BECO-85-148, Forwards Rev 1 to Procedure 1.3.37, Post-Trip Reviews, in Response to 850617 Request for Addl Info Re Generic Ltr 83-28,Item 1.1, Post-Trip Review: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:*     .
{{#Wiki_filter:*
1 :f f ,                                                   BOSTON EDisDN COMPANY
1 :f f,
    ,, e                                               800 BovLaTON STMEET BOSTON, MASSACHUBETTE O2199 E.',U.",". "..".^,"."'." "' "                                                         August 13, 1985 BECo 85-148 Mr. Domenic-8. Vassallo, Chief Operating. Reactors Branch #2 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.           20555 License DPR-35 Docket 50-293
BOSTON EDisDN COMPANY
,, e 800 BovLaTON STMEET BOSTON, MASSACHUBETTE O2199 E.',U.",". "..".^,"."'." "' "
August 13, 1985 BECo 85-148 Mr. Domenic-8. Vassallo, Chief Operating. Reactors Branch #2 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.
20555 License DPR-35 Docket 50-293


==Subject:==
==Subject:==
Line 25: Line 28:


==Dear Sir:==
==Dear Sir:==
Boston Edison Company (BECo) received the subject' letter on June 21, 1985, requesting additional information on Post-Trip Review within 60 days from the receipt of NRC letter.
Boston Edison Company (BECo) received the subject' letter on June 21, 1985, requesting additional information on Post-Trip Review within 60 days from the receipt of NRC letter.
BECo has implemented the Post-Trip Review via the attaced " Nuclear Operations Department Pilgrim Nuclear Power Station Procedure 1.3.37". This procedure was developed utilizing the guidelines of INP0 Good Practice OP-211, " Post Trip Reviews," and USNRC GL83-28. We believe this procedure alleviates the NRC's concerns addressed in the subject letter.
BECo has implemented the Post-Trip Review via the attaced " Nuclear Operations Department Pilgrim Nuclear Power Station Procedure 1.3.37".
This letter completes our response to GL83-28, Item 1.1. Should you desire any further information on our response, please contact us.
This procedure was developed utilizing the guidelines of INP0 Good Practice OP-211, " Post Trip Reviews," and USNRC GL83-28. We believe this procedure alleviates the NRC's concerns addressed in the subject letter.
Very truly yours, N         W c
This letter completes our response to GL83-28, Item 1.1.
l l
Should you desire any further information on our response, please contact us.
Very truly yours, N
W c
Attachment HGL/ns
Attachment HGL/ns
                                                                                                                    )
)
f 8508190216 DR         850813                                                      I p    ADOCM 05000293                                                     i PDR}}
f 8508190216 850813 DR ADOCM 05000293 i
I p
PDR}}

Latest revision as of 06:28, 12 December 2024

Forwards Rev 1 to Procedure 1.3.37, Post-Trip Reviews, in Response to 850617 Request for Addl Info Re Generic Ltr 83-28,Item 1.1, Post-Trip Review
ML20134D431
Person / Time
Site: Pilgrim
Issue date: 08/13/1985
From: Harrington W
BOSTON EDISON CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20134D433 List:
References
BECO-85-148, GL-83-28, NUDOCS 8508190216
Download: ML20134D431 (1)


Text

1 :f f,

BOSTON EDisDN COMPANY

,, e 800 BovLaTON STMEET BOSTON, MASSACHUBETTE O2199 E.',U.",". "..".^,"."'." "' "

August 13, 1985 BECo 85-148 Mr. Domenic-8. Vassallo, Chief Operating. Reactors Branch #2 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.

20555 License DPR-35 Docket 50-293

Subject:

NRC Request for Additional Information Relative to GL83-28, Item 1.1 (Post-Trip Review) dated June 17, 1985

Dear Sir:

Boston Edison Company (BECo) received the subject' letter on June 21, 1985, requesting additional information on Post-Trip Review within 60 days from the receipt of NRC letter.

BECo has implemented the Post-Trip Review via the attaced " Nuclear Operations Department Pilgrim Nuclear Power Station Procedure 1.3.37".

This procedure was developed utilizing the guidelines of INP0 Good Practice OP-211, " Post Trip Reviews," and USNRC GL83-28. We believe this procedure alleviates the NRC's concerns addressed in the subject letter.

This letter completes our response to GL83-28, Item 1.1.

Should you desire any further information on our response, please contact us.

Very truly yours, N

W c

Attachment HGL/ns

)

f 8508190216 850813 DR ADOCM 05000293 i

I p

PDR