ML20092F185: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
: . . . . . . . .. _ .. e--w--    - - -
e--w--
  .        Il                                                                         I flabe kvr Comjwny Hurhoria Center l'O tha 900i
Il I
          . Charlotiv, N C 2Mol It>UT DUKEPOWER February 14, 1992 U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C. 20555 RE: Catawba Nuclear, Station Docket No. 50-423 and 50-414 File: GS-801.01
flabe kvr Comjwny Hurhoria Center l'O tha 900i
. Charlotiv, N C 2Mol It>UT DUKEPOWER February 14, 1992 U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C.
20555 RE: Catawba Nuclear, Station Docket No. 50-423 and 50-414 File: GS-801.01


==Dear Sir:==
==Dear Sir:==
Please find attached information concerning the performance and operating status of the Catawba Nuclear Station for the month of January,1992.
Please find attached information concerning the performance and operating status of the Catawba Nuclear Station for the month of January,1992.
Very t'culy yours,
Very t'culy yours,
        $~         k- tLW E. O. McCraw, Manager Operations, Performance, & Automation E0M/sdg Attachments xc:     Stewart D. Ebneter                   Richard G. Oehl, NE-44 Regional Administrator / Region II   U.S. Department of Energy U.S. Nuclear Regulatory Commission   19901 Germantown Rd.
$~
101 Marietta St., NW, Suite 2900     Germantown,-MD 20874 Atlanta, GA 30323 W. T. Orders                         INP0 Records Center Senior Resident Inspector           1100 Circle 75' Parkway, Suite 1500 Catawba Nuclear Station             Atlanta, GA 30323 American Nuclear Insurers           Bob Martin c/o Dottie Sherman, ANI Library     Office Nuclear Regulation The Exchange, Suite 245             U.S. Nuc. Reg. Commission 270 Farmington Ave.                 Washington, D.C. 20555 Farmington, CT 06032 Ms. Vickie White Nuclear Assurance Corp.
k-tLW E. O. McCraw, Manager Operations, Performance, & Automation E0M/sdg Attachments xc:
                                                                                                            )
Stewart D. Ebneter Richard G. Oehl, NE-44 Regional Administrator / Region II U.S. Department of Energy U.S. Nuclear Regulatory Commission 19901 Germantown Rd.
6251 Crooked Creek Road                         I Norcross, GA 30092                           p      /i 920132 R Dja2     j g 05000413
101 Marietta St., NW, Suite 2900 Germantown,-MD 20874 Atlanta, GA 30323 W. T. Orders INP0 Records Center Senior Resident Inspector 1100 Circle 75' Parkway, Suite 1500 Catawba Nuclear Station Atlanta, GA 30323 American Nuclear Insurers Bob Martin c/o Dottie Sherman, ANI Library Office Nuclear Regulation The Exchange, Suite 245 U.S. Nuc. Reg. Commission 270 Farmington Ave.
                                                                                                  /
Washington, D.C.
20555 Farmington, CT 06032 Ms. Vickie White
)
Nuclear Assurance Corp.
6251 Crooked Creek Road I
Norcross, GA 30092
/ i p
Dja2 j g 05000413 920132 R
/
PDR
PDR


U.S.'NRC - CNS
U.S.'NRC - CNS
        *Feb.-14, 1992 Page 2 bxc   D. A. Braatz                         PDS K. S. Canady                         EC08H B. T. Faulkenberry                   WC251 R. C. Futrell                         CNS E. G. LaCasse                         CNS T. E. Mooney                         (WC26C)
*Feb.-14, 1992 Page 2 bxc D. A. Braatz PDS K. S. Canady EC08H B. T. Faulkenberry WC251 R. C. Futrell CNS E. G. LaCasse CNS T. E. Mooney (WC26C)
: 8. J. Horsley                         CNS Contracts - EC03U                                       <
: 8. J. Horsley CNS Contracts - EC03U N. A. Rutherford WC25D J. S. Forbes CNS R. A. Williams (3)
N. A. Rutherford                     WC25D J. S. Forbes                         CNS R. A. Williams (3)                   WC25A J. C. Wimbish                         WC23C E. C. Fisher                         NNS B. W. Walsh                           PB02L S. D. Galloway                       CNS C. D. Denton                         PB05E R. L. Gill                           WC26A(File)
WC25A J. C. Wimbish WC23C E. C. Fisher NNS B. W. Walsh PB02L S. D. Galloway CNS C. D. Denton PB05E R. L. Gill WC26A(File)


l OPERAi!% CATA FEFORT-DutrEi NO           50-413 DATE February 16. 1992 OrERATING STATUS                                                                       COMPLETED BY         R.A. Willise t TELEPHONE- 704 373-5987
l OPERAi!% CATA FEFORT-DutrEi NO 50-413 DATE February 16. 1992 OrERATING STATUS COMPLETED BY R.A. Willise t TELEPHONE-704 373-5987
: 1. Unit hase: Catawba 1
: 1. Unit hase: Catawba 1
: 2. Reporting f eriod: January 1,1992-January 31,1992
: 2. Reporting f eriod: January 1,1992-January 31,1992
: 3. Licensed thernal Power (MWtli           3411
: 3. Licensed thernal Power (MWtli 3411
: 4. Nameplate Rating (Bross MWe):             1305                                       Notes aNameplate Rating
: 4. Nameplate Rating (Bross MWe):
: 5. Design Electrital Rating (Net Mke h           !!45                                   (Stoss MWel calculated as
1305 Notes aNameplate Rating
        .6. Marisue Dependable Capacity (Bross MWel:       1192                                 ;1450.000 MVA x .90 power
: 5. Design Electrital Rating (Net Mke h
: 7. Manieus Dependable Capacity (Net MWe):         1129                                   factor per Fage lii, B. If Changes Octur in Capacity Ratings-(Itees Nusber 3 Through 7) Since Last           NUREG-0020.
!!45 (Stoss MWel calculated as
.6. Marisue Dependable Capacity (Bross MWel:
1192
;1450.000 MVA x.90 power
: 7. Manieus Dependable Capacity (Net MWe):
1129 factor per Fage lii, B. If Changes Octur in Capacity Ratings-(Itees Nusber 3 Through 7) Since Last NUREG-0020.
Report. Give Reasonst
Report. Give Reasonst
                                                                                                                                      ~
: 9. Power Level Te Which Restricted, if Any (Net MWe):
: 9. Power Level Te Which Restricted, if Any (Net MWe):
        '10. Reason For Restritticos, if any:
~
This Month     -Yr.-to-Date         Cueulative
'10. Reason For Restritticos, if any:
: 11. Heurs in Reporting Period                                                       744.0             744.0-         57793.0
This Month
: 12. haster Of Hocrs Reactor Was Critical                                           744.0-             744.0           43134.2.
-Yr.-to-Date Cueulative
        -13. Reactor lieserve Shutdown Hours                                                 --0---             --0--             --0--
: 11. Heurs in Reporting Period 744.0 744.0-57793.0
: 14. Hours Generator On-Line                                                         744.0-             744.01       -42139.9 15,ilnitReserveStutdownHeurs                                                       <--0--               --0--.           --0--
: 12. haster Of Hocrs Reactor Was Critical 744.0-744.0 43134.2.
        -16. Gross theraal Energy Generated (MWH)                                         2523221           T2523221       -~l36009526
-13. Reactor lieserve Shutdown Hours
: 17. Gross Electrical Energy Generated (RWH1                                       896831             896831           47766235
--0---
: 18. Net Electrical Energy Generated (MWH)                                         851801           ~B51901         44785495
--0--
: 19. Unit Service Factor-                                                           -100.0:           -100.0               72.9 20.UnitAvailabilityFatter                                                         -100.0               100.0             72.9 2!. Unit Capacity Factor (Using MLC Net)-                                           .101.4             .:101.4             60.3
--0--
: 22. Indt Capacity Factor (Using DER Net)-                                           100.0               100.0.           -67.7
: 14. Hours Generator On-Line 744.0-744.01
        -23. Unit Fcrced Outage Rate       . .                                                  0.0 -             -0.0-             11.3 4      24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
-42139.9 15,ilnitReserveStutdownHeurs
Re f ue linr - June 23. 1992' - 65 days-25.'If Shut Dodo At End Of Report Period. Estiaated Cate of Startup:-
<--0--
: 26. Unit In Test Status (Prior;to Consercial Operation):                                           ' Forecast;       Achieved _
--0--.
--0--
-16. Gross theraal Energy Generated (MWH) 2523221 T2523221
-~l36009526
: 17. Gross Electrical Energy Generated (RWH1 896831 896831 47766235
: 18. Net Electrical Energy Generated (MWH) 851801
~B51901 44785495
: 19. Unit Service Factor-
-100.0:
-100.0 72.9 20.UnitAvailabilityFatter
-100.0 100.0 72.9 2!. Unit Capacity Factor (Using MLC Net)-
.101.4
.:101.4 60.3
: 22. Indt Capacity Factor (Using DER Net)-
100.0 100.0.
-67.7
-23. Unit Fcrced Outage Rate 0.0 -
-0.0-11.3
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
4 Re f ue linr - June 23. 1992' - 65 days-25.'If Shut Dodo At End Of Report Period. Estiaated Cate of Startup:-
: 26. Unit In Test Status (Prior;to Consercial Operation):
' Forecast; Achieved _
INITIALCRITICALITY-IN!ilAL ELECTRICITY COMMERCIAL OPERATION
INITIALCRITICALITY-IN!ilAL ELECTRICITY COMMERCIAL OPERATION


j-
j-
                                      .~                                                                                                                             .
.~
OPERAllNSDATAREPORT DOCrET NO         50-413 UN!I -   - Cat uta 1 CATE February 14. 1992 COMPLETEDBY   R.A Willises TELEPHONE   704-373-5987 MONTH         January 1992 (E.         .AVERABEDAILYF0WERLEVEL           pfE       AVERASEDAILYF0WERLEVEL--
OPERAllNSDATAREPORT DOCrET NO 50-413 UN!I -
(MWe-Net)                                   (MWe-Net)-
- Cat uta 1 CATE February 14. 1992 COMPLETEDBY R.A Willises TELEPHONE 704-373-5987 MONTH January 1992 (E.
1-                   1166                   17                 1145 2                     1146                   -IB                 !!45 3                     1143                     19                 1165 4                     1142                   20         _
.AVERABEDAILYF0WERLEVEL pfE AVERASEDAILYF0WERLEVEL--
1151 5                     1147                   21                 1145 6                     1167                   22 -               1145 7                   -1147-                   23               -1140 8                     1146                   24                 1139 9                     1146-                   25                   1133-
(MWe-Net)
                          - 10                       1146                     26                 '1145'
(MWe-Net)-
                              !!                      !!46                   27                 1146 12                   ' 1147 -                   26                 11444 13                     --1149 -                   29               - 1144 -
1-1166 17 1145 2
                            .. g-                 . g j gg -                 -30               -g g g3 .-
1146
                            . 15                       1151                   .31                 1144 16                       1146 him--.. . . _.. _. . _ _ . . . .                         . _                                                                            ...._a ... . . .  .-.p   du
-IB
!!45 3
1143 19 1165 4
1142 20 1151 5
1147 21 1145 6
1167 22 -
1145 7
-1147-23
-1140 8
1146 24 1139 9
1146-25 1133-
- 10 1146 26
'1145'
!!46 27 1146 12
' 1147 -
26 11444 13
--1149 -
29
- 1144 -
.. g-
. g j gg -
-30
-g g g3.-
. 15 1151
.31 1144 16 1146 him--.... _.. _.. _ _....
...._a
.-.p du


UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                       DOCKET NO.       50-413                   .
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME       CArawta 1 DATE     vz/14/92 REPORT MONTH                                 January 1992                                           COMPLETED BY           s. w. Must.x TELEPHONE       ( / v41 -J / J-3 / tiz (1)                         (2            (3)                             (4)                       (5)
50-413 UNIT NAME CArawta 1 DATE vz/14/92 REPORT MONTH January 1992 COMPLETED BY s.
R)
w.
E MET-HOD T                       A             OF                   LICENSE N                                     .. Y                       S             SHUT                 EVENT     SYS-                                                 CAUSE AND CORRECTIVE O                                       P   DURATION           O             DOWN                 REPORT     TEM       COMPONENT                                             ACTION TO
Must.x TELEPHONE
    .              DATE                     E   . HOURS             N             R/X                   NO.     CODE         CODE                                           PREVENT RECURRENCE NO   SHUTDOWNS             OR                         REDUCTION S (1)                               '(2)Reason-                                                                              (3)                                                 (4)
( / v41 -J / J-3 / tiz R)
F Forced                                                                                                                     Method:                                             Exhibit G - Instructions S Scheduled.                       A-Equipment Failure (Explain)                                                           1-Manual                                             for Preparation of, Data B-Maintenance'or test                                                                   2-Manual Scram                                       Entry Sneets For Licensee C-Refueling                                                                             3-Automatic Scram                                   Event Report (LER D-Regulatory. Restrictiory -                                             ,      ,
(3)
4-Other (Explain)                                   File (NUREG-0161))
(4)
E-Operator Training & License Examination F-Administrative                                                                                                                           (5)
(5)
G-Operator Error (Explain)                                                                                                                   Exhibit I - Same Source H-Other (Explain).
(2 (1)
MET-E HOD T
A OF LICENSE N
.. Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
. HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)
'(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled.
A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance'or test 2-Manual Scram Entry Sneets For Licensee Event Report (LER (NUREG-0161))
C-Refueling 3-Automatic Scram D-Regulatory. Restrictiory -
4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain).


DOCKET NO: 50-413 UNIT: Catawba 1 DATE: 2/14/92 NARRATIVE  
DOCKET NO:
50-413 UNIT:
Catawba 1 DATE:
2/14/92 NARRATIVE  


==SUMMARY==
==SUMMARY==
MONTil: January 1992 Catawba Unit 1 began the month of January operating at 100% full power.
MONTil: January 1992 Catawba Unit 1 began the month of January operating at 100% full power.
The unit operated at or near 100% full power for the entire month, and ended the month operating at 100% full power.
The unit operated at or near 100% full power for the entire month, and ended the month operating at 100% full power.
Prepared by: S. W. Moser Telephone:   704-373-5762
Prepared by:
S. W. Moser Telephone:
704-373-5762


MONTilLY REFUELING INFORMATION REQUEST
MONTilLY REFUELING INFORMATION REQUEST 1.
: 1. Facility name: Catawba. Unit 1
Facility name: Catawba.
: 2. Scheduled next refueling shutdown: June 1992
Unit 1 2.
: 3. Scheduled restart following refueling: Auaust 1992 Tile PROJECT MANAGER HAS DEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. Ti!EREFORE, QUESTIONS - 4 TilROUGli 6 WILL NO LONGER DE MAINTAINED IN TilIS REPORT.
Scheduled next refueling shutdown: June 1992 3.
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Scheduled restart following refueling: Auaust 1992 Tile PROJECT MANAGER HAS DEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CilANGE OR LICENSE AMENDMENT.
Ti!EREFORE, QUESTIONS - 4 TilROUGli 6 WILL NO LONGER DE MAINTAINED IN TilIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If yes, what will these be?
If no, has reload design and. core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
If no, has reload design and. core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
: 5. Scheduled date(s) for submitting proposed licensing action and .
5.
Scheduled date(s) for submitting proposed licensing action and.
supporting information.
supporting information.
: 6. Important licensing considerations -(now or different design or supplier,   unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
6.
: 7. Number of Fuel assemblies     (a)                               in the core: .L92 (b)                               in the spent fuel pool: 336
Important licensing considerations -(now or different design or
: 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase:                                 -
: supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
: 9. Projected date of last refueling which can be accommodated by present licensed capacity: September 2009 DUKE POWER COMPANY                                                   DATE:     February 14. 1992 Name of
7.
Number of Fuel assemblies (a) in the core:.L92 (b) in the spent fuel pool: 336 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: September 2009 DUKE POWER COMPANY DATE:
February 14. 1992 Name of


==Contact:==
==Contact:==
-R. A. Williams                                   Phone:   704-373-5987
-R.
A.
Williams Phone:
704-373-5987


2                                                                                                     _
2 0FERA11NG DAIA FEf0k1 DOCKET ND 50-414 DATE February 14. 1992 -
0FERA11NG DAIA FEf0k1 DOCKET ND           50-414 DATE February 14. 1992 -
OPEFATINGSTATL'S COMPLETED BY.
OPEFATINGSTATL'S                                                                           COMPLETED BY.       P. A.= Willins
P. A.= Willins
                                                                                                  -TELEPHONE       704 373-5987
-TELEPHONE 704 373-5987
: 1. Unit Naee: Catanta 2
: 1. Unit Naee: Catanta 2
: 2. Reporting Feriod: January 1, 1992-January 31, 1992
: 2. Reporting Feriod: January 1, 1992-January 31, 1992
: 3. Licensed thermal Fomer (Mdt):             3411 4.WaseplateRating(BrossMWel                   13055                                       Notes aNameplate Rating.
: 3. Licensed thermal Fomer (Mdt):
: 5. Design Electrical Ratirg (Net MWe):               -1145                               -(Gross MWe) calculated as
3411 4.WaseplateRating(BrossMWel 13055 Notes aNameplate Rating.
: 6. Maxinus Dependable Cap;ity (Eress MWelt             1192                                 1450.000MVA:-90   . power-
: 5. Design Electrical Ratirg (Net MWe):
: 7. Marious Deper.dable Captity (Net MWe):     _
-1145
                                                            !!29_ _              _
-(Gross MWe) calculated as
: 6. Maxinus Dependable Cap;ity (Eress MWelt 1192 1450.000MVA:-90 power-
: 7. Marious Deper.dable Captity (Net MWe):
!!29_ _
factor per Page 111,_
factor per Page 111,_
B. If Charges Occur in Capacity Ratings litems Number 3 Through 7) Since Last             NUREG-0020.
B. If Charges Occur in Capacity Ratings litems Number 3 Through 7) Since Last NUREG-0020.
Peptt. Give Reasons -
Peptt. Give Reasons -
: 9. Poser Level To Which Restricted, if Any (Net MWe):
: 9. Poser Level To Which Restricted, if Any (Net MWe):
: 10. Reason for Restrictiens, if anyt This Mo' nth     Yr.-to-Date         Cuaulative
: 10. Reason for Restrictiens, if anyt This Mo' nth Yr.-to-Date Cuaulative
: 11. Hours in Reprting Period                                                           744,0             744.0               47009.0'
: 11. Hours in Reprting Period 744,0 744.0 47009.0'
: 12. Nusber Of Hours Reactor Was Critical                                             721.4-             721.4             - 35019.0-
: 12. Nusber Of Hours Reactor Was Critical 721.4-721.4
: 13. Reatter Reserve Shutdown Hours                                                     --0--             --0--                   --0--
- 35019.0-
: 14. Hours Generator On-Line                                                         . 703.6 L         -703.6               34266.9-
: 13. Reatter Reserve Shutdown Hours
: 15. Unit Reserve Shutdown Heurs-                                                      -    -
--0--
                                                                                                                                      --0--
--0--
: 16. Stoss Thereal Energy Benerated-(MWHi                                           2330404           23304B4           107456661
--0--
: 17. Gross Electrical Energy Generated-(MWH)-                                         827994             627994-             30003899
: 14. Hours Generator On-Line
: 16. Net Electrical Energy Generated (MWH)                                           784213,           784213-             35639052 19.UnitServiceFacter                                                                     94 6             94.6                 -71.7=
. 703.6 L
: 20. Unit Availability Factor                                                             94.6             ;94.6 '                     71.7 21.-Unit Capacity Factor (Using hDC Neti                                                 93,4 .             93.4-                 -65.0
-703.6 34266.9-
: 22. Unit Ca pcity. Factor (Using DER Net)                                               -92.1               92.1                       65.1 23.UnitForcedOutageRate                                               _
: 15. Unit Reserve Shutdown Heurs-
3.7-               3.7                   - 12.9 -
--0--
: 24. Shutdcen Scheduled O ar Next 6 Months (Typ , Date, and Duration of Each):-
: 16. Stoss Thereal Energy Benerated-(MWHi 2330404 23304B4 107456661
: 17. Gross Electrical Energy Generated-(MWH)-
827994 627994-30003899
: 16. Net Electrical Energy Generated (MWH)
: 784213, 784213-35639052 19.UnitServiceFacter 94 6 94.6
-71.7=
: 20. Unit Availability Factor 94.6
;94.6 '
71.7 21.-Unit Capacity Factor (Using hDC Neti 93,4.
93.4-
-65.0
: 22. Unit Ca pcity. Factor (Using DER Net)
-92.1 92.1 65.1 23.UnitForcedOutageRate 3.7-3.7
- 12.9 -
: 24. Shutdcen Scheduled O ar Next 6 Months (Typ, Date, and Duration of Each):-
Jane
Jane
: 25. If Shut Down At End Df Report Feriod. Estinated Date of Startup
: 25. If Shut Down At End Df Report Feriod. Estinated Date of Startup
: 26. Units in Test Status (Prior to Cessercial Operation):                                           -Forecast             Achieved:
: 26. Units in Test Status (Prior to Cessercial Operation):
-Forecast Achieved:
IMIT!AL CRITICALITY
IMIT!AL CRITICALITY
                                                                              ~
- !NITIALELECTRICITY.
                                  - !NITIALELECTRICITY.
~
COMMERCIAL OFERATICN
COMMERCIAL OFERATICN


    ,,              ..      . ~ -       . . . . - . . . .. ~                         -,..--.
. ~ -
.... -..... ~
I OPERAllNG DATA F.EPDRT
I OPERAllNG DATA F.EPDRT
                                                                                                                                        -DOCKET NO         50-414' UNIT       Catuba E         ,
-DOCKET NO 50-414' UNIT Catuba E t' ATE february 14. ML COMPLETELBY P.A. Wt111aes-TELEFHONE 704-373 5987 t
t' ATE february 14. ML COMPLETELBY     P.A. Wt111aes-TELEFHONE     704-373 5987 t
i NONTH Jawarv.1992 3
i NONTH         Jawarv.1992                                                                                                                                             -
i Q,Al AVERA6E LAILY POWER LEVFL-pfl
3 i
- AVERAGE DAILY F'0WER LEVEL (NWe-Net)
Q,Al           AVERA6E LAILY POWER LEVFL-                       pfl               - AVERAGE DAILY F'0WER LEVEL (NWe-Net)                                                             (MWe-Net) 1                     1159                                     17                                   1145 2                     1152                                     18'                                 1155 3                     1156                                     19                                   1157-4                     1090                                     20                                   1157 5                       31                                   El                                   1150 6                       909                                   22                                   1159 7                     1147-                                   23                                   1151 B                     1151                                     24                                   !!67
(MWe-Net) 1 1159 17 1145 2
:- 9                     -1151-                                   25                                   1160-10o                     1154                                     26                                   1157 11                       1160                                     27-                               '1161-12                       !!'8                                     20                               ' 1158 '
1152 18' 1155 3
__13                     -1150                                     29                                   1162 14-                     t150                                   '30'                                   1156 15                         71                                   31                               ~ 1142
1156 19 1157-4 1090 20 1157 5
              '!6                         472 i
31 El 1150 6
909 22 1159 7
1147-23 1151 B
1151 24
!!67
:- 9
-1151-25 1160-10o 1154 26 1157 11 1160 27-
'1161-12
!!'8 20
' 1158 '
__13
-1150 29 1162 14-t150
'30' 1156 15 71 31
~ 1142
'!6 472 i
(;
(;
        ._ ,        _ , -  . - .      .u.,--,     -..2.. , , _ . . , ,  ; , ,-. , a-.   . . _ . .    ,.,-,,,.. -.,--..                                  -..u,,,._..
.u.,--,
-..2..
;,,-., a-.
-..u,,,._..


DOCKET NO. 50-414 UNIT SHUTDOWNF AND POWER REDUCTIONS              UNIT NAME   ChawbA z DATE   Uz/14/vz January 1992             COMPLETED BY     s. w. Mus t;H REPORT MONTH                                    TELEPHONE   ( / v41 5 / a > / ez (1)            (2) (3 I   _         (4)       (5)
UNIT SHUTDOWNF AND POWER REDUCTIONS DOCKET NO.
R    ME)-
50-414 UNIT NAME ChawbA z DATE Uz/14/vz REPORT MONTH January 1992 COMPLETED BY s.
E     WO T             A     GF  LICENSE                          CAUSE AND CORRECTIVE Y              S  l SHUT EVENT   SYS-N v     DOWN REPORT   TEM   COMPONENT                 ACTION TO O              P    DURATION                              CODE              PREVENT RECURRENCE
w.
      . DATE       E     HOURS   N     R/X   NO. CODE S               B   --            HH     INSTRU   LOAD REJECTION TESTING 1-P 92 4           --
Mus t;H TELEPHONE
13.55   B   3             HH     INSTRU   TURBINE TRIP FOR LOAD REJECTION 1  92 4    S                                                    TESTING, REACTOR REMAINING CRITICAL B   --            HH     INSTRU   LOAD REJECTION TESTING 2-P 92 5   S       --
( / v41 5 / a > / ez (3
A   --            HG   HTEXCH   HOTWELL DISSOLVED OXYGEN OUT OF 3-P 92 5    S       --
I _
SPEC H   --            HH     PUMPXX   FEEDWATER PUMP '2A' START 4-P 92 6    S      --
(4)
F      26.85   A   3             HA     PUMPXU   REACTOR TRIP DUE TO TURBINE TRIP'ON 2  92- 1-15                                                        ELECTRO-HYDRAULIC CONTROL PROBLEM F               H   --            ZZ     ZZZZZZ   PLACING UNIT ON-LINE 5-P 92- 1-16           --
(5)
F                B   --            HA     PUMPXX   INTERNAL TIME SET POINT ADJUSTMENT 6-P 92- 1-16            --
ME)-
ON TURBINE HYDRAULIC SYSTEM / PUMP TEST (3)                     (4)
(1)
(1)           (2)                                             Method:                 Exhibit G - Instructions F Forced       Reason-                                                               for Preparation of, Data S Scheduled   A-Equipment Failure (Explain)                 1-Manual 2-Manual Scram         Entn Sheets For Licensee B-Maintenance or test                          3-Automatic Scram                       (LER C-Refueling                                   4-Other (Explain)       Event File Report (NUREG-0161))
(2)
D-Regulatory Restriction                  .
R E
E-Operator Training & License Examination                           (5)
WO GF LICENSE T
F-Administrative                                                      Exhibit I - Same Source G-Operator Error (Explain)
A l SHUT EVENT SYS-CAUSE AND CORRECTIVE N
Y S
O P
DURATION v
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 1-P 92 4 S
B HH INSTRU LOAD REJECTION TESTING 1
92 4 S
13.55 B
3 HH INSTRU TURBINE TRIP FOR LOAD REJECTION TESTING, REACTOR REMAINING CRITICAL 2-P 92 5 S
B HH INSTRU LOAD REJECTION TESTING 3-P 92-1-5 S
A HG HTEXCH HOTWELL DISSOLVED OXYGEN OUT OF SPEC 4-P 92 6 S
H HH PUMPXX FEEDWATER PUMP
'2A' START 2
92-1-15 F
26.85 A
3 HA PUMPXU REACTOR TRIP DUE TO TURBINE TRIP'ON ELECTRO-HYDRAULIC CONTROL PROBLEM 5-P 92-1-16 F
H ZZ ZZZZZZ PLACING UNIT ON-LINE 6-P 92-1-16 F
B HA PUMPXX INTERNAL TIME SET POINT ADJUSTMENT ON TURBINE HYDRAULIC SYSTEM / PUMP TEST (3)
(4)
(1)
(2)
Method:
Exhibit G - Instructions F Forced Reason-S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Entn Sheets For Licensee Event Report (NUREG-0161))
(LER 3-Automatic Scram C-Refueling D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source G-Operator Error (Explain)
H-Other (Explain) t
H-Other (Explain) t


DOCKET NO:   50 414 UNIT:   Catawba 2 DATE: 2/14/0 NAhRATIVC  
DOCKET NO:
50 414 UNIT:
Catawba 2 DATE:
2/14/0 NAhRATIVC  


==SUMMARY==
==SUMMARY==
MONTil: January 1992 Catawba Unit 1 began the inonth of January operating at 100% full power.
MONTil: January 1992 Catawba Unit 1 began the inonth of January operating at 100% full power.
The unit operated at 100% full power until 2043 on 01/04, when a power reduction was begun to begin load rejection testing of the digital feedwater / turbine control system.                                                           The unit was held at approximately 45% power from 2255 to 2346 or 01/04 in preparation for the testing At 2346 on 01/04, the unit was tripped for the test. The unit was placed back on line at 1319 on 01/05.                                                           During the power escalation, the unit was held at approximately 15% power from 2120 to 2213 on 01/05 due to secondary chemist ry, and at approximately 45% power from 0105 to 0130 on 01/06 to tart the '2A' main feedwater pump.                                                             The unit reached 100% full power at 1805 on 01/06.                                                           Tho unit operated at or near 100%
The unit operated at 100% full power until 2043 on 01/04, when a power reduction was begun to begin load rejection testing of the digital feedwater / turbine control system.
full power until 0214 on 01/15, when the unit tripped off-line due to turbine control problems. The unit was placed back on line at 0505 on 01/16. During the power escalation the unit wan held at approximately 50% power from 1441 to 1602 on 01/16 for a set point adjustment on the turbino control system. The unit reached 100% full power at 0400 on 01/17, and operated at or near 100% full power for the remainder of the month, prepared by:   S. W. Moser Telephone:   704 373-5762
The unit was held at approximately 45% power from 2255 to 2346 or 01/04 in preparation for the testing At 2346 on 01/04, the unit was tripped for the test.
The unit was placed back on line at 1319 on 01/05.
During the power escalation, the unit was held at approximately 15% power from 2120 to 2213 on 01/05 due to secondary chemist ry, and at approximately 45% power from 0105 to 0130 on 01/06 to tart the '2A' main feedwater pump.
The unit reached 100% full power at 1805 on 01/06.
Tho unit operated at or near 100%
full power until 0214 on 01/15, when the unit tripped off-line due to turbine control problems. The unit was placed back on line at 0505 on 01/16.
During the power escalation the unit wan held at approximately 50% power from 1441 to 1602 on 01/16 for a set point adjustment on the turbino control system. The unit reached 100% full power at 0400 on 01/17, and operated at or near 100% full power for the remainder of the
: month, prepared by:
S. W. Moser Telephone:
704 373-5762


        ,              MONTilLY REFUELING INEQ1Q4ATION REOUEST
MONTilLY REFUELING INEQ1Q4ATION REOUEST 1.
: 1. Facility namos Catawba.       Unit 2
Facility namos Catawba.
: 2. Scheduled next refueling shutdownt Januarv 1993
Unit 2 2.
: 3. Scheduled restart following refueling: April 1993 Ti!E PROJECT MANAGER !!AS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. Cl!ANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER DE MAINTAINED IN TilIS REPORT.
Scheduled next refueling shutdownt Januarv 1993 3.
: 4. Will refueling or resumption of operation thoroaf ter require a technical specification chango or other licenso amendment?
Scheduled restart following refueling: April 1993 Ti!E PROJECT MANAGER !!AS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
Cl!ANGE OR LICENSE AMENDMENT.
TilEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER DE MAINTAINED IN TilIS REPORT.
4.
Will refueling or resumption of operation thoroaf ter require a technical specification chango or other licenso amendment?
If yes, what will those be?
If yes, what will those be?
If no, has roload design and coro configuration boon reviewed by Safety Review Committoo regarding unroviewed safety questions?
If no, has roload design and coro configuration boon reviewed by Safety Review Committoo regarding unroviewed safety questions?
: 5. Schedulod dato(s) for submitting proposed licensing action and supporting information.
5.
: 6. Important licensing considerations (now or dif ferent design or supplier,   unroviewed design or performanco - analysis ruettsods ,
Schedulod dato(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (now or dif ferent design or
: supplier, unroviewed design or performanco - analysis ruettsods,
significant changes in design or now operating procedur9s).
significant changes in design or now operating procedur9s).
: 7. Number of Fuel assemblies       (a) in the core 192 (b) in the spent fuel pool: 21Q
7.
: 8. Present licensed fuel pool capacity: 1418 Size of requested or' planned increasos--
Number of Fuel assemblies (a) in the core 192 (b) in the spent fuel pool: 21Q 8.
: 9. Projected dato of last refueling which can be accommodated by present licensed capacity: Sentomber 2011 DUKE POWER COMPANY                       DATE:   February 14. 1992 Hamo of
Present licensed fuel pool capacity: 1418 Size of requested or' planned increasos--
9.
Projected dato of last refueling which can be accommodated by present licensed capacity: Sentomber 2011 DUKE POWER COMPANY DATE:
February 14. 1992 Hamo of


==Contact:==
==Contact:==
R. A. Williams       Phone:   104-373-5987
R.
A. Williams Phone:
104-373-5987


t CATAWBA liUCLEAR STATIO!1 MoliTi!LY OPERATIliG STATUS REPORT December 1991
t CATAWBA liUCLEAR STATIO!1 MoliTi!LY OPERATIliG STATUS REPORT December 1991
                                                                                                                                                                \
\\
: 1.                           Pornonnel Exposure -
1.
Pornonnel Exposure -
For the month of December, no individual (s) exceodod 10 porcent of their allowable annual radiation dose limit.
For the month of December, no individual (s) exceodod 10 porcent of their allowable annual radiation dose limit.
: 2.                           The total station liquid roloaso for December has boon compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of thin limit.
2.
The total station liquid roloaso for December has boon compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of thin limit.
The total station gaseous roloaso for December has boon compared with the Technical Specifications maximum annual doso commitmont and was less than 10 percent of this list.
The total station gaseous roloaso for December has boon compared with the Technical Specifications maximum annual doso commitmont and was less than 10 percent of this list.
                                                                                                                                                              .}}
-}}

Latest revision as of 11:22, 13 December 2024

Monthly Operating Repts for Jan 1992 for Catawba Nuclear Station Units 1 & 2
ML20092F185
Person / Time
Site: Catawba  
Issue date: 01/31/1992
From: Mccraw E, Moser S, Robert Williams
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9202190136
Download: ML20092F185 (13)


Text

-

e--w--

Il I

flabe kvr Comjwny Hurhoria Center l'O tha 900i

. Charlotiv, N C 2Mol It>UT DUKEPOWER February 14, 1992 U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C.

20555 RE: Catawba Nuclear, Station Docket No. 50-423 and 50-414 File: GS-801.01

Dear Sir:

Please find attached information concerning the performance and operating status of the Catawba Nuclear Station for the month of January,1992.

Very t'culy yours,

$~

k-tLW E. O. McCraw, Manager Operations, Performance, & Automation E0M/sdg Attachments xc:

Stewart D. Ebneter Richard G. Oehl, NE-44 Regional Administrator / Region II U.S. Department of Energy U.S. Nuclear Regulatory Commission 19901 Germantown Rd.

101 Marietta St., NW, Suite 2900 Germantown,-MD 20874 Atlanta, GA 30323 W. T. Orders INP0 Records Center Senior Resident Inspector 1100 Circle 75' Parkway, Suite 1500 Catawba Nuclear Station Atlanta, GA 30323 American Nuclear Insurers Bob Martin c/o Dottie Sherman, ANI Library Office Nuclear Regulation The Exchange, Suite 245 U.S. Nuc. Reg. Commission 270 Farmington Ave.

Washington, D.C.

20555 Farmington, CT 06032 Ms. Vickie White

)

Nuclear Assurance Corp.

6251 Crooked Creek Road I

Norcross, GA 30092

/ i p

Dja2 j g 05000413 920132 R

/

PDR

U.S.'NRC - CNS

  • Feb.-14, 1992 Page 2 bxc D. A. Braatz PDS K. S. Canady EC08H B. T. Faulkenberry WC251 R. C. Futrell CNS E. G. LaCasse CNS T. E. Mooney (WC26C)
8. J. Horsley CNS Contracts - EC03U N. A. Rutherford WC25D J. S. Forbes CNS R. A. Williams (3)

WC25A J. C. Wimbish WC23C E. C. Fisher NNS B. W. Walsh PB02L S. D. Galloway CNS C. D. Denton PB05E R. L. Gill WC26A(File)

l OPERAi!% CATA FEFORT-DutrEi NO 50-413 DATE February 16. 1992 OrERATING STATUS COMPLETED BY R.A. Willise t TELEPHONE-704 373-5987

1. Unit hase: Catawba 1
2. Reporting f eriod: January 1,1992-January 31,1992
3. Licensed thernal Power (MWtli 3411
4. Nameplate Rating (Bross MWe):

1305 Notes aNameplate Rating

5. Design Electrital Rating (Net Mke h

!!45 (Stoss MWel calculated as

.6. Marisue Dependable Capacity (Bross MWel:

1192

1450.000 MVA x.90 power
7. Manieus Dependable Capacity (Net MWe):

1129 factor per Fage lii, B. If Changes Octur in Capacity Ratings-(Itees Nusber 3 Through 7) Since Last NUREG-0020.

Report. Give Reasonst

9. Power Level Te Which Restricted, if Any (Net MWe):

~

'10. Reason For Restritticos, if any:

This Month

-Yr.-to-Date Cueulative

11. Heurs in Reporting Period 744.0 744.0-57793.0
12. haster Of Hocrs Reactor Was Critical 744.0-744.0 43134.2.

-13. Reactor lieserve Shutdown Hours

--0---

--0--

--0--

14. Hours Generator On-Line 744.0-744.01

-42139.9 15,ilnitReserveStutdownHeurs

<--0--

--0--.

--0--

-16. Gross theraal Energy Generated (MWH) 2523221 T2523221

-~l36009526

17. Gross Electrical Energy Generated (RWH1 896831 896831 47766235
18. Net Electrical Energy Generated (MWH) 851801

~B51901 44785495

19. Unit Service Factor-

-100.0:

-100.0 72.9 20.UnitAvailabilityFatter

-100.0 100.0 72.9 2!. Unit Capacity Factor (Using MLC Net)-

.101.4

.:101.4 60.3

22. Indt Capacity Factor (Using DER Net)-

100.0 100.0.

-67.7

-23. Unit Fcrced Outage Rate 0.0 -

-0.0-11.3

24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

4 Re f ue linr - June 23. 1992' - 65 days-25.'If Shut Dodo At End Of Report Period. Estiaated Cate of Startup:-

26. Unit In Test Status (Prior;to Consercial Operation):

' Forecast; Achieved _

INITIALCRITICALITY-IN!ilAL ELECTRICITY COMMERCIAL OPERATION

j-

.~

OPERAllNSDATAREPORT DOCrET NO 50-413 UN!I -

- Cat uta 1 CATE February 14. 1992 COMPLETEDBY R.A Willises TELEPHONE 704-373-5987 MONTH January 1992 (E.

.AVERABEDAILYF0WERLEVEL pfE AVERASEDAILYF0WERLEVEL--

(MWe-Net)

(MWe-Net)-

1-1166 17 1145 2

1146

-IB

!!45 3

1143 19 1165 4

1142 20 1151 5

1147 21 1145 6

1167 22 -

1145 7

-1147-23

-1140 8

1146 24 1139 9

1146-25 1133-

- 10 1146 26

'1145'

!!46 27 1146 12

' 1147 -

26 11444 13

--1149 -

29

- 1144 -

.. g-

. g j gg -

-30

-g g g3.-

. 15 1151

.31 1144 16 1146 him--.... _.. _.. _ _....

...._a

.-.p du

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-413 UNIT NAME CArawta 1 DATE vz/14/92 REPORT MONTH January 1992 COMPLETED BY s.

w.

Must.x TELEPHONE

( / v41 -J / J-3 / tiz R)

(3)

(4)

(5)

(2 (1)

MET-E HOD T

A OF LICENSE N

.. Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

. HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)

'(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled.

A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance'or test 2-Manual Scram Entry Sneets For Licensee Event Report (LER (NUREG-0161))

C-Refueling 3-Automatic Scram D-Regulatory. Restrictiory -

4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain).

DOCKET NO:

50-413 UNIT:

Catawba 1 DATE:

2/14/92 NARRATIVE

SUMMARY

MONTil: January 1992 Catawba Unit 1 began the month of January operating at 100% full power.

The unit operated at or near 100% full power for the entire month, and ended the month operating at 100% full power.

Prepared by:

S. W. Moser Telephone:

704-373-5762

MONTilLY REFUELING INFORMATION REQUEST 1.

Facility name: Catawba.

Unit 1 2.

Scheduled next refueling shutdown: June 1992 3.

Scheduled restart following refueling: Auaust 1992 Tile PROJECT MANAGER HAS DEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

CilANGE OR LICENSE AMENDMENT.

Ti!EREFORE, QUESTIONS - 4 TilROUGli 6 WILL NO LONGER DE MAINTAINED IN TilIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and. core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and.

supporting information.

6.

Important licensing considerations -(now or different design or

supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core:.L92 (b) in the spent fuel pool: 336 8.

Present licensed fuel pool capacity: 1418 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: September 2009 DUKE POWER COMPANY DATE:

February 14. 1992 Name of

Contact:

-R.

A.

Williams Phone:

704-373-5987

2 0FERA11NG DAIA FEf0k1 DOCKET ND 50-414 DATE February 14. 1992 -

OPEFATINGSTATL'S COMPLETED BY.

P. A.= Willins

-TELEPHONE 704 373-5987

1. Unit Naee: Catanta 2
2. Reporting Feriod: January 1, 1992-January 31, 1992
3. Licensed thermal Fomer (Mdt):

3411 4.WaseplateRating(BrossMWel 13055 Notes aNameplate Rating.

5. Design Electrical Ratirg (Net MWe):

-1145

-(Gross MWe) calculated as

6. Maxinus Dependable Cap;ity (Eress MWelt 1192 1450.000MVA:-90 power-
7. Marious Deper.dable Captity (Net MWe):

!!29_ _

factor per Page 111,_

B. If Charges Occur in Capacity Ratings litems Number 3 Through 7) Since Last NUREG-0020.

Peptt. Give Reasons -

9. Poser Level To Which Restricted, if Any (Net MWe):
10. Reason for Restrictiens, if anyt This Mo' nth Yr.-to-Date Cuaulative
11. Hours in Reprting Period 744,0 744.0 47009.0'
12. Nusber Of Hours Reactor Was Critical 721.4-721.4

- 35019.0-

13. Reatter Reserve Shutdown Hours

--0--

--0--

--0--

14. Hours Generator On-Line

. 703.6 L

-703.6 34266.9-

15. Unit Reserve Shutdown Heurs-

--0--

16. Stoss Thereal Energy Benerated-(MWHi 2330404 23304B4 107456661
17. Gross Electrical Energy Generated-(MWH)-

827994 627994-30003899

16. Net Electrical Energy Generated (MWH)
784213, 784213-35639052 19.UnitServiceFacter 94 6 94.6

-71.7=

20. Unit Availability Factor 94.6
94.6 '

71.7 21.-Unit Capacity Factor (Using hDC Neti 93,4.

93.4-

-65.0

22. Unit Ca pcity. Factor (Using DER Net)

-92.1 92.1 65.1 23.UnitForcedOutageRate 3.7-3.7

- 12.9 -

24. Shutdcen Scheduled O ar Next 6 Months (Typ, Date, and Duration of Each):-

Jane

25. If Shut Down At End Df Report Feriod. Estinated Date of Startup
26. Units in Test Status (Prior to Cessercial Operation):

-Forecast Achieved:

IMIT!AL CRITICALITY

- !NITIALELECTRICITY.

~

COMMERCIAL OFERATICN

. ~ -

.... -..... ~

I OPERAllNG DATA F.EPDRT

-DOCKET NO 50-414' UNIT Catuba E t' ATE february 14. ML COMPLETELBY P.A. Wt111aes-TELEFHONE 704-373 5987 t

i NONTH Jawarv.1992 3

i Q,Al AVERA6E LAILY POWER LEVFL-pfl

- AVERAGE DAILY F'0WER LEVEL (NWe-Net)

(MWe-Net) 1 1159 17 1145 2

1152 18' 1155 3

1156 19 1157-4 1090 20 1157 5

31 El 1150 6

909 22 1159 7

1147-23 1151 B

1151 24

!!67

- 9

-1151-25 1160-10o 1154 26 1157 11 1160 27-

'1161-12

!!'8 20

' 1158 '

__13

-1150 29 1162 14-t150

'30' 1156 15 71 31

~ 1142

'!6 472 i

(;

.u.,--,

-..2..

,,-., a-.

-..u,,,._..

UNIT SHUTDOWNF AND POWER REDUCTIONS DOCKET NO.

50-414 UNIT NAME ChawbA z DATE Uz/14/vz REPORT MONTH January 1992 COMPLETED BY s.

w.

Mus t;H TELEPHONE

( / v41 5 / a > / ez (3

I _

(4)

(5)

ME)-

(1)

(2)

R E

WO GF LICENSE T

A l SHUT EVENT SYS-CAUSE AND CORRECTIVE N

Y S

O P

DURATION v

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 1-P 92 4 S

B HH INSTRU LOAD REJECTION TESTING 1

92 4 S

13.55 B

3 HH INSTRU TURBINE TRIP FOR LOAD REJECTION TESTING, REACTOR REMAINING CRITICAL 2-P 92 5 S

B HH INSTRU LOAD REJECTION TESTING 3-P 92-1-5 S

A HG HTEXCH HOTWELL DISSOLVED OXYGEN OUT OF SPEC 4-P 92 6 S

H HH PUMPXX FEEDWATER PUMP

'2A' START 2

92-1-15 F

26.85 A

3 HA PUMPXU REACTOR TRIP DUE TO TURBINE TRIP'ON ELECTRO-HYDRAULIC CONTROL PROBLEM 5-P 92-1-16 F

H ZZ ZZZZZZ PLACING UNIT ON-LINE 6-P 92-1-16 F

B HA PUMPXX INTERNAL TIME SET POINT ADJUSTMENT ON TURBINE HYDRAULIC SYSTEM / PUMP TEST (3)

(4)

(1)

(2)

Method:

Exhibit G - Instructions F Forced Reason-S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Entn Sheets For Licensee Event Report (NUREG-0161))

(LER 3-Automatic Scram C-Refueling D-Regulatory Restriction 4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source G-Operator Error (Explain)

H-Other (Explain) t

DOCKET NO:

50 414 UNIT:

Catawba 2 DATE:

2/14/0 NAhRATIVC

SUMMARY

MONTil: January 1992 Catawba Unit 1 began the inonth of January operating at 100% full power.

The unit operated at 100% full power until 2043 on 01/04, when a power reduction was begun to begin load rejection testing of the digital feedwater / turbine control system.

The unit was held at approximately 45% power from 2255 to 2346 or 01/04 in preparation for the testing At 2346 on 01/04, the unit was tripped for the test.

The unit was placed back on line at 1319 on 01/05.

During the power escalation, the unit was held at approximately 15% power from 2120 to 2213 on 01/05 due to secondary chemist ry, and at approximately 45% power from 0105 to 0130 on 01/06 to tart the '2A' main feedwater pump.

The unit reached 100% full power at 1805 on 01/06.

Tho unit operated at or near 100%

full power until 0214 on 01/15, when the unit tripped off-line due to turbine control problems. The unit was placed back on line at 0505 on 01/16.

During the power escalation the unit wan held at approximately 50% power from 1441 to 1602 on 01/16 for a set point adjustment on the turbino control system. The unit reached 100% full power at 0400 on 01/17, and operated at or near 100% full power for the remainder of the

month, prepared by:

S. W. Moser Telephone:

704 373-5762

MONTilLY REFUELING INEQ1Q4ATION REOUEST 1.

Facility namos Catawba.

Unit 2 2.

Scheduled next refueling shutdownt Januarv 1993 3.

Scheduled restart following refueling: April 1993 Ti!E PROJECT MANAGER !!AS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

Cl!ANGE OR LICENSE AMENDMENT.

TilEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER DE MAINTAINED IN TilIS REPORT.

4.

Will refueling or resumption of operation thoroaf ter require a technical specification chango or other licenso amendment?

If yes, what will those be?

If no, has roload design and coro configuration boon reviewed by Safety Review Committoo regarding unroviewed safety questions?

5.

Schedulod dato(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (now or dif ferent design or

supplier, unroviewed design or performanco - analysis ruettsods,

significant changes in design or now operating procedur9s).

7.

Number of Fuel assemblies (a) in the core 192 (b) in the spent fuel pool: 21Q 8.

Present licensed fuel pool capacity: 1418 Size of requested or' planned increasos--

9.

Projected dato of last refueling which can be accommodated by present licensed capacity: Sentomber 2011 DUKE POWER COMPANY DATE:

February 14. 1992 Hamo of

Contact:

R.

A. Williams Phone:

104-373-5987

t CATAWBA liUCLEAR STATIO!1 MoliTi!LY OPERATIliG STATUS REPORT December 1991

\\

1.

Pornonnel Exposure -

For the month of December, no individual (s) exceodod 10 porcent of their allowable annual radiation dose limit.

2.

The total station liquid roloaso for December has boon compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of thin limit.

The total station gaseous roloaso for December has boon compared with the Technical Specifications maximum annual doso commitmont and was less than 10 percent of this list.

-