ML20129A231: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:_.                 _                                    _ _ .      -        _.    ._.    -
{{#Wiki_filter:_.
1 s         6.                                                                                                                 i e       .a
s 6.
    ' Document Transmittal #: 50716                   Date: 9/12/96                                                           l Tc:     NRC (DC DESK)                           MAC: N/A                                                               ;
i e
Destination:                                  
.a
' Document Transmittal #: 50716 Date: 9/12/96 Tc:
NRC (DC DESK)
MAC: N/A Destination:


== Description:==
==
l Copy           Copy Totals Document:                 Revision:       Comment:                                 #        INFO CNTL MSTR             )
Description:==
AR0303                     24                                                             24     1     0     0 l
Copy Copy Totals Document:
4 J
Revision:
I i
Comment:
INFO CNTL MSTR AR0303 24 24 1
0 0
l 4
J i
4 l
4 l
l I
s 1
s 1
1 1
i l
I i
Instructions to the Addressee:
l Instructions to the Addressee:
Pisase verify the document (s) received agrees with the above information. Be sure to destroy document (s) or portions of document (s) superseded by the above.
Pisase verify the document (s) received agrees with the above information. Be sure to destroy document (s) or portions of document (s) superseded by the above.
Tha signature indicates acknowledgment of receipt of the above document (s). Retum signed and dated
Tha signature indicates acknowledgment of receipt of the above document (s). Retum signed and dated
    . trcnsmittal to Document Control within 20 days at mail code:
. trcnsmittal to Document Control within 20 days at mail code:
NA1C Florida Power Corporation Document Control, NA1C
NA1C Florida Power Corporation Document Control, NA1C
                                                                                                                        }
}
Crystal River Energy Complex 15760 W. Power Line St.
Crystal River Energy Complex
                                                                                                                          /
/
Crystal River, FL 34428-6708 Signature of Addressee:                                                       Date:
15760 W. Power Line St.
Independent Verification:                                                     Date:
Crystal River, FL 34428-6708 Signature of Addressee:
(Control Room documents only) 9609180047 960906 PDR     ADOCK 05000302
Date:
          ~F                       PDR
Independent Verification:
Date:
(Control Room documents only) 9609180047 960906 PDR ADOCK 05000302
~F PDR


Rev. 24 Effective Date                           /-
Rev. 24 Effective Date
(                   m.rutnent Sect'P1                         p c   necanu vnu                                     a li       . _ , _ _
/-
C. 9.       J     -
(
                                                                - - ~ ~ ~ " = -
m.rutnent Sect'P1 p
A C_
c necanu vnu a li C. 9.
ANNUNCIATOR RESPONSE AR-303 FLORIDA POWER CORPORATION
J
                              -            CRYSTAL RIVER UNIT 3 ESC ANNUNCIATOR RESPONSE O
- " " -A C_
APPROVED BY:         Interpretati n Cont t h k/w /j.b & ,( x k m f (SIjNATUREON' FILE)
- - ~ ~ ~ " = -
ANNUNCIATOR RESPONSE AR-303 FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 ESC ANNUNCIATOR RESPONSE O
APPROVED BY:
Interpretati n Cont t h k/w /j.b &,( x k m f (SIjNATUREON' FILE)
{
{
DATE:             ,
fo/76 DATE:
fo/76 INTERPRETATION CONTACT: Manager, Nuclear Operations Support j
INTERPRETATION CONTACT: Manager, Nuclear Operations Support j


,    _ _              .__    .  .          ._      _        ..        ._                _ ~_ _    _  . __
~_
e       ,
e I
I
TABLE OF CONTENTS SECTION EAE 1.0 PURPOSE............................
                                            ,    TABLE OF CONTENTS SECTION                                                                                 EAE           l 1.0         PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . .                 1         ;
1


==2.0         REFERENCES==
==2.0 REFERENCES==
    ..........................                                        1 2.1       INPLENENTING REFERENCES . . . . . . . . . . . . . . .               1 2.2       DEVELOPNENTAL REFERENCES           ..............                    1 3.0         PERSONNEL INDOCTRINATION       ...................                            2 4.0         INSTRUCTIONS   .........................                                      2 5.0         FOLLOW-UP ACTIONS       . . . . . . . . . . . .          .........            2 ENCLOSURE 1     Annunciator Response       ..      ..................                          3
1 2.1 INPLENENTING REFERENCES...............
          -                                                                                                        i l
1 2.2 DEVELOPNENTAL REFERENCES 1
l
3.0 PERSONNEL INDOCTRINATION 2
                                                                                                                  )
2 4.0 INSTRUCTIONS 5.0 FOLLOW-UP ACTIONS 2
I l
ENCLOSURE 3
I l
1 Annunciator Response i
i 1
)
l i
1 1
1 1
1 l
l 1
i l
i l
l l
AR-303 Rev. 24 Page i i
l AR-303                                     Rev. 24                                   Page i 1
j
i j


a     .
a 1.0 PURPOSE pa 1.1 Establish a reference document for each Annunciator Window on the ESAB-A Lampbox.
p        1.0     PURPOSE a
1.2 Establish operator actions for valid Annunciator alarms on the ESAB-A Lampbox.
1.1     Establish a reference document for each Annunciator Window on the ESAB-A Lampbox.
1.3 Establish a reference to other procedures which address operator actions for valid Annunciator alarms on the ESAB-A Lampbox.
1.2     Establish operator actions for valid Annunciator alarms on the ESAB-A Lampbox.
~
1.3     Establish a reference to other procedures which address operator actions for valid Annunciator alarms on the ESAB-A Lampbox.
      ~
 
==2.0      REFERENCES==


2.1     IMPLEMENTING REFERENCES 2.1.1   E0P, Emergency Operating Procedure 2.1.2   AP-330, Loss of Nuclear Services Water 2.1.3   AP-470, Loss of Instrument Air 2.1.4   AP-961, Earthquake 2.1.5   OP-700C,120/240 Volt AC Distribution Panels 2.1.6   OP-301, Operation of the Reactor Coolant System 2.1.7   OP-416, Domestic Water Supply System 2.1.8   SP-317, RC System Water Inventory Balance 2.2     DEVELOPMENTAL REFERENCES 2.2.1   INP0 90-021, Good Practice OP-217, Alarm Response Procedures 2.2.2   Annunciator Window Engraving Drawing E-224-048 2.2.3   MAR 88-05-25-05, FCN #19, SW Isolation to RC Pumps 4
==2.0 REFERENCES==
2.2.4   MAR 92-09-08-01, Annunciator Window Relocation and Rewire 2.2.5   MAR 92-10-24-01, ES Status Light Color Change
2.1 IMPLEMENTING REFERENCES 2.1.1 E0P, Emergency Operating Procedure 2.1.2 AP-330, Loss of Nuclear Services Water 2.1.3 AP-470, Loss of Instrument Air 2.1.4 AP-961, Earthquake 2.1.5 OP-700C,120/240 Volt AC Distribution Panels 2.1.6 OP-301, Operation of the Reactor Coolant System 2.1.7 OP-416, Domestic Water Supply System 2.1.8 SP-317, RC System Water Inventory Balance 2.2 DEVELOPMENTAL REFERENCES 2.2.1 INP0 90-021, Good Practice OP-217, Alarm Response Procedures 2.2.2 Annunciator Window Engraving Drawing E-224-048 2.2.3 MAR 88-05-25-05, FCN #19, SW Isolation to RC Pumps 4
2.2.4 MAR 92-09-08-01, Annunciator Window Relocation and Rewire 2.2.5 MAR 92-10-24-01, ES Status Light Color Change
'O
'O
            ^R-303 -                             Rev. 24                           Page 1
^R-303 -
Rev. 24 Page 1


a   .
a 3.0 PERSONNEL INDOCTRINATION 3.1 The Annunciator System is powered from VBDP-5 Breaker 28.
3.0     PERSONNEL INDOCTRINATION               .
4.0 INSTRUCTIONS 4.1 Respond to alarms on the ESAB-A Lampbox as indicated on Enclosure 1, Annunciator Response.
3.1     The Annunciator System is powered from VBDP-5 Breaker 28.
5.0 FOLLOW-UP ACTIONS None O
4.0     INSTRUCTIONS 4.1     Respond to alarms on the ESAB-A Lampbox as indicated on Enclosure 1, Annunciator Response.
l O
5.0     FOLLOW-UP ACTIONS None                                                   ,
AR-303 Rev. 24 Page 2
O l
O AR-303                             Rev. 24                             Page 2


e s ENCLOSURE 1 (Page 1 of 87)
e s
ESAB-A ANNUNCIATOR RES00NSE               ESAB-A-01-01     C-01-01 RZ l     I I     I l     l                                   RC-1 I     I                               HIGH PRESS BISTABLE TRIP l     l l     l l     l l     l l      l                        EVENT POINT 0937 I     I I     I INDICATED CONDITION:
ENCLOSURE 1 (Page 1 of 87)
o RCS PRESSURE < 1500 PSIG                             ,
ESAB-A ANNUNCIATOR RES00NSE ESAB-A-01-01 C-01-01 RZ l
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:                                     1
I I
      }
I l
l RC-1 I
I HIGH PRESS l
l BISTABLE TRIP l
l l
l l
l l
l EVENT POINT 0937 I
I I
I INDICATED CONDITION:
o RCS PRESSURE < 1500 PSIG
}
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o ES STATUS LIGHT RC-1 ' BISTABLE TRIPPED' IS LIT.
o ES STATUS LIGHT RC-1 ' BISTABLE TRIPPED' IS LIT.
o ACTUATION CHANNEL CABINET #1 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.
o ACTUATION CHANNEL CABINET #1 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.
Line 112: Line 129:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-028 SHEET ESA-24 I     SENSING ELEMENT:     BT-1 ES ACTUATION RELAY     ,
DRAWING 208-028 SHEET ESA-24 I
AR-303                                 Rev. 24                             Page 3
SENSING ELEMENT:
BT-1 ES ACTUATION RELAY AR-303 Rev. 24 Page 3


ENCLOSURE 1 (Page 2 of 87)
ENCLOSURE 1 (Page 2 of 87)
    /~'N                   ESAB-A ANNUNCIATOR RESPONSE           ESAB-A-01-02     C-01-02 V
/~'N ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-02 C-01-02 V
RC-4 LOVV PRESS BISTABLE TRIP EVENT POINT 0940 INDICATED CONDITION:
RC-4 LOVV PRESS BISTABLE TRIP EVENT POINT 0940 INDICATED CONDITION:
o RCS PRESSURE <500 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o RCS PRESSURE <500 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
()         o ES STATUS LIGHT RC-4 ' BISTABLE TRIPPED' IS LIT.
()
o ES STATUS LIGHT RC-4 ' BISTABLE TRIPPED' IS LIT.
o ACTUATION CHANNEL CABINET #1 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.
o ACTUATION CHANNEL CABINET #1 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
Line 128: Line 147:
==REFERENCES:==
==REFERENCES:==
ORAWING 208-028 SHEET ESB-39 SENSING ELEMENT: BT-7 ES ACTUATION RELAY O
ORAWING 208-028 SHEET ESB-39 SENSING ELEMENT: BT-7 ES ACTUATION RELAY O
AR-303                             Rev. 24                               Page 4
AR-303 Rev. 24 Page 4


ENCLOSURE 1 (Page 3 of 87)
ENCLOSURE 1 (Page 3 of 87)
O o
O ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-03 C-01-03 o
ESAB-A ANNUNCIATOR RESPONSE           ESAB-A-01-03       C-01-03 a
a SW BP A/B TRIP l
SW BP A/B TRIP l
EVENT POINT 1831 INDICATED CONDITION:
EVENT POINT 1831 INDICATED CONDITION:
      -          0 SWP-2A MOTOR NOT ENERGIZED WITH CONTROL SWITCW IN NORMAL AFTER START POSITION.
0 SWP-2A MOTOR NOT ENERGIZED WITH CONTROL SWITCW IN NORMAL AFTER START POSITION.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION.
o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION.
Line 148: Line 166:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-04 SENSING ELEMENT:   SWP-2A CONTROL SWITCH CONTACTS CS/SC, CS/0 AR-303                               Rev. 24                                 Page 5
DRAWING 208-056 SHEET SW-04 SENSING ELEMENT:
SWP-2A CONTROL SWITCH CONTACTS CS/SC, CS/0 AR-303 Rev. 24 Page 5


      ~     '
~
ENCLOSURE 1 (Page 4 of 87)
ENCLOSURE 1 (Page 4 of 87)
(                       ESAB-A ANNUNCIATOR RESPONSE         ESAB-A-01-03       C-01-03 SW BP A/B TRIP             ,
(
4 EVENT POINT 1833 INDICATED CONDITION:
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-03 C-01-03 SW BP A/B TRIP 4
EVENT POINT 1833 INDICATED CONDITION:
o SWP-2B MOTOR NOT ENERGIZED W.ITH CONTROL SWITCH IN NORMAL AFTER START POSITION.
o SWP-2B MOTOR NOT ENERGIZED W.ITH CONTROL SWITCH IN NORMAL AFTER START POSITION.
i REDUNDANT INDICATION WHICH WILL VERIFY ALAJM:
i REDUNDANT INDICATION WHICH WILL VERIFY ALAJM:
Line 161: Line 181:
O CRDM HIGH TEMP COMPUTER ALARM (S).
O CRDM HIGH TEMP COMPUTER ALARM (S).
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o ENSURE SWP-2A STARTS.                                                         ,
o ENSURE SWP-2A STARTS.
0 INVESTIGATE CAUSE OF PUMP TRIP.
0 INVESTIGATE CAUSE OF PUMP TRIP.
DISCUSSION:
DISCUSSION:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-05 SENSING ELEMENT:   SWP-2B CONTROL SWITCH CONTACTS CS/SC, CS/0 AR-303                               Rev. 24                               Page 6 l
DRAWING 208-056 SHEET SW-05 SENSING ELEMENT:
j
SWP-2B CONTROL SWITCH CONTACTS CS/SC, CS/0 AR-303 Rev. 24 Page 6 j


ENCLOSURE 1 (Page 5 of 87)
ENCLOSURE 1 (Page 5 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-01-04     C-01-04
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-04 C-01-04
(}
(}
SW BP A/B FLOW LC)VV EVENT POINT 1830 INDICATED CONDITION:
SW BP A/B FLOW LC)VV EVENT POINT 1830 INDICATED CONDITION:
o CRDM B00 STER PUMP FLOW <140 GPM FOR >5 SEC AS SENSED BY SW-91-FS.
o CRDM B00 STER PUMP FLOW <140 GPM FOR >5 SEC AS SENSED BY SW-91-FS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
[O~l REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
[O~l o SW BP A/B TRIP ALARM.
o SW BP A/B TRIP ALARM.
o SW BP A/B AUTO START ALARM.
o SW BP A/B AUTO START ALARM.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
Line 182: Line 202:
O CHECK NUCLEAR SERVICES FLOWPATH.
O CHECK NUCLEAR SERVICES FLOWPATH.
DISCUSSION:
DISCUSSION:
4 ALTERNATE NUCLEAR SERVICE B00 STER PUMP STARTS IF <140 GPM FOR >2 SEC.
ALTERNATE NUCLEAR SERVICE B00 STER PUMP STARTS IF <140 GPM FOR >2 SEC.
1 IF TWO PUMPS ARE RUNNING AND ONE PUMP WILL PROVIDE SUFFICIENT FLOW, THEN ONE PUMP SHOULD BE SECURED.
4 IF TWO PUMPS ARE RUNNING AND ONE PUMP WILL PROVIDE SUFFICIENT FLOW, THEN ONE PUMP SHOULD BE SECURED.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-04
DRAWING 208-056 SHEET SW-04 SENSING ELEMENT:
  -~      SENSING ELEMENT:     SW-91-FS h)
SW-91-FS
AR-303                               Rev. 24                               Page 7
-~h)
AR-303 Rev. 24 Page 7


ENCLOSURE 1 (Page 6 of 87)
ENCLOSURE 1 (Page 6 of 87)
ESAB-A ANNUNCIATOR RESPONSE         ESAB-A-01-06     C-01-06 b('''
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-06 C-01-06 b('''
                                    --                                SW BP A/B AUTO START EVENT POINT 1832 INDICATED CONDITION:
SW BP A/B AUTO START EVENT POINT 1832 INDICATED CONDITION:
o SWP-2A MOTOR ENERGIZED WITH CONTROL SWITCH IN NORMAL AFTER STOP
o SWP-2A MOTOR ENERGIZED WITH CONTROL SWITCH IN NORMAL AFTER STOP POSITION.
,                POSITION.
; ()
()         REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o RED LIGHT WITH A GREEN FLAG ON CONTROL STATION.
o RED LIGHT WITH A GREEN FLAG ON CONTROL STATION.
O SW BP A/B LOW FLOW ALARM.
O SW BP A/B LOW FLOW ALARM.
Line 207: Line 228:
==REFERENCES:==
==REFERENCES:==
DRAk'ING 208-056 SHEET SW-04
DRAk'ING 208-056 SHEET SW-04
'O(_,/       SENSING ELEMENT:   SWP-2A CONTROL SWITCH CONTACTS CS/SC, CS/0                 i AR-303                               Rev. 24     .                      Page 8     i
'O
                                                                                                )
(_,/
SENSING ELEMENT:
SWP-2A CONTROL SWITCH CONTACTS CS/SC, CS/0 i
AR-303 Rev. 24 Page 8 i


l ENCLOSURE 1 (Page 7 of 87)
l ENCLOSURE 1 (Page 7 of 87)
()                     ESAB-A ANNUNCIATOR RESPONSE         ESAB-A-01-06     C-01-06
()
                                    --                                SW BP AIB AUTO START EVENT POINT 1834 INDICATED CONDITION:
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-06 C-01-06 SW BP AIB AUTO START EVENT POINT 1834 INDICATED CONDITION:
o SWP-2B MOTOR ENERGIZED WITH CONTROL SWITCH IN NORMAL AFTER STOP POSITION.
o SWP-2B MOTOR ENERGIZED WITH CONTROL SWITCH IN NORMAL AFTER STOP POSITION.
l
()
()       REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o RED LIGHT WITH A GREEN FLAG ON CONTROL STATION.
o RED LIGHT WITH A GREEN FLAG ON CONTROL STATION.
O SW BP A/B LOW FLOW ALARM.
O SW BP A/B LOW FLOW ALARM.
Line 227: Line 251:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-05
DRAWING 208-056 SHEET SW-05
  ')
')
  \_,      SENSING ELEMENT:   SWP-2B CONTROL SWITCH CONTACTS CS/SC, CS/0 AR-303                               Rev. 24                             Page 9
SENSING ELEMENT:
SWP-2B CONTROL SWITCH CONTACTS CS/SC, CS/0
\\_,
AR-303 Rev. 24 Page 9


1 ENCLOSURE 1   1 (Page 8 of 87)
1 ENCLOSURE 1 1
ESAB-A-01-08    C-01-08
(Page 8 of 87)
(]
(]
v ESAB-A ANNUNCIATOR RESPONSE SW SURGE TANK LEVEL HIGH/ LOW EVENT POINT 1835 INDICATED CONDITION:
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-08 C-01-08 v
SW SURGE TANK LEVEL HIGH/ LOW EVENT POINT 1835 INDICATED CONDITION:
o SW SURGE TANK LEVEL >10'0" AS SENSED BY SW-137-LS.
o SW SURGE TANK LEVEL >10'0" AS SENSED BY SW-137-LS.
(     REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
(
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o HIGH NITROGEN PRESSURE ALARM.
o HIGH NITROGEN PRESSURE ALARM.
o RML-3 RADIATION ALARM.
o RML-3 RADIATION ALARM.
O SWV-277 OPEN INDICATION.                                         /
O SWV-277 OPEN INDICATION.
/
o COMPUTER POINT, X333.
o COMPUTER POINT, X333.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
Line 247: Line 277:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:   SW-137-LS AR-303                               Rev. 24                             Page 10
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:
SW-137-LS AR-303 Rev. 24 Page 10


ENCLOSURE 1
ENCLOSURE 1 (Page 9 of 87)
  -                                                                                  (Page 9 of 87) i                    ESAB-A ANNUNCIATOR RESPONSE              ESAB-A-01-08    C-01-08
(~'/
(~'/
w SW SURGE TANK LEVEL HIGH/ LOW EVENT POINT 1836 INDICATED CONDITION:
i ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-08 C-01-08 w
SW SURGE TANK LEVEL HIGH/ LOW EVENT POINT 1836 INDICATED CONDITION:
o SW SURGE TANK LEVEL <8'6" AS SENSED BY SW-137-LS.
o SW SURGE TANK LEVEL <8'6" AS SENSED BY SW-137-LS.
()           REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
()
4                  o LOW NITROGEN PRESSURE ALARM.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
,                  o SW SYSTEM PRESSURE LOW ALARM.
o LOW NITROGEN PRESSURE ALARM.
O COMPUTER POINT, X333.                                                         !
4 o SW SYSTEM PRESSURE LOW ALARM.
I OPERATOR ACTION FOR A VALID ALARM:
O COMPUTER POINT, X333.
OPERATOR ACTION FOR A VALID ALARM:
o FILL SW SURGE TANK AS NECESSARY.
o FILL SW SURGE TANK AS NECESSARY.
o INVESTIGATE CAUSE OF LOW TANK LEVEL.
o INVESTIGATE CAUSE OF LOW TANK LEVEL.
O REFER TO AP-330.
O REFER TO AP-330.
o IE A 4# RBIC ACTUATION HAS OCCURRED AND IS BYPASSED, 4                      IBEN CLOSE THE SW ISOLATION VALVES TO THE RCP'S, SWV-79 THROUGH SWV-86.
o IE A 4# RBIC ACTUATION HAS OCCURRED AND IS BYPASSED, IBEN CLOSE THE SW ISOLATION VALVES TO THE RCP'S, SWV-79 THROUGH SWV-86.
1 DISCUSSION:
4 DISCUSSION:
A DECREASING SW SURGE TANK LEVEL MAY INDICATE POSSIBLE LEAKAGE FROM SYSTEM RELIEF VALVES. IF RUNNING MORE THAN 1 SW PUMP THEN SYSTEM PRESSURE MAY BE HIGH CAUSING THIS LEAKAGE.
A DECREASING SW SURGE TANK LEVEL MAY INDICATE POSSIBLE LEAKAGE FROM SYSTEM RELIEF VALVES. IF RUNNING MORE THAN 1 SW PUMP THEN SYSTEM PRESSURE MAY BE HIGH CAUSING THIS LEAKAGE.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31
DRAWING 208-056 SHEET SW-31
()           SENSING ELEMENT:     SW-137-LS AR-303                                 Rev. 24                           Page 11
()
SENSING ELEMENT:
SW-137-LS AR-303 Rev. 24 Page 11


ENCLOSURE 1 (Page 10 of 87)
ENCLOSURE 1 (Page 10 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-01-09   C-01-09 SW SURGE TANK PRESS HIGH/ LOW EVENT POINT 1837 4
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-09 C-01-09 SW SURGE TANK PRESS HIGH/ LOW EVENT POINT 1837 4
;          INDICATED CONDITION:
INDICATED CONDITION:
o SW SURGE TANK PRESSURE >90 PSI,G AS SENSED BY SW-134-PSI.
o SW SURGE TANK PRESSURE >90 PSI,G AS SENSED BY SW-134-PSI.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
Line 282: Line 316:
o IF PRESSURE ALARM CAUSED BY HIGH LEVEL, RESTORE LEVEL TO NORMAL BAND.
o IF PRESSURE ALARM CAUSED BY HIGH LEVEL, RESTORE LEVEL TO NORMAL BAND.
DISCUSSION:
DISCUSSION:
THIS ALARM COULD BE CAUSED BY RISING TANK LEVEL DUE TO IN LEAKAGE FROM A LETDOWN COOLER OR RCP SEAL PACKAGE COOLER, OR A RISE IN SW SYSTEM           ,
THIS ALARM COULD BE CAUSED BY RISING TANK LEVEL DUE TO IN LEAKAGE FROM A LETDOWN COOLER OR RCP SEAL PACKAGE COOLER, OR A RISE IN SW SYSTEM TEMPERATURE DUE TO A LOCA OR COMPONENT FAILURE.
TEMPERATURE DUE TO A LOCA OR COMPONENT FAILURE.
IF NECESSARY TO REDUCE TANK PRESSURE A MANUAL VENT VALVE (SWV-198) IS AVAILABLE TO VENT THE EXCESS PRESSURE TO THE AB VENTILATION SYSTEM.
IF NECESSARY TO REDUCE TANK PRESSURE A MANUAL VENT VALVE (SWV-198) IS AVAILABLE TO VENT THE EXCESS PRESSURE TO THE AB VENTILATION SYSTEM.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31 r~     SENSING ELEMENT:   SW-134-PSI L)
DRAWING 208-056 SHEET SW-31 r~
AR-303                               Rev. 24                           Page 12
SENSING ELEMENT:
SW-134-PSI L)
AR-303 Rev. 24 Page 12


s'     5 ENCLOSURE 1 (Page 11 of 87)
s' 5
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-01-09     C-01-09 l
ENCLOSURE 1 (Page 11 of 87)
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-09 C-01-09 l
SW SURGE TANK PRESS HIGH/ LOW EVENT POINT 1838 INDICATED CONDITION:
SW SURGE TANK PRESS HIGH/ LOW EVENT POINT 1838 INDICATED CONDITION:
o SW SURGE TANK PRESSURE <77 PSIG AS SENSED BY SW-134-PS.                     ,
o SW SURGE TANK PRESSURE <77 PSIG AS SENSED BY SW-134-PS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o LOW INDICATED TANK PRESSURE.
o LOW INDICATED TANK PRESSURE.
Line 304: Line 340:
O CHECK TANK PRESSURE CONTROL VALVE, ISOLATION VALVE (SWV-282) IS CLOSED.
O CHECK TANK PRESSURE CONTROL VALVE, ISOLATION VALVE (SWV-282) IS CLOSED.
o IF PRESSURE ALARM CAUSED BY LOW LEVEL, RESTORE LEVEL TO NORMAL BAND.
o IF PRESSURE ALARM CAUSED BY LOW LEVEL, RESTORE LEVEL TO NORMAL BAND.
o IF LEVEL IS SATISFACTORILY, ADD N2 DISCUSSION:
o IF LEVEL IS SATISFACTORILY, ADD N 2
DISCUSSION:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:   SW-134-PS2 AR-303                                 Rev. 24                           Page 13
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:
SW-134-PS2 AR-303 Rev. 24 Page 13


    .                                                                                          i ENCLOSURE 1 (Page 12 of 87)     l ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-01-11   C-01-ll (J'')
i ENCLOSURE 1 (Page 12 of 87)
(J'')
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-11 C-01-ll l
l l
l l
l l                              RB FAN A/B/C I   l                             CLG WTR FLOW I   I                                   LOW l   l I   I
l RB FAN A/B/C I
                                                  -          . EVENT POINT 1843 l
l CLG WTR FLOW I
I    I l   I                                                       l INDICATED CONDITION:
I LOW l
l I
I EVENT POINT 1843 I
I l
l I
INDICATED CONDITION:
o SW OR CI FLOW FROM AIR HANDLING UNIT 1A <400 GPM AS SENSED BY SW-47-FS.
o SW OR CI FLOW FROM AIR HANDLING UNIT 1A <400 GPM AS SENSED BY SW-47-FS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
(~')
o REACTOR BUILDING SW SYSTEM LEAK ALARM.
o REACTOR BUILDING SW SYSTEM LEAK ALARM.
(~')
\\- -
  \- -       O COMPUTER POINT S348.
O COMPUTER POINT S348.
o SW OUTLET VALVE (SWV-41) CLOSED INDICATION.
o SW OUTLET VALVE (SWV-41) CLOSED INDICATION.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o IF ADDITIONAL COOLING WATER FLOW IS REQUIRED, START SWP-1A OR SWP-1B
o IF ADDITIONAL COOLING WATER FLOW IS REQUIRED, START SWP-1A OR SWP-1B AND ENSURE THE FAN IS ALIGNED TO SW.
                                                            ~
~
AND ENSURE THE FAN IS ALIGNED TO SW.                                       .
o.IF SW LEAKAGE IS INDICATED, ISOLATE COOLING WATER TO AHF-1A.
o.IF SW LEAKAGE IS INDICATED, ISOLATE COOLING WATER TO AHF-1A.
l DISCUSSION:                                                                       l THIS ALARM IS AN EXPECTED ALARM AFTER AIR HANDLING UNIT TRIPS OFF.   (TIME       .
DISCUSSION:
DELAY OF =60 SECONDS CLOSES SWV-41.)
THIS ALARM IS AN EXPECTED ALARM AFTER AIR HANDLING UNIT TRIPS OFF.
(TIME DELAY OF =60 SECONDS CLOSES SWV-41.)
THIS ALARM WILL NOT COME IN, OR WILL CLEAR, IF CONTROL SWITCH IS SELECTED TO 0FF.
THIS ALARM WILL NOT COME IN, OR WILL CLEAR, IF CONTROL SWITCH IS SELECTED TO 0FF.
4
4
Line 332: Line 378:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31 I''T
DRAWING 208-056 SHEET SW-31 I''T
(_ ,/     SENSING ELEMENT:     SW-47-FS i
(_,/
AR-303                                 Rev. 24                         Page 14
SENSING ELEMENT:
SW-47-FS i
AR-303 Rev. 24 Page 14


1 ENCLOSURE 1 (Page 13 of 87)
1 ENCLOSURE 1 (Page 13 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-01-11   C-01-ll l   l l   l l   l l   l                             RB FAN A/B/C l   l                             CLG WTR FLOW I   I                                   LOW I   I I   I EVENT POINT 1844 I   I I   I INDICATED CONDITION:
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-11 C-01-ll l
l l
l l
l l
l RB FAN A/B/C l
l CLG WTR FLOW I
I LOW I
I I
I EVENT POINT 1844 I
I I
I INDICATED CONDITION:
o SW OR CI FLOW FROM AIR HANDLING UNIT 1B <400 GPM AS SENSED BY SW-51-FS.
o SW OR CI FLOW FROM AIR HANDLING UNIT 1B <400 GPM AS SENSED BY SW-51-FS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
CT       o REACTOR BUILDING SW SYSTEM LEAK ALARM.
CT o REACTOR BUILDING SW SYSTEM LEAK ALARM.
b/       o COMPUTER POINT S376.
b/
o COMPUTER POINT S376.
o SW OUTLET VALVE (SWV-43) CLOSED INDICATION.
o SW OUTLET VALVE (SWV-43) CLOSED INDICATION.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
Line 346: Line 405:
o IF SW LEAKAGE IS INDICATED, ISOLATE COOLING WATER TO AHF-18.
o IF SW LEAKAGE IS INDICATED, ISOLATE COOLING WATER TO AHF-18.
DISCUSSION:
DISCUSSION:
THIS ALARM IS AN EXPECTED ALARM AFTER AIR HANDLING UNIT TRIPS OFF.   (TIME DELAY OF =60 SECONDS CLOSES SWV-43.)
THIS ALARM IS AN EXPECTED ALARM AFTER AIR HANDLING UNIT TRIPS OFF.
(TIME DELAY OF =60 SECONDS CLOSES SWV-43.)
THIS ALARM WILL NOT COME IN, OR WILL CLEAR, IF CONTROL SWITCH IS SELECTED TO OFF.
THIS ALARM WILL NOT COME IN, OR WILL CLEAR, IF CONTROL SWITCH IS SELECTED TO OFF.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:     SW-51-FS AR-303                                 Rev. 24                         Page 15
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:
SW-51-FS AR-303 Rev. 24 Page 15


ENCLOSURE 1 (Page 14 of 87)
ENCLOSURE 1 (Page 14 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-01-ll     C-01-11 l
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-ll C-01-11 l
l l
l l
l                                                     l l                                RB FAN A/B/C l                             CLG WTR FLOW           )
l RB FAN A/B/C l
I                                    LOW l
CLG WTR FLOW I
LOW l
l EVENT POINT 1845 I
l EVENT POINT 1845 I
I INDICATED CONDITION:                                     .
I INDICATED CONDITION:
o SW OR CI FLOW FROM AIR HANDLING UNIT IC <400 GPM AS SENSED BY SW-55-FS.
o SW OR CI FLOW FROM AIR HANDLING UNIT IC <400 GPM AS SENSED BY SW-55-FS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o REACTOR BUILDING SW SYSTEM LEAK ALARM.
O) o REACTOR BUILDING SW SYSTEM LEAK ALARM.
O)
(
(              o COMPUTER POINT S387.
o COMPUTER POINT S387.
o SW OUTLET VALVE (SWV-45) CLOSED INDICATION.
o SW OUTLET VALVE (SWV-45) CLOSED INDICATION.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
Line 373: Line 435:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:     SW-55-FS AR-303                                 Rev. 24                           Page 16
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:
SW-55-FS AR-303 Rev. 24 Page 16


                        -                                                      ENCLOSURE 1 (Page 15 of 87)
ENCLOSURE 1 (Page 15 of 87)
ESAB-A-01-12      C-01-12
(~')
(~')
    %j ESAB-A ANNUNCIATOR RESPONSE l   l l   l l   l l   l l   l                             REACTOR BLDG I   I                               SW SYSTEM LEAK l   l I   I l   l EVENT POINT 1840
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12
                                              ~
%j l
I   l INDICATED CONDITION:
l l
l l
l l
l l
l REACTOR BLDG I
I SW SYSTEM l
l LEAK I
I l
l EVENT POINT 1840
~
I l
INDICATED CONDITION:
o DIFF FLOW TO AIR HANDLING UNIT 1A >90 GPM AS SENSED BY SW-46-FS.
o DIFF FLOW TO AIR HANDLING UNIT 1A >90 GPM AS SENSED BY SW-46-FS.
    ,- s      REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o RB FAN A/B/C CLG WTR FLOW LOW ALARM.
,- s o RB FAN A/B/C CLG WTR FLOW LOW ALARM.
o DECREASING LEVEL IN SW SURGE TANK.
o DECREASING LEVEL IN SW SURGE TANK.
O HIGH TEMP ALARM ON AFFECTED COMP 0NENT.
O HIGH TEMP ALARM ON AFFECTED COMP 0NENT.
Line 394: Line 467:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31
DRAWING 208-056 SHEET SW-31
()       SENSING ELEMENT:     SW-46-FS AR-303                                 Rev. 24                           Page 17
()
SENSING ELEMENT:
SW-46-FS AR-303 Rev. 24 Page 17


ENCLOSURE 1 (Page 16 of 87)
ENCLOSURE 1 (Page 16 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-01-12     C-01-12 l   l l   l I   I I   I l   l                             REACTOR BLDG 1   1                             SW SYSTEM I   I                                   LEAK I   I l   l
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 l
_                    EVENT POINT 1841 l   l
l l
  ~
l I
I I
I l
l REACTOR BLDG 1
1 SW SYSTEM I
I LEAK I
I l
l EVENT POINT 1841 l
l
~
INDICATED CONDITION:
INDICATED CONDITION:
O DIFF FLOW TO AIR HANDLING UNIT 18 >90 GPM AS SENSED BY SW-50-FS.
O DIFF FLOW TO AIR HANDLING UNIT 18 >90 GPM AS SENSED BY SW-50-FS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
/
/V o RB FAN A/B/C CLG WTR FLOW LOW ALARM.
V           o RB FAN A/B/C CLG WTR FLOW LOW ALARM.
O DECREASING LEVEL IN SW SURGE TANK.
O DECREASING LEVEL IN SW SURGE TANK.
o HIGH TEMP ALARM ON AFFECTED COMPONENT.                                     l 1
o HIGH TEMP ALARM ON AFFECTED COMPONENT.
OPERATOR ACTION FOR A VALID ALARM:
l OPERATOR ACTION FOR A VALID ALARM:
o REFER TO AP-330.
o REFER TO AP-330.
o ISOLATE THE AFFECTED COMPONENT, AND PLACE BACKUP IN SERVICE IF REQUIRED.
o ISOLATE THE AFFECTED COMPONENT, AND PLACE BACKUP IN SERVICE IF REQUIRED.
O FILL SW SURGE TANK AS NECESSARY.
O FILL SW SURGE TANK AS NECESSARY.
l DISCUSSION:                                                                   )
DISCUSSION:
I l
l


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31
DRAWING 208-056 SHEET SW-31
_(         SENSING ELEMENT:     SW-50-FS AR-303                               Rev. 24                           Page 18 1
_(
SENSING ELEMENT:
SW-50-FS AR-303 Rev. 24 Page 18


r ENCLOSURE 1 (Page 17 of u7)
r ENCLOSURE 1 (Page 17 of u7)
G ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-01-12     C-01-12 C/
G ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 C/
I     I I     I I     I l     l                           REACTOR BLDG l     l                             SW SYSTEM I     I                                 LEAK I     I I     I
I I
      -                            l     l
I I
                                              -                  EVENT POINT 1842
I I
                                  'l     l INDICATED CONDITION:
l l
REACTOR BLDG l
l SW SYSTEM I
I LEAK I
I I
I l
l EVENT POINT 1842
'l l
INDICATED CONDITION:
o DIFF FLOW TO AIR HANDLING UNIT 10 >90 GPM AS SENSED BY SW-54-FS.
o DIFF FLOW TO AIR HANDLING UNIT 10 >90 GPM AS SENSED BY SW-54-FS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
(     %
(
o RB FAN A/8/C CLG WTR FLOW LOW ALARM.
o RB FAN A/8/C CLG WTR FLOW LOW ALARM.
  't           o DECREASING LEVEL IN SW SURGE TANK.
't o DECREASING LEVEL IN SW SURGE TANK.
O HIGH TEMP ALARM ON AFFECTED COMPONENT.
O HIGH TEMP ALARM ON AFFECTED COMPONENT.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
Line 438: Line 529:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31 m            SENSING ELEMENT:     SW-54-FS h
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:
AR-303                               Rev. 24                             Page 19
SW-54-FS mh AR-303 Rev. 24 Page 19


a     p ENCLOSURE 1 (Page 18 of 87)
a p
  <O                 ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-01-12           C-01-12 V
ENCLOSURE 1 (Page 18 of 87)
I     I i                             l     i I     I
<O ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 V
:                              I    I l     l                           REACTOR BLDG I     I                             SW SYSTEM I     I l     l EVENT POINT 1846 l     I INDICATED CONDITION:
I I
i l
i I
I I
I l
l REACTOR BLDG I
I SW SYSTEM I
I l
l EVENT POINT 1846 l
I INDICATED CONDITION:
o DIFF FLOW TO LD COOLER A AND C >50 GPM AS SENSED BY SW-42-FS.
o DIFF FLOW TO LD COOLER A AND C >50 GPM AS SENSED BY SW-42-FS.
O
O REDUNDANT INDICATION WHICH WILL VERIFY TLARM:
, L,]
, L,]
REDUNDANT INDICATION WHICH WILL VERIFY TLARM:
o DECREASING LEVEL IN SW SURGE TANK.
o DECREASING LEVEL IN SW SURGE TANK.
O HIGH TEMP ALARM ON AFFECTED COMPONENT.
O HIGH TEMP ALARM ON AFFECTED COMPONENT.
l OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o REFER TO AP-330.
o REFER TO AP-330.
o ISOLATE THE AFFECTED COMP 0NENT, AND PLACE BACKUP IN SERVICE IF REQUIRED.
o ISOLATE THE AFFECTED COMP 0NENT, AND PLACE BACKUP IN SERVICE IF REQUIRED.
Line 458: Line 557:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31 O
DRAWING 208-056 SHEET SW-31 O()
SENSING ELEMENT:     SW-42-FS
SENSING ELEMENT:
()
SW-42-FS AR-303 Rev. 24 Page 20
AR-303                               Rev. 24                                   Page 20


      .  .                                                                                          l ENCLOSURE 1             :
ENCLOSURE 1 (Page 19 of 87)
(Page 19 of 87)
Ci ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 1
Ci V
V l
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-01-12   C-01-12             1 l
l l
l                                                                l l
l l
l l                               REACTOR BLDG                     ;
REACTOR BLDG I
I                                SW SYSTEM LEAK l                                                               '
SW SYSTEM l
l l                                                              l EVENT POINT 1847 l                                                               l l
LEAK l
l INDICATED CONDITION:
l EVENT POINT 1847 l
l l
INDICATED CONDITION:
o DIFF FLOW TO LD COOLER B >50 GPM AS SENSED BY S,W-43-FS.
o DIFF FLOW TO LD COOLER B >50 GPM AS SENSED BY S,W-43-FS.
(       REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
(
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o DECREASING LEVEL IN SW SURGE TANK.
o DECREASING LEVEL IN SW SURGE TANK.
o HIGH TEMP ALARM ON AFFECTED COMPONENT.                                               !
o HIGH TEMP ALARM ON AFFECTED COMPONENT.
l OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o REFER TO AP-330.                                                                     l 0 ISOLATE THE AFFECTED COMPONENT, AND PLACE BACKUP IN SERVICE IF REQUIRED.             !
o REFER TO AP-330.
0 ISOLATE THE AFFECTED COMPONENT, AND PLACE BACKUP IN SERVICE IF REQUIRED.
O FILL SW SURGE TANK AS NECESSARY.
O FILL SW SURGE TANK AS NECESSARY.
}
}
DISCUSSION:
DISCUSSION:
f 1
f


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:   SW-43-FS AR-303                               Rev. 24                           Page 21
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:
SW-43-FS AR-303 Rev. 24 Page 21


ENCLOSURE 1 (Page 20 of 87)
ENCLOSURE 1 (Page 20 of 87)
ESAB-A ANNUNCIATOR RESPONSE           ESAB-A-01-12                                     C-01-12 l l l   1 I   I I   I l   l                           REACTOR BLDG I   I                                     SW SYSTEM
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 l
            .                    l  l i                                 l   i I   I Z                   EVENT POINT 1848-l   l 3
l l
1 I
I I
I l
l REACTOR BLDG I
I SW SYSTEM l
l i
l i
I I
Z EVENT POINT 1848-l l
INDICATED CONDITION:
INDICATED CONDITION:
o DIFF FLOW TO CRDM'S >10 GPM AS SENSED BY SW-90-FS.   ,
3 o DIFF FLOW TO CRDM'S >10 GPM AS SENSED BY SW-90-FS.
i
i,q REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
  ,q
  ,        REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o DECREASING LEVEL IN SW SURGE TANK.
o DECREASING LEVEL IN SW SURGE TANK.
o INCREASING TEMPS ON CRDM'S.
o INCREASING TEMPS ON CRDM'S.
Line 503: Line 613:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:     SW-90-FS AR-303                                 Rev. 24                                                             Page 22
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:
SW-90-FS AR-303 Rev. 24 Page 22


_                                              .- -      - ~_       .
- ~_
ENCLOSURE 1 (Page 21 of 87)
ENCLOSURE 1 (Page 21 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-01-12         C-01-12 lv I   l l   l l   l l   l l   l                             REACTOR BLDG I   I                             SW SYSTEM LEAK l   l I   I l   l                                                               1
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 lv I
)                                           Z                 EVENT POINT 1849 I   I INDICATED CONDITION:
l l
l l
l l
l l
l REACTOR BLDG I
I SW SYSTEM l
l LEAK I
I l
l
)
Z EVENT POINT 1849 I
I INDICATED CONDITION:
o DIFF FLOW TO RCP-1A >20 GPM AS SENSED BY SW-107-FS.
o DIFF FLOW TO RCP-1A >20 GPM AS SENSED BY SW-107-FS.
e
e REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
,            REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
I o DECREASING LEVEL IN SW SURGE TANK.
I o DECREASING LEVEL IN SW SURGE TANK.
O INCREASING TEMPS ON RCP A.
O INCREASING TEMPS ON RCP A.
Line 521: Line 642:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:     SW-107-FS AR-303                               Rev. 24                           .      Page 23
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:
SW-107-FS Page 23 AR-303 Rev. 24


        ~     '
~
                                                              .              ENCLOSURE 1   ;
ENCLOSURE 1 (Page 22 of 87) f ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 ll l
(Page 22 of 87) f                   ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-01-12     C-01-12 ll   l l   l 1   I                                                     J l   l l   l                           REACTOR BLDG I   I                               SW SYSTEM LEAK j
l l
l    l I   I l   l Z               EVENT POINT 1850 l   I     e INDICATED CONDITION:                                                           J o DIFF FLOW TO RCP-1B >20 GPM AS SENSED BY SW-113-FS.
1 I
't
J l
    -      REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
l l
(d         o DECREASING LEVEL IN SW SURGE TANK.
l REACTOR BLDG I
I SW SYSTEM l
l LEAK j
I I
l l
Z EVENT POINT 1850 l
I e
INDICATED CONDITION:
J o DIFF FLOW TO RCP-1B >20 GPM AS SENSED BY SW-113-FS.
't REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
(d o DECREASING LEVEL IN SW SURGE TANK.
O INCREASING TEMPS ON RCP B.
O INCREASING TEMPS ON RCP B.
o COMPUTER GROUP 79.
o COMPUTER GROUP 79.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o REFER TO AP-330.
o REFER TO AP-330.
O FILL SW SURGE TANK AS NECESSARY.                                             !
O FILL SW SURGE TANK AS NECESSARY.
.l DISCUSSION:
.l DISCUSSION:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31
DRAWING 208-056 SHEET SW-31
  \         SENSING ELEMENT:     SW-113-FS AR-303                               Rev. 24                             Page 24
\\
SENSING ELEMENT:
SW-113-FS AR-303 Rev. 24 Page 24


ENCLOSURE 1 (Page 23 of G7)
ENCLOSURE 1 (Page 23 of G7)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-01-12   C-01-12 l
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 l
l l
l l
l l
l l                                REACTOR BLDG I                                   SW SYSTEM LEAK l
REACTOR BLDG I
i I   l Z                   EVENT POINT 1851 1   I INDICATED CONDITION:
SW SYSTEM l
LEAK i
I l
Z EVENT POINT 1851 1
I INDICATED CONDITION:
o DIFF FLOW TO RCP-1C >20 GPM AS SENSED BY SW-95-FS.
o DIFF FLOW TO RCP-1C >20 GPM AS SENSED BY SW-95-FS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
b       o DECREASING LEVEL IN SW SURGE TANK.                                             l 0 INCREASING TEMPS ON RCP C.                                                     l 0 COMPUTER GROUP 80.
b o DECREASING LEVEL IN SW SURGE TANK.
0 INCREASING TEMPS ON RCP C.
0 COMPUTER GROUP 80.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o REFER TO AP-330.
o REFER TO AP-330.
O FILL SW SURGE TANK AS NECESSARY.
O FILL SW SURGE TANK AS NECESSARY.
l DISCUSSION:
DISCUSSION:
1
1


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31 i       SENSING ELEMENT: SW-95-FS AR-303                               Rev. 24                           Page 25
DRAWING 208-056 SHEET SW-31 i
SENSING ELEMENT: SW-95-FS AR-303 Rev. 24 Page 25


ENCLOSURE 1 (Page 24 of 87) J A                   ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-01-12   C-01-12 l
ENCLOSURE 1 (Page 24 of 87)
l                                                     l l
J A
l                                                    \
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 l
l                             REACTOR BLDG I                               SW SYSTEM             i LEAK l
l l
I l
l
EVENT POINT 1852 I
\\
l REACTOR BLDG I
SW SYSTEM l
LEAK I
l EVENT POINT 1852 I
INDICATED CONDITION:
INDICATED CONDITION:
o DIFF FLOW TO RCP-ID >20 GPM AS SENSED BY SW-101-FS.
o DIFF FLOW TO RCP-ID >20 GPM AS SENSED BY SW-101-FS.
1 REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o DECREASING LEVEL IN SW SURGE TANK.
o DECREASING LEVEL IN SW SURGE TANK.
O INCREASING TEMPS ON RCP D.
O INCREASING TEMPS ON RCP D.
Line 576: Line 722:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:   SW-101-FS AR-303                               Rev. 24                           Page 26
DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:
SW-101-FS AR-303 Rev. 24 Page 26


ENCLOSURE 1    1 (Page 25 of 87)   l ESAB-A ANNUNCIATOR RESPONSE                 ESAB-A-01-14   C-01-14 l
ENCLOSURE 1 (Page 25 of 87)
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-14 C-01-14 l
1 l
1 l
                            \
\\
l                                           ES CAB l                                             FAN               ,
l ES CAB l
FAILURE l
FAN l
I I                                                              l I
FAILURE I
l                                  EVENT POINT 1232 INDICATED CONDITION:
I l
I l
EVENT POINT 1232 INDICATED CONDITION:
o LOW CABINET AIR FLOW AS SENSED BY INDIVIDUAL CABINET FAN FLOW SWITCH.
o LOW CABINET AIR FLOW AS SENSED BY INDIVIDUAL CABINET FAN FLOW SWITCH.
I REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
l o ' FAN RUNNING' LIGHT EXTINGUISHED l
o ' FAN RUNNING' LIGHT EXTINGUISHED
                                ,/
,/
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o VERIFY COOLING FAN IN OPERATION.
o VERIFY COOLING FAN IN OPERATION.
Line 595: Line 745:


==REFERENCES:==
==REFERENCES:==
. DRAWING 208-028 SHEET ESAB-5 SENSING ELEMENT:     FSBFX (ES ACTUATION CABINET INDIVIDUAL FAN FLOW SWITCH)
. DRAWING 208-028 SHEET ESAB-5 SENSING ELEMENT:
AR-303                                 Rev. 24                             Page 27
FSBFX (ES ACTUATION CABINET INDIVIDUAL FAN FLOW SWITCH)
AR-303 Rev. 24 Page 27


(       e       .
(
ENCLOSURE 1 (Page 26 of 87)
e ENCLOSURE 1 (Page 26 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-01                                   C-02-01 i
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-01 C-02-01 RC-2 HIGH PRESS BISTABLE TRIP EVENT POINT 0938 INDICATED CONDITION:
l RC-2
                                                <                      HIGH PRESS BISTABLE TRIP                                         l l
EVENT POINT 0938                                           ;
i INDICATED CONDITION:
o RCS PRESSURE <1500 PSIG
o RCS PRESSURE <1500 PSIG
(           REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
(
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o ES STATUS LIGHT RC-2 ' BISTABLE TRIPPED' IS LIT.
o ES STATUS LIGHT RC-2 ' BISTABLE TRIPPED' IS LIT.
O ACTUATION CHANNEL CABINET #2 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.
O ACTUATION CHANNEL CABINET #2 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
l o REFER TO E0P l
l o REFER TO E0P i
i l
DISCUSSION:
DISCUSSION:
THIS ALARM INDICATES ONE CHANNEL TRIPPED IN A 2 OUT OF 3 HPI LOGIC.
THIS ALARM INDICATES ONE CHANNEL TRIPPED IN A 2 OUT OF 3 HPI LOGIC.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-028 SHEET ESA-24 SENSING ELEMENT:   BT-2 ES ACTUATION RELAY AR-303                               Rev. 24                                                           Page 28
DRAWING 208-028 SHEET ESA-24 SENSING ELEMENT:
BT-2 ES ACTUATION RELAY AR-303 Rev. 24 Page 28


8     e ENCLOSURE 1 (Page 27 of 87)
8 e
ESAB-A-02-02   C-02-02 fv^)                  ESAB-A ANNUNCIATOR RESPONSE RC-5 LOW PRESS BISTABLE TRIP EVENT POINT 0925 INDICATED CONDITION:
ENCLOSURE 1 (Page 27 of 87) f ^)
o RCS PRESSURE <500 PSIG                   ,
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-02 C-02-02 v
()       REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
RC-5 LOW PRESS BISTABLE TRIP EVENT POINT 0925 INDICATED CONDITION:
o RCS PRESSURE <500 PSIG
()
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o ES STATUS LIGHT RC-5 ' BISTABLE TRIPPED' IS LIT.
o ES STATUS LIGHT RC-5 ' BISTABLE TRIPPED' IS LIT.
o ACTUATION CHANNEL CABINET #2 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.
o ACTUATION CHANNEL CABINET #2 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.
Line 630: Line 781:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-028 SHEET ESB-39
DRAWING 208-028 SHEET ESB-39
()       SENSING ELEMENT:   BT-8 ES ALTUATION RELAY AR-303                               Rev. 24                           Page 29
()
SENSING ELEMENT:
BT-8 ES ALTUATION RELAY AR-303 Rev. 24 Page 29


ENCLOSURE 1 (Page 28 of 87) l ESAB-A ANNUNCIATOR RESPONSE               ESAB-A-02-03   C-02-03
ENCLOSURE 1 (Page 28 of 87)
                      ~
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-03 C-02-03
SW PUMP C TRIP EVENT POINT 1821           ;
~
                                                                                        )
SW PUMP C TRIP EVENT POINT 1821
)
i INDICATED CONDITION:
i INDICATED CONDITION:
o SWP-1C BREAKER OPEN WITH CONTROL SWITCH IN NORMAL AFTER START POSIT:0N.     !
o SWP-1C BREAKER OPEN WITH CONTROL SWITCH IN NORMAL AFTER START POSIT:0N.
REDUNDANT INDICATION WHICH'WILL VERIFY ALARM:                                   ,
REDUNDANT INDICATION WHICH'WILL VERIFY ALARM:
i o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION.
i o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION.
O SWP-1B AUTO START ALARM.
O SWP-1B AUTO START ALARM.
Line 646: Line 800:
o INVESTIGATE CAUSE OF PUMP TRIP.
o INVESTIGATE CAUSE OF PUMP TRIP.
DISCUSSION:
DISCUSSION:
          $WP-1B STARTS 2 SEC AFTER PRESS DECREASES TO <110 PSIG. IF SWP-1B FAILS TO START, OR IS TAGGED OUT, SWP-1A WILL START 10 SEC AFTER PRESS DECREASES TO <110 PSIG. NO AUTO START ALARM I-S CURRENTLY INSTALLED FOR SWP-1A.
$WP-1B STARTS 2 SEC AFTER PRESS DECREASES TO <110 PSIG. IF SWP-1B FAILS TO START, OR IS TAGGED OUT, SWP-1A WILL START 10 SEC AFTER PRESS DECREASES TO <110 PSIG. NO AUTO START ALARM I-S CURRENTLY INSTALLED FOR SWP-1A.
THIS IS AN EXPECTED ALARM FROM AN ES ACTUATION.
THIS IS AN EXPECTED ALARM FROM AN ES ACTUATION.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-01 SWP-lC CONTROL SWITCH CONTACTS CS/SC, CS/0 JENSINGELEMENT:
DRAWING 208-056 SHEET SW-01 JENSINGELEMENT:
AD-303                               Rev. 24                           Page 30
SWP-lC CONTROL SWITCH CONTACTS CS/SC, CS/0 AD-303 Rev. 24 Page 30


l ENCLOSURE 1 (Page 29 of 87)         l I
l ENCLOSURE 1 (Page 29 of 87)
ESAB-A ANNUNCIATOR RESPONSE               ESAB-A-02-04   C-02-04 1
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-04 C-02-04 SWPC MOTOR OVERLOAD EVENT POINT 1822 INDICATED CONDITION:
SWPC l
MOTOR                       l OVERLOAD                     l EVENT POINT 1822 INDICATED CONDITION:
o SWP-1C MOTOR AMPS >115% RATED LOAD.
o SWP-1C MOTOR AMPS >115% RATED LOAD.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
Line 662: Line 814:
O SWP-1C TRIP.
O SWP-1C TRIP.
o GREEN LIGHT ON WITH A RED FLAG ON SWP-1C CONTROL STATION.
o GREEN LIGHT ON WITH A RED FLAG ON SWP-1C CONTROL STATION.
O SW SYSTEM PRESS LOW SW-2-PI.                                                         i l
O SW SYSTEM PRESS LOW SW-2-PI.
l OPERATOR ACTION FOR A VALID ALARM:
i OPERATOR ACTION FOR A VALID ALARM:
i o START SWP-1A OR SWP-1B, SECURE SWP-1C, INVESTIGATE CAUSE OF OVERLOAD.                 l l
i o START SWP-1A OR SWP-1B, SECURE SWP-1C, INVESTIGATE CAUSE OF OVERLOAD.
DISCUSSION-THIS ALARM INDICATES THAT EITHER THE TIMED OVERCURRENT OR INSTANTANE0US OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANE0US OVERCURRENT PROTECTIVE RELAY ACTUATION WILL TRIP THE BREAKER.
DISCUSSION-THIS ALARM INDICATES THAT EITHER THE TIMED OVERCURRENT OR INSTANTANE0US OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANE0US OVERCURRENT PROTECTIVE RELAY ACTUATION WILL TRIP THE BREAKER.
IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.                           ,
IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.
l


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-01 SENSING ELEMENT:   51 RELAY (INSIDE 4160V BREAKER CUBICLE) i I
DRAWING 208-056 SHEET SW-01 SENSING ELEMENT:
AR-303                                 Rev. 24                           Page 31         ;
51 RELAY (INSIDE 4160V BREAKER CUBICLE) i AR-303 Rev. 24 Page 31
l
\\
                                                                                                  \


ENCLOSURE 1 (Page 30 of 87)
ENCLOSURE 1 (Page 30 of 87)
()                   ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-05     C-02-05 Z         Z                         SW SYSTEM PRESS LC)VV EVENT POINT 1823 INDICATED CONDITION:
()
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-05 C-02-05 Z
Z SW SYSTEM PRESS LC)VV EVENT POINT 1823 INDICATED CONDITION:
o SW SYSTEM HEADER PRESSURE <110 PSIG AS SENSED BY SW-151-PS.
o SW SYSTEM HEADER PRESSURE <110 PSIG AS SENSED BY SW-151-PS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
g-~)
g-~)
''#      o SWP TRIP ALARM ON RUNNING SW PUMP.
o SWP TRIP ALARM ON RUNNING SW PUMP.
o HIGH MOTOR AMPS ON RUNNING SW PUMP.
o HIGH MOTOR AMPS ON RUNNING SW PUMP.
O SW SURGE TANK PRESS LOW.
O SW SURGE TANK PRESS LOW.
Line 693: Line 845:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-03
DRAWING 208-056 SHEET SW-03
/7                           SW-151-PS
/7
( ,/     SENSING ELEMENT:
(,/
AR-303                               Rev. 24   .                          Page 32
SENSING ELEMENT:
SW-151-PS AR-303 Rev. 24 Page 32


1
1 i
        .      ,                                                                            i ENCLOSURE 1 (Page 31 of 87)
ENCLOSURE 1 (Page 31 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-06   C-02-06
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-06 C-02-06
      }
}
SW SYSTEM             l
SW SYSTEM TEMP HIGH EVENT POINT 1839 INDICATED CONDITION:
_        _                            TEMP HIGH l
l EVENT POINT 1839 INDICATED CONDITION:
o SW PUMP SUCTION TEMP >105'F AS SENSED BY SW-5-TS.
o SW PUMP SUCTION TEMP >105'F AS SENSED BY SW-5-TS.
    ~s        REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
  \d           o SCREEN WASH TROUBLE.
~s
\\d o SCREEN WASH TROUBLE.
o RW PUMP TRIP, OR ABNORMAL CURRENT.
o RW PUMP TRIP, OR ABNORMAL CURRENT.
O SW PUMP TRIP, OR ABNORMAL CURRENT OPERATOR ACTION FOR A VALID ALARM:
O SW PUMP TRIP, OR ABNORMAL CURRENT OPERATOR ACTION FOR A VALID ALARM:
Line 717: Line 869:
o CHECK FOR BACKFLOW PAST CHECK VALVE ON IDLE SW PUMPS.
o CHECK FOR BACKFLOW PAST CHECK VALVE ON IDLE SW PUMPS.
DISCUSSION:
DISCUSSION:
DRAWING 208-056 SHEET SW-31


==REFERENCES:==
==REFERENCES:==
 
DRAWING 208-056 SHEET SW-31 f~'T SENSING ELEMENT:
SENSING ELEMENT:     SW-5-TS                                                   4 f~'T s_ /                                                                                       l A!!-303                               Rev. 24                           Page 33
SW-5-TS 4
l s_ /
A!!-303 Rev. 24 Page 33


ENCLOSURE 1 (Page 32 of 87)
ENCLOSURE 1 (Page 32 of 87)
[                         ESAB-A ANNUNCIATOR RESPONSE     ESAB-A-02-08     C-02-08 BWST LEVEL HIGH/ LOW EVENT POINT 0157 INDICATED CONDITION:
[
l     o BWST LEVEL <45.5' AS SENSED BY DH-11-LS                                 .
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-08 C-02-08 BWST LEVEL HIGH/ LOW EVENT POINT 0157 INDICATED CONDITION:
f~
l o BWST LEVEL <45.5' AS SENSED BY DH-11-LS f~(
(          REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o DH-7-LI o DH-37-LI                                             '
o DH-7-LI o DH-37-LI o DH-7-LIR o COMPUTER POINT X335 OPERATOR ACTION FOR A VALID ALARM:
o DH-7-LIR o COMPUTER POINT X335 OPERATOR ACTION FOR A VALID ALARM:
o INVESTIGATE CAUSE OF DECREASING LEVEL.
o INVESTIGATE CAUSE OF DECREASING LEVEL.
DISCUSSION:
DISCUSSION:
REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
            =
=


==REFERENCES:==
==REFERENCES:==
DRAWING 208-021 SHEET DH-22 Cs         SENSING ELEMENT:   DH-11-LS AR-303                               Rev. 24                       Page 34
DRAWING 208-021 SHEET DH-22 Cs SENSING ELEMENT:
DH-11-LS AR-303 Rev. 24 Page 34


S 4
S 4
ENCLOSURE 1 (Page 33 of 87)
ENCLOSURE 1 (Page 33 of 87)
O V
O ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-08 C-02-08 V
ESAB-A ANNUNCIATOR RESPONSE     ESAB-A-02-08   C-02-08 swsT LEVEL HIGH/ LOW EVENT POINT 0233 INDICATED CONDITION:
swsT LEVEL HIGH/ LOW EVENT POINT 0233 INDICATED CONDITION:
I l     o BWST LEVEL >46.5' AS SENSED BY DH-11-LS.
l o BWST LEVEL >46.5' AS SENSED BY DH-11-LS.
A
A()
()         REDUNDANT INDICATION WHICH WILL VERIFY ALARM:                           l o DH-7-LI o DH-37-LI o DH-7-LIR o COMPUTER POINT X335 OPERATOR ACTION FOR A VALID ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o DH-7-LI o DH-37-LI o DH-7-LIR o COMPUTER POINT X335 OPERATOR ACTION FOR A VALID ALARM:
o INVESTIGATE CAUSE OF INCREASING LEVEL.
o INVESTIGATE CAUSE OF INCREASING LEVEL.
I DISCUSSION:
I DISCUSSION:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-021 SHEET DH-22 SENSING ELEMENT: DH-ll-LS AR-303                             Rev. 24                       Page 35
DRAWING 208-021 SHEET DH-22 SENSING ELEMENT: DH-ll-LS AR-303 Rev. 24 Page 35


.    .                                                                                      1 ENCLOSURE 1 (Page 34 of 87)
ENCLOSURE 1 (Page 34 of 87)
(''}
(''}
V ESAB-A ANNUNCIATOR RESPONSE         ESAB-A-02-08     C-02-08 swsT LEVEL HIGH/ LOW EVENT POINT 0234 INDICATED CONDITION:
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-08 C-02-08 V
swsT LEVEL HIGH/ LOW EVENT POINT 0234 INDICATED CONDITION:
o BWST LEVEL <15' AS SENSED BY DH-7-LSI.
o BWST LEVEL <15' AS SENSED BY DH-7-LSI.
()         REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
()
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o DH-7-LI o DH-37-LI o DH-7-LIR o COMPUTER POINT X335 OPERATOR ACTION FOR A VALID ALARM:
o DH-7-LI o DH-37-LI o DH-7-LIR o COMPUTER POINT X335 OPERATOR ACTION FOR A VALID ALARM:
o INVESTIGATE CAUSE OF DECREASING LEVEL.
o INVESTIGATE CAUSE OF DECREASING LEVEL.
Line 762: Line 918:
DISCUSSION:
DISCUSSION:
o REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
o REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
o SWAP OVER TO RB SUMP FOR LONG TERM RECIRCULATION MODE IS REQUIRED TO BE COMPLETE BEFORE BWST REACHES 7' INDICATED LEVEL TO PREVENT EQUIPMENT DAMAGE.                                                             ,
o SWAP OVER TO RB SUMP FOR LONG TERM RECIRCULATION MODE IS REQUIRED TO BE COMPLETE BEFORE BWST REACHES 7' INDICATED LEVEL TO PREVENT EQUIPMENT DAMAGE.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-021 SHEET DH-24                                       ,
DRAWING 208-021 SHEET DH-24 SENSING ELEMENT:
SENSING ELEMENT:     DH-7-LS1 AR-303                               Rev. 24                           Page 36
DH-7-LS1 AR-303 Rev. 24 Page 36


ENCLOSURE 1 (Page 35 of 87)
ENCLOSURE 1 (Page 35 of 87)
ESAB-A ANNUNCIATOR RESPONSE         ESAB-A-02-08   C-02-08 BWST               l LEVEL               l HIGH/ LOW EVENT POINT 0235 1
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-08 C-02-08 BWST LEVEL HIGH/ LOW EVENT POINT 0235 INDICATED CONDITION:
INDICATED CONDITION:
o BWST LEVEL <7' AS SENSED BY DH-7-LSI.
o BWST LEVEL <7' AS SENSED BY DH-7-LSI.                                     -
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o DH-7-LI
o DH-7-LI o DH-37-LI o DH-7-LIR o COMPUTER POINT X335 OPERATOR ACTION FOR A VALID ALARM:
;        o DH-37-LI o DH-7-LIR o COMPUTER POINT X335 OPERATOR ACTION FOR A VALID ALARM:
o INVESTIGATE CAUSE OF DECREASING LEVEL.
o INVESTIGATE CAUSE OF DECREASING LEVEL.
O ENSURE SWAP OVER TO RB SUMP IS COMPLETED AS S00N AS POSSIBLE DURING VALID ES ACTUATION S0 AS TO PRECLUDE DAMAGE TO ECCS EQUIPMENT.
O ENSURE SWAP OVER TO RB SUMP IS COMPLETED AS S00N AS POSSIBLE DURING VALID ES ACTUATION S0 AS TO PRECLUDE DAMAGE TO ECCS EQUIPMENT.
Line 782: Line 936:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-021 SHEET DH-24 SENSING ELEMENT:     DH-7-LS1 O
DRAWING 208-021 SHEET DH-24 SENSING ELEMENT:
AR-303                                 Rev. 24                         Page 37
DH-7-LS1 O
AR-303 Rev. 24 Page 37


ENCL 0SURE 1 (Page 36 of 87)
ENCL 0SURE 1 (Page 36 of 87)
ESAB-A ANNUNCIATOR RESPONSE         ESAB-A-02-09     C-02-09
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-09 C-02-09
(
(
'l BWST TEMP Z         Z                         HIGH/ LOW
'l BWST TEMP Z
Z HIGH/ LOW
: f. VENT POINT 0236 INDICATED CONDITION:
: f. VENT POINT 0236 INDICATED CONDITION:
l o BWST TEMPERATURE x110*F AS SENSED BY DH-9-TTS.
o BWST TEMPERATURE x110*F AS SENSED BY DH-9-TTS.
  'A
l
  '()     REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
'A'()
o DH-10-TI o DH-9-TI o COMPUTER POINT X336 OPERATOR ACTION FOR A VALID ALARM:                                         ,
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o DH-10-TI o DH-9-TI o COMPUTER POINT X336 OPERATOR ACTION FOR A VALID ALARM:
o INVESTIGATE CAUSE OF INCREASING TEMPERATURE.
o INVESTIGATE CAUSE OF INCREASING TEMPERATURE.
O ENSURE BWST HEATER (S) NOT IN OPERATION.
O ENSURE BWST HEATER (S) NOT IN OPERATION.
Line 799: Line 956:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-02I SHEET DH-22 SENSING ELEMENT: DH-9-TTS AR-303                                 Rev. 24                           Page 38
DRAWING 208-02I SHEET DH-22 SENSING ELEMENT: DH-9-TTS AR-303 Rev. 24 Page 38


  .    .                                                                            l ENCLOSURE 1   l (Page 37 of 87) l ESAB-A ANNUNCIATOR RESPONSE         ESAB-A-02-09   C-02-09 l
ENCLOSURE 1 (Page 37 of 87) l ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-09 C-02-09 l
BWST TEMP HIGH/ LOW EVENT POINT 0237           l I!
BWST TEMP HIGH/ LOW EVENT POINT 0237 I!
INDICATED CONDITION:
INDICATED CONDITION:
I o BWST TEMPERATURE < 60*F AS SENSED BY DH-10-TTS.
o BWST TEMPERATURE < 60*F AS SENSED BY DH-10-TTS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o DH-10-TI o DH-9-TI o COMPUTER POINT X336 OPERATOR ACTION FOR A VALID ALARM:
o DH-10-TI o DH-9-TI o COMPUTER POINT X336 OPERATOR ACTION FOR A VALID ALARM:
o INVESTIGATE CAUSE OF DECREASING TEMPERATURE.                               1 o ENSURE BWST HEATER (S) IN OPERATION.
o INVESTIGATE CAUSE OF DECREASING TEMPERATURE.
o ENSURE BWST HEATER (S) IN OPERATION.
l DISCUSSION:
l DISCUSSION:
REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS.                               ,
REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-021 SHEET DH-22 SENSING ELEMENT: DH-10-TTS AR-303                               Rev. 24                         Page 39 i
DRAWING 208-021 SHEET DH-22 SENSING ELEMENT: DH-10-TTS AR-303 Rev. 24 Page 39 i


l ENCLOSURE 1 (Page 38 of 87)
l ENCLOSURE 1 (Page 38 of 87)
O v
O ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-11 C-02-11 v
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-11   C-02-11 I   I                                               -
I I
1   I l
1 I
I   I l   l                         REACTOR BLDG I     I                         FLOOD LEVEL I     I HIGH I     I I     I l
I I
EVENT POINT 1510             l l    I                                                 l I     l l
l l
INDICATED CONDITION:
REACTOR BLDG I
I FLOOD LEVEL I
I HIGH I
I I
I EVENT POINT 1510 l
I I
l INDICATED CONDITION:
o REACTOR BUILDING WATER LEVEL >3'6" ABOVE RB FLOOR (>98'6" elevation)
o REACTOR BUILDING WATER LEVEL >3'6" ABOVE RB FLOOR (>98'6" elevation)
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
Line 826: Line 990:
o HIGH SUMP WATER LEVEL ON WD-222-LI.
o HIGH SUMP WATER LEVEL ON WD-222-LI.
o HIGH SUMP WATER LEVEL ON BS-93-PIR.
o HIGH SUMP WATER LEVEL ON BS-93-PIR.
OPERATOR ACTION FOR A VALID ALARM:                                               I o REFER TO E0P-07 OR E0P-08 TO SWAP DHP/BSP SUCTION TO RB SUMP DURING A         l L.0.C.A.
OPERATOR ACTION FOR A VALID ALARM:
o REFER TO E0P-07 OR E0P-08 TO SWAP DHP/BSP SUCTION TO RB SUMP DURING A L.0.C.A.
DISCUSSION:
DISCUSSION:
ALARM SETPOINT IS BASED ON WATER LEVEL IN REACTOR BUILDING FOR DHP AND BSP NPSH TO PERMIT SWAP OVER TO SUMP DURING A L.0.C.A. PER E.0.P.S.
ALARM SETPOINT IS BASED ON WATER LEVEL IN REACTOR BUILDING FOR DHP AND BSP NPSH TO PERMIT SWAP OVER TO SUMP DURING A L.0.C.A. PER E.0.P.S.
Line 833: Line 998:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-060 SHEET WD-137 SENSING ELEMENT: WD-303-LY,WD-304-LY LEVEL TRANSMITTERS O
DRAWING 208-060 SHEET WD-137 SENSING ELEMENT: WD-303-LY,WD-304-LY LEVEL TRANSMITTERS O
AR-303                                 Rev. 24                         Page 40
AR-303 Rev. 24 Page 40


              .                                                          ENCLOSURE 1 (Page 39 of 87)
ENCLOSURE 1 (Page 39 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-l2     C-02-12 l   l 1   I I   I I   I l   l                       REACTOR BLDG I   I                         SUMP LEVEL HIGH l   l I   I I   I EVENT POINT 1509 I   I INDICATED CONDITION:
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-l2 C-02-12 l
l 1
I I
I I
I l
l REACTOR BLDG I
I SUMP LEVEL l
l HIGH I
I I
I EVENT POINT 1509 I
I INDICATED CONDITION:
o REACTOR BUILDING SUMP LEVEL >4' AB0VE SUMP BOTTOM (>88'6" elevation).
o REACTOR BUILDING SUMP LEVEL >4' AB0VE SUMP BOTTOM (>88'6" elevation).
n        REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
\')         o HIGH SUMP WATER LEVEL ON WD-222-LI.
n
\\')
o HIGH SUMP WATER LEVEL ON WD-222-LI.
o HIGH SUMP WATER LEVEL ON BS-93-PIR.
o HIGH SUMP WATER LEVEL ON BS-93-PIR.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
Line 846: Line 1,023:
o REFER TO E0P.
o REFER TO E0P.
DISCUSSION:
DISCUSSION:
LEAKAGE INTO SUMP MAY BE FROM ONE OR MORE OF THE FOLLOWING: REACTOR COOLANT SYSTEM, SECONDARY SYSTEM, RC PUMP OIL, DEMIN WATER, SW LEAKS, COOLING WATER       -
LEAKAGE INTO SUMP MAY BE FROM ONE OR MORE OF THE FOLLOWING: REACTOR COOLANT SYSTEM, SECONDARY SYSTEM, RC PUMP OIL, DEMIN WATER, SW LEAKS, COOLING WATER LINES CONDENSING HUMID AIR, REFUELING CANAL DRAINS.
LINES CONDENSING HUMID AIR, REFUELING CANAL DRAINS.
REFER TO SP-317 AND OP-301 TO DETERMINE IF RCS WATER IS BEING LOST TO THE RB SUMP.
I REFER TO SP-317 AND OP-301 TO DETERMINE IF RCS WATER IS BEING LOST TO THE RB SUMP.
ENSURE ANY RECENT CHANGES TO SYSTEM LINEUPS THAT MAY HAVE CAUSED THIS HIGH LEVEL CONDITION ARE INVESTIGATED.
ENSURE ANY RECENT CHANGES TO SYSTEM LINEUPS THAT MAY HAVE CAUSED THIS HIGH LEVEL CONDITION ARE INVESTIGATED.                                                   ;
1


==REFERENCES:==
==REFERENCES:==
DRAWING 208-060 SHEET WD-137                                         l SENSING ELEMENT: WD-301-LY,WD-302-LY LEVEL TRANSMITTERS AR-303                               Rev. 24                           Page 41 l
DRAWING 208-060 SHEET WD-137 SENSING ELEMENT: WD-301-LY,WD-302-LY LEVEL TRANSMITTERS AR-303 Rev. 24 Page 41


ENCLOSURE 1 (Page 40 of 87)
ENCLOSURE 1 (Page 40 of 87)
ESAB-A ANNUNCIATOR RESPONSE               ESAB-A-02-13     C-02-13
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-13 C-02-13 l
                      .          l   l l   l l   l l    I I   I                           REACTOR BLDG I   I                             SUMP PUMP TROUBLE l   l I   I l   l l   l EVENT POINT 1585 INDICATED CONDITION:
l l
o RB SUMP PUMP A OR B AUTO START AT 12".     (IF SELECTED TO ' LEAD')
l l
l l
I I
I REACTOR BLDG I
I SUMP PUMP l
l TROUBLE I
I l
l l
l EVENT POINT 1585 INDICATED CONDITION:
o RB SUMP PUMP A OR B AUTO START AT 12".
(IF SELECTED TO ' LEAD')
o RB SUMP PUMP A OR B TRIP.
o RB SUMP PUMP A OR B TRIP.
o RB SUMP LEVEL >18".
o RB SUMP LEVEL >18".
m      o WASTE DISPOSAL PANEL FAN FAILURE.
o WASTE DISPOSAL PANEL FAN FAILURE.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
m REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o RBS PUMP C/S GREEN LIGHT ON AND SWITCH IN NORM AFTER START.
o RBS PUMP C/S GREEN LIGHT ON AND SWITCH IN NORM AFTER START.
O HIGH SUMP LEVEL ON WD-222-LI.
O HIGH SUMP LEVEL ON WD-222-LI.
Line 876: Line 1,061:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-060 SHEET WD-07, WD-134, WD-148 SENSING ELEMENT: WD-222-LS O
DRAWING 208-060 SHEET WD-07, WD-134, WD-148 SENSING ELEMENT: WD-222-LS O
AR-303                               Rev. 24                             Page 42
AR-303 Rev. 24 Page 42


e         e ENCLOSURE 1 (Page 41 of 87) l ESAB-A ANNUNCIATOR RESPONSE           ESAB-A-02-14     C-02-14 J
e e
l   I I   I I   I l   l l   l                       SW ISO VALVE I   I                             AIR FAILURE l   l I   l l   l I   I
ENCLOSURE 1 l
,                                        l  l                   EVENT POINT 0530 INDICATED CONDITION:
(Page 41 of 87)
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 J
l I
I I
I I
l l
l l
SW ISO VALVE I
I AIR l
l FAILURE I
l l
l I
I l
l EVENT POINT 0530 INDICATED CONDITION:
O SUPPLY AIR PRESSURE TO CIV-34 <80 PSIG AS SENSED BY CI-411-PS.
O SUPPLY AIR PRESSURE TO CIV-34 <80 PSIG AS SENSED BY CI-411-PS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o INSTRUMENT AIR PRESSURE INDICATING LOW.                                     l 0 CIV-34 VALVE POSITION INDICATING MID POSITION.                             I OPERATOR ACTION FOR A VALID ALARM:
o INSTRUMENT AIR PRESSURE INDICATING LOW.
0 CIV-34 VALVE POSITION INDICATING MID POSITION.
OPERATOR ACTION FOR A VALID ALARM:
o REFER TO AP-470.
o REFER TO AP-470.
o INVESTIGATE CAUSE OF LOW PRESSURE TO CIV-34.
o INVESTIGATE CAUSE OF LOW PRESSURE TO CIV-34.
Line 890: Line 1,090:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-077 SHEET Cl-20 SENSING ELEMENT:   CI-411-PS AR-303                               Rev. 24                           Page 43
DRAWING 208-077 SHEET Cl-20 SENSING ELEMENT:
CI-411-PS AR-303 Rev. 24 Page 43


ENCLOSURE 1 (Page 42 of 87)
ENCLOSURE 1 (Page 42 of 87)
()                 ESAB-A ANNUNCIATOR RESPONSE           ESAB-A-02-14     C-02-14 i
()
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 i
SW ISO VALVE
SW ISO VALVE
                                                                      /UR             I FAILURE EVENT POINT 0531
/UR FAILURE EVENT POINT 0531
                                    !Z INDICATED CONDITION:
!Z INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO CIV-35 <80 PSIG AS SENSED BY CI-412-PS.
o SUPPLY AIR PRESSURE TO CIV-35 <80 PSIG AS SENSED BY CI-412-PS.
l
()
()     REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
0 INSTRUMENT AIR PRESSURE INDICATING LOW.
0 INSTRUMENT AIR PRESSURE INDICATING LOW.
o CIV-35 VALVE POSITION INDICATING MID POSITION.
o CIV-35 VALVE POSITION INDICATING MID POSITION.
Line 910: Line 1,112:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-077 SHEET CI-21
DRAWING 208-077 SHEET CI-21
()     SENSING ELEMENT:   CI-412-PS AR-303                               Rev. 24                           Page 44
()
SENSING ELEMENT:
CI-412-PS AR-303 Rev. 24 Page 44


                                                                                      . 1 ENCLOSURE 1 (Page 43 of 87)
1 ENCLOSURE 1 (Page 43 of 87)
ESAB-A ANNUNCIATOR RESPONSE           ESAB-A-02-14     C-02-14 1
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 SW ISO VALVE AIR FAILURE EVENT POINT 0532 EZ INDICATED CONDITION:
SW ISO VALVE             I I
AIR FAILURE 1
l EVENT POINT 0532 EZ INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO CIV-40 <80 PSIG AS SENSED BY CI-413-PS.
o SUPPLY AIR PRESSURE TO CIV-40 <80 PSIG AS SENSED BY CI-413-PS.
I REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o INSTRUMENT AIR PRESSURE INDICATING LOW.
o INSTRUMENT AIR PRESSURE INDICATING LOW.
O CIV-40 VALVE POSITION INDICATING MID POSITION.
O CIV-40 VALVE POSITION INDICATING MID POSITION.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
,          o REFER TO AP-470.
o REFER TO AP-470.
O INVESTIGATE CAUSE OF LOW PRESSURE TO CIV-40, i
O INVESTIGATE CAUSE OF LOW PRESSURE TO CIV-40, i
DISCUSSION:
DISCUSSION:
Line 928: Line 1,129:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-077 SHEET CI-22 m
DRAWING 208-077 SHEET CI-22 md SENSING ELEMENT:
d        SENSING ELEMENT:   CI-413-PS AR-303                               Rev. 24                           Page 45
CI-413-PS AR-303 Rev. 24 Page 45


4     #
4 ENCLOSURE 1 (Page 44 of 87)
ENCLOSURE 1 (Page 44 of 87)
('"N ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-14   C-02-14
('"N
(
(
SW ISO VALVE AIR FAILURE EVENT POINT 0533 Z       EZ INDICATED CONDITION:
SW ISO VALVE AIR FAILURE EVENT POINT 0533 Z
EZ INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO CIV-41 <80 PSIG AS SENSED BY Cl-414-PS.
o SUPPLY AIR PRESSURE TO CIV-41 <80 PSIG AS SENSED BY Cl-414-PS.
l l
l
[}
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
[}
o INSTRUMENT AIR PRESSURE INDICATING LOW.
o INSTRUMENT AIR PRESSURE INDICATING LOW.
o CIV-41 VALVE POSITION INDICATING MID POSITION.
o CIV-41 VALVE POSITION INDICATING MID POSITION.
Line 951: Line 1,151:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-077 SHEET CI-23
DRAWING 208-077 SHEET CI-23
()         SENSING ELEMENT:   CI-414-PS AR-303                               Rev. 24                           Page 46 i
()
SENSING ELEMENT:
CI-414-PS AR-303 Rev. 24 Page 46 i


ENCLOSURE 1 (Page 45 of 87) ,
ENCLOSURE 1 (Page 45 of 87)
i ESAB-A ANNUNCIATOR RESPONSE           ESAB-A-02-14     C-02-14   !
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 II.
II.                                                       i SW ISO VALVE AIR FAILURE l
SW ISO VALVE AIR l
FAILURE I
I I
I I
I I                        EVENT POINT 1855 Z                                               l INDICATED CONDITION:
I EVENT POINT 1855 Z
l INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO SWV-12 <80 PSIG AS SENSED BY SWV-12-PS.
o SUPPLY AIR PRESSURE TO SWV-12 <80 PSIG AS SENSED BY SWV-12-PS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
Line 965: Line 1,169:
o REFER TO AP-470.
o REFER TO AP-470.
o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-12.
o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-12.
l DISCUSSION:
DISCUSSION:
    -        ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.
ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-06 SENSING ELEMENT:     SWV-12-PS AR-303                               Rev. 24                   .      Page 47
DRAWING 208-056 SHEET SW-06 SENSING ELEMENT:
SWV-12-PS AR-303 Rev. 24 Page 47


ENCLOSURE I (Page 46 of 87)   l O                 ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-14   C-02-14 V
ENCLOSURE I (Page 46 of 87)
O ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 V
l I
l I
I I
I I
I                         SW ISO VALVE I                               AIR               i FAILURE l
I SW ISO VALVE I
I I                                               I I                                                ;
AIR i
l                  EVENT POINT 1856             l 1
l FAILURE I
,        INDICATED CONDITION:
I I
I l
EVENT POINT 1856 INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO SWV-35 <80 PSIG AS SENSED BY SWV-35-PS.
o SUPPLY AIR PRESSURE TO SWV-35 <80 PSIG AS SENSED BY SWV-35-PS.
I l
,9 REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
  ,9     REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
V o INSTRUMENT AIR PRESSURE INDICATING LOW.
V o INSTRUMENT AIR PRESSURE INDICATING LOW.
o SWV-35 VALVE POSITION INDICATING MID POSITION.
o SWV-35 VALVE POSITION INDICATING MID POSITION.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o REFER TO AP-470.
o REFER TO AP-470.
,          o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-35.                                 l DISCUSSION:
o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-35.
DISCUSSION:
ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.
ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-06 SWV-35-PS
DRAWING 208-056 SHEET SW-06
(     SENSING ELEMENT:
(
AR-303                               Rev. 24                           Page 48
SENSING ELEMENT:
SWV-35-PS AR-303 Rev. 24 Page 48


ENCLOSURE I (Page 47 of 87)
ENCLOSURE I (Page 47 of 87)
(                   ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-14   C-02-14 l
(
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 l
l l
l l
SW ISO VALVE I
AIR l
FAILURE I
l l
l l
l l                        SW ISO VALVE I                              AIR FAILURE l
l EVENT POINT 1857
I l
~
l l                  EVENT POINT 1857
                              ~
INDICATED CONDITION:
INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO SWV-37 <80 PSIG AS SENSED BY SWV-37-PS.
o SUPPLY AIR PRESSURE TO SWV-37 <80 PSIG AS SENSED BY SWV-37-PS.
t         REDUNDANT INDICATION f;!ICH WILL VERIFY ALARM:
t REDUNDANT INDICATION f;!ICH WILL VERIFY ALARM:
o INSTRUMENT AIR PRESSURE INDICATING LOW.
o INSTRUMENT AIR PRESSURE INDICATING LOW.
o SWV-37 VALVE POSITION INDICATING MID POSITION.
o SWV-37 VALVE POSITION INDICATING MID POSITION.
Line 1,012: Line 1,225:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-07 SENSING ELEMENT:   SWV-37-PS
DRAWING 208-056 SHEET SW-07 SENSING ELEMENT:
        . AR-303                               Rev. 24                           Page 49
SWV-37-PS
. AR-303 Rev. 24 Page 49


ENCLOSURE 1 (Page 48 of 87)
ENCLOSURE 1 (Page 48 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-14     C-02-14 I
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 I
I I
I I
I I
I I                              SW ISO VALVE I                                   AIR FAILURE l
SW ISO VALVE I
I l
AIR l
l l                        EVENT POINT 1858 2                                               l INDICATED CONDITION:
FAILURE I
l l
l EVENT POINT 1858 2
l INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO SWV-39 <80 PSIG AS SENSED BY SWV-39-PS.
o SUPPLY AIR PRESSURE TO SWV-39 <80 PSIG AS SENSED BY SWV-39-PS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o INSTRUMENT AIR PRESSURE INDICATING LOW.                                     ;
o INSTRUMENT AIR PRESSURE INDICATING LOW.
o SWV-39 VALVE POSITION INDICATING MID POSITION.                             l OPERATOR ACTION FOR A VALID ALARM:
o SWV-39 VALVE POSITION INDICATING MID POSITION.
OPERATOR ACTION FOR A VALID ALARM:
o REFER TO AP-470.
o REFER TO AP-470.
O INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-39.
O INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-39.
Line 1,032: Line 1,251:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET CW-07
DRAWING 208-056 SHEET CW-07
(       SENSING ELEMENT:     SWV-39-PS AR-303                               Rev. 24                           Page 50
(
SENSING ELEMENT:
SWV-39-PS AR-303 Rev. 24 Page 50


ENCLOSURE 1 (Page 49 of 87)
ENCLOSURE 1 (Page 49 of 87)
[                   ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-14   C-02-14 I
[
I
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 I
.                                  I I
I I
I                              SW ISO VALVE I                                     AIR FAILURE l
I I
I l
SW ISO VALVE I
l l                        EVENT POINT 1859 i
AIR l
FAILURE I
l l
l EVENT POINT 1859 i
INDICATED CONDITION:
INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO SWV-41 <80 PSIG AS SENSED BY SWV-41-PS.
o SUPPLY AIR PRESSURE TO SWV-41 <80 PSIG AS SENSED BY SWV-41-PS.
Line 1,049: Line 1,273:
o REFER TO AP-470.
o REFER TO AP-470.
O INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-41.
O INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-41.
!            DISCUSSION:
DISCUSSION:
ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.
ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-08 SENSING ELEMENT:   SWV-41-PS AR-303                               Rev. 24                           Page 51
DRAWING 208-056 SHEET SW-08 SENSING ELEMENT:
SWV-41-PS AR-303 Rev. 24 Page 51


ENCLOSURE 1 (Page 50 of 87)
ENCLOSURE 1 (Page 50 of 87)
ESAB-A ANNUNCIATOR RESPONt.            ESAB-A-02-14            C-02-14 4
(}
(}
SW ISO VALVE AIR FAILURE EVENT POINT 1860 EZ
ESAB-A ANNUNCIATOR RESPONt.
,            INDICATED CONDITION:
ESAB-A-02-14 C-02-14 4
o SUPPLY AIR PRESSURE TO SWV-43 <80 PSIG AS SENSED BY SWV-43-PS.                           ,
SW ISO VALVE AIR FAILURE EVENT POINT 1860 EZ INDICATED CONDITION:
()         REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o SUPPLY AIR PRESSURE TO SWV-43 <80 PSIG AS SENSED BY SWV-43-PS.
()
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o INSTRUMENT AIR PRESSURE INDICATING LOW.
o INSTRUMENT AIR PRESSURE INDICATING LOW.
O SWV-43 VALVE POSITION INDICATING MID POSITION.
O SWV-43 VALVE POSITION INDICATING MID POSITION.
Line 1,072: Line 1,298:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-08
DRAWING 208-056 SHEET SW-08
()         SENSING ELEMENT:   SWV-43-PS AR-303                               Rev. 24                                   Page 52
()
SENSING ELEMENT:
SWV-43-PS AR-303 Rev. 24 Page 52


ENCLOSURE 1 (Page 51 of 87)
ENCLOSURE 1 (Page 51 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-14   C-02-14
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14
(
(
l     l
l l
;                                  I     I I     I i                                 l     I I     I                         SW ISO VALVE I     I -                            AIR FAILURE l     l I     I I     I I     I I     I                   EVENT POINT 1861 4
I I
M INDICATED CONDITION:
I I
i l
I I
I SW ISO VALVE I
I AIR l
l FAILURE I
I I
I I
I I
I EVENT POINT 1861 M
4 INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO SWV-45 <80 PSIG AS SENSED BY SWV-45-PS.
o SUPPLY AIR PRESSURE TO SWV-45 <80 PSIG AS SENSED BY SWV-45-PS.
1 REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
1 REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
Line 1,093: Line 1,331:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-09
DRAWING 208-056 SHEET SW-09
(       SENSING ELEMENT:   SWV-45-PS AR-303                               Rev. 24                           Page 53
(
SENSING ELEMENT:
SWV-45-PS AR-303 Rev. 24 Page 53


ENCLOSURE 1 (Page 52 of 87)
ENCLOSURE 1 (Page 52 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-14   C-02-14 I     I l     1 I     I I     I l     l                         SW ISO VALVE                           ,
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 I
I     I                              AIR                               I FAILURE l     l I     i l     l l     I l     l                   EVENT POINT 1862 l
I l
1 I
I I
I l
l SW ISO VALVE I
I AIR l
l FAILURE I
i l
l l
I l
l EVENT POINT 1862 l
INDICATED CONDITION:
INDICATED CONDITION:
o SUPPLY AIR PRESSURE,TO SWV-79 <80 PSIG AS SENSED BY SWV-79-PS.
o SUPPLY AIR PRESSURE,TO SWV-79 <80 PSIG AS SENSED BY SWV-79-PS.
Line 1,111: Line 1,361:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-14
DRAWING 208-056 SHEET SW-14
(       SENSING ELEMENT:   SWV-79-PS AR-303                               Rev. 24                           Page 54
(
SENSING ELEMENT:
SWV-79-PS AR-303 Rev. 24 Page 54


j ENCLOSURE 1 l
j ENCLOSURE 1 l
(Page 53 of 87)
(Page 53 of 87)
ESAB-A-02-14    C-02-14
(]
(]
kJ ESAB-A ANNUNCIATOR RESPONSE SW ISO VALVE AIR FAILURE
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 kJ SW ISO VALVE AIR FAILURE EVENT POINT 1863
      ~
~
EVENT POINT 1863 EZ INDICATED CONDITION:                                                           l 0 SUPPLY AIR PRESSURE TO SWV-80 <80 PSIG AS SENSED BY SWV-80-PS.
EZ INDICATED CONDITION:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:                                 i o INSTRUMENT AIR PRESSURE INDICATING LOW.
0 SUPPLY AIR PRESSURE TO SWV-80 <80 PSIG AS SENSED BY SWV-80-PS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o INSTRUMENT AIR PRESSURE INDICATING LOW.
o SWV-80 VALVE POSITION INDICATING MID POSITION.
o SWV-80 VALVE POSITION INDICATING MID POSITION.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
Line 1,130: Line 1,383:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-15
DRAWING 208-056 SHEET SW-15
(               SENSING ELEMENT:   SWV-80-PS AR-303                                     Rev. 24                           Page 55
(
SENSING ELEMENT:
SWV-80-PS AR-303 Rev. 24 Page 55


ENCLOSURE I (Page 54 of 87)
ENCLOSURE I (Page 54 of 87)
O                   ESAB-A ANNUNCIAT00 RESPONSE             ESAB-A-02-14     C-02-14 V
O ESAB-A ANNUNCIAT00 RESPONSE ESAB-A-02-14 C-02-14 V
I I
I I
I l
l SW ISO VALVE l
l AIR I
I FAILURE I
I I
I I
                                  ;    I I    I l    l                          SW ISO VALVE l    l                                AIR I    I                            FAILURE I    I I    I
I
                                      -l                     . . .
-l l
l     l                    EVENT POINT 1864 INDICATED CONDITION:
l EVENT POINT 1864 INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO SWV-81 <80 PSIG AS SENSED BY SWV-81-PS.
o SUPPLY AIR PRESSURE TO SWV-81 <80 PSIG AS SENSED BY SWV-81-PS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o INSTRUMENT AIR PRESSURE INDICATING LOW.                                             I c SWV-81 VALVE POSITION INDICATING MID POSITION.
o INSTRUMENT AIR PRESSURE INDICATING LOW.
I c SWV-81 VALVE POSITION INDICATING MID POSITION.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o REFER TO AP-470.
o REFER TO AP-470.
Line 1,149: Line 1,411:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-16 SENSING ELEMENT: SWV-81-PS AR-303                               Rev. 24                             Page 56
DRAWING 208-056 SHEET SW-16 SENSING ELEMENT: SWV-81-PS AR-303 Rev. 24 Page 56


ENCLOSURE 1 (Page 55 of 87)
ENCLOSURE 1 (Page 55 of 87)
,                    ESA8-AANNUNCIATORSESPONSE               ESA8-A-02-14   C-02-14 l     l .
ESA8-AANNUNCIATORSESPONSE ESA8-A-02-14 C-02-14 l
I     I I     I I     I I     I                          SW ISO VALVE I     I                                 AIR FAILURE l     l I     l l     l l     l l     l                     EVENT POINT 1865 INDICATED CONDITION:
l I
I I
I I
I I
I SW ISO VALVE I
I AIR l
l FAILURE I
l l
l l
l l
l EVENT POINT 1865 INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO SWV-82 <80 PSIG AS SENSED BY SWV-82-PS.
o SUPPLY AIR PRESSURE TO SWV-82 <80 PSIG AS SENSED BY SWV-82-PS.
hl w
hl REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
w 0 INSTRUMENT AIR PRESSURE INDICATING LOW.
0 INSTRUMENT AIR PRESSURE INDICATING LOW.
o SWV-82 VALVE POSITION INDICATING MID POSITION.
o SWV-82 VALVE POSITION INDICATING MID POSITION.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o REFER TO AP-470.
o REFER TO AP-470.
;          o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-82.
o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-82.
DISCUSSION:
DISCUSSION:
ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.
ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-17 SENSING ELEMENT:   SWV-82-PS AR-303                               Rev. 24                           Page 57
DRAWING 208-056 SHEET SW-17 SENSING ELEMENT:
SWV-82-PS AR-303 Rev. 24 Page 57


ENCLOSURE _1 (Page 56 of 87)
ENCLOSURE _1 (Page 56 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-14     C-02-14
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14
      }
}
l SW ISO VALVE                 !
SW ISO VALVE JUR FAILURE EVENT POINT 1866 INDICATED CONDITION:
JUR FAILURE EVENT POINT 1866 INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO SWV-83 <80 PSIG AS SENSED BY SWV-83-PS.
o SUPPLY AIR PRESSURE TO SWV-83 <80 PSIG AS SENSED BY SWV-83-PS.
; (' )       REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
; (' )
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o INSTRUMENT AIR PRESSURE INDICATING LOW.
o INSTRUMENT AIR PRESSURE INDICATING LOW.
O SWV-83 VALVE POSITION INDICATING MID POSITION.
O SWV-83 VALVE POSITION INDICATING MID POSITION.
                                                                        /
/
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o REFER TO AP-470.
o REFER TO AP-470.
Line 1,186: Line 1,458:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-0S6 SHEET SW-18
DRAWING 208-0S6 SHEET SW-18
()       SENSING ELEMENT:   SWV-83-PS AR-303                               Rev. 24                           Page 58
()
SENSING ELEMENT:
SWV-83-PS AR-303 Rev. 24 Page 58


l
ENCLOSURE 1 (Page 57 of 87) j ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 l
.                                                                                      1 ENCLOSURE 1     i (Page 57 of 87)   j l
l I
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-14   C-02-14     l l     I I     I I     I I     I I     I                         SW ISO VALVE           !
I I
I     I                              AIR FAILURE l     l                                               '
I I
I    l l     l                                                 l l     l                                                l l     l                  EVENT POINT 1867 INDICATED CONDITION:
I I
o SUPPLY AIR PRESSURE TO SWV-84 <80 PSIG AS SENSED BY SWV-84-PS.               )
I I
SW ISO VALVE I
I AIR l
l FAILURE I
l l
l l
l l
l EVENT POINT 1867 INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO SWV-84 <80 PSIG AS SENSED BY SWV-84-PS.
)
l REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
l REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o INSTRUMENT AIR PRESSURE INDICATING LOW.
o INSTRUMENT AIR PRESSURE INDICATING LOW.
Line 1,204: Line 1,487:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-19 SENSING ELEMENT:   SWV-84-PS AR-303                               Rev. 24                           Page 59
DRAWING 208-056 SHEET SW-19 SENSING ELEMENT:
SWV-84-PS AR-303 Rev. 24 Page 59


ENCLOSURE 1 (Page 58 of 87)
ENCLOSURE 1 (Page 58 of 87)
Og                 ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-14     C-02-14 O
Og ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 O
l   l l   l l   l l   l 1   I                         $W ISO VALVE I   I                               AIR FAILURE l   l I   I I   I I   I l   l                     EVENT POINT 1868 INDICATED CONDITION:
l l
o SUPPLY AIR PRESSURE 10 SWV-85 <80 PSIG AS SENSED BY SWV-85-PS.              .
l l
l l
l l
1 I
$W ISO VALVE I
I AIR l
l FAILURE I
I I
I I
I l
l EVENT POINT 1868 INDICATED CONDITION:
o SUPPLY AIR PRESSURE 10 SWV-85 <80 PSIG AS SENSED BY SWV-85-PS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o INSTRUMENT AIR PRESSURE INDICATING LOW.
o INSTRUMENT AIR PRESSURE INDICATING LOW.
Line 1,220: Line 1,515:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-20 SENSING ELEMENT: SWV-85-PS AR-303                               Rev. 24                           Page 60
DRAWING 208-056 SHEET SW-20 SENSING ELEMENT: SWV-85-PS AR-303 Rev. 24 Page 60


ENCLOSURE I (Page 59 of 87)
ENCLOSURE I (Page 59 of 87)
O                                                           ESAB-A-02-14         C-02-14
O ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14
(>                   ESAB-A ANNUNCIATOR RESPONSE l     l l     l l     l l     l l     l                         SW ISO VALVE I     I                             AIR FAILURE
(>
                          ,        l    l I     l l     l l     l l     l                   EVENT POINT 1869 INDICATED CONDITION:
l l
o SUPPLY AIR PRESSURE TO SWV-86 <80 PSIG AS SENSED BY SWV-86-PS.         ,
l l
l l
l l
l l
SW ISO VALVE I
I AIR l
l FAILURE I
l l
l l
l l
l EVENT POINT 1869 INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO SWV-86 <80 PSIG AS SENSED BY SWV-86-PS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o INSTRUMENT AIR PRESSURE INDICATING LOW.
o INSTRUMENT AIR PRESSURE INDICATING LOW.
Line 1,237: Line 1,543:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-21 SENSING ELEMENT:     SWV-86-PS AR-303                               Rev. 24                               Page 61
DRAWING 208-056 SHEET SW-21 SENSING ELEMENT:
SWV-86-PS AR-303 Rev. 24 Page 61


                                                                            ^
^
I l     .      ,
I l
l ENCLOSURE 1 (Page 60 of 87)
l ENCLOSURE 1 (Page 60 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-14     C-02-14 (O) l     I I     I I     I I     I I     I                       SW ISO VALVE I     I                               AIR FAILURE l     l I     I l     l l     l   '
(O ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14
l     l                    EVENT POINT 1870 l
)
l I
I I
I I
I I
I I
SW ISO VALVE I
I AIR l
l FAILURE I
I l
l l
l l
l EVENT POINT 1870 l
INDICATED C0i3ITION:
INDICATED C0i3ITION:
o SUPPLY AIR PRESSURE TO SWV-109 <80 PSIG AS SENSED BY SWV-109-PS.
o SUPPLY AIR PRESSURE TO SWV-109 <80 PSIG AS SENSED BY SWV-109-PS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
I o INSTRUMENT AIR PRESSURE INDICATING LOW.
o INSTRUMENT AIR PRESSURE INDICATING LOW.
o SWV-109 VALVE POSITION INDICATING MID POSITION.
o SWV-109 VALVE POSITION INDICATING MID POSITION.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o REFER TO AP-470.
o REFER TO AP-470.
o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-109.
o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-109.
l l
l DISCUSSION:
DISCUSSION:
ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.
ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-22 SENSING ELEMENT:   SWV-109-PS AR-303                               Rev. 24                           Page 62
DRAWING 208-056 SHEET SW-22 SENSING ELEMENT:
SWV-109-PS AR-303 Rev. 24 Page 62


ENCLOSURE 1 (Page 61 of 87)
ENCLOSURE 1 (Page 61 of 87)
ESAB-A ANNUNCIATOR RESPONSE           ESAB-A-02-14     C-02-14 l   l l   l l   l l   l 1   i                       SW ISO VALVE I   I                               AIR FAILURE l   l I     I l     l l     l l -l                     EVENT POINT 1871 INDICATED CONDITION:
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 l
l l
l l
l l
l 1
i SW ISO VALVE I
I AIR l
l FAILURE I
I l
l l
l l
-l EVENT POINT 1871 INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO SWV-110 <80 PSIG AS SENSED BY SWV-110-PS.
o SUPPLY AIR PRESSURE TO SWV-110 <80 PSIG AS SENSED BY SWV-110-PS.
i REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o INSTRUMENT AIR PRESSURE INDICATING LOW.                                     i o SWV-110 VALVE POSITION INDICATING MID POSITION.                             l l
o INSTRUMENT AIR PRESSURE INDICATING LOW.
i o SWV-110 VALVE POSITION INDICATING MID POSITION.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o REFER TO AP-470.
o REFER TO AP-470.
Line 1,272: Line 1,603:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-23
DRAWING 208-056 SHEET SW-23
  )       SENSING ELEMENT:   SWV-110-PS AR-303                               Rev. 24                           Page 63
)
* s ENCLOSURE 1 (Page 62 of 87)
SENSING ELEMENT:
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-14     C-02-14 I                                           .
SWV-110-PS AR-303 Rev. 24 Page 63
 
s ENCLOSURE 1 (Page 62 of 87)
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 I
I I
I I
I l                        SW ISO VALVE I                              AIR FAILURE l
I l
I l
l l                   EVENT POINT 1872
SW ISO VALVE I
                              ~
AIR l
INDICATED CONDITION:                                                           1 l
FAILURE I
l l
l EVENT POINT 1872
~
INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO SWV-353 <80 PSIG AS SENSED BY SWV-353-PS.
o SUPPLY AIR PRESSURE TO SWV-353 <80 PSIG AS SENSED BY SWV-353-PS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
Line 1,288: Line 1,625:
o REFER TO AP-470.
o REFER TO AP-470.
o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-353.
o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-353.
l DISCUSSION:
DISCUSSION:
ENCLOSURE I 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.
ENCLOSURE I 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-24
DRAWING 208-056 SHEET SW-24
(       SENSING ELEMENT:   SWV-353-PS AR-303                               Rev. 24                           Page 64
(
SENSING ELEMENT:
SWV-353-PS AR-303 Rev. 24 Page 64


              -                                                                ENCLOSURE 1 (Page 63 of 91)     l 1
ENCLOSURE 1 (Page 63 of 91) 1 ESAB-A ANNUNCIATOR RESPONSE ESAB-A'02-14 C-02-14 l
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A'02-14     C-02-14 l                                                   l l                                                   l l    I                                                   l t
l l
i    I l     I                       SW ISO VALVE I     I                               AIR                 i FAILURE l     l i
I l
I    I l     l
t i
                                                                -                                \
I l
l     I l     l                   EVENT POINT 1873 1
I SW ISO VALVE I
INDICATED CONDITION:
I AIR l
l FAILURE I
I i
\\
l l
l I
l l
EVENT POINT 1873 INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO SWV-354 <80 PSIG AS SENSED BY SWV-354-PS.
o SUPPLY AIR PRESSURE TO SWV-354 <80 PSIG AS SENSED BY SWV-354-PS.
I           REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
I REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o INSTRUMENT AIR PRESSURE INDICATING LOW.                                       i o SWV-354 VALVE POSITION INDICATING MID POSITION.                               !
o INSTRUMENT AIR PRESSURE INDICATING LOW.
l OPERATOR ACTION FOR A VALID ALARM:
i o SWV-354 VALVE POSITION INDICATING MID POSITION.
OPERATOR ACTION FOR A VALID ALARM:
o REFER TO AP-470.
o REFER TO AP-470.
O INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-354.
O INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-354.
Line 1,312: Line 1,659:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-25 SENSING ELEMENT:     SWV-354-PS AR-303                               Rev. 24                           Page 65
DRAWING 208-056 SHEET SW-25 SENSING ELEMENT:
SWV-354-PS AR-303 Rev. 24 Page 65


ENCLOSURE 1 (Page 64 of 87)
ENCLOSURE 1 (Page 64 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-14     C-02-14
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 l
                .                    l l
l l
l l
l l
l                        SW ISO VALVE I                               AIR FAILURE l
SW ISO VALVE I
AIR l
FAILURE I
I I
I I
I                                                i l                   EVENT POINT 1874
i l
                            ~
EVENT POINT 1874
~
INDICATED CONDITION:
INDICATED CONDITION:
i o SUPPLY AIR PRESSURE TO SWV-355 <80 PSIG AS SENSED BY SWV-355-PS.             j O
i o SUPPLY AIR PRESSURE TO SWV-355 <80 PSIG AS SENSED BY SWV-355-PS.
d        REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
j O
o INSTRUMENT AIR PRESSURE INDICATING LOW.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
d o INSTRUMENT AIR PRESSURE INDICATING LOW.
O SWV-355 VALVE POSITION INDICATING MID POSITION.
O SWV-355 VALVE POSITION INDICATING MID POSITION.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
Line 1,334: Line 1,686:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-26 I       SENSING ELEMENT:   SWV-355-PS AR-303                               Rev. 24                             Page 66
DRAWING 208-056 SHEET SW-26 I
SENSING ELEMENT:
SWV-355-PS AR-303 Rev. 24 Page 66


ENCLOSURE 1 (Page 65 of 87)
ENCLOSURE 1 (Page 65 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-14     C-02-14 SW ISO VALVE AIR FAILURE EVENT POINT 1875 INDICATED CONDITION:
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 SW ISO VALVE AIR FAILURE EVENT POINT 1875 INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO SWV-151 <80 PSIG AS SENSED BY SWV-151-PS.
o SUPPLY AIR PRESSURE TO SWV-151 <80 PSIG AS SENSED BY SWV-151-PS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
Line 1,343: Line 1,697:
o SWV-151 VALVE POSITION INDICATING MID POSITION.
o SWV-151 VALVE POSITION INDICATING MID POSITION.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o REFER TO AP-470.                                                                                     ;
o REFER TO AP-470.
i o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-151.
i o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-151.
4 l
4 DISCUSSION:
DISCUSSION:
ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.
ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-29 SENSING ELEMENT:   SWV-151-PS AR-303                               Rev. 24                                             Page 67
DRAWING 208-056 SHEET SW-29 SENSING ELEMENT:
SWV-151-PS AR-303 Rev. 24 Page 67


ENCLOSURE 1 (Page 66 of 87)
ENCLOSURE 1 (Page 66 of 87)
ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-02-14     C-02-14
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14
(
(
l fl     l
l fl l
.                                      l ,,
l SW ISO VALVE I
SW ISO VALVE I   '                            AIR FAILURE l   l I   I I   I I   I l   l                 EVENT POINT 1876 INDICATED CONDITION:
AIR l
,            o SUPPLY AIR PRESSURE TO SWV-152 <80 PSIG AS SENSED BY SWV-152-PS.
l FAILURE I
(       REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
I I
I I
I l
l EVENT POINT 1876 INDICATED CONDITION:
o SUPPLY AIR PRESSURE TO SWV-152 <80 PSIG AS SENSED BY SWV-152-PS.
(
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o INSTRUMENT AIR PRESSURE INDICATING LOW.
o INSTRUMENT AIR PRESSURE INDICATING LOW.
.            o SWV-152 VALVE POSITION INDICATING MID POSITION.
o SWV-152 VALVE POSITION INDICATING MID POSITION.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o REFER TO AP-470.
o REFER TO AP-470.
Line 1,369: Line 1,729:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-056 SHEET SW-30 SENSING ELEMENT:   SWV-152-PS AR-303                               Rev. 24                           Page 68
DRAWING 208-056 SHEET SW-30 SENSING ELEMENT:
SWV-152-PS AR-303 Rev. 24 Page 68


ENCLOSURE 1 (Page 67 of 87) l                 ESAB-A ANNUNCIATOR RESPONSE               ESAB-A-03-01   C-03-01 RC-3 HIGH PRESS BISTABLE TRIP EVENT POINT 0939 INDICATED CONDITION:
ENCLOSURE 1 (Page 67 of 87) l ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-01 C-03-01 RC-3 HIGH PRESS BISTABLE TRIP EVENT POINT 0939 INDICATED CONDITION:
o RCS PRESSURE <1500 PSIG               ,
o RCS PRESSURE <1500 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o ES STATUS LIGHT RC-3 ' BISTABLE TRIPPED' IS LIT.
o ES STATUS LIGHT RC-3 ' BISTABLE TRIPPED' IS LIT.
O ACTUATION CHANNEL CABINET #3 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.
O ACTUATION CHANNEL CABINET #3 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
c REFER TO E0P                                                                               .
c REFER TO E0P J
1 J
DISCUSSION:
DISCUSSION:
THIS ALARM INDICATES ONE CHANNEL TRIPPED IN A 2 OUT OF 3 HPI LOGIC.
THIS ALARM INDICATES ONE CHANNEL TRIPPED IN A 2 OUT OF 3 HPI LOGIC.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-028 SHEET ESA-24 SENSING ELEMENT:   BT-3 ES ACTUATION RELAY l
DRAWING 208-028 SHEET ESA-24 SENSING ELEMENT:
AR-303                               Rev. 24                             Page 69
BT-3 ES ACTUATION RELAY AR-303 Rev. 24 Page 69 a
                                                                                            . _ - __ _ a
 
* s ENCLOSURE 1 (Page 68 of 87)
s ENCLOSURE 1 (Page 68 of 87)
ESAB-A ANNUNCIATOR RESPONSE           ESAB-A-03-02   C-03-02 r( ';
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-02 C-03-02 r( ';
RC-6 LOW PRESS BISTABLE TRIP EVENT POINT 0926 INDICATED CONDITION:
RC-6 LOW PRESS BISTABLE TRIP EVENT POINT 0926 INDICATED CONDITION:
o RCS PRESSURE <500 PSIG                     ,
o RCS PRESSURE <500 PSIG
([ )
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
([ )
o ES STATUS LIGHT RC-6 ' BISTABLE TRIPPED' IS LIT.
o ES STATUS LIGHT RC-6 ' BISTABLE TRIPPED' IS LIT.
O ACTUATION CHANNEL CABINET #3 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.
O ACTUATION CHANNEL CABINET #3 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.
1 OPERATOR ACTION FOR A VALID ALARM:                                             l o REFER TO E0P                                                               l l
OPERATOR ACTION FOR A VALID ALARM:
l DISCUSSION:
o REFER TO E0P DISCUSSION:
THIS ALARM INDICATES ONE CHANNEL TRIPPED IN A 2 OUT OF 3 LPI LOGIC.
THIS ALARM INDICATES ONE CHANNEL TRIPPED IN A 2 OUT OF 3 LPI LOGIC.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-028 SHEET ESB-39
DRAWING 208-028 SHEET ESB-39
()           SENSING ELEMENT:   BT-9 ES ACTUATION RELAY AR-303                               Rev. 24                           Page 70
()
SENSING ELEMENT:
BT-9 ES ACTUATION RELAY AR-303 Rev. 24 Page 70


                  ~
~
ENCLOSURE 1 (Page 69 of 87)
ENCLOSURE 1 (Page 69 of 87)
ESAB-A ANNUNCIATOR RESPONSE         ESAB-A-03-03                                         C-03-03 RWP-1
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-03 C-03-03 RWP-1 TRIP EVENT POINT 0001 INDICATED CONDITION:
  .                                                                      TRIP EVENT POINT 0001 INDICATED CONDITION:
1 o RWP-1 BREAKER IS OPEN WITH CONTROL HANDLE IN NORMAL AFTER START POSITION.
1 o RWP-1 BREAKER IS OPEN WITH CONTROL HANDLE IN NORMAL AFTER START POSITION.
;          REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
;          o Gr.EEN LIGHT ON WITH A RED FLAG ON CONTROL STATION.
o Gr.EEN LIGHT ON WITH A RED FLAG ON CONTROL STATION.
O RWP-28 AUTO START.
O RWP-28 AUTO START.
O RW-23-PI SW RW SUPPLY PRESSURE LOW.
O RW-23-PI SW RW SUPPLY PRESSURE LOW.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
,          o ENSURE RWP-2B START.
o ENSURE RWP-2B START.
o INVESTIGATE CAUSE OF PUMP TRIP.
o INVESTIGATE CAUSE OF PUMP TRIP.
O CHECK BREAKER FOR DROPPED RELAY TARGETS.
O CHECK BREAKER FOR DROPPED RELAY TARGETS.
Line 1,419: Line 1,779:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-050 SHEET RW-01 SENSING ELEMENT:   RWP-1 CONTROL SWITCH CONTACTS CS/SC, CS/0, RW-63-PS1 I
DRAWING 208-050 SHEET RW-01 SENSING ELEMENT:
AR-303                               Rev. 24               .                                                Page 71
RWP-1 CONTROL SWITCH CONTACTS CS/SC, CS/0, RW-63-PS1 Page 71 AR-303 Rev. 24


                                                        .                    ENCLOSURE 1 (Page 70 of 87)
ENCLOSURE 1 (Page 70 of 87)
ESAB-A ANNUNCIATOR RESPONSE           ESAB-A-03-04   C-03-04 SW RW PUMP MOTOR OVERLOAD EVENT POINT 0002 INDICATED CONDITION:
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-04 C-03-04 SW RW PUMP MOTOR OVERLOAD EVENT POINT 0002 INDICATED CONDITION:
o RWP-1 MOTOR AMPS >115% RATED LOAD
o RWP-1 MOTOR AMPS >115% RATED LOAD
(       REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
(
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o HIGH MOTOR AMPS.
o HIGH MOTOR AMPS.
O RW-23-PI SW RW SUPPLY PRESSURE LOW.
O RW-23-PI SW RW SUPPLY PRESSURE LOW.
Line 1,431: Line 1,792:
o START RWP-2A OR RWP-2B, SECURE RWP-I.
o START RWP-2A OR RWP-2B, SECURE RWP-I.
o INVESTIGATE CAUSE OF OVERLOAD.
o INVESTIGATE CAUSE OF OVERLOAD.
4 DISCUSSION:
DISCUSSION:
THIS ALARM INDICATES EITHER THE TIMED OVERCURRENT OR INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANEOUS OVERCURRENT RELAY ACTUATION WILL TRIP THE BREAKER.
4 THIS ALARM INDICATES EITHER THE TIMED OVERCURRENT OR INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANEOUS OVERCURRENT RELAY ACTUATION WILL TRIP THE BREAKER.
IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.                   j
IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.
j


==REFERENCES:==
==REFERENCES:==
ORAWING 208-050 SHEET RW-01                                       I
ORAWING 208-050 SHEET RW-01 SENSING ELEMENT:
  ,        SENSING ELEMENT:     51 RELAY (INSIDE 4160V BREAKER CUBICLE)
51 RELAY (INSIDE 4160V BREAKER CUBICLE)
AR-303                                 Rev. 24                           Page 72
AR-303 Rev. 24 Page 72


ENCLOSURE 1 (Page 71 of 87)
ENCLOSURE 1 (Page 71 of 87)
ESAB-A-03-05   C-03-05
.Cy ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-05 C-03-05
  .Cy                      ESAB-A ANNUNCIATOR RESPONSE
%J SW RW SYSTEM PRESS LOW EVENT POINT 0007 INDICATED CONDITION:
    %J SW RW SYSTEM PRESS LOW EVENT POINT 0007 INDICATED CONDITION:
o NUCLEAR SERVICES RAW WATER HEADER PRESS <7 PSIG AS SENSED BY RW-63-PSI.
o NUCLEAR SERVICES RAW WATER HEADER PRESS <7 PSIG AS SENSED BY RW-63-PSI.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o RWP-28 AUTO START.                                                           ,
o RWP-28 AUTO START.
o POSSIBLE RW PUMP TRIP.                                                       l OPERATOR ACTION FOR A VALID ALARM:
o POSSIBLE RW PUMP TRIP.
OPERATOR ACTION FOR A VALID ALARM:
o ENSURE RWP-2B AUTO START.
o ENSURE RWP-2B AUTO START.
o INVESTIGATE CAUSE OF LOW PRESSURE.
o INVESTIGATE CAUSE OF LOW PRESSURE.
O CHECK INTAKE AREA AND INTAKE SCREENS FOR OBSTRUCTIONS TO FLOW.               1 0 CHECK FOR PROPER VALVE ALIGNMENT FOR RUNNING RW PUMP.                         l l
O CHECK INTAKE AREA AND INTAKE SCREENS FOR OBSTRUCTIONS TO FLOW.
l i
0 CHECK FOR PROPER VALVE ALIGNMENT FOR RUNNING RW PUMP.
DISCUSSION:                                                                     ;
i DISCUSSION:
I l
l
l


==REFERENCES:==
==REFERENCES:==
DRAWING 208-050 SHEET RW-03                                       l SENSING ELEMENT:   RW-63-PS1 1
DRAWING 208-050 SHEET RW-03 SENSING ELEMENT:
      . AR-303                               Rev. 24                           Page 73
RW-63-PS1 AR-303 Rev. 24 Page 73
_j
_j
* a ENCLOSURE._1 (Page 72 of 87)
 
;                      ESAB-A ANNUNCIATOR RESPONSE           ESAB-A-03-06   C-03-06
a ENCLOSURE._1 (Page 72 of 87)
                              --                                      RWP AND           ;
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-06 C-03-06 RWP AND SW RW PP RUNNING EVENT POINT 0024 INDICATED CONDITION:
SW RW PP RUNNING EVENT POINT 0024 INDICATED CONDITION:
o RWP-1 AND RWP-2A AND/0R RWP-2B RUNNING AT THE SAME TIME.
o RWP-1 AND RWP-2A AND/0R RWP-2B RUNNING AT THE SAME TIME.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
Line 1,475: Line 1,835:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-050 SHEET RW-01 SENSING ELEMENT:     52S/A RELAY (RWP-1 RWP-2A,RWP-2B 4160V BREAKER CUBICLES) l l
DRAWING 208-050 SHEET RW-01 SENSING ELEMENT:
AR-303                                 Rev. 24                           Page 74
52S/A RELAY (RWP-1 RWP-2A,RWP-2B 4160V BREAKER CUBICLES) l AR-303 Rev. 24 Page 74


          .                                                                                  I ENCLOSURF__1 (Page 73 of 87) l
I ENCLOSURF__1 (Page 73 of 87)
)
)
ESAB-A-03-07     C-03-07
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-07 C-03-07
    ,q                   ESAB-A ANNUNCIATOR RESPONSE O                                                                                       ,
,q O
1 l
SW RW 1
1 SW RW               ;
TEMP HIGH EVENT POINT 0054 i
1                              __                                        TEMP             ,
INDICATED CONDITION:
__                                        HIGH             l EVENT POINT 0054 i
o RAW WATER SUPPLY TO SW HEAT EXCHANGERS TEMPERATURE IS >91.5* F AS SENSED BY RW-19-TS.
!          INDICATED CONDITION:
1 REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o RAW WATER SUPPLY TO SW HEAT EXCHANGERS TEMPERATURE IS >91.5* F AS SENSED     i BY RW-19-TS.                                                                 l 1
o RW TEMPERATURE INDICATION RW-19-TI OPERATOR ACTION FOR A VALID ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o NOTIFY AUXILIARY BUILDING OPERATOR TO SHUTDOWN RW PIT RECIRC BY FAILING CLOSED RWV-150 OR CLOSING RWV-149, o ENSURE SW RW TEMPERATURE CONTROL SURVEILLANCE KEY SWITCH IS IN THE NORMAL POSITION.
    ,        o RW TEMPERATURE INDICATION RW-19-TI OPERATOR ACTION FOR A VALID ALARM:
o NOTIFY AUXILIARY BUILDING OPERATOR TO SHUTDOWN RW PIT RECIRC BY FAILING
-                CLOSED RWV-150 OR CLOSING RWV-149, o ENSURE SW RW TEMPERATURE CONTROL SURVEILLANCE KEY SWITCH IS IN THE           l NORMAL POSITION.
DISCUSSION:
DISCUSSION:
RWV-150 IS THE SW TEMPERATURE CONTROL VALVE AND RECIRCULATES "B" SIDE SW       l RW BACK TO THE "B" SIDE RW PIT AS NECESSARY TO MAINTAIN SW SYSTEM TEMPERATURE AT 82* F (WHEN GULF 0F MEXIC0/ RAW WATER TEMPERATURE IS BELOW 80* F).
RWV-150 IS THE SW TEMPERATURE CONTROL VALVE AND RECIRCULATES "B" SIDE SW RW BACK TO THE "B" SIDE RW PIT AS NECESSARY TO MAINTAIN SW SYSTEM TEMPERATURE AT 82* F (WHEN GULF 0F MEXIC0/ RAW WATER TEMPERATURE IS BELOW 80* F).
RWV-150 IS A SPRING CLOSE/ AIR TO OPEN CONTR01: VALVE AND FAILS CLOSED ON:
RWV-150 IS A SPRING CLOSE/ AIR TO OPEN CONTR01: VALVE AND FAILS CLOSED ON:
LOSS OF DC POWER TO CONTROL VALVE SOLEN 0ID, LOSS OF AIR SUPPLY PRESSURE,       l AND RWP-2B AUTO START, RWP-3B AUTO START.                                       j REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.                                   I
LOSS OF DC POWER TO CONTROL VALVE SOLEN 0ID, LOSS OF AIR SUPPLY PRESSURE, AND RWP-2B AUTO START, RWP-3B AUTO START.
j REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.


==REFERENCES:==
==REFERENCES:==
DRAWING 210-583, MAR 86-12-02-04 4
DRAWING 210-583, MAR 86-12-02-04
(       SENSING ELEMENT:   RW-19-TS AR-303                               Rev. 24                             Page 75
(
SENSING ELEMENT:
RW-19-TS 4
AR-303 Rev. 24 Page 75


I ENCLOSURE 1 (Page 74 of 87)
I ENCLOSURE 1 (Page 74 of 87)
ESAB-A-03-08     C-03-08 (x  g ESAB-A ANNUNCIATOR RESPONSE
(x ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-08 C-03-08 g
  'w/
'w/
I   l                                                   ,
I l
i I   I i   l i   I                         FLUSH WATER I   I                           SYSTEM PRESS I   I LOW l   l l   l EVENT POINT 1517 I   I I   I I   li INDICATED CONDITION:                                                             )
I I
i i
l i
I FLUSH WATER I
I SYSTEM PRESS I
I LOW l
l l
l EVENT POINT 1517 I
I I
I I
li INDICATED CONDITION:
)
o FLUSH WATER SYSTEM PRESSURE <75 PSIG AS SENSED BY D0-2-PS.
o FLUSH WATER SYSTEM PRESSURE <75 PSIG AS SENSED BY D0-2-PS.
I (O,)     REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
(O,)
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
OPERATOR ACTIONS FOR A VALID ALARM:
OPERATOR ACTIONS FOR A VALID ALARM:
o REFER TO OP-416 FOR ALTERNATE RWP FLUSH WATER SUPPLIES DISCUSSION:
o REFER TO OP-416 FOR ALTERNATE RWP FLUSH WATER SUPPLIES DISCUSSION:
~
~
THE RWP'S ARE CURRENTLY SUPPLIED WITH DEMIN WATER VIA D0V-128.
THE RWP'S ARE CURRENTLY SUPPLIED WITH DEMIN WATER VIA D0V-128.
OP-416 LISTS TWO ALTERNATIVE SUPPLIES, DOMESTIC WATER VIA 1 0F 2 FILTERS AND PUMPS OR NUCLEAR SERVICES WATER VIA D0V-210 OR D0V-238. IF THE             l FLUSH WATER PRESSURE DROPS BELOW RWP DISCHARGE PRESSURE, THEN THE RUNNING RWP'S WILL SUPPLY THEIR OWN FLUSH WATER FOR THE RUNNING RWP'S.
OP-416 LISTS TWO ALTERNATIVE SUPPLIES, DOMESTIC WATER VIA 1 0F 2 FILTERS AND PUMPS OR NUCLEAR SERVICES WATER VIA D0V-210 OR D0V-238.
IF THE FLUSH WATER PRESSURE DROPS BELOW RWP DISCHARGE PRESSURE, THEN THE RUNNING RWP'S WILL SUPPLY THEIR OWN FLUSH WATER FOR THE RUNNING RWP'S.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-022-D0-13 k.J       SENSING ELEMENT:   D0-2-PS AR-303                               Rev. 24                           Page 76   I l
DRAWING 208-022-D0-13 k.J SENSING ELEMENT:
D0-2-PS AR-303 Rev. 24 Page 76


      '      ~
~
ENCLOSURE 1 (Page 75 of 87)
ENCLOSURE 1 (Page 75 of 87)
    -g                     ESAB-A ANNUNCIATOR RESPONSE       ESAB-A-03-09     C-03-09 I   I I   I I   I I   I                         FLUSH WATER I   I                               PUMP I   I                               TRIP I   I EVENT POINT 1513 I   I                     -
-g ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-09 C-03-09 I
i j
I I
1 I
I I
INDICATED CONDITION:
I I
I FLUSH WATER I
I PUMP I
I TRIP I
I EVENT POINT 1513 I
I i
j 1
I INDICATED CONDITION:
o DOP-2A MOTOR NOT ENERGIZED WITH CONTROL SWITCH IN NORt:AL AFTER START POSITION.
o DOP-2A MOTOR NOT ENERGIZED WITH CONTROL SWITCH IN NORt:AL AFTER START POSITION.
()       REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
()
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
O GREEN LIGHT ON WITH A RED FLAG ON D0P-2A CONTROL STATION.
O GREEN LIGHT ON WITH A RED FLAG ON D0P-2A CONTROL STATION.
OPERATOR ACTIONS FOR A VALID ALARM:
OPERATOR ACTIONS FOR A VALID ALARM:
Line 1,532: Line 1,915:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-022-00-02 SENSING ELEMENT: DOP-2A CONTROL SWITCH CONTACTS CS/SC, CS/0 AR-303                                 Rev. 24                           Page 77
DRAWING 208-022-00-02 SENSING ELEMENT: DOP-2A CONTROL SWITCH CONTACTS CS/SC, CS/0 AR-303 Rev. 24 Page 77


ENCLOSURE 1 (Page 76 of 87)
ENCLOSURE 1 (Page 76 of 87)
ESAB-A ANNUNCIATOR RESPONSE           ESAB-Z-03-09     C-03-09 I   I
ESAB-A ANNUNCIATOR RESPONSE ESAB-Z-03-09 C-03-09 I
                .                      l   l l   l                            FLUSH WATER             I I   I                                  PUMP I   I                                 TRIP I   I I   I                                                     i EVENT POINT 1515               l l   l                                                    1 I   I                                                     :
I l
I   I I   I INDICATED CONDITION:
l l
l FLUSH WATER I
I PUMP I
I TRIP I
I I
I EVENT POINT 1515 l
l 1
I I
I I
I I
INDICATED CONDITION:
o DOP-2B HOTOR NOT ENERGIZED WITH CONTROL SWITCH IN NORMAL AFTER START POSITION.
o DOP-2B HOTOR NOT ENERGIZED WITH CONTROL SWITCH IN NORMAL AFTER START POSITION.
                                  .                                                              1
1
(       REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
(
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o GREEN LIGHT ON WITH A RED FLAG ON DOP-2B CONTROL STATION.
o GREEN LIGHT ON WITH A RED FLAG ON DOP-2B CONTROL STATION.
OPERATOR ACTIONS FOR A VALID ALARM:
OPERATOR ACTIONS FOR A VALID ALARM:
o REFER TO OP-416 ' DOMESTIC WATER SUPPLY SYSTEM' FOR ALTERNATE RWP FLUSH           '
o REFER TO OP-416 ' DOMESTIC WATER SUPPLY SYSTEM' FOR ALTERNATE RWP FLUSH WATER SUPPLIES.
WATER SUPPLIES.
o INVESTIGATE CAUSE OF PUMP TRIP.
o INVESTIGATE CAUSE OF PUMP TRIP.
DISCUSSION:
DISCUSSION:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-022-D0-03 SENSING ELEMENT:       DOP-2B CONTROL SWITCH CONTACTS CS/SC, CS/0 O
DRAWING 208-022-D0-03 SENSING ELEMENT:
AR-303                                   Rev. 24                             Page 78
DOP-2B CONTROL SWITCH CONTACTS CS/SC, CS/0 O
AR-303 Rev. 24 Page 78


  .  =
=
ENCLOSURE 1 (Page 77 of 87)
ENCLOSURE 1 (Page 77 of 87)
ESAB-A ANNUNCIATOR RESPONSE         ESAB-A-03-10               C-03-10 l   I I   I                                     FLUSH WATER I   I                                       PUMP I   I                                     AUTO START
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-10 C-03-10 l
* I   I I   I I l   l                     EVENT POINT 1514 l   l l   I I   I INDICATED CONDITION:
I I
I FLUSH WATER I
I PUMP I
I AUTO START I
I I
I I
I l
l EVENT POINT 1514 l
l l
I I
I INDICATED CONDITION:
o D0P-2A MOTOR ENERGIZED WITH CONTROL SWITCH IN NORMAL AFTER STOP POSITION.
o D0P-2A MOTOR ENERGIZED WITH CONTROL SWITCH IN NORMAL AFTER STOP POSITION.
iO U
iO U
Line 1,567: Line 1,971:
==REFERENCES:==
==REFERENCES:==
DRAWING 208-022-D0-02 3
DRAWING 208-022-D0-02 3
SENSING ELEMENT:     00P-2A CONTROL SWITCH CONTACTS CS/SC, CS/0 AR-303                                 Rev. 24                                       Page 79
SENSING ELEMENT:
00P-2A CONTROL SWITCH CONTACTS CS/SC, CS/0 AR-303 Rev. 24 Page 79


ENCLOSURE I (Page 78 of 87)
ENCLOSURE I (Page 78 of 87)
I g                        ESAB-A ANNUNCIATOR RESPONSE         ESAB-A-03-10     C-03-10 V                                                                                                 ;
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-10 C-03-10 g
l i    I I   I                           FLUSH WATER I   I                                 PUMP I   I                           AUTO START I   I I   I I   I                                                          I l   l                     EVENT POINT 1516                     l l    l I   I I   I                                                     .
V i
INDICATED CONDITION:
I I
I FLUSH WATER I
I PUMP I
I AUTO START I
I I
I I
I l
l EVENT POINT 1516 l
l I
I I
I INDICATED CONDITION:
o 00P-28 MOTOR ENERGIZED WITH CONTROL SWITCH IN NORMAL AFTER STOP POSITION.
o 00P-28 MOTOR ENERGIZED WITH CONTROL SWITCH IN NORMAL AFTER STOP POSITION.
v REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
v REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
Line 1,579: Line 1,994:
o INVESTIGATE CAUSE OF PUMP AUTO START.
o INVESTIGATE CAUSE OF PUMP AUTO START.
o REFER TO OP-416 ' DOMESTIC WATER SUPPLY SYSTEM' FOR ALTERNATE RWP FLUSH WATER SUPPLIES.
o REFER TO OP-416 ' DOMESTIC WATER SUPPLY SYSTEM' FOR ALTERNATE RWP FLUSH WATER SUPPLIES.
DISCUSSION:                                                             ,
DISCUSSION:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-022-00-03 I   SENSING ELEMENT:     D0P-2B CONTROL SWITCH CONTACTS CS/SC, CS/0 AR-303                                 fiev. 24                             Page 80
DRAWING 208-022-00-03 I
SENSING ELEMENT:
D0P-2B CONTROL SWITCH CONTACTS CS/SC, CS/0 AR-303 fiev. 24 Page 80


ENCLOSURE 1 (Page 79 of 87)
ENCLOSURE 1 (Page 79 of 87)
ESAB-A ANNUNCIATOR RESPONSE       ESAB-A-03-Il   C-03-ll
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-Il C-03-ll
(-].
(-].
LJ l   I
LJ l
                                      'l   l I   I I   I I   I I   I                     DH TO PZR l   l                   SPRAY VALVE I   l                       OPEN l   I             EVENT POINT 0240 l     I   I INDICATED CONDITION:                                                           ,
I
i o DHV-91 NOT FULL CLOSED AND RCS PRESSURE >284 PSIG AS SENSED BY               !
'l l
RC-3A-PS7.
I I
O       REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
I I
I I
I I
DH TO PZR l
l SPRAY VALVE I
l OPEN l
I EVENT POINT 0240 l
I I
INDICATED CONDITION:
i o DHV-91 NOT FULL CLOSED AND RCS PRESSURE >284 PSIG AS SENSED BY RC-3A-PS7.
O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o DHV-91 VALVE POSITION INDICATION.
o DHV-91 VALVE POSITION INDICATION.
o RCS PRESSURE INDICATION.
o RCS PRESSURE INDICATION.
Line 1,597: Line 2,024:
o INVESTIGATE CAUSE OF INCREASING PRESSURE.
o INVESTIGATE CAUSE OF INCREASING PRESSURE.
O CLOSE DHV-91 IF RCS PRESSURE >284 PSIG.
O CLOSE DHV-91 IF RCS PRESSURE >284 PSIG.
l DISCUSSION:
DISCUSSION:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-021 SHEET DH-16 SENSING ELEMENT:     RC-3A-PS7 AR-303                                 Rev. 24                         Page 81
DRAWING 208-021 SHEET DH-16 SENSING ELEMENT:
RC-3A-PS7 AR-303 Rev. 24 Page 81


                                                      ,w -- --                -~ . - - - -
,w
ENCLOSURE 1 (Page 80 of 87) p                      ESAB-A ANNUNCIATOR RESPONSE             ESAB-A-03-ll         C-03-11 O                                      l   l I   I I   I I   I I   I I   I                         DH TO PZR l   l                         SPRAY VALVE I   I                           OPEN l   l                   EVENT POINT 1316 I   I l
-~. - - - -
l INDICATED CONDITION:
ENCLOSURE 1 (Page 80 of 87)
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-ll C-03-11 pO l
l I
I I
I I
I I
I I
I DH TO PZR l
l SPRAY VALVE I
I OPEN l
l EVENT POINT 1316 I
I INDICATED CONDITION:
o RCV-53 NOT FULL CLOSED AND RCS PRESSURE >200 PSIG AS SENSED BY RC-3A-PS7.
o RCV-53 NOT FULL CLOSED AND RCS PRESSURE >200 PSIG AS SENSED BY RC-3A-PS7.
i REDUNDANT INDICATION WHICH WILL VERIFY ALARM:             ,-
i REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
0 RCV-53 VALVE POSITION INDICATION.
0 RCV-53 VALVE POSITION INDICATION.
O RCS PRESSURE INDICATION.
O RCS PRESSURE INDICATION.
OPERATOR ACTION FOR A VALID ALARM:                                                           l 0 INVESTIGATE CAUSE OF INCREASING PRESSURE.
OPERATOR ACTION FOR A VALID ALARM:
0 INVESTIGATE CAUSE OF INCREASING PRESSURE.
o CLOSE RCV-53 IF RCS PRESSURE >200 PSIG.
o CLOSE RCV-53 IF RCS PRESSURE >200 PSIG.
DISCllSSION:
DISCllSSION:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-047 SHEET RC-16 f        SENSING ELEMENT:     RC-3A-PS7 G
DRAWING 208-047 SHEET RC-16 SENSING ELEMENT:
AR-303                               Rev. 24                                       Page 82
RC-3A-PS7 f
G AR-303 Rev. 24 Page 82


ENCLOSURE 1 (Page 81 of 87) l ESAB-A ANNUNCIATOR RESPONSE           ESAB-A-03-12   C-03-12 U                               -
ENCLOSURE 1 (Page 81 of 87) l ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-12 C-03-12 U
I I
I I
I I
I I
I DH VALVE           .
I DH VALVE l
l                          ACISYSTEM             l l    i                     TROUBLE l     l J
ACISYSTEM TROUBLE l
l                               _
i l
EVENT POINT 1233 I     I INDICATED CONDITION:
l l
J EVENT POINT 1233 I
I INDICATED CONDITION:
o ACI SUBSYSTEM 1 OR 2 BYPASS KEY IN BYPASS POSITION.
o ACI SUBSYSTEM 1 OR 2 BYPASS KEY IN BYPASS POSITION.
O           O ACI SUBSYSTEM 1 OR 2 MODULE REMOVED.
O O ACI SUBSYSTEM 1 OR 2 MODULE REMOVED.
o DHV-3 OR DHV-4 NOT FULL CLOSED AND RCS PRESSURE >284 PSIG.
o DHV-3 OR DHV-4 NOT FULL CLOSED AND RCS PRESSURE >284 PSIG.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
Line 1,635: Line 2,078:
O CLOSE DHV-3 AND/0R DHV-4 IF RCS PRESSURE >2B4 PSIG.
O CLOSE DHV-3 AND/0R DHV-4 IF RCS PRESSURE >2B4 PSIG.
DISCUSSION:
DISCUSSION:
o DHV-3 ACI USES RC-147-PT FOR RCS PRESSURE AND CAN BE SEEN ON THE REMOTE l         SHUTDOWN PANEL, OR SPDS o DHV-4 ACI USES RC-132-PT FOR RCS PRESSURE AND CAN BE SEEN IN ES CABINET #3.
o DHV-3 ACI USES RC-147-PT FOR RCS PRESSURE AND CAN BE SEEN ON THE REMOTE l
SHUTDOWN PANEL, OR SPDS o DHV-4 ACI USES RC-132-PT FOR RCS PRESSURE AND CAN BE SEEN IN ES CABINET #3.


==REFERENCES:==
==REFERENCES:==
DRAWING 208-028 SHEET ESAB-6 A
DRAWING 208-028 SHEET ESAB-6 A
SENSING ELEMENT:    BT-13.BT-14 ES ACTUATION RELAYS
(]
(]
AR-303                                 Rev. 24                         Page 83
SENSING ELEMENT:
BT-13.BT-14 ES ACTUATION RELAYS AR-303 Rev. 24 Page 83


ENCLOSURE 1 (Page 82 of 87)
ENCLOSURE 1 (Page 82 of 87)
ESAB-A ANNUNCIATOR RESPONSE         ESAB-A-03-13   C-03-13 b,A l   l l   l 1   I I   I I   I I   I DH DROPLINE l   l                       VALVES             j l   l                         OPEN               l l   l l    l                                            l Z                             EVENT POINT 0214 i
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-13 C-03-13 b,A l
INDICATED CONDITION,:                                                       ,
l l
l               o DHV-3 NOT CLOSED AND RCS PRESSURE >200 PSIG AS SENSED BY 3RC-3A-PS8.
l 1
I I
I I
I I
I DH DROPLINE l
l VALVES j
l l
OPEN l
l l
l Z
EVENT POINT 0214 i
INDICATED CONDITION,:
l o DHV-3 NOT CLOSED AND RCS PRESSURE >200 PSIG AS SENSED BY 3RC-3A-PS8.
REDUNDANT INDICATION WHICH WILL VERIFY AltRM:
REDUNDANT INDICATION WHICH WILL VERIFY AltRM:
o DHV-3 VALVE POSITION INDICATI0s:.
o DHV-3 VALVE POSITION INDICATI0s:.
o RCS PRESSURE INDICATION.
o RCS PRESSURE INDICATION.
l OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o CLOSE DHV-3 IF RCS FRESSURE >284 PSIG.
o CLOSE DHV-3 IF RCS FRESSURE >284 PSIG.
DISCUSSION:             .
DISCUSSION:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-021 SHEET DH-03
DRAWING 208-021 SHEET DH-03 SENSING ELEMENT:
;g          l SENSING ELEMENT:   3RC-3A-PS8
3RC-3A-PS8
;g l
(
(
AR-303                               Rev. 24                           Page 84
AR-303 Rev. 24 Page 84


                  =                                                         .            _ . _ -                  _
=
ENCLOSURE 1 (Page 83 of 87)
ENCLOSURE 1 (Page 83 of 87)
ESAB-A ANNUNCIATOR RESPONSE           ESAB-A-03-13         C-03-13
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-13 C-03-13
, b I   I I   I I   I I   I I   I I   I                     DH DROP LINE l   l                             VALVES l   I                               OPEN I   I I   I
, b I
                                                                                                                      ~
I I
I I
I I
I I
I I
I DH DROP LINE l
l VALVES l
I OPEN I
I I
I
~
EVENT POINT 0215 s
EVENT POINT 0215 s
:                              INDICATED CONDITION:
INDICATED CONDITION:
l
l
~
~
Line 1,675: Line 2,142:
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o CLOSE DHV-4 IF RCS PRESSURE >284 PSIG.
o CLOSE DHV-4 IF RCS PRESSURE >284 PSIG.
t
t DISCUSSION:
;                              DISCUSSION:


==REFERENCES:==
==REFERENCES:==
DRAWING 208-021 SHEET DH-04 SENSING ELEMENT:   3RC-3A-PS9 AR-303                               Rev. 24                                 Page 85
DRAWING 208-021 SHEET DH-04 SENSING ELEMENT:
3RC-3A-PS9 AR-303 Rev. 24 Page 85


ENCLOSURE 1 (Page 84 of 87)
ENCLOSURE 1 (Page 84 of 87)
ESAB-A ANNUNCIATOR RESPONSE     ESAB-A-03-13     C-03-13 I   I I   I I   I I   I I   I I   I DH DROP LINE l   l                   VALVES I   I                     OPEN l   l l   l Z                         EVENT POINT 0216 INDICATED CONDITION:
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-13 C-03-13 I
I I
I I
I I
I I
I I
I DH DROP LINE l
l VALVES I
I OPEN l
l l
l Z
EVENT POINT 0216 INDICATED CONDITION:
oDHV-41NdTCLOSEDANDRCSPRESSURE>200PSIGASSENSEDBY3RC-3A-PS4.
oDHV-41NdTCLOSEDANDRCSPRESSURE>200PSIGASSENSEDBY3RC-3A-PS4.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o DHV-41 VALVE POSITION INDICATION.                                     f o RCS PRESSURE INDICATION.
o DHV-41 VALVE POSITION INDICATION.
f o RCS PRESSURE INDICATION.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
I o CLOSE DHV-41 IF RCS PRESSURE >284 PSIG.
o CLOSE DHV-41 IF RCS PRESSURE >284 PSIG.
DISCUSSION:
DISCUSSION:


Line 1,693: Line 2,172:
DRAWING 208-021 SHEET DH-13
DRAWING 208-021 SHEET DH-13
^
^
SENSING ELEMENT:   3RC-3A-PS4 AR 303                             Rev. 24                       Page 86
SENSING ELEMENT:
3RC-3A-PS4 AR 303 Rev. 24 Page 86


    . u ENCLOSURE 1 l
u ENCLOSURE 1 l
                                                                          - (Page 85 of 87) i ESAB-A ANNUNCIATOR RESPONSE           ESAB-A-03-14   C-03-14
- (Page 85 of 87) i ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-14 C-03-14
'v SEISMIC SYSTEM TROUBLE
'v SEISMIC SYSTEM TROUBLE EVENT POINT 1709 INDICATED CONDITION:
_____                          EVENT POINT 1709 INDICATED CONDITION:
'o SEISMIC EVENT OCCURRED i
          'o SEISMIC EVENT OCCURRED i
p.
p.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
          .o INDICATION AT SEISMIC PANEL.
.o INDICATION AT SEISMIC PANEL.
o NOTIFICATION OF SEISMIC EVENT.
o NOTIFICATION OF SEISMIC EVENT.
OPERATOR ACTION FOR A VALID ALARM:
OPERATOR ACTION FOR A VALID ALARM:
o CHECK SEISMIC PANEL FOR CAUSE OF ALARM.                                     ,
o CHECK SEISMIC PANEL FOR CAUSE OF ALARM.
o REFER TO AP-961.
o REFER TO AP-961.
4 DISCUSSION:                                                                     ;
4 DISCUSSION:
I&C SHOP PERFORMS ALL SURVEILLANCE PROCEDURES AND MAGNETIC TAPE REPLACEMENT WHEN REQUIRED.
I&C SHOP PERFORMS ALL SURVEILLANCE PROCEDURES AND MAGNETIC TAPE REPLACEMENT WHEN REQUIRED.


==REFERENCES:==
==REFERENCES:==
SENSING ELEMENT:
SEISMIC INSTRUMENT PANEL.
AR-303 Rev. 24 Page 87


SENSING ELEMENT:    SEISMIC INSTRUMENT PANEL.
4 u
l AR-303                                  Rev. 24                          Page 87
ENCLOSURE 1 (Page 86 of 87)
 
ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-14 C-03-14
4 u ENCLOSURE 1 (Page 86 of 87)
,-                    ESAB-A ANNUNCIATOR RESPONSE           ESAB-A-03-14                           C-03-14
(
(
l   l l   l l   l l   l l   l I   I                         SEISMIC l   l                         SYSTEM l   l                       TROUBLE l   l l   l l   l EVENT POINT 1710 1
l l
INDICATED CONDITION:
l l
O SEISMIC PANEL LOSS OF POWER G
l l
b      REP 9NDANT INDICATION WHICH WILL VERIFY ALARM:
l l
0 INDICATION AT SEISMIC PANEL.                                                                         !
l l
l OPERATOR ACTION FOR A VALID ALARM:
I I
SEISMIC l
l SYSTEM l
l TROUBLE l
l l
l l
l EVENT POINT 1710 INDICATED CONDITION:
O SEISMIC PANEL LOSS OF POWER Gb REP 9NDANT INDICATION WHICH WILL VERIFY ALARM:
0 INDICATION AT SEISMIC PANEL.
OPERATOR ACTION FOR A VALID ALARM:
o INVESTIGATE SEISMIC PANEL FOR CAUSE OF LOSS OF POWER ALARM.
o INVESTIGATE SEISMIC PANEL FOR CAUSE OF LOSS OF POWER ALARM.
o REFER TO OP-700C.
o REFER TO OP-700C.
DISCUSSION:
DISCUSSION:
POWER SUPPLY IS ACDP-52 BREAKER 31 p      
POWER SUPPLY IS ACDP-52 BREAKER 31 p


==REFERENCES:==
==REFERENCES:==
SENSING ELEMENT:
SEISMIC INSTRUMENT PANEL.
AR-303 Rev. 24 Page 88


SENSING ELEMENT:  SEISMIC INSTRUMENT PANEL.
s.
AR-303                              Rev. 24                                                    Page 88
ENCLOSURE 1 (Page 87 of 87)
 
~~
      . >      s.
ESAB A ANNUNCIATOR RESPONSE ESAB-A-03-14 C-03-14
ENCLOSURE 1
^
            ~~
I I
(Page 87 of 87)
I I
    ^                            ESAB A ANNUNCIATOR RESPONSE         ESAB-A-03-14     C-03-14 I   I I   I I   I I   I I   I I   I                         SEISMIC I   I                       SYSTEM TROUBLE l   l l   l           ~
I I
l   l I   I EVENT POINT 1711 1                                                 -
I I
I I
I I
SEISMIC I
I SYSTEM l
l TROUBLE l
l
~
l l
I I
EVENT POINT 1711 1
INDICATED CONDITION:
INDICATED CONDITION:
o SEISMIC RECORDER END OF TAPE.
o SEISMIC RECORDER END OF TAPE.
Line 1,750: Line 2,252:


==REFERENCES:==
==REFERENCES:==
 
t SENSING ELEMENT:
t                 SENSING ELEMENT:   SEISMIC INSTRUMENT PANEL.
SEISMIC INSTRUMENT PANEL.
AR-303                               Rev. 24               Page 89 (LAST PAGE)}}
AR-303 Rev. 24 Page 89 (LAST PAGE)}}

Latest revision as of 12:19, 12 December 2024

Rev 24 to AR-303, ESC Annunciator Response
ML20129A231
Person / Time
Site: Crystal River 
Issue date: 09/06/1996
From:
FLORIDA POWER CORP.
To:
References
AR-303, NUDOCS 9609180047
Download: ML20129A231 (92)


Text

_.

s 6.

i e

.a

' Document Transmittal #: 50716 Date: 9/12/96 Tc:

NRC (DC DESK)

MAC: N/A Destination:

==

Description:==

Copy Copy Totals Document:

Revision:

Comment:

INFO CNTL MSTR AR0303 24 24 1

0 0

l 4

J i

4 l

s 1

i l

Instructions to the Addressee:

Pisase verify the document (s) received agrees with the above information. Be sure to destroy document (s) or portions of document (s) superseded by the above.

Tha signature indicates acknowledgment of receipt of the above document (s). Retum signed and dated

. trcnsmittal to Document Control within 20 days at mail code:

NA1C Florida Power Corporation Document Control, NA1C

}

Crystal River Energy Complex

/

15760 W. Power Line St.

Crystal River, FL 34428-6708 Signature of Addressee:

Date:

Independent Verification:

Date:

(Control Room documents only) 9609180047 960906 PDR ADOCK 05000302

~F PDR

Rev. 24 Effective Date

/-

(

m.rutnent Sect'P1 p

c necanu vnu a li C. 9.

J

- " " -A C_

- - ~ ~ ~ " = -

ANNUNCIATOR RESPONSE AR-303 FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 ESC ANNUNCIATOR RESPONSE O

APPROVED BY:

Interpretati n Cont t h k/w /j.b &,( x k m f (SIjNATUREON' FILE)

{

fo/76 DATE:

INTERPRETATION CONTACT: Manager, Nuclear Operations Support j

~_

e I

TABLE OF CONTENTS SECTION EAE 1.0 PURPOSE............................

1

2.0 REFERENCES

1 2.1 INPLENENTING REFERENCES...............

1 2.2 DEVELOPNENTAL REFERENCES 1

3.0 PERSONNEL INDOCTRINATION 2

2 4.0 INSTRUCTIONS 5.0 FOLLOW-UP ACTIONS 2

ENCLOSURE 3

1 Annunciator Response i

)

l i

1 1

i l

AR-303 Rev. 24 Page i i

j

a 1.0 PURPOSE pa 1.1 Establish a reference document for each Annunciator Window on the ESAB-A Lampbox.

1.2 Establish operator actions for valid Annunciator alarms on the ESAB-A Lampbox.

1.3 Establish a reference to other procedures which address operator actions for valid Annunciator alarms on the ESAB-A Lampbox.

~

2.0 REFERENCES

2.1 IMPLEMENTING REFERENCES 2.1.1 E0P, Emergency Operating Procedure 2.1.2 AP-330, Loss of Nuclear Services Water 2.1.3 AP-470, Loss of Instrument Air 2.1.4 AP-961, Earthquake 2.1.5 OP-700C,120/240 Volt AC Distribution Panels 2.1.6 OP-301, Operation of the Reactor Coolant System 2.1.7 OP-416, Domestic Water Supply System 2.1.8 SP-317, RC System Water Inventory Balance 2.2 DEVELOPMENTAL REFERENCES 2.2.1 INP0 90-021, Good Practice OP-217, Alarm Response Procedures 2.2.2 Annunciator Window Engraving Drawing E-224-048 2.2.3 MAR 88-05-25-05, FCN #19, SW Isolation to RC Pumps 4

2.2.4 MAR 92-09-08-01, Annunciator Window Relocation and Rewire 2.2.5 MAR 92-10-24-01, ES Status Light Color Change

'O

^R-303 -

Rev. 24 Page 1

a 3.0 PERSONNEL INDOCTRINATION 3.1 The Annunciator System is powered from VBDP-5 Breaker 28.

4.0 INSTRUCTIONS 4.1 Respond to alarms on the ESAB-A Lampbox as indicated on Enclosure 1, Annunciator Response.

5.0 FOLLOW-UP ACTIONS None O

l O

AR-303 Rev. 24 Page 2

e s

ENCLOSURE 1 (Page 1 of 87)

ESAB-A ANNUNCIATOR RES00NSE ESAB-A-01-01 C-01-01 RZ l

I I

I l

l RC-1 I

I HIGH PRESS l

l BISTABLE TRIP l

l l

l l

l l

l EVENT POINT 0937 I

I I

I INDICATED CONDITION:

o RCS PRESSURE < 1500 PSIG

}

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o ES STATUS LIGHT RC-1 ' BISTABLE TRIPPED' IS LIT.

o ACTUATION CHANNEL CABINET #1 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO E0P.

1 DISCUSSION:

THIS ALARM INDICATES ONE CHANNEL TRIPPED IN A 2 OUT OF 3 HPI LOGIC.

REFERENCES:

DRAWING 208-028 SHEET ESA-24 I

SENSING ELEMENT:

BT-1 ES ACTUATION RELAY AR-303 Rev. 24 Page 3

ENCLOSURE 1 (Page 2 of 87)

/~'N ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-02 C-01-02 V

RC-4 LOVV PRESS BISTABLE TRIP EVENT POINT 0940 INDICATED CONDITION:

o RCS PRESSURE <500 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

()

o ES STATUS LIGHT RC-4 ' BISTABLE TRIPPED' IS LIT.

o ACTUATION CHANNEL CABINET #1 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO E0P 4

DISCUSSION:

THIS ALARM INDICATES ONE CHANNEL TRIPPED IN A 2 OUT OF 3 LPI LOGIC.

REFERENCES:

ORAWING 208-028 SHEET ESB-39 SENSING ELEMENT: BT-7 ES ACTUATION RELAY O

AR-303 Rev. 24 Page 4

ENCLOSURE 1 (Page 3 of 87)

O ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-03 C-01-03 o

a SW BP A/B TRIP l

EVENT POINT 1831 INDICATED CONDITION:

0 SWP-2A MOTOR NOT ENERGIZED WITH CONTROL SWITCW IN NORMAL AFTER START POSITION.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION.

o SWP-2B AUTO START.

O SW BP A/B FLOW LOW ALARM.

o CRDM COMPUTER HIGH TEMP ALARM (S).

OPERATOR ACTION FOR A VALID ALARM:

o ENSURE SWP-2B STARTS.

o INVESTIGATE CAUSE OF PUMP TRIP.

DISCUSSION:

1

REFERENCES:

DRAWING 208-056 SHEET SW-04 SENSING ELEMENT:

SWP-2A CONTROL SWITCH CONTACTS CS/SC, CS/0 AR-303 Rev. 24 Page 5

~

ENCLOSURE 1 (Page 4 of 87)

(

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-03 C-01-03 SW BP A/B TRIP 4

EVENT POINT 1833 INDICATED CONDITION:

o SWP-2B MOTOR NOT ENERGIZED W.ITH CONTROL SWITCH IN NORMAL AFTER START POSITION.

i REDUNDANT INDICATION WHICH WILL VERIFY ALAJM:

o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION.

O SWP-2A AUTO START.

O SW BP A/B FLOW LOW ALARM.

O CRDM HIGH TEMP COMPUTER ALARM (S).

OPERATOR ACTION FOR A VALID ALARM:

o ENSURE SWP-2A STARTS.

0 INVESTIGATE CAUSE OF PUMP TRIP.

DISCUSSION:

REFERENCES:

DRAWING 208-056 SHEET SW-05 SENSING ELEMENT:

SWP-2B CONTROL SWITCH CONTACTS CS/SC, CS/0 AR-303 Rev. 24 Page 6 j

ENCLOSURE 1 (Page 5 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-04 C-01-04

(}

SW BP A/B FLOW LC)VV EVENT POINT 1830 INDICATED CONDITION:

o CRDM B00 STER PUMP FLOW <140 GPM FOR >5 SEC AS SENSED BY SW-91-FS.

[O~l REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o SW BP A/B TRIP ALARM.

o SW BP A/B AUTO START ALARM.

OPERATOR ACTION FOR A VALID ALARM:

o ENSURE STANDBY NUCLEAR SERVICES B0OSTER PUMP IS RUNNING.

O CHECK CRDM FILTER AP,IF HIGH PLACE STANDBY FILTER IN SERVICE.

O CHECK NUCLEAR SERVICES FLOWPATH.

DISCUSSION:

ALTERNATE NUCLEAR SERVICE B00 STER PUMP STARTS IF <140 GPM FOR >2 SEC.

4 IF TWO PUMPS ARE RUNNING AND ONE PUMP WILL PROVIDE SUFFICIENT FLOW, THEN ONE PUMP SHOULD BE SECURED.

REFERENCES:

DRAWING 208-056 SHEET SW-04 SENSING ELEMENT:

SW-91-FS

-~h)

AR-303 Rev. 24 Page 7

ENCLOSURE 1 (Page 6 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-06 C-01-06 b(

SW BP A/B AUTO START EVENT POINT 1832 INDICATED CONDITION:

o SWP-2A MOTOR ENERGIZED WITH CONTROL SWITCH IN NORMAL AFTER STOP POSITION.

()

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o RED LIGHT WITH A GREEN FLAG ON CONTROL STATION.

O SW BP A/B LOW FLOW ALARM.

OPERATOR ACTION FOR A VALID ALARM:

o INVESTIGATE CAUSE OF B0OSTER PUMP AUTO START.

o INVESTIGATE CAUSE OF PUMP TRIP.

O CHECK FILTER AP.

DISCUSSION:

WITH A DECREASING FLOW THE ALTERNATE NUCLEAR SERVICES B0OSTER PUMP WILL START WHEN FLOW IS <140 GPM FOR >2 SEC.

REFERENCES:

DRAk'ING 208-056 SHEET SW-04

'O

(_,/

SENSING ELEMENT:

SWP-2A CONTROL SWITCH CONTACTS CS/SC, CS/0 i

AR-303 Rev. 24 Page 8 i

l ENCLOSURE 1 (Page 7 of 87)

()

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-06 C-01-06 SW BP AIB AUTO START EVENT POINT 1834 INDICATED CONDITION:

o SWP-2B MOTOR ENERGIZED WITH CONTROL SWITCH IN NORMAL AFTER STOP POSITION.

()

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o RED LIGHT WITH A GREEN FLAG ON CONTROL STATION.

O SW BP A/B LOW FLOW ALARM.

OPERATOR ACTION FOR A VALID ALARM:

o INVESTIGATE CAUSE OF B00 STER PUMP AUTO START.

o INVESTIGATE CAUSE OF PUMP TRIP.

o CHECK FILTER AP.

DISCUSSION:

WITH A DECREASING FLOW THE ALTERNATE NUCLEAR SERVICES B0OSTER PUMP WILL START WHEN FLOW IS <140 GPM FOR >2 SEC.

REFERENCES:

DRAWING 208-056 SHEET SW-05

')

SENSING ELEMENT:

SWP-2B CONTROL SWITCH CONTACTS CS/SC, CS/0

\\_,

AR-303 Rev. 24 Page 9

1 ENCLOSURE 1 1

(Page 8 of 87)

(]

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-08 C-01-08 v

SW SURGE TANK LEVEL HIGH/ LOW EVENT POINT 1835 INDICATED CONDITION:

o SW SURGE TANK LEVEL >10'0" AS SENSED BY SW-137-LS.

(

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o HIGH NITROGEN PRESSURE ALARM.

o RML-3 RADIATION ALARM.

O SWV-277 OPEN INDICATION.

/

o COMPUTER POINT, X333.

OPERATOR ACTION FOR A VALID ALARM:

o INVESTIGATE CAUSE OF HIGH LEVEL ALARM.

O REFER TO OP-301 IF RCS LEAK.

DISCUSSION:

AN INCREASING SW SURGE TANK LEVEL MAY INDICATE LEAKAGE FROM ANY OF THE LETDOWN COOLERS OR RCP SEAL PACKAGE COOLERS. ADDITIONALLY, A RISE IN SW SYSTEM TEMPERATURE AS A RESULT OF A LOCA OR COMPONENT FAILURE COULD RAISE TANK LEVEL.

REFERENCES:

DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:

SW-137-LS AR-303 Rev. 24 Page 10

ENCLOSURE 1 (Page 9 of 87)

(~'/

i ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-08 C-01-08 w

SW SURGE TANK LEVEL HIGH/ LOW EVENT POINT 1836 INDICATED CONDITION:

o SW SURGE TANK LEVEL <8'6" AS SENSED BY SW-137-LS.

()

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOW NITROGEN PRESSURE ALARM.

4 o SW SYSTEM PRESSURE LOW ALARM.

O COMPUTER POINT, X333.

OPERATOR ACTION FOR A VALID ALARM:

o FILL SW SURGE TANK AS NECESSARY.

o INVESTIGATE CAUSE OF LOW TANK LEVEL.

O REFER TO AP-330.

o IE A 4# RBIC ACTUATION HAS OCCURRED AND IS BYPASSED, IBEN CLOSE THE SW ISOLATION VALVES TO THE RCP'S, SWV-79 THROUGH SWV-86.

4 DISCUSSION:

A DECREASING SW SURGE TANK LEVEL MAY INDICATE POSSIBLE LEAKAGE FROM SYSTEM RELIEF VALVES. IF RUNNING MORE THAN 1 SW PUMP THEN SYSTEM PRESSURE MAY BE HIGH CAUSING THIS LEAKAGE.

REFERENCES:

DRAWING 208-056 SHEET SW-31

()

SENSING ELEMENT:

SW-137-LS AR-303 Rev. 24 Page 11

ENCLOSURE 1 (Page 10 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-09 C-01-09 SW SURGE TANK PRESS HIGH/ LOW EVENT POINT 1837 4

INDICATED CONDITION:

o SW SURGE TANK PRESSURE >90 PSI,G AS SENSED BY SW-134-PSI.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o HIGH INDICATED TANK PRESSURE.

o HIGH SW SURGE TANK LEVEL.

OPERATOR ACTION FOR A VALID ALARM:

o INVESTIGATE CAUSE OF HIGH PRESSURE.

o CHECK NITR0 GEN SUPPLY ISOLATION VALVE CLOSED.

o IF PRESSURE ALARM CAUSED BY HIGH LEVEL, RESTORE LEVEL TO NORMAL BAND.

DISCUSSION:

THIS ALARM COULD BE CAUSED BY RISING TANK LEVEL DUE TO IN LEAKAGE FROM A LETDOWN COOLER OR RCP SEAL PACKAGE COOLER, OR A RISE IN SW SYSTEM TEMPERATURE DUE TO A LOCA OR COMPONENT FAILURE.

IF NECESSARY TO REDUCE TANK PRESSURE A MANUAL VENT VALVE (SWV-198) IS AVAILABLE TO VENT THE EXCESS PRESSURE TO THE AB VENTILATION SYSTEM.

REFERENCES:

DRAWING 208-056 SHEET SW-31 r~

SENSING ELEMENT:

SW-134-PSI L)

AR-303 Rev. 24 Page 12

s' 5

ENCLOSURE 1 (Page 11 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-09 C-01-09 l

SW SURGE TANK PRESS HIGH/ LOW EVENT POINT 1838 INDICATED CONDITION:

o SW SURGE TANK PRESSURE <77 PSIG AS SENSED BY SW-134-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOW INDICATED TANK PRESSURE.

o LOW SW SURGE TANK LEVEL.

O SW SYSTEM PRESS LOW.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-330.

O CHECK FOR TANK GAS SPACE LEAKS.

o CHECK TANK PRESSURE CONTROL BYPASS VALVE (SWV-198) CLOSED.

O CHECK TANK PRESSURE CONTROL VALVE, ISOLATION VALVE (SWV-282) IS CLOSED.

o IF PRESSURE ALARM CAUSED BY LOW LEVEL, RESTORE LEVEL TO NORMAL BAND.

o IF LEVEL IS SATISFACTORILY, ADD N 2

DISCUSSION:

REFERENCES:

DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:

SW-134-PS2 AR-303 Rev. 24 Page 13

i ENCLOSURE 1 (Page 12 of 87)

(J)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-11 C-01-ll l

l l

l RB FAN A/B/C I

l CLG WTR FLOW I

I LOW l

l I

I EVENT POINT 1843 I

I l

l I

INDICATED CONDITION:

o SW OR CI FLOW FROM AIR HANDLING UNIT 1A <400 GPM AS SENSED BY SW-47-FS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

(~')

o REACTOR BUILDING SW SYSTEM LEAK ALARM.

\\- -

O COMPUTER POINT S348.

o SW OUTLET VALVE (SWV-41) CLOSED INDICATION.

OPERATOR ACTION FOR A VALID ALARM:

o IF ADDITIONAL COOLING WATER FLOW IS REQUIRED, START SWP-1A OR SWP-1B AND ENSURE THE FAN IS ALIGNED TO SW.

~

o.IF SW LEAKAGE IS INDICATED, ISOLATE COOLING WATER TO AHF-1A.

DISCUSSION:

THIS ALARM IS AN EXPECTED ALARM AFTER AIR HANDLING UNIT TRIPS OFF.

(TIME DELAY OF =60 SECONDS CLOSES SWV-41.)

THIS ALARM WILL NOT COME IN, OR WILL CLEAR, IF CONTROL SWITCH IS SELECTED TO 0FF.

4

REFERENCES:

DRAWING 208-056 SHEET SW-31 IT

(_,/

SENSING ELEMENT:

SW-47-FS i

AR-303 Rev. 24 Page 14

1 ENCLOSURE 1 (Page 13 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-11 C-01-ll l

l l

l l

l l

l RB FAN A/B/C l

l CLG WTR FLOW I

I LOW I

I I

I EVENT POINT 1844 I

I I

I INDICATED CONDITION:

o SW OR CI FLOW FROM AIR HANDLING UNIT 1B <400 GPM AS SENSED BY SW-51-FS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

CT o REACTOR BUILDING SW SYSTEM LEAK ALARM.

b/

o COMPUTER POINT S376.

o SW OUTLET VALVE (SWV-43) CLOSED INDICATION.

OPERATOR ACTION FOR A VALID ALARM:

o IF ADDITIONAL COOLING WATER FLOW IS REQUIRED, START SWP-1A OR SWP-1B AND ENSURE THE FAN IS ALIGNED TO SW.

o IF SW LEAKAGE IS INDICATED, ISOLATE COOLING WATER TO AHF-18.

DISCUSSION:

THIS ALARM IS AN EXPECTED ALARM AFTER AIR HANDLING UNIT TRIPS OFF.

(TIME DELAY OF =60 SECONDS CLOSES SWV-43.)

THIS ALARM WILL NOT COME IN, OR WILL CLEAR, IF CONTROL SWITCH IS SELECTED TO OFF.

REFERENCES:

DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:

SW-51-FS AR-303 Rev. 24 Page 15

ENCLOSURE 1 (Page 14 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-ll C-01-11 l

l l

l RB FAN A/B/C l

CLG WTR FLOW I

LOW l

l EVENT POINT 1845 I

I INDICATED CONDITION:

o SW OR CI FLOW FROM AIR HANDLING UNIT IC <400 GPM AS SENSED BY SW-55-FS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

O) o REACTOR BUILDING SW SYSTEM LEAK ALARM.

(

o COMPUTER POINT S387.

o SW OUTLET VALVE (SWV-45) CLOSED INDICATION.

OPERATOR ACTION FOR A VALID ALARM:

o IF ADDITIONAL COOLING WATER FLOW IS REQUIRED, START SWP-1A OR SWP-1B AND ENSURE THE FAN IS ALIGNED TO SW.

o IF SW LEAKAGE IS INDICATED, ISOLATE COOLING WATER TO AHF-lC.

DISCUSSION:

THIS ALARM IS AN EXPECTED ALARM AFTER AIR HANDLING UNIT TRIPS OFF. (TIME DELAY OF =60 SECONDS CLOSES SWV-45.)

THIS ALARM WILL NOT COME IN, OR WILL CLEAR, IF CONTROL SWITCH IS SELECTED TO 0FF.

REFERENCES:

DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:

SW-55-FS AR-303 Rev. 24 Page 16

ENCLOSURE 1 (Page 15 of 87)

(~')

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12

%j l

l l

l l

l l

l l

l REACTOR BLDG I

I SW SYSTEM l

l LEAK I

I l

l EVENT POINT 1840

~

I l

INDICATED CONDITION:

o DIFF FLOW TO AIR HANDLING UNIT 1A >90 GPM AS SENSED BY SW-46-FS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

,- s o RB FAN A/B/C CLG WTR FLOW LOW ALARM.

o DECREASING LEVEL IN SW SURGE TANK.

O HIGH TEMP ALARM ON AFFECTED COMP 0NENT.

1 OPERATOR ACTION FOR A VALID ALARM:

o REFER'TO AP-330.

o ISOLATE THE AFFECTED COMP 0NENT, AND PLACE BACKUP IN SERVICE IF REQUIRED.

O FILL SW SURGE TANK AS NECESSARY.

DISCUSSION:

REFERENCES:

DRAWING 208-056 SHEET SW-31

()

SENSING ELEMENT:

SW-46-FS AR-303 Rev. 24 Page 17

ENCLOSURE 1 (Page 16 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 l

l l

l I

I I

I l

l REACTOR BLDG 1

1 SW SYSTEM I

I LEAK I

I l

l EVENT POINT 1841 l

l

~

INDICATED CONDITION:

O DIFF FLOW TO AIR HANDLING UNIT 18 >90 GPM AS SENSED BY SW-50-FS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

/V o RB FAN A/B/C CLG WTR FLOW LOW ALARM.

O DECREASING LEVEL IN SW SURGE TANK.

o HIGH TEMP ALARM ON AFFECTED COMPONENT.

l OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-330.

o ISOLATE THE AFFECTED COMPONENT, AND PLACE BACKUP IN SERVICE IF REQUIRED.

O FILL SW SURGE TANK AS NECESSARY.

DISCUSSION:

REFERENCES:

DRAWING 208-056 SHEET SW-31

_(

SENSING ELEMENT:

SW-50-FS AR-303 Rev. 24 Page 18

r ENCLOSURE 1 (Page 17 of u7)

G ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 C/

I I

I I

I I

l l

REACTOR BLDG l

l SW SYSTEM I

I LEAK I

I I

I l

l EVENT POINT 1842

'l l

INDICATED CONDITION:

o DIFF FLOW TO AIR HANDLING UNIT 10 >90 GPM AS SENSED BY SW-54-FS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

(

o RB FAN A/8/C CLG WTR FLOW LOW ALARM.

't o DECREASING LEVEL IN SW SURGE TANK.

O HIGH TEMP ALARM ON AFFECTED COMPONENT.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-330.

o ISOLATE THE AFFECTED COMP 0NENT, AND PLACE BACKUP IN SERVICE IF REQUIRED.

o FILL SW SURGE TANK AS NECESSARY.

DISCUSSION:

REFERENCES:

DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:

SW-54-FS mh AR-303 Rev. 24 Page 19

a p

ENCLOSURE 1 (Page 18 of 87)

<O ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 V

I I

i l

i I

I I

I l

l REACTOR BLDG I

I SW SYSTEM I

I l

l EVENT POINT 1846 l

I INDICATED CONDITION:

o DIFF FLOW TO LD COOLER A AND C >50 GPM AS SENSED BY SW-42-FS.

O REDUNDANT INDICATION WHICH WILL VERIFY TLARM:

, L,]

o DECREASING LEVEL IN SW SURGE TANK.

O HIGH TEMP ALARM ON AFFECTED COMPONENT.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-330.

o ISOLATE THE AFFECTED COMP 0NENT, AND PLACE BACKUP IN SERVICE IF REQUIRED.

O FILL SW SURGE TANK AS NECESSARY.

DISCUSSION:

REFERENCES:

DRAWING 208-056 SHEET SW-31 O()

SENSING ELEMENT:

SW-42-FS AR-303 Rev. 24 Page 20

ENCLOSURE 1 (Page 19 of 87)

Ci ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 1

V l

l l

l l

REACTOR BLDG I

SW SYSTEM l

LEAK l

l EVENT POINT 1847 l

l l

INDICATED CONDITION:

o DIFF FLOW TO LD COOLER B >50 GPM AS SENSED BY S,W-43-FS.

(

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o DECREASING LEVEL IN SW SURGE TANK.

o HIGH TEMP ALARM ON AFFECTED COMPONENT.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-330.

0 ISOLATE THE AFFECTED COMPONENT, AND PLACE BACKUP IN SERVICE IF REQUIRED.

O FILL SW SURGE TANK AS NECESSARY.

}

DISCUSSION:

f

REFERENCES:

DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:

SW-43-FS AR-303 Rev. 24 Page 21

ENCLOSURE 1 (Page 20 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 l

l l

1 I

I I

I l

l REACTOR BLDG I

I SW SYSTEM l

l i

l i

I I

Z EVENT POINT 1848-l l

INDICATED CONDITION:

3 o DIFF FLOW TO CRDM'S >10 GPM AS SENSED BY SW-90-FS.

i,q REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o DECREASING LEVEL IN SW SURGE TANK.

o INCREASING TEMPS ON CRDM'S.

o COMPUTER GROUP 15 OR POINTS X-211 TO X-279.

t OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-330.

o FILL SW SURGE TANK AS NECESSARY.

4 DISCUSSION:

REFERENCES:

DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:

SW-90-FS AR-303 Rev. 24 Page 22

- ~_

ENCLOSURE 1 (Page 21 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 lv I

l l

l l

l l

l l

l REACTOR BLDG I

I SW SYSTEM l

l LEAK I

I l

l

)

Z EVENT POINT 1849 I

I INDICATED CONDITION:

o DIFF FLOW TO RCP-1A >20 GPM AS SENSED BY SW-107-FS.

e REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

I o DECREASING LEVEL IN SW SURGE TANK.

O INCREASING TEMPS ON RCP A.

O COMPUTER GROUP 78.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-330.

O FILL SW SURGE TANK AS NECESSARY.

'I DISCUSSION:

REFERENCES:

DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:

SW-107-FS Page 23 AR-303 Rev. 24

~

ENCLOSURE 1 (Page 22 of 87) f ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 ll l

l l

1 I

J l

l l

l REACTOR BLDG I

I SW SYSTEM l

l LEAK j

I I

l l

Z EVENT POINT 1850 l

I e

INDICATED CONDITION:

J o DIFF FLOW TO RCP-1B >20 GPM AS SENSED BY SW-113-FS.

't REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

(d o DECREASING LEVEL IN SW SURGE TANK.

O INCREASING TEMPS ON RCP B.

o COMPUTER GROUP 79.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-330.

O FILL SW SURGE TANK AS NECESSARY.

.l DISCUSSION:

REFERENCES:

DRAWING 208-056 SHEET SW-31

\\

SENSING ELEMENT:

SW-113-FS AR-303 Rev. 24 Page 24

ENCLOSURE 1 (Page 23 of G7)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 l

l l

l l

REACTOR BLDG I

SW SYSTEM l

LEAK i

I l

Z EVENT POINT 1851 1

I INDICATED CONDITION:

o DIFF FLOW TO RCP-1C >20 GPM AS SENSED BY SW-95-FS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

b o DECREASING LEVEL IN SW SURGE TANK.

0 INCREASING TEMPS ON RCP C.

0 COMPUTER GROUP 80.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-330.

O FILL SW SURGE TANK AS NECESSARY.

DISCUSSION:

1

REFERENCES:

DRAWING 208-056 SHEET SW-31 i

SENSING ELEMENT: SW-95-FS AR-303 Rev. 24 Page 25

ENCLOSURE 1 (Page 24 of 87)

J A

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-12 C-01-12 l

l l

l

\\

l REACTOR BLDG I

SW SYSTEM l

LEAK I

l EVENT POINT 1852 I

INDICATED CONDITION:

o DIFF FLOW TO RCP-ID >20 GPM AS SENSED BY SW-101-FS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o DECREASING LEVEL IN SW SURGE TANK.

O INCREASING TEMPS ON RCP D.

O COMPUTER GROUP 81.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-330.

O FILL SW SURGE TANK AS NECESSARY.

1 DISCUSSION:

REFERENCES:

DRAWING 208-056 SHEET SW-31 SENSING ELEMENT:

SW-101-FS AR-303 Rev. 24 Page 26

ENCLOSURE 1 (Page 25 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-01-14 C-01-14 l

1 l

\\

l ES CAB l

FAN l

FAILURE I

I l

I l

EVENT POINT 1232 INDICATED CONDITION:

o LOW CABINET AIR FLOW AS SENSED BY INDIVIDUAL CABINET FAN FLOW SWITCH.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o ' FAN RUNNING' LIGHT EXTINGUISHED

,/

OPERATOR ACTION FOR A VALID ALARM:

o VERIFY COOLING FAN IN OPERATION.

DISCUSSION:

I&C SHOP PERIODICALLY REPLACES THE DOOR FILTERS PER SCMEDULED PM'S. IF THE ALARM BECOMES A NUISANCE BECAUSE OF DIRTY FILTERS, GENERATE A WORK REQUEST TO REPLACE THE FILTERS. SOMETIMES A LIGHT VACUUMING WILL HELP UNTIL REPLACEMENT.

REFERENCES:

. DRAWING 208-028 SHEET ESAB-5 SENSING ELEMENT:

FSBFX (ES ACTUATION CABINET INDIVIDUAL FAN FLOW SWITCH)

AR-303 Rev. 24 Page 27

(

e ENCLOSURE 1 (Page 26 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-01 C-02-01 RC-2 HIGH PRESS BISTABLE TRIP EVENT POINT 0938 INDICATED CONDITION:

o RCS PRESSURE <1500 PSIG

(

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o ES STATUS LIGHT RC-2 ' BISTABLE TRIPPED' IS LIT.

O ACTUATION CHANNEL CABINET #2 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.

OPERATOR ACTION FOR A VALID ALARM:

l o REFER TO E0P i

DISCUSSION:

THIS ALARM INDICATES ONE CHANNEL TRIPPED IN A 2 OUT OF 3 HPI LOGIC.

REFERENCES:

DRAWING 208-028 SHEET ESA-24 SENSING ELEMENT:

BT-2 ES ACTUATION RELAY AR-303 Rev. 24 Page 28

8 e

ENCLOSURE 1 (Page 27 of 87) f ^)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-02 C-02-02 v

RC-5 LOW PRESS BISTABLE TRIP EVENT POINT 0925 INDICATED CONDITION:

o RCS PRESSURE <500 PSIG

()

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o ES STATUS LIGHT RC-5 ' BISTABLE TRIPPED' IS LIT.

o ACTUATION CHANNEL CABINET #2 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO E0P DISCUSSION:

THIS ALARM INDICATES ONE CHANNEL TRIPPED IN A 2 OUT OF 3 LPI LOGIC.

REFERENCES:

DRAWING 208-028 SHEET ESB-39

()

SENSING ELEMENT:

BT-8 ES ALTUATION RELAY AR-303 Rev. 24 Page 29

ENCLOSURE 1 (Page 28 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-03 C-02-03

~

SW PUMP C TRIP EVENT POINT 1821

)

i INDICATED CONDITION:

o SWP-1C BREAKER OPEN WITH CONTROL SWITCH IN NORMAL AFTER START POSIT:0N.

REDUNDANT INDICATION WHICH'WILL VERIFY ALARM:

i o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION.

O SWP-1B AUTO START ALARM.

o SW SYSTEM PRESS LOW ALARM.

OPERATOR ACTION FOR A VALID ALARM:

o ENSURE EMERGENCY NUCLEAR SERVICES PUMP SWP-1B OR SWP-1A AUTO START.

o INVESTIGATE CAUSE OF PUMP TRIP.

DISCUSSION:

$WP-1B STARTS 2 SEC AFTER PRESS DECREASES TO <110 PSIG. IF SWP-1B FAILS TO START, OR IS TAGGED OUT, SWP-1A WILL START 10 SEC AFTER PRESS DECREASES TO <110 PSIG. NO AUTO START ALARM I-S CURRENTLY INSTALLED FOR SWP-1A.

THIS IS AN EXPECTED ALARM FROM AN ES ACTUATION.

REFERENCES:

DRAWING 208-056 SHEET SW-01 JENSINGELEMENT:

SWP-lC CONTROL SWITCH CONTACTS CS/SC, CS/0 AD-303 Rev. 24 Page 30

l ENCLOSURE 1 (Page 29 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-04 C-02-04 SWPC MOTOR OVERLOAD EVENT POINT 1822 INDICATED CONDITION:

o SWP-1C MOTOR AMPS >115% RATED LOAD.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o HIGH MOTOR AMPS.

O SWP-1C TRIP.

o GREEN LIGHT ON WITH A RED FLAG ON SWP-1C CONTROL STATION.

O SW SYSTEM PRESS LOW SW-2-PI.

i OPERATOR ACTION FOR A VALID ALARM:

i o START SWP-1A OR SWP-1B, SECURE SWP-1C, INVESTIGATE CAUSE OF OVERLOAD.

DISCUSSION-THIS ALARM INDICATES THAT EITHER THE TIMED OVERCURRENT OR INSTANTANE0US OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANE0US OVERCURRENT PROTECTIVE RELAY ACTUATION WILL TRIP THE BREAKER.

IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.

REFERENCES:

DRAWING 208-056 SHEET SW-01 SENSING ELEMENT:

51 RELAY (INSIDE 4160V BREAKER CUBICLE) i AR-303 Rev. 24 Page 31

\\

ENCLOSURE 1 (Page 30 of 87)

()

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-05 C-02-05 Z

Z SW SYSTEM PRESS LC)VV EVENT POINT 1823 INDICATED CONDITION:

o SW SYSTEM HEADER PRESSURE <110 PSIG AS SENSED BY SW-151-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

g-~)

o SWP TRIP ALARM ON RUNNING SW PUMP.

o HIGH MOTOR AMPS ON RUNNING SW PUMP.

O SW SURGE TANK PRESS LOW.

OPERATOR ACTION FOR A VALID ALARM:

0 ENSURE SWP-1B OR SWP-1A HAS STARTED.

o MONITOR SW SURGE TANK LEVEL FOR ADEQUATE INVENTORY.

O CHECK SW SYSTEM FOR LEAKS.

O CHECK FOR PROPER VALVE ALIGNMENT FOR RUNNING SW PUMP.

O CHECK FOR BACKFLOW PAST CHECK VALVE ON IDLE SW PUMPS.

DISCUSSION:

REFERENCES:

DRAWING 208-056 SHEET SW-03

/7

(,/

SENSING ELEMENT:

SW-151-PS AR-303 Rev. 24 Page 32

1 i

ENCLOSURE 1 (Page 31 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-06 C-02-06

}

SW SYSTEM TEMP HIGH EVENT POINT 1839 INDICATED CONDITION:

o SW PUMP SUCTION TEMP >105'F AS SENSED BY SW-5-TS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

~s

\\d o SCREEN WASH TROUBLE.

o RW PUMP TRIP, OR ABNORMAL CURRENT.

O SW PUMP TRIP, OR ABNORMAL CURRENT OPERATOR ACTION FOR A VALID ALARM:

O REFER TO AP-330.

O PLACE ALL SW HEAT EXCHANGERS IN SERVICE IF REQUIRED.

O CHECK INTAKE SCREENS AND RWP'S TO ENSURE RAW WATER FLOW TO HEAT EXCHANGERS.

O MINIMIZE HEAT LOADS ON SW SYSTEM.

o CHECK SW HEAT EXCHANGERS DIFFERENTIAL TEMPERATURES FOR INDICATIONS OF FOULING.

o CHECK FOR PROPER VALVE ALIGNMENT FOR RUNNING SW PUMP AND SW HEAT EXCHANGERS.

o CHECK FOR BACKFLOW PAST CHECK VALVE ON IDLE SW PUMPS.

DISCUSSION:

REFERENCES:

DRAWING 208-056 SHEET SW-31 f~'T SENSING ELEMENT:

SW-5-TS 4

l s_ /

A!!-303 Rev. 24 Page 33

ENCLOSURE 1 (Page 32 of 87)

[

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-08 C-02-08 BWST LEVEL HIGH/ LOW EVENT POINT 0157 INDICATED CONDITION:

l o BWST LEVEL <45.5' AS SENSED BY DH-11-LS f~(

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o DH-7-LI o DH-37-LI o DH-7-LIR o COMPUTER POINT X335 OPERATOR ACTION FOR A VALID ALARM:

o INVESTIGATE CAUSE OF DECREASING LEVEL.

DISCUSSION:

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

=

REFERENCES:

DRAWING 208-021 SHEET DH-22 Cs SENSING ELEMENT:

DH-11-LS AR-303 Rev. 24 Page 34

S 4

ENCLOSURE 1 (Page 33 of 87)

O ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-08 C-02-08 V

swsT LEVEL HIGH/ LOW EVENT POINT 0233 INDICATED CONDITION:

l o BWST LEVEL >46.5' AS SENSED BY DH-11-LS.

A()

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o DH-7-LI o DH-37-LI o DH-7-LIR o COMPUTER POINT X335 OPERATOR ACTION FOR A VALID ALARM:

o INVESTIGATE CAUSE OF INCREASING LEVEL.

I DISCUSSION:

REFERENCES:

DRAWING 208-021 SHEET DH-22 SENSING ELEMENT: DH-ll-LS AR-303 Rev. 24 Page 35

ENCLOSURE 1 (Page 34 of 87)

(}

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-08 C-02-08 V

swsT LEVEL HIGH/ LOW EVENT POINT 0234 INDICATED CONDITION:

o BWST LEVEL <15' AS SENSED BY DH-7-LSI.

()

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o DH-7-LI o DH-37-LI o DH-7-LIR o COMPUTER POINT X335 OPERATOR ACTION FOR A VALID ALARM:

o INVESTIGATE CAUSE OF DECREASING LEVEL.

o BEGIN SWAP OVER TO RB SUMP IF A VALID ES ACTUATION HAS OCCURRED.

REFER TO DIRECTING EMERGENCY OPERATING PROCEDURE.

DISCUSSION:

o REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

o SWAP OVER TO RB SUMP FOR LONG TERM RECIRCULATION MODE IS REQUIRED TO BE COMPLETE BEFORE BWST REACHES 7' INDICATED LEVEL TO PREVENT EQUIPMENT DAMAGE.

REFERENCES:

DRAWING 208-021 SHEET DH-24 SENSING ELEMENT:

DH-7-LS1 AR-303 Rev. 24 Page 36

ENCLOSURE 1 (Page 35 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-08 C-02-08 BWST LEVEL HIGH/ LOW EVENT POINT 0235 INDICATED CONDITION:

o BWST LEVEL <7' AS SENSED BY DH-7-LSI.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o DH-7-LI o DH-37-LI o DH-7-LIR o COMPUTER POINT X335 OPERATOR ACTION FOR A VALID ALARM:

o INVESTIGATE CAUSE OF DECREASING LEVEL.

O ENSURE SWAP OVER TO RB SUMP IS COMPLETED AS S00N AS POSSIBLE DURING VALID ES ACTUATION S0 AS TO PRECLUDE DAMAGE TO ECCS EQUIPMENT.

DISCUSSION:

o REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

o UNDER FULL FLOW ECCS CONDITIONS VORTEXING COULD OCCUR IN THE BWST AT INDICATED LEVEL OF < 7' (5' PLUS INSTRUMENT ERROR)

REFERENCES:

DRAWING 208-021 SHEET DH-24 SENSING ELEMENT:

DH-7-LS1 O

AR-303 Rev. 24 Page 37

ENCL 0SURE 1 (Page 36 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-09 C-02-09

(

'l BWST TEMP Z

Z HIGH/ LOW

f. VENT POINT 0236 INDICATED CONDITION:

o BWST TEMPERATURE x110*F AS SENSED BY DH-9-TTS.

l

'A'()

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o DH-10-TI o DH-9-TI o COMPUTER POINT X336 OPERATOR ACTION FOR A VALID ALARM:

o INVESTIGATE CAUSE OF INCREASING TEMPERATURE.

O ENSURE BWST HEATER (S) NOT IN OPERATION.

DISCUSSION:

REFERENCES:

DRAWING 208-02I SHEET DH-22 SENSING ELEMENT: DH-9-TTS AR-303 Rev. 24 Page 38

ENCLOSURE 1 (Page 37 of 87) l ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-09 C-02-09 l

BWST TEMP HIGH/ LOW EVENT POINT 0237 I!

INDICATED CONDITION:

o BWST TEMPERATURE < 60*F AS SENSED BY DH-10-TTS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o DH-10-TI o DH-9-TI o COMPUTER POINT X336 OPERATOR ACTION FOR A VALID ALARM:

o INVESTIGATE CAUSE OF DECREASING TEMPERATURE.

o ENSURE BWST HEATER (S) IN OPERATION.

l DISCUSSION:

REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-021 SHEET DH-22 SENSING ELEMENT: DH-10-TTS AR-303 Rev. 24 Page 39 i

l ENCLOSURE 1 (Page 38 of 87)

O ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-11 C-02-11 v

I I

1 I

I I

l l

REACTOR BLDG I

I FLOOD LEVEL I

I HIGH I

I I

I EVENT POINT 1510 l

I I

l INDICATED CONDITION:

o REACTOR BUILDING WATER LEVEL >3'6" ABOVE RB FLOOR (>98'6" elevation)

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o HIGH RB WATER LEVEL AS INDICATED ON WD-303-LI AND WD-304-LI.

o HIGH SUMP WATER LEVEL ON WD-222-LI.

o HIGH SUMP WATER LEVEL ON BS-93-PIR.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO E0P-07 OR E0P-08 TO SWAP DHP/BSP SUCTION TO RB SUMP DURING A L.0.C.A.

DISCUSSION:

ALARM SETPOINT IS BASED ON WATER LEVEL IN REACTOR BUILDING FOR DHP AND BSP NPSH TO PERMIT SWAP OVER TO SUMP DURING A L.0.C.A. PER E.0.P.S.

SWAP OVER TO SUMP SHOULD BE BASED ON BWST WATER LEVEL AND NOT SUMP LEVEL.

REFERENCES:

DRAWING 208-060 SHEET WD-137 SENSING ELEMENT: WD-303-LY,WD-304-LY LEVEL TRANSMITTERS O

AR-303 Rev. 24 Page 40

ENCLOSURE 1 (Page 39 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-l2 C-02-12 l

l 1

I I

I I

I l

l REACTOR BLDG I

I SUMP LEVEL l

l HIGH I

I I

I EVENT POINT 1509 I

I INDICATED CONDITION:

o REACTOR BUILDING SUMP LEVEL >4' AB0VE SUMP BOTTOM (>88'6" elevation).

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

n

\\')

o HIGH SUMP WATER LEVEL ON WD-222-LI.

o HIGH SUMP WATER LEVEL ON BS-93-PIR.

OPERATOR ACTION FOR A VALID ALARM:

o CHECK FOR INDICATIONS OF RCS LEAKAGE.

o NOTIFY PRIMARY PLANT OPERATOR TO INVESTIGATE.

o REFER TO E0P.

DISCUSSION:

LEAKAGE INTO SUMP MAY BE FROM ONE OR MORE OF THE FOLLOWING: REACTOR COOLANT SYSTEM, SECONDARY SYSTEM, RC PUMP OIL, DEMIN WATER, SW LEAKS, COOLING WATER LINES CONDENSING HUMID AIR, REFUELING CANAL DRAINS.

REFER TO SP-317 AND OP-301 TO DETERMINE IF RCS WATER IS BEING LOST TO THE RB SUMP.

ENSURE ANY RECENT CHANGES TO SYSTEM LINEUPS THAT MAY HAVE CAUSED THIS HIGH LEVEL CONDITION ARE INVESTIGATED.

REFERENCES:

DRAWING 208-060 SHEET WD-137 SENSING ELEMENT: WD-301-LY,WD-302-LY LEVEL TRANSMITTERS AR-303 Rev. 24 Page 41

ENCLOSURE 1 (Page 40 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-13 C-02-13 l

l l

l l

l l

I I

I REACTOR BLDG I

I SUMP PUMP l

l TROUBLE I

I l

l l

l EVENT POINT 1585 INDICATED CONDITION:

o RB SUMP PUMP A OR B AUTO START AT 12".

(IF SELECTED TO ' LEAD')

o RB SUMP PUMP A OR B TRIP.

o RB SUMP LEVEL >18".

o WASTE DISPOSAL PANEL FAN FAILURE.

m REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o RBS PUMP C/S GREEN LIGHT ON AND SWITCH IN NORM AFTER START.

O HIGH SUMP LEVEL ON WD-222-LI.

O HIGH SUMP WATER LEVEL ON BS-93-PIR.

OPERATOR ACTION FOR A VALID ALARM:

o IF PUMP AUTO START, OBSERVE LEVEL DECREASE.

o IF PUMP TRIP, INVESTIGATE REASON FOR PUMP TRIP.

o NOTIFY PRIMARY PLANT OPERATOR TO INVESTIGATE FAN FAILURE AT WASTE.

DISPOSAL PANEL, AND SELECT ALTERNATE FAN IF REQUIRED.

DISCUSSION:

THIS ALARM SHOULD CLEAR WHEN AUTO PUMP SHUTDOWN OCCURS AT 2".

REFERENCES:

DRAWING 208-060 SHEET WD-07, WD-134, WD-148 SENSING ELEMENT: WD-222-LS O

AR-303 Rev. 24 Page 42

e e

ENCLOSURE 1 l

(Page 41 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 J

l I

I I

I I

l l

l l

SW ISO VALVE I

I AIR l

l FAILURE I

l l

l I

I l

l EVENT POINT 0530 INDICATED CONDITION:

O SUPPLY AIR PRESSURE TO CIV-34 <80 PSIG AS SENSED BY CI-411-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

0 CIV-34 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

o INVESTIGATE CAUSE OF LOW PRESSURE TO CIV-34.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-077 SHEET Cl-20 SENSING ELEMENT:

CI-411-PS AR-303 Rev. 24 Page 43

ENCLOSURE 1 (Page 42 of 87)

()

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 i

SW ISO VALVE

/UR FAILURE EVENT POINT 0531

!Z INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO CIV-35 <80 PSIG AS SENSED BY CI-412-PS.

()

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

0 INSTRUMENT AIR PRESSURE INDICATING LOW.

o CIV-35 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

O INVESTIGATE CAUSE OF LOW PRESSURE TO CIV-35.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-077 SHEET CI-21

()

SENSING ELEMENT:

CI-412-PS AR-303 Rev. 24 Page 44

1 ENCLOSURE 1 (Page 43 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 SW ISO VALVE AIR FAILURE EVENT POINT 0532 EZ INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO CIV-40 <80 PSIG AS SENSED BY CI-413-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

O CIV-40 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

O INVESTIGATE CAUSE OF LOW PRESSURE TO CIV-40, i

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-077 SHEET CI-22 md SENSING ELEMENT:

CI-413-PS AR-303 Rev. 24 Page 45

4 ENCLOSURE 1 (Page 44 of 87)

('"N ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14

(

SW ISO VALVE AIR FAILURE EVENT POINT 0533 Z

EZ INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO CIV-41 <80 PSIG AS SENSED BY Cl-414-PS.

l

[}

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

o CIV-41 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

O INVESTIGATE CAUSE OF LOW PRESSURE TO CIV-41.

i DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-077 SHEET CI-23

()

SENSING ELEMENT:

CI-414-PS AR-303 Rev. 24 Page 46 i

ENCLOSURE 1 (Page 45 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 II.

SW ISO VALVE AIR l

FAILURE I

I I

I EVENT POINT 1855 Z

l INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-12 <80 PSIG AS SENSED BY SWV-12-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

o SWV-12 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-12.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-06 SENSING ELEMENT:

SWV-12-PS AR-303 Rev. 24 Page 47

ENCLOSURE I (Page 46 of 87)

O ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 V

l I

I I

I SW ISO VALVE I

AIR i

l FAILURE I

I I

I l

EVENT POINT 1856 INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-35 <80 PSIG AS SENSED BY SWV-35-PS.

,9 REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

V o INSTRUMENT AIR PRESSURE INDICATING LOW.

o SWV-35 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-35.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-06

(

SENSING ELEMENT:

SWV-35-PS AR-303 Rev. 24 Page 48

ENCLOSURE I (Page 47 of 87)

(

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 l

l l

l l

SW ISO VALVE I

AIR l

FAILURE I

l l

l EVENT POINT 1857

~

INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-37 <80 PSIG AS SENSED BY SWV-37-PS.

t REDUNDANT INDICATION f;!ICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

o SWV-37 VALVE POSITION INDICATING MID POSITION.

1 OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

O INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-37.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-07 SENSING ELEMENT:

SWV-37-PS

. AR-303 Rev. 24 Page 49

ENCLOSURE 1 (Page 48 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 I

I I

I I

SW ISO VALVE I

AIR l

FAILURE I

l l

l EVENT POINT 1858 2

l INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-39 <80 PSIG AS SENSED BY SWV-39-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

o SWV-39 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

O INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-39.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET CW-07

(

SENSING ELEMENT:

SWV-39-PS AR-303 Rev. 24 Page 50

ENCLOSURE 1 (Page 49 of 87)

[

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 I

I I

I I

SW ISO VALVE I

AIR l

FAILURE I

l l

l EVENT POINT 1859 i

INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-41 <80 PSIG AS SENSED BY SWV-41-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

1 o SWV-41 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

O INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-41.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-08 SENSING ELEMENT:

SWV-41-PS AR-303 Rev. 24 Page 51

ENCLOSURE 1 (Page 50 of 87)

(}

ESAB-A ANNUNCIATOR RESPONt.

ESAB-A-02-14 C-02-14 4

SW ISO VALVE AIR FAILURE EVENT POINT 1860 EZ INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-43 <80 PSIG AS SENSED BY SWV-43-PS.

()

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

O SWV-43 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-43.

d DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-08

()

SENSING ELEMENT:

SWV-43-PS AR-303 Rev. 24 Page 52

ENCLOSURE 1 (Page 51 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14

(

l l

I I

I I

i l

I I

I SW ISO VALVE I

I AIR l

l FAILURE I

I I

I I

I I

I EVENT POINT 1861 M

4 INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-45 <80 PSIG AS SENSED BY SWV-45-PS.

1 REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

(

o INSTRUMENT AIR PRESSURE INDICATING LOW.

o SWV-45 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

O INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-45.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-09

(

SENSING ELEMENT:

SWV-45-PS AR-303 Rev. 24 Page 53

ENCLOSURE 1 (Page 52 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 I

I l

1 I

I I

I l

l SW ISO VALVE I

I AIR l

l FAILURE I

i l

l l

I l

l EVENT POINT 1862 l

INDICATED CONDITION:

o SUPPLY AIR PRESSURE,TO SWV-79 <80 PSIG AS SENSED BY SWV-79-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

O SWV-79 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

O INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-79.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-14

(

SENSING ELEMENT:

SWV-79-PS AR-303 Rev. 24 Page 54

j ENCLOSURE 1 l

(Page 53 of 87)

(]

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 kJ SW ISO VALVE AIR FAILURE EVENT POINT 1863

~

EZ INDICATED CONDITION:

0 SUPPLY AIR PRESSURE TO SWV-80 <80 PSIG AS SENSED BY SWV-80-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

o SWV-80 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-80.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-15

(

SENSING ELEMENT:

SWV-80-PS AR-303 Rev. 24 Page 55

ENCLOSURE I (Page 54 of 87)

O ESAB-A ANNUNCIAT00 RESPONSE ESAB-A-02-14 C-02-14 V

I I

I I

I l

l SW ISO VALVE l

l AIR I

I FAILURE I

I I

I

-l l

l EVENT POINT 1864 INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-81 <80 PSIG AS SENSED BY SWV-81-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

I c SWV-81 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-81.

1 l

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-16 SENSING ELEMENT: SWV-81-PS AR-303 Rev. 24 Page 56

ENCLOSURE 1 (Page 55 of 87)

ESA8-AANNUNCIATORSESPONSE ESA8-A-02-14 C-02-14 l

l I

I I

I I

I I

I SW ISO VALVE I

I AIR l

l FAILURE I

l l

l l

l l

l EVENT POINT 1865 INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-82 <80 PSIG AS SENSED BY SWV-82-PS.

hl REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

w 0 INSTRUMENT AIR PRESSURE INDICATING LOW.

o SWV-82 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-82.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-17 SENSING ELEMENT:

SWV-82-PS AR-303 Rev. 24 Page 57

ENCLOSURE _1 (Page 56 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14

}

SW ISO VALVE JUR FAILURE EVENT POINT 1866 INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-83 <80 PSIG AS SENSED BY SWV-83-PS.

(' )

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

O SWV-83 VALVE POSITION INDICATING MID POSITION.

/

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

O INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-83.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-0S6 SHEET SW-18

()

SENSING ELEMENT:

SWV-83-PS AR-303 Rev. 24 Page 58

ENCLOSURE 1 (Page 57 of 87) j ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 l

l I

I I

I I

I I

I I

SW ISO VALVE I

I AIR l

l FAILURE I

l l

l l

l l

l EVENT POINT 1867 INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-84 <80 PSIG AS SENSED BY SWV-84-PS.

)

l REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

O SWV-84 VALVE POSITION INDICATING HID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-84.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-19 SENSING ELEMENT:

SWV-84-PS AR-303 Rev. 24 Page 59

ENCLOSURE 1 (Page 58 of 87)

Og ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 O

l l

l l

l l

l l

1 I

$W ISO VALVE I

I AIR l

l FAILURE I

I I

I I

I l

l EVENT POINT 1868 INDICATED CONDITION:

o SUPPLY AIR PRESSURE 10 SWV-85 <80 PSIG AS SENSED BY SWV-85-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

o SWV-85 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-85.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-20 SENSING ELEMENT: SWV-85-PS AR-303 Rev. 24 Page 60

ENCLOSURE I (Page 59 of 87)

O ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14

(>

l l

l l

l l

l l

l l

SW ISO VALVE I

I AIR l

l FAILURE I

l l

l l

l l

l EVENT POINT 1869 INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-86 <80 PSIG AS SENSED BY SWV-86-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

o SWV-86 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

O INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-86.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-21 SENSING ELEMENT:

SWV-86-PS AR-303 Rev. 24 Page 61

^

I l

l ENCLOSURE 1 (Page 60 of 87)

(O ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14

)

l I

I I

I I

I I

I I

SW ISO VALVE I

I AIR l

l FAILURE I

I l

l l

l l

l EVENT POINT 1870 l

INDICATED C0i3ITION:

o SUPPLY AIR PRESSURE TO SWV-109 <80 PSIG AS SENSED BY SWV-109-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

o SWV-109 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-109.

l DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-22 SENSING ELEMENT:

SWV-109-PS AR-303 Rev. 24 Page 62

ENCLOSURE 1 (Page 61 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 l

l l

l l

l l

l 1

i SW ISO VALVE I

I AIR l

l FAILURE I

I l

l l

l l

-l EVENT POINT 1871 INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-110 <80 PSIG AS SENSED BY SWV-110-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

i o SWV-110 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-110.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-23

)

SENSING ELEMENT:

SWV-110-PS AR-303 Rev. 24 Page 63

s ENCLOSURE 1 (Page 62 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 I

I I

I l

SW ISO VALVE I

AIR l

FAILURE I

l l

l EVENT POINT 1872

~

INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-353 <80 PSIG AS SENSED BY SWV-353-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

O SWV-353 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-353.

DISCUSSION:

ENCLOSURE I 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-24

(

SENSING ELEMENT:

SWV-353-PS AR-303 Rev. 24 Page 64

ENCLOSURE 1 (Page 63 of 91) 1 ESAB-A ANNUNCIATOR RESPONSE ESAB-A'02-14 C-02-14 l

l l

I l

t i

I l

I SW ISO VALVE I

I AIR l

l FAILURE I

I i

\\

l l

l I

l l

EVENT POINT 1873 INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-354 <80 PSIG AS SENSED BY SWV-354-PS.

I REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

i o SWV-354 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

O INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-354.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-25 SENSING ELEMENT:

SWV-354-PS AR-303 Rev. 24 Page 65

ENCLOSURE 1 (Page 64 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 l

l l

l l

SW ISO VALVE I

AIR l

FAILURE I

I I

i l

EVENT POINT 1874

~

INDICATED CONDITION:

i o SUPPLY AIR PRESSURE TO SWV-355 <80 PSIG AS SENSED BY SWV-355-PS.

j O

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

d o INSTRUMENT AIR PRESSURE INDICATING LOW.

O SWV-355 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

O INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-355.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-26 I

SENSING ELEMENT:

SWV-355-PS AR-303 Rev. 24 Page 66

ENCLOSURE 1 (Page 65 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14 SW ISO VALVE AIR FAILURE EVENT POINT 1875 INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-151 <80 PSIG AS SENSED BY SWV-151-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

o SWV-151 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

i o INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-151.

4 DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-29 SENSING ELEMENT:

SWV-151-PS AR-303 Rev. 24 Page 67

ENCLOSURE 1 (Page 66 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-02-14 C-02-14

(

l fl l

l SW ISO VALVE I

AIR l

l FAILURE I

I I

I I

I l

l EVENT POINT 1876 INDICATED CONDITION:

o SUPPLY AIR PRESSURE TO SWV-152 <80 PSIG AS SENSED BY SWV-152-PS.

(

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATING LOW.

o SWV-152 VALVE POSITION INDICATING MID POSITION.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO AP-470.

O INVESTIGATE CAUSE OF LOW PRESSURE TO SWV-152.

DISCUSSION:

ENCLOSURE 1 0F AP-470 LISTS AIR OPERATED VALVES AND THEIR FAILED POSITION.

REFERENCES:

DRAWING 208-056 SHEET SW-30 SENSING ELEMENT:

SWV-152-PS AR-303 Rev. 24 Page 68

ENCLOSURE 1 (Page 67 of 87) l ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-01 C-03-01 RC-3 HIGH PRESS BISTABLE TRIP EVENT POINT 0939 INDICATED CONDITION:

o RCS PRESSURE <1500 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o ES STATUS LIGHT RC-3 ' BISTABLE TRIPPED' IS LIT.

O ACTUATION CHANNEL CABINET #3 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.

OPERATOR ACTION FOR A VALID ALARM:

c REFER TO E0P J

DISCUSSION:

THIS ALARM INDICATES ONE CHANNEL TRIPPED IN A 2 OUT OF 3 HPI LOGIC.

REFERENCES:

DRAWING 208-028 SHEET ESA-24 SENSING ELEMENT:

BT-3 ES ACTUATION RELAY AR-303 Rev. 24 Page 69 a

s ENCLOSURE 1 (Page 68 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-02 C-03-02 r( ';

RC-6 LOW PRESS BISTABLE TRIP EVENT POINT 0926 INDICATED CONDITION:

o RCS PRESSURE <500 PSIG

([ )

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o ES STATUS LIGHT RC-6 ' BISTABLE TRIPPED' IS LIT.

O ACTUATION CHANNEL CABINET #3 BISTABLE OUTPUT STATE LIGHT ' BRIGHT'.

OPERATOR ACTION FOR A VALID ALARM:

o REFER TO E0P DISCUSSION:

THIS ALARM INDICATES ONE CHANNEL TRIPPED IN A 2 OUT OF 3 LPI LOGIC.

REFERENCES:

DRAWING 208-028 SHEET ESB-39

()

SENSING ELEMENT:

BT-9 ES ACTUATION RELAY AR-303 Rev. 24 Page 70

~

ENCLOSURE 1 (Page 69 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-03 C-03-03 RWP-1 TRIP EVENT POINT 0001 INDICATED CONDITION:

1 o RWP-1 BREAKER IS OPEN WITH CONTROL HANDLE IN NORMAL AFTER START POSITION.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o Gr.EEN LIGHT ON WITH A RED FLAG ON CONTROL STATION.

O RWP-28 AUTO START.

O RW-23-PI SW RW SUPPLY PRESSURE LOW.

OPERATOR ACTION FOR A VALID ALARM:

o ENSURE RWP-2B START.

o INVESTIGATE CAUSE OF PUMP TRIP.

O CHECK BREAKER FOR DROPPED RELAY TARGETS.

1 DISCUSSION:

RWP-2B STARTS ON DECREASING HEADER PRESSURE AT 7 PSIG.

REFERENCES:

DRAWING 208-050 SHEET RW-01 SENSING ELEMENT:

RWP-1 CONTROL SWITCH CONTACTS CS/SC, CS/0, RW-63-PS1 Page 71 AR-303 Rev. 24

ENCLOSURE 1 (Page 70 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-04 C-03-04 SW RW PUMP MOTOR OVERLOAD EVENT POINT 0002 INDICATED CONDITION:

o RWP-1 MOTOR AMPS >115% RATED LOAD

(

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o HIGH MOTOR AMPS.

O RW-23-PI SW RW SUPPLY PRESSURE LOW.

OPERATOR ACTION FOR A VALID ALARM:

o START RWP-2A OR RWP-2B, SECURE RWP-I.

o INVESTIGATE CAUSE OF OVERLOAD.

DISCUSSION:

4 THIS ALARM INDICATES EITHER THE TIMED OVERCURRENT OR INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANEOUS OVERCURRENT RELAY ACTUATION WILL TRIP THE BREAKER.

IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.

j

REFERENCES:

ORAWING 208-050 SHEET RW-01 SENSING ELEMENT:

51 RELAY (INSIDE 4160V BREAKER CUBICLE)

AR-303 Rev. 24 Page 72

ENCLOSURE 1 (Page 71 of 87)

.Cy ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-05 C-03-05

%J SW RW SYSTEM PRESS LOW EVENT POINT 0007 INDICATED CONDITION:

o NUCLEAR SERVICES RAW WATER HEADER PRESS <7 PSIG AS SENSED BY RW-63-PSI.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o RWP-28 AUTO START.

o POSSIBLE RW PUMP TRIP.

OPERATOR ACTION FOR A VALID ALARM:

o ENSURE RWP-2B AUTO START.

o INVESTIGATE CAUSE OF LOW PRESSURE.

O CHECK INTAKE AREA AND INTAKE SCREENS FOR OBSTRUCTIONS TO FLOW.

0 CHECK FOR PROPER VALVE ALIGNMENT FOR RUNNING RW PUMP.

i DISCUSSION:

l

REFERENCES:

DRAWING 208-050 SHEET RW-03 SENSING ELEMENT:

RW-63-PS1 AR-303 Rev. 24 Page 73

_j

a ENCLOSURE._1 (Page 72 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-06 C-03-06 RWP AND SW RW PP RUNNING EVENT POINT 0024 INDICATED CONDITION:

o RWP-1 AND RWP-2A AND/0R RWP-2B RUNNING AT THE SAME TIME.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INDICATION OF MORE THAN ONE PUMP RUNNING.

o RW SYSTEM HEADER PRESSURE HIGH.

O RWP-2B AUTO START ALARM.

OPERATOR ACTION FOR A VALID ALARM:

o SECURE RW PUMP (S) NOT REQUIRED.

DISCUSSION:

IF RWP-1 IS RUNNING WITH EITHER RWP-2A AND/0R RWP-2B, THEN RWP-1 WILL TRIP AFTER 15 SECONDS.

REFERENCES:

DRAWING 208-050 SHEET RW-01 SENSING ELEMENT:

52S/A RELAY (RWP-1 RWP-2A,RWP-2B 4160V BREAKER CUBICLES) l AR-303 Rev. 24 Page 74

I ENCLOSURF__1 (Page 73 of 87)

)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-07 C-03-07

,q O

SW RW 1

TEMP HIGH EVENT POINT 0054 i

INDICATED CONDITION:

o RAW WATER SUPPLY TO SW HEAT EXCHANGERS TEMPERATURE IS >91.5* F AS SENSED BY RW-19-TS.

1 REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o RW TEMPERATURE INDICATION RW-19-TI OPERATOR ACTION FOR A VALID ALARM:

o NOTIFY AUXILIARY BUILDING OPERATOR TO SHUTDOWN RW PIT RECIRC BY FAILING CLOSED RWV-150 OR CLOSING RWV-149, o ENSURE SW RW TEMPERATURE CONTROL SURVEILLANCE KEY SWITCH IS IN THE NORMAL POSITION.

DISCUSSION:

RWV-150 IS THE SW TEMPERATURE CONTROL VALVE AND RECIRCULATES "B" SIDE SW RW BACK TO THE "B" SIDE RW PIT AS NECESSARY TO MAINTAIN SW SYSTEM TEMPERATURE AT 82* F (WHEN GULF 0F MEXIC0/ RAW WATER TEMPERATURE IS BELOW 80* F).

RWV-150 IS A SPRING CLOSE/ AIR TO OPEN CONTR01: VALVE AND FAILS CLOSED ON:

LOSS OF DC POWER TO CONTROL VALVE SOLEN 0ID, LOSS OF AIR SUPPLY PRESSURE, AND RWP-2B AUTO START, RWP-3B AUTO START.

j REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 210-583, MAR 86-12-02-04

(

SENSING ELEMENT:

RW-19-TS 4

AR-303 Rev. 24 Page 75

I ENCLOSURE 1 (Page 74 of 87)

(x ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-08 C-03-08 g

'w/

I l

I I

i i

l i

I FLUSH WATER I

I SYSTEM PRESS I

I LOW l

l l

l EVENT POINT 1517 I

I I

I I

li INDICATED CONDITION:

)

o FLUSH WATER SYSTEM PRESSURE <75 PSIG AS SENSED BY D0-2-PS.

(O,)

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

OPERATOR ACTIONS FOR A VALID ALARM:

o REFER TO OP-416 FOR ALTERNATE RWP FLUSH WATER SUPPLIES DISCUSSION:

~

THE RWP'S ARE CURRENTLY SUPPLIED WITH DEMIN WATER VIA D0V-128.

OP-416 LISTS TWO ALTERNATIVE SUPPLIES, DOMESTIC WATER VIA 1 0F 2 FILTERS AND PUMPS OR NUCLEAR SERVICES WATER VIA D0V-210 OR D0V-238.

IF THE FLUSH WATER PRESSURE DROPS BELOW RWP DISCHARGE PRESSURE, THEN THE RUNNING RWP'S WILL SUPPLY THEIR OWN FLUSH WATER FOR THE RUNNING RWP'S.

REFERENCES:

DRAWING 208-022-D0-13 k.J SENSING ELEMENT:

D0-2-PS AR-303 Rev. 24 Page 76

~

ENCLOSURE 1 (Page 75 of 87)

-g ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-09 C-03-09 I

I I

I I

I I

I FLUSH WATER I

I PUMP I

I TRIP I

I EVENT POINT 1513 I

I i

j 1

I INDICATED CONDITION:

o DOP-2A MOTOR NOT ENERGIZED WITH CONTROL SWITCH IN NORt:AL AFTER START POSITION.

()

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

O GREEN LIGHT ON WITH A RED FLAG ON D0P-2A CONTROL STATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o REFER TO OP-416 ' DOMESTIC WATER SUPPLY SYSTEM' FOR ALTERNATE RWP FLUSH WATER SUPPLIES.

O INVESTIGATE CAUSE OF PUMP TRIP.

1 DISCUSSION:

REFERENCES:

DRAWING 208-022-00-02 SENSING ELEMENT: DOP-2A CONTROL SWITCH CONTACTS CS/SC, CS/0 AR-303 Rev. 24 Page 77

ENCLOSURE 1 (Page 76 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-Z-03-09 C-03-09 I

I l

l l

l FLUSH WATER I

I PUMP I

I TRIP I

I I

I EVENT POINT 1515 l

l 1

I I

I I

I I

INDICATED CONDITION:

o DOP-2B HOTOR NOT ENERGIZED WITH CONTROL SWITCH IN NORMAL AFTER START POSITION.

1

(

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o GREEN LIGHT ON WITH A RED FLAG ON DOP-2B CONTROL STATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o REFER TO OP-416 ' DOMESTIC WATER SUPPLY SYSTEM' FOR ALTERNATE RWP FLUSH WATER SUPPLIES.

o INVESTIGATE CAUSE OF PUMP TRIP.

DISCUSSION:

REFERENCES:

DRAWING 208-022-D0-03 SENSING ELEMENT:

DOP-2B CONTROL SWITCH CONTACTS CS/SC, CS/0 O

AR-303 Rev. 24 Page 78

=

ENCLOSURE 1 (Page 77 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-10 C-03-10 l

I I

I FLUSH WATER I

I PUMP I

I AUTO START I

I I

I I

I l

l EVENT POINT 1514 l

l l

I I

I INDICATED CONDITION:

o D0P-2A MOTOR ENERGIZED WITH CONTROL SWITCH IN NORMAL AFTER STOP POSITION.

iO U

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o RED LIGHT ON WITH A GREEN FLAG ON D0P-2A CONTROL STATION.

OPERATOR ACTIONS FOR A' VALID ALARM:

o INVESTIGATE CAUSE OF PUMP AUTO START.

o REFER TO OP-416 ' DOMESTIC WATER SUPPLY SYSTEM' FOR ALTERNATE RWP FLUSH WATER SUPPLIES.

DISCUSSION:

REFERENCES:

DRAWING 208-022-D0-02 3

SENSING ELEMENT:

00P-2A CONTROL SWITCH CONTACTS CS/SC, CS/0 AR-303 Rev. 24 Page 79

ENCLOSURE I (Page 78 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-10 C-03-10 g

V i

I I

I FLUSH WATER I

I PUMP I

I AUTO START I

I I

I I

I l

l EVENT POINT 1516 l

l I

I I

I INDICATED CONDITION:

o 00P-28 MOTOR ENERGIZED WITH CONTROL SWITCH IN NORMAL AFTER STOP POSITION.

v REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o RED LIGHT ON WITH A GREEN FLAG ON D0P-2B CONTROL STATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTIGATE CAUSE OF PUMP AUTO START.

o REFER TO OP-416 ' DOMESTIC WATER SUPPLY SYSTEM' FOR ALTERNATE RWP FLUSH WATER SUPPLIES.

DISCUSSION:

REFERENCES:

DRAWING 208-022-00-03 I

SENSING ELEMENT:

D0P-2B CONTROL SWITCH CONTACTS CS/SC, CS/0 AR-303 fiev. 24 Page 80

ENCLOSURE 1 (Page 79 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-Il C-03-ll

(-].

LJ l

I

'l l

I I

I I

I I

I I

DH TO PZR l

l SPRAY VALVE I

l OPEN l

I EVENT POINT 0240 l

I I

INDICATED CONDITION:

i o DHV-91 NOT FULL CLOSED AND RCS PRESSURE >284 PSIG AS SENSED BY RC-3A-PS7.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o DHV-91 VALVE POSITION INDICATION.

o RCS PRESSURE INDICATION.

OPERATOR ACTION FOR A VALID ALARM:

o INVESTIGATE CAUSE OF INCREASING PRESSURE.

O CLOSE DHV-91 IF RCS PRESSURE >284 PSIG.

DISCUSSION:

REFERENCES:

DRAWING 208-021 SHEET DH-16 SENSING ELEMENT:

RC-3A-PS7 AR-303 Rev. 24 Page 81

,w

-~. - - - -

ENCLOSURE 1 (Page 80 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-ll C-03-11 pO l

l I

I I

I I

I I

I I

I DH TO PZR l

l SPRAY VALVE I

I OPEN l

l EVENT POINT 1316 I

I INDICATED CONDITION:

o RCV-53 NOT FULL CLOSED AND RCS PRESSURE >200 PSIG AS SENSED BY RC-3A-PS7.

i REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

0 RCV-53 VALVE POSITION INDICATION.

O RCS PRESSURE INDICATION.

OPERATOR ACTION FOR A VALID ALARM:

0 INVESTIGATE CAUSE OF INCREASING PRESSURE.

o CLOSE RCV-53 IF RCS PRESSURE >200 PSIG.

DISCllSSION:

REFERENCES:

DRAWING 208-047 SHEET RC-16 SENSING ELEMENT:

RC-3A-PS7 f

G AR-303 Rev. 24 Page 82

ENCLOSURE 1 (Page 81 of 87) l ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-12 C-03-12 U

I I

I I

I DH VALVE l

ACISYSTEM TROUBLE l

i l

l l

J EVENT POINT 1233 I

I INDICATED CONDITION:

o ACI SUBSYSTEM 1 OR 2 BYPASS KEY IN BYPASS POSITION.

O O ACI SUBSYSTEM 1 OR 2 MODULE REMOVED.

o DHV-3 OR DHV-4 NOT FULL CLOSED AND RCS PRESSURE >284 PSIG.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o DHV-3 VALVE POSITION INDICATION.

O DHV-4 VALVE POSITION INDICATION.

O RCS PRESSURE INDICATION.

OPERATOR ACTION FOR A VALID ALARM:

o INVESTIGATE CAUSE OF INCREASING PRESSURE.

O CLOSE DHV-3 AND/0R DHV-4 IF RCS PRESSURE >2B4 PSIG.

DISCUSSION:

o DHV-3 ACI USES RC-147-PT FOR RCS PRESSURE AND CAN BE SEEN ON THE REMOTE l

SHUTDOWN PANEL, OR SPDS o DHV-4 ACI USES RC-132-PT FOR RCS PRESSURE AND CAN BE SEEN IN ES CABINET #3.

REFERENCES:

DRAWING 208-028 SHEET ESAB-6 A

(]

SENSING ELEMENT:

BT-13.BT-14 ES ACTUATION RELAYS AR-303 Rev. 24 Page 83

ENCLOSURE 1 (Page 82 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-13 C-03-13 b,A l

l l

l 1

I I

I I

I I

I DH DROPLINE l

l VALVES j

l l

OPEN l

l l

l Z

EVENT POINT 0214 i

INDICATED CONDITION,:

l o DHV-3 NOT CLOSED AND RCS PRESSURE >200 PSIG AS SENSED BY 3RC-3A-PS8.

REDUNDANT INDICATION WHICH WILL VERIFY AltRM:

o DHV-3 VALVE POSITION INDICATI0s:.

o RCS PRESSURE INDICATION.

OPERATOR ACTION FOR A VALID ALARM:

o CLOSE DHV-3 IF RCS FRESSURE >284 PSIG.

DISCUSSION:

REFERENCES:

DRAWING 208-021 SHEET DH-03 SENSING ELEMENT:

3RC-3A-PS8

g l

(

AR-303 Rev. 24 Page 84

=

ENCLOSURE 1 (Page 83 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-13 C-03-13

, b I

I I

I I

I I

I I

I I

I DH DROP LINE l

l VALVES l

I OPEN I

I I

I

~

EVENT POINT 0215 s

INDICATED CONDITION:

l

~

o DHV-4 NOT CLOSED AND RCS PRESSURE >200 PSIG AS SENSED BY 3RC-3A~-PS9.

r REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o DHV-4 VALVE POSITION INDICATION.

o RCS PRESSURE INDICATION.

OPERATOR ACTION FOR A VALID ALARM:

o CLOSE DHV-4 IF RCS PRESSURE >284 PSIG.

t DISCUSSION:

REFERENCES:

DRAWING 208-021 SHEET DH-04 SENSING ELEMENT:

3RC-3A-PS9 AR-303 Rev. 24 Page 85

ENCLOSURE 1 (Page 84 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-13 C-03-13 I

I I

I I

I I

I I

I I

I DH DROP LINE l

l VALVES I

I OPEN l

l l

l Z

EVENT POINT 0216 INDICATED CONDITION:

oDHV-41NdTCLOSEDANDRCSPRESSURE>200PSIGASSENSEDBY3RC-3A-PS4.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o DHV-41 VALVE POSITION INDICATION.

f o RCS PRESSURE INDICATION.

OPERATOR ACTION FOR A VALID ALARM:

o CLOSE DHV-41 IF RCS PRESSURE >284 PSIG.

DISCUSSION:

REFERENCES:

DRAWING 208-021 SHEET DH-13

^

SENSING ELEMENT:

3RC-3A-PS4 AR 303 Rev. 24 Page 86

u ENCLOSURE 1 l

- (Page 85 of 87) i ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-14 C-03-14

'v SEISMIC SYSTEM TROUBLE EVENT POINT 1709 INDICATED CONDITION:

'o SEISMIC EVENT OCCURRED i

p.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

.o INDICATION AT SEISMIC PANEL.

o NOTIFICATION OF SEISMIC EVENT.

OPERATOR ACTION FOR A VALID ALARM:

o CHECK SEISMIC PANEL FOR CAUSE OF ALARM.

o REFER TO AP-961.

4 DISCUSSION:

I&C SHOP PERFORMS ALL SURVEILLANCE PROCEDURES AND MAGNETIC TAPE REPLACEMENT WHEN REQUIRED.

REFERENCES:

SENSING ELEMENT:

SEISMIC INSTRUMENT PANEL.

AR-303 Rev. 24 Page 87

4 u

ENCLOSURE 1 (Page 86 of 87)

ESAB-A ANNUNCIATOR RESPONSE ESAB-A-03-14 C-03-14

(

l l

l l

l l

l l

l l

I I

SEISMIC l

l SYSTEM l

l TROUBLE l

l l

l l

l EVENT POINT 1710 INDICATED CONDITION:

O SEISMIC PANEL LOSS OF POWER Gb REP 9NDANT INDICATION WHICH WILL VERIFY ALARM:

0 INDICATION AT SEISMIC PANEL.

OPERATOR ACTION FOR A VALID ALARM:

o INVESTIGATE SEISMIC PANEL FOR CAUSE OF LOSS OF POWER ALARM.

o REFER TO OP-700C.

DISCUSSION:

POWER SUPPLY IS ACDP-52 BREAKER 31 p

REFERENCES:

SENSING ELEMENT:

SEISMIC INSTRUMENT PANEL.

AR-303 Rev. 24 Page 88

s.

ENCLOSURE 1 (Page 87 of 87)

~~

ESAB A ANNUNCIATOR RESPONSE ESAB-A-03-14 C-03-14

^

I I

I I

I I

I I

I I

I I

SEISMIC I

I SYSTEM l

l TROUBLE l

l

~

l l

I I

EVENT POINT 1711 1

INDICATED CONDITION:

o SEISMIC RECORDER END OF TAPE.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INDICATION AT SEISMIC PANEL.

OPERATOR ACTION FOR A VALID ALARM:

o INVESTIGATE SEISMIC PANEL RECORDER, IF AT THE END OF TAPE, GENERATE A WORK REQUEST TO REPLACE MAGNETIC TAPE (S).

l DISCUSSION:

I&C SHOP PERFORMS ALL SURVEILLANCE PROCEDURES AND MAGNETIC TAPE REPLACEMENT WHEN REQUIRED.

REFERENCES:

t SENSING ELEMENT:

SEISMIC INSTRUMENT PANEL.

AR-303 Rev. 24 Page 89 (LAST PAGE)