APPENDIX A | |||
NOTICE OF VIOLATION | |||
Duquesne Light Company | |||
Docket No. 50-412 | |||
Beaver Valley Power Station, Unit 2 | |||
License No. CPPR-105 | |||
As a result of the inspection conducted on May 23 - June 28, 1985, and in accor- | |||
dance with the NRC Enforcement Policy (10 CFR 2, Appendix C), published in the | |||
Federal Register on March 8, 1984 (49 FR 8583), the following violation was iden- | |||
tified: | |||
10 CFR 50, Appendix B, Criterion V requires that activities affecting | |||
quality shall be prescribed by procedures and shall be accomplished in | |||
accordance with these procedures. | |||
Drawing 12241-BZ-19A-48-0C defines the dimensions, associated tolerances, and | |||
other necessary details to properly install pipe support 2SWS-PSST 625. | |||
Contrary to the above, and even though the installed support was " final in- | |||
spected," the relative piping / support centerline dimension of pipe support | |||
25WS-PSST 625 did not conform to that specified on Drawing 12241-BZ-19A-48-0C. | |||
This is a Severity Level IV Violation (Supplement II). | |||
Pursuant to the provisions of 10 CFR 2.201, Duquesne Light Company is hereby re- | |||
quired to submit to this office within thirty days of the date of the cover letter | |||
to this Notice, a written statement or explanation in reply including: (1) the | |||
corrective steps which have been taken and results achieved; (2) corrective steps | |||
which will be taken to avoid further violations; and (3) the date when full com- | |||
pliance is achieved. Where good cause is shown, consideration will be given to | |||
extending your response time. | |||
. | |||
P | |||
OFFICIAL RECORD COPY | |||
8508090089 850718 | |||
PDR | |||
ADOCK 05000412 | |||
G | |||
PDR | |||
}} | }} | ||
Latest revision as of 08:13, 12 December 2024
| ML20133G834 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 07/18/1985 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20133G825 | List: |
| References | |
| 50-412-85-13, NUDOCS 8508090089 | |
| Download: ML20133G834 (1) | |
See also: IR 05000523/2006028
Text
r
.-
..
-
.
APPENDIX A
Duquesne Light Company
Docket No. 50-412
Beaver Valley Power Station, Unit 2
License No. CPPR-105
As a result of the inspection conducted on May 23 - June 28, 1985, and in accor-
dance with the NRC Enforcement Policy (10 CFR 2, Appendix C), published in the
Federal Register on March 8, 1984 (49 FR 8583), the following violation was iden-
tified:
10 CFR 50, Appendix B, Criterion V requires that activities affecting
quality shall be prescribed by procedures and shall be accomplished in
accordance with these procedures.
Drawing 12241-BZ-19A-48-0C defines the dimensions, associated tolerances, and
other necessary details to properly install pipe support 2SWS-PSST 625.
Contrary to the above, and even though the installed support was " final in-
spected," the relative piping / support centerline dimension of pipe support
25WS-PSST 625 did not conform to that specified on Drawing 12241-BZ-19A-48-0C.
This is a Severity Level IV Violation (Supplement II).
Pursuant to the provisions of 10 CFR 2.201, Duquesne Light Company is hereby re-
quired to submit to this office within thirty days of the date of the cover letter
to this Notice, a written statement or explanation in reply including: (1) the
corrective steps which have been taken and results achieved; (2) corrective steps
which will be taken to avoid further violations; and (3) the date when full com-
pliance is achieved. Where good cause is shown, consideration will be given to
extending your response time.
.
P
OFFICIAL RECORD COPY
8508090089 850718
ADOCK 05000412
G