ENS 46057: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 06/30/2010 09:55 EDT
| event date = 06/30/2010 09:55 EDT
| last update date = 06/30/2010
| last update date = 06/30/2010
| title = Offsite Notification Due To Sulfuric Acid Spill Onsite
| title = Offsite Notification Due to Sulfuric Acid Spill Onsite
| event text = At 0955 on June 30, 2010, the Control Room was notified that sulfuric acid was leaking from a temporary acid containment berm onto a gravel surface area adjacent to the containment berm. The quantity of this leak was <5 gallons of approximately 93% concentrated sulfuric acid. The leak was in the non-radiologically controlled area of the plant, associated with a temporary acid injection system for cooling tower water treatment.
| event text = At 0955 on June 30, 2010, the Control Room was notified that sulfuric acid was leaking from a temporary acid containment berm onto a gravel surface area adjacent to the containment berm. The quantity of this leak was <5 gallons of approximately 93% concentrated sulfuric acid. The leak was in the non-radiologically controlled area of the plant, associated with a temporary acid injection system for cooling tower water treatment.
Spill response personnel responded to contain and neutralize the leakage. No material was directly released to any waterway or offsite area. The quantity of material released is below any environmental regulatory limits. Actions are ongoing in removal of the acid from the leaking tank inside the containment berm area. An offsite company with expertise in the handling of this material has been contacted and will be providing assistance with the response efforts.
Spill response personnel responded to contain and neutralize the leakage. No material was directly released to any waterway or offsite area. The quantity of material released is below any environmental regulatory limits. Actions are ongoing in removal of the acid from the leaking tank inside the containment berm area. An offsite company with expertise in the handling of this material has been contacted and will be providing assistance with the response efforts.

Latest revision as of 21:09, 1 March 2018

ENS 46057 +/-
Where
Susquehanna Talen Energy icon.png
Pennsylvania (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release
Time - Person (Reporting Time:+2.13 h0.0888 days <br />0.0127 weeks <br />0.00292 months <br />)
Opened: Martin Lichtner
16:03 Jun 30, 2010
NRC Officer: Joe O'Hara
Last Updated: Jun 30, 2010
46057 - NRC Website