ML20126J559: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.     _
{{#Wiki_filter:.
_
?
?
                                                JUN 7   1985
JUN 7
    Docket No. 50-412
1985
    Duquesne Light Company.
Docket No. 50-412
    ATTN: Mr. J. J. Carey
Duquesne Light Company.
              Vice President - Nuclear
ATTN: Mr. J. J. Carey
    Robinson Plaza Building No. 2
Vice President - Nuclear
    . Suite #210, PA Route 60
Robinson Plaza Building No. 2
    Pittsburgh, Pennsylvania 15205
. Suite #210, PA Route 60
    Gentlemen:
Pittsburgh, Pennsylvania 15205
    Subject:   Inspection Report No. 50-412/85-07
Gentlemen:
    This refers to the special inspection conducted by Mr. C. Anderson of this
Subject:
    office on March 18 - 29, 1985 at Beaver Valley Power Station, Unit 2,
Inspection Report No. 50-412/85-07
    Shippingport, Pennsylvania of activities authorized by NRC License No. CPPR-105
This refers to the special inspection conducted by Mr. C. Anderson of this
    and to the discussions of our findings held by Mr. Anderson with Mr. E. Woolever
office on March 18 - 29, 1985 at Beaver Valley Power Station, Unit 2,
    and other members of your staff at the conclusion of the inspection, and to
Shippingport, Pennsylvania of activities authorized by NRC License No. CPPR-105
    subsequent telephone discussions between Mr. Anderson and Mr. Coupland of your
and to the discussions of our findings held by Mr. Anderson with Mr. E. Woolever
    staff on April 25, 1985 and April 30, 1985. This also refers to the meeting
and other members of your staff at the conclusion of the inspection, and to
    held at the NRC Region I office on May 10, 1985 and attended by you and members
subsequent telephone discussions between Mr. Anderson and Mr. Coupland of your
    of your staff.
staff on April 25, 1985 and April 30, 1985. This also refers to the meeting
    Areas examined during this inspection are described in the NRC Region I
held at the NRC Region I office on May 10, 1985 and attended by you and members
    Inspection Report which is enclosed with this letter. Within these areas, the
of your staff.
    inspection consisted of selective examinations of procedures and representative
Areas examined during this inspection are described in the NRC Region I
    records, interviews with personnel, and observations by the inspector.
Inspection Report which is enclosed with this letter. Within these areas, the
    . Based on the results of this inspection, it appears that certain of your ac-
inspection consisted of selective examinations of procedures and representative
    tivities were not conducted in full compliance with NRC requirements, as set
records, interviews with personnel, and observations by the inspector.
    forth in the Notice of Violation, enclosed herewith as Appendix A. These vio-
. Based on the results of this inspection, it appears that certain of your ac-
    lations have been categorized by severity level in accordance with the revised
tivities were not conducted in full compliance with NRC requirements, as set
    NRC Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register
forth in the Notice of Violation, enclosed herewith as Appendix A.
    Notice (49 FR 8583) dated March 8,1984. You are required to respond to this
These vio-
    letter and in preparing your response, you should follow the instructions in
lations have been categorized by severity level in accordance with the revised
    Appendix A.
NRC Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register
    In addition to the apparent items of noncompliance discussed above and in
Notice (49 FR 8583) dated March 8,1984. You are required to respond to this
    Apper. dix A, " Notice of Violation", findings of this inspection also indicate
letter and in preparing your response, you should follow the instructions in
    that several weaknesses exist in your design and construction program.
Appendix A.
    This area is discussed in Appendix B, Significant Observations. You are
In addition to the apparent items of noncompliance discussed above and in
    requested to inform this office of the results of actions you have taken or
Apper. dix A, " Notice of Violation", findings of this inspection also indicate
    plan to take to improve your construction program in the area of the apparent
that several weaknesses exist in your design and construction program.
    program weaknesses identified in Appendix B.
This area is discussed in Appendix B, Significant Observations. You are
    The responses directed by this letter and the accompanying Notice are not
requested to inform this office of the results of actions you have taken or
      subject to the clearance procedures of the Office of Management and Budget
plan to take to improve your construction program in the area of the apparent
    as required by the Paperwork Reduction Act of 1980, PL 96-511.
program weaknesses identified in Appendix B.
                                OFFICIAL RECORD COPY     IR BV2 85-07 - 0001.0.0
The responses directed by this letter and the accompanying Notice are not
    DR    A    [ lM12                                     05/21/85
subject to the clearance procedures of the Office of Management and Budget
                        -
as required by the Paperwork Reduction Act of 1980, PL 96-511.
                              -           -                       -
OFFICIAL RECORD COPY
                                                                                  pm  _
IR BV2 85-07 - 0001.0.0
[ lM12
05/21/85
DR
A
pm
-
-
-
-


                              -
-
4 10-
4 10-
      Duquesne Light Company               2
Duquesne Light Company
      Your cooperation with us in this matter is appreciated.
2
                                            Sincerely,
Your cooperation with us in this matter is appreciated.
                                              Originni Signed By:
Sincerely,
                                              Stewart D. Ebnoter
Originni Signed By:
                                            Stewart D. Ebneter, Director
Stewart D. Ebnoter
                                            Division of Reactor Safety
Stewart D. Ebneter, Director
      Enclosures:
Division of Reactor Safety
      1. -Appendix A, Notice of Violation
Enclosures:
      2. Appendix B, Significant Observations
1. -Appendix A, Notice of Violation
      3.   NRC Region I Inspection Report No. 50-412/85-07
2.
      cc w/encls:
Appendix B, Significant Observations
      'E. J. Woolever, Vice President, Special Nuclear Projects
3.
      E. Ewing, Quality Assurance Manager
NRC Region I Inspection Report No. 50-412/85-07
      R. J. Swiderski, Manager, Startup Group
cc w/encls:
      R. E. Martin, Manager, Engineering
'E. J. Woolever, Vice President, Special Nuclear Projects
      E. L F. Kurtz, Jr., Manager, Regulatory Affairs
E. Ewing, Quality Assurance Manager
      P. RaySircar, Stone and Webster Engineering Corporation
R. J. Swiderski, Manager, Startup Group
      Public Document Room (PDR)
R. E. Martin, Manager, Engineering
      Local Public Document Room (LPDR)
E. L F. Kurtz, Jr., Manager, Regulatory Affairs
      Nuclear Safety Information Center (NSIC)
P. RaySircar, Stone and Webster Engineering Corporation
      NRC Resident Inspector
Public Document Room (PDR)
      Commonwealth of Pennsylvania
Local Public Document Room (LPDR)
      bec w/encls:
Nuclear Safety Information Center (NSIC)
      Region I Docket Room (with concurrences)
NRC Resident Inspector
      Senior 0perations Officer (w/o enc 1)
Commonwealth of Pennsylvania
      L. Tripp, Section Chief #3A, DRP
bec w/encls:
      J. Grant, DRP
Region I Docket Room (with concurrences)
      RI:DRS
Senior 0perations Officer (w/o enc 1)
                        b
L. Tripp, Section Chief #3A, DRP
                        RI:DRS   RI:DRS
J. Grant, DRP
      Anderson /geb   Durr     Eb eter
b
      5/sf/85         f/,2 fff$" f 3
RI:DRS
        e/o
RI:DRS
                                  0FFICIAL RECORD COPY       IR BV2 85-07 - 0001.1.0
RI:DRS
                                                              05/21/85
Anderson /geb
Durr
Eb eter
5/sf/85
f/,2 fff$" f 3
e/o
0FFICIAL RECORD COPY
IR BV2 85-07 - 0001.1.0
05/21/85
-
}}
}}

Latest revision as of 18:27, 12 December 2024

Forwards Insp Rept 50-412/85-07 on 850318-29,notice of Violation & Significant Observations Re Weaknesses Noted in Design & Const Program
ML20126J559
Person / Time
Site: Beaver Valley
Issue date: 06/07/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20126J563 List:
References
NUDOCS 8506100637
Download: ML20126J559 (2)


See also: IR 05000412/1985007

Text

.

_

?

JUN 7

1985

Docket No. 50-412

Duquesne Light Company.

ATTN: Mr. J. J. Carey

Vice President - Nuclear

Robinson Plaza Building No. 2

. Suite #210, PA Route 60

Pittsburgh, Pennsylvania 15205

Gentlemen:

Subject:

Inspection Report No. 50-412/85-07

This refers to the special inspection conducted by Mr. C. Anderson of this

office on March 18 - 29, 1985 at Beaver Valley Power Station, Unit 2,

Shippingport, Pennsylvania of activities authorized by NRC License No. CPPR-105

and to the discussions of our findings held by Mr. Anderson with Mr. E. Woolever

and other members of your staff at the conclusion of the inspection, and to

subsequent telephone discussions between Mr. Anderson and Mr. Coupland of your

staff on April 25, 1985 and April 30, 1985. This also refers to the meeting

held at the NRC Region I office on May 10, 1985 and attended by you and members

of your staff.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

. Based on the results of this inspection, it appears that certain of your ac-

tivities were not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A.

These vio-

lations have been categorized by severity level in accordance with the revised

NRC Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register

Notice (49 FR 8583) dated March 8,1984. You are required to respond to this

letter and in preparing your response, you should follow the instructions in

Appendix A.

In addition to the apparent items of noncompliance discussed above and in

Apper. dix A, " Notice of Violation", findings of this inspection also indicate

that several weaknesses exist in your design and construction program.

This area is discussed in Appendix B, Significant Observations. You are

requested to inform this office of the results of actions you have taken or

plan to take to improve your construction program in the area of the apparent

program weaknesses identified in Appendix B.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

OFFICIAL RECORD COPY

IR BV2 85-07 - 0001.0.0

[ lM12

05/21/85

DR

A

pm

-

-

-

-

-

4 10-

Duquesne Light Company

2

Your cooperation with us in this matter is appreciated.

Sincerely,

Originni Signed By:

Stewart D. Ebnoter

Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosures:

1. -Appendix A, Notice of Violation

2.

Appendix B, Significant Observations

3.

NRC Region I Inspection Report No. 50-412/85-07

cc w/encls:

'E. J. Woolever, Vice President, Special Nuclear Projects

E. Ewing, Quality Assurance Manager

R. J. Swiderski, Manager, Startup Group

R. E. Martin, Manager, Engineering

E. L F. Kurtz, Jr., Manager, Regulatory Affairs

P. RaySircar, Stone and Webster Engineering Corporation

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/encls:

Region I Docket Room (with concurrences)

Senior 0perations Officer (w/o enc 1)

L. Tripp, Section Chief #3A, DRP

J. Grant, DRP

b

RI:DRS

RI:DRS

RI:DRS

Anderson /geb

Durr

Eb eter

5/sf/85

f/,2 fff$" f 3

e/o

0FFICIAL RECORD COPY

IR BV2 85-07 - 0001.1.0

05/21/85

-