4 ENCLOSURE 1 NOTICE OF VIOLATION Florida Power Corporation Docket No. 50-302 Crystal River 3 License No. DPR-72 y
ENCLOSURE 1 NOTICE OF VIOLATION Florida Power Corporation                                                               Docket No. 50-302 Crystal River 3                                                                         License No. DPR-72 y
~
                    ~
The following violation was identified during.an inspection conducted 'on March 25-28, 1985. ~ The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix-C).
The following violation was identified during .an inspection conducted 'on March 25-28, 1985. ~ The Severity Level was assigned in accordance with the NRC
10 CFR 50, Appendix B, Criterion V, and FSAR Section.1.7.1.5 require that
.              Enforcement Policy (10 CFR Part 2, Appendix-C).
. activities affecting quality shall be prescribed by documented instructions, procedures or drawings...- and shall be accomplished in accordance with these p.
10 CFR 50, Appendix B, Criterion V, and FSAR Section .1.7.1.5 require that
instructions, procedures or drawings..The pipe support drawing and modifi-cation drawing provide installation dimensions for piece "H" of pipe support y -
                      . activities affecting quality shall be prescribed by documented instructions, procedures or drawings...- and shall be accomplished in accordance with these
=MUH 556.
: p.                       instructions, procedures or drawings. .The pipe support drawing and modifi-cation drawing provide installation dimensions for piece "H" of pipe support y-                     =MUH 556.             The " Piping Hanger - Final Inspection" requirements provided on
The " Piping Hanger - Final Inspection" requirements provided on
                      ' inspection plan . number. WR-60571 for pipe support . MUH 556 required - QC .                                                                    .
' inspection plan. number. WR-60571 for pipe support. MUH 556 required - QC.
E                        verification that "the overall configuration and sizing .of the completed hanger assembly or modification conform. to the applicable approved                                                                               '
verification that "the overall configuration and sizing.of the completed E
engineering; drawing."
hanger assembly or modification conform. to the applicable approved engineering; drawing."
M Contrary to the above, completed, installed, modified, inspected and QC 3                        accepted pipe support MUH 556 piece "H" installation dimensions did not e                        " conform" with the applicable approved _ engineering drawings. . In addition, O                       unauthorized. loads (scaffolding) were being partially supported by the pipe 1                       support.             No procedure or -instructions were available authorizing or f                       prohibiting installation of scaffolding / staging on permanent -plant
M Contrary to the above, completed, installed, modified, inspected and QC accepted pipe support MUH 556 piece "H" installation dimensions did not 3
                        . equipment.      .
" conform" with the applicable approved _ engineering drawings.. In addition, e
O unauthorized. loads (scaffolding) were being partially supported by the pipe 1
support.
No procedure or -instructions were available authorizing or f
prohibiting installation of scaffolding / staging on permanent -plant
. equipment.
This is a Severity Level IV violation (Supplement II).
This is a Severity Level IV violation (Supplement II).
              . Pursuant to 10 CFR 2.201, you are required to submit to this office within 30
. Pursuant to 10 CFR 2.201, you are required to submit to this office within 30
              ' days of the date of this Notice, .a written statement or explanation in reply, 1
' days of the date of this Notice,.a written statement or explanation in reply, 1
including: (1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results . achieved; (4). corrective steps which will be taken' to avoid
including:
              ;further violations; and (5) the date when full compliance will be achieved.
(1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results. achieved; (4). corrective steps which will be taken' to avoid
              , Security or' safeguards information should be submitted as 'an enclosure - to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d)
;further violations; and (5) the date when full compliance will be achieved.
              'or 10 CFR 73.21.
, Security or' safeguards information should be submitted as 'an enclosure - to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d)
p-n Q
'or 10 CFR 73.21.
Date:           APR 181985
p-n Date:
,g             a c             ;
APR 181985 Q
                          -9505210152 850418 PDR             ADOCK 05000302
,g a
*%                        G                            PDR v
c
4   ,
-9505210152 850418 PDR ADOCK 05000302 G
7
PDR v
: s.     , , . . . _ ,        -  ,;,..- .-,,,.,_._.,.,,,.,-,_,,-+-,,.,_.--n.-_.-                       . , _ . - . , . , , , - , _ , . , - _ . .}}
4 7
s.
.-,,,.,_._.,.,,,.,-,_,,-+-,,.,_.--n.-_.-
., _. -.,.,,, -, _,., - _..}}

Latest revision as of 16:28, 12 December 2024

Notice of Violation from Insp on 850325-28
ML20127G811
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/18/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20127G809 List:
References
50-302-85-16, NUDOCS 8505210152
Download: ML20127G811 (1)


Text

._

jo

+

4 ENCLOSURE 1 NOTICE OF VIOLATION Florida Power Corporation Docket No. 50-302 Crystal River 3 License No. DPR-72 y

~

The following violation was identified during.an inspection conducted 'on March 25-28, 1985. ~ The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix-C).

10 CFR 50, Appendix B, Criterion V, and FSAR Section.1.7.1.5 require that

. activities affecting quality shall be prescribed by documented instructions, procedures or drawings...- and shall be accomplished in accordance with these p.

instructions, procedures or drawings..The pipe support drawing and modifi-cation drawing provide installation dimensions for piece "H" of pipe support y -

=MUH 556.

The " Piping Hanger - Final Inspection" requirements provided on

' inspection plan. number. WR-60571 for pipe support. MUH 556 required - QC.

verification that "the overall configuration and sizing.of the completed E

hanger assembly or modification conform. to the applicable approved engineering; drawing."

M Contrary to the above, completed, installed, modified, inspected and QC accepted pipe support MUH 556 piece "H" installation dimensions did not 3

" conform" with the applicable approved _ engineering drawings.. In addition, e

O unauthorized. loads (scaffolding) were being partially supported by the pipe 1

support.

No procedure or -instructions were available authorizing or f

prohibiting installation of scaffolding / staging on permanent -plant

. equipment.

This is a Severity Level IV violation (Supplement II).

. Pursuant to 10 CFR 2.201, you are required to submit to this office within 30

' days of the date of this Notice,.a written statement or explanation in reply, 1

including:

(1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results. achieved; (4). corrective steps which will be taken' to avoid

further violations; and (5) the date when full compliance will be achieved.

, Security or' safeguards information should be submitted as 'an enclosure - to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d)

'or 10 CFR 73.21.

p-n Date:

APR 181985 Q

,g a

c

-9505210152 850418 PDR ADOCK 05000302 G

PDR v

4 7

s.

.-,,,.,_._.,.,,,.,-,_,,-+-,,.,_.--n.-_.-

., _. -.,.,,, -, _,., - _..