ML20084S218: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:__
{{#Wiki_filter:__
f' l. .
Commoh.4ucicar Power StationO f' l..
alth Edison Commoh.4ucicar Power Station Ouad-Cine 3 O                                    -
alth Edison
Post Off.cc Box 210
{ 7"ak.s _/
{ 7"ak.s _/
Cordova,1;hnois G1242
Ouad-Cine 3 Post Off.cc Box 210 Cordova,1;hnois G1242
      '. Q f         Tc!cphono 300/654-2241 NJK-75-508 Telecopy:           Region III, Attention:                                                 Mr. C. Feierabend October 15, 1975 J. Keppler, Re gion'al Dire c to r -                                                                                 .
'. Q f Tc!cphono 300/654-2241 NJK-75-508 Telecopy:
Office of Inspection and Enforcement
Region III, Attention:
!    Region III                                                                                                             .
Mr.
l    U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Re f e ren ce :       Quad-Cities Nuclear Power Station, Unit 1 Docket No. 50-254, DPR-29 Appendix A, Sections 1.0.A.4, 3.1.A, 6.6.B.l.a
C.
Feierabend October 15, 1975 J. Keppler, Re gion'al Dire c to r -
Office of Inspection and Enforcement Region III l
U.
S.
Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Re f e ren ce :
Quad-Cities Nuclear Power Station, Unit 1 Docket No. 50-254, DPR-29 Appendix A, Sections 1.0.A.4, 3.1.A, 6.6.B.l.a


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
 
The purpose of this letter is to provide you with notification of an Abnormal Occurrence as required by Technical Spe cification 6.6.B.1.a within 24 hours of the occurrence.
The purpose of this letter is to provide you with notification of an Abnormal Occurrence as required by Technical Spe cification 6.6.B.1.a within 24 hours of the occurrence.                                                              .
On October 14, 1975 while performing routine quarterly calibra-tion of the high drywell pressure s cram swit ches, two of them were found in the isolated condition.
On October 14, 1975 while performing routine quarterly calibra-tion of the high drywell pressure s cram swit ches , two of them were found in the isolated condition. The system would have performed its function because one isolated switch was contained in each trip channel.                   The other two switches were always operable and their trip points were within limits.                                                                     ,
The system would have performed its function because one isolated switch was contained in each trip channel.
This occurrence was discussed by telephone with Mr. Feierabend of your office on October 15, 1975. Further info rmation will be provided by Abnormal Occurrence Report A0_50-2p /75-2_1 which will be submitted within 10 days of the date of this occurrence.
The other two switches were always operable and their trip points were within limits.
Very truly yours, COMMONWE ALTil EDISON C021PANY                                                                                 -N ..
This occurrence was discussed by telephone with Mr. Feierabend of your office on October 15, 1975.
QUAD-CITIES NUCLEAR POWER STATION j
Further info rmation will be provided by Abnormal Occurrence Report A0_50-2p /75-2_1 which will be submitted within 10 days of the date of this occurrence.
                                                                                                              /                 s   q
Very truly yours, COMMONWE ALTil EDISON C021PANY
          /                    .jf f N. J. Kalivianakis                 M                                                             '
-N..
O/g         -
QUAD-CITIES NUCLEAR POWER STATION
Station Superintendent                                                                                                     g       ,
/
y           ~.y         ,r.)
j s
NJK/RAR/lk
q
                                                                                                              'Y./ry]
.jf f
                                                                                                                '% .. -      jTd ,U cc:         Office of Nuclear Reactor Regulation G. A. Abrell 8306160240 751024                                                                                                                             1-       F E
/
PDR ADOCK 05000254 S                       PDR}}
O N.
J.
Kalivianakis M
/g Station Superintendent g
y
~.y
,r.)
'Y./ry] jTd,U NJK/RAR/lk cc:
Office of Nuclear Reactor Regulation G.
A.
Abrell 8306160240 751024 1-F PDR ADOCK 05000254 E
S PDR}}

Latest revision as of 05:03, 14 December 2024

Telecopy Ao:On 751014,two High Drywell Pressure Scram Switches Found in Isolated Condition.Further Info to Be Provided in AO 50-254/75-21
ML20084S218
Person / Time
Site: Quad Cities 
Issue date: 10/15/1975
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084S215 List:
References
NJK-75-508, NUDOCS 8306160240
Download: ML20084S218 (1)


Text

__

Commoh.4ucicar Power StationO f' l..

alth Edison

{ 7"ak.s _/

Ouad-Cine 3 Post Off.cc Box 210 Cordova,1;hnois G1242

'. Q f Tc!cphono 300/654-2241 NJK-75-508 Telecopy:

Region III, Attention:

Mr.

C.

Feierabend October 15, 1975 J. Keppler, Re gion'al Dire c to r -

Office of Inspection and Enforcement Region III l

U.

S.

Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Re f e ren ce :

Quad-Cities Nuclear Power Station, Unit 1 Docket No. 50-254, DPR-29 Appendix A, Sections 1.0.A.4, 3.1.A, 6.6.B.l.a

Dear Mr. Keppler:

The purpose of this letter is to provide you with notification of an Abnormal Occurrence as required by Technical Spe cification 6.6.B.1.a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.

On October 14, 1975 while performing routine quarterly calibra-tion of the high drywell pressure s cram swit ches, two of them were found in the isolated condition.

The system would have performed its function because one isolated switch was contained in each trip channel.

The other two switches were always operable and their trip points were within limits.

This occurrence was discussed by telephone with Mr. Feierabend of your office on October 15, 1975.

Further info rmation will be provided by Abnormal Occurrence Report A0_50-2p /75-2_1 which will be submitted within 10 days of the date of this occurrence.

Very truly yours, COMMONWE ALTil EDISON C021PANY

-N..

QUAD-CITIES NUCLEAR POWER STATION

/

j s

q

.jf f

/

O N.

J.

Kalivianakis M

/g Station Superintendent g

y

~.y

,r.)

'Y./ry] jTd,U NJK/RAR/lk cc:

Office of Nuclear Reactor Regulation G.

A.

Abrell 8306160240 751024 1-F PDR ADOCK 05000254 E

S PDR