ML20133F691: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _ .
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _ .
  "
"
.
.
                                                                                                                        9
9
                                              JUL26 E83
JUL26 E83
      Docket No. 50-219
Docket No. 50-219
      License No. DPR-16
License No. DPR-16
      GPU Nuclear Corporation                                                                                           i
GPU Nuclear Corporation
      ATIN: Mr. P. B. Fiedler                                               .
i
                Vice President and Director
ATIN: Mr. P. B. Fiedler
      Oyster Creek Nuclear Generating Station
.
        P. O. Box 388
Vice President and Director
        Forked River, New Jersey 08731
Oyster Creek Nuclear Generating Station
        Gentlemen:
P. O. Box 388
        Subject:   Inspection Report No. 50-219/85-19
Forked River, New Jersey 08731
        This refers to the routine resident safety inspection by Messrs. W. Bateman,
Gentlemen:
        J. Wechselberger, W. Baunack, and H. Bicehouse from June 3 - 30, 1985, at the
Subject:
        Oyster Creek Nuclear Generating Station. The inspection consisted of document
Inspection Report No. 50-219/85-19
        reviews, interviews, and observations of activities as documented in the enclosed
This refers to the routine resident safety inspection by Messrs. W. Bateman,
        inspection report. The findings were discussed with you and members of your
J. Wechselberger, W. Baunack, and H. Bicehouse from June 3 - 30, 1985, at the
        staff at the conclusion of the inspection.
Oyster Creek Nuclear Generating Station. The inspection consisted of document
        Within the scope of this inspection, no violations were identified.
reviews, interviews, and observations of activities as documented in the enclosed
        This inspection Report summarizes the followup meeting held in Region I with
inspection report. The findings were discussed with you and members of your
        members of GPUN management to discuss results of recent hanger inspections and
staff at the conclusion of the inspection.
        a justification for continued operation based on the large number of identified
Within the scope of this inspection, no violations were identified.
        disc.epancies.     Also discussed were GPUN's problems with identification and
This inspection Report summarizes the followup meeting held in Region I with
        resolution of old issues and weaknesses in their configuration control program.
members of GPUN management to discuss results of recent hanger inspections and
        The respor.se of the plant operators to the scram from full power operation on
a justification for continued operation based on the large number of identified
        June 12, 1985 was observed and noted by the inspectors to be commendable.
disc.epancies.
        Your cooperation with us in these matters is appreciated.
Also discussed were GPUN's problems with identification and
                                                    Sincerely,
resolution of old issues and weaknesses in their configuration control program.
                                                  Origina131Enzd E7 ;
The respor.se of the plant operators to the scram from full power operation on
                                                    Harry B. Kister, Chief
June 12, 1985 was observed and noted by the inspectors to be commendable.
                                                    Projects Branch No. 1
Your cooperation with us in these matters is appreciated.
                                                    Division of Reactor Prr.jects
Sincerely,
        Enclosure:
Origina131 nzd E ;
        NRC Region I Report 50-219/85-19
E
                                    0FFICIAL RECORD COPY       IR OYC 85-19 - 0001.0.0
7
                                                                07/23/25
Harry B. Kister, Chief
    B508080392 850726
Projects Branch No. 1
    PDR
Division of Reactor Prr.jects
    G
Enclosure:
          ADOCK 05000219
NRC Region I Report 50-219/85-19
                        PINI
0FFICIAL RECORD COPY
                                                                                    IE e t'8
IR OYC 85-19 - 0001.0.0
                                                                                                                      3
07/23/25
B508080392 850726
PDR
ADOCK 05000219
IE e t
G
PINI
'8
3


                              ._                           . _ _ _ _ _ .     _ - _ _ _____-__ .
._
          *
. _ _ _ _ _ .
  ,
_ - _ _ _____-__ .
                GPU Nuclear Corporation                   2
*
                cc w/ enc 1:
,
                BWR Licensing Manager-
GPU Nuclear Corporation
                Licensing Manager, Oyster Creek
2
                Public Document Room (PDR)
cc w/ enc 1:
                Local Public Document Room (LPDR)
BWR Licensing Manager-
                Nuclear Safety Information Center (NSIC)
Licensing Manager, Oyster Creek
                NRC Resident Inspector
Public Document Room (PDR)
                J. Fair, IE
Local Public Document Room (LPDR)
              ~ State of New Jersey
Nuclear Safety Information Center (NSIC)
                                                                                                                    i
NRC Resident Inspector
                bec w/ enc 1:                                                                                       l
J. Fair, IE
                Region I Docket Room (with concurrences)
~ State of New Jersey
                Senior Operations Chief (w/o encl)
i
                DRS Director
bec w/ enc 1:
                DRSS Director
l
                                                                                                                    1
Region I Docket Room (with concurrences)
                                            /
Senior Operations Chief (w/o encl)
                        .
DRS Director
                  O                   e
DRSS Director
                Bateman/sm           Kist r
1
                7/ /85               7/L 85   '!kk(/
/
  -
.
                                              0FFICIAL RECORD COPY                           IR OYC 85-19 - 0001.1.0
O
                                                                                            07/23/85
e
t,. .. ..   .
'!kk(/
                    .     .
Bateman/sm
                                . . .   .
Kist r
                                              . . .
7/ /85
                                                    ..                 ____
7/L 85
-
0FFICIAL RECORD COPY
IR OYC 85-19 - 0001.1.0
07/23/85
t,.
.. ..
.
.
.
. . .
.
. . .
..
____
}}
}}

Latest revision as of 08:25, 12 December 2024

Forwards Safety Insp Rept 50-219/85-19 on 850603-30.No Violations Noted
ML20133F691
Person / Time
Site: Oyster Creek
Issue date: 07/26/1985
From: Kister H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20133F693 List:
References
NUDOCS 8508080392
Download: ML20133F691 (2)


See also: IR 05000219/1985019

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ .

"

.

9

JUL26 E83

Docket No. 50-219

License No. DPR-16

GPU Nuclear Corporation

i

ATIN: Mr. P. B. Fiedler

.

Vice President and Director

Oyster Creek Nuclear Generating Station

P. O. Box 388

Forked River, New Jersey 08731

Gentlemen:

Subject:

Inspection Report No. 50-219/85-19

This refers to the routine resident safety inspection by Messrs. W. Bateman,

J. Wechselberger, W. Baunack, and H. Bicehouse from June 3 - 30, 1985, at the

Oyster Creek Nuclear Generating Station. The inspection consisted of document

reviews, interviews, and observations of activities as documented in the enclosed

inspection report. The findings were discussed with you and members of your

staff at the conclusion of the inspection.

Within the scope of this inspection, no violations were identified.

This inspection Report summarizes the followup meeting held in Region I with

members of GPUN management to discuss results of recent hanger inspections and

a justification for continued operation based on the large number of identified

disc.epancies.

Also discussed were GPUN's problems with identification and

resolution of old issues and weaknesses in their configuration control program.

The respor.se of the plant operators to the scram from full power operation on

June 12, 1985 was observed and noted by the inspectors to be commendable.

Your cooperation with us in these matters is appreciated.

Sincerely,

Origina131 nzd E ;

E

7

Harry B. Kister, Chief

Projects Branch No. 1

Division of Reactor Prr.jects

Enclosure:

NRC Region I Report 50-219/85-19

0FFICIAL RECORD COPY

IR OYC 85-19 - 0001.0.0

07/23/25

B508080392 850726

PDR

ADOCK 05000219

IE e t

G

PINI

'8

3

._

. _ _ _ _ _ .

_ - _ _ _____-__ .

,

GPU Nuclear Corporation

2

cc w/ enc 1:

BWR Licensing Manager-

Licensing Manager, Oyster Creek

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

J. Fair, IE

~ State of New Jersey

i

bec w/ enc 1:

l

Region I Docket Room (with concurrences)

Senior Operations Chief (w/o encl)

DRS Director

DRSS Director

1

/

.

O

e

'!kk(/

Bateman/sm

Kist r

7/ /85

7/L 85

-

0FFICIAL RECORD COPY

IR OYC 85-19 - 0001.1.0

07/23/85

t,.

.. ..

.

.

.

. . .

.

. . .

..

____