nn Tennessee Valley Authonty. Post Othee Box 2000 Soddy-Damy. Tennessee 37379 April 10, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
nn Tennessee Valley Authonty. Post Othee Box 2000 Soddy-Damy. Tennessee 37379 April 10, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
In the Matter of                                                     )         Docket Nos. 50-327 Tennessee Valley Authority                                           )                       50-328 SEQUOYAH NUCLEAR PLANT (SQN) - MARCH 1995 MONTHLY OPERATING REPORT Enclosed is the March 1995 Monthly operating Report as required by SQN Technical Specification 6.9.1.10.
20555 Gentlemen:
If you have any questions concerning this matter,                       ,e call J. W. Proffitt at (615) 843-6651.
In the Matter of
Sincerely, Yo R. H. Shell Manager SQN Site Licensing Enclosure cc       See page 2 1SC052                                                                           $k 9504180003 950410 PDR       ADOCK 05000327 M "7                                          i R               _.._ ,_.PDR,               ,$
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - MARCH 1995 MONTHLY OPERATING REPORT Enclosed is the March 1995 Monthly operating Report as required by SQN Technical Specification 6.9.1.10.
If you have any questions concerning this matter,
,e call J. W. Proffitt at (615) 843-6651.
Sincerely, Yo R. H. Shell Manager SQN Site Licensing Enclosure cc See page 2 1SC052
$k 9504180003 950410 "7
PDR ADOCK 05000327 M i
R
_.._,_.PDR,


      -.          .              . . . - - . .,  ~.    - .  . - . ..._ -..
~.
1 U.S. Nuclear Regulatory commission                           I Page 2                                                       l April 10,-1995                                               1 l
1 U.S. Nuclear Regulatory commission Page 2 April 10,-1995 1
1
l 1
                    -cc'(Enclosure):
-cc'(Enclosure):
                          'I'PO Records Center Institute of Nuclear Power Operations                 1 700 Galleria Parkway-                               -);
'I'PO Records Center Institute of Nuclear Power Operations 1
Atlanta,. Georgia.30339-5957 I
700 Galleria Parkway-
Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission                     i i
-)
One White Flint,-North 11555 Rockville. Pike.
Atlanta,. Georgia.30339-5957 Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission i
Rockville,_ Maryland 20852-2739 i                           Mr.' Joseph Santucci, Manager                           l l                          . Advanced Reactor' Department,                         j l                           Electric Power Research Institute-                   -l 3340 Hillview Avenue                                   l Palo Alto,' California 94304
i One White Flint,-North 11555 Rockville. Pike.
                                                                                  ]
Rockville,_ Maryland 20852-2739 i
NRC Resident Inspector                                 i Sequoyah Nuclear Plant
Mr.' Joseph Santucci, Manager l
,                            2600 Igou Ferry Road                                   .
. Advanced Reactor' Department, j
: l.                          Soddy-Daisy, Tennessee 37379-3624 Regional Administration                               I U.S. Nuclear Regulatory Commission                     j office of Inspection and Enforcement                   l Region II 101 Marietta Street, NW, Suite 2900-Atlanta, Georgia 30323-2711 Regional Administrator U.S. Nuclear Regulatory Commission j                           Region II-
l Electric Power Research Institute-
: l.                         -101 Marietta Street, NW, Suite 2900 l                           Atlanta, Georgia 30323-2711 l
-l 3340 Hillview Avenue l
t
Palo Alto,' California 94304
.                            Mr..F. Yost,' Director Research Services Utility Data Institute 1200 G Street, NW, Suite 250 Washington, D.C. 20005 j .-
]
NRC Resident Inspector i
Sequoyah Nuclear Plant 2600 Igou Ferry Road l.
Soddy-Daisy, Tennessee 37379-3624 Regional Administration I
U.S. Nuclear Regulatory Commission j
office of Inspection and Enforcement l
Region II 101 Marietta Street, NW, Suite 2900-Atlanta, Georgia 30323-2711 Regional Administrator U.S. Nuclear Regulatory Commission j
Region II-l.
-101 Marietta Street, NW, Suite 2900 l
Atlanta, Georgia 30323-2711 l
t Mr..F. Yost,' Director Research Services Utility Data Institute 1200 G Street, NW, Suite 250 Washington, D.C.
20005 j.-
i i
i i
l~                                                                                 l l'
l ~
                                                                                  -l
l l'
-l


i l.
i l.
l TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT                                                 ,
l TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT l
l MONTHLY OPERATING REPORT TO THE NUCLEAR REGULATORY COMMISSION                                             ,
MONTHLY OPERATING REPORT TO THE NUCLEAR REGULATORY COMMISSION l
l MARCH 1995 I                                                                                                       e I
MARCH 1995 I
UNIT 1 DOCKET NUMBER 50-327                                                 P LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 l                                 LICENSE NUMBER DPR-79
e I
    ,                _ _ . .                      _        . . _ _ _ , _ _ . _ _ . . _ _ . . --.m..- ,
UNIT 1 DOCKET NUMBER 50-327 P
LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 l
LICENSE NUMBER DPR-79
--.m..-


6 OPERATIONAL  
6 OPERATIONAL  
Line 54: Line 79:
==SUMMARY==
==SUMMARY==
MARCH 1995 i
MARCH 1995 i
e UNIT 1                                   [
e UNIT 1
[
Unit 1 generated 718,250 megawatthours (MWh) (gross) electrical' power-during March with a capacity factor of 83.9 percent.
Unit 1 generated 718,250 megawatthours (MWh) (gross) electrical' power-during March with a capacity factor of 83.9 percent.
Unit i remained in Mode 4 at the beginning of March'as inspections .
Unit i remained in Mode 4 at the beginning of March'as inspections.
continued on reactor vessel' level indicating system (RVLIS) compression fittings following a reactor coolant system leak at a_ compression fitting.
continued on reactor vessel' level indicating system (RVLIS) compression fittings following a reactor coolant system leak at a_ compression fitting.
on a RVLIS line in the incore instrument room. The Unit 1 reactor was taken critical on March 3 at 2250 Eastern standard time (EST). Unit 1 was tiedLto.the grid at 1259 EST on March 4. Unit 1 reached 100 percent
on a RVLIS line in the incore instrument room. The Unit 1 reactor was taken critical on March 3 at 2250 Eastern standard time (EST).
                    -reactor power on March--14.
Unit 1 was tiedLto.the grid at 1259 EST on March 4.
Unit 1 operated at near 100 percent reactor. power through the end of         ,
Unit 1 reached 100 percent
March.
-reactor power on March--14.
UNIT 2 Unit 2 generated 860,910.megawatthours (MWh) (gross) electrical power during March with a capacity factor of 101 percent.                           -
Unit 1 operated at near 100 percent reactor. power through the end of March.
UNIT 2 Unit 2 generated 860,910.megawatthours (MWh) (gross) electrical power during March with a capacity factor of 101 percent.
F i
F i
1 I
1 I
l l
l l
b                                                                                                 i
b i
!                                                                                                  I l-l l
l-l
                                                                                                    \
\\
s.
l
l
: s.                                                                                                  :
,o
l                                                                                                  ,
o


  .s                 .
.s AVERACE DAILY UNIT POWER LEVEL DOCKET NO.-
AVERACE DAILY UNIT POWER LEVEL DOCKET NO.-           50-327'           UNIT.No. One                         DATE:'   04-03-95 COMPLETED BY:           T.'J.'Ho11omon-                           ' TELEPHONE:           f615) 843-7528                   1 MONTH:       MARCH 1995 AVERAGE DAILY POWER LEVEL                           . AVERAGE' DAILY POWER LEVEL'.                                   j D&1                     'fMWe-Net)                 ]Zh1                         (MWe-Net)                               ')
50-327' UNIT.No.
1                         -28                     11 7 -                         1153 1
One DATE:'
                                                -33                     '18                             1156                                       l l
04-03-95 COMPLETED BY:
j;                       '3                         -33                     119                           :1151'                                       ,
T.'J.'Ho11omon-
                                                                                                                                                      .i j                         4                           81                       20                             1150-5                         489                       21                           '1149
' TELEPHONE:
,                          6                          522                       22                           -1144-                                       ,
f615) 843-7528 1
i 4
MONTH:
l'                        7                         616                       23.                           1148-8                         958                       ;
MARCH 1995 AVERAGE DAILY POWER LEVEL
2 4-                         '1152-i 9                         990                       25.                           1155 10                       1113                       26                             1154 l
. AVERAGE' DAILY POWER LEVEL'.
l-                        11                       1134                       27                             1150 12                       1132                       28                         ~1149 13                       1130                       29                           1146 14                       1152                       30                           1147 15                       '1153                       31'                           1152 16                       1153 i
j D&1
l t                                                                                                                                                         i i
'fMWe-Net)
            ,            ,                -. ,                          .  .              --            ,        -  -a_.    - - . .
]Zh1 (MWe-Net)
')
1
-28 11 7 -
1153 1 -33
'18 1156 j;
'3
-33 119
:1151'
.i j
4 81 20 1150-5 489 21
'1149 6
522 22
-1144-i 4
7 616 23.
1148-l' 8
958 2;4-
'1152-i 9
990 25.
1155 10 1113 26 1154 l
11 1134 27 l-1150 12 1132 28
~1149 13 1130 29 1146 14 1152 30 1147 15
'1153 31' 1152 16 1153 i
t i
i
-a.


AVERAGE DAILY UNIT POWER LEVEL 1
l DOCKET NO.
50-328' UNIT No.
Two' DATE:
04-03-95 l
COMPLETED BYr T.
J.
Hollomon TELEPHONE:
f615) 843-7528.
1 MONTH:
MARCH 1995 I
. AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL I
Q&1 (MWe-Net)'
QA1 (MWe-Net)'
1
1
            **                        AVERAGE DAILY UNIT POWER LEVEL                              1 l        DOCKET NO.      50-328'          UNIT No. Two'            DATE:    04-03-95 l
-1142 17 3134 j
COMPLETED BYr    T. J. Hollomon                        TELEPHONE:    f615) 843-7528. 1 MONTH:      MARCH 1995 I              . AVERAGE DAILY POWER LEVEL                  AVERAGE DAILY POWER LEVEL            l I
-2' 1138 18 1131 3
Q&1              (MWe-Net)'                QA1              (MWe-Net)'
1139 19 1131 4
j        1                -1142                     17               3134
1142 20 1127 l'
        -2'                 1138                     18               1131 3                 1139                     19               1131 4                 1142                     20               1127 l'
5 1142 21 1122
!        5                 1142                     21               1122                     -I 6                 1141                     22               1112' 7                 1134                     23               1113 8                 1101                     24               1117
-I 6
.        9                  1085                     25               1119 l
1141 22 1112' 7
j       10                 1083~                     26               1119 l
1134 23 1113 8
11                 1036                     27               1121 12                 1116                     28               1123 13                 1123                     29               1124 14                 1130                     30               1120 l
1101 24 1117 9
15                 1130                     31               1117 16                 1117                                                                   ]
1085 25 1119 l
j 10 1083~
26 1119 11 1036 27 1121 12 1116 28 1123 13 1123 29 1124 14 1130 30 1120 l
15 1130 31 1117 16 1117
]
l I
l I
: l. .
 
OPERATING DATA REPORT DOCKET NO. _50-327 DATE 04/03/95 COMPLETED BY T. J. Ho' lomon
l.
!                                                                                TELEPHONE (615) 843-7528 l       OPERATING STATUS l                                                                       l Notes                         l l-     1. Unit Name:     Seouovah Unit One                             l                               l l     2. Reporting Period:   March 1995                             l                               l l     3. Licensed Thermal Power (MWt): 3411.0                       l                               l
OPERATING DATA REPORT DOCKET NO. _50-327 DATE 04/03/95 COMPLETED BY T. J. Ho' lomon TELEPHONE (615) 843-7528 l
: 4. Nameplate Rating (Gross MWe): 1220.6                         l                               l
OPERATING STATUS l
: 5. Design Electrical Rating (Net MWe): 1148.0                   l                               l l     6. Maximum Dependable Capacity (Gross MWe): 1151.0             l                               l l     7. Maximum Dependable Capacity (Net MWe): 1111.0               l                               I
l Notes l
: 8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
l-1.
: 9. Power Level To Which Restricted, If Any (Net MWe):     N/A
Unit Name:
: 10. Reasons For Restrictions, If Any:         N/A This Month         Yr-to-Date         Cumulative
Seouovah Unit One l
: 11. Hours in Reporting Period                         744                 2.160           120.529
l l
: 12. Number of Hours Reactor Was Critical             673.2               1.963.6         64 013   j
2.
: 13. Reactor Reserve Shutdown Hours                     0                     0                 0
Reporting Period:
: 14. Hours Generator On-Line                           659.0               1.949.2         62.553.5
March 1995 l
: 15. Unit Reserve Shutdown Hours                         0                     0                 0   4
l l
: 16. Gross Thermal Energy Generated (MWH)       2.060.933.9           6.432.797.6     204.008.794     l
3.
: 17. Gross Electrical Energy Generated (MWH)       718.250             2.242.960       69.293.844     l
Licensed Thermal Power (MWt): 3411.0 l
: 18. Net Electrical Energy Generated (MWH)         691.605             2.165.485       66.428.898
l 4.
: 19. Unit Service Factor                               88.6                   90.2             51.9
Nameplate Rating (Gross MWe): 1220.6 l
: 20. Unit Availability Factor                           88.6                   90.2             51.9
l 5.
: 21. Unit Capacity Factor (Using MDC Net)               83.7                   90.2             49.6
Design Electrical Rating (Net MWe): 1148.0 l
: 22. Unit Capacity Factor (Using DER Net)               81.0                   87.3             48.0
l l
: 23. Unit Forced Outage Rate                           11.4                   9.8             36.0
6.
Maximum Dependable Capacity (Gross MWe): 1151.0 l
l l
7.
Maximum Dependable Capacity (Net MWe): 1111.0 l
I 8.
If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
: 10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative
: 11. Hours in Reporting Period 744 2.160 120.529
: 12. Number of Hours Reactor Was Critical 673.2 1.963.6 64 013 j
: 13. Reactor Reserve Shutdown Hours 0
0 0
: 14. Hours Generator On-Line 659.0 1.949.2 62.553.5
: 15. Unit Reserve Shutdown Hours 0
0 0
4
: 16. Gross Thermal Energy Generated (MWH) 2.060.933.9 6.432.797.6 204.008.794
: 17. Gross Electrical Energy Generated (MWH) 718.250 2.242.960 69.293.844
: 18. Net Electrical Energy Generated (MWH) 691.605 2.165.485 66.428.898
: 19. Unit Service Factor 88.6 90.2 51.9
: 20. Unit Availability Factor 88.6 90.2 51.9
: 21. Unit Capacity Factor (Using MDC Net) 83.7 90.2 49.6
: 22. Unit Capacity Factor (Using DER Net) 81.0 87.3 48.0
: 23. Unit Forced Outage Rate 11.4 9.8 36.0
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
The Unit 1 Cvele 7 refuelino outaae is scheduled to beain September 9,1995. with a duration of 51 days.
The Unit 1 Cvele 7 refuelino outaae is scheduled to beain September 9,1995. with a duration of 51 days.
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:


4 OPERATING DATA REPORT DOCKET NO. 50-328 DATE 04/03/95           l COMPLETED BY   T. J. Ho11omon TELEPHONE (615) 843-7528 l
4 OPERATING DATA REPORT DOCKET NO.
1 OPERATING STATUS                                                                                     j l Notes                       l
50-328 DATE 04/03/95 COMPLETED BY T. J. Ho11omon TELEPHONE (615) 843-7528 l
: 1. Unit Name:     Seauovah Unit Two                                 l                             l
1 OPERATING STATUS j
: 2. Reporting Period: March 1995                                     l                             l
l Notes l
: 3. Licensed Thermal Power (MWt): 3411.0                             l                             l  l
1.
: 4. Nameplate Ra*,ing (Gross MWe): 1220.6                           l                             l
Unit Name:
: 5. Design Electrical Rating (Net MWe): 1148.0                       l                             l
Seauovah Unit Two l
: 6. Maximum Dependable Capacity (Gross We): 1146,0                   l                             l.
l 2.
: 7. Maximum Dependable Capacity (Net HWe): 1106.0                   l                             l
Reporting Period: March 1995 l
: 8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
l 3.
: 9. Power Level To Which Restricted, If Any (Net HWe):     N/A
Licensed Thermal Power (MWt): 3411.0 l
: 10. Reasons For Restrictions, If Any:       N/A This Month       Yr-to-Date           Cumulative
l 4.
: 11. Hours in Reporting Period                       744                 2.160           112,489
Nameplate Ra*,ing (Gross MWe): 1220.6 l
: 12. Number of Hours Reactor Was Critical             744.0               2.137.7           66.494
l 5.
: 13. Reactor Reserve Shutdown Hours                     0                     0                 0
Design Electrical Rating (Net MWe): 1148.0 l
: 14. Hours Generator On-Line                         744.0               2.098.7 ,         64.808.4
l 6.
: 15. Unit Reserve Shutdown Hours                         0                     0                 0
Maximum Dependable Capacity (Gross We): 1146,0 l
: 16. Gross Thermal Energy Generated (HWH)       2.500.844.1         6.974.737.3       204.502.200
l.
: 17. Gross Electrical Energy Generated (MWH)     860.910           2.398.403           69.406.012
7.
: 18. Net Electrical Energy Generated (MWH)       832.002           2.314.039           66.428.221
Maximum Dependable Capacity (Net HWe): 1106.0 l
: 19. Unit Service Factor                             100.0                   97.2             57.6
l 8.
: 20. Unit Availability Factor                         100.0                 97.2             57.6   j
If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
,      21. Unit Capacity Factor (Using HDC Net)             101.1                 96.9             53.4   l
9.
: 22. Unit Capacity Factor (Using DER Net)               97.4                 93.3             51.4   l
Power Level To Which Restricted, If Any (Net HWe):
: 23. Unit Forced Outage Rate                             0.0                   2.8             34.4   ;
N/A
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):                         l Unit 2 is scheduled to becin a forced maintenance on April 6.1995. with a duration of I             16 days.
: 10. Reasons For Restrictions, If Any:
;      25. If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A This Month Yr-to-Date Cumulative
: 11. Hours in Reporting Period 744 2.160 112,489
: 12. Number of Hours Reactor Was Critical 744.0 2.137.7 66.494
: 13. Reactor Reserve Shutdown Hours 0
0 0
: 14. Hours Generator On-Line 744.0 2.098.7,
64.808.4
: 15. Unit Reserve Shutdown Hours 0
0 0
: 16. Gross Thermal Energy Generated (HWH) 2.500.844.1 6.974.737.3 204.502.200
: 17. Gross Electrical Energy Generated (MWH) 860.910 2.398.403 69.406.012
: 18. Net Electrical Energy Generated (MWH) 832.002 2.314.039 66.428.221
: 19. Unit Service Factor 100.0 97.2 57.6
: 20. Unit Availability Factor 100.0 97.2 57.6 j
: 21. Unit Capacity Factor (Using HDC Net) 101.1 96.9 53.4
: 22. Unit Capacity Factor (Using DER Net) 97.4 93.3 51.4
: 23. Unit Forced Outage Rate 0.0 2.8 34.4
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Unit 2 is scheduled to becin a forced maintenance on April 6.1995. with a duration of I
16 days.
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
i I
i I


                                                                                                                                                                                                                        ,1 -
,1 DOCKET NO:
DOCKET NO:     50-327 UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                                                   UNIT NAME:       One         ,
50-327 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME:
DATE: 04/01/95
One DATE:
* REPORT MONTH:                   March 1995                                                                                   COMPLETED BY:T. O. Ho' lomon TELEPHONE:(615) 843-7528 Method of                         Licensee                                                                                       Cause and Corrective Duration               Shutting Down                       Event         Systy                            Compgnent Action to
04/01/95 REPORT MONTH:
* No.   .Date       Type     (Hours)     Reason     Reactor                           Report No. Code                             Code                                           Prevent Recurrence.                 "
March 1995 COMPLETED BY:T. O. Ho' lomon TELEPHONE:(615) 843-7528 Method of Licensee Cause and Corrective Action to Systy Compgnent Duration Shutting Down Event No.
1     950301       F       84.98-       A               1                         50-327/95002     AB                                 N/A                                 Unit I remained in Mode 4 at the beginning of March as inspections continued on RVLIS compression fittings. The Unit I reactor was taken critical on March 3 and was tied to the grid at 1259 EST on March 4.
.Date Type (Hours)
2 Reason:                                                          3                                                                                 4 I:F Forced                                                                             Method:                                                                             Exhibit G-Instructions S: Scheduled '   a-tquipment Failure (Explain)                                       1-Manual                                                                         -for Preparation of Data B-Maintenance or.. Test                                             2-Manual Scram                                                                     - Entry sheets for Licensee C-Refueling                                                         3-Automatic Scram                                                                     Event Report (LER) File D-Regulatory Restruction                                           4-Continuation of Existing Outage -                                                 '(NUREG-1022)
Reason Reactor Report No.
E-Operator Training and License' Examination                       '5-Reduction
Code Code Prevent Recurrence.
                  'F-Administrative.                                                   9-Other~
1 950301 F
5 G-Operational Error (Explain)                                                                                                                         Exhibit I-Same Source H-Other (Explain)
84.98-A 1
50-327/95002 AB N/A Unit I remained in Mode 4 at the beginning of March as inspections continued on RVLIS compression fittings. The Unit I reactor was taken critical on March 3 and was tied to the grid at 1259 EST on March 4.
2 3
4 I: Forced Reason:
Method:
Exhibit G-Instructions F
S: Scheduled '
a-tquipment Failure (Explain) 1-Manual
-for Preparation of Data B-Maintenance or.. Test 2-Manual Scram
- Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restruction 4-Continuation of Existing Outage -
'(NUREG-1022)
E-Operator Training and License' Examination
'5-Reduction
'F-Administrative.
9-Other~
l 5
G-Operational Error (Explain)
Exhibit I-Same Source H-Other (Explain) i i


DOCKET NO:   50-328 UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                                                                                         UNIT NAME:     Two     *'
DOCKET NO:
DATE: ('4/01/95 REPORT MONTH:   March 1995                                                                                                                     COMPLETED BY:T. . . Ho' lomon
50-328 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME:
                                                                                                                                                                                                                                                                          -TELEPHONE:(61b) 843-7528-Method of               Licensee                                                                                                                   Cause and Corrective Duration                                                     Shutting Down                 Event         Systy                     Comppent                                                                                         Action to-
Two DATE:
* No. Date     Type         (Hours)           Reason                                         Reactor                 Report No. Code                       Code                                                                             Prevent Recurrence There were no outages or power ~
('4/01/95 REPORT MONTH:
March 1995 COMPLETED BY:T... Ho' lomon
-TELEPHONE:(61b) 843-7528-Method of Licensee Cause and Corrective Action to-Duration Shutting Down Event Systy Comppent No.
Date Type (Hours)
Reason Reactor Report No.
Code Code Prevent Recurrence There were no outages or power ~
reductions of greater than 20 percent to report during March.
reductions of greater than 20 percent to report during March.
1 2 Reason:                                                                                              3 Method:                                                                          4 I:F Forced                                                                                                                                                                                                     Exhibit G-Instructions.
1 2
5: Scheduled     A-Equipment Failure (Explain)                                                                           1-Manual                                                                             'for Preparation of Data-B-Maintenance or Test                                                                                   2-Manual Scram -                                                                         Entry sheets for Licensee C-Refueling                                                                                             3-Automatic Scram                                                                       Event Report (LER) Flie D-Regulatory Restruction                                                                               4-Continuation of Existing Outage .                                                   -(NUREG-1022)
3 4
E-Operator Training and License Examination                                                             5-Reduction F-Administrative                                                                                       9-Other S
I: Forced Reason:
G-Operational Error (Explain)                                                                                                                                                               Exhibit I-Same Source H-Othe'r (Explain)
Method:
_}}
Exhibit G-Instructions.
F 5: Scheduled A-Equipment Failure (Explain) 1-Manual
'for Preparation of Data-B-Maintenance or Test 2-Manual Scram -
Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) Flie D-Regulatory Restruction 4-Continuation of Existing Outage.
-(NUREG-1022)
E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other S
G-Operational Error (Explain)
Exhibit I-Same Source H-Othe'r (Explain)
.}}

Latest revision as of 07:02, 14 December 2024

Monthly Operating Repts for Mar 1995 for Sequoyah Nuclear Plant
ML20082H963
Person / Time
Site: Sequoyah  
Issue date: 03/31/1995
From: Hollomon T, Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9504180003
Download: ML20082H963 (10)


Text

_ _ _ _.

)

nn Tennessee Valley Authonty. Post Othee Box 2000 Soddy-Damy. Tennessee 37379 April 10, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - MARCH 1995 MONTHLY OPERATING REPORT Enclosed is the March 1995 Monthly operating Report as required by SQN Technical Specification 6.9.1.10.

If you have any questions concerning this matter,

,e call J. W. Proffitt at (615) 843-6651.

Sincerely, Yo R. H. Shell Manager SQN Site Licensing Enclosure cc See page 2 1SC052

$k 9504180003 950410 "7

PDR ADOCK 05000327 M i

R

_.._,_.PDR,

~.

1 U.S. Nuclear Regulatory commission Page 2 April 10,-1995 1

l 1

-cc'(Enclosure):

'I'PO Records Center Institute of Nuclear Power Operations 1

700 Galleria Parkway-

-)

Atlanta,. Georgia.30339-5957 Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission i

i One White Flint,-North 11555 Rockville. Pike.

Rockville,_ Maryland 20852-2739 i

Mr.' Joseph Santucci, Manager l

. Advanced Reactor' Department, j

l Electric Power Research Institute-

-l 3340 Hillview Avenue l

Palo Alto,' California 94304

]

NRC Resident Inspector i

Sequoyah Nuclear Plant 2600 Igou Ferry Road l.

Soddy-Daisy, Tennessee 37379-3624 Regional Administration I

U.S. Nuclear Regulatory Commission j

office of Inspection and Enforcement l

Region II 101 Marietta Street, NW, Suite 2900-Atlanta, Georgia 30323-2711 Regional Administrator U.S. Nuclear Regulatory Commission j

Region II-l.

-101 Marietta Street, NW, Suite 2900 l

Atlanta, Georgia 30323-2711 l

t Mr..F. Yost,' Director Research Services Utility Data Institute 1200 G Street, NW, Suite 250 Washington, D.C.

20005 j.-

i i

l ~

l l'

-l

i l.

l TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT l

MONTHLY OPERATING REPORT TO THE NUCLEAR REGULATORY COMMISSION l

MARCH 1995 I

e I

UNIT 1 DOCKET NUMBER 50-327 P

LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 l

LICENSE NUMBER DPR-79

--.m..-

6 OPERATIONAL

SUMMARY

MARCH 1995 i

e UNIT 1

[

Unit 1 generated 718,250 megawatthours (MWh) (gross) electrical' power-during March with a capacity factor of 83.9 percent.

Unit i remained in Mode 4 at the beginning of March'as inspections.

continued on reactor vessel' level indicating system (RVLIS) compression fittings following a reactor coolant system leak at a_ compression fitting.

on a RVLIS line in the incore instrument room. The Unit 1 reactor was taken critical on March 3 at 2250 Eastern standard time (EST).

Unit 1 was tiedLto.the grid at 1259 EST on March 4.

Unit 1 reached 100 percent

-reactor power on March--14.

Unit 1 operated at near 100 percent reactor. power through the end of March.

UNIT 2 Unit 2 generated 860,910.megawatthours (MWh) (gross) electrical power during March with a capacity factor of 101 percent.

F i

1 I

l l

b i

l-l

\\

s.

l

,o

.s AVERACE DAILY UNIT POWER LEVEL DOCKET NO.-

50-327' UNIT.No.

One DATE:'

04-03-95 COMPLETED BY:

T.'J.'Ho11omon-

' TELEPHONE:

f615) 843-7528 1

MONTH:

MARCH 1995 AVERAGE DAILY POWER LEVEL

. AVERAGE' DAILY POWER LEVEL'.

j D&1

'fMWe-Net)

]Zh1 (MWe-Net)

')

1

-28 11 7 -

1153 1 -33

'18 1156 j;

'3

-33 119

1151'

.i j

4 81 20 1150-5 489 21

'1149 6

522 22

-1144-i 4

7 616 23.

1148-l' 8

958 2;4-

'1152-i 9

990 25.

1155 10 1113 26 1154 l

11 1134 27 l-1150 12 1132 28

~1149 13 1130 29 1146 14 1152 30 1147 15

'1153 31' 1152 16 1153 i

t i

i

-a.

AVERAGE DAILY UNIT POWER LEVEL 1

l DOCKET NO.

50-328' UNIT No.

Two' DATE:

04-03-95 l

COMPLETED BYr T.

J.

Hollomon TELEPHONE:

f615) 843-7528.

1 MONTH:

MARCH 1995 I

. AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL I

Q&1 (MWe-Net)'

QA1 (MWe-Net)'

1

-1142 17 3134 j

-2' 1138 18 1131 3

1139 19 1131 4

1142 20 1127 l'

5 1142 21 1122

-I 6

1141 22 1112' 7

1134 23 1113 8

1101 24 1117 9

1085 25 1119 l

j 10 1083~

26 1119 11 1036 27 1121 12 1116 28 1123 13 1123 29 1124 14 1130 30 1120 l

15 1130 31 1117 16 1117

]

l I

l.

OPERATING DATA REPORT DOCKET NO. _50-327 DATE 04/03/95 COMPLETED BY T. J. Ho' lomon TELEPHONE (615) 843-7528 l

OPERATING STATUS l

l Notes l

l-1.

Unit Name:

Seouovah Unit One l

l l

2.

Reporting Period:

March 1995 l

l l

3.

Licensed Thermal Power (MWt): 3411.0 l

l 4.

Nameplate Rating (Gross MWe): 1220.6 l

l 5.

Design Electrical Rating (Net MWe): 1148.0 l

l l

6.

Maximum Dependable Capacity (Gross MWe): 1151.0 l

l l

7.

Maximum Dependable Capacity (Net MWe): 1111.0 l

I 8.

If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 744 2.160 120.529
12. Number of Hours Reactor Was Critical 673.2 1.963.6 64 013 j
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 659.0 1.949.2 62.553.5
15. Unit Reserve Shutdown Hours 0

0 0

4

16. Gross Thermal Energy Generated (MWH) 2.060.933.9 6.432.797.6 204.008.794
17. Gross Electrical Energy Generated (MWH) 718.250 2.242.960 69.293.844
18. Net Electrical Energy Generated (MWH) 691.605 2.165.485 66.428.898
19. Unit Service Factor 88.6 90.2 51.9
20. Unit Availability Factor 88.6 90.2 51.9
21. Unit Capacity Factor (Using MDC Net) 83.7 90.2 49.6
22. Unit Capacity Factor (Using DER Net) 81.0 87.3 48.0
23. Unit Forced Outage Rate 11.4 9.8 36.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

The Unit 1 Cvele 7 refuelino outaae is scheduled to beain September 9,1995. with a duration of 51 days.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

4 OPERATING DATA REPORT DOCKET NO.

50-328 DATE 04/03/95 COMPLETED BY T. J. Ho11omon TELEPHONE (615) 843-7528 l

1 OPERATING STATUS j

l Notes l

1.

Unit Name:

Seauovah Unit Two l

l 2.

Reporting Period: March 1995 l

l 3.

Licensed Thermal Power (MWt): 3411.0 l

l 4.

Nameplate Ra*,ing (Gross MWe): 1220.6 l

l 5.

Design Electrical Rating (Net MWe): 1148.0 l

l 6.

Maximum Dependable Capacity (Gross We): 1146,0 l

l.

7.

Maximum Dependable Capacity (Net HWe): 1106.0 l

l 8.

If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net HWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 744 2.160 112,489
12. Number of Hours Reactor Was Critical 744.0 2.137.7 66.494
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 744.0 2.098.7,

64.808.4

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (HWH) 2.500.844.1 6.974.737.3 204.502.200
17. Gross Electrical Energy Generated (MWH) 860.910 2.398.403 69.406.012
18. Net Electrical Energy Generated (MWH) 832.002 2.314.039 66.428.221
19. Unit Service Factor 100.0 97.2 57.6
20. Unit Availability Factor 100.0 97.2 57.6 j
21. Unit Capacity Factor (Using HDC Net) 101.1 96.9 53.4
22. Unit Capacity Factor (Using DER Net) 97.4 93.3 51.4
23. Unit Forced Outage Rate 0.0 2.8 34.4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Unit 2 is scheduled to becin a forced maintenance on April 6.1995. with a duration of I

16 days.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

i I

,1 DOCKET NO:

50-327 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME:

One DATE:

04/01/95 REPORT MONTH:

March 1995 COMPLETED BY:T. O. Ho' lomon TELEPHONE:(615) 843-7528 Method of Licensee Cause and Corrective Action to Systy Compgnent Duration Shutting Down Event No.

.Date Type (Hours)

Reason Reactor Report No.

Code Code Prevent Recurrence.

1 950301 F

84.98-A 1

50-327/95002 AB N/A Unit I remained in Mode 4 at the beginning of March as inspections continued on RVLIS compression fittings. The Unit I reactor was taken critical on March 3 and was tied to the grid at 1259 EST on March 4.

2 3

4 I: Forced Reason:

Method:

Exhibit G-Instructions F

S: Scheduled '

a-tquipment Failure (Explain) 1-Manual

-for Preparation of Data B-Maintenance or.. Test 2-Manual Scram

- Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restruction 4-Continuation of Existing Outage -

'(NUREG-1022)

E-Operator Training and License' Examination

'5-Reduction

'F-Administrative.

9-Other~

l 5

G-Operational Error (Explain)

Exhibit I-Same Source H-Other (Explain) i i

DOCKET NO:

50-328 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME:

Two DATE:

('4/01/95 REPORT MONTH:

March 1995 COMPLETED BY:T... Ho' lomon

-TELEPHONE:(61b) 843-7528-Method of Licensee Cause and Corrective Action to-Duration Shutting Down Event Systy Comppent No.

Date Type (Hours)

Reason Reactor Report No.

Code Code Prevent Recurrence There were no outages or power ~

reductions of greater than 20 percent to report during March.

1 2

3 4

I: Forced Reason:

Method:

Exhibit G-Instructions.

F 5: Scheduled A-Equipment Failure (Explain) 1-Manual

'for Preparation of Data-B-Maintenance or Test 2-Manual Scram -

Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) Flie D-Regulatory Restruction 4-Continuation of Existing Outage.

-(NUREG-1022)

E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other S

G-Operational Error (Explain)

Exhibit I-Same Source H-Othe'r (Explain)

.