ML20115G475: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
{{#Wiki_filter:.
{{#Wiki_filter:.
NRC MONTHLY OPERATING REPORT DOCKET NO. ___50-5_2 8_____
NRC MONTHLY OPERATING REPORT DOCKET NO. ___50-5_2 8_____
UN I T N AME___ PVNGS- l____
UN I T N AME___ PVNGS-l____
DATE___ 3[05 / 85 COMPLETED BY___ M.P_._ Rich _ardson       .
DATE___ 3[05 / 85 COMPLETED BY___ M.P_._ Rich _ardson TELEPHONE 602-932-5300
TELEPHONE                         602-932-5300
' _~ ~ E_ t._5_ _3_ _ _
                                                                                                                                          ~      ~~
~
                                                                                                                        ' _~ ~ E_ t ._5_ _3_ _ _
~~
OEEg8IING SIBIUS
OEEg8IING SIBIUS
: 1. Unit Name: __Palo,Ve ge_ Nucle _aL enera                 G      gn1 _t_a_t_iont_U_
__Palo,Ve ge_ Nucle _aL enera gn1 _t_a_t_iont_U_ nit _1___
S                 nit _1___
G S
: 2. Reporting Period: __F_e_b rua r_y,19 85
1.
: 3. Licensed Thermal Power (MWt):                                   3800
Unit Name:
: 4. Nameplate Rating (Gross MWe): __1304_________________
2.
: 5. Design Electrical Rating (Net MWe):__12ZO____________
Reporting Period: __F_e_b rua r_y,19 85 3.
: 6. Maximum Dependable Capacity (Gross MWe): _To_b_e__de t e rmine d
Licensed Thermal Power (MWt):
: 7. Maximum Decendable Caoacity (Net MWe): _ _ _To_b_e._ _d ele r_m_iDe d
3800 4.
: 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Recort, Give Reasons:                                             _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Nameplate Rating (Gross MWe): __1304_________________
N/_A
5.
: 9. Power Level To Which Restricted, If Any (Net MWe):190_MWt_IQ_,We)
Design Electrical Rating (Net MWe):__12ZO____________
6.
Maximum Dependable Capacity (Gross MWe): _To_b_e__de t e rmine d 7.
Maximum Decendable Caoacity (Net MWe): _ _ _To_b_e._ _d ele r_m_iDe d 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Recort, Give Reasons:
N/_A 9.
Power Level To Which Restricted, If Any (Net MWe):190_MWt_IQ_,We)
: 10. Reasons For Restrietions. I f Any : _LQW_fover_DneInting._Licenac_____
: 10. Reasons For Restrietions. I f Any : _LQW_fover_DneInting._Licenac_____
This Month                 Yr.-to-Date                     Cumulat ive
This Month Yr.-to-Date Cumulat ive
: 11. Hours In Reoorting Period                                               _ _ _612_ _ _ _ _           __l416___.___                   _14 L6._ _ _
: 11. Hours In Reoorting Period
: 12. Number Of Hourc Reactor Was Critical                                                                         0                               0                       0
_ _ _612_ _ _ _ _
: 13. Reactor Reserve Shutdown Hours                                           _,____0_____               _ _          0______           ____0___
__l416___.___
: 14. Hours Generator On-Line                                                           0                               0                       0
_14 L6._ _ _
: 15. Unit Reserve Shutdown Hours                                                       0                               0                       0
: 12. Number Of Hourc Reactor Was Critical 0
: 16. Gross Thermal Energy Generated                                                     0                              0                        0 (MWH)
0 0
: 17. Gross Electrical Energy Generated                                                  0                 ____0__,____                          0 (MWH)
: 13. Reactor Reserve Shutdown Hours
: 18. Net Electrical Energy Generated                                          _____Q.____                ____S-                  __    _ _ _ _Q. _ _ _
_,____0_____
0______
____0___
: 14. Hours Generator On-Line 0
0 0
: 15. Unit Reserve Shutdown Hours 0
0 0
: 16. Gross Thermal Energy Generated 0
0 0
(MWH)
(MWH)
: 19. Unit Service Factor                                                     __NL&____                   _ _ _N/A _ _ _ _ _             _HLA___
: 17. Gross Electrical Energy Generated 0
: 20. Unit Availability Factor                                                 ___ NLA                     _ _ _H/A _ _ _. _               _ N LA_ _ __
____0__,____
g        21. Unit Capacity Factor (Using MDC                                         __NL&____                   ___N/L _____                   _EL&__
0 (MWH)
No:         Net)
: 18. Net Electrical Energy Generated
: 22. Unit Caoacity Factor (Using DER                                         _ _ _ ELA._ _ _ _ _         _ _ _N/A _ _ _ _ _             _ _ NLA_ _ _ _
_____Q.____
  @*b@
____S-
N 00 Net) on       23. Unit Forced Outage Rate                                                 _ _ pl& _ _ _               ___N/A _____                   _ _ yL& _ _, _
_ _ _ _Q. _ _ _
03 0     24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and N:s           Duration of Each): _ _ _Hq.mi gnifkant_.g u t_qu_ g LqnDc d _unti l _af_t e t _ _ _ _ _ _ _ _ _ _ _ .
(MWH)
E             walrranty._run_ W l8D.____._________.-_____________._.--_..                                                   __________________
: 19. Unit Service Factor
__NL&____
_ _ _N/A _ _ _ _ _
_HLA___
: 20. Unit Availability Factor
___ NLA
_ _ _H/A _ _ _. _
_ N LA_ _ __
: 21. Unit Capacity Factor (Using MDC
__NL&____
___N/L _____
_EL&__
g No:
Net)
: 22. Unit Caoacity Factor (Using DER
_ _ _ ELA._ _ _ _ _
_ _ _N/A _ _ _ _ _
_ _ NLA_ _ _ _
@*b@
N Net) 00 on
: 23. Unit Forced Outage Rate
_ _ pl& _ _ _
___N/A _____
_ _ yL& _ _, _
03 0
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and N:s Duration of Each): _ _ _Hq.mi gnifkant_.g u t_qu_ g LqnDc d _unti l _af_t e t _ _ _ _ _ _ _ _ _ _ _.
E walrranty._run_ W l8D.____._________.-_____________._.--_..
N
: 25. If Shutdown At End Of Reoort Period, Estimated Date of Startuo: _g/A_
: 25. If Shutdown At End Of Reoort Period, Estimated Date of Startuo: _g/A_
N e
e 26 Unite ~5n~T7st-StatIt$ (prior To Commercial Ooeration):
g    26   Unite ~5n~T7st-StatIt$ (prior To Commercial Ooeration):
~
                  ~
g Forecast Achieved INITIAL CRITICALITY
Forecast                           Achieved INITIAL CRITICALITY                                                             _ _ _ .5185. _ _ _ _ ._               _ _ .H/L _ _ _ _ _ _ _
_ _ _.5185. _ _ _ _._
INITIAL ELECTRICITY                                                             ____6185.___                 _      _ _ _N/L _ _ _ _ _ _ _
_ _.H/L _ _ _ _ _ _ _
COMMERCIAL OPERATION                                                           _ _ _1_.118_5_ _ _ _ _ _             __N/L_______
INITIAL ELECTRICITY
____6185.___
_ _ _N/L _ _ _ _ _ _ _
COMMERCIAL OPERATION
_ _ _1_.118_5_ _ _ _ _ _ __N/L_______


                    ; ;;                                    t 7.. \
t 7..
        .)                                             ,
. )
l .
\\
                                                          <    ?.
l.
                                                .,            )-
?.
)-


==SUMMARY==
==SUMMARY==
OF OPERATING EXPgBJENCE EDB Idg MgNIH DOCKET NO.____jQ_l?J_______                         _
OF OPERATING EXPgBJENCE EDB Idg MgNIH DOCKET NO.____jQ_l?J_______
U N I T _ _ _ _ _ __ _ _ _HN_G S, ,l_ __ __ _ _ _ __ _ _
U N I T _ _ _ _ _ __ _ _ _HN_G S,,l_ __ __ _ _ _ __ _ _
v
v
                ',,_                                                        .D AT E ___ _ ____ __,}/_Q'i/Jj_ ____ ____ ___
.D AT E ___ _ ____ __,}/_Q'i/Jj_ ____ ____ ___
s 4-t, I                                               COMPLETED BY__LP_u,RigitarJsga_____
s t,
    .                      s TELEPHONE ____.6Q2,_9_32-5,10.D________
I COMPLETED BY__LP_u,RigitarJsga_____
s                 .
4-s TELEPHONE ____.6Q2,_9_32-5,10.D________
                .                                                                          _____    Ext._J521__________
s Ext._J521__________
4 February 11, 1985'         "B" Train' electrical outage established February 13, 1985 - Completed Reactor Coolant System (rcd) Fill and Vent pyricess i                                       <
4 February 11, 1985' "B" Train' electrical outage established February 13, 1985 - Completed Reactor Coolant System (rcd) Fill and Vent pyricess i t
t February 16, 1985 - Comh.eted "E" Train electrical ootage L
February 16, 1985 - Comh.eted "E" Train electrical ootage L
February 25,1985           "A" Train electrical outage estiablished i
February 25,1985 "A" Train electrical outage estiablished i
February 26, 1985 - Filled.the Spent Fuel Pool with borated water.
February 26, 1985 - Filled.the Spent Fuel Pool with borated water.
Spent Fuel Pool boron concentration 4090 ppm
Spent Fuel Pool boron concentration 4090 ppm
                    )
)
;j s
;j s
i                                                                             f t-     g k
i f
t-g k
i s
i s
          -a---                 ,-, ,
-a---


          ~
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.               JD-j23, UNIT _________1% K-l________
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
JD-j23, UNIT _________1% K-l________
DATE_________3102M________
DATE_________3102M________
COMPLETED BY_LE,31shgutdaga_
COMPLETED BY_LE,31shgutdaga_
TELEPHONE                 JD2-J132,-11QD_
TELEPHONE JD2-J132,-11QD_
                                                                                                                    -12 lum 91______
-12 lum 91______
MQNTO:         February 1985 DAY AVERAGE DAILY POWER LEVEL                               DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                                       (MWe-Net) 1           _ _ ___ ___ 0 17 _ _ __ _ _ __ _ _ _g_ ___ _____             ___
MQNTO:
2                       0                                   18   ___________3______________
February 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
3                       0         _
(MWe-Net) 1
19 -=                 =____g______________
_ _ ___ ___ 0 17 _ _ __ _ _ __ _ _ _g_ ___ _____
                  -4     __________0________________                           20 ___________S______________
2 0
5'   __________Q---               =- ________               21 _-_             -- . _=S______________
18 ___________3______________
3 0
19 -=
=____g______________
- 4
__________0________________
20 ___________S______________
5'
__________Q---
=- ________
21 _-_
_=S______________
i v.
i v.
6     _________J1_                 _ = _______
6
_________J1_
22 ___________fL_____________
22 ___________fL_____________
i
_ = _______
. ,.                7 ._________J1_________=_                             --
i 7._________J1_________=_
23 __-         ____
23 __-
___a______________
___a______________
8     _________J1_______________                             24   ___________fL_____________
8
i 9     ___              Ja_______________                   25 ___________fL_____________
_________J1_______________
,                                                                            r .
24 ___________fL_____________
;                  10 _________J1_______________                               2 6 _ _ _ _ _ _ _ _ _ _ _ IL __ _ _ _ _ _ _         __
i 9
11   __________Q_______________                             27'___________fL_____________
Ja_______________
12 __________Q_______________                               28   ___________fL_____________
25 ___________fL_____________
13 __________Q_______________                               29 _______-_-_. _____________   -
r 10 _________J1_______________
                  - 1 4 _ _ _ _ _ _ _ _ _ _Q _ _ _ _ = = _ _       =_____       30 __________________________
2 6 _ _ _ _ _ _ _ _ _ _ _ IL __ _ _ _ _ _ _
15 __________Q_______________                               31   __________________________
11 __________Q_______________
16 __________Q_______________
27'___________fL_____________
4 1
12 __________Q_______________
28 ___________fL_____________
13 __________Q_______________
29 _______-_-_. _____________
- 1 4 _ _ _ _ _ _ _ _ _ _Q _ _ _ _ = = _ _
30 __________________________
=_____
15 __________Q_______________
31 16 __________Q_______________
1 4


r - - - - - - - - - _ - _ _ __                                                              __
r UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET 100.
DOCKET 100. sn %9A UNIT SHUTDOWNS AND POWER REDUCTIONS                          PVNG4-1 UNIT NAMC DATE     3/05/RS               .          ,
sn %9A UNIT NAMC PVNG4-1 DATE 3/05/RS COMPLETED BY M.12 R i c h n rds ort TELEPHONE ~ 9 U-5 400 vvr Asot Method or Shutting Down System Component Cause er Corrective 1
COMPLETED BY     M .12 R i c h n rds ort TELEPHONE ~ 9 U-5 400 vvr     Asot Method or Shutting Down                 System     Component           Cause er Corrective 2             3   LER             4           5                 Action to 1    Duration                                                              Code              Prevent Recurrence Reason      Reactor      No.        Code No. Date       Type       (Hours)
Duration 2
Not applicable - reactor N/A has not achieved initial criticality.
3 LER 4
3                         la 1                 2                                                                 Method:                     ruhlblt F = Instructions F-Forced           Reason:                                                         1-Manual                   for Prnparation or Data S-Scheduled       A-Equipment ralluro (Explain)                                   2-Hanval Sc ra m.           Entry Sheets for Licensee D-Haintenance or Test                                           3-Automa tic Scram.         [ vent Report (LER) File C-Rcrocling                                                     4-Continuation from         INUREC 0161)
5 Action to No.
D-Regulatory Restriction                                         Prevfous Month E-Operator Training & License Examination                       5-Redvetion or 20%       5 T- Adm in i s t ra t ive                                         or Creator in the         Exhibit H-Same Source C-Operational Error (Explain)                                     Past 24 Hours H-Other (Explain)                                     .
Date Type (Hours)
6-Other (Explain) 29tsou
Reason Reactor No.
Code Code Prevent Recurrence Not applicable - reactor N/A has not achieved initial criticality.
3 la 1
2 Method:
ruhlblt F = Instructions F-Forced Reason:
1-Manual for Prnparation or Data S-Scheduled A-Equipment ralluro (Explain) 2-Hanval Sc ra m.
Entry Sheets for Licensee D-Haintenance or Test 3-Automa tic Scram.
[ vent Report (LER) File C-Rcrocling 4-Continuation from INUREC 0161)
D-Regulatory Restriction Prevfous Month E-Operator Training & License Examination 5-Redvetion or 20%
5 T-Adm in i s t ra t ive or Creator in the Exhibit H-Same Source C-Operational Error (Explain)
Past 24 Hours H-Other (Explain) 6-Other (Explain) 29tsou


            ?-
?-
,    7
7 REFUELING INFORMATION DOCKET NO.__
,                                                    REFUELING INFORMATION DOCKET NO.__     sn-528.______-
sn-528.______-
UNIT.,______. PVNGS 1,__________
UNIT.,______.
PVNGS 1,__________
D AT E__ _______ _3/D5 481__ __ _ _ _ _ _
D AT E__ _______ _3/D5 481__ __ _ _ _ _ _
COMPLETED BY_.}i.y. nichnraann __
COMPLETED BY_.}i.y. nichnraann __
;                                                                  TELEPHONE ____ 6n?-932- 5300______
TELEPHONE ____ 6n?-932-5300______
__. F=xh _6593_____     __
F=xh _6593_____
: 1. Scheduled date for next refueling shutdown.
1.
10/1/86
Scheduled date for next refueling shutdown.
: 2. Scheduled date for restart following refueling.
10/1/86 2.
11/19/86
Scheduled date for restart following refueling.
: 3. Will refueling or resumotion of operation thereafter recuire a Technical Soecification change or other licenna amendment?
11/19/86 3.
Will refueling or resumotion of operation thereafter recuire a Technical Soecification change or other licenna amendment?
Not yet determined What will these be?
Not yet determined What will these be?
Not yet determined
Not yet determined 4.
: 4. Scheduled date for submitting prooosed licensing action and sucoorting information.
Scheduled date for submitting prooosed licensing action and sucoorting information.
Not yet determined
Not yet determined 5.
: 5. Imoortant Licensing considerations associated with refueling,
Imoortant Licensing considerations associated with refueling,
: e. g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new ooerating orocedures.
: e. g.
Not yet determined
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new ooerating orocedures.
: 6. The number of fuel assemblies.
Not yet determined 6.
a) I n t h e co re. _.241_ *,___________                                                   .
The number of fuel assemblies.
b) In the scent fuel storage                 cool.____0________
a) I n t h e co re. _.241_ *,___________
: 7. Licensed spent fuel st ora g e ca pac i t y. ______1329______..
b) In the scent fuel storage cool.____0________
Intended change in scent fuel storage capacity.                       Nnnn
7.
: 8. Projected date of last refuelina that can be discharned to spent fuel storage pool assuming cresent capacity.
Licensed spent fuel st ora g e ca pac i t y. ______1329______..
Intended change in scent fuel storage capacity.
Nnnn 8.
Projected date of last refuelina that can be discharned to spent fuel storage pool assuming cresent capacity.
2002 (w/ annual reloads and full core discharge capability).
2002 (w/ annual reloads and full core discharge capability).
N
N


2-Arizona Nuclear Power Project P.O. BOX 52034
2-Arizona Nuclear Power Project P.O. BOX 52034
* PHOENIX, ARIZONA 85072-2034 ANPP-32151-EEVB/WFQ March 15, 1985 Learned W. Barry, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.         20555
* PHOENIX, ARIZONA 85072-2034 ANPP-32151-EEVB/WFQ March 15, 1985 Learned W. Barry, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.
20555


==Subject:==
==Subject:==
Line 165: Line 250:


==Dear Mr. Barry:==
==Dear Mr. Barry:==
Attached please find the February, 1985 Monthly Operating Report prepared and sub-mitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License. By copy of this letter we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V Office.
Attached please find the February, 1985 Monthly Operating Report prepared and sub-mitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License. By copy of this letter we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V Office.
Specification 6.9.1.6 requires the documentation of all challenges to the safety valves. No such challenges occurred during the reporting period.
Specification 6.9.1.6 requires the documentation of all challenges to the safety valves. No such challenges occurred during the reporting period.
If you have any questions or concerns, please conta'ct me.
If you have any questions or concerns, please conta'ct me.
Very truly ours CLLL   n 'C E. E. Van Brunt, Jr.
Very truly ours CLLL n 'C E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/GEC/mb Attachments cc:   J. B. Martin w/a R. P. Zimmerman w/a E. A. Licitra w/a A. C. Gehr w/a If g}}
Executive Vice President Project Director EEVB/GEC/mb Attachments cc:
J. B. Martin w/a R. P. Zimmerman w/a E. A. Licitra w/a A. C. Gehr w/a If g}}

Latest revision as of 00:15, 13 December 2024

Monthly Operating Rept for Feb 1985
ML20115G475
Person / Time
Site: Palo Verde 
Issue date: 02/28/1985
From: Richardson M, Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Barry L
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ANPP-32151-EEVB, NUDOCS 8504220212
Download: ML20115G475 (6)


Text

.

NRC MONTHLY OPERATING REPORT DOCKET NO. ___50-5_2 8_____

UN I T N AME___ PVNGS-l____

DATE___ 3[05 / 85 COMPLETED BY___ M.P_._ Rich _ardson TELEPHONE 602-932-5300

' _~ ~ E_ t._5_ _3_ _ _

~

~~

OEEg8IING SIBIUS

__Palo,Ve ge_ Nucle _aL enera gn1 _t_a_t_iont_U_ nit _1___

G S

1.

Unit Name:

2.

Reporting Period: __F_e_b rua r_y,19 85 3.

Licensed Thermal Power (MWt):

3800 4.

Nameplate Rating (Gross MWe): __1304_________________

5.

Design Electrical Rating (Net MWe):__12ZO____________

6.

Maximum Dependable Capacity (Gross MWe): _To_b_e__de t e rmine d 7.

Maximum Decendable Caoacity (Net MWe): _ _ _To_b_e._ _d ele r_m_iDe d 8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Recort, Give Reasons:

N/_A 9.

Power Level To Which Restricted, If Any (Net MWe):190_MWt_IQ_,We)

10. Reasons For Restrietions. I f Any : _LQW_fover_DneInting._Licenac_____

This Month Yr.-to-Date Cumulat ive

11. Hours In Reoorting Period

_ _ _612_ _ _ _ _

__l416___.___

_14 L6._ _ _

12. Number Of Hourc Reactor Was Critical 0

0 0

13. Reactor Reserve Shutdown Hours

_,____0_____

0______

____0___

14. Hours Generator On-Line 0

0 0

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated 0

0 0

(MWH)

17. Gross Electrical Energy Generated 0

____0__,____

0 (MWH)

18. Net Electrical Energy Generated

_____Q.____

____S-

_ _ _ _Q. _ _ _

(MWH)

19. Unit Service Factor

__NL&____

_ _ _N/A _ _ _ _ _

_HLA___

20. Unit Availability Factor

___ NLA

_ _ _H/A _ _ _. _

_ N LA_ _ __

21. Unit Capacity Factor (Using MDC

__NL&____

___N/L _____

_EL&__

g No:

Net)

22. Unit Caoacity Factor (Using DER

_ _ _ ELA._ _ _ _ _

_ _ _N/A _ _ _ _ _

_ _ NLA_ _ _ _

@*b@

N Net) 00 on

23. Unit Forced Outage Rate

_ _ pl& _ _ _

___N/A _____

_ _ yL& _ _, _

03 0

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and N:s Duration of Each): _ _ _Hq.mi gnifkant_.g u t_qu_ g LqnDc d _unti l _af_t e t _ _ _ _ _ _ _ _ _ _ _.

E walrranty._run_ W l8D.____._________.-_____________._.--_..

N

25. If Shutdown At End Of Reoort Period, Estimated Date of Startuo: _g/A_

e 26 Unite ~5n~T7st-StatIt$ (prior To Commercial Ooeration):

~

g Forecast Achieved INITIAL CRITICALITY

_ _ _.5185. _ _ _ _._

_ _.H/L _ _ _ _ _ _ _

INITIAL ELECTRICITY

____6185.___

_ _ _N/L _ _ _ _ _ _ _

COMMERCIAL OPERATION

_ _ _1_.118_5_ _ _ _ _ _ __N/L_______

t 7..

. )

\\

l.

?.

)-

SUMMARY

OF OPERATING EXPgBJENCE EDB Idg MgNIH DOCKET NO.____jQ_l?J_______

U N I T _ _ _ _ _ __ _ _ _HN_G S,,l_ __ __ _ _ _ __ _ _

v

.D AT E ___ _ ____ __,}/_Q'i/Jj_ ____ ____ ___

s t,

I COMPLETED BY__LP_u,RigitarJsga_____

4-s TELEPHONE ____.6Q2,_9_32-5,10.D________

s Ext._J521__________

4 February 11, 1985' "B" Train' electrical outage established February 13, 1985 - Completed Reactor Coolant System (rcd) Fill and Vent pyricess i t

February 16, 1985 - Comh.eted "E" Train electrical ootage L

February 25,1985 "A" Train electrical outage estiablished i

February 26, 1985 - Filled.the Spent Fuel Pool with borated water.

Spent Fuel Pool boron concentration 4090 ppm

)

j s

i f

t-g k

i s

-a---

~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

JD-j23, UNIT _________1% K-l________

DATE_________3102M________

COMPLETED BY_LE,31shgutdaga_

TELEPHONE JD2-J132,-11QD_

-12 lum 91______

MQNTO:

February 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

_ _ ___ ___ 0 17 _ _ __ _ _ __ _ _ _g_ ___ _____

2 0

18 ___________3______________

3 0

19 -=

=____g______________

- 4

__________0________________

20 ___________S______________

5'

__________Q---

=- ________

21 _-_

_=S______________

i v.

6

_________J1_

22 ___________fL_____________

_ = _______

i 7._________J1_________=_

23 __-

___a______________

8

_________J1_______________

24 ___________fL_____________

i 9

Ja_______________

25 ___________fL_____________

r 10 _________J1_______________

2 6 _ _ _ _ _ _ _ _ _ _ _ IL __ _ _ _ _ _ _

11 __________Q_______________

27'___________fL_____________

12 __________Q_______________

28 ___________fL_____________

13 __________Q_______________

29 _______-_-_. _____________

- 1 4 _ _ _ _ _ _ _ _ _ _Q _ _ _ _ = = _ _

30 __________________________

=_____

15 __________Q_______________

31 16 __________Q_______________

1 4

r UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET 100.

sn %9A UNIT NAMC PVNG4-1 DATE 3/05/RS COMPLETED BY M.12 R i c h n rds ort TELEPHONE ~ 9 U-5 400 vvr Asot Method or Shutting Down System Component Cause er Corrective 1

Duration 2

3 LER 4

5 Action to No.

Date Type (Hours)

Reason Reactor No.

Code Code Prevent Recurrence Not applicable - reactor N/A has not achieved initial criticality.

3 la 1

2 Method:

ruhlblt F = Instructions F-Forced Reason:

1-Manual for Prnparation or Data S-Scheduled A-Equipment ralluro (Explain) 2-Hanval Sc ra m.

Entry Sheets for Licensee D-Haintenance or Test 3-Automa tic Scram.

[ vent Report (LER) File C-Rcrocling 4-Continuation from INUREC 0161)

D-Regulatory Restriction Prevfous Month E-Operator Training & License Examination 5-Redvetion or 20%

5 T-Adm in i s t ra t ive or Creator in the Exhibit H-Same Source C-Operational Error (Explain)

Past 24 Hours H-Other (Explain) 6-Other (Explain) 29tsou

?-

7 REFUELING INFORMATION DOCKET NO.__

sn-528.______-

UNIT.,______.

PVNGS 1,__________

D AT E__ _______ _3/D5 481__ __ _ _ _ _ _

COMPLETED BY_.}i.y. nichnraann __

TELEPHONE ____ 6n?-932-5300______

F=xh _6593_____

1.

Scheduled date for next refueling shutdown.

10/1/86 2.

Scheduled date for restart following refueling.

11/19/86 3.

Will refueling or resumotion of operation thereafter recuire a Technical Soecification change or other licenna amendment?

Not yet determined What will these be?

Not yet determined 4.

Scheduled date for submitting prooosed licensing action and sucoorting information.

Not yet determined 5.

Imoortant Licensing considerations associated with refueling,

e. g.

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new ooerating orocedures.

Not yet determined 6.

The number of fuel assemblies.

a) I n t h e co re. _.241_ *,___________

b) In the scent fuel storage cool.____0________

7.

Licensed spent fuel st ora g e ca pac i t y. ______1329______..

Intended change in scent fuel storage capacity.

Nnnn 8.

Projected date of last refuelina that can be discharned to spent fuel storage pool assuming cresent capacity.

2002 (w/ annual reloads and full core discharge capability).

N

2-Arizona Nuclear Power Project P.O. BOX 52034

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528, License No. NPF-34 February Monthly Operating Report File: 85-056-026; G.1.01.10

Dear Mr. Barry:

Attached please find the February, 1985 Monthly Operating Report prepared and sub-mitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License. By copy of this letter we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V Office.

Specification 6.9.1.6 requires the documentation of all challenges to the safety valves. No such challenges occurred during the reporting period.

If you have any questions or concerns, please conta'ct me.

Very truly ours CLLL n 'C E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/GEC/mb Attachments cc:

J. B. Martin w/a R. P. Zimmerman w/a E. A. Licitra w/a A. C. Gehr w/a If g