BECO-85-148, Forwards Rev 1 to Procedure 1.3.37, Post-Trip Reviews, in Response to 850617 Request for Addl Info Re Generic Ltr 83-28,Item 1.1, Post-Trip Review: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:* | {{#Wiki_filter:* | ||
1 :f f , | 1 :f f, | ||
BOSTON EDisDN COMPANY | |||
,, e 800 BovLaTON STMEET BOSTON, MASSACHUBETTE O2199 E.',U.",". "..".^,"."'." "' " | |||
August 13, 1985 BECo 85-148 Mr. Domenic-8. Vassallo, Chief Operating. Reactors Branch #2 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C. | |||
20555 License DPR-35 Docket 50-293 | |||
==Subject:== | ==Subject:== | ||
| Line 25: | Line 28: | ||
==Dear Sir:== | ==Dear Sir:== | ||
Boston Edison Company (BECo) received the subject' letter on June 21, 1985, requesting additional information on Post-Trip Review within 60 days from the receipt of NRC letter. | Boston Edison Company (BECo) received the subject' letter on June 21, 1985, requesting additional information on Post-Trip Review within 60 days from the receipt of NRC letter. | ||
BECo has implemented the Post-Trip Review via the attaced " Nuclear Operations Department Pilgrim Nuclear Power Station Procedure 1.3.37". This procedure was developed utilizing the guidelines of INP0 Good Practice OP-211, " Post Trip Reviews," and USNRC GL83-28. We believe this procedure alleviates the NRC's concerns addressed in the subject letter. | BECo has implemented the Post-Trip Review via the attaced " Nuclear Operations Department Pilgrim Nuclear Power Station Procedure 1.3.37". | ||
This letter completes our response to GL83-28, Item 1.1. Should you desire any further information on our response, please contact us. | This procedure was developed utilizing the guidelines of INP0 Good Practice OP-211, " Post Trip Reviews," and USNRC GL83-28. We believe this procedure alleviates the NRC's concerns addressed in the subject letter. | ||
Very truly yours, N | This letter completes our response to GL83-28, Item 1.1. | ||
Should you desire any further information on our response, please contact us. | |||
Very truly yours, N | |||
W c | |||
Attachment HGL/ns | Attachment HGL/ns | ||
) | |||
f 8508190216 DR | f 8508190216 850813 DR ADOCM 05000293 i | ||
I p | |||
PDR}} | |||
Latest revision as of 06:28, 12 December 2024
| ML20134D431 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 08/13/1985 |
| From: | Harrington W BOSTON EDISON CO. |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20134D433 | List: |
| References | |
| BECO-85-148, GL-83-28, NUDOCS 8508190216 | |
| Download: ML20134D431 (1) | |
Text
1 :f f,
BOSTON EDisDN COMPANY
,, e 800 BovLaTON STMEET BOSTON, MASSACHUBETTE O2199 E.',U.",". "..".^,"."'." "' "
August 13, 1985 BECo 85-148 Mr. Domenic-8. Vassallo, Chief Operating. Reactors Branch #2 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.
20555 License DPR-35 Docket 50-293
Subject:
NRC Request for Additional Information Relative to GL83-28, Item 1.1 (Post-Trip Review) dated June 17, 1985
Dear Sir:
Boston Edison Company (BECo) received the subject' letter on June 21, 1985, requesting additional information on Post-Trip Review within 60 days from the receipt of NRC letter.
BECo has implemented the Post-Trip Review via the attaced " Nuclear Operations Department Pilgrim Nuclear Power Station Procedure 1.3.37".
This procedure was developed utilizing the guidelines of INP0 Good Practice OP-211, " Post Trip Reviews," and USNRC GL83-28. We believe this procedure alleviates the NRC's concerns addressed in the subject letter.
This letter completes our response to GL83-28, Item 1.1.
Should you desire any further information on our response, please contact us.
Very truly yours, N
W c
Attachment HGL/ns
)
f 8508190216 850813 DR ADOCM 05000293 i
I p