U-601933, Forwards Monthly Operating Rept for Jan 1992 & Rev for Dec 1991 for Clinton Power Station Unit 1: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_ _ . _ _.
{{#Wiki_filter:_ _.
          *,                                                                                                      Illinois Power Company
Illinois Power Company
    , ?
?
Clinton Power Station P.O. Box 678 C6nton, ii. 61727 Tel 217 935-8801 I
Clinton Power Station P.O. Box 678 C6nton, ii. 61727 Tel 217 935-8801 I
ILLINISIS                                                                                         u-601933 POWER                                                                                         L30-92(02-12)-LP 8E.100c February 12, 1992 10CFR50.36 4
ILLINISIS u-601933 POWER L30-92(02-12)-LP 8E.100c February 12, 1992 10CFR50.36 4
Docket No. 50-461 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Docket No. 50-461 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555


==Subject:==
==Subject:==
clirton Power Station, Unit 1 Facility Operating License NPF-62 i                                   January 1992 Monthly Operatinn Returt
clirton Power Station, Unit 1 Facility Operating License NPF-62 i
January 1992 Monthly Operatinn Returt


==Dear Sir:==
==Dear Sir:==
Please find in Attachment 1 the Monthly Ope ting Report for Clinton Power Station, Unit 1, for the period eing January 31, 1992.
Please find in Attachment 1 the Monthly Ope ting Report for Clinton Power Station, Unit 1, for the period eing January 31, 1992.
In addition, Attachment 2 contains a clarification to the Unit Shutdown summarj provided in the report for December 1991.                                           This r.ttachment is being provided to clarify that the failed components were sensors, rather than logic components. Additional informati'on regarding this plant shutdown has been provided in Clinton Power Station Licensee Event Report (LER) 9c008.
In addition, Attachment 2 contains a clarification to the Unit Shutdown summarj provided in the report for December 1991.
Sincerely yours, q   _p 9 )             ,
This r.ttachment is being provided to clarify that the failed components were sensors, rather than logic components. Additional informati'on regarding this plant shutdown has been provided in Clinton Power Station Licensee Event Report (LER) 9c008.
M< ;         vu a,     h
Sincerely yours, q
                                                                                                          )
_p 9 )
F. A. Spangenberg, III Manager   . Licensing and Safety DAS/ alh Attachment
,)
              ,    cc:   NRC Region III Regional Administrator i                           NRC Resident Office Illinois Department of Nuclear Safety I
M< ;
9202190064 920212                                                                                                                 '
vu a, h F. A. Spangenberg, III Manager
PDR     ADOCK 05000461                                                                                                         /
. Licensing and Safety DAS alh
                                                                                                                                          / /,
/
R                       PDR                                                                                                             l
Attachment cc:
                                                                                                                                        /\iv
NRC Region III Regional Administrator i
                                                                                                                                          )             l
NRC Resident Office Illinois Department of Nuclear Safety I
_ _ _ _ _ _ _ _ - - . _ _ _ _ - -}}
9202190064 920212 PDR ADOCK 05000461
/
/ /,
l R
PDR
/\\iv
)
l
_ _ _ _ _ _ _ _ - -. _ _ _ _ - -}}

Latest revision as of 11:23, 13 December 2024

Forwards Monthly Operating Rept for Jan 1992 & Rev for Dec 1991 for Clinton Power Station Unit 1
ML20092F050
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/12/1992
From: Spangenberg F
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092F051 List:
References
U-601933, NUDOCS 9202190064
Download: ML20092F050 (1)


Text

_ _.

Illinois Power Company

?

Clinton Power Station P.O. Box 678 C6nton, ii. 61727 Tel 217 935-8801 I

ILLINISIS u-601933 POWER L30-92(02-12)-LP 8E.100c February 12, 1992 10CFR50.36 4

Docket No. 50-461 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555

Subject:

clirton Power Station, Unit 1 Facility Operating License NPF-62 i

January 1992 Monthly Operatinn Returt

Dear Sir:

Please find in Attachment 1 the Monthly Ope ting Report for Clinton Power Station, Unit 1, for the period eing January 31, 1992.

In addition, Attachment 2 contains a clarification to the Unit Shutdown summarj provided in the report for December 1991.

This r.ttachment is being provided to clarify that the failed components were sensors, rather than logic components. Additional informati'on regarding this plant shutdown has been provided in Clinton Power Station Licensee Event Report (LER) 9c008.

Sincerely yours, q

_p 9 )

,)

M< ;

vu a, h F. A. Spangenberg, III Manager

. Licensing and Safety DAS alh

/

Attachment cc:

NRC Region III Regional Administrator i

NRC Resident Office Illinois Department of Nuclear Safety I

9202190064 920212 PDR ADOCK 05000461

/

/ /,

l R

PDR

/\\iv

)

l

_ _ _ _ _ _ _ _ - -. _ _ _ _ - -