR-107) -
(16-1TR-108) i f
J
* At less than or equal to 450 R/hr, closes vent and purge valves
* At less than or equal to 450 R/hr, closes vent and purge valves
                                ' Amendment No.}36 77a                                                         i J
' Amendment No.}36 77a i
                                                                                          ~9
J
~9


l
l JAFNPP j
,                                                                                                        JAFNPP                                                                         !
j TABLE 3.2-8 (cont'd)
j                                                                                                                                                                           .
?
j                                                                                                   TABLE 3.2-8 (cont'd)                                                               ?
i ACCIDENT MONITORING INSTRUMENTATION
i i
[
ACCIDENT MONITORING INSTRUMENTATION No.of Channels Minimum No.of     Mode in Which
i I
;                                                                                                          Provided by   Operable Channels Instrument Must                             ,
No.of Channels Minimum No.of Mode in Which
j                  instrument                                                                             Design         Required         be Operable     Action                       ;
{
4
Provided by Operable Channels Instrument Must j
: 8.         Torus Water Level (wide range)                                                           2 1                 Note J       Note A                     I (230-202A or 23LR-202A/203A)
instrument Design Required be Operable Action 4
(23U-2028 or 23LR-202B/2038)                                                                                                                                         -
8.
: 9.       . Torus Bulk Water Temperature                                                           2             1                 Note J       Note A                     !
Torus Water Level (wide range) 2 1
(16-1TI-131 A or 16-1TR-131 A)
Note J Note A I
(16-1TI-1318 or 16-1TR-1318)
(230-202A or 23LR-202A/203A)
: 10.     - Torus Pressure                                                                           2             1                 Note J       Note A                     ,
(23U-2028 or 23LR-202B/2038) 9.
(27PR-101 A)-                                                                                                                                                       '
. Torus Bulk Water Temperature 2
1 Note J Note A (16-1TI-131 A or 16-1TR-131 A)
(16-1TI-1318 or 16-1TR-1318) 10.
- Torus Pressure 2
1 Note J Note A (27PR-101 A)-
(27PR-10181)
(27PR-10181)
~
~
~
~
: 11.       Drywell Hydrogen / Oxygen Concentration                                                 2.
11.
1                 NoteJ         Note F (27PCR-101 A) .
Drywell Hydrogen / Oxygen Concentration 2.
                ' (27PCR-1018)
1 NoteJ Note F (27PCR-101 A).
        .12. -     ReactorVessel Pressure                                                                   2             1-4-                                                                                                                                            . Note J . Note A (06PI-61 A or 06PR-61 A)                                                                                                                                             1 (06PI-61B or 06PR-618) 13..     Reactor Water Level (fuel zone) .                                                         2             1                 Note J       Note A (02-3U-091) .                                                                                                                                                         '
' (27PCR-1018)
t
.12. -
                  . (02-3LR-098) .                                                                                                                                                         !
ReactorVessel Pressure 2
;''      14.      Reactor Water Level (wide range)                                                         2                                 Nc,*o J                                     '
1-
1                                Note A (02-3U-85A)                                                                                                                                                           '
. Note J.
Note A 4-(06PI-61 A or 06PR-61 A) 1 (06PI-61B or 06PR-618) 13..
Reactor Water Level (fuel zone).
2 1
Note J Note A (02-3U-091).
. (02-3LR-098).
t Reactor Water Level (wide range) 2 1
Nc,*o J Note A 14.
(02-3U-85A)
:(02-3LR-858) j.
:(02-3LR-858) j.
e
e
!-    ' Amendment No M -   .
' Amendment No M -
77b
77b
                                                                    - . . ~                           ,              .,                                          .. -        .- _ _ .
-.. ~


                                              .                                  s
s
                                                =-   ..  ..
=-
pp TABLE 3.2-8 (cont'd)                                                   .
pp TABLE 3.2-8 (cont'd) t ACCIDENT MONITORING INSTRUMENTATION No. of Channels Minimum No. of Mode in Which Provided by Operable Channels instrument Must lastrument Design Required be Operable Action 15.
t ACCIDENT MONITORING INSTRUMENTATION No. of Channels Minimum No. of   Mode in Which Provided by       Operable Channels instrument Must lastrument                                             Design           Required         be Operable       Action
Core Spray Row 1 per loop 1 per loop Ns 'e J Note A
: 15. Core Spray Row                                             1 per loop       1 per loop       Ns 'e J         Note A
!~Jp A (14F1-50A) loop B (14R-508) 16.
              !~Jp A (14F1-50A) loop B (14R-508)
Core Spray discharge pressure 1 per loop 1 per loop Note J Note A loop A (14PI-48A) loop B (14PI-488) 17.
: 16. Core Spray discharge pressure                               1 per loop       1 per loop         Note J           Note A loop A (14PI-48A) loop B (14PI-488)
LPCI (RHR) Row 2 per loop 1 per loop Note J Note A loop A (t0FI-133A)
: 17. LPCI (RHR) Row                                             2 per loop       1 per loop         Note J           Note A loop A (t0FI-133A)
(10FR-143 - red pen) loop B (10R-1338)
(10FR-143 - red pen) loop B (10R-1338)
(10FR-143 - black pen)
(10FR-143 - black pen) 18.
,      18. RHR Service Water Flow                                     1 per loop       1 per loop       Note J           Note A l           loop A (10Fi-132A) loop B (10R-1328) l     19. Safety / Relief Valve Position Indicator                   2                 1                 Note J           Notes D, E (See Note C)
RHR Service Water Flow 1 per loop 1 per loop Note J Note A l
: 20. Torus Water Level (narrow range)                           2               1                 Note J           Note B (23LI-201 A or 27R-101 - red pen or EPIC A-1258)
loop A (10Fi-132A) loop B (10R-1328) l 19.
Safety / Relief Valve Position Indicator 2
1 Note J Notes D, E (See Note C) 20.
Torus Water Level (narrow range) 2 1
Note J Note B (23LI-201 A or 27R-101 - red pen or EPIC A-1258)
(EPIC A-1260)
(EPIC A-1260)
(See Note G) -
(See Note G) -
;    21. Drywell-Torus Differential Pressure                         2               1                 Note J           Note B (16-1DPR-200 or EPIC A-3554)
21.
Drywell-Torus Differential Pressure 2
1 Note J Note B (16-1DPR-200 or EPIC A-3554)
(EPIC A-3551)
(EPIC A-3551)
(See Note G)
(See Note G)
Line 119: Line 158:
77c
77c


l
l l
                                                                                                                                                                .                    l JAFNPP                                                                                     i l
JAFNPP i
TABLE 3.2-8 (Cont'd)
l TABLE 3.2-8 (Cont'd)
ACCIDENT MONITORING INSTRUMENTATION                                                                                   l l
ACCIDENT MONITORING INSTRUMENTATION l
NOTES FOR TABE 3.2-8 A.-   With tee number of operable channels less than the required minimum, either restore the inoperable channels to operable status within 30 days, or be in e cold condition within the next 24 hours.
l NOTES FOR TABE 3.2-8 A.-
  .B. With the number of OPERABE channels less than required by the minimum channels OPERABE requirements, initiate an alternate method of monitoring the appropriate parametar(s) within 72 hours and: (1) either restore the inoperable channel (s) to OPERABE status within 7 days of the event, or '2) prepare and submit a Special Report to the Commission within 14 days following the event outlining the cause of the
With tee number of operable channels less than the required minimum, either restore the inoperable channels to operable status within 30 days, or be in e cold condition within the next 24 hours.
          -inoperability, he action taken, and the plans and schedule for restoring the system to OPERABE status.-
.B.
C. Each Safety / Relief Valve is equipped with two acoustical detectors, one of which is in service. Each SRV also has a backup thermocouple detector. In the ev=t that a thermocouple is inoperable, SRV performance shall be monitored daily with the associated in service acoustical
With the number of OPERABE channels less than required by the minimum channels OPERABE requirements, initiate an alternate method of monitoring the appropriate parametar(s) within 72 hours and: (1) either restore the inoperable channel (s) to OPERABE status within 7 days of the event, or '2) prepare and submit a Special Report to the Commission within 14 days following the event outlining the cause of the
        ' detector.
-inoperability, he action taken, and the plans and schedule for restoring the system to OPERABE status.-
D. From and after the date that both of the acoustical detectors are inoperable, continued operation is' permissible until the next outage in which a primary containment entry is made provided that the thermocouple is operable. Both acoustical detectors shall be made operable prior to restart.
C.
E. In the event that both pr: mary (acousticai detectors) and secondary (thermocouple) indications of this parameter for any one valve are disabled
Each Safety / Relief Valve is equipped with two acoustical detectors, one of which is in service. Each SRV also has a backup thermocouple detector. In the ev=t that a thermocouple is inoperable, SRV performance shall be monitored daily with the associated in service acoustical
        ^ and neither indication can be restored in forty-eight (48) hours, an orderly shutdown shall be initiated and the reactor shall be in a Hot Shutdown condition in twelve (12) hours and in a Cold Shutdown within the next twenty-four (24) hours.
' detector.
F. Refer to Specification 3.7.A.9.
D.
G. This parameter and associated instrumentation are not part of post-accident monitoring.
From and after the date that both of the acoustical detectors are inoperable, continued operation is' permissible until the next outage in which a primary containment entry is made provided that the thermocouple is operable. Both acoustical detectors shall be made operable prior to restart.
  . H. ~ This instrument shall be operab;e in the Run, Startup/ Hot Standby, and Hot Shutdown modes.
E.
J.'   This instrument shall be operable in the Run and Startup/ Hot Standby modes.
In the event that both pr: mary (acousticai detectors) and secondary (thermocouple) indications of this parameter for any one valve are disabled
l Amendment No.
^ and neither indication can be restored in forty-eight (48) hours, an orderly shutdown shall be initiated and the reactor shall be in a Hot Shutdown condition in twelve (12) hours and in a Cold Shutdown within the next twenty-four (24) hours.
                                                                                          .77d
F.
Refer to Specification 3.7.A.9.
G.
This parameter and associated instrumentation are not part of post-accident monitoring.
. H. ~ This instrument shall be operab;e in the Run, Startup/ Hot Standby, and Hot Shutdown modes.
J.'
This instrument shall be operable in the Run and Startup/ Hot Standby modes.
l Amendment No.
.77d


l JAFNPP TABLE 4.2-8                                                         .
l JAFNPP TABLE 4.2-8 MINIMUM TEST AND CALIBRATION FREQUENCY FOR ACCIDENT MONITORING INSTRUMENTATION Instrument instrument Instrument Instrument.
MINIMUM TEST AND CALIBRATION FREQUENCY FOR ACCIDENT MONITORING INSTRUMENTATION Instrument                 instrument               Instrument Instrument .                               -
Functional Test Calibration Frequency Check Stack High Range Effluent Monitor Once/ Operating Cycle Once/ Operating Cycle Once/ day 2.
Functional Test           Calibration Frequency   Check
Turbine Building Vent High Range Effluent FAcnitor Once/ Operating Cycle Once/ Operating Cycle Once/ day 3.
      . Stack High Range Effluent Monitor                         Once/ Operating Cycle     Once/ Operating Cycle   Once/ day
Radwaste Building Vent High Range Effluent Monitor Once/ Operating Cycle Once/ Operating Cycle Once/ day 4.
: 2. Turbine Building Vent High Range Effluent FAcnitor       Once/ Operating Cycle     Once/ Operating Cycle   Once/ day
Containment High Range Radiation Monitor Once/ Operating Cycle Once/ Operating Cycle Once/ day 5.
: 3. Radwaste Building Vent High Range Effluent Monitor       Once/ Operating Cycle     Once/ Operating Cycle   Once/ day
Drywell Pressure (narrow range)
: 4. Containment High Range Radiation Monitor                 Once/ Operating Cycle     Once/ Operating Cycle   Once/ day           ,
N/A Once/ Operating Cycle Once/dcy l
: 5. Drywell Pressure (narrow range)                                 N/A                 Once/ Operating Cycle   Once/dcy l 6. Drywell Pressure (wide range)                                   N/A                 Once/ Operating Cycle   Once/ day
6.
: 7. Drywell Temperature                                             N/A                 Once/ Operating Cycle   Once/ day           j
Drywell Pressure (wide range)
: 8. Torus Water Level (wide range)                                   ',q/A               Once/ Operating Cycle   Once/ day
N/A Once/ Operating Cycle Once/ day 7.
: 9. Torus Bu!k Water Temperature                                     N/A                 Once/ Operating Cycle   Once/ day           1
Drywell Temperature N/A Once/ Operating Cycle Once/ day j
: 10. Torus Pressure                                                   N/A                 Once/ Operating Cycle   Once/ day
8.
: 11. . Drywell Hydrogen / Oxygen Concentration Analyzer               N/A                 Once/3 months           Once/ day
Torus Water Level (wide range)
: 12. Reactor Vessel Pressure                                         N/A                 Once/ Operating Cycle   Once/ day l
',q/A Once/ Operating Cycle Once/ day 9.
: 13. Reactor Water Level (fuel zone)                                 N/A                 Once/ Operating Cycle   Once/ day           l
Torus Bu!k Water Temperature N/A Once/ Operating Cycle Once/ day 1
: 14. Reactor Water Level (wide range)                                 N/A                 Once/ Operating Cycle   Once/ day Amendment No. 25 86
10.
Torus Pressure N/A Once/ Operating Cycle Once/ day 11.
. Drywell Hydrogen / Oxygen Concentration Analyzer N/A Once/3 months Once/ day 12.
Reactor Vessel Pressure N/A Once/ Operating Cycle Once/ day l
13.
Reactor Water Level (fuel zone)
N/A Once/ Operating Cycle Once/ day l
14.
Reactor Water Level (wide range)
N/A Once/ Operating Cycle Once/ day Amendment No. 25 86


JAFNPP TABLE 4.2-8 (cont'd)                                       ,
JAFNPP TABLE 4.2-8 (cont'd) l MINIMUM TEST AND CAllBRATION FREQUENCY FOR ACCIDENT MONITORING INSTRUMENTATION Instrument instrument Instrument Instrument Functional Test Calibration Frequency Check 15.
l MINIMUM TEST AND CAllBRATION FREQUENCY FOR ACCIDENT MONITORING INSTRUMENTATION Instrument           instrument           Instrument Instrument                                                       Functional Test     Calibration Frequency Check Core Spray Flow                                                         N/A           Once/ Operating Cycle Once/ day             l 15.
Core Spray Flow N/A Once/ Operating Cycle Once/ day l
: 16. - Core Spray Discharge Pressure                                           N/A           Once/ Operating Cycle Once/ day
: 16. -
: 17.                                                                           N/A           Once/ Operating Cycle Once/ day LPCI (RHR) Flow
Core Spray Discharge Pressure N/A Once/ Operating Cycle Once/ day 17.
: 18. RHR Service Water Row                                                   N/A           Once/ Operating Cycle Once/ day
LPCI (RHR) Flow N/A Once/ Operating Cycle Once/ day 18.
: 19. Safety / Relief Va!ve Position Indicatar                         Once/ Operating Cycle             N/A       Once/ month (Primary and Secondary)                                                                                                             ;
RHR Service Water Row N/A Once/ Operating Cycle Once/ day 19.
: 20. Torus Water Level (narrow range)                                       N/A           Once/ Operating Cycle Once/ day
Safety / Relief Va!ve Position Indicatar Once/ Operating Cycle N/A Once/ month (Primary and Secondary) 20.
: 21. Drywell-Torus Differential Pressure                                     N/A           Once/ Operating Cycle Once/ day .
Torus Water Level (narrow range)
o i
N/A Once/ Operating Cycle Once/ day 21.
Drywell-Torus Differential Pressure N/A Once/ Operating Cycle Once/ day.
.o i
l l
l l
Amendment No. L'Ad l                                                                                 86a l
Amendment No. L'Ad l
86a l
l
l
                                                        ..  . , - ~
., - ~}}
_ _ _ _}}

Latest revision as of 04:07, 15 December 2024

Replacement Tech Spec Pages Re Accident Monitoring Instrumentation
ML20073A636
Person / Time
Site: FitzPatrick 
Issue date: 04/18/1991
From:
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20073A631 List:
References
NUDOCS 9104230288
Download: ML20073A636 (8)


Text

_-

.=..

ATTACHMENT ll TO JPN 91-014 REPLACEMENT TECHNICAL SPECIFICATION PAGES ACCIDENT MONITORING INSTRUMENTATION AMENDMENT (JPTS-89015) l l

l' New York Power Authority JAMES A. FITZPATRICK NUCLEAR POWER PLANT Docket No. 50 333 i

-l l.

l 9104230288-91041s PDR ADOCK 05000333 F

PDR

... ~

JAFNPP 3.2 (cont'd) 42 (cont'd)

E Drywell Leak Detection E

Drywell Leak Detection The limiting conditions of operation for the instrumentation that instrumentation shall be calibrated and checked as indicated in monitors drywell leak detection are given in Table 32-5.

Table 42-5 F.

(Deleted)

F.

(Deleted)

G.

Recirculation Pump Trip G.

Recirculation Pump Trip The limiting conditions for operation for the instrumentation that Instrumentation sha!! be functionally tested and calibrated as trip (s) the recirculation pumps as a means of limiting the indicated in Table 42-7 consequences of a failure to scram during an anticipated transient are given in Table 32-7.

System logic shall be functiona!!y tested as indicated in Table 42-7.

H.

Accident Monitoring instrumentation H.

Accident Monitoring Instrumentation The limiting conditions for operation of the instrumentation that

. provides accident monitoring are given in Table 32-8' instrumentation shall be demonstrated operable by performance of a channel check and channel calibration as indicated in Table 1.

4kv Emergency Bus Undervoltage Trip 42-8.

The limiting conditions for opera' ion for the irstrumentation that 3

prevents damage to electrical equipment or circuits as a result of either a degraded or loss-of-voltage condition on the emergency efectrical buses are given in Table 32-2.

Amendment No.1jiMS, ti!6 54

1

~

l JAFNPP TABLE 3.2-8

[

i-ACCIDENT MONITORING INSTRUMENTATION i

No.of Channels Minirnum No. of Mode in Which Provided by Operable Channels Instrument Must l

j instrument Design Required be Operable Action l

1.

Stack High Range Effluent Monitor 2

1 Note H Note 8 (17RM-53A) j (17RM-538) 2.

Turbine Building Vent High Range Effluent Monitor 2

1 Note H Note B 1.

(17RM-434A) i (17RM-4348) 3.

Radwaste Building Vent High Range Effluent Monitor.

2 1

Note H Note B (17RM-463A)

(17RM-4638)

' 4.

Containment High Range Radiation Monitor 2

1 Note H Note A I

(27RM-104A)

(27RM-1048)

I 5.'

Drywell Pressure (narrow range) 2 1

NoteJ Note A I

'(27PI-115A1 or 27PR-115A1)

(27PI-11581 or 27PR-11581)

I i

6.

Drywell Pressure (wide range) 2 1

Note J Note A (27PI-115A2 or 27PR-115A2) i (27PI-11582 or 27PR-11582) '

7.

DrywellTemperature 2

1 Note J Note A j-

.(16-1TR-107) -

(16-1TR-108) i f

J

  • At less than or equal to 450 R/hr, closes vent and purge valves

' Amendment No.}36 77a i

J

~9

l JAFNPP j

j TABLE 3.2-8 (cont'd)

?

i ACCIDENT MONITORING INSTRUMENTATION

[

i I

No.of Channels Minimum No.of Mode in Which

{

Provided by Operable Channels Instrument Must j

instrument Design Required be Operable Action 4

8.

Torus Water Level (wide range) 2 1

Note J Note A I

(230-202A or 23LR-202A/203A)

(23U-2028 or 23LR-202B/2038) 9.

. Torus Bulk Water Temperature 2

1 Note J Note A (16-1TI-131 A or 16-1TR-131 A)

(16-1TI-1318 or 16-1TR-1318) 10.

- Torus Pressure 2

1 Note J Note A (27PR-101 A)-

(27PR-10181)

~

~

11.

Drywell Hydrogen / Oxygen Concentration 2.

1 NoteJ Note F (27PCR-101 A).

' (27PCR-1018)

.12. -

ReactorVessel Pressure 2

1-

. Note J.

Note A 4-(06PI-61 A or 06PR-61 A) 1 (06PI-61B or 06PR-618) 13..

Reactor Water Level (fuel zone).

2 1

Note J Note A (02-3U-091).

. (02-3LR-098).

t Reactor Water Level (wide range) 2 1

Nc,*o J Note A 14.

(02-3U-85A)

(02-3LR-858) j.

e

' Amendment No M -

77b

-.. ~

s

=-

pp TABLE 3.2-8 (cont'd) t ACCIDENT MONITORING INSTRUMENTATION No. of Channels Minimum No. of Mode in Which Provided by Operable Channels instrument Must lastrument Design Required be Operable Action 15.

Core Spray Row 1 per loop 1 per loop Ns 'e J Note A

!~Jp A (14F1-50A) loop B (14R-508) 16.

Core Spray discharge pressure 1 per loop 1 per loop Note J Note A loop A (14PI-48A) loop B (14PI-488) 17.

LPCI (RHR) Row 2 per loop 1 per loop Note J Note A loop A (t0FI-133A)

(10FR-143 - red pen) loop B (10R-1338)

(10FR-143 - black pen) 18.

RHR Service Water Flow 1 per loop 1 per loop Note J Note A l

loop A (10Fi-132A) loop B (10R-1328) l 19.

Safety / Relief Valve Position Indicator 2

1 Note J Notes D, E (See Note C) 20.

Torus Water Level (narrow range) 2 1

Note J Note B (23LI-201 A or 27R-101 - red pen or EPIC A-1258)

(EPIC A-1260)

(See Note G) -

21.

Drywell-Torus Differential Pressure 2

1 Note J Note B (16-1DPR-200 or EPIC A-3554)

(EPIC A-3551)

(See Note G)

Amendment No.

77c

l l

JAFNPP i

l TABLE 3.2-8 (Cont'd)

ACCIDENT MONITORING INSTRUMENTATION l

l NOTES FOR TABE 3.2-8 A.-

With tee number of operable channels less than the required minimum, either restore the inoperable channels to operable status within 30 days, or be in e cold condition within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

.B.

With the number of OPERABE channels less than required by the minimum channels OPERABE requirements, initiate an alternate method of monitoring the appropriate parametar(s) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and: (1) either restore the inoperable channel (s) to OPERABE status within 7 days of the event, or '2) prepare and submit a Special Report to the Commission within 14 days following the event outlining the cause of the

-inoperability, he action taken, and the plans and schedule for restoring the system to OPERABE status.-

C.

Each Safety / Relief Valve is equipped with two acoustical detectors, one of which is in service. Each SRV also has a backup thermocouple detector. In the ev=t that a thermocouple is inoperable, SRV performance shall be monitored daily with the associated in service acoustical

' detector.

D.

From and after the date that both of the acoustical detectors are inoperable, continued operation is' permissible until the next outage in which a primary containment entry is made provided that the thermocouple is operable. Both acoustical detectors shall be made operable prior to restart.

E.

In the event that both pr: mary (acousticai detectors) and secondary (thermocouple) indications of this parameter for any one valve are disabled

^ and neither indication can be restored in forty-eight (48) hours, an orderly shutdown shall be initiated and the reactor shall be in a Hot Shutdown condition in twelve (12) hours and in a Cold Shutdown within the next twenty-four (24) hours.

F.

Refer to Specification 3.7.A.9.

G.

This parameter and associated instrumentation are not part of post-accident monitoring.

. H. ~ This instrument shall be operab;e in the Run, Startup/ Hot Standby, and Hot Shutdown modes.

J.'

This instrument shall be operable in the Run and Startup/ Hot Standby modes.

l Amendment No.

.77d

l JAFNPP TABLE 4.2-8 MINIMUM TEST AND CALIBRATION FREQUENCY FOR ACCIDENT MONITORING INSTRUMENTATION Instrument instrument Instrument Instrument.

Functional Test Calibration Frequency Check Stack High Range Effluent Monitor Once/ Operating Cycle Once/ Operating Cycle Once/ day 2.

Turbine Building Vent High Range Effluent FAcnitor Once/ Operating Cycle Once/ Operating Cycle Once/ day 3.

Radwaste Building Vent High Range Effluent Monitor Once/ Operating Cycle Once/ Operating Cycle Once/ day 4.

Containment High Range Radiation Monitor Once/ Operating Cycle Once/ Operating Cycle Once/ day 5.

Drywell Pressure (narrow range)

N/A Once/ Operating Cycle Once/dcy l

6.

Drywell Pressure (wide range)

N/A Once/ Operating Cycle Once/ day 7.

Drywell Temperature N/A Once/ Operating Cycle Once/ day j

8.

Torus Water Level (wide range)

',q/A Once/ Operating Cycle Once/ day 9.

Torus Bu!k Water Temperature N/A Once/ Operating Cycle Once/ day 1

10.

Torus Pressure N/A Once/ Operating Cycle Once/ day 11.

. Drywell Hydrogen / Oxygen Concentration Analyzer N/A Once/3 months Once/ day 12.

Reactor Vessel Pressure N/A Once/ Operating Cycle Once/ day l

13.

Reactor Water Level (fuel zone)

N/A Once/ Operating Cycle Once/ day l

14.

Reactor Water Level (wide range)

N/A Once/ Operating Cycle Once/ day Amendment No. 25 86

JAFNPP TABLE 4.2-8 (cont'd) l MINIMUM TEST AND CAllBRATION FREQUENCY FOR ACCIDENT MONITORING INSTRUMENTATION Instrument instrument Instrument Instrument Functional Test Calibration Frequency Check 15.

Core Spray Flow N/A Once/ Operating Cycle Once/ day l

16. -

Core Spray Discharge Pressure N/A Once/ Operating Cycle Once/ day 17.

LPCI (RHR) Flow N/A Once/ Operating Cycle Once/ day 18.

RHR Service Water Row N/A Once/ Operating Cycle Once/ day 19.

Safety / Relief Va!ve Position Indicatar Once/ Operating Cycle N/A Once/ month (Primary and Secondary) 20.

Torus Water Level (narrow range)

N/A Once/ Operating Cycle Once/ day 21.

Drywell-Torus Differential Pressure N/A Once/ Operating Cycle Once/ day.

.o i