ML20127K779: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:~
{{#Wiki_filter:~
  ,-   ,.
,-
                                              MRY 2.314
,.
          Carolina Power and Light Company
MRY 2.314
          ATTH: Mr. E. E. Utley
Carolina Power and Light Company
                  Executive Vice President
ATTH: Mr. E. E. Utley
                  Power Supply and Engineering
Executive Vice President
                    and Construction
Power Supply and Engineering
          411 Fayetteville Street
and Construction
          Raleigh, NC 27602
411 Fayetteville Street
          Gentlemen:
Raleigh, NC 27602
          SUBJECT:     REPORT NOS. 50-325/85-09 AND 50-324/85-09
Gentlemen:
          On April 1-30, 1985, NRC inspected activities authorized by NRC Operating License
SUBJECT:
          Nos. DPR-71 and DPR-62 for your Brunswick facility. At the conclusion of the
REPORT NOS. 50-325/85-09 AND 50-324/85-09
          inspection', the finding ~s - were discussed with those members of your staff
On April 1-30, 1985, NRC inspected activities authorized by NRC Operating License
          identified in the enclosed inspection report.
Nos. DPR-71 and DPR-62 for your Brunswick facility. At the conclusion of the
          Areas examined during the inspection are identified in the report. Within thes2
inspection', the finding ~s - were discussed with those members of your staff
          areas, the inspection consisted of selective examinations of procedures and
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within thes2
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
#
#
          representative records, interviews with personnel, and observation of activities
in progress.
          in progress.                       .
.
;         Within the scope of the inspection, no violations or deviations were identified.
;
          Should you have any questions concerning this letter, please contact us.
Within the scope of the inspection, no violations or deviations were identified.
                                                      Sincerely,
Should you have any questions concerning this letter, please contact us.
                                                      /s/ V . G     cm.\\
Sincerely,
/s/ V . G
cm.\\\\
?
?
                                                Qe( David M. Verre111, Chief
Qe( David M. Verre111, Chief
                                                  d   Reactor Projects Branch 1
d
                                                      Division of Reactor Projects
Reactor Projects Branch 1
          Enclosure:
Division of Reactor Projects
          Inspection Report Nos. 50-325/85-09
Enclosure:
            and 50-324/85-09
Inspection Report Nos. 50-325/85-09
          cc w/ enc 1:
and 50-324/85-09
          P. W. Howe, Vice President
cc w/ enc 1:
            Brunswick Nuclear Project
P. W. Howe, Vice President
          C. R. Dietz, Plant General Manager
Brunswick Nuclear Project
          bec w/ enc 1:
C. R. Dietz, Plant General Manager
          NRC Resident Inspector               g62058 gg3
bec w/ enc 1:
          Document Control Desk               G                 PDR
NRC Resident Inspector
          State of North Carolina
g62058 gg3
Document Control Desk
G
PDR
State of North Carolina
4
4
          RII                   RII
RII
            Nin:jw             P e     ekson
RII
          5/gp/85               5/f/85                                                         ,y
Nin:jw
    _
P e
                                                                                        _TE o /
ekson
5/gp/85
5/f/85
,y
_TE o /
_
}}
}}

Latest revision as of 16:02, 12 December 2024

Forwards Insp Repts 50-324/85-09 & 50-325/85-09 on 850401-30.No Violation Noted
ML20127K779
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/23/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20127K782 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8506270587
Download: ML20127K779 (1)


See also: IR 05000324/1985009

Text

~

,-

,.

MRY 2.314

Carolina Power and Light Company

ATTH: Mr. E. E. Utley

Executive Vice President

Power Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh, NC 27602

Gentlemen:

SUBJECT:

REPORT NOS. 50-325/85-09 AND 50-324/85-09

On April 1-30, 1985, NRC inspected activities authorized by NRC Operating License

Nos. DPR-71 and DPR-62 for your Brunswick facility. At the conclusion of the

inspection', the finding ~s - were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within thes2

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

/s/ V . G

cm.\\\\

?

Qe( David M. Verre111, Chief

d

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-325/85-09

and 50-324/85-09

cc w/ enc 1:

P. W. Howe, Vice President

Brunswick Nuclear Project

C. R. Dietz, Plant General Manager

bec w/ enc 1:

NRC Resident Inspector

g62058 gg3

Document Control Desk

G

PDR

State of North Carolina

4

RII

RII

Nin:jw

P e

ekson

5/gp/85

5/f/85

,y

_TE o /

_