                                                  APPENDIX A
.
                                            NOTICE OF VIOLATION
APPENDIX A
          Duquesne Light Company                                           Docket No. 50-412
NOTICE OF VIOLATION
          Beaver Valley Power Station, Unit 2                               License No. CPPR-105
Duquesne Light Company
          As a result of the inspection conducted on May 23 - June 28, 1985, and in accor-
Docket No. 50-412
          dance with the NRC Enforcement Policy (10 CFR 2, Appendix C), published in the
Beaver Valley Power Station, Unit 2
          Federal Register on March 8, 1984 (49 FR 8583), the following violation was iden-
License No. CPPR-105
          tified:
As a result of the inspection conducted on May 23 - June 28, 1985, and in accor-
                  10 CFR 50, Appendix B, Criterion V requires that activities affecting
dance with the NRC Enforcement Policy (10 CFR 2, Appendix C), published in the
                  quality shall be prescribed by procedures and shall be accomplished in
Federal Register on March 8, 1984 (49 FR 8583), the following violation was iden-
                  accordance with these procedures.
tified:
                  Drawing 12241-BZ-19A-48-0C defines the dimensions, associated tolerances, and
10 CFR 50, Appendix B, Criterion V requires that activities affecting
                  other necessary details to properly install pipe support 2SWS-PSST 625.
quality shall be prescribed by procedures and shall be accomplished in
                  Contrary to the above, and even though the installed support was " final in-
accordance with these procedures.
                  spected," the relative piping / support centerline dimension of pipe support
Drawing 12241-BZ-19A-48-0C defines the dimensions, associated tolerances, and
                  25WS-PSST 625 did not conform to that specified on Drawing 12241-BZ-19A-48-0C.
other necessary details to properly install pipe support 2SWS-PSST 625.
                  This is a Severity Level IV Violation (Supplement II).
Contrary to the above, and even though the installed support was " final in-
          Pursuant to the provisions of 10 CFR 2.201, Duquesne Light Company is hereby re-
spected," the relative piping / support centerline dimension of pipe support
          quired to submit to this office within thirty days of the date of the cover letter
25WS-PSST 625 did not conform to that specified on Drawing 12241-BZ-19A-48-0C.
          to this Notice, a written statement or explanation in reply including: (1) the
This is a Severity Level IV Violation (Supplement II).
          corrective steps which have been taken and results achieved; (2) corrective steps
Pursuant to the provisions of 10 CFR 2.201, Duquesne Light Company is hereby re-
          which will be taken to avoid further violations; and (3) the date when full com-
quired to submit to this office within thirty days of the date of the cover letter
          pliance is achieved. Where good cause is shown, consideration will be given to
to this Notice, a written statement or explanation in reply including: (1) the
          extending your response time.
corrective steps which have been taken and results achieved; (2) corrective steps
                .
which will be taken to avoid further violations; and (3) the date when full com-
                                            P
pliance is achieved. Where good cause is shown, consideration will be given to
                                              OFFICIAL RECORD COPY
extending your response time.
          8508090089 850718
.
          PDR     ADOCK 05000412
P
          G                   PDR
OFFICIAL RECORD COPY
8508090089 850718
PDR
ADOCK 05000412
G
PDR
}}
}}

Latest revision as of 08:13, 12 December 2024

Notice of Violation from Insp on 850523-0628
ML20133G834
Person / Time
Site: Beaver Valley
Issue date: 07/18/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20133G825 List:
References
50-412-85-13, NUDOCS 8508090089
Download: ML20133G834 (1)


See also: IR 05000523/2006028

Text

r

.-

..

-

.

APPENDIX A

NOTICE OF VIOLATION

Duquesne Light Company

Docket No. 50-412

Beaver Valley Power Station, Unit 2

License No. CPPR-105

As a result of the inspection conducted on May 23 - June 28, 1985, and in accor-

dance with the NRC Enforcement Policy (10 CFR 2, Appendix C), published in the

Federal Register on March 8, 1984 (49 FR 8583), the following violation was iden-

tified:

10 CFR 50, Appendix B, Criterion V requires that activities affecting

quality shall be prescribed by procedures and shall be accomplished in

accordance with these procedures.

Drawing 12241-BZ-19A-48-0C defines the dimensions, associated tolerances, and

other necessary details to properly install pipe support 2SWS-PSST 625.

Contrary to the above, and even though the installed support was " final in-

spected," the relative piping / support centerline dimension of pipe support

25WS-PSST 625 did not conform to that specified on Drawing 12241-BZ-19A-48-0C.

This is a Severity Level IV Violation (Supplement II).

Pursuant to the provisions of 10 CFR 2.201, Duquesne Light Company is hereby re-

quired to submit to this office within thirty days of the date of the cover letter

to this Notice, a written statement or explanation in reply including: (1) the

corrective steps which have been taken and results achieved; (2) corrective steps

which will be taken to avoid further violations; and (3) the date when full com-

pliance is achieved. Where good cause is shown, consideration will be given to

extending your response time.

.

P

OFFICIAL RECORD COPY

8508090089 850718

PDR

ADOCK 05000412

G

PDR