Forwards Insp Repts 50-324/85-09 & 50-325/85-09 on 850401-30.No Violation Noted
ML20127K779
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/23/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20127K782 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8506270587
Download: ML20127K779 (1)


See also: IR 05000324/1985009

Text

~

,-

,.

MRY 2.314

Carolina Power and Light Company

ATTH: Mr. E. E. Utley

Executive Vice President

Power Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh, NC 27602

Gentlemen:

SUBJECT:

REPORT NOS. 50-325/85-09 AND 50-324/85-09

On April 1-30, 1985, NRC inspected activities authorized by NRC Operating License

Nos. DPR-71 and DPR-62 for your Brunswick facility. At the conclusion of the

inspection', the finding ~s - were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within thes2

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

/s/ V . G

cm.\\\\

?

Qe( David M. Verre111, Chief

d

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-325/85-09

and 50-324/85-09

cc w/ enc 1:

P. W. Howe, Vice President

Brunswick Nuclear Project

C. R. Dietz, Plant General Manager

bec w/ enc 1:

NRC Resident Inspector

g62058 gg3

Document Control Desk

G

PDR

State of North Carolina

4

RII

RII

Nin:jw

P e

ekson

5/gp/85

5/f/85

,y

_TE o /

_