PBAPS [Peach Bottom Atomic Power Station] Units 2 and 3 experienced a seismic event which was felt in the control room in conjunction with a seismic trigger alarm set a 0.01G acceleration. The
operating basis earthquake alarm of 0.05G was not received.
'Both units continue to operate at pre-event levels.
Currently there is no indication of damage at the site. Initial plant walkdowns indicate no plant damage and walkdowns are continuing.
There were no personnel injuries. The licensee has notified the NRC Resident Inspector.
- * * UPDATE FROM BRAD KIRKMON TO HOWIE CROUCH AT 1800 EDT ON 8/23/11 * * *
At 1750 hrs. EDT, Peach Bottom terminated the Unusual Event that was declared at 1401 today due to a seismic event that occurred at the station. Both Unit 2 and 3 operational walk downs of the site have been completed. There are no issues related to the seismic event which would impact continued safe operation of either unit.
The licensee has made state and local notifications as well as notifying the NRC Resident Inspector. Notified R1