ENS 4277915 August 2006 18:47:00

During a 24 hour endurance run of the E3 Emergency Diesel Generator (EDG), a small fire occurred on the roof of the E3 EDG Building. Fire reported at 1759, UE declared at 1814. E3 was approximately 19 hours into the full load run. E3 was immediately shut down. As of 1835 the fire was reported out and no offsite assistance was required. The licensee is investigating the cause of the fire. The licensee notified the NRC Resident Inspector.

  • * * UPDATE FROM L. KEENER TO W. GOTT AT 2044 ON 08/15/06 * * *

Licensee terminated the Unusual Event at 2040. Conditions to secure were that the fire was out and overhauled and the E3 EDG fuel racks tripped. The E3 EDG is considered inoperable and not available (14 day shutdown LCO). The licensee will notify the NRC Resident Inspector. Notified R1DO (R. Lorson), NRR EO (P.T. Kuo), IRD (P. Wilson), DHS (M. Charter), FEMA (D. Barden)

  • * * UPDATE FROM SULLIVAN TO HUFFMAN AT 0010 ON 8/16/06 * * *

The licensee will be issuing a press release about the Unusual Event. R1DO( Lorson) notified.