{{#Wiki_filter:OPERATING DATA REPORT DOCKET NO.
OPERATING DATA REPORT DOCKET NO.             050-0298 UNIT         CNS DATE       March 10. 1992 OPERATING STATUS                                                                                                    TELEPHONE          _( 402) 825-5766
050-0298 UNIT CNS DATE March 10. 1992
: 1.     Unit Name:             COooet Nuclear Station                                       Notes
_ 402) 825-5766
: 2.       Reporting Period;                           February 1992 3       Ucensed Thermal Power (MWt):                       2381
(
: 4.       Nameplate Rating (Gross MWe):                     836
OPERATING STATUS TELEPHONE 1.
: 5.       Design Electrical Rating (Net MWe): 778 6       Maximum Dependable Capacity (Gross MWe): 787
Unit Name:
: 7.       Maximum Dependable Capacity (Net MWe):                 764 8         If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:                                                           _
COooet Nuclear Station Notes 2.
: 9.       Power Level To Which Restricted, if Any (Net MWe):
Reporting Period; February 1992 3
: 10.       Reasons For Restrict:on,if Any:
Ucensed Thermal Power (MWt):
This Month                                   Yr.-to-Date                 Cumulative
2381 4.
: 11.       Hours in Reporting Period                                                         696 0                           1.440.0               154.873 0
Nameplate Rating (Gross MWe):
: 12.       Number of Hours Reactor Was Critical                                             576 7                           1,320.7               117.821.0
836 5.
: 13.       Reactor Reserve Shutdown Hours                                                             0.0                         0.0                         0.0
Design Electrical Rating (Net MWe): 778 6
: 14.       Hours Generator On-Une                                                             565_0_     0                    1.309 0               116.081.5
Maximum Dependable Capacity (Gross MWe): 787 7.
: 15.       Unit Reserve Shutdown Hours                                                                 00                         00                         0.0
Maximum Dependable Capacity (Net MWe):
: 16.       Gross Thermal Energy Generated (MWH)                         _1.280.256 0                                   3.041.544.0             236.597.596 0
764 8
: 17.       Gross Electric Energy Generated (MWH)                             426.823 0                                   1.018.966.0             76.589.118.0 18         Not Electric Energy Generated (MWH)                               414.200.0                                     987.589 0             73.917.976 0
If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
: 19.       Unit Service Factor                                                                     81.2                         90.9                       75 0 20         Unit Availability Factor                                                               81.2                         90.9                       75.0
9.
: 21.       Unit Capacity Factor (Using MDC Net)                                                   77.9                         89 8                       62_5._
Power Level To Which Restricted, if Any (Net MWe):
: 22.       Unit Capacity Factor (U9q DER Net)                                                     76 5                         88.2                       61.3
10.
: 23.       Unit Forced Outage Rate                                                                 18 8                         9.1                         4.6 24         Shutdown Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Reasons For Restrict:on,if Any:
BaMery replacement shutdown - April 17. Duration 7 days 25         If Shut Down At End of Report Period, Estimated Date of Startup:
This Month Yr.-to-Date Cumulative 11.
26         Units in Test Status (Prior to Commercial Operation):                                       Forecast                               Achieved INITlAL CRITICAUTY INITIAL ELECTRICITY COMMERCLAL OPERATION 9212160196 921204 PDR ADOCK 05000298 R                                   PDR
Hours in Reporting Period 696 0 1.440.0 154.873 0 12.
--                                      _ _ - __-__ _ - -                          __ _ _ _ - - _ _ - _ _ _ _                                                -___}}
Number of Hours Reactor Was Critical 576 7 1,320.7 117.821.0 13.
Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14.
Hours Generator On-Une 565_0_
1.309 0 116.081.5 0
15.
Unit Reserve Shutdown Hours 00 00 0.0 16.
Gross Thermal Energy Generated (MWH)
_1.280.256 0 3.041.544.0 236.597.596 0 17.
Gross Electric Energy Generated (MWH) 426.823 0 1.018.966.0 76.589.118.0 18 Not Electric Energy Generated (MWH) 414.200.0 987.589 0 73.917.976 0 19.
Unit Service Factor 81.2 90.9 75 0 20 Unit Availability Factor 81.2 90.9 75.0 21.
Unit Capacity Factor (Using MDC Net) 77.9 89 8 62_5._
22.
Unit Capacity Factor (U9q DER Net) 76 5 88.2 61.3 23.
Unit Forced Outage Rate 18 8 9.1 4.6 24 Shutdown Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
BaMery replacement shutdown - April 17. Duration 7 days 25 If Shut Down At End of Report Period, Estimated Date of Startup:
26 Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITlAL CRITICAUTY INITIAL ELECTRICITY COMMERCLAL OPERATION 9212160196 921204 PDR ADOCK 05000298 R
PDR
-___}}

Latest revision as of 20:32, 12 December 2024

Revised Monthly Operating Rept for Feb 1992 for Cooper Nuclear Station
ML20125E122
Person / Time
Site: Cooper 
Issue date: 02/29/1992
From:
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20125E109 List:
References
NUDOCS 9212160196
Download: ML20125E122 (1)


Text

OPERATING DATA REPORT DOCKET NO.

050-0298 UNIT CNS DATE March 10. 1992

_ 402) 825-5766

(

OPERATING STATUS TELEPHONE 1.

Unit Name:

COooet Nuclear Station Notes 2.

Reporting Period; February 1992 3

Ucensed Thermal Power (MWt):

2381 4.

Nameplate Rating (Gross MWe):

836 5.

Design Electrical Rating (Net MWe): 778 6

Maximum Dependable Capacity (Gross MWe): 787 7.

Maximum Dependable Capacity (Net MWe):

764 8

If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, if Any (Net MWe):

10.

Reasons For Restrict:on,if Any:

This Month Yr.-to-Date Cumulative 11.

Hours in Reporting Period 696 0 1.440.0 154.873 0 12.

Number of Hours Reactor Was Critical 576 7 1,320.7 117.821.0 13.

Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14.

Hours Generator On-Une 565_0_

1.309 0 116.081.5 0

15.

Unit Reserve Shutdown Hours 00 00 0.0 16.

Gross Thermal Energy Generated (MWH)

_1.280.256 0 3.041.544.0 236.597.596 0 17.

Gross Electric Energy Generated (MWH) 426.823 0 1.018.966.0 76.589.118.0 18 Not Electric Energy Generated (MWH) 414.200.0 987.589 0 73.917.976 0 19.

Unit Service Factor 81.2 90.9 75 0 20 Unit Availability Factor 81.2 90.9 75.0 21.

Unit Capacity Factor (Using MDC Net) 77.9 89 8 62_5._

22.

Unit Capacity Factor (U9q DER Net) 76 5 88.2 61.3 23.

Unit Forced Outage Rate 18 8 9.1 4.6 24 Shutdown Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

BaMery replacement shutdown - April 17. Duration 7 days 25 If Shut Down At End of Report Period, Estimated Date of Startup:

26 Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITlAL CRITICAUTY INITIAL ELECTRICITY COMMERCLAL OPERATION 9212160196 921204 PDR ADOCK 05000298 R

PDR

-___