| title = Unanalyzed Condition Due To Increase In Probable Maximum Flood Level
| title = Unanalyzed Condition Due to Increase in Probable Maximum Flood Level
| event text = On June 29, 2012, TVA issued an updated calculation titled 'PMF Determination for Tennessee River Watershed' The calculation resulted in an increase in the Watts Bar Nuclear (WBN) probable maximum flood (PMF) level from Elevation 734.9 to Elevation 739.2. All flood sensitive safety related systems, structures, and components have been reviewed and been determined to remain unaffected by the revised PMF surge elevation, with the exception of the Thermal Barrier Booster Pump Motors and Essential Raw Cooling Water (ERCW) equipment required for flood mode operation located on Elevation 722 of the Intake Pumping Station (IPS). The updated PMF of Elevation 739.2 could impact the ability of the thermal barrier booster pumps and the Elevation 722 IPS ERCW equipment to perform their design accident protection function. Because of the unanalyzed condition. the potential existed for WBN to exceed its PMF design basis and adversely affect plant safety.
| event text = On June 29, 2012, TVA issued an updated calculation titled 'PMF Determination for Tennessee River Watershed' The calculation resulted in an increase in the Watts Bar Nuclear (WBN) probable maximum flood (PMF) level from Elevation 734.9 to Elevation 739.2. All flood sensitive safety related systems, structures, and components have been reviewed and been determined to remain unaffected by the revised PMF surge elevation, with the exception of the Thermal Barrier Booster Pump Motors and Essential Raw Cooling Water (ERCW) equipment required for flood mode operation located on Elevation 722 of the Intake Pumping Station (IPS). The updated PMF of Elevation 739.2 could impact the ability of the thermal barrier booster pumps and the Elevation 722 IPS ERCW equipment to perform their design accident protection function. Because of the unanalyzed condition. the potential existed for WBN to exceed its PMF design basis and adversely affect plant safety.
This notification is being made pursuant to 10 CFR 50.72(b)(3)(ii)(B).
This notification is being made pursuant to 10 CFR 50.72(b)(3)(ii)(B).

Latest revision as of 22:02, 1 March 2018

ENS 48056 +/-
Where
Watts Bar Tennessee Valley Authority icon.png
Tennessee (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition
Time - Person (Reporting Time:+-1.4 h-0.0583 days <br />-0.00833 weeks <br />-0.00192 months <br />)
Opened: Charles Broesche
13:04 Jun 29, 2012
NRC Officer: Joe O'Hara
Last Updated: Nov 29, 2012