MRY 2.314
Carolina Power and Light Company
ATTH: Mr. E. E. Utley
Executive Vice President
Power Supply and Engineering
and Construction
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
SUBJECT:
REPORT NOS. 50-325/85-09 AND 50-324/85-09
On April 1-30, 1985, NRC inspected activities authorized by NRC Operating License
Nos. DPR-71 and DPR-62 for your Brunswick facility. At the conclusion of the
inspection', the finding ~s - were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within thes2
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
/s/ V . G
cm.\\\\
?
Qe( David M. Verre111, Chief
d
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-325/85-09
and 50-324/85-09
cc w/ enc 1:
P. W. Howe, Vice President
Brunswick Nuclear Project
C. R. Dietz, Plant General Manager
bec w/ enc 1:
NRC Resident Inspector
g62058 gg3
Document Control Desk
G
State of North Carolina
4
RII
RII
Nin:jw
P e
ekson
5/gp/85
5/f/85
,y
_TE o /
_