ML20100F708: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
* h
h
            ., o OPERATING DATA REPORT DOCKET NO.           050-0298 UNIT     CNS DATE     February 15. 1996 OPERATING STATUS                                                                               TELEPHONE         (402) 825-5295 1
., o OPERATING DATA REPORT DOCKET NO.
: 1.          Unit Name:         Coooer Nuclear Station                                               Notes
050-0298 UNIT CNS DATE February 15. 1996 OPERATING STATUS TELEPHONE (402) 825-5295 1.
: 2.         Reporting Period:               Decernber 1995
Unit Name:
: 3.         Licensed Thermal Power (MWt):         2381
Coooer Nuclear Station Notes 2.
: 4.           Nameplate Rating (Gross MWe):           836
Reporting Period:
: 5.         Design Electrical Rating (Net MWe):             778
Decernber 1995 3.
: 6.           Maximum Dependable Capacity (Gross MWe):             787
Licensed Thermal Power (MWt):
: 7.           Maximum Dependable Capacity (Net MWe):               764
2381 4.
: 8.           If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
Nameplate Rating (Gross MWe):
: 9.           Power Level To Which Restricted, if Any (Net MWe):
836 5.
: 10.         Reasons For Restriction, if Any:
Design Electrical Rating (Net MWe):
This Month                 Yr.-to-Date             Cumulative
778 6.
: 11.         Hours in Reporting Period                                         744.0                   8.760.0             188.497.0
Maximum Dependable Capacity (Gross MWe):
: 13.         Number of Hours Reactor Was Critical                             102.8                   5.851.2             139.041.4
787 7.
: 13.         Reactor Reserve Shutdown Hours                                     0.0                         0.0                   0.0 l
Maximum Dependable Capacity (Net MWe):
: 14.         Hours Generator On-Line                                           38.7                   5.664.6             136.943.9
764 8.
: 15.         Unit Reserve Shutdown Haurs                                         0.0                         0.0                   0.0
If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
: 16.         Gross Thermal Energy Generated (MWH)                         51.672.0               13.015.184.0         284.326.428 0 1
9.
: 17.         Gross Electric Energy Generated (MWH)                         9.852.0                 4.261.965.0           92.380.310.0 l
Power Level To Which Restricted, if Any (Net MWe):
: 18.         Net Electric Energy Generated (MWH)                           9.022.0                 4.127.691.0           89.226.129 0
10.
: 19.         Unit Service Factor                                                 5.2                         64.7                 72.7
Reasons For Restriction, if Any:
: 30.         Unit Availability Factor                                           5.2                         64.7                 72.7
This Month Yr.-to-Date Cumulative 11.
: 31.         Unit Capacity Factor (Using MDC Net)                                 1.6                       61.7                 62.0
Hours in Reporting Period 744.0 8.760.0 188.497.0 13.
: 33.         Unit Capacity Factor (Using DER Net)                                 1.6                       60.6                 60.8
Number of Hours Reactor Was Critical 102.8 5.851.2 139.041.4 13.
: 23.         Unit Forced Outage Rate                                             0.0                         17.9                   8.5
Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14.
: 34.         Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Hours Generator On-Line 38.7 5.664.6 136.943.9 15.
Unit Reserve Shutdown Haurs 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 51.672.0 13.015.184.0 284.326.428 0 17.
Gross Electric Energy Generated (MWH) 9.852.0 4.261.965.0 92.380.310.0 18.
Net Electric Energy Generated (MWH) 9.022.0 4.127.691.0 89.226.129 0 19.
Unit Service Factor 5.2 64.7 72.7 30.
Unit Availability Factor 5.2 64.7 72.7 31.
Unit Capacity Factor (Using MDC Net) 1.6 61.7 62.0 33.
Unit Capacity Factor (Using DER Net) 1.6 60.6 60.8 23.
Unit Forced Outage Rate 0.0 17.9 8.5 34.
Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None.
None.
: 35.         If Shut Dowr, At End of Report Period, Estimated Date of Startup:     N/A
35.
: 26.           Units In Test StaNs (Prior to Commercial Operation):   Forecast                   Acnieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9602220048 960215 PDR     ADOCK 05000298 R                           PDR}}
If Shut Dowr, At End of Report Period, Estimated Date of Startup:
N/A 26.
Units In Test StaNs (Prior to Commercial Operation):
Forecast Acnieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9602220048 960215 PDR ADOCK 05000298 R
PDR}}

Latest revision as of 05:55, 13 December 2024

Corrected Page for Monthly Operating Rept for Dec 1995 for Cooper Nuclear Station
ML20100F708
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/31/1995
From:
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20100F701 List:
References
NUDOCS 9602220048
Download: ML20100F708 (1)


Text

.

h

., o OPERATING DATA REPORT DOCKET NO.

050-0298 UNIT CNS DATE February 15. 1996 OPERATING STATUS TELEPHONE (402) 825-5295 1.

Unit Name:

Coooer Nuclear Station Notes 2.

Reporting Period:

Decernber 1995 3.

Licensed Thermal Power (MWt):

2381 4.

Nameplate Rating (Gross MWe):

836 5.

Design Electrical Rating (Net MWe):

778 6.

Maximum Dependable Capacity (Gross MWe):

787 7.

Maximum Dependable Capacity (Net MWe):

764 8.

If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, if Any (Net MWe):

10.

Reasons For Restriction, if Any:

This Month Yr.-to-Date Cumulative 11.

Hours in Reporting Period 744.0 8.760.0 188.497.0 13.

Number of Hours Reactor Was Critical 102.8 5.851.2 139.041.4 13.

Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14.

Hours Generator On-Line 38.7 5.664.6 136.943.9 15.

Unit Reserve Shutdown Haurs 0.0 0.0 0.0 16.

Gross Thermal Energy Generated (MWH) 51.672.0 13.015.184.0 284.326.428 0 17.

Gross Electric Energy Generated (MWH) 9.852.0 4.261.965.0 92.380.310.0 18.

Net Electric Energy Generated (MWH) 9.022.0 4.127.691.0 89.226.129 0 19.

Unit Service Factor 5.2 64.7 72.7 30.

Unit Availability Factor 5.2 64.7 72.7 31.

Unit Capacity Factor (Using MDC Net) 1.6 61.7 62.0 33.

Unit Capacity Factor (Using DER Net) 1.6 60.6 60.8 23.

Unit Forced Outage Rate 0.0 17.9 8.5 34.

Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None.

35.

If Shut Dowr, At End of Report Period, Estimated Date of Startup:

N/A 26.

Units In Test StaNs (Prior to Commercial Operation):

Forecast Acnieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9602220048 960215 PDR ADOCK 05000298 R

PDR