ENS 42779: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 08/15/2006 18:14 EDT | | event date = 08/15/2006 18:14 EDT | ||
| last update date = 08/15/2006 | | last update date = 08/15/2006 | ||
| title = Unusual Event Due | | title = Unusual Event Due to Fire on Roof of Edg Building | ||
| event text = During a 24 hour endurance run of the E3 Emergency Diesel Generator (EDG), a small fire occurred on the roof of the E3 EDG Building. Fire reported at 1759, UE declared at 1814. E3 was approximately 19 hours into the full load run. E3 was immediately shut down. As of 1835 the fire was reported out and no offsite assistance was required. | | event text = During a 24 hour endurance run of the E3 Emergency Diesel Generator (EDG), a small fire occurred on the roof of the E3 EDG Building. Fire reported at 1759, UE declared at 1814. E3 was approximately 19 hours into the full load run. E3 was immediately shut down. As of 1835 the fire was reported out and no offsite assistance was required. | ||
The licensee is investigating the cause of the fire. | The licensee is investigating the cause of the fire. |
Latest revision as of 21:18, 1 March 2018
Where | |
---|---|
Peach Bottom Pennsylvania (NRC Region 1) | |
Reporting | |
Emergency class: | Unusual Event |
10 CFR 50.72(a) (1) (i), Emergency Class Declaration | |
Time - Person (Reporting Time:+-3.45 h-0.144 days <br />-0.0205 weeks <br />-0.00473 months <br />) | |
Opened: | Eric Carr 18:47 Aug 15, 2006 |
NRC Officer: | Bill Gott |
Last Updated: | Aug 15, 2006 |
42779 - NRC Website
| |