{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION
                        OFFICE OF INSPECTION AND ENFORCEMENT
OFFICE OF INSPECTION AND ENFORCEMENT
                            DIVISION OF INSPECTION PROGRAffS
DIVISION OF INSPECTION PROGRAffS
                        REACTOR CONSTRUCTION PROGRAMS BRANCH
REACTOR CONSTRUCTION PROGRAMS BRANCH
Report No.:           50-461/85-30
Report No.:
Docket No.:           50-461
50-461/85-30
Licensee:             Illinois Power Company
Docket No.:
Facility Name:       Clinton Power Station
50-461
Inspection At:       Clinton, Illinois
Licensee:
Inspection Conducted:         flay 20-31 and June 10-21, 1985
Illinois Power Company
Inspectors:       / [ //Mor/Ed
Facility Name:
                li. W. Per      ~c h, Chief, Construction Programs /
Clinton Power Station
                                                                                      /I
Inspection At:
                                                                                    Date Signed
Clinton, Illinois
                CAT S       ion Team Le
Inspection Conducted:
                                                                                  $6/85
flay 20-31 and June 10-21, 1985
                T.(L.#LhaT, Reactor         ons uction Engineer                    Date Signed
Inspectors:
                  P A ,e                       M'       uction Engineer
/ [ //Mor/Ed
                                                                                    S     h5
/I
                                                                                    Date'51gned
~ h, Chief, Construction Programs /
                G. B. g giev,L5r. Rdactor Co
Date Signed
                      VO b.J
li. W. Per
                T. K. McLellan, Reactor Construction Engineer
c
                                                                                      bbW
CAT S
                                                                                    Date Signed
ion Team Le
              0                       (/f
$6/85
                    I. Nemoto, Reactor Construction Engineer
ons uction Engineer
                                                                                    8/fo/85
Date Signed
                                                                                    Da'te signed
T.(L.#LhaT, Reactor
                      //b Aff97fc^                                                 R///SV
P A ,e
                                                                                    Date Signed
M'
            [R.J.5meenge,ReactorInspector(RegionIII)
S h5
          [4
G. B. g giev,L5r. Rdactor Co
                2 st A u n?'
uction Engineer
                5. R. Stein, Reactor Construction Engineer
Date'51gned
                                                                                    warc
VO b.J
                                                                                    ~
bbW
                                                                                    Date Signed
T. K. McLellan, Reactor Construction Engineer
                Consultants:         A. V. DuBouchet, D. C. Ford, J. B. McCormack,
Date Signed
                                    0. P. Mallon, W. S. Marini, E. Y. ifartindale,
0
                                    R. E. Serb and W. J. Sperko, Jr.
(/f
Approved By:             c         M
8/fo/85
                Robert F. Heishman, Chief                                           Date Signed
I. Nemoto, Reactor Construction Engineer
                Reactor Construction Programs Branch
Da'te signed
        8508210250 850015           1
//b Aff97fc^
          DR   ADOCK 050
R///SV
[R.J.5meenge,ReactorInspector(RegionIII)
Date Signed
2 st A u n?'
warc
[4
5. R. Stein, Reactor Construction Engineer
Date Signed
~
Consultants:
A. V. DuBouchet, D. C. Ford, J. B. McCormack,
0. P. Mallon, W. S. Marini, E. Y. ifartindale,
R. E. Serb and W. J. Sperko, Jr.
Approved By:
c
M
Robert F. Heishman, Chief
Date Signed
Reactor Construction Programs Branch
8508210250 850015
DR
ADOCK 050
1


                                                    _ - _ _ - _ - - _ - -       .
_ - _ _ - _ - - _ -
                                                                                      .
-
                                                                                          ,
.
                                                                                          1
.
                                                                                          l
,
                              TABLE OF CONTENTS                                           ,
1
                                                                                          1
l
                                                                                          1
TABLE OF CONTENTS
TOPIC                                                                     SECTION
,
INSPECTION SCOPE AND OBJECTIVES..................................             I
1
ELECTRICAL AND INSTRUMENTATION CONSTRUCTION......................           II
1
MECHANICAL CONSTRUCTION..........................................         III
TOPIC
WELDING AND NONDESTRUCTIVE EXAMINATION...........................           IV
SECTION
CIVIL AND STRUCTURAL CONSTRUCTION................................           V
INSPECTION SCOPE AND OBJECTIVES..................................
MATERIAL TRACEABILITY AND CONTR0L................................           VI
I
DESIGN CHANGE CONTR0L............................................           VII
ELECTRICAL AND INSTRUMENTATION CONSTRUCTION......................
CORRECTIVE ACTION SYSTEMS........................................         VIII
II
MECHANICAL CONSTRUCTION..........................................
III
WELDING AND NONDESTRUCTIVE EXAMINATION...........................
IV
CIVIL AND STRUCTURAL CONSTRUCTION................................
V
MATERIAL TRACEABILITY AND CONTR0L................................
VI
DESIGN CHANGE CONTR0L............................................
VII
CORRECTIVE ACTION SYSTEMS........................................
VIII
ATTACHMENT A - PERSONS CONTACTED AND DOCUMENTS REVIEWED
ATTACHMENT A - PERSONS CONTACTED AND DOCUMENTS REVIEWED
ATTACHMENT B - GLOSSARY OF ABBREVIATIONS
ATTACHMENT B - GLOSSARY OF ABBREVIATIONS
                                                                                          l
l
                                                                                          l
l
                                                                                          l
l
                                                                                          l
l
                                                                                          I
I
                                                                                          l
l
                                                                                    _____s
_____s


                                                                    _
_
  I. INSPECTION SCOPE AND OBJECTIVES
I.
      The objective of this inspection was to evaluate the adequacy of
INSPECTION SCOPE AND OBJECTIVES
      construction at the Clinton Power Station site. This objective was accom-
The objective of this inspection was to evaluate the adequacy of
      plished through review of the construction program, evaluation of project
construction at the Clinton Power Station site.
      construction controls, and review of selected portions of the Quality
This objective was accom-
      Assurance Program, with emphasis on the installed hardware in the field.
plished through review of the construction program, evaluation of project
      The scope and significance of identified problems were also determined. In
construction controls, and review of selected portions of the Quality
      addition, a sample of the results of the licensee's Overinspection Program
Assurance Program, with emphasis on the installed hardware in the field.
      were compared with the NRC CAT inspection findings in applicable areas
The scope and significance of identified problems were also determined.
      inspected.
In
      Within the areas examined, the inspection consisted of a detailed examina-
addition, a sample of the results of the licensee's Overinspection Program
      tion of selected hardware subsequent to quality control inspections, a
were compared with the NRC CAT inspection findings in applicable areas
      selective examination of procedures and representative records, and limited
inspected.
      observation of in process work.
Within the areas examined, the inspection consisted of a detailed examina-
      For each of the areas inspected, the following was determined:
tion of selected hardware subsequent to quality control inspections, a
;
selective examination of procedures and representative records, and limited
'
observation of in process work.
          Were project construction controls adequate to assure quality
For each of the areas inspected, the following was determined:
          construction?
Were project construction controls adequate to assure quality
          Was the hardware or product fabricated or installed as designed?
;
          Were quality verifications performed during the work process with
'
          applicable hold points?
construction?
Was the hardware or product fabricated or installed as designed?
Were quality verifications performed during the work process with
applicable hold points?
i
i
          Was there adequate documentation to determine the acceptability of
Was there adequate documentation to determine the acceptability of
          installed hardware or product?
installed hardware or product?
          Are systems turned over to the startup organization in operable
Are systems turned over to the startup organization in operable
          condition and are they being properly maintained?
condition and are they being properly maintained?
                                        I-l
I-l
        _   _-           ._              _ _ - _             . _ _ _ . . _ _ __ .- _
_
_-
.
_ _ -
_
. _ _ _ . . _ _
__
.-
_


                                                                                      .
.
  II. ELECTRICAL AND INSTRUMENTATION CONSTRUCTION
II.
      A. Objective
ELECTRICAL AND INSTRUMENTATION CONSTRUCTION
          The primary objective of the appraisal of electrical and instrumentation
A.
Objective
The primary objective of the appraisal of electrical and instrumentation
construction was to determine whether safety-related components and
,
,
          construction was to determine whether safety-related components and
systems were installed in accordance with regulatory requirements,
          systems were installed in accordance with regulatory requirements,
Safety Analysis Report commitments, and approved vendor and construction
          Safety Analysis Report commitments, and approved vendor and construction
specifications and drawings.
          specifications and drawings. Additional objectives were to determine
Additional objectives were to determine
          whether procedures, instructions and drawings used to accomplish
whether procedures, instructions and drawings used to accomplish
          construction activities were adequate and whether quality related
construction activities were adequate and whether quality related
          records accurately reflected the completed work.
records accurately reflected the completed work.
      B. Discussion
B.
          Within the broad categories of electrical and instrumentation
Discussion
          construction, attention was given to several specific areas. These
Within the broad categories of electrical and instrumentation
          included electrical cable, raceways and raceway supports, electrical
construction, attention was given to several specific areas.
          equipment, and instrumentation piping and components. Additionally,
These
          a review was made of a selected number of documents associated with
included electrical cable, raceways and raceway supports, electrical
          design change control and nonconformance reporting.
equipment, and instrumentation piping and components. Additionally,
          A number of inspection samples in several areas coincided with either
a review was made of a selected number of documents associated with
          Baldwin Associates' Field Verification (BAFV) Program or Illinois
design change control and nonconformance reporting.
          Power Company's Overinspection (IPOI) Program. These are identified
A number of inspection samples in several areas coincided with either
          in the following sections along with an assessment of the programs'
Baldwin Associates' Field Verification (BAFV) Program or Illinois
          findings compared to the observations of this inspection. Refer to
Power Company's Overinspection (IPOI) Program.
          Section VII, Design Change Control, of this report for further
These are identified
          discussion of the IPOI Program.
in the following sections along with an assessment of the programs'
          1.   Electrical Raceway Installation
findings compared to the observations of this inspection.
          a.   Inspection Scope
Refer to
              Seventy segments of installed Class 1E cable tray, representing a
Section VII, Design Change Control, of this report for further
              total length of about 1,200 feet, were selected from various plant
discussion of the IPOI Program.
              areas for detailed examination by the NRC Construction Appraisal
1.
              Team (CAT).   These segments were inspected for compliance to
Electrical Raceway Installation
              requirements relative to routing, location, separation, identifica-
a.
              tion, protection, physical loading, support spacing and support
Inspection Scope
              configuration.   Additionally, 31 runs of installed conduit, with an
Seventy segments of installed Class 1E cable tray, representing a
              aggregate length of about 1,000 feet, were inspected for compliance
total length of about 1,200 feet, were selected from various plant
              to specified requirements such as routing, location, separation,
areas for detailed examination by the NRC Construction Appraisal
              bend radii, support spacing and associated fittings.     The BAFV
Team (CAT).
              records for a number of the conduit runs inspected were also
These segments were inspected for compliance to
              reviewed.
requirements relative to routing, location, separation, identifica-
              Thirteen raceway supports were examined in detail for such items
tion, protection, physical loading, support spacing and support
              as location, material, anchor spacing, weld quality, bolt torque
configuration.
              and installed configuration.
Additionally, 31 runs of installed conduit, with an
              See Table II-1 for a listing of the cable tray, conduit and raceway
aggregate length of about 1,000 feet, were inspected for compliance
              support samples.
to specified requirements such as routing, location, separation,
                                            II-1
bend radii, support spacing and associated fittings.
                                                          --       -             - -   - -
The BAFV
records for a number of the conduit runs inspected were also
reviewed.
Thirteen raceway supports were examined in detail for such items
as location, material, anchor spacing, weld quality, bolt torque
and installed configuration.
See Table II-1 for a listing of the cable tray, conduit and raceway
support samples.
II-1
--
-
- -
-
-


  The following documents provided the basic acceptance for the
The following documents provided the basic acceptance for the
  inspection:
inspection:
  *
*
        Sargent & Lundy Clinton Power Station Unit 1 Specification
Sargent & Lundy Clinton Power Station Unit 1 Specification
        K-2999, " Electrical Installation," Amd. 10
K-2999, " Electrical Installation," Amd. 10
        Baldwin Associates Project Procedure BAP 3.3.1, " Exposed
Baldwin Associates Project Procedure BAP 3.3.1, " Exposed
        Conduit Installation and Traveler Processing," Rev. 18
Conduit Installation and Traveler Processing," Rev. 18
        BAP 3.3.6, " Electrical Raceway Support Installation,"
BAP 3.3.6, " Electrical Raceway Support Installation,"
        Rev. 9
Rev. 9
        OAP 3.3.10, " Cable Tray Installation and Traveler Pro-
OAP 3.3.10, " Cable Tray Installation and Traveler Pro-
        c?ssing," Rev. 6
c?ssing," Rev. 6
        BA) 2.3.11, " Cable Tray Attachment Installation," Rev. 6
BA) 2.3.11, " Cable Tray Attachment Installation," Rev. 6
  *
*
        BAP 3.3.14, " Conduit Support Installation," Rev. 1 Change B
BAP 3.3.14, " Conduit Support Installation," Rev. 1 Change B
        Baldwin Associates Quality Assurance Instruction BQAI-190-8,
Baldwin Associates Quality Assurance Instruction BQAI-190-8,
        " Electrical Raceway Hanger / Supports Field Verification,"
" Electrical Raceway Hanger / Supports Field Verification,"
        Rev. 4
Rev. 4
  *
*
        BQAI-190-9, " Electrical Raceway Field Verification,"
BQAI-190-9, " Electrical Raceway Field Verification,"
        Rev. 4.
Rev. 4.
b. Inspection Findings
b.
  The NRC CAT inspectors observed that, in general, Class 1E raceway
Inspection Findings
  installations were in accordance with applicable design criteria.
The NRC CAT inspectors observed that, in general, Class 1E raceway
  Important quality attributes such as material type, location,
installations were in accordance with applicable design criteria.
  identification and installed configuration were found to be as shown
Important quality attributes such as material type, location,
  on approved construction drawings.     However, several construction
identification and installed configuration were found to be as shown
  deficiencies were identified and are discussed in the following
on approved construction drawings.
  sections.
However, several construction
  (1) Raceway Separation
deficiencies were identified and are discussed in the following
        The requirement to establish physically independent and
sections.
        redundant cable raceway systems is specified in the Clinton
(1) Raceway Separation
        Power Station (CPS) Final Safety Analysis Report (FSAR).
The requirement to establish physically independent and
        Section 8.3.1.4, entitled " Independence of Redundant Systems,"
redundant cable raceway systems is specified in the Clinton
        describes requirements for physical arrangement of raceways in
Power Station (CPS) Final Safety Analysis Report (FSAR).
        order to comply with the requirements of Regulatory Guide (RG)
Section 8.3.1.4, entitled " Independence of Redundant Systems,"
        1.75.
describes requirements for physical arrangement of raceways in
        The CPS raceway design includes four safety-related divisions
order to comply with the requirements of Regulatory Guide (RG)
        to serve the Engineered Safety Features systems and two
1.75.
        nonsafety-related divisions which serve the balance of plant
The CPS raceway design includes four safety-related divisions
        systems.   Minimum spatial separation between raceways
to serve the Engineered Safety Features systems and two
        comprising each of these divisions has been established in
nonsafety-related divisions which serve the balance of plant
        accordance with the guidelines specified in the Institute of
systems.
        Electrical and Electronic Engineers (IEEE) Standard 384-1974.
Minimum spatial separation between raceways
                                II-2
comprising each of these divisions has been established in
accordance with the guidelines specified in the Institute of
Electrical and Electronic Engineers (IEEE) Standard 384-1974.
II-2


  NRC CAT inspectors reviewed documents which explained the CPS
NRC CAT inspectors reviewed documents which explained the CPS
  electrical separation design philosophy. In summary, Sargent
electrical separation design philosophy.
  & Lundy Engineers (S&L) as the Architect Engineer controls
In summary, Sargent
  electrical separation through their design process. Location
& Lundy Engineers (S&L) as the Architect Engineer controls
  dimensions on electrical raceway installation drawings are used
electrical separation through their design process.
  for maintaining proper separation. Consequently, specific
Location
  separation criteria is purposely not included in the specifica-
dimensions on electrical raceway installation drawings are used
  tions and instructions issued to the electrical contractor for
for maintaining proper separation.
  installation and inspection.     This has resulted in an inspec-
Consequently, specific
  tion program which verifies the correct location of raceway
separation criteria is purposely not included in the specifica-
  components but does not include attributes for inspection of
tions and instructions issued to the electrical contractor for
  electrical separation.
installation and inspection.
  To verify the adequacy of controls established through the
This has resulted in an inspec-
  design process, NRC CAT inspectors selected a sample of com-
tion program which verifies the correct location of raceway
  pleted raceway installations for review. During the examina-
components but does not include attributes for inspection of
  tion the inspectors identified numerous installations which did
electrical separation.
  not maintain spatial separation as described in the FSAR.
To verify the adequacy of controls established through the
  Several deficiencies existed between components of redundant
design process, NRC CAT inspectors selected a sample of com-
  safety divisions, but deficiencies primarily occurred between
pleted raceway installations for review.
  safety and nonsafety-related components. Specific cable tray
During the examina-
  deficiencies were then compared to design drawings to determine
tion the inspectors identified numerous installations which did
  if required fire barriers (i.e., tray covers) had been detailed
not maintain spatial separation as described in the FSAR.
  for installations which exhibited less than the required
Several deficiencies existed between components of redundant
  spatial separation.   It was noted that in many cases barriers
safety divisions, but deficiencies primarily occurred between
  had not been specified on the applicable drawing. Reference
safety and nonsafety-related components.
  Table II-2 for a listing of raceway separation deficiencies
Specific cable tray
  identified by the NRC CAT inspectors.
deficiencies were then compared to design drawings to determine
  Discussions with the licensee indicate that they had become
if required fire barriers (i.e., tray covers) had been detailed
  aware of the need to perform specific walkdowns for electrical
for installations which exhibited less than the required
  separation because field installation tolerances could not be
spatial separation.
  controlled by design drawings. As such, field walkdowns of
It was noted that in many cases barriers
  raceway for seismic interaction were incorporated into S&L's
had not been specified on the applicable drawing.
  Clinton Project Instruction PI-CP-034, Interaction Analysis
Reference
  Procedure, early in 1983. However, incorporation of specific
Table II-2 for a listing of raceway separation deficiencies
  electrical raceway separation criteria was not accomplished
identified by the NRC CAT inspectors.
  until mid 1985.
Discussions with the licensee indicate that they had become
  In order to evaluate this program, NRC CAT inspectors reviewed
aware of the need to perform specific walkdowns for electrical
  the walkdown procedure, examined the plant area previously
separation because field installation tolerances could not be
  inspected by the separation walkdown team, and interviewed the
controlled by design drawings.
  engineers responsible for performing the walkdown. The
As such, field walkdowns of
  following concerns were identified as a result of this
raceway for seismic interaction were incorporated into S&L's
  evaluation:
Clinton Project Instruction PI-CP-034, Interaction Analysis
      Separation criteria detailed in the walkdown procedure is
Procedure, early in 1983.
      not complete in that spatial separation between raceway
However, incorporation of specific
      and exposed electrical cable has not been addressed.
electrical raceway separation criteria was not accomplished
  *
until mid 1985.
      Personnel performing separation walkdowns have not
In order to evaluate this program, NRC CAT inspectors reviewed
      received training adequate to assure that they are
the walkdown procedure, examined the plant area previously
      knowledgeable of all accept / reject criteria.
inspected by the separation walkdown team, and interviewed the
                          II-3
engineers responsible for performing the walkdown.
The
following concerns were identified as a result of this
evaluation:
Separation criteria detailed in the walkdown procedure is
not complete in that spatial separation between raceway
and exposed electrical cable has not been addressed.
*
Personnel performing separation walkdowns have not
received training adequate to assure that they are
knowledgeable of all accept / reject criteria.
II-3
_
_
                                _
_
                                        -.
-.


          The program represents the final inspection and acceptance
The program represents the final inspection and acceptance
          of raceway for the attribute of electrical separation.     As
of raceway for the attribute of electrical separation.
          such, it lacks appropriate involvement from the quality
As
          assurance (QA) organization.
such, it lacks appropriate involvement from the quality
    In connection with this issue, review of Sargent & Lundy
assurance (QA) organization.
    Electrical Department Standard ESI-180 indicates that analysis
In connection with this issue, review of Sargent & Lundy
    has been used to justify many of the installations which
Electrical Department Standard ESI-180 indicates that analysis
    exhibit less than the required spatial separation.     NRC CAT
has been used to justify many of the installations which
    inspectors noted that this does not satisfy the requirement of
exhibit less than the required spatial separation.
    section 8.1.6.14 position C.6 of the CPS FSAR which states,
NRC CAT
    "The analysis 'out' given in paragraphs 4.5(3), 4.6.2 and
inspectors noted that this does not satisfy the requirement of
    5.1.1.2 has not been used."
section 8.1.6.14 position C.6 of the CPS FSAR which states,
    An S&L calculation, No. 19-BD-13, was cited as justification
"The analysis 'out' given in paragraphs 4.5(3), 4.6.2 and
    for the examples of lessor separation identified by the NRC CAT
5.1.1.2 has not been used."
    between non-Class 1E raceway run above Class 1E cable tray.     A
An S&L calculation, No. 19-BD-13, was cited as justification
    review of the analysis indicates that it does not meet the
for the examples of lessor separation identified by the NRC CAT
    requirements of IEEE-384 paragraph 5.1.1.2 in that it is not
between non-Class 1E raceway run above Class 1E cable tray.
    based on tests of proposed installations and does not consider
A
    actual raceway arrangements. The analysis only addresses non-
review of the analysis indicates that it does not meet the
    Class 1E raceway which crosses over Class IE cable tray and
requirements of IEEE-384 paragraph 5.1.1.2 in that it is not
    states that covers are not required for the Class 1E tray as
based on tests of proposed installations and does not consider
    the heat from a fire or fault in the upper raceway will rise.
actual raceway arrangements.
    Discussions with the licensee revealed that an amendment to
The analysis only addresses non-
    the CPS FSAR has been prepared which would allow the use of
Class 1E raceway which crosses over Class IE cable tray and
    analysis to establish adequate electrical separation. As a
states that covers are not required for the Class 1E tray as
    result, further evaluation of this issue will be required by
the heat from a fire or fault in the upper raceway will rise.
    NRC personnel.
Discussions with the licensee revealed that an amendment to
    In summary, the review of design, construction, and inspection
the CPS FSAR has been prepared which would allow the use of
    activities indicates that existing design and quality verifica-
analysis to establish adequate electrical separation.
    tion programs have not been adequate to assure that commitments
As a
    relative to electrical separation have been met.     As a result
result, further evaluation of this issue will be required by
    of this observation, the licensee has indicated that a program
NRC personnel.
    evaluation will be performed. Additionally, based upon
In summary, the review of design, construction, and inspection
    results of the evaluation and concerns addressed in this
activities indicates that existing design and quality verifica-
    report, program requirements may be revised.
tion programs have not been adequate to assure that commitments
relative to electrical separation have been met.
As a result
of this observation, the licensee has indicated that a program
evaluation will be performed.
Additionally, based upon
results of the evaluation and concerns addressed in this
report, program requirements may be revised.
(2) Raceway Supporting Scaffolding
(2) Raceway Supporting Scaffolding
    BAP 3.3.10 permits the use of installed cable tray to support
BAP 3.3.10 permits the use of installed cable tray to support
    temporary scaffolding with notification of BA quality control
temporary scaffolding with notification of BA quality control
    (QC) by the area electrical supervisor, and the procedure
(QC) by the area electrical supervisor, and the procedure
    provides inspection criteria following removal of the scaf-
provides inspection criteria following removal of the scaf-
    folding.   The NRC CAT inspectors questioned the procedure
folding.
    controls that would alert BA QC whenever Class 1E cable trays
The NRC CAT inspectors questioned the procedure
    were used to support scaffolding and assure inspection of the
controls that would alert BA QC whenever Class 1E cable trays
    trays after removal of the scaffolding.
were used to support scaffolding and assure inspection of the
    Since the controls were not well documented, BA's Deputy
trays after removal of the scaffolding.
    Project Manager subsequently issued letter EPR-160-85 June 4,
Since the controls were not well documented, BA's Deputy
    1985. The letter only permits placing scaffolds on Class 1E
Project Manager subsequently issued letter EPR-160-85 June 4,
    cable tray on an exception basis requiring Superintendent
1985.
                            II-4
The letter only permits placing scaffolds on Class 1E
cable tray on an exception basis requiring Superintendent
II-4


            . = -                     -.                 -
. = -
          approval. The letter also requires documentation in a depart-
-.
        mental log and written notification to BA QC.
-
          Section III, Mechanical Construction, of this report, also
approval.
          discusses support of temporary scaffolding.
The letter also requires documentation in a depart-
    (3) Electrical Conduit
mental log and written notification to BA QC.
          In general, the installation of conduit conforms to design
Section III, Mechanical Construction, of this report, also
          requirements. A number of separation violations were noted
discusses support of temporary scaffolding.
        between conduits, and between conduits and cable tray and are
(3) Electrical Conduit
          included in the discussion in Section II.B.1.b(1), above.
In general, the installation of conduit conforms to design
          In what the NRC CAT inspectors considcr an isolated case, con-
requirements. A number of separation violations were noted
        duits C9822, C9823, and C9824 are not attached to support E29-
between conduits, and between conduits and cable tray and are
        1000-02C-122 as required by drawing E29-1000-02C-EIH. The
included in the discussion in Section II.B.1.b(1), above.
          licensee subsequently issued Nanconformance Report (NCR) 31717
In what the NRC CAT inspectors considcr an isolated case, con-
        to document the condition.
duits C9822, C9823, and C9824 are not attached to support E29-
  (4) Raceway Supports
1000-02C-122 as required by drawing E29-1000-02C-EIH.
        The examination of seismic raceway supports was accomplished
The
        for both cable tray and conduit installations.     In general,
licensee subsequently issued Nanconformance Report (NCR) 31717
        attributes such as location, material type and size, anchor
to document the condition.
        spacing, welds (location, size and general quality) and
(4) Raceway Supports
        installed configuration were found to be in accordance with
The examination of seismic raceway supports was accomplished
        design requirements.
for both cable tray and conduit installations.
c. Conclusions
In general,
  The use of engineering analysis to establish adequate electrical
attributes such as location, material type and size, anchor
  separation is not consistent with current FSAR commitments, and an
spacing, welds (location, size and general quality) and
  analysis to justify separation between Class IE and non-Class IE
installed configuration were found to be in accordance with
  raceway was found to be technically inadequate.
design requirements.
  The licensee's existing programs of design and quality verification
c.
  activities have not been adequate to assure that raceway
Conclusions
  installations conform to FSAR commitments for electrical separation.
The use of engineering analysis to establish adequate electrical
  With the exception of compliance with electrical separation
separation is not consistent with current FSAR commitments, and an
  criteria, conduit and support installations appear to be in
analysis to justify separation between Class IE and non-Class IE
  conformance with requirements.
raceway was found to be technically inadequate.
2. Electrical Cable Installation
The licensee's existing programs of design and quality verification
a. Inspection Scope
activities have not been adequate to assure that raceway
  The NRC CAT inspectors selected a sample of installed Class IE
installations conform to FSAR commitments for electrical separation.
  cable runs that had been previously accepted by BA QC inspectors.
With the exception of compliance with electrical separation
  The sample included medium and low voltage power, control, and
criteria, conduit and support installations appear to be in
  instrumentation cables. For each of the cable runs, physical
conformance with requirements.
  inspection was made to ascertain compliance with applicable design
2.
  criteria relative to size, type, location, routing, bend radii,
Electrical Cable Installation
  protection, separation, identification and support.     In addition,
a.
                                  II-5
Inspection Scope
                                          .. . _ . -
The NRC CAT inspectors selected a sample of installed Class IE
cable runs that had been previously accepted by BA QC inspectors.
The sample included medium and low voltage power, control, and
instrumentation cables.
For each of the cable runs, physical
inspection was made to ascertain compliance with applicable design
criteria relative to size, type, location, routing, bend radii,
protection, separation, identification and support.
In addition,
II-5
..
. _ .
-


                                                                      ,
,
IPOI records for installation and termination of those cables marked
IPOI records for installation and termination of those cables marked
with an *, below, were reviewed.
with an *, below, were reviewed.
The NRC CAT inspectors selected approximately 270 cable ends for
The NRC CAT inspectors selected approximately 270 cable ends for
examination. These were inspected to applicable design and
examination.
These were inspected to applicable design and
installation documents for items such as lug size and type, proper
installation documents for items such as lug size and type, proper
terminal point configuration, correct identification of cable and
terminal point configuration, correct identification of cable and
conductors, proper crimping of lugs or connectors, and absence of
conductors, proper crimping of lugs or connectors, and absence of
insulation or jacket damage. See Table II-3 for a listing of cable
insulation or jacket damage.
See Table II-3 for a listing of cable
terminations examined.
terminations examined.
The following medium and low voltage power cables, totaling about
The following medium and low voltage power cables, totaling about
1,650 feet, were selected from different systems, electrical trains
1,650 feet, were selected from different systems, electrical trains
and locations:
and locations:
            Cable                         Type
Cable
        1HP03C-P3E                 3 Conductor 750 MCM
Type
        *1HP08A-P3E                 3 Conductor 500 MCM
1HP03C-P3E
        1RH02A-P2E                 3 Conductor 1/0 AWG
3 Conductor 750 MCM
        *1RH27A-P1E                 3 Conductor 19/22 AWG
*1HP08A-P3E
        *1CC08A-P2E                 3 Conductor 19/22 AWG
3 Conductor 500 MCM
        1DC01B-P1E                 3 Conductor 4/0 AWG
1RH02A-P2E
        *1LP01A-PIE                 3 Conductor 500 MCM
3 Conductor 1/0 AWG
        ILP03A-P1E                 3 Conductor 19/22 AWG
*1RH27A-P1E
3 Conductor 19/22 AWG
*1CC08A-P2E
3 Conductor 19/22 AWG
1DC01B-P1E
3 Conductor 4/0 AWG
*1LP01A-PIE
3 Conductor 500 MCM
ILP03A-P1E
3 Conductor 19/22 AWG
The following control cables totaling approximately 1,020 feet were
The following control cables totaling approximately 1,020 feet were
selected from different systems, electrical trains and locations:
selected from different systems, electrical trains and locations:
            Cable                           Type
Cable
          1HP08E-C3E               2 Conductor 19/22 AWG
Type
          1DG01C-CIE               15 Conductor 19/25 AWG
1HP08E-C3E
          1DC01E-C1E               4 Conductor 19/25 AWG
2 Conductor 19/22 AWG
        *1IA028-CIE               12 Conductor 19/25 AWG
1DG01C-CIE
15 Conductor 19/25 AWG
1DC01E-C1E
4 Conductor 19/25 AWG
*1IA028-CIE
12 Conductor 19/25 AWG
The following instrument cables totaling approximately 560 feet
The following instrument cables totaling approximately 560 feet
were selected from different systems, electrical trains and
were selected from different systems, electrical trains and
locations:
locations:
            Cable                         Type
Cable
    1LD41F-K2E             1 Pair 16 AWG Twisted Wire Shielded
Type
    ISC76A-K1E             1 Pair 16 AWG Twisted Wire Shielded
1LD41F-K2E
    IDC06G-K4E             1 Pair 16 AWG Twisted Wire Shielded
1 Pair 16 AWG Twisted Wire Shielded
  *1NR758-KIN             1 Pair 16 AWG Twisted Wire Shielded
ISC76A-K1E
1 Pair 16 AWG Twisted Wire Shielded
IDC06G-K4E
1 Pair 16 AWG Twisted Wire Shielded
*1NR758-KIN
1 Pair 16 AWG Twisted Wire Shielded
The following documents provided the basic acceptance criteria for
The following documents provided the basic acceptance criteria for
the inspection:
the inspection:
    S&L Clinton Power Station Specification K-2999, " Electrical
S&L Clinton Power Station Specification K-2999, " Electrical
      Installation," Amd. 10
Installation," Amd. 10
    BAP 3.3.2, " Cable Installation," Rev. 14
BAP 3.3.2, " Cable Installation," Rev. 14
                            II-6
II-6
                                                                    ,
,


          BAP 3.3.3, " Cable Terminations," Rev. 6
BAP 3.3.3, " Cable Terminations," Rev. 6
    *
*
          BAP 3.3.9, " Cable Protection," Rev. 6
BAP 3.3.9, " Cable Protection," Rev. 6
          BQAI-190-12, " Electrical Cable Installation Field
BQAI-190-12, " Electrical Cable Installation Field
          Verification"
Verification"
          BQAI-190-7, " Electrical Cable Termination Field
BQAI-190-7, " Electrical Cable Termination Field
          Ve ri fication. "
Ve ri fication. "
  b. Inspection Findings
b.
    (1) Ro ut.i_ng
Inspection Findings
                n
(1) Ro ut.i_ng
          In ceneral, the routing of Class 1E cables through design
n
          designated raceway systems was found to be in accordance with
In ceneral, the routing of Class 1E cables through design
          specified criteria. Each of the Class IE cables examined by
designated raceway systems was found to be in accordance with
          NRC CAT inspectors had been installed in accordance with the
specified criteria.
          roul.ing detailed on the applicable computer generated Cable
Each of the Class IE cables examined by
          Pu'l Ticket.
NRC CAT inspectors had been installed in accordance with the
          One instance of improper routing was identified in the Power
roul.ing detailed on the applicable computer generated Cable
          Generation Control Complex (PGCC).     NRC CAT inspectors noted
Pu'l Ticket.
          that nonsafety-related cable C11A-XX-030 had been looped into
One instance of improper routing was identified in the Power
          a Division 2 safety-related floor section near panel H13-P652.
Generation Control Complex (PGCC).
          Investigation indicated that this condition was the result of
NRC CAT inspectors noted
          improper distribution of excessive slack in the cable.     A
that nonsafety-related cable C11A-XX-030 had been looped into
          review of the applicable design document, Panel Module
a Division 2 safety-related floor section near panel H13-P652.
          Wirelist 287A5660, Rev. 11 showed a correct routing of this
Investigation indicated that this condition was the result of
          cable through nonsafety-related floor sections.
improper distribution of excessive slack in the cable.
          As a result of this observation, the licensee has issued
A
review of the applicable design document, Panel Module
Wirelist 287A5660, Rev. 11 showed a correct routing of this
cable through nonsafety-related floor sections.
As a result of this observation, the licensee has issued
Nonconforming Material Report (NCMR) 2-0304 and Construction
'
'
          Nonconforming Material Report (NCMR) 2-0304 and Construction
Work Request (CWR) 6271 to document and correct this condition.
          Work Request (CWR) 6271 to document and correct this condition.
(2) Separation
    (2) Separation
During the inspection of Class IE cables NRC CAT inspectors
          During the inspection of Class IE cables NRC CAT inspectors
identified a number of cable and wiring installations which
          identified a number of cable and wiring installations which
did not conform to specified requirements for electrical
          did not conform to specified requirements for electrical
separation.
          separation. Examples identified include wiring deficiencies
Examples identified include wiring deficiencies
          which were located inside of control room operator panels.       In
which were located inside of control room operator panels.
          this area, examination revealed that vendor installed wiring
In
          had been routed through flexible metalic conduit.     In several
this area, examination revealed that vendor installed wiring
          areas conduits which contained redundant Class 1E wiring had
had been routed through flexible metalic conduit.
          been installed in physical contact with one another.     Examples
In several
          of this condition were observed in the following panels:
areas conduits which contained redundant Class 1E wiring had
                              P800-62, 63, 64, 65
been installed in physical contact with one another.
                              P870-55, 57, 58, 59, 61
Examples
                              P601-19, 22
of this condition were observed in the following panels:
          Additionally, inadequate spatial separation was observed be-
P800-62, 63, 64, 65
          tween exposed Class IE wiring in several of the control panel
P870-55, 57, 58, 59, 61
          sections.
P601-19, 22
                                  II-7
Additionally, inadequate spatial separation was observed be-
tween exposed Class IE wiring in several of the control panel
sections.
II-7


              _     _                             __
_
_
__
NRC CAT inspectors examined the documents whic.h control the
NRC CAT inspectors examined the documents whic.h control the
design and installation of equipment in the cortrol room area.
design and installation of equipment in the cortrol room area.
The General Electric Company (GE) Topical Repor?. NEDO-10466-A
The General Electric Company (GE) Topical Repor?. NEDO-10466-A
provides design criteria and safety evaluation 1or components
provides design criteria and safety evaluation 1or components
comprising the PGCC. In accordance with the definition pro-
comprising the PGCC.
In accordance with the definition pro-
vided by this document, the PGCC consists of 1) a set of steel
vided by this document, the PGCC consists of 1) a set of steel
floor sections, 2) a set of termination cabinets, and 3) a set
floor sections, 2) a set of termination cabinets, and 3) a set
Line 469: Line 597:
Other control room panels, such as operator and signal
Other control room panels, such as operator and signal
conditioning panels, are not considered part of the PGCC
conditioning panels, are not considered part of the PGCC
and were designed by Sargent & Lundy Engineers.     However,
and were designed by Sargent & Lundy Engineers.
However,
internal separation for all control room panels was to be
internal separation for all control room panels was to be
in accordance with the requirements of GE document 22A7472
in accordance with the requirements of GE document 22A7472
Line 476: Line 605:
In reviewing these documents NRC CAT inspectors raised
In reviewing these documents NRC CAT inspectors raised
questions concerning the use of flexible conduit as a fire
questions concerning the use of flexible conduit as a fire
rated barrier within control room panels. Discussions with
rated barrier within control room panels.
Discussions with
licensee personnel indicate that the use of flexible conduit
licensee personnel indicate that the use of flexible conduit
in the PGCC panels and ficor sections has been justified by
in the PGCC panels and ficor sections has been justified by
Line 484: Line 614:
However, based upon subsequent discussions with the NRR staff,
However, based upon subsequent discussions with the NRR staff,
NRC CAT inspectors concluded that analysis of components
NRC CAT inspectors concluded that analysis of components
outside the scope of the PGCC has not been provided. As such,
outside the scope of the PGCC has not been provided.
As such,
the wiring configurations described above do not comply with
the wiring configurations described above do not comply with
FSAR requirements.
FSAR requirements.
Line 492: Line 623:
further evaluation by the NRC.
further evaluation by the NRC.
In connection with this issue a program weakness was identified
In connection with this issue a program weakness was identified
concerning the review of vendor issued specifications. GE
concerning the review of vendor issued specifications.
GE
specification 22A7472 was issued in April of 1981 and, as pre-
specification 22A7472 was issued in April of 1981 and, as pre-
viously indicated, provides requirements for separation within
viously indicated, provides requirements for separation within
electrical equipment. However, the S&L review of this spec-
electrical equipment.
ification did not occur until January of 1985. The S&L approval
However, the S&L review of this spec-
ification did not occur until January of 1985.
The S&L approval
of this specification stipulates that " contractor may proceed
of this specification stipulates that " contractor may proceed
in accordance with specification based on making the revisions
in accordance with specification based on making the revisions
Line 504: Line 638:
and that much of the equipment affected by the requirements of
and that much of the equipment affected by the requirements of
the specification had previously been installed and, in some
the specification had previously been installed and, in some
cases, turned over to operations. The licensee should deter-
cases, turned over to operations.
The licensee should deter-
mine whether S&L's specification changes are being incorporated
mine whether S&L's specification changes are being incorporated
into the installed equipment.
into the installed equipment.
                        II-8
II-8


Separation deficiencies were also identified in 4160V switch-
'
'
        Separation deficiencies were also identified in 4160V switch-
gear E22-5004.
        gear E22-5004.     However, this deficiency and the adequacy of
However, this deficiency and the adequacy of
        the installation are addressed in Potential Deficiency Report
the installation are addressed in Potential Deficiency Report
      81-05. Construction activity in connection with resolution of       l
81-05.
        this report has not been completed.
Construction activity in connection with resolution of
        Separation Leficiencies also exist between exposed electrical
l
      cable and raceway components.     As discussed in Section
this report has not been completed.
        II.B.1.b(1) above, these deficiencies had not been identified
Separation Leficiencies also exist between exposed electrical
      by the licensee due to inadequate incorporation of accept /
cable and raceway components.
        reject criteria into separation walkdown procedures.
As discussed in Section
  (3) Power Cable Spacing and Derating
II.B.1.b(1) above, these deficiencies had not been identified
      CPS power cable installations have been designed in accordance
by the licensee due to inadequate incorporation of accept /
      with Insulated Power Cable Engineers Association (IPCEA) publi-
reject criteria into separation walkdown procedures.
      cations P-46-426 " Power Cable Ampacities - Volume I - Copper
(3) Power Cable Spacing and Derating
      Conductors" and P-54-440 "Ampacities - Cables in Open Top Cable
CPS power cable installations have been designed in accordance
      Trays." The power cables have been derated in accordance with
with Insulated Power Cable Engineers Association (IPCEA) publi-
      the IPCEA standards such that cables sharing raceways may be in
cations P-46-426 " Power Cable Ampacities - Volume I - Copper
      contact.   Additionally, ampacities for power cables are based
Conductors" and P-54-440 "Ampacities - Cables in Open Top Cable
      on a 2-inch average depth of fill in cable tray. As a       result,
Trays." The power cables have been derated in accordance with
      cables in solid metal trays could be installed without
the IPCEA standards such that cables sharing raceways may be in
      maintained spacing.
contact.
      The project's power cable ampacities calculation, S&L No.
Additionally, ampacities for power cables are based
      19-G-1, was reviewed and compared to the FSAR commitments.
on a 2-inch average depth of fill in cable tray.
      The calculation takes the appropriate values from tables in
As a result,
        IPCEA P-54-440, adjusts the values for actual cable
cables in solid metal trays could be installed without
      diameters and applys a five percent general derating factor
maintained spacing.
      for tray covers.     The ampacities are derated an additional
The project's power cable ampacities calculation, S&L No.
      10 percent as required by IPCEA P-54-440 for a 50 C ambient
19-G-1, was reviewed and compared to the FSAR commitments.
      temperature and it is these values that are listed in the
The calculation takes the appropriate values from tables in
      FSAR Section 8.3.
IPCEA P-54-440, adjusts the values for actual cable
      No deficiencies were identified in this area.
diameters and applys a five percent general derating factor
  (4) Cable Damage
for tray covers.
      With the exception of the Class 1E cables damaged as a result
The ampacities are derated an additional
      of the watt transducer fire in 4160V switchgear 1E22-5004
10 percent as required by IPCEA P-54-440 for a 50 C ambient
      discussed in Section II.B.3, below, no deficiencies were
temperature and it is these values that are listed in the
      identified in this area.
FSAR Section 8.3.
  (5) Cable Identification
No deficiencies were identified in this area.
      In general, the identification of Class 1E cable installations
(4) Cable Damage
      was found to be in accordance with applicable design
With the exception of the Class 1E cables damaged as a result
      criteria.   No construction deficiencies were identified.
of the watt transducer fire in 4160V switchgear 1E22-5004
  (6) Terminations
discussed in Section II.B.3, below, no deficiencies were
      In general, cable termination activities performed by
identified in this area.
      construction personnel conformed to requirements. However,
(5) Cable Identification
      two types of deficiencies were observed and are discussed
In general, the identification of Class 1E cable installations
      below,                                                             i
was found to be in accordance with applicable design
                                II-9
criteria.
                                                                          }
No construction deficiencies were identified.
(6) Terminations
In general, cable termination activities performed by
construction personnel conformed to requirements.
However,
two types of deficiencies were observed and are discussed
below,
i
II-9
}


  (a) The NRC CAT examined four 5kV terminations in switchgear
(a) The NRC CAT examined four 5kV terminations in switchgear
      and found three which were not insulated as required by
and found three which were not insulated as required by
      specification.     These were the "from" ends of cables
specification.
      1LP01A-PIE, 1HP08A-P3E and 1HP030-P3E.       Section 1004.1C2
These were the "from" ends of cables
      of S&L Specification K-2999 and paragraph 4.12.la of BAP
1LP01A-PIE, 1HP08A-P3E and 1HP030-P3E.
      3.3.3 require all SkV terminations in switchgear to be
Section 1004.1C2
      insulated with termination kits or insulating boots. The
of S&L Specification K-2999 and paragraph 4.12.la of BAP
      BA QC Inspection Checklists for the three terminations and
3.3.3 require all SkV terminations in switchgear to be
      IPOI's checklist for ILP01A accepted the installations
insulated with termination kits or insulating boots.
      indicating that insulation was not required.
The
      The terminations for 1HP08A and 1HP03D in switchgear
BA QC Inspection Checklists for the three terminations and
      1E22-S004 were subsequently documented on NCR 32232 and
IPOI's checklist for ILP01A accepted the installations
      Field Change Request (FCR) 38981 and dispositioned use-
indicating that insulation was not required.
      as-is. This was based on S&L's determination that the
The terminations for 1HP08A and 1HP03D in switchgear
      busses for this particular switchgear were not required
1E22-S004 were subsequently documented on NCR 32232 and
      to be insulated and, therefore, the cable terminations
Field Change Request (FCR) 38981 and dispositioned use-
      need not be. IP startup had identified uninsulated bus
as-is.
      to breaker connections in the switchgear containing cable
This was based on S&L's determination that the
      ILP01A, but had not identified the uninsulated cable
busses for this particular switchgear were not required
      terminations.
to be insulated and, therefore, the cable terminations
      Although discussions with the licensee indicate there may
need not be.
      be technical justifications for certain uninsulated SkV
IP startup had identified uninsulated bus
      terminations, the installations identified by the NRC CAT
to breaker connections in the switchgear containing cable
      inspectors do not conform to current specification require-
ILP01A, but had not identified the uninsulated cable
      ments.
terminations.
  (b) A field-installed jumper wire in the remote shutdown panel
Although discussions with the licensee indicate there may
      was found by the NRC CAT to be a type which is not qualified
be technical justifications for certain uninsulated SkV
      for Class 1E service. This jumper wire is located on ter-
terminations, the installations identified by the NRC CAT
      minal strip GG, between terminal points 18 and 26, and is
inspectors do not conform to current specification require-
      depicted on drawing E03-1C61-P001, sheet 6, Rev. K.         Further
ments.
      investigation of this finding revealed the following:
(b) A field-installed jumper wire in the remote shutdown panel
      *
was found by the NRC CAT to be a type which is not qualified
          Startup discovered, during system checkout, that the
for Class 1E service.
          required jumper between these points was missing and
This jumper wire is located on ter-
          initiated Maintenance Work Request (MWR) B02288 in
minal strip GG, between terminal points 18 and 26, and is
          order to have plant operating staff personnel install
depicted on drawing E03-1C61-P001, sheet 6, Rev. K.
          the missing jumper wire.
Further
      *
investigation of this finding revealed the following:
          The MWR form was improperly reviewed, thus the K R
*
          was processed as a nonsafety-related work order.
Startup discovered, during system checkout, that the
          Due to the error in the processing of the MWR form,
required jumper between these points was missing and
          non-Class 1E qualified jumper wire was obtained from
initiated Maintenance Work Request (MWR) B02288 in
          the operations warehouse and installed by plant
order to have plant operating staff personnel install
          operating staff personnel, and QC inspection of this
the missing jumper wire.
          installation was not performed.
*
      Subsequently, the licensee has issued MWR-B11255 and
The MWR form was improperly reviewed, thus the K R
      Condition Report 1-85-06-007 to document this NRC CAT
was processed as a nonsafety-related work order.
      finding.     However, the condition report inaccurately
Due to the error in the processing of the MWR form,
      indicates that use of unqualified wire does not involve
non-Class 1E qualified jumper wire was obtained from
      nonconforming material and, therefore, does not indicate
the operations warehouse and installed by plant
operating staff personnel, and QC inspection of this
installation was not performed.
Subsequently, the licensee has issued MWR-B11255 and
Condition Report 1-85-06-007 to document this NRC CAT
finding.
However, the condition report inaccurately
indicates that use of unqualified wire does not involve
^
^
                            II-10
nonconforming material and, therefore, does not indicate
                    ~_.                       _     ___ _.
II-10
~_.
_
___ _.


the appropriate safety classification for the condition
the appropriate safety classification for the condition
being reported.
being reported.
It should be noted that, due to a similar finding by the
It should be noted that, due to a similar finding by the
NRC CAT at another facility, the licensee had previously
NRC CAT at another facility, the licensee had previously
instituted a program to assure that all field-installed
instituted a program to assure that all field-installed
wiring was accomplished using Class 1E qualified wire.
wiring was accomplished using Class 1E qualified wire.
This included the removal of all unqualified wire from
This included the removal of all unqualified wire from
the construction warehouses to preclude its inadvertent
the construction warehouses to preclude its inadvertent
use. However, this purge of unqualified wire did not
use.
However, this purge of unqualified wire did not
extend into IP's operations warehouse.
extend into IP's operations warehouse.
The NRC CAT inspectors then selected an additional 10
The NRC CAT inspectors then selected an additional 10
Line 626: Line 782:
ties requested by startup and performed by plant staff.
ties requested by startup and performed by plant staff.
The MWRs selected are: 804831, B1000, B10039, A13589,
The MWRs selected are: 804831, B1000, B10039, A13589,
B10038, A16980, A14412, A17116, A17112, and 810159. These
B10038, A16980, A14412, A17116, A17112, and 810159.
These
were reviewed for proper processing of the form and evi-
were reviewed for proper processing of the form and evi-
dence of the application of adequate QA program require-
dence of the application of adequate QA program require-
ments to the work performed. In addition, the NRC CAT
ments to the work performed.
In addition, the NRC CAT
inspectors physically inspected the completed hardware
inspectors physically inspected the completed hardware
pertaining to each MWR.
pertaining to each MWR.
The results of this review are as follows:
The results of this review are as follows:
    Two additional instances of unqualified jumper wire
Two additional instances of unqualified jumper wire
    were discovered.     These were related to MWRs A16980
were discovered.
    and A17116 and involved internal wiring in
These were related to MWRs A16980
    safety-related motor operated valves ISX004C and
and A17116 and involved internal wiring in
    1SX006C.
safety-related motor operated valves ISX004C and
1SX006C.
*
*
    The form for MWR A14412 indicated that no QC inspection
The form for MWR A14412 indicated that no QC inspection
    was required. The work associated with this MWR is the
was required.
    splicing of internal motor leads to field cable in
The work associated with this MWR is the
    safety-related motor operated valve ISX004C, Sargent
splicing of internal motor leads to field cable in
    & Lundy Standard EA-209 requires these splices to be
safety-related motor operated valve ISX004C,
    insulated, either with Class IE qualified insulating
Sargent
    and jacketing tapes, or with Class IE qualified heat-
& Lundy Standard EA-209 requires these splices to be
    shrinkable tubing. The completed configurations of
insulated, either with Class IE qualified insulating
    either of these methods renders it impossible to
and jacketing tapes, or with Class IE qualified heat-
    determine whether or not qualified materials were
shrinkable tubing.
    used and were properly installed. Therefore, in order
The completed configurations of
    to assure the adequacy of these splices, an in process
either of these methods renders it impossible to
    witnessing inspection by QC was necessary.
determine whether or not qualified materials were
used and were properly installed.
Therefore, in order
to assure the adequacy of these splices, an in process
witnessing inspection by QC was necessary.
*
*
    MWR 81000 involves the swapping of two motor leads at
MWR 81000 involves the swapping of two motor leads at
    the Residual Heat Removal pump 1C motor in order to
the Residual Heat Removal pump 1C motor in order to
    achieve proper phase rotation of the motor.       Review of
achieve proper phase rotation of the motor.
    the MWR form and associated QC inspection documentation
Review of
    indicates that the work was properly accomplished and
the MWR form and associated QC inspection documentation
    inspected. However, no documentation was generated
indicates that the work was properly accomplished and
    which would inform the designer of the change in motor
inspected.
    phasing. Therefore, the currently approved design doc-
However, no documentation was generated
    ument (wiring diagram E03-1RH00, SH.9, Rev. D) is in
which would inform the designer of the change in motor
                      II-11
phasing.
Therefore, the currently approved design doc-
ument (wiring diagram E03-1RH00, SH.9, Rev. D) is in
II-11


              ---   _ _ _                   ___       ._ .____.._._ __                             _ _ _ - _ _ _ . _ - -                       . - _
---
                                          conflict with the as-installed configuration of the in-
_ _ _
                                          sta11ation. The licensee stated that the disposition of
___
                                          FCR 24896 allows motor terminations to be changed with-
._ .____.._._ __
_ _ _ - _ _ _ . _ - -
. -
_
conflict with the as-installed configuration of the in-
sta11ation.
The licensee stated that the disposition of
FCR 24896 allows motor terminations to be changed with-
out initiating a design change document and that the
4
4
                                          out initiating a design change document and that the
designer need not be notified of such changes in motor
                                          designer need not be notified of such changes in motor
!
!                                         phasing. A review of this FCR reveals that, although
phasing.
A review of this FCR reveals that, although
;
it does state " connections may be modified as required
to obtain proper motor rotation", it does not indicate
'
'
;                                        it does state " connections may be modified as required
that approved design drawings (wiring diagrams) do not
                                          to obtain proper motor rotation", it does not indicate
1
1
i
                                          that approved design drawings (wiring diagrams) do not
have to depict the as-installed wiring configurations.
i
                                          have to depict the as-installed wiring configurations.
j
j
'
In addition, on page 2 of 5 of the "Clinton Power
                                          In addition, on page 2 of 5 of the "Clinton Power
'
                                          Station As-built Program" dated May 2, 1985, the
Station As-built Program" dated May 2, 1985, the
                                          licensee has committed to maintain wiring diagrams
licensee has committed to maintain wiring diagrams
l                                         in an as-built condition.
l
                                      In summary, of 11 maintenance work orders reviewed, 6
in an as-built condition.
                                      instances of either unqualified material, improperly
In summary, of 11 maintenance work orders reviewed, 6
                                      documented or missed inspections, and conflict between
instances of either unqualified material, improperly
                                      as-built configuration and approved drawing were observed.
documented or missed inspections, and conflict between
                                      This indicates that the Maintenance Work Request Program
as-built configuration and approved drawing were observed.
                                      is ineffective in identifying safety-related work and
This indicates that the Maintenance Work Request Program
                                      prescribing the appropriate QA requirements for the work.
is ineffective in identifying safety-related work and
              c. Conclusions
prescribing the appropriate QA requirements for the work.
                  Wiring installations in a number of control panels are not in
c.
I                 accordance with applicable electrical separation requirements.
Conclusions
                  Additionally, the use of flexible conduit as a fire rated barrier
Wiring installations in a number of control panels are not in
                  and the fire protection adequacy of certain control room panels are
I
                  issues requiring further evaluation by the NRC. A number of Class
accordance with applicable electrical separation requirements.
                  IE 4160V cable terminations have not been completed in accordance
Additionally, the use of flexible conduit as a fire rated barrier
                  with applicable design requirements.
and the fire protection adequacy of certain control room panels are
'
issues requiring further evaluation by the NRC.
A number of Class
IE 4160V cable terminations have not been completed in accordance
with applicable design requirements.
The hardware and QA program deficiencies identified in the area of
l
'
"
"
                  The hardware and QA program deficiencies identified in the area of                                                                        l
the Maintenance Work Request program indicate a need for additional
                  the Maintenance Work Request program indicate a need for additional
management attention in order to assure that safety-related wiring
                  management attention in order to assure that safety-related wiring
remains in conformance with applicable requirements subsequent to
                  remains in conformance with applicable requirements subsequent to
turnover from construction.
                  turnover from construction.
3.
              3. Electrical Equipment Installation
Electrical Equipment Installation
              a. Inspection Scope
a.
                  Over 30 pieces of installed or partially installed electrical
Inspection Scope
                  equipment and associated hardware items were inspected. Samples
Over 30 pieces of installed or partially installed electrical
J                 were based on system function and safety classification.
equipment and associated hardware items were inspected.
                  The following specific electrical components were inspected in
Samples
                  detail:
J
                  (1) Motors
were based on system function and safety classification.
                                The installation of four motors and associated hardware was
The following specific electrical components were inspected in
                                  inspected for such items as location, anchoring, grounding,                                                               i
detail:
                                  identification and protection.                       The motors inspected were:                                           ,
(1) Motors
The installation of four motors and associated hardware was
inspected for such items as location, anchoring, grounding,
i
identification and protection.
The motors inspected were:
,
.
II-12
_
_-
-
._ -
_- , _ .
._
. --
__
- - - -
.
.
.
                                                                            II-12
. _ _
  _ _- -
_
          ._ -            _- , _ .        ._       . --                  __    - - - -
- - - - - - - - - -
                                                                                                . _ _                      _ - - - - - - - - - -
_ ____
                                                                                                                                                      _ ____


  _ _ __.                   __       ___ -- - _   .       _ - - . - _               __-                           _           -   .           _
_
l                           Residual Heat Removal Pump Motor                             1AP07EG-1A
_
l                           Residual Heat Removal Pump Motor                             JAP 09ED-1B
__.
                            Low Pressure Core Spray Pump Motor                           1AP07EE
__
                          High Pressure Core Spray Pump Motor                           IE22-S001
___
          (2) Electrical Penetration Assemblies
-- - _
                      The following containment penetration assemblies were
.
                      inspected:
_ - - . - _
                                  1EE10E-1P2E                 Power
__-
                                  IEE22E-1C3E                 Control
_
                                  1EE33E-1K2E                 Neutron Monitoring
-
!                                 1EE18E-1C1E                 Control
.
                      The location, type, mounting and identification of these
_
                      penetrations were compared with the installation drawings
l
                      and vendor manual.
Residual Heat Removal Pump Motor
          (3) Circuit Breakers
1AP07EG-1A
                      Circuit breakers for the following Class IE pump motors were
l
                      examined to determine compliance with design and installation
Residual Heat Removal Pump Motor
l                      documents for size, type, system interface and maintenance.
JAP 09ED-1B
                                  Low Pressure Core Spray
Low Pressure Core Spray Pump Motor
i                                High Pressure Core Spray
1AP07EE
                                  Residual Heat Removal Pump 1A
High Pressure Core Spray Pump Motor
          (4) Switchgear and Motor Control Centers
IE22-S001
l                      The following switchgear and motor control centers were
(2) Electrical Penetration Assemblies
                      inspected:
The following containment penetration assemblies were
                                Motor Control Center                              1AP30E-18
inspected:
1EE10E-1P2E
Power
IEE22E-1C3E
Control
1EE33E-1K2E
Neutron Monitoring
!
1EE18E-1C1E
Control
The location, type, mounting and identification of these
penetrations were compared with the installation drawings
and vendor manual.
(3) Circuit Breakers
Circuit breakers for the following Class IE pump motors were
examined to determine compliance with design and installation
l
l
                                Motor Control Center                             1AP60E-1A
documents for size, type, system interface and maintenance.
Low Pressure Core Spray
i
High Pressure Core Spray
Residual Heat Removal Pump 1A
(4) Switchgear and Motor Control Centers
l
The following switchgear and motor control centers were
inspected:
Motor Control Center
1AP30E-18
l
Motor Control Center
1AP60E-1A
;
;
                                Motor Control Center                             1AP73E-1A
Motor Control Center
                                4160V Switchgear                                 1AP07E-1A1
1AP73E-1A
                                4160V Switchgear                                 1AP09E-181
4160V Switchgear
                                4160V Switchgear                                 1E22-5004-101
1AP07E-1A1
          (5) Station Batteries and Racks
4160V Switchgear
                      The 125V battery rooms including the installed batteries,
1AP09E-181
                      battery racks and associated equipment were inspected. The
4160V Switchgear
                      location, mounting, maintenance and environmental control for
1E22-5004-101
                      installation of the batteries were compared with the applicable
(5) Station Batteries and Racks
                      requirements cnd quality records.
The 125V battery rooms including the installed batteries,
battery racks and associated equipment were inspected.
The
location, mounting, maintenance and environmental control for
installation of the batteries were compared with the applicable
requirements cnd quality records.
i
125V DC Battery
1DC06E-1A
,
i
i
,                                125V DC Battery                                 1DC06E-1A
125V DC Battery
i                                125V DC Battery                                  10C01E-1B
10C01E-1B
:
:
                                                    II-13
II-13
,
,
          - . , , . .         - - - ,
- . , , . .
                                                  -     r-             - . . . - . -     .,----------.,n - , - - ,.,_-- - - - -   --~-------rm-.
- - - ,
-
r-
- . . . - . -
.,----------.,n
- , - - ,.,_-- - - - -
--~-------rm-.


                                                                            ._ _
._
    (6) 125V DC System Equipment
_
          The following equipment comprising portions of the 125V dc
(6) 125V DC System Equipment
          systems were inspected for compliance to design documents
The following equipment comprising portions of the 125V dc
          for such items as location, mounting (welds, concrete anchors
systems were inspected for compliance to design documents
          and bolting) and proper configuratfor
for such items as location, mounting (welds, concrete anchors
              Battery Charger                     10C06E-1A
and bolting) and proper configuratfor
              Battery Charger                     1DC07E-1A
Battery Charger
              125V DC Motor Control Center       1DC14E-1B
10C06E-1A
              125V DC Distribution Panel         1DC14E-4A
Battery Charger
              Static Inverter                     1C71-S001A
1DC07E-1A
              Static Inverter                     1C71-S0018
125V DC Motor Control Center
  (7) Conteql Panels
1DC14E-1B
          A number of safety-related electrical control panels were
125V DC Distribution Panel
          inspected for compliance to requirements for items such as
1DC14E-4A
          location, mounting and type. The panels inspected were:
Static Inverter
              Remote Shutdown Panel               1C61-P001
1C71-S001A
              Diesel Generator Control Panel     IPL12JA
Static Inverter
              Diesel Generator Control Panel     1PL12JB
1C71-S0018
              Operator Main Control Panels
(7) Conteql Panels
  (8) Motor Operated Valves
A number of safety-related electrical control panels were
          Four motor operated valves were examined in detail.
inspected for compliance to requirements for items such as
                              1E12-F004A
location, mounting and type.
                              1E12-F0278
The panels inspected were:
                              1E12-F0248
Remote Shutdown Panel
                              1E12-F047A
1C61-P001
  The following documents provided the basic acceptance criteria for
Diesel Generator Control Panel
  the inspections:
IPL12JA
        S&L Clinton Power Station Specification K-2999, " Electrical
Diesel Generator Control Panel
          Installation," Amd. 10
1PL12JB
        BAP 2.10, " Equipment Installation," Rev. 6
Operator Main Control Panels
  *
(8) Motor Operated Valves
        BQAI-190-6, " Electrical Equipment Field Verification," Rev. 4.
Four motor operated valves were examined in detail.
b. Inspection Findings
1E12-F004A
  (1) Motors
1E12-F0278
        Motors examined were found to have been installed in accordance
1E12-F0248
        with applicable design criteria.     Nameplate data such as operat-
1E12-F047A
          ing voltage, horsepower and speed were compared with FSAR re-
The following documents provided the basic acceptance criteria for
        quirements and found to be acceptable. Maintenance records for
the inspections:
        the High Pressure Core Spray pump motor were reviewed and also
S&L Clinton Power Station Specification K-2999, " Electrical
        found to be acceptable.
Installation," Amd. 10
                                  II-14
BAP 2.10, " Equipment Installation," Rev. 6
*
BQAI-190-6, " Electrical Equipment Field Verification," Rev. 4.
b.
Inspection Findings
(1) Motors
Motors examined were found to have been installed in accordance
with applicable design criteria.
Nameplate data such as operat-
ing voltage, horsepower and speed were compared with FSAR re-
quirements and found to be acceptable. Maintenance records for
the High Pressure Core Spray pump motor were reviewed and also
found to be acceptable.
II-14


        _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                               ._
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
                                                  During the examination of the Low Pressure Core Spray pump motor
._
                                                  NRC CAT inspectors raised questions concerning the adequacy of
During the examination of the Low Pressure Core Spray pump motor
                                                  materials used to mount the motor to its pedestal. This issue
NRC CAT inspectors raised questions concerning the adequacy of
                                                  is discussed further in Section VI, Material Traceability and     l
materials used to mount the motor to its pedestal. This issue
                                                  Control, of this report.
is discussed further in Section VI, Material Traceability and
      (2) Electrical Penetrations
                                                  Penetrations examined were found to be in accordance with
                                                  design documents.    Installation and inspection procedures were
                                                  thorough, and associated inspection and maintenance records
                                                  were detailed and complete.
                                                  During the examination of the electrical penetration assemblies
                                                  it was noted that a pipe restraint had been welded to the
                                                  nozzle of penetration IEE27E. Discussion with the licensee
l
l
                                                  regarding this issue disclosed that nonconformance reports (NCR
Control, of this report.
                                                  28725 and NCMR 1-0971) had previously been issued to document
(2) Electrical Penetrations
                                                  this condition and had been dispositioned use-as-is by engi-
Penetrations examined were found to be in accordance with
                                                  neering.   Based upon the information available, NRC CAT
design documents.
                                                  inspectors could not determine whether this activity had
Installation and inspection procedures were
thorough, and associated inspection and maintenance records
were detailed and complete.
During the examination of the electrical penetration assemblies
it was noted that a pipe restraint had been welded to the
nozzle of penetration IEE27E.
Discussion with the licensee
regarding this issue disclosed that nonconformance reports (NCR
l
28725 and NCMR 1-0971) had previously been issued to document
this condition and had been dispositioned use-as-is by engi-
neering.
Based upon the information available, NRC CAT
inspectors could not determine whether this activity had
adversely affected the penetration gas boundary or components
.
.
within the penetration sleeve, or whether the disposition of
'
'
                                                  adversely affected the penetration gas boundary or components
the nonconformance reports is adequate.
                                                  within the penetration sleeve, or whether the disposition of
Further evaluation by the licensee is required.
                                                  the nonconformance reports is adequate.
(3) Circuit Breakers
                                                  Further evaluation by the licensee is required.
The examination of the selected circuit breakers indicated
      (3) Circuit Breakers
that they had been installed and maintained in accordance
                                                  The examination of the selected circuit breakers indicated
with applicable design documents.
                                                  that they had been installed and maintained in accordance
Important installation
                                                  with applicable design documents. Important installation
attributes such as proper alignment and main contact pene-
                                                  attributes such as proper alignment and main contact pene-
tration were verified by physical inspection of the equip-
                                                  tration were verified by physical inspection of the equip-
ment and review of construction and startup test records.
                                                  ment and review of construction and startup test records.
(4) Switchgear and Motor Control Centers
      (4) Switchgear and Motor Control Centers
Several construction deficiencies were identified in Class 1E
                                                  Several construction deficiencies were identified in Class 1E
switchgear installations.
                                                  switchgear installations.     The examination of switchgear 1AP09E
The examination of switchgear 1AP09E
                                                  disclosed that the switchgear unit had been floor mounted using
disclosed that the switchgear unit had been floor mounted using
American Society for Testing and Materials (ASTM) A-307 bolting
'
'
                                                  American Society for Testing and Materials (ASTM) A-307 bolting
materials corresponding to Society of Automotive Engineers
                                                  materials corresponding to Society of Automotive Engineers
(SAE) Grade 2.
                                                  (SAE) Grade 2. In reviewing the vendor (Westinghouse) manual
In reviewing the vendor (Westinghouse) manual
                                                  NRC CAT inspectors noted that SAE Grade 5 bolting material had
NRC CAT inspectors noted that SAE Grade 5 bolting material had
                                                  been specified for this installation.     Additionally, the review
been specified for this installation.
                                                  of the seismic qualification report for this equipment indi-
Additionally, the review
                                                  cates that Grade 5 bolting materials had been used to mount the
of the seismic qualification report for this equipment indi-
                                                  test unit to the shake table for qualification.
cates that Grade 5 bolting materials had been used to mount the
                                                  This item was discussed with licensee personnel who produced
test unit to the shake table for qualification.
                                                  NCR 24174 which had been issued in December of 1984 to document
This item was discussed with licensee personnel who produced
                                                  this condition. Subsequently, this item was transferred to
NCR 24174 which had been issued in December of 1984 to document
                                                  and dispositioned on CPS NCMR 1-0413 in accordance with site
this condition.
                                                  procedures for items turned over to operations. The disposi-
Subsequently, this item was transferred to
                                                                          II-15
and dispositioned on CPS NCMR 1-0413 in accordance with site
    ..
procedures for items turned over to operations.
  .
The disposi-
II-15
.
..


  .
.
    -     -__-__-                               --                                   -
-
                tion of the NCMR requires that all of the existing bolting
-__-__-
                material be replaced with the specified SAE Grade 5 material.
--
                NRC CAT inspectors noted that the switchgear unit is energized
-
                and provides the Class 1E power feed for many of the plant
tion of the NCMR requires that all of the existing bolting
                systems currently under test.               Consequently, although this
material be replaced with the specified SAE Grade 5 material.
                deficiency had been properly identified by the licensee, the
NRC CAT inspectors noted that the switchgear unit is energized
                delay in initiating the specified corrective action could ad-
and provides the Class 1E power feed for many of the plant
                versely affect other plant systems.
systems currently under test.
                During the examination of switchgear 1E22-5004 NRC CAT inspec-
Consequently, although this
                tors noted that watt transducer 1JY-AP778 located inside of
deficiency had been properly identified by the licensee, the
                cubicle 1 of the switchgear had burned. Additionally, the trans-
delay in initiating the specified corrective action could ad-
                ducer associated wiring and Class 1E field cables located above
versely affect other plant systems.
                the device had also been damaged as a result of the transducer
During the examination of switchgear 1E22-5004 NRC CAT inspec-
                  fire.
tors noted that watt transducer 1JY-AP778 located inside of
                Discussions with licensee personnel revealed that MWR B08649
cubicle 1 of the switchgear had burned. Additionally, the trans-
                had been issued to document and correct this condition. A
ducer associated wiring and Class 1E field cables located above
                  review of this document indicates that the disposition,
the device had also been damaged as a result of the transducer
                " Procure, calibrate and install new transducer and associated
fire.
                wiring as necessary," is inadequate in that it fails to
Discussions with licensee personnel revealed that MWR B08649
                consider damage done to the Class 1E field cables located
had been issued to document and correct this condition.
                  in proximity to the device.
A
                Wiring separation deficiencies were also identified inside of
review of this document indicates that the disposition,
                various cubicles of switchgear 1E22-5004. This item is identi-
" Procure, calibrate and install new transducer and associated
                  fied as part of Potential Reportable Deficiency 81-05 dated
wiring as necessary," is inadequate in that it fails to
                February 5,1982 and specified rework is scheduled to be
consider damage done to the Class 1E field cables located
                accomplished in accordance with the resolution of this docu-
in proximity to the device.
                ment.
Wiring separation deficiencies were also identified inside of
                The examination of switchgear 1AP07E and the motor control
various cubicles of switchgear 1E22-5004.
                centers selected indicate that they have been installed in
This item is identi-
                accordance with applicable requirements.
fied as part of Potential Reportable Deficiency 81-05 dated
      (5) Station Batteries and Racks
February 5,1982 and specified rework is scheduled to be
accomplished in accordance with the resolution of this docu-
ment.
The examination of switchgear 1AP07E and the motor control
centers selected indicate that they have been installed in
accordance with applicable requirements.
(5) Station Batteries and Racks
i
i
!
!
                The condition of the 125V battery rooms was found to be clean,
The condition of the 125V battery rooms was found to be clean,
                  free of debris and in good order.           Although permanent ventila-
free of debris and in good order.
                  tion systems had not been installed, temporary systems were in
Although permanent ventila-
                place and provided adequate ventilation for the areas examined.
tion systems had not been installed, temporary systems were in
                Access to these areas was controlled by keyed entry.
place and provided adequate ventilation for the areas examined.
                The 125V batteries were examined in detail and found to be
Access to these areas was controlled by keyed entry.
                  in good condition. Maintenance activities were reviewed and
The 125V batteries were examined in detail and found to be
                  in general had been performed in accordance with requirements.
in good condition.
      (6) 125V DC System
Maintenance activities were reviewed and
                  Inspection of components comprising the 125V de system
in general had been performed in accordance with requirements.
                  disclosed a deficier.cy in the installation of battery chargers
(6) 125V DC System
                  1DC07E and 1DC06E.             Design documents which specify
Inspection of components comprising the 125V de system
                  installation details for this equipment show mounting pad               I
disclosed a deficier.cy in the installation of battery chargers
                  dimensions which differ from the actual field configuration.             '
1DC07E and 1DC06E.
                                                    II-16
Design documents which specify
        _             _ _ _ _ _ _ _ _ _ _ _ _ _ _
installation details for this equipment show mounting pad
I
dimensions which differ from the actual field configuration.
'
II-16
_
_ _ _ _ _ _ _ _ _ _ _ _ _ _


  _
_
        . _ _ _ _ _ _ _         _ ____ _
.
                                                    __ .
_ _ _ _ _ _ _
_ ____ _
__ .
l
;
IDC07E - Design Dimensions 48 inches W x 40 inches D
Actual Dimensions 47 inches W x 36 inches D
IDC06E - Design Dimensions 48 inches W x 40 inches D
Actual Dimensions 47 inches W x 38 inches D
l
The review of applicable records indicates $ hat the
l
appropriate design change document had been initiated for the
conditions noted on charger 1DC-06E.
However, technical
justification for the discrepancies identified on charger
1DC-07E was not provided.
As a result of this observation the licensee has issued NCR
l
l
;                                        IDC07E - Design Dimensions 48 inches W x 40 inches D
32598 to document and correct this condition.
                                                  Actual Dimensions 47 inches W x 36 inches D
                                          IDC06E - Design Dimensions 48 inches W x 40 inches D
                                                  Actual Dimensions 47 inches W x 38 inches D
l                            The review of applicable records indicates $ hat the
l                            appropriate design change document had been initiated for the
                            conditions noted on charger 1DC-06E. However, technical
                            justification for the discrepancies identified on charger
                            1DC-07E was not provided.
                            As a result of this observation the licensee has issued NCR
l                            32598 to document and correct this condition.
l
l
                            Other 125V dc system components examined were found to have
Other 125V dc system components examined were found to have
                            been installed in accordance with requirements.
been installed in accordance with requirements.
                        (7) Control Panels
(7) Control Panels
                            In general, the installation of Class 1E control panels was
In general, the installation of Class 1E control panels was
                            found to be in accordance with applicable requirements. Six
found to be in accordance with applicable requirements.
                            panels were identified which had been mounted using bolts of
Six
                            indeterminate material type. The following panels exhibited
panels were identified which had been mounted using bolts of
                            this condition:
indeterminate material type.
                                        Switchgear HVAC Control Panel           1PL65JC
The following panels exhibited
                                        Switchgear HVAC Control Panel           IPL65JB
this condition:
                                        Diesel Generator HVAC Panel             1PL54JA
Switchgear HVAC Control Panel
                                        Shutdown Service Water Panel           1PL53JA
1PL65JC
                                        Shutdown Service Water Panel           1PL53JB
Switchgear HVAC Control Panel
                                        Shutdown Service Water Panel           1PL53JC
IPL65JB
Diesel Generator HVAC Panel
1PL54JA
Shutdown Service Water Panel
1PL53JA
Shutdown Service Water Panel
1PL53JB
Shutdown Service Water Panel
1PL53JC
i
i
                            The use of indeterminate bolting materials in safety-related
The use of indeterminate bolting materials in safety-related
                            applications is discussed in detail in Section VI, Material
applications is discussed in detail in Section VI, Material
                            Traceability and Control, of this report.
Traceability and Control, of this report.
                            During the examination of the Divisions 1 and 2 Class 1E Diesel
During the examination of the Divisions 1 and 2 Class 1E Diesel
                            Generator Control panels, NRC CAT inspectors noted that physical
Generator Control panels, NRC CAT inspectors noted that physical
                            identification of the panels was not in compliance with FSAR
identification of the panels was not in compliance with FSAR
                            requirements for identification of Class 1E equipment. Name-
requirements for identification of Class 1E equipment.
                            plates supplied by the vendor (Stewart & Stevenson) are not of
Name-
                            the color coding required for safety-related Divisions 1 and 2
plates supplied by the vendor (Stewart & Stevenson) are not of
                            electrical equipment.
the color coding required for safety-related Divisions 1 and 2
                            Discussions with the licensee indicate that the requirements of
electrical equipment.
                            Specification K-2861, to which these panels were purchased, may
Discussions with the licensee indicate that the requirements of
                            have been implemented prior to the FSAR commitment for color
Specification K-2861, to which these panels were purchased, may
                            coding of equipment. Consequently, these panels had not been
have been implemented prior to the FSAR commitment for color
                            properly identified.           As a result of this observation the licen-
coding of equipment.
                            see has issued Field Engineering Change Notice (FECN) 10305 to
Consequently, these panels had not been
                            document and correct this condition.
properly identified.
                                                            II-17
As a result of this observation the licen-
    .
see has issued Field Engineering Change Notice (FECN) 10305 to
      .
document and correct this condition.
II-17
.
.


                                                                                    :
In addition, the NRC CAT inspectors reviewed a licensee surveil-
                                                                                    l
lance of vendor panels.
                                                                                    l
Based on an NRC inspection at another
        In addition, the NRC CAT inspectors reviewed a licensee surveil-
site, the licensee's QA organization initiated a special surveil-
        lance of vendor panels.   Based on an NRC inspection at another
lance of vendor panels concentrating on those turned over to IP
        site, the licensee's QA organization initiated a special surveil-
startup and initially tested.
        lance of vendor panels concentrating on those turned over to IP
The surveillance findings indica-
        startup and initially tested.         The surveillance findings indica-
ted a number of problems and resulted in IP QC performing a
        ted a number of problems and resulted in IP QC performing a
broader scope inspection program.
        broader scope inspection program. However, the scope of the IP
However, the scope of the IP
        QC inspection program does not include panels manufactured by
QC inspection program does not include panels manufactured by
        MCC Powers and a number of GE panels.
MCC Powers and a number of GE panels.
        The NRC CAT specifically inspected a number of panels excluded
The NRC CAT specifically inspected a number of panels excluded
        from the IP QC program and identified a number of discrepancies:
from the IP QC program and identified a number of discrepancies:
            IPL54JA (MCC Powers)       Separation between non-Class 1E
IPL54JA (MCC Powers)
                                        field installed lighting circuit
Separation between non-Class 1E
                                        and Class 1E vendor wires; minimum
field installed lighting circuit
                                        bend radius of Class 1E vendor
and Class 1E vendor wires; minimum
                                      wires (subsequently documented on
bend radius of Class 1E vendor
                                        NCMR 2-0350); mounting bolts of
wires (subsequently documented on
                                        indeterminate material.
NCMR 2-0350); mounting bolts of
            IPL53JA (MCC Powers)       Separation between non-Class 1E
indeterminate material.
                                        field cable IVH79A and Class 1E
IPL53JA (MCC Powers)
                                        vendor wires; mounting bolts of
Separation between non-Class 1E
                                        indeterminate material.
field cable IVH79A and Class 1E
            1PL53JB and JC (MCC       Mounting bolts of indeterminate
vendor wires; mounting bolts of
              Powers)                 material.
indeterminate material.
            H22-P028 (GE)             Misidentification of Class 1E
1PL53JB and JC (MCC
                                      associated vendor wiring as non-
Mounting bolts of indeterminate
                                      Class 1E; separation between
Powers)
                                      Class 1E vendor wiring and non-
material.
                                      Class IE lighting and utility
H22-P028 (GE)
                                      circuits; isolation or analysis of
Misidentification of Class 1E
                                        the interface between Class 1E
associated vendor wiring as non-
                                      associated vendor wiring and non-
Class 1E; separation between
                                      Class 1E field wiring.       Subsequently
Class 1E vendor wiring and non-
                                      addressed on Field Deviation
Class IE lighting and utility
                                      Disposition Request, LH1-3027
circuits; isolation or analysis of
                                      Rev. O.
the interface between Class 1E
        The NRC CAT findings indicate that the scope of the IP QC
associated vendor wiring and non-
        inspection program for vendor supplied control panels needs to
Class 1E field wiring.
        be enlarged. The discrepancies found in the MCC Powers equip-
Subsequently
        ment and the GE panel indicate t, hat the 63 panels manufactured
addressed on Field Deviation
        by these two companies originally omitted from the inspection
Disposition Request, LH1-3027
        program should be included. Inspection attributes, such as the
Rev. O.
        interface between field wiring and vendor wiring, mounting
The NRC CAT findings indicate that the scope of the IP QC
        details, and minimum bend radius should be added to the QC
inspection program for vendor supplied control panels needs to
        inspection program.
be enlarged.
  (8) Motor Operated Valves
The discrepancies found in the MCC Powers equip-
        Motor operated valves examined were installed and maintained
ment and the GE panel indicate t, hat the 63 panels manufactured
        in accordance with applicable design documents.
by these two companies originally omitted from the inspection
                                II-18
program should be included.
                                                                                  _
Inspection attributes, such as the
                                                              _
interface between field wiring and vendor wiring, mounting
_-                                        _- -
details, and minimum bend radius should be added to the QC
inspection program.
(8) Motor Operated Valves
Motor operated valves examined were installed and maintained
in accordance with applicable design documents.
II-18
_-
_- -
_
_


  .                       ~           . . _ . . _   - -       - - - - .                     _ _ - .                                                     . - ..
.
i
~
l
. . _ . .
I                                   c.     Conclusions
_
l                                           In general, the installation of electrical equipment has been
- -
i                                           accomplished in accordance with requirements. However, of concern
- - - - .
j                                           were the examples of hardware deficiencies which exist in equipment
_ _ - .
i                                           which has been turned over for operation.
. -
l                                           Items such as internal panel separation and the mounting of                                                             l
..
1                                           seismically qualified equipment are concerns which will require
i
i                                           additional attention by the licensee.
l
I
c.
Conclusions
l
In general, the installation of electrical equipment has been
i
accomplished in accordance with requirements.
However, of concern
j
were the examples of hardware deficiencies which exist in equipment
i
which has been turned over for operation.
l
Items such as internal panel separation and the mounting of
l
1
seismically qualified equipment are concerns which will require
i
additional attention by the licensee.
i
i
4.
Instrumentation Installation
;
a.
Inspection Scope
i
i
i                                   4.    Instrumentation Installation
i
;                                    a.    Inspection Scope
:
i                                                                                                                                                                  i
The NRC CAT inspectors selected a sample of 15 completed runs of
:                                          The NRC CAT inspectors selected a sample of 15 completed runs of
instrument piping, comprising about 930 feet, for a detailed
,                                          instrument piping, comprising about 930 feet, for a detailed
,
j                                           examination in accordance with specification requirements and
j
j                                         isometric drawings.
examination in accordance with specification requirements and
:
j
isometric drawings.
:
four instrument racks and ten piping supports were examined for
'
'
                                            four instrument racks and ten piping supports were examined for
i
i                                          conformance with requirements including installed configuration,
conformance with requirements including installed configuration,
mounting details, material conformance, identification, and loca-
*
*
                                          mounting details, material conformance, identification, and loca-
l
                                            tion.
tion.
l
;
;                                          Eleven instruments were examined for conformance with requirements
Eleven instruments were examined for conformance with requirements
'
'
                                            for location, mounting details, and instrument type and range.
for location, mounting details, and instrument type and range.
i
i
:                                         See Table II-4 for a listing of piping runs, supports, racks, and                                                       l
:
See Table II-4 for a listing of piping runs, supports, racks, and
l
1
1
                                            instruments included in the sample, and identification of those
instruments included in the sample, and identification of those
j                                           items previously inspected by BAFV or IPOI programs.
j
                                          The following documents provided the acceptance criteria for the in-
items previously inspected by BAFV or IPOI programs.
;                                           spections:
The following documents provided the acceptance criteria for the in-
;
spections:
f
f
*
l
l
                                            *
S&L Clinton Power Station Specification K-2883, " Erection of
                                                  S&L Clinton Power Station Specification K-2883, " Erection of
l
l                                                 Phase I Piping Systems and Equipment," Amd. 13
Phase I Piping Systems and Equipment," Amd. 13
                                            *
*
                                                  BAP 2.6, " Instrumentation," Rev. 7 Change F
BAP 2.6, " Instrumentation," Rev. 7 Change F
f                                                 Applicable design drawings and change documents.
f
I~                                   b.     Inspection Findings
Applicable design drawings and change documents.
l                                           In general, the installation of instruments, racks, piping runs,
I~
j.                                         and supports conformed to the appropriate requirements. However, a
b.
                                            number of deficiencies were identified and are discussed below:
Inspection Findings
l
In general, the installation of instruments, racks, piping runs,
j.
and supports conformed to the appropriate requirements.
However, a
'
'
                                                                                                                                                                  ,
number of deficiencies were identified and are discussed below:
,
l
l
l                                           (1) The weld symbol for weld number 1 of support 1AB35011G on
l
!                                                 drawing M-1AB35011G, Rev. B does not indicate the required
(1) The weld symbol for weld number 1 of support 1AB35011G on
j                                                fillet weld size.                       The licensee subsequently issued NCR 32421
!
                                                  to document this condition. It should be noted that this
drawing M-1AB35011G, Rev. B does not indicate the required
i                                                 support had undergone reinspection under the BAFV program, and                                                   ,
fillet weld size.
The licensee subsequently issued NCR 32421
j
to document this condition.
It should be noted that this
i
support had undergone reinspection under the BAFV program, and
,
this drawing deficiency was not identified.
4
4
                                                  this drawing deficiency was not identified.
!
!
il
il
j                                                                                             11-19
j
t
11-19
t
!
!
    . - --.~,..._ _ . ,_,,-_ _ .- _                       , _..           - ,_. - _ _ . -               ._ - - _ ___... - - .. _ ,... ._ . _ _ _ _. - - -
. - --.~,..._ _ . ,_,,-_ _ .- _
, _..
- ,_. - _ _ . -
._ - - _ ___... - - .. _ ,... ._ . _ _ _ _. - - -


                                                                          s
s
(2)   Instrument line RH-919-7C was found bent in two locations (due
(2)
      to construction traffic in the area) near support 1AB01034G.
Instrument line RH-919-7C was found bent in two locations (due
    The licensee subsequently issued NCMR 2-0338 to document this
to construction traffic in the area) near support 1AB01034G.
    condition.
The licensee subsequently issued NCMR 2-0338 to document this
condition.
(3) The support clamp for piping run IE12-N015A "LO" on support
(3) The support clamp for piping run IE12-N015A "LO" on support
    1AB02204G was found to be missing. Further review revealed
1AB02204G was found to be missing.
    that this condition had been previously discovered by the BAFV
Further review revealed
    program and documented on NCR 80367 and NCMR 1-1005.
that this condition had been previously discovered by the BAFV
(4)   Instruments 1E12-N015C, 1E12-N055C, and 1E12-N056C are mounted
program and documented on NCR 80367 and NCMR 1-1005.
    on instrument rack 1E22-P005 using bolts containing no identi-
(4)
    fication markings on their bolt heads.         The NRC CAT inspectors
Instruments 1E12-N015C, 1E12-N055C, and 1E12-N056C are mounted
    observed that all other bolts used to mount instruments to this
on instrument rack 1E22-P005 using bolts containing no identi-
    and other instrument racks contain markings which identify them
fication markings on their bolt heads.
    as ASTM A-307 (SAE Class 2) bolts. The licensee has subsequently
The NRC CAT inspectors
    issued NCMR 2-0335 to document this condition. This NCMR states
observed that all other bolts used to mount instruments to this
    that Rosemont Instruction Manual 4302, Rev. 8, Model 1153 re-
and other instrument racks contain markings which identify them
    quires these bolts to be ASTM A-193, Grade B8, which would indi-
as ASTM A-307 (SAE Class 2) bolts.
    cate that all bolts used to mount instruments to racks are non-
The licensee has subsequently
    conforming. Further review by the licensee is necessary to ac-
issued NCMR 2-0335 to document this condition.
    curately define the material requirements for these bolts.
This NCMR states
that Rosemont Instruction Manual 4302, Rev. 8, Model 1153 re-
quires these bolts to be ASTM A-193, Grade B8, which would indi-
cate that all bolts used to mount instruments to racks are non-
conforming.
Further review by the licensee is necessary to ac-
curately define the material requirements for these bolts.
(5) Three instances were observed of installed instrument piping
(5) Three instances were observed of installed instrument piping
    in physical contact with other items.     These are:
in physical contact with other items.
          Instrument line 1MS31AB-3/4 is in contact with 6-inch
These are:
          diameter pipe 1HG05BA
Instrument line 1MS31AB-3/4 is in contact with 6-inch
    *
diameter pipe 1HG05BA
          Instrument line IMS31JB-3/4 is in contact with 3-inch
*
          diameter pipe ISC02DA
Instrument line IMS31JB-3/4 is in contact with 3-inch
          Instrument line 1NB05BB-3/4 is in contact with heating,
diameter pipe ISC02DA
          ventilating and air conditioning duct support P-4010.
Instrument line 1NB05BB-3/4 is in contact with heating,
    In the first two cases, the licensee's Interaction Analysis
ventilating and air conditioning duct support P-4010.
    Group had previously documented these points of contact on
In the first two cases, the licensee's Interaction Analysis
    Potential Interference Reports (PIRs) C-2007 and C-2008, which
Group had previously documented these points of contact on
    have been dispositioned use-as-is by S&L. Further discussions
Potential Interference Reports (PIRs) C-2007 and C-2008, which
    with the Interaction Analysis Group reveals that the analysis
have been dispositioned use-as-is by S&L.
    supporting the use-as-is dispositions only addresses possible
Further discussions
    seismic interaction and may not consider thermal expansion or
with the Interaction Analysis Group reveals that the analysis
    movement of either the instrument lines or the pipe involved.
supporting the use-as-is dispositions only addresses possible
    In the third case, discussions with the Interaction Analysis
seismic interaction and may not consider thermal expansion or
    Group indicates that interactions of this type are considered
movement of either the instrument lines or the pipe involved.
    to be a generic exclusion to their criteria and, as such, they
In the third case, discussions with the Interaction Analysis
    are not required to document this on a PIR. However, following
Group indicates that interactions of this type are considered
    further discussion with the licensee, NCMR 2-0334 was issued to
to be a generic exclusion to their criteria and, as such, they
    document this condition as a construction deficiency instead of
are not required to document this on a PIR.
    a seismic interaction.     The NRC CAT questions the prudence of
However, following
    the generic exclusion for such an item.         Identified construc-
further discussion with the licensee, NCMR 2-0334 was issued to
    tion deficiencies in completed and QC accepted installations
document this condition as a construction deficiency instead of
    need to be recorded and evaluated in accordance with existing
a seismic interaction.
    QA requirements.
The NRC CAT questions the prudence of
                              II-20
the generic exclusion for such an item.
                                                __
Identified construc-
tion deficiencies in completed and QC accepted installations
need to be recorded and evaluated in accordance with existing
QA requirements.
II-20
__


                                                                        .__
.__
        Refer to Section III, Mechanical Construction, of this report       )
Refer to Section III, Mechanical Construction, of this report
        for a further discussion of the licensee's Interaction               !
for a further discussion of the licensee's Interaction
        Analysis Program.                                                   -j
Analysis Program.
c. Conclusions
- j
  The NRC CAT inspectors determined that, in general, instrumentation,
c.
  tubing, and support installations conform to applicable require-
Conclusions
  ments. The activities of the Interaction Analysis Group and
The NRC CAT inspectors determined that, in general, instrumentation,
  subsequent dispositioning of identified PIRs by S&L require further
tubing, and support installations conform to applicable require-
  review by the licensee.
ments.
                                                                            1
The activities of the Interaction Analysis Group and
                              II-21
subsequent dispositioning of identified PIRs by S&L require further
review by the licensee.
1
II-21


                _
_
l
l
;                                                                 TABLE II-1
;
TABLE II-1
,
,
                                                    RACEWAY INSPECTION SAMPLE
RACEWAY INSPECTION SAMPLE
              Cable Tray:
Cable Tray:
189A(P2E)
188A(P2E)
187A(P2E)
186A(P2E)
185A(P2E)
'
'
                    189A(P2E)          188A(P2E)                  187A(P2E)              186A(P2E)  185A(P2E)
184A(P2E)
                    184A(P2E)          183E(P2E)                 182A(P2E)               181A(P2E)   18R9(P2E)
183E(P2E)
                    1892G(P2E)         1893G(P2E)                 16297G(P2E)             1894G(P2E) 1895G(P2E)
182A(P2E)
                    16296G(P2E)         16295G(P2E)               16294G(P2E)             16293G(P2E) 16292G(P2E)
181A(P2E)
                    16291G(P2E)         16260G(P2E)               16259G(P2E)             16257G(P2E) 1071D(P2E)
18R9(P2E)
1892G(P2E)
1893G(P2E)
16297G(P2E)
1894G(P2E)
1895G(P2E)
16296G(P2E)
16295G(P2E)
16294G(P2E)
16293G(P2E)
16292G(P2E)
16291G(P2E)
16260G(P2E)
16259G(P2E)
16257G(P2E)
1071D(P2E)
1072D(P2E)
1070D(P2E)
10690(P2E)
1068D(P2E)
10670(P2E)
,
i
i
,
1063D(P2E)
                    1072D(P2E)         1070D(P2E)                 10690(P2E)             1068D(P2E) 10670(P2E)
1064D(P2E)
                    1063D(P2E)         1064D(P2E)                 1065D(P2E)             1066D(P2E) 169D(P2E)
1065D(P2E)
1066D(P2E)
169D(P2E)
168D(P2E)
167D(P2E)
166D(P2E)
165D(P2E)
164D(P2E)
i
i
                    168D(P2E)          167D(P2E)                  166D(P2E)              165D(P2E)  164D(P2E)
163D(P2E)
                    163D(P2E)          162D(P2E)                 161D(P2E)               16R1(P2E)   16413K(C4E)
162D(P2E)
                    16412K(C4E)         16411K(C4E)               16410K(C4E)             10510K(C1E) 16R9(C1E)
161D(P2E)
                    1614B(C1E)         17R12(K1E)                 17111C(K1E)             17112C(K1E) 17115C(K1E)
16R1(P2E)
                    17116C(K1E)         17117C(K1E)               17R55(K1E)             17220C(K1E) 17222C(K1E)
16413K(C4E)
                    17223C(K1E)         17224C(K1E)               17R80(K1E)             19120D(P3E) 19121D(P3E)
16412K(C4E)
                    19122D(P3E)                                                                       19123D(P3E)
16411K(C4E)
              Cable Tray Supports:
16410K(C4E)
                                        Support Number                       Drawing Number
10510K(C1E)
                                          1000-0180H3                       E26-1000-018-H3
16R9(C1E)
                                                                              E26-1000-018-CPH
1614B(C1E)
                                          1001-03A-H24                       E26-1001-03A-H24
17R12(K1E)
                                                                              E26-1001-03A-CPH
17111C(K1E)
l                                         1003-01A-H57                       E26-1003-01A-H57
17112C(K1E)
                                                                              E26-1003-01A-CPH
17115C(K1E)
17116C(K1E)
17117C(K1E)
17R55(K1E)
17220C(K1E)
17222C(K1E)
17223C(K1E)
17224C(K1E)
17R80(K1E)
19120D(P3E)
19121D(P3E)
19122D(P3E)
19123D(P3E)
Cable Tray Supports:
Support Number
Drawing Number
1000-0180H3
E26-1000-018-H3
E26-1000-018-CPH
1001-03A-H24
E26-1001-03A-H24
E26-1001-03A-CPH
l
1003-01A-H57
E26-1003-01A-H57
E26-1003-01A-CPH
1005-04A-H44
E30-1005-04A-H44
'
'
                                          1005-04A-H44                      E30-1005-04A-H44
E30-1005-04A-CPH
                                                                              E30-1005-04A-CPH
;
;                                         1004-04A-H2                       E30-1004-04A-H2
1004-04A-H2
                                                                              E30-1004-04A-CPH
E30-1004-04A-H2
                                          1002-01A-H1                       E27-1002-01A-H1
E30-1004-04A-CPH
                                                                              E27-1002-01A-CPH
1002-01A-H1
                                          1003-01C-H9                       E27-1003-01C-H9
E27-1002-01A-H1
E27-1002-01A-CPH
1003-01C-H9
E27-1003-01C-H9
i
i
                                                                              E27-1002-01C-CPH
E27-1002-01C-CPH
-
-
!
!
i
i
i
i
!
!
!
!
                                                                          II-22
II-22
4
4
  - - - - - -       --,e--.-. - - , n -   -     - . , ~ , - -     ,,       , - --- -           ,   ,,-,-,.-w,, - - - . . ,-,,,v- ,,,-,-,- - , - , ---- -- - - - .
- - - - - -
--,e--.-.
- -
,
n
-
-
- . , ~ , - -
,,
, - --- -
,
,,-,-,.-w,, - - - . . ,-,,,v-
,,,-,-,- - , - , ---- -- - - - .


            _   _. _           _   _
_
I                                   TABLE II-1 (Continued)
_. _
                                  RACEWAY INSPECTION SAMPLE
_
  Conduit Supports:
_
                      E26-1003-03A-TCC-2
I
TABLE II-1 (Continued)
RACEWAY INSPECTION SAMPLE
Conduit Supports:
E26-1003-03A-TCC-2
'
'
                      E26-1003-01A-CC-CP-2
E26-1003-01A-CC-CP-2
                      E26-1002-04A-CC-17
E26-1002-04A-CC-17
                      E26-1002-04A-JS-1
E26-1002-04A-JS-1
                      E26-1003-01A-CC-57
E26-1003-01A-CC-57
                      E26-1003-01A-WH-3
E26-1003-01A-WH-3
  Conduits:
Conduits:
        Conduit No.         Length (feet)           Conduit No.   Length (feet)
Conduit No.
          C2301                     8                 C61490             36
Length (feet)
        *C2305                     10               *C61545             29
Conduit No.
          C2318                     19               *C62867             31
Length (feet)
        *C2319                     10                 C71191             37
C2301
          C2341                     8                 C71192             39
8
          C629                     48               *C72183             45
C61490
          C633                     48               *C71365             110
36
          C6404                     33               *C71543             46
*C2305
          C6438                     23                 C71855             50
10
          C6141                     52                 C9822               43
*C61545
          C61039                   17                 C9823               43
29
          C61066                   27                 C9824               43
C2318
          C61069                   28               *C91230             23
19
          C61371                   25                 C91523             21
*C62867
          C61386                   16                 C91527             20
31
          C61394                   27
*C2319
10
C71191
37
C2341
8
C71192
39
C629
48
*C72183
45
C633
48
*C71365
110
C6404
33
*C71543
46
C6438
23
C71855
50
C6141
52
C9822
43
C61039
17
C9823
43
C61066
27
C9824
43
C61069
28
*C91230
23
C61371
25
C91523
21
C61386
16
C91527
20
C61394
27
l
l
: NOTE:   The (*) indicates conduits inspected under the Baldwin Associates
:
          Field Verification Program.
NOTE:
The (*) indicates conduits inspected under the Baldwin Associates
Field Verification Program.
1
1
                                              II-23
II-23


  -_           - - _ _ _ - -                     ...         . _ _ _ . _ _ . . _ _ .                                     _ _ . .           .__           _   _. _ - _
-_
:
- - _ _ _ - -
                                                                                                                TABLE II-2
...
                                                                                                      SEPARATION FINDINGS
. _ _ _ . _ _ . . _ _ .
                                                                                                                                                                          ,
_
j                   Raceway segments listed in the A columns do not maintain required separation from
_ . .
!                   the corresponding raceway segments in B columns. The (*) indicates physical
.__
;
_
                    separation of less than one inch between the two raceway segments.
_.
_ - _
:
TABLE II-2
SEPARATION FINDINGS
,
j
Raceway segments listed in the A columns do not maintain required separation from
!
the corresponding raceway segments in B columns.
The (*) indicates physical
separation of less than one inch between the two raceway segments.
;
I
I
!
!
                                Column A                                         Column B                                       Column A           Column B
Column A
                                                                    *
Column B
l                              C9713(K1E)                                         IPB999(P2E)                                   C6207(B)           167D(P2E)
Column A
;                                                                                                                                                   *
Column B
'                              C92709(C18) *                                     C92757(P1E)                                     C659(B)           168D(P2E)
l
                                                                    *
C9713(K1E)
                                C92709(C18)                                       C92758(C1E)                                     C0357(B)           1065E(C2E)
IPB999(P2E)
                                                                    *
C6207(B)
                                C73991(C28)                                       C71191(C2E)                                     C02522(B)         1065E(C2E)
167D(P2E)
                                                                    *
*
j                               C73991(C28)                                       C71192(P2E)                                     C8926(B)           187A(P2E)
;
                                                                    *
C92709(C18) *
C92757(P1E)
C659(B)
168D(P2E)
*
'
*
C92709(C18)
C92758(C1E)
C0357(B)
1065E(C2E)
*
C73991(C28)
C71191(C2E)
C02522(B)
1065E(C2E)
*
j
C73991(C28)
C71192(P2E)
C8926(B)
187A(P2E)
*
1
1
C71365(C2E)
C73639(K18)
C8133(B)
187A(P2E)
,
'
'
                                C71365(C2E)                                       C73639(K18)                                    C8133(B)          187A(P2E)            ,
C71365(C2E) *
                                C71365(C2E) *                                    C7894 (C1E)                                     C8578(B)           184A(P2E)             1
C7894 (C1E)
                                                                    *
C8578(B)
)                                C71365(C2E)                                       C71991(K3N)                                     C8579(B)           184B(C2E)
184A(P2E)
j                                                                   *
1
                                C71365(C2E)                                       C73218(C28)                                     C8137(B)           184A(P2E)
)
{                               C71365(C2E) *                                     C72235(K18)                                     C8300(B)           183A(P2E)
C71365(C2E)
                                                                    *                                                                             *
C71991(K3N)
!                               C71991(K3N)                                       C72030(K28)                                     C8538(B)           C81649(2E)
C8579(B)
j                               -C72717(C2E)
184B(C2E)
                                                                    *
*
                                                                                  C72812(K1E)                                     C8699(C3E)         1875D(P28)
j
i                               C7891 (C2E) *                                     C73287(K1B)                                     C81775(2E)         1833D(P3E)'
C71365(C2E)
f-                               C62367(K4E) *                                     C61069(C2E)                                     C81777(2E)         1833D(P3E)
C73218(C28)
                                                                    *
C8137(B)
                                C62367(K4E)                                       C62084(P2E)                                     C81776(2E)         1833D(P3E)
184A(P2E)
*
{
C71365(C2E) *
C72235(K18)
C8300(B)
183A(P2E)
*
*
!
C71991(K3N)
C72030(K28)
C8538(B)
C81649(2E)
j
-C72717(C2E)
C72812(K1E)
C8699(C3E)
1875D(P28)
*
i
C7891 (C2E) *
C73287(K1B)
C81775(2E)
1833D(P3E)'
f-
C62367(K4E) *
C61069(C2E)
C81777(2E)
1833D(P3E)
*
C62367(K4E)
C62084(P2E)
C81776(2E)
1833D(P3E)
C62367(K4E) *
C61068(P2E)
C81778(2E)
1833D(P3E)
'
'
                                C62367(K4E) *                                     C61068(P2E)                                    C81778(2E)        1833D(P3E)
}
}                                C62367(K4E) *                                    C62100(K18)                                     C81257(B)         18926(P2E)
C62367(K4E) *
l-                               C6141 (CIE) *                                     1PB695(P18)                                     C0224(B)          1061D(P2E)
C62100(K18)
i                                16300K(C4E)                                      C61039(C2E)                                    C0223(B)          1061D(P2E)
C81257(B)
j                                16300K(C4E)                                      C61037(C2E)                                    1068D(P2E)        C0372(B)
18926(P2E)
j                                16300K(C4E)                                      C61038(C2E)                                    1068C(C2E)        C0372(B)
l-
!                                16300K(C4E)
C6141 (CIE) *
                                                                  *
1PB695(P18)
                                                                                  C62876(C2E)                                    C72997(1E) *      C72514(4E)
C0224(B)
,                                C6947 (P1B)                                      C6949 (PIE)                                    C72296(1E) *      C72514(4E)
1061D(P2E)
j                                C61066(P2E) *                                    C61364(K1E)                                    C72297(1E) *      C71570(3E)
j                                                                  *
                                C61371(C2E)                                      C6934 (P28)                                    C71570(3E) *      C72296(1E)
                                                                  *
!                                C73255(CIE)                                      IPB7107(DIV.2)                                  C72888(1E) *      C71541(2E)
i
i
                                C71855(K3E) *                                    17128C(K1B)                                     C73160(B) *        C73666(1E)             l
16300K(C4E)
                                C6917(B)                                         16279G(P2E)                                     1H13-P70GA(1E) 10360A(C1B)
C61039(C2E)
                                                                  *
C0223(B)
i;                              C61364(1E)                                       C61066(2E)                                     1H13-P701A(1E) 10347A(C1B)
1061D(P2E)
.                                C61374(1E)                                       16257B(C2E)                                     1H13-P731F(IE) 10344A(C1B)
j
                                                                                                                                                    *
16300K(C4E)
!                               C61373(1E)                                       16257A(C2E)                                     C62382(B)         16390E(C3E)
C61037(C2E)
                                                                  *                                                                                *
1068D(P2E)
C0372(B)
j
16300K(C4E)
C61038(C2E)
1068C(C2E)
C0372(B)
!
16300K(C4E)
C62876(C2E)
C72997(1E) *
C72514(4E)
*
C6947 (P1B)
C6949 (PIE)
C72296(1E) *
C72514(4E)
,
j
C61066(P2E) *
C61364(K1E)
C72297(1E) *
C71570(3E)
j
C61371(C2E)
C6934 (P28)
C71570(3E) *
C72296(1E)
*
!
C73255(CIE)
IPB7107(DIV.2)
C72888(1E) *
C71541(2E)
*
i
i
C71855(K3E) *
17128C(K1B)
C73160(B)
C73666(1E)
l
*
C6917(B)
16279G(P2E)
1H13-P70GA(1E) 10360A(C1B)
i;
C61364(1E)
C61066(2E)
1H13-P701A(1E) 10347A(C1B)
*
.
C61374(1E)
16257B(C2E)
1H13-P731F(IE) 10344A(C1B)
!
C61373(1E)
16257A(C2E)
C62382(B)
*
16390E(C3E)
*
*
i
C61258(P28)
C61373(1E)
C62381(B)
16390E(C3E)
'
'
                                C61258(P28)                                      C61373(1E)                                      C62381(B)          16390E(C3E)
C6249(B)
                                C6249(B)                                          161D(P2E)                                       10602(C1B)         10603K(P2E)
161D(P2E)
                                                                  *
10602(C1B)
                                C6303(B)                                         167E(C2E)                                       10602B(CIB)       10631A(P1E)
10603K(P2E)
;                                                                                                                                                                           ;
*
                                                                                                                                                                            '
C6303(B)
167E(C2E)
10602B(CIB)
10631A(P1E)
;
i
i
I
I
1
1
i
i
a                                                                                                                     II-24
a
      _. .. _ _ _ . . _ . _ , _ . _ _ _ _ _ . . _ . _ . _ . _ _ _ _ . . , _ . _ . . . _ . . _ - , - _ . - _ . _ - . ,
II-24
_. .. _ _ _ . . _ . _ , _ . _ _ _ _ _ . . _ . _ . _ . _ _ _ _ . . , _ . _ . . . _ . . _ - , - _ . - _ . _ - . ,


                            TABLE II-2 (Continued)
TABLE II-2 (Continued)
                              SEPARATION FINDINGS
SEPARATION FINDINGS
                    Column A             Column B
Column A
                    10632B(C1E)           10603K(P2E)
Column B
                    10603K(P2E)         10632A(PIE)
10632B(C1E)
                    10611D(P28)         10615K(P2E)
10603K(P2E)
                    10611E(C28)         10615L(C2E)
10603K(P2E)
                                    *
10632A(PIE)
                    10600E(C28)         10632B(C1E)
10611D(P28)
                                    *
10615K(P2E)
                    C1079(B)             10632B(C1E)
10611E(C28)
                    10600K-P2E           10632A(PIE)
10615L(C2E)
                    C6901(P28)           16257G(P2E)
10600E(C28)
                    C6901(P28)           16258A(C2E)
*
                    C6901(P28)           16258G(P2E)
10632B(C1E)
                    C6901(P28)           16259G(P2E)1
C1079(B)
                    C0409(B)             C9866(1E)1
*
                    10358B(C1B)         1H13-P706F(1E)1
10632B(C1E)
                    C0409(B)             1992B(C1E)
10600K-P2E
                                  *
10632A(PIE)
                    C9866(B)             C9831(C1E)
C6901(P28)
                    C0410(B)             1989B(C1E)
16257G(P2E)
                                  *
C6901(P28)
                    C9713(K1E)           IPB999(P2E)
16258A(C2E)
                    C9804(B)             1992A(PIE)
C6901(P28)
                                  *
16258G(P2E)
                    C9657(2E)           C9617(B)                 '
C6901(P28)
                                  *
16259G(P2E)1
                    C9657(2E)           C9615(B)
C0409(B)
                                  *
C9866(1E)1
                    C74311(B)           C72514(4E)
10358B(C1B)
NOTE: 1These separation deficiencies also involve raceway to cable.
1H13-P706F(1E)1
                                        11-25
C0409(B)
1992B(C1E)
*
C9866(B)
C9831(C1E)
C0410(B)
1989B(C1E)
*
C9713(K1E)
IPB999(P2E)
C9804(B)
1992A(PIE)
*
C9657(2E)
C9617(B)
'
*
C9657(2E)
C9615(B)
*
C74311(B)
C72514(4E)
NOTE:
1These separation deficiencies also involve raceway to cable.
11-25


                                      TABLE II-3
TABLE II-3
                          CABLE TERMINATION INSPECTION SAMPLE
CABLE TERMINATION INSPECTION SAMPLE
PGCC Termination Cabinet 1H13-P743
PGCC Termination Cabinet 1H13-P743
      Cables: 1VD038,     IVD18E,   IVD11F,       IVD03D, IVD06B, 1VD03C,
Cables:
              IVD06C,   IVH09E,   1VH098,       IVH09D, IVX218, IVX188,
1VD038,
              1VX09B,   IVX128,   IVY 098,     IVY 088, 1D003C, 1HP21P,
IVD18E,
              1HP75A,   1HP75B,   1HP75C,       1HP75D, 100798, ID079A,
IVD11F,
              1SX750,   ISX75C,   1SX55A,     1SX08C, 1SX03D, ISX038.
IVD03D,
IVD06B,
1VD03C,
IVD06C,
IVH09E,
1VH098,
IVH09D,
IVX218,
IVX188,
1VX09B,
IVX128,
IVY 098,
IVY 088,
1D003C,
1HP21P,
1HP75A,
1HP75B,
1HP75C,
1HP75D,
100798,
ID079A,
1SX750,
ISX75C,
1SX55A,
1SX08C,
1SX03D,
ISX038.
PGCC Termination Cabinet 1H13-P742
PGCC Termination Cabinet 1H13-P742
    Cables: 1VC068,     IVC 088, IVD05C,     IVD02D, IVD028, IVD10F,
Cables:
              1VD18C,   IVD02C,   IVF07J,     IVC 40L, IVG35K, IVC 02C,
1VC068,
              IVC 45H,   IVC 148, IVC 45F,     1AP23G, 1DG31G, 1AP23B,
IVC 088,
              1DG21f,   1AP290,   LAP 21G,     1AP23F, IAP21M, IDG31L,
IVD05C,
              IAP60D,   IAP29C,   1AP29K,     ICC08C, ICC09C.
IVD02D,
IVD028,
IVD10F,
1VD18C,
IVD02C,
IVF07J,
IVC 40L,
IVG35K,
IVC 02C,
IVC 45H,
IVC 148,
IVC 45F,
1AP23G,
1DG31G,
1AP23B,
1DG21f,
1AP290,
LAP 21G,
1AP23F,
IAP21M,
IDG31L,
IAP60D,
IAP29C,
1AP29K,
ICC08C,
ICC09C.
PGCC Termination Cabinet 1H13-P741
PGCC Termination Cabinet 1H13-P741
    Cables: 1AP220,     IDG11G,   1AP28E,     1AP228, 1DGG1D, 1AP20G,
Cables:
              IAP22G,   1AP20M,   ICC11F,     ICC14G, IDG11L, 1AP28K,
1AP220,
              ICC14C,     ICC11C,   ICC17L,     ICY 05C, IRP11E, ICY 09C.
IDG11G,
1AP28E,
1AP228,
1DGG1D,
1AP20G,
IAP22G,
1AP20M,
ICC11F,
ICC14G,
IDG11L,
1AP28K,
ICC14C,
ICC11C,
ICC17L,
ICY 05C,
IRP11E,
ICY 09C.
Diesel Generator IA Control Panel 1PL12JA
Diesel Generator IA Control Panel 1PL12JA
    Cables:   IDG02A,   IDG020,   IDG11F,     IDG11S, 1DG02B, IDG11C,
Cables:
              1DG11T,     1DG11E,   1DG11D,     1DG01D, 1DG02F, 1DG04A,
IDG02A,
              1DG06A,   IDG098,   10G09C,     1DG10C, 1DG108, IDG05A,
IDG020,
              1DG07A,     IDG02C,   1DG02E,     1DG02G, 1DG75E, 10G11R,
IDG11F,
              1DG75C,   IAP20K,   1AP22J,     1DG08A, IDG01E, 10G01Q,
IDG11S,
              IAP20M,   IAP22K,   IDG015,     IDG01Q, IDG01R.
1DG02B,
IDG11C,
1DG11T,
1DG11E,
1DG11D,
1DG01D,
1DG02F,
1DG04A,
1DG06A,
IDG098,
10G09C,
1DG10C,
1DG108,
IDG05A,
1DG07A,
IDG02C,
1DG02E,
1DG02G,
1DG75E,
10G11R,
1DG75C,
IAP20K,
1AP22J,
1DG08A,
IDG01E,
10G01Q,
IAP20M,
IAP22K,
IDG015,
IDG01Q,
IDG01R.
Division 3 Optical Isolator Cabinet IPL49J
Division 3 Optical Isolator Cabinet IPL49J
    Cables: IMIO5A,     1HP110,   1HP17J,     ISX03E.
Cables:
IMIO5A,
1HP110,
1HP17J,
ISX03E.
Remote Shutdown Panel 1C61-P001
Remote Shutdown Panel 1C61-P001
    Cables: 1RH55F,     1RH55E,   1RH40D,     1RH40C, 1RH310, 1RH31C,
Cables:
              1RH27D,     1RH27C,   1RH070,     IRH07C, 1RH12D, 1RH12E,
1RH55F,
              1RH12C,     1RH01G,   IRH01H,     1Ril01C, 1RS02A, 1RH22E,
1RH55E,
              1RH09F,     1RH09D,   1RH09C,     1RH18D, 1RH18C, IRH16D,
1RH40D,
              1RH16C,     1RH61F,   1RH61E,     1RH380, 1RH38C, 1RH63F,
1RH40C,
              1RH63E,     1SX20C,   ISX20N,     1RH220, 1RH22C, IRI13E,
1RH310,
              IRI13C,     1RIl0D,   IRIl0C,     IRIO3D, IRIO3C, IRIO60,
1RH31C,
              1RIO6C,     1RI26D,   1RI26C,     1RIO5D, IRIO5C, IRIO8D,
1RH27D,
              IRIO8C,     IRI25C,   1RI258,     IRI248, IRI24A, IRI27F,
1RH27C,
              IRI27G,     1NB380,   1RH73L,     IRI12E, IRI12C, IRIO9G,
1RH070,
              1RIO9C,     IRI24J,   IRI24H,     1RI24G, IRI24K, 1RSO4A,
IRH07C,
              1RS06A,     1RS82A,   IRIllD,     IRI11C, IRIO7D, IRIO7C,
1RH12D,
              IRIO40,     IRIO4C,   1RS05C,     1RH13D, 1RH13C, IRH13E,
1RH12E,
              IRH17F,     1RH17E,   1RS05B,     1RH10E, 1RH23D, 1RIO2F,
1RH12C,
              IRI15F,     IRI27J,   IRI27H,     IRI15E, IRI170, IRI17C,
1RH01G,
              1RH37C,     1RH37D,   INB390,     IRS 05A, 1NB35A, 1NB35C,
IRH01H,
                                            II-26
1Ril01C,
1RS02A,
1RH22E,
1RH09F,
1RH09D,
1RH09C,
1RH18D,
1RH18C,
IRH16D,
1RH16C,
1RH61F,
1RH61E,
1RH380,
1RH38C,
1RH63F,
1RH63E,
1SX20C,
ISX20N,
1RH220,
1RH22C,
IRI13E,
IRI13C,
1RIl0D,
IRIl0C,
IRIO3D,
IRIO3C,
IRIO60,
1RIO6C,
1RI26D,
1RI26C,
1RIO5D,
IRIO5C,
IRIO8D,
IRIO8C,
IRI25C,
1RI258,
IRI248,
IRI24A,
IRI27F,
IRI27G,
1NB380,
1RH73L,
IRI12E,
IRI12C,
IRIO9G,
1RIO9C,
IRI24J,
IRI24H,
1RI24G,
IRI24K,
1RSO4A,
1RS06A,
1RS82A,
IRIllD,
IRI11C,
IRIO7D,
IRIO7C,
IRIO40,
IRIO4C,
1RS05C,
1RH13D,
1RH13C,
IRH13E,
IRH17F,
1RH17E,
1RS05B,
1RH10E,
1RH23D,
1RIO2F,
IRI15F,
IRI27J,
IRI27H,
IRI15E,
IRI170,
IRI17C,
1RH37C,
1RH37D,
INB390,
IRS 05A,
1NB35A,
1NB35C,
II-26


                              TABLE II-3 (Continued)
TABLE II-3 (Continued)
                        CABLE TERMINATION INSPECTION SAMPLE
CABLE TERMINATION INSPECTION SAMPLE
Remote Shutdown Panel 1C61-P001 (Continued)
Remote Shutdown Panel 1C61-P001 (Continued)
    Cables: 1RI760,   IRI76G,   IRI76E,     IRI76C, IRI85C, 1RS75A,
Cables:
            1RS768,   1RS76D,   IRI858,     IRI85A, 1RS03A, ISX59D,
1RI760,
            1SX59C,   1RH240,   1RH24C,     1RH33D, IRH33C, 1RH360,
IRI76G,
            1RH36C,   1RH500,   1RH50C,     ISX14K, 1SX14L, ISX14M,
IRI76E,
            1SX30E,   1SX170,   1SX33D,     1SX37E, 1SX10F, ISX20Q,
IRI76C,
            ISX14C,   1SX14F,   1SX14J,     ISX30C, ISX17C, 1SX33C,
IRI85C,
            1SX37C,   1SX10C,   1SX11C,     ISX25J, ISX25Q, ISX50F,
1RS75A,
            1SX20J,   1SX50K,   ISX25X,     ISX25V, ISX110, 1RS80A,
1RS768,
            1RS798,   1RS79D,   INB35M,     INB35B, IRIO2G, IRIO2F.
1RS76D,
IRI858,
IRI85A,
1RS03A,
ISX59D,
1SX59C,
1RH240,
1RH24C,
1RH33D,
IRH33C,
1RH360,
1RH36C,
1RH500,
1RH50C,
ISX14K,
1SX14L,
ISX14M,
1SX30E,
1SX170,
1SX33D,
1SX37E,
1SX10F,
ISX20Q,
ISX14C,
1SX14F,
1SX14J,
ISX30C,
ISX17C,
1SX33C,
1SX37C,
1SX10C,
1SX11C,
ISX25J,
ISX25Q,
ISX50F,
1SX20J,
1SX50K,
ISX25X,
ISX25V,
ISX110,
1RS80A,
1RS798,
1RS79D,
INB35M,
INB35B,
IRIO2G,
IRIO2F.
4160 V Power Cables in Switchgear
4160 V Power Cables in Switchgear
    Cables: 1RH02A,   1LP01A,   1HP08A,     1RH27A, ILP03A, 1HP03D.
Cables:
                                          11-27
1RH02A,
1LP01A,
1HP08A,
1RH27A,
ILP03A,
1HP03D.
11-27


_
_
                                            TABLE II-4
TABLE II-4
                              INSTRUMENTATION INSPECTION SAMPLE
INSTRUMENTATION INSPECTION SAMPLE
            Instrument Racks:                 1H22-P005           BA OI
Instrument Racks:
                                                IH22-P026           BA OI
1H22-P005
                                                1H22-P027           BA 01
BA
                                                1H22-P042           BA
OI
        -
IH22-P026
            Instrument Pipe Supports:         ISPS-CM096A
BA
                                                1AB35004G           BA
OI
                                                1AB35003G           BA
1H22-P027
                                                1AB35002G           BA
BA
                                                1AB35011G           BA
01
                                                1RB31511R           BA
1H22-P042
                                                1RB32518G           BA
BA
                                                1RB22538G           BA
Instrument Pipe Supports:
                                                1RB21572R           BA
ISPS-CM096A
                                                1RB21576X
-
            Instrument Piping Runs:           1PT-CM034/1PT-CH256 BA
1AB35004G
                                                1E31-N088C "HI"
BA
                                                1E31-N088C "LO"     BA
1AB35003G
                                                1E31-N0888 "HI"     BA
BA
                                                1E31-N0888 "LO"     BA
1AB35002G
                                                1E12-N015C "HI"     BA DI
BA
                                                1E12-N015C "LO"
1AB35011G
                                                1E12-N015B "HI"       OI
BA
                                                1E12-N015B "LO"     BA
1RB31511R
                                                1E12-N015A "HI"
BA
                                                1E12-N015A "LO"     BA
1RB32518G
                                                1821-N078A         BA
BA
                                                1B21-N081A "HI"
1RB22538G
                                                1821-N0788         BA
BA
                                                1821-N0818 "HI"
1RB21572R
            Instruments:                       1E31-N088C
BA
                                                1E31-N0888
1RB21576X
                                                1821-N081B
Instrument Piping Runs:
                                                1E12-N015A
1PT-CM034/1PT-CH256
                                                1E12-N0158
BA
                                                1E12-N015C
1E31-N088C "HI"
                                                1PT-CM034
1E31-N088C "LO"
                                                IPT-CM256
BA
                                                1821-N078A
1E31-N0888 "HI"
                                                1821-N0788
BA
                                                1821-N081A
1E31-N0888 "LO"
  NOTE:   8A indicates inclusion in Baldwin Associates Field Verification.
BA
          OI   indicates inclusion in Illinois Power Company Overinspection.
1E12-N015C "HI"
                                                II-28
BA
DI
1E12-N015C "LO"
1E12-N015B "HI"
OI
1E12-N015B "LO"
BA
1E12-N015A "HI"
1E12-N015A "LO"
BA
1821-N078A
BA
1B21-N081A "HI"
1821-N0788
BA
1821-N0818 "HI"
Instruments:
1E31-N088C
1E31-N0888
1821-N081B
1E12-N015A
1E12-N0158
1E12-N015C
1PT-CM034
IPT-CM256
1821-N078A
1821-N0788
1821-N081A
NOTE:
8A indicates inclusion in Baldwin Associates Field Verification.
OI
indicates inclusion in Illinois Power Company Overinspection.
II-28


III. MECHANICAL CONSTRUCTION
III.
    A. Objective
MECHANICAL CONSTRUCTION
        The objective of the appraisal of mechanical construction was to deter-
A.
        mine if installed and Quality Control (QC) accepted mechanical items
Objective
        conformed to engineering design, regulatory requirements and licensee
The objective of the appraisal of mechanical construction was to deter-
        commitments.
mine if installed and Quality Control (QC) accepted mechanical items
    B. Discussion
conformed to engineering design, regulatory requirements and licensee
        The specific areas of mechanical construction evaluated were piping,
commitments.
        pipe supports / restraints, concrete expansion anchors, mechanical
B.
        equipment, and heating, ventilating and air conditioning (HVAC)
Discussion
        systems.   To accomplish the above objective, a field inspection of a
The specific areas of mechanical construction evaluated were piping,
        sample of QC accepted hardware was performed in each area. In
pipe supports / restraints, concrete expansion anchors, mechanical
        addition, certain programs, procedures and documentation were reviewed
equipment, and heating, ventilating and air conditioning (HVAC)
        as required to support or clarify hardware inspection findings.
systems.
        The inspection samples in a number of these areas included items
To accomplish the above objective, a field inspection of a
        covered by the Illinois Power ~ Company (IP) Overinspection Program.
sample of QC accepted hardware was performed in each area.
        Section VII, Design Change Control, of this report provides further
In
        discussion of the IP Overinspection Program.
addition, certain programs, procedures and documentation were reviewed
        1.   Piping
as required to support or clarify hardware inspection findings.
        a.   Inspection Scope
The inspection samples in a number of these areas included items
              Piping depicted on the 11 Baldwin Associates (BA) and 3 Reactor
covered by the Illinois Power ~ Company (IP) Overinspection Program.
            Controls, Inc. (RCI) drawings listed in Tables III-la and b was
Section VII, Design Change Control, of this report provides further
              inspected by the NRC Construction Appraisal Team (CAT). In all
discussion of the IP Overinspection Program.
            cases, piping inspected by the NRC CAT had been previously inspected
1.
            and accepted by the responsible QC organizations. The piping
Piping
              samples included portions of the High Pressure Core Spray (HPCS),
a.
              Low Pressure Core Spray, Reactor Core Isolation Cooling (RCIC),
Inspection Scope
            Reactor Water Clean-Up, Shutdown Service Water, Main Steam Isolation
Piping depicted on the 11 Baldwin Associates (BA) and 3 Reactor
            Valve Leakage Control, Nuclear Boiler, and Control Rod Drive ('RD)
Controls, Inc. (RCI) drawings listed in Tables III-la and b was
            systems. In addition, some of the NRC CAT samples included piping
inspected by the NRC Construction Appraisal Team (CAT).
            covered by the IP Overinspection Program. Attributes inspected
In all
              included configuration (i.e., component orientation and dimensions),
cases, piping inspected by the NRC CAT had been previously inspected
            component locations and types, and valve operator orientations.
and accepted by the responsible QC organizations.
            Pipe support locations and types were inspected against hanger
The piping
            design drawings to the extent indicated in Table III-1. Site
samples included portions of the High Pressure Core Spray (HPCS),
            construction practice as it affected installed components was
Low Pressure Core Spray, Reactor Core Isolation Cooling (RCIC),
            observed and component material specifications were compared to
Reactor Water Clean-Up, Shutdown Service Water, Main Steam Isolation
            drawing bills of material on a random basis.
Valve Leakage Control, Nuclear Boiler, and Control Rod Drive ('RD)
            The sample of BA piping selected for inspection included all American
systems.
            Society of Mechanical Engineers (ASME) pipe classes and ranged in
In addition, some of the NRC CAT samples included piping
            size from 1 to 20 inches. The sample included approximately 600
covered by the IP Overinspection Program.
              feet of large bore (greater than 2-inch diameter) and approximately
Attributes inspected
            275 feet of small bore (less than or equal to 2-inch diameter)
included configuration (i.e., component orientation and dimensions),
            piping located in the containment, auxiliary, fuel and diesel
component locations and types, and valve operator orientations.
            generator buildings.     QC verified isometric drawings were used to
Pipe support locations and types were inspected against hanger
                                            III-1
design drawings to the extent indicated in Table III-1.
Site
construction practice as it affected installed components was
observed and component material specifications were compared to
drawing bills of material on a random basis.
The sample of BA piping selected for inspection included all American
Society of Mechanical Engineers (ASME) pipe classes and ranged in
size from 1 to 20 inches.
The sample included approximately 600
feet of large bore (greater than 2-inch diameter) and approximately
275 feet of small bore (less than or equal to 2-inch diameter)
piping located in the containment, auxiliary, fuel and diesel
generator buildings.
QC verified isometric drawings were used to
III-1


                                                                      1
1
                                                                        l
perform the inspection.
perform the inspection.   Subsequently, field data compiled by the
Subsequently, field data compiled by the
NRC CAT was also compared to walkdown record copies (NRC IE Bulletin
NRC CAT was also compared to walkdown record copies (NRC IE Bulletin
79-14) of piping design drawings to the extent indicated in Table
79-14) of piping design drawings to the extent indicated in Table
III-1.   Observations associated with the inspected piping are listed
III-1.
in Tables III-la and b. A sample of approximately 125 feet of RCI
Observations associated with the inspected piping are listed
piping associated with the insert and withdraw of the CRD was
in Tables III-la and b.
inspected by the NRC CAT. The inspection utilized walkdown record
A sample of approximately 125 feet of RCI
copies of the RCI drawings listed in Table III-lb.
piping associated with the insert and withdraw of the CRD was
inspected by the NRC CAT.
The inspection utilized walkdown record
copies of the RCI drawings listed in Table III-lb.
Thirteen piping samples representing approximately 200 feet of pipe
Thirteen piping samples representing approximately 200 feet of pipe
were selected to determine whether ASME requirements for pipe wall
were selected to determine whether ASME requirements for pipe wall
thickness were met. The measured pipe wall thicknesses were com-
thickness were met.
The measured pipe wall thicknesses were com-
pared against the minimum wall thickness requirement specified by
pared against the minimum wall thickness requirement specified by
ASME (12.5 percent below nominal thickness). Pipe wall thickness
ASME (12.5 percent below nominal thickness).
Pipe wall thickness
was measured using ultrasonic methods, with personnel and equipment
was measured using ultrasonic methods, with personnel and equipment
provided by the licensee. Circumferential measurements were taken
provided by the licensee.
Circumferential measurements were taken
at the ends and the center of the samples; other measurements along
at the ends and the center of the samples; other measurements along
the length of the pipe were also obtained for those samples in
the length of the pipe were also obtained for those samples in
which a potential for violating minimum wall thickness requirements
which a potential for violating minimum wall thickness requirements
appeared likely. See Table III-2 for the inspection sample and
appeared likely.
See Table III-2 for the inspection sample and
observations.
observations.
The following documents provided the acceptance criteria and back-
The following documents provided the acceptance criteria and back-
ground information:
ground information:
      BA Project Procedure (BAP) 2.14, " Fabrication / Installation of
BA Project Procedure (BAP) 2.14, " Fabrication / Installation of
      Items, Systems, and Components," Rev. 10, Change F
Items, Systems, and Components," Rev. 10, Change F
      BAP 3.2.9, " Piping 'As-Builts'," Rev. O, Change A
BAP 3.2.9, " Piping 'As-Builts'," Rev. O, Change A
*
*
      BAP 3.6.6, " Control of Welded Temporary Attachments," Rev. O
BAP 3.6.6, " Control of Welded Temporary Attachments," Rev. O
                                                                      i
i
      Sargent & Lundy Engineers (S&L) Project Instruction
Sargent & Lundy Engineers (S&L) Project Instruction
      PI-CP-028, " Field Installation Data Required to Permit
PI-CP-028, " Field Installation Data Required to Permit
      Confirmation of Piping Subsystem Analysis," Rev. 2
Confirmation of Piping Subsystem Analysis," Rev. 2
*
*
      S&L Drawing M09-1001N, " Component Support Installation
S&L Drawing M09-1001N, " Component Support Installation
      Tolerances ... " Sheet 1, Rev. N and Sheet 12, Rev. N
Tolerances ... " Sheet 1, Rev. N and Sheet 12, Rev. N
*
*
      S&L Specification K-2882, " Nuclear Safety Related and
S&L Specification K-2882, " Nuclear Safety Related and
      Non-Nuclear Safety Related Specifications for Phase II
Non-Nuclear Safety Related Specifications for Phase II
      Piping, Miscellaneous Equipment, and Equipment Erection,"
Piping, Miscellaneous Equipment, and Equipment Erection,"
      through Amendment 11
through Amendment 11
*
*
      S&L Nuclear Station Engineering Instructions (NSEI) ME-2,
S&L Nuclear Station Engineering Instructions (NSEI) ME-2,
      " Interaction Analysis Program," Rev. 0
" Interaction Analysis Program," Rev. 0
*
*
      S&L Project Instruction PI-CP-034, " Interaction Analysis,"
S&L Project Instruction PI-CP-034, " Interaction Analysis,"
      Rev. 4
Rev. 4
*
*
      RCI Quality Assurance Instruction QAI-10-1, " Instruction
RCI Quality Assurance Instruction QAI-10-1, " Instruction
      for Quality Control Inspection," Rev. 6
for Quality Control Inspection," Rev. 6
                              III-2
III-2


        RCI QAI-8-4, " Instruction for As-Built Inspection / Verification
RCI QAI-8-4, " Instruction for As-Built Inspection / Verification
        Walkdown," Rev. 5
Walkdown," Rev. 5
  *
*
        RCI Document No. RCI-FPC-4, " Friction Clamp for 1" Withdraw
RCI Document No. RCI-FPC-4, " Friction Clamp for 1" Withdraw
        CRD Pipe," Rev. 6
CRD Pipe," Rev. 6
  *
*
        RCI Document No. CLN-TOL-1, "Clinton Field Tolerances,"
RCI Document No. CLN-TOL-1, "Clinton Field Tolerances,"
        through Rev. 3
through Rev. 3
        RCI Document No. CLN-TOL-2, "Clinton Interface Tolerances,"
RCI Document No. CLN-TOL-2, "Clinton Interface Tolerances,"
        Rev. 1.
Rev. 1.
b. Inspection Findings
b.
  In general, the NRC CAT inspected piping conformed to installation
Inspection Findings
  requirements and tolerances. However, the following observations
In general, the NRC CAT inspected piping conformed to installation
  and discrepancies warrant additional attention.
requirements and tolerances.
  (1) Baldwin Associates
However, the following observations
        *
and discrepancies warrant additional attention.
            Pipe spool 1-NB-751-4 depicted on Drawing NB-751 is routed
(1) Baldwin Associates
            through and is in contact with the tube steel support for
*
            electrical box lJB729. This configuration is in accordance
Pipe spool 1-NB-751-4 depicted on Drawing NB-751 is routed
            with the support design drawing, No. E27-1602-038-EIT and
through and is in contact with the tube steel support for
            the piping design drawing, No. M27-1602-03B-03BK except
electrical box lJB729.
            that the current pipe to support steel contact is not
This configuration is in accordance
            identified by either drawing.   According to BAP 2.14 (Form
with the support design drawing, No. E27-1602-038-EIT and
            JV-734) and BA QC personnel, this contact is regarded as an
the piping design drawing, No. M27-1602-03B-03BK except
            interference to be identified during the QC walkdown
that the current pipe to support steel contact is not
            inspection. Also, according to the BA Resident Engineer,
identified by either drawing.
            such contact must be identified during preparation of the
According to BAP 2.14 (Form
            as-built drawings.
JV-734) and BA QC personnel, this contact is regarded as an
            There was no evidence presented to the NRC CAT inspector
interference to be identified during the QC walkdown
            that this pipe to electrical support steel contact was
inspection.
            identified by either the QC inspection or the as-built
Also, according to the BA Resident Engineer,
            walkdown for evaluation by the piping design organization.
such contact must be identified during preparation of the
            Since no similar instances of obvious interference with
as-built drawings.
            piping were encountered by the NRC CAT, this finding is
There was no evidence presented to the NRC CAT inspector
            considered an isolated case which requires appropriate
that this pipe to electrical support steel contact was
            engineering disposition.
identified by either the QC inspection or the as-built
        *
walkdown for evaluation by the piping design organization.
            At pipe spool pieces 1-RI-758-3 and 1-RI-758-5A, a temporary
Since no similar instances of obvious interference with
            pipe support was not removed at the time of the NRC CAT
piping were encountered by the NRC CAT, this finding is
            inspection. Procedure BAP 2.14 specifically noted that
considered an isolated case which requires appropriate
            removal of temporary supports need not be verified for QC
engineering disposition.
            acceptance of the piping. BA QC personnel noted that
*
            removal of each temporary support was controlled by the
At pipe spool pieces 1-RI-758-3 and 1-RI-758-5A, a temporary
            discipline superintendent and the dismantling was performed
pipe support was not removed at the time of the NRC CAT
            in accordance with BAP 3.6.6. As discussed with BA QC
inspection.
            however, neither that procedure nor any other presented
Procedure BAP 2.14 specifically noted that
            to the NRC CAT inspector provided assurance that all
removal of temporary supports need not be verified for QC
    -
acceptance of the piping.
            temporary supports would be removed.   The NRC CAT is
BA QC personnel noted that
                                III-3
removal of each temporary support was controlled by the
discipline superintendent and the dismantling was performed
in accordance with BAP 3.6.6.
As discussed with BA QC
however, neither that procedure nor any other presented
to the NRC CAT inspector provided assurance that all
-
temporary supports would be removed.
The NRC CAT is
III-3


          concerned that the QC inspection and acceptance of piping
concerned that the QC inspection and acceptance of piping
          prior to the removal of temporary supports may result in
prior to the removal of temporary supports may result in
          undetected unacceptable conditions once the temporary
undetected unacceptable conditions once the temporary
          supports are removed, or that if the supports are not
supports are removed, or that if the supports are not
          removed, that unanalyzed constraints may be imposed on
removed, that unanalyzed constraints may be imposed on
          the piping.
the piping.
    *
*
          Various dimensional discrepancies were also noted among
Various dimensional discrepancies were also noted among
          the inspected piping. Two instances were observed where
the inspected piping.
          the three inch tolerance for fitting to fitting dimensions,
Two instances were observed where
          as specified by the piping specification K-2882, had been
the three inch tolerance for fitting to fitting dimensions,
          exceeded. As a result of the NRC CAT observations, the
as specified by the piping specification K-2882, had been
          licensee has prepared Nonconforming Material Reports
exceeded.
          (NCMRs) addressing the discrepant dimensions.
As a result of the NRC CAT observations, the
          In related inspection observations, three instances were
licensee has prepared Nonconforming Material Reports
          noted where dimensions between components, or components
(NCMRs) addressing the discrepant dimensions.
          and supports were found to differ from the as-built
In related inspection observations, three instances were
          dimensions by one inch or more. Procedure BAP 3.2.9
noted where dimensions between components, or components
          required that as-built dimensions be checked and recorded
and supports were found to differ from the as-built
          to the closest inch.
dimensions by one inch or more.
          The maximum out of tolerance conditions and maximum dif-
Procedure BAP 3.2.9
          ference between as-built and measured dimensions were
required that as-built dimensions be checked and recorded
          two inches for both cases. The magnitude of these dis-
to the closest inch.
          crepancies when considered with regard to the pipe sizes
The maximum out of tolerance conditions and maximum dif-
          involved, are not large. The NRC CAT did not identify a
ference between as-built and measured dimensions were
          large number of discrepancies of this nature, and thus,
two inches for both cases.
          does not consider the occurrences of the discrepant con-
The magnitude of these dis-
          ditions to be of significant concern.
crepancies when considered with regard to the pipe sizes
involved, are not large.
The NRC CAT did not identify a
large number of discrepancies of this nature, and thus,
does not consider the occurrences of the discrepant con-
ditions to be of significant concern.
(2) Reactor Controls, Inc.
(2) Reactor Controls, Inc.
    With respect to RCI installed piping, no discrepant conditions
With respect to RCI installed piping, no discrepant conditions
    were found by the NRC CAT during the inspection.     However, the
were found by the NRC CAT during the inspection.
    following observations are provided.
However, the
    *
following observations are provided.
          During inspection of the CR0 piping, the RCI document
*
          which specified the design of friction clamps used for
During inspection of the CR0 piping, the RCI document
          axial restraint of withdraw piping was reviewed. Based
which specified the design of friction clamps used for
          on this review and discussions with RCI engineering and
axial restraint of withdraw piping was reviewed.
          QC personnel, it was determined that no inspection
Based
          tolerance or minimum clearance was specified for the gap
on this review and discussions with RCI engineering and
          between the clamp halves (ears). To function as designed,
QC personnel, it was determined that no inspection
          the clamp must develop bearing between the clamp and pipe
tolerance or minimum clearance was specified for the gap
          by the controlled application of torque to the clamp bolts.
between the clamp halves (ears).
          Contact between the clamp ears would result in reduced
To function as designed,
          clamp to pipe bearing, and therefore reduced capacity of
the clamp must develop bearing between the clamp and pipe
          clamp restraint in the axial (pipe) direction.   Although
by the controlled application of torque to the clamp bolts.
          not a QC inspection attribute, RCI stated that the need to
Contact between the clamp ears would result in reduced
          maintain a minimum gap was known and that in all cases,
clamp to pipe bearing, and therefore reduced capacity of
          such a gap was maintained by construction.
clamp restraint in the axial (pipe) direction.
                              III-4
Although
not a QC inspection attribute, RCI stated that the need to
maintain a minimum gap was known and that in all cases,
such a gap was maintained by construction.
III-4


              Random inspection of RCI supports by the NRC CAT included
Random inspection of RCI supports by the NRC CAT included
              an inspection for a minimum clearance between clamp ears on
an inspection for a minimum clearance between clamp ears on
              approximately 60 axial clamps associated with the CRD
approximately 60 axial clamps associated with the CRD
              " withdraw" piping. No cases of contact between the clamp
" withdraw" piping.
              ears were observed, but several clamp ears exhibited
No cases of contact between the clamp
              clearances of only one to two mils indicating that this
ears were observed, but several clamp ears exhibited
              attribute may warrant QC inspection.
clearances of only one to two mils indicating that this
          *
attribute may warrant QC inspection.
              In conjunction with the inspection of RCI installed
*
              piping, their as-building and stress reconciliation effort
In conjunction with the inspection of RCI installed
              was also reviewed.   As a result, it was observed that
piping, their as-building and stress reconciliation effort
              portions of piping associated with the Hydraulic Control
was also reviewed.
              Units (HCU) to which RCI piping interfaced, had not been
As a result, it was observed that
              walked-down for as-built reconciliation of the RCI piping
portions of piping associated with the Hydraulic Control
              since the HCUs had been installed by BA.     Subsequent clari-
Units (HCU) to which RCI piping interfaced, had not been
              fication provided by RCI stated that RCI would incorporate
walked-down for as-built reconciliation of the RCI piping
              the piping associated with the HCUs into their walkdown.
since the HCUs had been installed by BA.
              Because the previously completed walkdowns did not include
Subsequent clari-
              the HCU piping, the need exists for the licensee to assure
fication provided by RCI stated that RCI would incorporate
              that the additional piping is incorporated into the
the piping associated with the HCUs into their walkdown.
              as-building effort, and to recognize the potential for
Because the previously completed walkdowns did not include
              deficiencies arising from construction interfaces.
the HCU piping, the need exists for the licensee to assure
    (3) Piping Minimum Wall Verification
that the additional piping is incorporated into the
          With regard to the 13 piping samples selected for minimum wall
as-building effort, and to recognize the potential for
          thickness verification, none of the samples were found to be
deficiencies arising from construction interfaces.
          below the specified minimum values. Only one sample was within
(3) Piping Minimum Wall Verification
          seven mils of the minimum wall thickness limit. The various
With regard to the 13 piping samples selected for minimum wall
  ,      sa.mples ranged in diameter from     inch to 24 inches, and were
thickness verification, none of the samples were found to be
below the specified minimum values.
Only one sample was within
seven mils of the minimum wall thickness limit.
The various
sa.mples ranged in diameter from
inch to 24 inches, and were
,
s'ecified to meet the ASME Boiler and Pressure Vessel Code,
p
"
"
          s'ecified to meet the ASME Boiler and Pressure Vessel Code,
Section III, Class 1, 2 and MC requirements (as appropriate).
          p
(4)
          Section III, Class 1, 2 and MC requirements (as appropriate).
Interaction Analysis Program
    (4) Interaction Analysis Program
.
    .
In conjunction with the review of piping systems, the NRC CAT
          In conjunction with the review of piping systems, the NRC CAT
reviewed the licensee's Interaction Analysis Program as it
          reviewed the licensee's Interaction Analysis Program as it
related to Unresolved Safety Issue (USI) A-17, " Systems
          related to Unresolved Safety Issue (USI) A-17, " Systems
Interaction in Nuclear Power Plants," discussed in the Clinton
          Interaction in Nuclear Power Plants," discussed in the Clinton
Power Station (CPS) Safety Evaluation Report (NUREG-0853).
          Power Station (CPS) Safety Evaluation Report (NUREG-0853).
NSEI ME-2 and Project Instruction PI-CP-034 were the guidance
          NSEI ME-2 and Project Instruction PI-CP-034 were the guidance
documents used for the interactions inspection program.
          documents used for the interactions inspection program.
The scope of the program originally considered only the
          The scope of the program originally considered only the
seismic displacement of components (e.g., piping, supports,
          seismic displacement of components (e.g., piping, supports,
cable trays).
          cable trays). The allowable clearance criteria stated in the
The allowable clearance criteria stated in the
          above identified instructions included a built-in incremental
above identified instructions included a built-in incremental
          clearance for thermal displacement. Conditions which violated
clearance for thermal displacement.
          the acceptable clearance criteria (under categories identified
Conditions which violated
          in the procedures) were identified on Potential Interaction
the acceptable clearance criteria (under categories identified
          Reports (PIRs).   These PIRs were then evaluated for their
in the procedures) were identified on Potential Interaction
          acceptability.
Reports (PIRs).
                                  III-5
These PIRs were then evaluated for their
acceptability.
III-5


                      -- -           -           . -- -                     . - _ _         _ - -
-- -
                  During the initial implementation of the program approximately
-
                  4000 PIRs were generated of which only 2 required rework; the
.
                  remainder were dispositioned use-as-is. Based on these results
-- -
                  (Report No. EMD-050518, " Generic Evaluation of Interaction
. - _ _
    -
_ -
                  Between Seismically Designed Components"), the licensee
-
  '
During the initial implementation of the program approximately
                  developed exclusions for which certain categories of potential
4000 PIRs were generated of which only 2 required rework; the
                  interactions need not be considered or documented.
remainder were dispositioned use-as-is.
                  In future revisions to the Interaction Analysis Program, the
Based on these results
'
(Report No. EMD-050518, " Generic Evaluation of Interaction
                  scope of the program will be expanded to address the thermal
Between Seismically Designed Components"),
                  effects of piping with respect to the overheating of electrical
the licensee
l                 components due to proximate hot piping, interferences with
-
!                 installation of piping insulation, and interferences with
'
                  pipe expansion resulting in piping overstress or interferences
developed exclusions for which certain categories of potential
                  with components. (The Interaction Analysis Program as it
interactions need not be considered or documented.
                  relates to electrical and instrumentation components, cables
In future revisions to the Interaction Analysis Program, the
                  and conduits is discussed in Section II, Electrical and Instru-
scope of the program will be expanded to address the thermal
                  mentation Construction, of this report).
'
                  The NRC CAT considers the guidance procedures to be difficult
effects of piping with respect to the overheating of electrical
                  to understand due to their apparent piecemeal compilation and
l
                  fragmented incorporation of information.                         Further, although the
components due to proximate hot piping, interferences with
                  NRC CAT did not identify any deviations regarding the applica-
!
                  tion of the current procedures, observations of hardware
installation of piping insulation, and interferences with
                  indicate that the program revision will need to ensure the
pipe expansion resulting in piping overstress or interferences
                  appropriate identification of thermal clearance violations
with components.
                  for the certain categories of interactions previously excluded.
(The Interaction Analysis Program as it
      c. Conclusions
relates to electrical and instrumentation components, cables
and conduits is discussed in Section II, Electrical and Instru-
mentation Construction, of this report).
The NRC CAT considers the guidance procedures to be difficult
to understand due to their apparent piecemeal compilation and
fragmented incorporation of information.
Further, although the
NRC CAT did not identify any deviations regarding the applica-
tion of the current procedures, observations of hardware
indicate that the program revision will need to ensure the
appropriate identification of thermal clearance violations
for the certain categories of interactions previously excluded.
c.
Conclusions
Piping was found to generally conform to design requirements and
,
,
          Piping was found to generally conform to design requirements and
specifications.
          specifications. Site inspection and engineering personnel were
Site inspection and engineering personnel were
          knowledgeable of requirements and responsibilities. No significant
knowledgeable of requirements and responsibilities. No significant
        problems regarding construction practice as it affected installed
problems regarding construction practice as it affected installed
        piping hardware were observed by the NRC CAT.                               However, the lack of
piping hardware were observed by the NRC CAT.
        control regarding the removal of temporary supports, and the
However, the lack of
        piecemeal formulation of the program for identification and evalua-
control regarding the removal of temporary supports, and the
          tion of potential interferences and interactions warrants additional                                         l
piecemeal formulation of the program for identification and evalua-
        attention.
l
      2. Pipe Supports / Restraints
tion of potential interferences and interactions warrants additional
      a. Inspection Scope
attention.
        Twenty-six ASME Class 1, 2 and 3, and ten Class D pipe supports /
2.
          restraints which represented a variety of types, sizes, systems and
Pipe Supports / Restraints
          locations were selected for detailed inspection.                             These supports /
a.
        restraints were inspected for proper configuration, clearances,
Inspection Scope
        member size, location, weld size, fasteners, and damage. All but
Twenty-six ASME Class 1, 2 and 3, and ten Class D pipe supports /
          two supports had been QC inspected and accepted. Included in the
restraints which represented a variety of types, sizes, systems and
        ASME supports sample were two supports / restraints reviewed under the
locations were selected for detailed inspection.
          IP Independent Design Review which was performed by Bechtel Power
These supports /
        Corporation and six supports / restraints reviewed under the IP
restraints were inspected for proper configuration, clearances,
                                                III-6
member size, location, weld size, fasteners, and damage.
        _ . . _ _           _ _ _ _   . . _ _ ,     __..._ _ . _ __ _ _ __                       __     - _ _ _ _ _
All but
two supports had been QC inspected and accepted.
Included in the
ASME supports sample were two supports / restraints reviewed under the
IP Independent Design Review which was performed by Bechtel Power
Corporation and six supports / restraints reviewed under the IP
III-6
_ . . _ _
_ _ _ _
.
. _ _ ,
__..._ _ . _ __ _ _ __
__
- _ _ _ _ _


                                  ._       -     - - - .     _.                   . _ -       _
._
            Overinspection Program.       See Table III-3 for a listing of the
-
            inspection sample.
- - - .
            In addition, approximately 70 other supports / restraints were
_.
            observed at random in the field for obvious deficiencies such as
. _ -
            loose or missing fasteners, improper clearances or angularity,
_
            improper locking devices, disassembled items, damage and improper
Overinspection Program.
            concrete expansion anchor spacing.
See Table III-3 for a listing of the
            Installation traveler packages for the supports were examined and
inspection sample.
            compared with drawings and change notices to verify that the
In addition, approximately 70 other supports / restraints were
            required attributes were inspected and that inspections were per-
observed at random in the field for obvious deficiencies such as
            formed to the latest design documents. BA Field Verification and IP
loose or missing fasteners, improper clearances or angularity,
            Overinspection reports were also reviewed to assess the effective-
improper locking devices, disassembled items, damage and improper
            ness of the program in this area.
concrete expansion anchor spacing.
            Acceptance criteria for these inspections were contained in the
Installation traveler packages for the supports were examined and
            following documents:
compared with drawings and change notices to verify that the
            *
required attributes were inspected and that inspections were per-
                  S&L Specification K-2882, " Phase II Piping, Miscellaneous
formed to the latest design documents.
                  Equipment, and Equipment Erection," through Amendment 11
BA Field Verification and IP
            *
Overinspection reports were also reviewed to assess the effective-
                  S&L Specification K-2884, " Component Supports," through
ness of the program in this area.
                  Amendment 8
Acceptance criteria for these inspections were contained in the
                  S&L Specification K-2884-001, " Basic Engineers Load Capacity
following documents:
                  Data Sheet Manual"
*
                  S&L Drawing No. M09-1001N, " Component Support Installation
S&L Specification K-2882, " Phase II Piping, Miscellaneous
                  Tolerances ... " Rev. N
Equipment, and Equipment Erection," through Amendment 11
                  S&L Drawing No. M09-1003N, " Component Support Installation
*
                  Tolerances ...." Rev. M
S&L Specification K-2884, " Component Supports," through
                  IP QAI-710.15, " Component Support Overinspection Checklist,"
Amendment 8
                  Rev. 4
S&L Specification K-2884-001, " Basic Engineers Load Capacity
                  "IP Nuclear Power Construction QA Manual," Appendix A,
Data Sheet Manual"
                  Rev. 10
S&L Drawing No. M09-1001N, " Component Support Installation
            *
Tolerances ... " Rev. N
                  BAP 3.2.5, " Piping Component Supports," Rev. 7, Change B
S&L Drawing No. M09-1003N, " Component Support Installation
            *
Tolerances ...." Rev. M
                  BA Quality Assurance Instruction BQAI-190-5, " Component
IP QAI-710.15, " Component Support Overinspection Checklist,"
                  Support Field Verification," Rev. 4
Rev. 4
            *
"IP Nuclear Power Construction QA Manual," Appendix A,
                  Applicable design drawings and change documents.
Rev. 10
!       b.   Inspection Findings
*
            Approximately 94 percent of the nearly 11,300 component supports
BAP 3.2.5, " Piping Component Supports," Rev. 7, Change B
            (large bore and small bore safety related, and fire protection
*
j           related) had been installed and QC accepted.         Approximately 65
BA Quality Assurance Instruction BQAI-190-5, " Component
            percent of the 545 Class D (quality inspectable) supports had been
Support Field Verification," Rev. 4
            installed and QC accepted.
*
                                            III-7
Applicable design drawings and change documents.
!
b.
Inspection Findings
Approximately 94 percent of the nearly 11,300 component supports
(large bore and small bore safety related, and fire protection
j
related) had been installed and QC accepted.
Approximately 65
percent of the 545 Class D (quality inspectable) supports had been
installed and QC accepted.
III-7
I
I
  -. --
-.
          -       - _ - -             .       _           -.   -       - -     --       - - -   -
--
-
- _ - -
.
_
-.
-
- -
--
- - -
-


The inspection activities for pipe support / restraint installation
The inspection activities for pipe support / restraint installation
was controlled by BAP 3.2.5 which included a three phase inspection
was controlled by BAP 3.2.5 which included a three phase inspection
program that required the preparation of travelers for each
program that required the preparation of travelers for each
inspectable support / restraint.
inspectable support / restraint.
      Phase I inspet. tion covers the installation of the support's
Phase I inspet. tion covers the installation of the support's
      primary attachment to the building, and verification of its
primary attachment to the building, and verification of its
      location and orientation to the building.
location and orientation to the building.
*
*
      Phase II inspection covers the inspection and verification of
Phase II inspection covers the inspection and verification of
      the installed support per the design drawings.
the installed support per the design drawings.
      Phase III inspection includes restroking of snubbers, load
Phase III inspection includes restroking of snubbers, load
      stamping of constant spring supports, and setting of variable
stamping of constant spring supports, and setting of variable
      spring supports.
spring supports.
In general, pipe supports / restraints were in conformance with the
In general, pipe supports / restraints were in conformance with the
specified requirements. The inspection checklists for attributes
specified requirements.
The inspection checklists for attributes
used by QC personnel were found to be comprehensive and detailed.
used by QC personnel were found to be comprehensive and detailed.
Several discrepancies were identified and are discussed below.
Several discrepancies were identified and are discussed below.
Line 1,852: Line 2,886:
mismatch between a snubber body and its extension piece, incorrect
mismatch between a snubber body and its extension piece, incorrect
substitution of material, and scaffold in contact with or supported
substitution of material, and scaffold in contact with or supported
by pipe support / restraint components. See Table III-4 for a listing
by pipe support / restraint components.
of inspection observations. Welding deficiencies are discussed in
See Table III-4 for a listing
of inspection observations.
Welding deficiencies are discussed in
Section IV, Welding and Nondestructive Examination, of this report.
Section IV, Welding and Nondestructive Examination, of this report.
      The lower pipe shear lugs on support M-ISX010285 were not in
The lower pipe shear lugs on support M-ISX010285 were not in
      contact with the riser clamp as required by the design drawing.
contact with the riser clamp as required by the design drawing.
      Gaps between the clamp and lugs ranged from 1/32 inch to 3/16
Gaps between the clamp and lugs ranged from 1/32 inch to 3/16
      inch. In addition, one shear lug was observed to be 1-1/4
inch.
      inches wide when the specified width was 2-1/2 inches. Engi-
In addition, one shear lug was observed to be 1-1/4
      neering documentation authorizing the variation of shear lug
inches wide when the specified width was 2-1/2 inches.
      sizes were not provided to the NRC CAT. NCMR 2-0327 was
Engi-
      generated for this condition.   While this support was inspected
neering documentation authorizing the variation of shear lug
      during the IP Independent Design Review performed by Bechtel
sizes were not provided to the NRC CAT.
      Power Corporation, these deficiencies were not identified
NCMR 2-0327 was
      during that review.
generated for this condition.
While this support was inspected
during the IP Independent Design Review performed by Bechtel
Power Corporation, these deficiencies were not identified
during that review.
"
"
      Two Pacific Scientific Arrestor PSA 35 snubbers, for supports
Two Pacific Scientific Arrestor PSA 35 snubbers, for supports
      M-1MS31002S and M-1RH080925, were identified by the NRC CAT
M-1MS31002S and M-1RH080925, were identified by the NRC CAT
      inspector as exhibiting a 1/4 inch thread length mismatch
inspector as exhibiting a 1/4 inch thread length mismatch
      between the extension piece and the snubber body. The exten-
between the extension piece and the snubber body.
      sion piece was provided by Basic Engineering (BE); the snubber
The exten-
      was provided by Pacific Scientific Company. This mismatch was
sion piece was provided by Basic Engineering (BE); the snubber
      a result of the male threads of the extension piece being
was provided by Pacific Scientific Company.
      longer than the female threads of the snubber.   Upon
This mismatch was
      disassembly, it was discovered that the extension piece was
a result of the male threads of the extension piece being
      fully seated against the internal dust cover.   The NRC CAT is
longer than the female threads of the snubber.
      concerned that the extension piece could be tighten beyond the
Upon
      1-1/4 inch depth of the female threads of the snubber body and
disassembly, it was discovered that the extension piece was
      push the dust cover into the inertia mass, thus causing the
fully seated against the internal dust cover.
                              III-8
The NRC CAT is
concerned that the extension piece could be tighten beyond the
1-1/4 inch depth of the female threads of the snubber body and
push the dust cover into the inertia mass, thus causing the
III-8


malfunction of the snubber. We are also concerned with the
malfunction of the snubber.
We are also concerned with the
potential generic implications of this condition on other
potential generic implications of this condition on other
supports which use Basic Engineering supplied extension pieces.
supports which use Basic Engineering supplied extension pieces.
Line 1,888: Line 2,933:
cance of this condition.
cance of this condition.
The licensee did not have a construction or QC procedure that
The licensee did not have a construction or QC procedure that
included inspection attributes which would prevent the over-
included inspection attributes which would prevent the over-
tightening of these components. However, as a result of these
tightening of these components.
However, as a result of these
observations, the licens:e is in the process of incorporating
observations, the licens:e is in the process of incorporating
the necessary changes into their inspection program to ensure
the necessary changes into their inspection program to ensure
Line 1,895: Line 2,941:
Two ASME Class 1 snubber supports were found to have been
Two ASME Class 1 snubber supports were found to have been
modelled and analyzed in a manner contrary to Final Safety
modelled and analyzed in a manner contrary to Final Safety
Analysis Report (FSAR) commitments. According to S&L, supports
Analysis Report (FSAR) commitments.
According to S&L, supports
M-1NB01003S and M-1NB010025 of the Nuclear Boiler System were
M-1NB01003S and M-1NB010025 of the Nuclear Boiler System were
modelled as rigid supports. The FSAR states that the Nuclear
modelled as rigid supports.
The FSAR states that the Nuclear
Steam Supply System (of which the Nuclear Boiler System is
Steam Supply System (of which the Nuclear Boiler System is
included) shall be modelled as flexible supports. The NRC
included) shall be modelled as flexible supports.
The NRC
CAT is concerned that this deviation could affect the adequacy
CAT is concerned that this deviation could affect the adequacy
of the design of the supports, and considers that this devia-
of the design of the supports, and considers that this devia-
tion in design warrants additional attention by the licensee.
tion in design warrants additional attention by the licensee.
The NRC CAT observed that the rear bracket (Part No. BE-410-5)
The NRC CAT observed that the rear bracket (Part No. BE-410-5)
on support M-1SX01028S did not have an "N" suffix as part of
on support M-1SX01028S did not have an "N"
the part number. The "N" suffix was observed on all of the
suffix as part of
ASME support components in our sample.   The NRC CAT was con-
the part number.
The "N" suffix was observed on all of the
ASME support components in our sample.
The NRC CAT was con-
cerned about the material traceability aspects of the component
cerned about the material traceability aspects of the component
and the significance of the "N" suffix. According to the
and the significance of the "N"
suffix.
According to the
licensee, traceability is determined by a Receiving Inspection
licensee, traceability is determined by a Receiving Inspection
Report (RIR) number which is etched on each part or assembly.
Report (RIR) number which is etched on each part or assembly.
From the RIR, the part or assembly can be traced to the
From the RIR, the part or assembly can be traced to the
purchase order, packing slip, and Certificate of Compliance (C
purchase order, packing slip, and Certificate of Compliance (C
of C). Part number BE-410-5 was obtained from the BE parts
of C).
catalog which did not list the "N" suffix.   BE-410-5 and
Part number BE-410-5 was obtained from the BE parts
catalog which did not list the "N" suffix.
BE-410-5 and
BE-410N-5 were identical parts, thus no specific distinctions
BE-410N-5 were identical parts, thus no specific distinctions
were made between the two. Safety-related supports / restraints
were made between the two.
are required to have C of Cs and RIRs. These documents are
Safety-related supports / restraints
are required to have C of Cs and RIRs.
These documents are
verified by BE QC, BA vendor surveillance and receiving QC
verified by BE QC, BA vendor surveillance and receiving QC
personnel. The licensee indicated that these supports will be
personnel.
The licensee indicated that these supports will be
reinspected for material compliance under Corrective Action
reinspected for material compliance under Corrective Action
Request 222 reinspection and verification program. Based on
Request 222 reinspection and verification program.
Based on
this program, adequate traceability appears to be provided.
this program, adequate traceability appears to be provided.
Evidence of a lack of attention to detail by QC personnel
Evidence of a lack of attention to detail by QC personnel
Line 1,927: Line 2,987:
was observed by the NRC CAT during the inspection of Class D
was observed by the NRC CAT during the inspection of Class D
seismic supports, even though the inspection checklist for
seismic supports, even though the inspection checklist for
attributes was thorough in content. The NRC CAT identified
attributes was thorough in content.
The NRC CAT identified
discrepancies in four of the ten supports selected for detailed
discrepancies in four of the ten supports selected for detailed
review, such as the unauthorized substitution of shaped steel
review, such as the unauthorized substitution of shaped steel
with one of a similar shape but smaller size, binding contact
with one of a similar shape but smaller size, binding contact
between a pipe clamp and eye nut, and various weld quality
between a pipe clamp and eye nut, and various weld quality
                        III-9
III-9


  _ . ~ . .   ---           - - -       _ _ - _ _             - __ -       - _ . _
_ .
                                                                                      .- -- . -_
~ . .
---
- - -
_ - _ _
- __ -
-
_ .
.-
--
. -_
_
_
,
,
                  irregularities. The NRC CAT reviewed the traveler packages for
irregularities.
                  these supports and in general, found them to be accurate and                   .
The NRC CAT reviewed the traveler packages for
                  acceptable. However, the above discrepancies were not iden-                   '
these supports and in general, found them to be accurate and
                  tified in the traveler packages associated with the supports.
acceptable.
!           '
However, the above discrepancies were not iden-
                  Numerous instances of wooden scaffold in contact with or supported
.
                  by permanent support components were observed. In one case,
'
                  scaffold was supported by a spring can and its support rod. In
tified in the traveler packages associated with the supports.
                  each case, there was no apparent damage to the support compo-
!
                  nents when the scaffolding was removed.
'
                  The licensee did not have a formalized program which controlled
Numerous instances of wooden scaffold in contact with or supported
                  the erection of temporary scaffold on permanent supports as was
by permanent support components were observed.
l                 evidenced by the numerous observations.             The NRC CAT is con-
In one case,
l                 cerned about the lack of control on the erection of scaffold
scaffold was supported by a spring can and its support rod.
                  and its effects on the hardware, since physical damage is not
In
each case, there was no apparent damage to the support compo-
nents when the scaffolding was removed.
The licensee did not have a formalized program which controlled
the erection of temporary scaffold on permanent supports as was
l
evidenced by the numerous observations.
The NRC CAT is con-
l
cerned about the lack of control on the erection of scaffold
and its effects on the hardware, since physical damage is not
restricted to that which is readily visible.
Further, damage
,
,
                  restricted to that which is readily visible.            Further, damage
to previously QC accepted supports could result in undetected
!
!
                  to previously QC accepted supports could result in undetected
,
,
                  unacceptable conditions. As a result of the NRC CAT observa-
unacceptable conditions.
As a result of the NRC CAT observa-
!
!
                  tion, the licensee has issued a project memorandum addressing
tion, the licensee has issued a project memorandum addressing
                  the erection of scaffolding. Section II, Electrical and
the erection of scaffolding.
                  Instrumentation Construction, of this report also discusses the
Section II, Electrical and
                  support of temporary scaffolding.
Instrumentation Construction, of this report also discusses the
support of temporary scaffolding.
l
l
:           During the review of piping (Section III.B.1, above), three box type
:
During the review of piping (Section III.B.1, above), three box type
l
l
            restraints were found not to exhibit the minimum gap requirement
restraints were found not to exhibit the minimum gap requirement
l           between the pipe and the support frame steel. The S&L M09 series
l
between the pipe and the support frame steel.
The S&L M09 series
!
!
drawings specify minimum pipe to support steel clearances based on
'
'
            drawings specify minimum pipe to support steel clearances based on
system temperatures.
            system temperatures. For the Shutdown Service Water piping of
For the Shutdown Service Water piping of
            Drawing SX-27, a minimum clearance of 0.015 inches is required.
Drawing SX-27, a minimum clearance of 0.015 inches is required.
            Furthermore, for any system regardless of temperature, an " air                       i
Furthermore, for any system regardless of temperature, an " air
            gap" must be maintained. For the three supports listed in Table
i
            III-la against Drawing SX-27, the required clearance was found not
gap" must be maintained.
            to exist. For two of these (supports ISX11014R and ISX11016R),
For the three supports listed in Table
            support frame steel was found to be in contact with the top and
III-la against Drawing SX-27, the required clearance was found not
            bottom of the pipe such that the requirement to maintain an air
to exist.
            gap was also violated.     As a result of the NRC CAT observations,
For two of these (supports ISX11014R and ISX11016R),
            BA has reviewed the supports in question and other similar Shut-
support frame steel was found to be in contact with the top and
            down Service Water supports.               Two Nonconformance Reports (NCRs)
bottom of the pipe such that the requirement to maintain an air
            addressing a total of six cases, including the three addressed
gap was also violated.
            here, of less than required pipe to steel clearances were written
As a result of the NRC CAT observations,
            following this review. The NRC CAT considers these discrepancies
BA has reviewed the supports in question and other similar Shut-
            to be isolated occurrences.
down Service Water supports.
            The installation and inspection travelers of six ASME and ten Class
Two Nonconformance Reports (NCRs)
            D supports / restraints were reviewed, and were found to exhibit
addressing a total of six cases, including the three addressed
            proper chronological inspection verification and acceptance of
here, of less than required pipe to steel clearances were written
            handling, installation processes and sequences. In addition,
following this review.
            six BA Field Verification packages and IP Overinspection reports
The NRC CAT considers these discrepancies
i          were reviewed and were found to accurately reflect the condition of
to be isolated occurrences.
l           the hardware.                                                                         ;
The installation and inspection travelers of six ASME and ten Class
                                                  III-10
D supports / restraints were reviewed, and were found to exhibit
proper chronological inspection verification and acceptance of
handling, installation processes and sequences.
In addition,
six BA Field Verification packages and IP Overinspection reports
were reviewed and were found to accurately reflect the condition of
i
l
the hardware.
;
III-10
-
-


  .- _ . - - - - _ -   - - -_ _   . _ _ _ _         - - -     . _ - - _ - _ . -         - - _ - -
.-
_
.
- - - - _ -
- -
-_ _
. _ _ _ _
- - -
.
_ - - _ - _ . -
- - _
- -
!
!
!
!
      c.   Conclusions
c.
          ASME Class 1, 2, and 3 pipe supports / restraints were found to be in
Conclusions
            general conformance to design requirements. Site engineering and
ASME Class 1, 2, and 3 pipe supports / restraints were found to be in
            inspection personnel were knowledgeable of procedures, requirements
general conformance to design requirements.
!          and responsibilities.                Procedures and inspection checklists were
Site engineering and
inspection personnel were knowledgeable of procedures, requirements
!
!
and responsibilities.
Procedures and inspection checklists were
!
thorough and detailed.
However, the NRC CAT is concerned with the
'
'
            thorough and detailed. However, the NRC CAT is concerned with the
potential damage and generic implications regarding the thread
          potential damage and generic implications regarding the thread
l
l
            1ength mismatch between snubber assembly components, and concludes
1ength mismatch between snubber assembly components, and concludes
that additional attention is warranted.
We are also concerned that
i
i
            that additional attention is warranted.               We are also concerned that
certain Class 1 supports may not be properly modelled and analyzed.
,
,
          certain Class 1 supports may not be properly modelled and analyzed.
l
l
          Class D pipe supports / restraints were generally found to be in
Class D pipe supports / restraints were generally found to be in
          conformance with design requirements. However, additional attention
conformance with design requirements.
            to detail by QC personnel during their inspections is warranted.
However, additional attention
          Observations regarding scaffolding in contact with permanent
to detail by QC personnel during their inspections is warranted.
!         supports indicates a deficiency in the control of the erection of
Observations regarding scaffolding in contact with permanent
!
supports indicates a deficiency in the control of the erection of
l
l
          scaffold.
scaffold.
l
l
      3. Concrete Expansion Anchors
3.
Concrete Expansion Anchors
!
!
      a.   Inspection Scope
a.
          Seventy-one concrete expansion anchors on 12 pipe supports /
Inspection Scope
          restraints and 61 anchors on 8 HVAC restraints were inspected for
Seventy-one concrete expansion anchors on 12 pipe supports /
          proper diameter, length stamp, embedment, edge distance, damage,
restraints and 61 anchors on 8 HVAC restraints were inspected for
          washers and residual torque (an indication of anchor preload). In
proper diameter, length stamp, embedment, edge distance, damage,
          addition, the length of the expansion anchors were verified by
washers and residual torque (an indication of anchor preload).
          ultrasonic testing.               The anchors inspected were selected at random
In
          on a variety of systems and ranged in diameter from one-half to one
addition, the length of the expansion anchors were verified by
            inch.       Anchors were torqued to the BA or Zack Company (Zack)
ultrasonic testing.
          specified post installation test torque.               Table III-5 provides a
The anchors inspected were selected at random
            listing of the anchors inspected.
on a variety of systems and ranged in diameter from one-half to one
inch.
Anchors were torqued to the BA or Zack Company (Zack)
specified post installation test torque.
Table III-5 provides a
listing of the anchors inspected.
l
l
          Acceptance criteria for the field inspections were contained in the
Acceptance criteria for the field inspections were contained in the
i
i
            following documents:
following documents:
          *
*
                      BAP 2.16 " Concrete Expansion Anchors Work," (sic) Rev. 12-5
BAP 2.16 " Concrete Expansion Anchors Work," (sic) Rev. 12-5
          *
*
                      Zack Procedure FQCP-12. " Inspection of Concrete Expansion                     1
Zack Procedure FQCP-12. " Inspection of Concrete Expansion
                      Anchors," Rev. 5-3
1
      b. Inspection Findings
Anchors," Rev. 5-3
          Pipe support / restraint expansion anchors were installed by BA, and
b.
          HVAC restraint anchors were installed by the HVAC subcontractor,
Inspection Findings
          Zack Company. Expansion anchor installations were inspected by the
Pipe support / restraint expansion anchors were installed by BA, and
          respective subcontractor QC personnel. The BA and Zack procedures
HVAC restraint anchors were installed by the HVAC subcontractor,
          were nearly identical in substance. However, two fundamental dif-                           l
Zack Company.
          ferences existed with respect to inspections. BA QC inspected and                         !
Expansion anchor installations were inspected by the
          witnessed 100 percent of the anchor bolts installed.                     Zack QC
respective subcontractor QC personnel.
          inspected a minimum of one concrete expansion anchor of each
The BA and Zack procedures
          diameter on each anchor plate assembly, or a minimum of one concrete
were nearly identical in substance.
However, two fundamental dif-
l
ferences existed with respect to inspections.
BA QC inspected and
!
witnessed 100 percent of the anchor bolts installed.
Zack QC
inspected a minimum of one concrete expansion anchor of each
diameter on each anchor plate assembly, or a minimum of one concrete
l
l
                                                    III-11
l
l
III-11
. .
-


    expansion anchor in every ten of each diameter, whichever was
expansion anchor in every ten of each diameter, whichever was
    greater.
greater.
    For the NRC CAT inspection the anchor nuts were torqued to the
For the NRC CAT inspection the anchor nuts were torqued to the
    specified retightening (BA) or testing (Zack) torque. Fourteen
specified retightening (BA) or testing (Zack) torque.
    anchors for pipe supports out of seventy-one tested exhibited
Fourteen
    insignificant nut rotation at less than the retightening torque
anchors for pipe supports out of seventy-one tested exhibited
  with a maximum of 1/8 turn (which was within the BAP 2.16 acceptance
insignificant nut rotation at less than the retightening torque
    criteria). Seven anchors for HVAC supports out of sixty-one tested
with a maximum of 1/8 turn (which was within the BAP 2.16 acceptance
    exhibited insignificant nut rotation at less than the testing torque
criteria).
  with a maximum of 1/16 turn.     Since Zack procedures did not specify
Seven anchors for HVAC supports out of sixty-one tested
    any allowable nut rotation, job plans to retorque each of the
exhibited insignificant nut rotation at less than the testing torque
  affected anchor nuts were issued for the associated anchor plate
with a maximum of 1/16 turn.
  assemblies.
Since Zack procedures did not specify
  All other features inspected by the NRC CAT for both BA and Zack
any allowable nut rotation, job plans to retorque each of the
    installed anchors were in conformance with requirements.
affected anchor nuts were issued for the associated anchor plate
c. Conclusions
assemblies.
  Concrete expansion anchors inspected by the NRC CAT were installed
All other features inspected by the NRC CAT for both BA and Zack
    in accordance with design and procedural requirements. The results
installed anchors were in conformance with requirements.
  of the torque tests are typical of normal wedge type expansion
c.
  anchor installations and do not indicate installation deficiencies.
Conclusions
4. Heating, Ventilating and Air Conditioning
Concrete expansion anchors inspected by the NRC CAT were installed
a. Inspection Scope
in accordance with design and procedural requirements.
  Six HVAC seismic restraints were selected at random and inspected
The results
  for location, configuration, member size, weld size and connection
of the torque tests are typical of normal wedge type expansion
  details.   Approximately 150 feet of duct adjacent to the restraints
anchor installations and do not indicate installation deficiencies.
  and others selected at random were examined for proper attachment to
4.
  anchors, companion angle size and joint makeup. Thirteen fire
Heating, Ventilating and Air Conditioning
  dampers were inspected for proper installation, operability and
a.
  condition. IP Overinspection documents were also reviewed to assess
Inspection Scope
  the effectiveness of the program in this area. HVAC concrete
Six HVAC seismic restraints were selected at random and inspected
  expansion anchor installation was inspected and is discussed in
for location, configuration, member size, weld size and connection
  Section III.B.3, above. See Table III-6 for a listing of inspected
details.
  items.
Approximately 150 feet of duct adjacent to the restraints
  The following documents provided the acceptance criteria for the
and others selected at random were examined for proper attachment to
  inspection of HVAC hardware installations:
anchors, companion angle size and joint makeup.
  *
Thirteen fire
        Zack Procedure FQCP-5, " Fabrication and Installation
dampers were inspected for proper installation, operability and
        Inspection," Rev. 8-1
condition.
  "
IP Overinspection documents were also reviewed to assess
        Zack Procedure FQCP-10.7, " System Walkdown for Turnover,"
the effectiveness of the program in this area.
        Rev. 2-1
HVAC concrete
  "
expansion anchor installation was inspected and is discussed in
        IP QAI-710.20 "HVAC Overinspection Checklist," Rev. 4
Section III.B.3, above.
  *
See Table III-6 for a listing of inspected
        S&L Specification K-2910, " General HVAC Specification"
items.
                                !!I-12
The following documents provided the acceptance criteria for the
inspection of HVAC hardware installations:
*
Zack Procedure FQCP-5, " Fabrication and Installation
Inspection," Rev. 8-1
"
Zack Procedure FQCP-10.7, " System Walkdown for Turnover,"
Rev. 2-1
"
IP QAI-710.20 "HVAC Overinspection Checklist," Rev. 4
*
S&L Specification K-2910, " General HVAC Specification"
!!I-12
.
-
- -
- - -
- - - - - - - - - - - -
- - -
----
----
-----


                                                                    .
.
          S&L PI-CP-024, "Non-Category I Verification Program," Rev. 2
S&L PI-CP-024, "Non-Category I Verification Program," Rev. 2
          S&L Design Criteria DC-ME-17-CP, " Design Criteria for
S&L Design Criteria DC-ME-17-CP, " Design Criteria for
          Interaction Analysis in Category I Buildings," Rev. 1
Interaction Analysis in Category I Buildings," Rev. 1
    *
*
          Applicable design drawings, duct standards and change
Applicable design drawings, duct standards and change
          documents.
documents.
  b. Inspection Findings
b.
    HVAC systems were designed by S&L and detailed on the Zack layout
Inspection Findings
    drawings.   Hardware for fabrication and installation were detai ed
HVAC systems were designed by S&L and detailed on the Zack layout
                                                                        l
drawings.
    on duct fabrication details and hanger details.
Hardware for fabrication and installation were detai ed
    The installation and inspection of HVAC seismic supports / restraints
l
    are controlled through the use of " job plans." A job plan is
on duct fabrication details and hanger details.
    essentially a traveler which details the activities to be performeo
The installation and inspection of HVAC seismic supports / restraints
    and the required inspection activities.     Installation and inspection
are controlled through the use of " job plans." A job plan is
    criteria are delineated on the job plans.     The inspections are
essentially a traveler which details the activities to be performeo
    documented on hanger inspection checklists, which then become part
and the required inspection activities.
    of the job plan package.
Installation and inspection
    In general, the inspected HVAC seismic restraints conformed to
criteria are delineated on the job plans.
    design documents and specification requirements. One minor brace
The inspections are
    angle discrepancy (four degrees out of tolerance) and one minor
documented on hanger inspection checklists, which then become part
    dimensional discrepancy were noted. The duct assemblies exhibited
of the job plan package.
    proper weld stitches to supports and companion angles, placement of
In general, the inspected HVAC seismic restraints conformed to
    reinforcements, proper fasteners, and in general, conformed to
design documents and specification requirements.
    specified requirements. However, two documentation related
One minor brace
    anomalies were noted for support R-7037.
angle discrepancy (four degrees out of tolerance) and one minor
    NCR 911376 recorded stiffener plates missing from its vertical
dimensional discrepancy were noted.
    channel members, and was dispositioned use-as-is.     The NRC CAT
The duct assemblies exhibited
    requested the calculations for the support which formed the basis
proper weld stitches to supports and companion angles, placement of
    for the disposition, and upon review noticed that the configuration
reinforcements, proper fasteners, and in general, conformed to
    used to disposition the NCR differed significantly from that
specified requirements.
    depicted on the current design drawing. Subsequent calculations
However, two documentation related
    utilizing as-built information reconfirmed that the use-as-is
anomalies were noted for support R-7037.
    disposition was still acceptable.     This same support also had a
NCR 911376 recorded stiffener plates missing from its vertical
    Field Engineering Change Notice (FECN) posted against it (FECN
channel members, and was dispositioned use-as-is.
    7718) when in fact a nonconformance report should have been
The NRC CAT
    generated. The FECN changed a weld symbol to match a field
requested the calculations for the support which formed the basis
    configuration which had been erroneously QC accepted. Support
for the disposition, and upon review noticed that the configuration
    R-7037 had undergone IP Overinspection, and the inspection results
used to disposition the NCR differed significantly from that
    were documented on Inspection Report No. H2030 prior to the
depicted on the current design drawing.
    inspection by the NRC CAT. These two anomolies are r.ot significant
Subsequent calculations
    in the engineering context and are considered to be isolated
utilizing as-built information reconfirmed that the use-as-is
    occurrences.
disposition was still acceptable.
    With respect to the licensee's inspection program of Class D
This same support also had a
    (nonsafety-related) seismic supports and duct, Zack Procedure
Field Engineering Change Notice (FECN) posted against it (FECN
    FQCP-5 required that the Class D seismic assemblies receive the
7718) when in fact a nonconformance report should have been
    same level of inspection as the safety-related seismic Category I
generated.
    assemblies. The job plan packages of the Class D seismic supports
The FECN changed a weld symbol to match a field
                                  III-13
configuration which had been erroneously QC accepted.
Support
R-7037 had undergone IP Overinspection, and the inspection results
were documented on Inspection Report No. H2030 prior to the
inspection by the NRC CAT.
These two anomolies are r.ot significant
in the engineering context and are considered to be isolated
occurrences.
With respect to the licensee's inspection program of Class D
(nonsafety-related) seismic supports and duct, Zack Procedure
FQCP-5 required that the Class D seismic assemblies receive the
same level of inspection as the safety-related seismic Category I
assemblies.
The job plan packages of the Class D seismic supports
III-13
-
-


    which were reviewed by the NRC CAT contained the appropriate
which were reviewed by the NRC CAT contained the appropriate
    inspection reports. The concerns of Position C.2 of Regulatory
inspection reports.
    Guide 1.29, " Seismic Design Classification," have been adequately
The concerns of Position C.2 of Regulatory
    considered and implemented by the licensee through the documents
Guide 1.29, " Seismic Design Classification," have been adequately
    PI-CP-024 and DC-ME-17-CP.
considered and implemented by the licensee through the documents
    With regard to the 13 fire dampers which were subjected to a release
PI-CP-024 and DC-ME-17-CP.
    test, all of the dampers released as designed and provided the
With regard to the 13 fire dampers which were subjected to a release
    required isolation.   It should be noted however, that Zack and S&L
test, all of the dampers released as designed and provided the
    are currently evaluating the impact of defects in certain fire
required isolation.
    dampers described in a 10 CFR 21 notification by the manufacturer of
It should be noted however, that Zack and S&L
    the fire dampers (Ruskin Manufacturing Company). This notification,
are currently evaluating the impact of defects in certain fire
    in part, stated that certain models of fire dampers were found not
dampers described in a 10 CFR 21 notification by the manufacturer of
    to close properly under air flow conditions, and recommended that
the fire dampers (Ruskin Manufacturing Company).
    the affected dampers be tested under the appropriate flow condi-
This notification,
    tions.
in part, stated that certain models of fire dampers were found not
    S&L intends to evaluate the functionality of the dampers through
to close properly under air flow conditions, and recommended that
    the use of test models. Test criteria have been developed; modelled
the affected dampers be tested under the appropriate flow condi-
  configurations. included horizontal and vertical duct runs, the use
tions.
  of balancing dampers, and multiple damper configurations. The
S&L intends to evaluate the functionality of the dampers through
  ducting ranged in size from 24x24 inches to 60x50 inches. The
the use of test models.
    tests were conducted at the vendor's facilities with the use of an
Test criteria have been developed; modelled
  S&L approved test procedure (XHV-85-41), which was originally
configurations. included horizontal and vertical duct runs, the use
  developed by Ruskin Manufacturing Company (415850Y-NIBD-23).
of balancing dampers, and multiple damper configurations.
  At the time of the NRC CAT inspection, S&L was reviewing the results
The
  of the tests.
ducting ranged in size from 24x24 inches to 60x50 inches.
c. Conclusions
The
  The inspected HVAC hardware generally conforms to design require-
tests were conducted at the vendor's facilities with the use of an
  ments and specifications, and the 10 CFR 21 notification regarding
S&L approved test procedure (XHV-85-41), which was originally
  fire dampers is receiving adequate licensee attention and followup.
developed by Ruskin Manufacturing Company (415850Y-NIBD-23).
5. Mechanical Equipment
At the time of the NRC CAT inspection, S&L was reviewing the results
a. Inspection Scope
of the tests.
  Twenty-four pieces of equipment for seven systems were inspected
c.
  for proper configuration, location, condition and bolt size.
Conclusions
  Installation documentation for these components were reviewed for
The inspected HVAC hardware generally conforms to design require-
  content, clarity, consistency and thoroughness. IP Overinspection
ments and specifications, and the 10 CFR 21 notification regarding
  and BA Field Verification documents were also reviewed in order to
fire dampers is receiving adequate licensee attention and followup.
  assess the effectiveness of these programs in this area. Equipment
5.
  examined included the Emergency Diesel Generators, Diesel Generator
Mechanical Equipment
  Day Tanks, and the Standby Liquid Control Pumps. The NRC CAT
a.
  inspector examined documentation for components which were considered
Inspection Scope
  to be completely installed, and those which were still in process.
Twenty-four pieces of equipment for seven systems were inspected
  Equipment which had received final alignment or whose foundation
for proper configuration, location, condition and bolt size.
  anchor bolts had been tensioned or torqued were considered to have
Installation documentation for these components were reviewed for
  been completely installed. Table III-7 provides a listing of
content, clarity, consistency and thoroughness.
  irsper.ted items.
IP Overinspection
                                III-14
and BA Field Verification documents were also reviewed in order to
assess the effectiveness of these programs in this area.
Equipment
examined included the Emergency Diesel Generators, Diesel Generator
Day Tanks, and the Standby Liquid Control Pumps.
The NRC CAT
inspector examined documentation for components which were considered
to be completely installed, and those which were still in process.
Equipment which had received final alignment or whose foundation
anchor bolts had been tensioned or torqued were considered to have
been completely installed.
Table III-7 provides a listing of
irsper.ted items.
III-14


  -_       ..     -__
-_
        The following documents provided the basic acceptance criteria for
..
        the inspections:
-__
        *
The following documents provided the basic acceptance criteria for
              BAP-2.10, " Equipment Installation," Rev. 10-D
the inspections:
        *
*
              BQAI-190-3, " Mechanical Equipment Field Verification," Rev. 3           i
BAP-2.10, " Equipment Installation," Rev. 10-D
        *
*
              IP QAI-710.3, " Mechanical Equipment Overinspection Checklist,"
BQAI-190-3, " Mechanical Equipment Field Verification," Rev. 3
              Rev. 1
i
        *
*
              Applicable equipment details and foundations drawings.
IP QAI-710.3, " Mechanical Equipment Overinspection Checklist,"
    b. Inspection Findings
Rev. 1
        Installation inspection reports generally exhibited the desired
*
        sequencing of installation activities and inspections. However,
Applicable equipment details and foundations drawings.
        BAP 2.10 which governed the preparation of equipment installation
b.
        travelers, did not require work to be performed in the sequence in
Inspection Findings
        which they appear in the traveler unless specifically noted. As
Installation inspection reports generally exhibited the desired
        such, any designated QC holdpoint did not disallow the initiation
sequencing of installation activities and inspections.
        or completion of work activities (which may fall sequentially later
However,
        in the traveler) prior to the sign-off of the QC holdpoint. Rather,
BAP 2.10 which governed the preparation of equipment installation
        only a QC verification need be performed for that particular
travelers, did not require work to be performed in the sequence in
        operation or activity at its completion.
which they appear in the traveler unless specifically noted.
        Of the 24 components for which installation documentation was
As
        reviewed, all had been inspected and found acceptable by QC for
such, any designated QC holdpoint did not disallow the initiation
        those attributes examined by the NRC CAT inspector. Of these
or completion of work activities (which may fall sequentially later
        components, the NRC CAT identified only one discrepancy between
in the traveler) prior to the sign-off of the QC holdpoint.
        installation requirements and as-installed conditions. Diesel Fuel
Rather,
        Oil Storage Tank 0001TC was found to be missing washers at the
only a QC verification need be performed for that particular
        foundation anchor attachment. Further, this was the only discre-
operation or activity at its completion.
        pancy identified between the sampled as-installed hardware and
Of the 24 components for which installation documentation was
        the associated BA Field Verification or IP Overinspection reports.
reviewed, all had been inspected and found acceptable by QC for
        It was noted however, that five components manufactured by Goulds
those attributes examined by the NRC CAT inspector.
        Pumps Inc.                 (HPCS Water Leg Pump, Residual Heat Removal Water Leg
Of these
        Pump, RCIC Water Leg Pump and the Control Room Chilled Water Pumps)
components, the NRC CAT identified only one discrepancy between
        appeared to nave been improperly fastened to the foundation anchor
installation requirements and as-installed conditions.
        bolts in that the foundation anchor nuts were tightened to a " snug
Diesel Fuel
l       tight plus \ turn" condition rather than the torque value specified
Oil Storage Tank 0001TC was found to be missing washers at the
        by the vendor drawings. For each water leg pump, this potential
foundation anchor attachment.
        discrepancy was originally documented by licensee QC personnel
Further, this was the only discre-
        on NCR 6639. This NCR was dispositioned use-as-is by the invocation
pancy identified between the sampled as-installed hardware and
the associated BA Field Verification or IP Overinspection reports.
It was noted however, that five components manufactured by Goulds
Pumps Inc.
(HPCS Water Leg Pump, Residual Heat Removal Water Leg
Pump, RCIC Water Leg Pump and the Control Room Chilled Water Pumps)
appeared to nave been improperly fastened to the foundation anchor
bolts in that the foundation anchor nuts were tightened to a " snug
l
tight plus \\ turn" condition rather than the torque value specified
by the vendor drawings.
For each water leg pump, this potential
discrepancy was originally documented by licensee QC personnel
on NCR 6639.
This NCR was dispositioned use-as-is by the invocation
/
/
of Field Change Request (FCR) 3477 which specified the snug tight
'
'
        of Field Change Request (FCR) 3477 which specified the snug tight
condition "unless otherwise specified." Due to the ambiguous and
        condition "unless otherwise specified." Due to the ambiguous and
imprecise language in both FCR 3477 and NCR 6639, the NCR appeared
        imprecise language in both FCR 3477 and NCR 6639, the NCR appeared
to have been improperly dispositioned.
        to have been improperly dispositioned. A review of NCR G571, which
A review of NCR G571, which
        dispositioned a similar discrepancy (for the Spent Fuel Cooling
dispositioned a similar discrepancy (for the Spent Fuel Cooling
        Pumps) in the same manner, revealed that the licensee's position was
Pumps) in the same manner, revealed that the licensee's position was
        that S&L's requirements prevailed over vendor recommendations as the
that S&L's requirements prevailed over vendor recommendations as the
        component installations were governed by S&L drawings and documents.
component installations were governed by S&L drawings and documents.
        The NRC CAT thus considers NCR 6639 to have been appropriately dis-
The NRC CAT thus considers NCR 6639 to have been appropriately dis-
                                                                III-15
III-15
                      - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _
- _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _


                                                    _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
    positioned and the equipment to have been properly installed. The
positioned and the equipment to have been properly installed.
    licensee has agreed to provide clarification regarding the tighten-
The
    ing of foundation anchor bolts.
licensee has agreed to provide clarification regarding the tighten-
    The NRC CAT inspector also reviewed the seismic analyses for the
ing of foundation anchor bolts.
    HPCS, RCIC and Residual Heat Removal Water Leg Pumps, RCIC Pump,
The NRC CAT inspector also reviewed the seismic analyses for the
    Turbine and Gland Seal Compressor, and the Diesel Generator Day
HPCS, RCIC and Residual Heat Removal Water Leg Pumps, RCIC Pump,
    Tanks for consistency between the foundation anchor bolt material
Turbine and Gland Seal Compressor, and the Diesel Generator Day
    type assumed in the analyses, and the as-installed material.                                                   No
Tanks for consistency between the foundation anchor bolt material
    discrepancies were identified.
type assumed in the analyses, and the as-installed material.
    During the review of equipment installation travelers, the traveler
No
    package covering the modification of the lube oil system for the
discrepancies were identified.
    HPCS diesel generator was examined.                                           Documentation showed a history
During the review of equipment installation travelers, the traveler
    of queries by licensee personnel regarding the appropriateness of
package covering the modification of the lube oil system for the
    the safety classification of the materials to be used during the
HPCS diesel generator was examined.
    modification; nonsafety-related material and components were
Documentation showed a history
    purchased for the modification.               These questions arose as a result
of queries by licensee personnel regarding the appropriateness of
    of a disparity between a vendor generated Field Deviation
the safety classification of the materials to be used during the
    Disposition Request (FDDR LH1-482) which categorized the lube
modification; nonsafety-related material and components were
    oil system to have been safety-related, and a General Electric
purchased for the modification.
    Quickletter dated March 4, 1985 which stated that the material to
These questions arose as a result
    be used in the modification need not be safety-related.
of a disparity between a vendor generated Field Deviation
    Ultimately, the use of nonsafety-related materials was approved
Disposition Request (FDDR LH1-482) which categorized the lube
    by the supplier of the HPCS diesel generator in FCR 37073. The
oil system to have been safety-related, and a General Electric
    NRC CAT inspector reviewed documents germaine to this concern and
Quickletter dated March 4, 1985 which stated that the material to
    concludes that the specified use of nonsafety related materials
be used in the modification need not be safety-related.
    and components as described in FCR 37073 is consistent with
Ultimately, the use of nonsafety-related materials was approved
    licensee commitments as evaluated in Section 9.5.7 of the
by the supplier of the HPCS diesel generator in FCR 37073.
The
NRC CAT inspector reviewed documents germaine to this concern and
concludes that the specified use of nonsafety related materials
and components as described in FCR 37073 is consistent with
licensee commitments as evaluated in Section 9.5.7 of the
CPS Safety Evaluation Report (NUREG-0853).
'
'
    CPS Safety Evaluation Report (NUREG-0853).
c.
  c. Conclusions
Conclusions
    Mechanical equipment installations generally conformed to design
Mechanical equipment installations generally conformed to design
    and installation requirements. Equipment travelers adequately
and installation requirements.
    documented work activities.
Equipment travelers adequately
documented work activities.
I
I
i
i
                                            III-16
III-16
                              _ _ _ _ _ _ _
_ _ _ _ _ _ _


,_- _ _ _ _ _____ _ _ - _ _ _ _ _ - _
,_- _ _ _ _ _____ _ _ - _ _ _ _ _ - _
                                                                      TABLE III-la
TABLE III-la
                                                          PIPING INSPECTION SAMPLE - LARGE BORE
PIPING INSPECTION SAMPLE - LARGE BORE
                                                                Baldwin Associates Piping                                 !
Baldwin Associates Piping
                                                                            No. of
                                                                            Support
                                      Drawing    Pipe  Diameter            Locations
                                      Number    Class (inches)            Inspected          Notes Observations
                                                                    Design      As-Built
                                                                                                                          l
                                                                                                                          l
                                      HP-2        2    20, 16        15                  15  1  10'0" design dwg.
                                      Rev. 10L                                                      dimension measures
                                                                                                    9'7"
                                      LP-1        1    10            5                    5  2
                                      Rev. 8G
                                      RI-7        2      6          12                  12
                                      Rev. 10M
                                      RI-14        1      4            -                    -
                                                                                                3
                                      Rev. 8J
I                                    RT-47        3    4, 3          14                  14
;                                    Rev. SK
l                                    SX-25        3      8          18                  18  4  6'10" as-built
l                                    Rev. 8J                                                      dimension from
;                                                                                                  Support 1SX13003X
                                                                                                    to upstream elbovi
                                                                                                    measures 6'8"
!
!
!                                     SX-27       3     8           15                   15       4'0" as-built
No. of
                                      Rev. 7P                                                       dimension from
Support
                                                                                                    Support 1SX11016R
Drawing
;                                                                                                   to Support ISX11015X
Pipe
l                                                                                                   measures 4'1"
Diameter
                                                                                                    Pipe to support steel
Locations
                                                                                                    minimum gap does not
Number
                                                                                                    exist at Supports
Class
                                                                                                    ISX11012R, 1SX11014R
(inches)
                                                                                                    and 1SX110016R
Inspected
                                                                              III-17
Notes
  ,.                       ..
Observations
                                              ..
Design
                                                                                  . _ _ _
As-Built
l
l
HP-2
2
20, 16
15
15
1
10'0" design dwg.
Rev. 10L
dimension measures
9'7"
LP-1
1
10
5
5
2
Rev. 8G
RI-7
2
6
12
12
Rev. 10M
RI-14
1
4
-
-
3
Rev. 8J
I
RT-47
3
4, 3
14
14
Rev. SK
;
l
SX-25
3
8
18
18
4
6'10" as-built
l
Rev. 8J
dimension from
;
Support 1SX13003X
to upstream elbovi
measures 6'8"
!
!
SX-27
3
8
15
15
4'0" as-built
Rev. 7P
dimension from
Support 1SX11016R
;
to Support ISX11015X
l
measures 4'1"
Pipe to support steel
minimum gap does not
exist at Supports
ISX11012R, 1SX11014R
and 1SX110016R
III-17
,.
..
..
. _ _ _


    -     .         - .. -             . - .                       .                       -_ -         __                   - .
-
  I
.
  ,                                                                        TABLE III-lb
-
                                      PIPING INSPECTION SAMPLE - SMALL BORE
.. -
                                                Baldwin Associates Piping
. - .
i
.
                                                                              No. of
-_ -
                                                                              Support
__
,            Drawing         Pipe Diameter                                 Locations
-
<           Number           Class (inches)                                 Inspected         Notes   Observations
.
                                                          Design                 As-Built
I
.
TABLE III-lb
!           HP-753               2   2, 1                             10               5         5     2'6" as-built
,
            Rev. 15                                                                                     dimension measures
PIPING INSPECTION SAMPLE - SMALL BORE
                                                                                                        2'7"
Baldwin Associates Piping
i
No. of
Support
Drawing
Pipe
Diameter
Locations
,
<
Number
Class
(inches)
Inspected
Notes
Observations
Design
As-Built
.
!
HP-753
2
2, 1
10
5
5
2'6" as-built
Rev. 15
dimension measures
2'7"
:
15-754
1, 2
1,2
23
0
6
3'9" design dwg.
'
Rev. 12
dimension measures
3'5 "
1
'
'
  :        15-754          1, 2    1,2                              23                0        6    3'9" design dwg.
NB-751
            Rev. 12                                                                                    dimension measures
1, 3
                                                                                                        3'5 "
2
1
-
'
-
            NB-751           1, 3   2                                     -             -
3
                                                                                                  3     Interference between
Interference between
Rev. 6
pipe and support for
4
4
"
"
            Rev. 6                                                                                      pipe and support for
electric box IJB729
                                                                                                        electric box IJB729
!
!
not documented for
                                                                                                        not documented for
piping design
                                                                                                        piping design
-
  -
incorporation
                                                                                                        incorporation
RI-758
            RI-758               2 2                                     0             0         7     Temporary pipe
2
            Rev. 17                                                                                     support not
2
                                                                                                        dismantled at two
0
                                                                                                        locations
0
                                              Reactor Controls, Inc. Piping
7
Temporary pipe
Rev. 17
support not
dismantled at two
locations
Reactor Controls, Inc. Piping
.
.
No. of
'
'
                                                                              No. of
Support
                                                                              Support
Drawing
            Drawing         Pipe Diameter                                 Locations
Pipe
            Number         Class (inches)                                 Inspected         Notes   Observations
Diameter
                                                          Design                   As-Built
Locations
            SA-489               2   1                                   -
Number
                                                                                        4         8
Class
            Rev. 3
(inches)
j           SA-490               2   1                                   -
Inspected
                                                                                        5         8
Notes
Observations
Design
As-Built
SA-489
2
1
-
4
8
Rev. 3
j
SA-490
2
1
-
5
8
i
i
            Rev. 5
Rev. 5
l           SA-501               2   1k                                 -
l
                                                                                        4         8
SA-501
            Rev. 3
2
1k
-
4
8
Rev. 3
i
i
                                                                                III-18
{
{
III-18
:
:
*
*
      . _             _ - . - .               , _ - - . . _ _ . . _ , _                             _
. _
                                                                                                                            ,
_ - . - .
, _ - - . . _ _ . . _ , _
. -
.
,
_


                                                                      _ . . -
_ . . -
                          TABLES III-la and b (Continued)
TABLES III-la and b (Continued)
                            PIPING INSPECTION SAMPLE
PIPING INSPECTION SAMPLE
                                        NOTES
NOTES
1. ' Piping dimensions inside containment wall not inspected.
1.
2. Piping dimensions outside containment wall not inspected.
' Piping dimensions inside containment wall not inspected.
3. Selected piping components inspected by NR'. CAT - Piping layout not
2.
    inspected.
Piping dimensions outside containment wall not inspected.
4. Piping between floor at elevation 737'0" and support M-1SX13004R not
3.
    inspected by NRC CAT.
Selected piping components inspected by NR'. CAT - Piping layout not
5. As-built walkdown is not required for all piping shown.
inspected.
6. As-built data not inspected.
4.
7. As-built walkdown not required for piping shown.
Piping between floor at elevation 737'0" and support M-1SX13004R not
8. Walkdown design data recorded (March 29, 1985) on listed mathematical
inspected by NRC CAT.
    model revision inspected by NRC CAT.
5.
                                          III-19
As-built walkdown is not required for all piping shown.
                                                                              I
6.
As-built data not inspected.
7.
As-built walkdown not required for piping shown.
8.
Walkdown design data recorded (March 29, 1985) on listed mathematical
model revision inspected by NRC CAT.
III-19
I


  .                                 __                             _   _   _
.
                                                  TABLE III-2
__
                              PIPE WALL THICKNESS SAMPLE AND OBSERVATIONS
_
i
_
                                                          Specified Nominal /     Minimum Wall
_
    Manufacturer2 /     Pipe Size /           ASME         Minimum Wall       Thickness Measured
TABLE III-2
PIPE WALL THICKNESS SAMPLE AND OBSERVATIONS
i
Specified Nominal /
Minimum Wall
2
Manufacturer /
Pipe Size /
ASME
Minimum Wall
Thickness Measured
(Heat No.)
Schedule
Class
Thickness (Inches)
(Inches)
*
*
      (Heat No.)        Schedule            Class      Thickness (Inches)      (Inches)
B&W (59768)
    B&W (59768)             2 /xxs             2           0.552/0.483           0.501
2 /xxs
    C-W (14-390)             12/40s             1           0.375/0.328           0.434
2
0.552/0.483
0.501
C-W (14-390)
12/40s
1
0.375/0.328
0.434
!
!
    C-W (13-419)             12/80s             1           0.688/0.602           0.715
C-W (13-419)
12/80s
1
0.688/0.602
0.715
!
!
    J&L (631675)             12/40             2           0.406/0.355           0.377
J&L (631675)
    J&L (364557)           4/80               2           0.337/0.295           0.316
12/40
    S   (466139)           1/80s             2           0.179/0.157           0.170
2
i   S   (465835)           \/40s               2           0.109/0.095           0.106
0.406/0.355
    S   (462337)           6/40s               2           0.280/0.245           0.267
0.377
    PSC (60834)             8/80               2           0.500/0.438           0.473
J&L (364557)
:   TCS (93563)             3/4/40s             2           0.113/0.099           0.109
4/80
2
0.337/0.295
0.316
S
(466139)
1/80s
2
0.179/0.157
0.170
i
S
(465835)
\\/40s
2
0.109/0.095
0.106
S
(462337)
6/40s
2
0.280/0.245
0.267
PSC (60834)
8/80
2
0.500/0.438
0.473
:
TCS (93563)
3/4/40s
2
0.113/0.099
0.109
USS (L-24722)
6/40
2
0.280/0.245
0.279
1
SF (1-RI-14-5)
4/120
1
1
    USS (L-24722)          6/40                2            0.280/0.245            0.279
0.438/0.383
    SF (1-RI-14-5)          4/120              1            0.438/0.383           0.390
0.390
          (1E51-D306)       24/                 MC           1.000/0.875           1.096
(1E51-D306)
    NOTES:
24/
    IB&W - Babcock & Wilcox Tubular Products Division
MC
      C-W - Curtiss-Wright Corporation
1.000/0.875
      J&L - Jones & Laughlin Steel Corporation
1.096
      S   - Sandvik, Inc.
NOTES:
      SF   - Southwest Fabricating & Welding Company, Inc.
IB&W - Babcock & Wilcox Tubular Products Division
      PSC - Phoenix Steel Corporation
C-W - Curtiss-Wright Corporation
      TCS - Teledyne Columbia - Summerill
J&L - Jones & Laughlin Steel Corporation
      USS - U.S. Steel Corporation
S
- Sandvik, Inc.
SF
- Southwest Fabricating & Welding Company, Inc.
PSC - Phoenix Steel Corporation
TCS - Teledyne Columbia - Summerill
USS - U.S. Steel Corporation
,
,
i
i
e
e
1
1
                                                        III-20
III-20
                          - ..           _ - -     . - .
- ..
_ - -
. - .


                                                                          -_   _ _ _ _ _ - _
-_
                                  TABLE III-3
_ _ _ _ _ - _
                  PIPE SUPPORT / RESTRAINT INSPECTION SAMPLE
TABLE III-3
                                    Pipe 2       Size
PIPE SUPPORT / RESTRAINT INSPECTION SAMPLE
S/R Number 1             Type       Class     (Inches)   Location 3 Comments 4
2
M-1MS32002S Rev. C       Snubber     C           12     Cont.
Size
M-1MS31002S Rev. C       Snubber     C           12     Cont.     BA
Pipe
M-1MS33009S Rev. O       Snubber     C           12     Cont.     BA
S/R Number 1
M-1MS31009C Rev. F       Spring       C           12     Cont.
Type
M-1NB01003S Rev. A       Snubber     A           2     Cont.
Class
M-1NB01002S Rev. 8       Snubber     A           2     Cont.
(Inches)
M-1NB01008S Rev. C       Snubber     A           2     Cont.
Location 3
M-1NB01027X Rev. A       Box         A           2     Cont.
Comments 4
H-1RH-780-4 Rev. 0       U-bolt       B         3/4       Aux.       IP
M-1MS32002S Rev. C
M-1RH47013G Rev. A       Box         B       1-1/2       Aux.       IP
Snubber
M-1RH71016G Rev. C       Box         C       1-1/2       Cont.     IP
C
M-1RH34010X Rev. A       Strut       A         18       Cont.     IP
12
M-1RH140095 Rev. D       Snubber     B           8     Aux.
Cont.
M-1RH14006S Rev. C       Snubber     B           8     Aux.       TVL
M-1MS31002S Rev. C
M-1RI14025G Rev. B       Box         B           1     Aux.
Snubber
M-1RI14018G Rev. D       Box         B           2     Aux.       BA, TVL
C
M-1RI14002G Rev. D       Box         B           2     Aux.       BA, TVL
12
M-1RI14015G Rev. E       Box         B           2     Aux.       BA, TVL
Cont.
M-1RI14001G Rev. G       Box         B           2     Aux.       BA, TVL
BA
M-1SX42021R Rev. F       Strut       C       2-1/2       Aux.       IP, TVL
M-1MS33009S Rev. O
M-1SX42019R Rev. C       Strut       C       1-1/2       Aux.       IP
Snubber
M-1SX01048X Rev. F     Strut         C         30       Screen
C
M-1SX01017R Rev. H       Riser Clamp C           30       Screen
12
M-ISX01050X Rev. E     Strut         C         30       Screen
Cont.
M-1SX01028R Rev. J       Riser Clamp C           30       Screen
BA
M-1SX21002G Rev. B     Box           C           2     Aux.
M-1MS31009C Rev. F
M-1CC06042G Rev. B     Box           D         14       Fuel       TVL*
Spring
M-1CC06016X Rev. B     Strut         D         14       Fuel       TVL*
C
M-1CC12007C Rev. D     Spring       D           3     Cont.     TVL
12
M-1CC07014R Rev. D     Rod           D         14       Fuel       TVL
Cont.
M-1CC06035X Rev. A     Strut         D         14       Fuel       TVL
M-1NB01003S Rev. A
M-1CC07050X Rev. C     Strut         D         14       Fuel       TVL
Snubber
M-1CY23002G Rev. C     Box           D           3     Aux.       TVL
A
M-1FWO30145 Rev. C     Snubber       D         20       Turbine   TVL
2
M-1HP03024R Rev. C     Rod           D         10       Fuel       TVL
Cont.
M-1VQ03003R Rev. E     Strut         D         10       Cont.     TVL
M-1NB01002S Rev. 8
                                        III-21
Snubber
                                                                                              1
A
2
Cont.
M-1NB01008S Rev. C
Snubber
A
2
Cont.
M-1NB01027X Rev. A
Box
A
2
Cont.
H-1RH-780-4 Rev. 0
U-bolt
B
3/4
Aux.
IP
M-1RH47013G Rev. A
Box
B
1-1/2
Aux.
IP
M-1RH71016G Rev. C
Box
C
1-1/2
Cont.
IP
M-1RH34010X Rev. A
Strut
A
18
Cont.
IP
M-1RH140095 Rev. D
Snubber
B
8
Aux.
M-1RH14006S Rev. C
Snubber
B
8
Aux.
TVL
M-1RI14025G Rev. B
Box
B
1
Aux.
M-1RI14018G Rev. D
Box
B
2
Aux.
BA, TVL
M-1RI14002G Rev. D
Box
B
2
Aux.
BA, TVL
M-1RI14015G Rev. E
Box
B
2
Aux.
BA, TVL
M-1RI14001G Rev. G
Box
B
2
Aux.
BA, TVL
M-1SX42021R Rev. F
Strut
C
2-1/2
Aux.
IP, TVL
M-1SX42019R Rev. C
Strut
C
1-1/2
Aux.
IP
M-1SX01048X Rev. F
Strut
C
30
Screen
M-1SX01017R Rev. H
Riser Clamp C
30
Screen
M-ISX01050X Rev. E
Strut
C
30
Screen
M-1SX01028R Rev. J
Riser Clamp C
30
Screen
M-1SX21002G Rev. B
Box
C
2
Aux.
M-1CC06042G Rev. B
Box
D
14
Fuel
TVL*
M-1CC06016X Rev. B
Strut
D
14
Fuel
TVL*
M-1CC12007C Rev. D
Spring
D
3
Cont.
TVL
M-1CC07014R Rev. D
Rod
D
14
Fuel
TVL
M-1CC06035X Rev. A
Strut
D
14
Fuel
TVL
M-1CC07050X Rev. C
Strut
D
14
Fuel
TVL
M-1CY23002G Rev. C
Box
D
3
Aux.
TVL
M-1FWO30145 Rev. C
Snubber
D
20
Turbine
TVL
M-1HP03024R Rev. C
Rod
D
10
Fuel
TVL
M-1VQ03003R Rev. E
Strut
D
10
Cont.
TVL
III-21


,
,
                                  TABLE III-3 (Continued)
TABLE III-3 (Continued)
                        PIPE SUPPORT / RESTRAINT INSPECTION SAMPLE
PIPE SUPPORT / RESTRAINT INSPECTION SAMPLE
  NOTES:
NOTES:
        1CC - Component Cooling Water
1CC - Component Cooling Water
          CY - Cycled Condensate
CY - Cycled Condensate
          FW - Feedwater
FW - Feedwater
          HP - High Pressure Core Spray
HP - High Pressure Core Spray
          MS - Main Steam
MS - Main Steam
          NB - Nuclear Boiler
NB - Nuclear Boiler
          RH - Residual Heat Removal
RH - Residual Heat Removal
          RI - Reactor Core Insolation Cooling
RI - Reactor Core Insolation Cooling
          SX - Shutdown Service Water
SX - Shutdown Service Water
          VQ - Drywell Purge
VQ - Drywell Purge
        2A - ASME Class 1
2A - ASME Class 1
          8 - ASME Class 2
8 - ASME Class 2
          C - Asme Class 3
C - Asme Class 3
        3 Cont.   - Containment Building
3 Cont.
          Aux.     - Auxiliary Building
- Containment Building
          Screen - Screen House
Aux.
          Fuel     - Fuel Building
- Auxiliary Building
          Turbine - Turbine Building
Screen - Screen House
        4BA - BA Field Verification Records Reviewed by NRC CAT
Fuel
          IP - IP Overinspection Records Reviewed by NRC CAT
- Fuel Building
          TVL - Traveler Package Reviewed by NRC CAT
Turbine - Turbine Building
          *
4BA - BA Field Verification Records Reviewed by NRC CAT
              - Not QC Inspected at Time of NRC CAT Inspection
IP - IP Overinspection Records Reviewed by NRC CAT
TVL - Traveler Package Reviewed by NRC CAT
*
- Not QC Inspected at Time of NRC CAT Inspection
4
4
1
1
                                              III-22
III-22
                                                                    . _ _ _ -
. _ _ _ -


                                        TABLE III-4
TABLE III-4
                    PIPE SUPPORT / RESTRAINT INSPECTION OBSERVATIONS
PIPE SUPPORT / RESTRAINT INSPECTION OBSERVATIONS
                                    From Support Sample
From Support Sample
Support / Restraint                                       Observations
Support / Restraint
M-1MS310025 Rev. C                     Mismatch of thread engagement of BE extension
Observations
                                        piece and PSA 35 snubber. Extension piece
M-1MS310025 Rev. C
                                        male threads measured 1-1/2 inches and snubber
Mismatch of thread engagement of BE extension
                                        body threads were 1-1/4 inches. Extension
piece and PSA 35 snubber.
                                        piece was in contact with internal dust cover.
Extension piece
                                        1/4 inch of threading exposed on extension
male threads measured 1-1/2 inches and snubber
                                        piece when assembled with snubber body.
body threads were 1-1/4 inches.
M-1MS31009C Rev. F                     Scaffold contacting against riser clamp.
Extension
M-1MS330095 Rev. D                     Exessive debris in W-beam i)1ocks drainage
piece was in contact with internal dust cover.
                                        of water.
1/4 inch of threading exposed on extension
M-1NB01003S Rev. A                     Incorrect lock wiring.   Not modelled per
piece when assembled with snubber body.
                                        FSAR commitment.
M-1MS31009C Rev. F
M-1NB01002S Rev. B                     Not modelled per FSAR commitment.
Scaffold contacting against riser clamp.
M-1NB01008S Rev. C                     Weld of item 2 to item 3 not welded as
M-1MS330095 Rev. D
                                        shown on design drawing.
Exessive debris in W-beam i)1ocks drainage
M-1NB01027X Rev. A                     Elevation of 2-1/2 x 2-1/2-inch angle is
of water.
                                        2-7/8 inches above drawing location.
M-1NB01003S Rev. A
                                        Thickness of 2-1/2 x 2-1/2-inch angle is not
Incorrect lock wiring.
                                        listed as 3/8 inch on FCR 33320.
Not modelled per
M-1RH14006S Rev. C                     Zero inch gap on top between telescoping
FSAR commitment.
                                        cylinder and support cylinder of snubber.   1/8
M-1NB01002S Rev. B
                                        inch gap on bottom between telescoping cylinder
Not modelled per FSAR commitment.
                                        and support cylinder of snubber.
M-1NB01008S Rev. C
M-1RH140095 Rev. O                     Cotter pin not spread. Loose locknut on
Weld of item 2 to item 3 not welded as
                                        extension piece. Zero inch gap on top
shown on design drawing.
                                        between telescoping cylinder and support
M-1NB01027X Rev. A
                                        cylinder of snubber. 1/8 inch gap on bottom
Elevation of 2-1/2 x 2-1/2-inch angle is
                                        between telescoping cylinder and support
2-7/8 inches above drawing location.
                                        cylinder of snubber.
Thickness of 2-1/2 x 2-1/2-inch angle is not
                                                                                        l
listed as 3/8 inch on FCR 33320.
                                                                                        ;
M-1RH14006S Rev. C
                                                                                        !
Zero inch gap on top between telescoping
                                                                                        ;
cylinder and support cylinder of snubber.
                                              III-23
1/8
inch gap on bottom between telescoping cylinder
and support cylinder of snubber.
M-1RH140095 Rev. O
Cotter pin not spread.
Loose locknut on
extension piece.
Zero inch gap on top
between telescoping cylinder and support
cylinder of snubber.
1/8 inch gap on bottom
between telescoping cylinder and support
cylinder of snubber.
l
;
III-23


                                                                  -                   - - _ _ _ _ _ _ _ _
-
                                TABLE III-4 (Continued)
- - _ _ _ _ _ _ _ _
                    PIPE SUPPORT / RESTRAINT INSPECTION OBSERVATIONS
TABLE III-4 (Continued)
                                    From Support Sample
PIPE SUPPORT / RESTRAINT INSPECTION OBSERVATIONS
                                                                                                          n:
From Support Sample
Support / Restraint                                     Observations
n:
M-1RI14002G Rev. D                     Zero inch clearance between top horizontal
Support / Restraint
                                        member and pipe. Pipe not supported by bottom
Observations
                                        horizontal member; 0.046 inch clearance between
M-1RI14002G Rev. D
                                        bottom member and pipe.
Zero inch clearance between top horizontal
M-1SX01048X Rev. F                     Sheet 1, item 6 calls for rear bracket
member and pipe.
(Ref. Dwg. No. M-1SX01017R)             BE-410-5, no "N" suffix.   Extra rear bracket
Pipe not supported by bottom
                                        of a BE strut was incorrectly listed on NCR
horizontal member; 0.046 inch clearance between
                                        26414.
bottom member and pipe.
M-1SX01017R Rev. H                     Support was not listed on NCR 26414 with
M-1SX01048X Rev. F
                                        reference tc the extra rear bracket shown on
Sheet 1, item 6 calls for rear bracket
                                        Drawing M-1SX01048X.
(Ref. Dwg. No. M-1SX01017R)
M-1SX01028R Rev. J                     Bottom lugs were not in contact with riser
BE-410-5, no "N"
                                        clamp.   Gaps measured 1/32 inch through 3/16
suffix.
                                        inch.   Bottom lug width of 1-1/4 inch did not
Extra rear bracket
                                        meet the design requirements of 2-1/2 inches.
of a BE strut was incorrectly listed on NCR
M-1CY23002G Rev. C                     1/8 inch grind depth at weld tie-in on east
26414.
                                        vert member.
M-1SX01017R Rev. H
M-1CC07014R Rev. D                     Pipe clamp ears binding against eye nut.   Cotter
Support was not listed on NCR 26414 with
                                        pin not spread.
reference tc the extra rear bracket shown on
M-1CC07050X Rev. C                     Undercut on main structural member (Item 6)
Drawing M-1SX01048X.
                                        greater than 1/16 inch. Members not welded
M-1SX01028R Rev. J
                                      as shown on design drawing (Item 6 to Item 7).
Bottom lugs were not in contact with riser
                                      Hole in weld of west rear bracket.
clamp.
M-1CC06042G Rev. 8                     Debris between pipe and south vertical support
Gaps measured 1/32 inch through 3/16
                                        steel. Support was not QC inspected.
inch.
M-1CC12007C Rev. O                     Structural steel shape M4 x 13 was substituted
Bottom lug width of 1-1/4 inch did not
                                        for a W4 x 13 shape. 3/16" x 3" x 6-1/4"
meet the design requirements of 2-1/2 inches.
                                      plate was substituted for two 3" x 3" washer
M-1CY23002G Rev. C
                                      plates without proper documentation.
1/8 inch grind depth at weld tie-in on east
                                              III-24
vert member.
                                                            -.           .
M-1CC07014R Rev. D
                                                                                  ,
Pipe clamp ears binding against eye nut.
Cotter
pin not spread.
M-1CC07050X Rev. C
Undercut on main structural member (Item 6)
greater than 1/16 inch.
Members not welded
as shown on design drawing (Item 6 to Item 7).
Hole in weld of west rear bracket.
M-1CC06042G Rev. 8
Debris between pipe and south vertical support
steel.
Support was not QC inspected.
M-1CC12007C Rev. O
Structural steel shape M4 x 13 was substituted
for a W4 x 13 shape.
3/16" x 3" x 6-1/4"
plate was substituted for two 3" x 3" washer
plates without proper documentation.
III-24
-.
.
,


                                  TABLE III-4 (Continued)
TABLE III-4 (Continued)
                      PIPE SUPPORT / RESTRAINT INSPECTION OBSERVATIONS
PIPE SUPPORT / RESTRAINT INSPECTION OBSERVATIONS
                                      From Random Sample
From Random Sample
i
i
  Support / Restraint                                       Observations
Support / Restraint
  M-1FC02003R                             Scaffold interfering with support.
Observations
  M-1FP46005                             Sway strut in contact with conduit C6513.
M-1FC02003R
  M-1HP03024R                             Scaffold resting on pipe support.
Scaffold interfering with support.
  M-1MS23006C                             Scaffold platform resting on riser clamp.
M-1FP46005
  M-1RH14010S                             Scaffold in contact with snubber.
Sway strut in contact with conduit C6513.
  M-1RH13036S                             Cotter pin not spread on rear bracket.
M-1HP03024R
  M-1RH09049X                             Loose locknut on pipe clamp.
Scaffold resting on pipe support.
  M-1RH16031X                             Nail substituted for cotter pin in rear
M-1MS23006C
                                          bracket of sway strut.
Scaffold platform resting on riser clamp.
  M-1RH07053X                             Auxiliary steel for conduit support E-26-1001-
M-1RH14010S
                                          02B-CP-13 is in contact with rear bracket pin
Scaffold in contact with snubber.
                                          on sway strut.
M-1RH13036S
  M-1RH08092S                             Mismatch of thread engagement of BE extension
Cotter pin not spread on rear bracket.
                                          piece and PSA 35 snubber. Extension piece
M-1RH09049X
              "
Loose locknut on pipe clamp.
                                          male threads measures 1-1/2 inches and
M-1RH16031X
                                          snubber body threads were 1-1/4 inches.
Nail substituted for cotter pin in rear
                                          Extension piece was in contact with internal
bracket of sway strut.
                                          dust cover. 1/4 inch of threads exposed on
M-1RH07053X
                                          extension piece when assembled with snubber.
Auxiliary steel for conduit support E-26-1001-
  M-1SX18022V                             Scaffold in contact with spring can.
02B-CP-13 is in contact with rear bracket pin
  M-1SX17028X                             Rear bracket binding eye bolt of sway strut.
on sway strut.
                                          Pipe clamp was 2 inches lower than design
M-1RH08092S
                                          elevation.
Mismatch of thread engagement of BE extension
  WS00520G                               U-bolt damaged (nonsafety).
piece and PSA 35 snubber.
  M-1VC02003R                             Scaffold interfering with support.
Extension piece
  Valve No. 2SX017A                       Scaffold interfering with valve.
"
                                                III-25
male threads measures 1-1/2 inches and
snubber body threads were 1-1/4 inches.
Extension piece was in contact with internal
dust cover.
1/4 inch of threads exposed on
extension piece when assembled with snubber.
M-1SX18022V
Scaffold in contact with spring can.
M-1SX17028X
Rear bracket binding eye bolt of sway strut.
Pipe clamp was 2 inches lower than design
elevation.
WS00520G
U-bolt damaged (nonsafety).
M-1VC02003R
Scaffold interfering with support.
Valve No. 2SX017A
Scaffold interfering with valve.
III-25


                                  -   - ._
-
- ._
a
a
                                          TABLE III-5
TABLE III-5
                    CONCRETE EXPANSION ANCHOR SAMP3.E AND OBSERVATIONS
CONCRETE EXPANSION ANCHOR SAMP3.E AND OBSERVATIONS
                                              Number of Bolts
Number of Bolts
                                              Turned Prior to     Number of Turns
Turned Prior to
                                                  Achieving           to Achieve
Number of Turns
  Pipe Support       Number of               Retightening or     Retightening or
Achieving
  Drawing (BA)   Bolts - Diameter             Testing Torque     Testing Torque
to Achieve
Pipe Support
Number of
Retightening or
Retightening or
Drawing (BA)
Bolts - Diameter
Testing Torque
Testing Torque
3
3
  M-IVC 04017X         15-3/4                         6           1/12, 1/12, 1/12
M-IVC 04017X
                                                                    1/8, 1/12, 1/32
15-3/4
  M-IVC 04001V           4-1/2                         0           -
6
  M-1CC06042G           6-1                           1           1/16
1/12, 1/12, 1/12
  M-1RI27003G           3-3/4                         1           1/8
1/8, 1/12, 1/32
  M-1RIO3017R           8-3/4                         0           -
M-IVC 04001V
  M-ISX75015G           4-1                           1           1/16
4-1/2
: M-1SX78008R           8-3/4                         2           1/32, 1/16
0
  M-1SX77020X           4-3/4                         1           1/32
-
  M-1SX21002G           4-1                           0           -
M-1CC06042G
  M-1SX23008V           4-3/4                         1           1/32
6-1
  M-1RI14001G           2-3/4,                       1           1/32
1
                        1-1
1/16
  M-1RI14019R           8-1                           0           -
M-1RI27003G
                                              Number of Bolts
3-3/4
                                              Turned Prior to     Nunber of Turns
1
                                                  Achieving           to Achieve
1/8
  HVAC Support       Number of               Retightening or     Retightening or
M-1RIO3017R
  Drawing (Zack)   Bolts - Diameter           Testing Torque     Testing Torque
8-3/4
  C-3163                 6-3/4                         3           1/16, 1/64, 1/64
0
  C-3162                 6-3/4                         0           -
-
  D-4308               15-3/4                         1           1/64
M-ISX75015G
  C-3211                 8-3/4*                       1           1/16
4-1
  C-3151                 8-3/4                         1           1/64
1
  D-0121                 6-3/4                         0           -
1/16
  C-1109-3               4-1                           0           -
:
  C-4103                 8-3/4                         1           1/64
M-1SX78008R
  *0ne anchor bolt is recessed into the nut and one thread of the nut is visible.
8-3/4
  NCR No. 912167 issued.
2
1/32, 1/16
M-1SX77020X
4-3/4
1
1/32
M-1SX21002G
4-1
0
-
M-1SX23008V
4-3/4
1
1/32
M-1RI14001G
2-3/4,
1
1/32
1-1
M-1RI14019R
8-1
0
-
Number of Bolts
Turned Prior to
Nunber of Turns
Achieving
to Achieve
HVAC Support
Number of
Retightening or
Retightening or
Drawing (Zack)
Bolts - Diameter
Testing Torque
Testing Torque
C-3163
6-3/4
3
1/16, 1/64, 1/64
C-3162
6-3/4
0
-
D-4308
15-3/4
1
1/64
C-3211
8-3/4*
1
1/16
C-3151
8-3/4
1
1/64
D-0121
6-3/4
0
-
C-1109-3
4-1
0
-
C-4103
8-3/4
1
1/64
*0ne anchor bolt is recessed into the nut and one thread of the nut is visible.
NCR No. 912167 issued.
.
III-26
-
. . .
---
-
-
.
_
.
.
                                              III-26
                                                        . . . ---    -    -
                                                                                    _ .


                -
_.
_. _
_
                                              .
-
                                          TABLE III-6
.
                          HVAC INSPECTION SAMPLE AND OBSERVATIONS
TABLE III-6
                                    Supports / Restraints
HVAC INSPECTION SAMPLE AND OBSERVATIONS
    Support I.D.                 Location                         Observations
Supports / Restraints
    R5008                       Containment                 Acceptable.
Support I.D.
    R7022                       Containment                 "E" and "X" dimensions were
Location
                                                              15/16 inches longer than
Observations
                                                              that shown on dwg.
R5008
    R7033                       Containment                 Brace angle exceeded dwg.
Containment
                                                              requirements by 4 degrees.
Acceptable.
                                                              NCR 911376 was dispositioned
R7022
                                                              using wrong configuration.
Containment
    C3163                       Control Building           Acceptable.
"E" and "X" dimensions were
    C6335                       Control Building           Acceptable.
15/16 inches longer than
    D4324                       Diesel Generator           Acceptable.
that shown on dwg.
                                  Building
R7033
                                        Fire Dampers
Containment
              Damper I.D.               Quantity             HVAC System
Brace angle exceeded dwg.
                  OVC42YF                   4               Control Building
requirements by 4 degrees.
                  OVC103Y                   1               Control Building
NCR 911376 was dispositioned
                  OVC104Y                   1               Control Building
using wrong configuration.
                  OVL68Y                     1               Laboratory HVAC
C3163
                  OVL70Y                     1               Laboratory HVAC
Control Building
                  1VX08YC                   1               Switchgear Heat Removal
Acceptable.
                  IVX82Y                     2               Switchgear Heat Removal
C6335
                  IVX86Y                     2               Switchgear Heat Removal
Control Building
                                                III-27
Acceptable.
D4324
Diesel Generator
Acceptable.
Building
Fire Dampers
Damper I.D.
Quantity
HVAC System
OVC42YF
4
Control Building
OVC103Y
1
Control Building
OVC104Y
1
Control Building
OVL68Y
1
Laboratory HVAC
OVL70Y
1
Laboratory HVAC
1VX08YC
1
Switchgear Heat Removal
IVX82Y
2
Switchgear Heat Removal
IVX86Y
2
Switchgear Heat Removal
III-27


                          -     .             -                                           . -.   - - _
-
                                          TABLE III-7                                                   ,
.
                                  MECHANICAL EQUIPMENT SAMPLE
-
              Diesel Generator Air Start Skid                     1DG06SA
.
              Diesel Generator Day Tanks                           1DG01TA,B,C
-.
              Diesel Generators                                   1DG01KA,B
- - _
              Diesel Generator Oil Transfer Pumps                 10001PA,C
TABLE III-7
              Diesel Generator Fuel Oil Storage Tanks             10001TA,C
,
              HPCS Diesel Engine                                   1E11-S001
MECHANICAL EQUIPMENT SAMPLE
              HPCS Water Leg Pump                                 1E22-C003
Diesel Generator Air Start Skid
              RHR Water Leg Pump                                   1E12-C003
1DG06SA
              RCIC Pump and Turbines                               1E51-C001, C002
Diesel Generator Day Tanks
              RCIC Gland Seal Compressor                           IE51-C002
1DG01TA,B,C
              RCIC Water Leg Pump                                 1E51-C003
Diesel Generators
              Standby Liquid Control Pumps                         1C41-C001A,B
1DG01KA,B
              Control Room Chilled Water Pumps                     OVC08PA,8
Diesel Generator Oil Transfer Pumps
              Switchgear Heat Removal Coolers                     IVX01SA,B
10001PA,C
Diesel Generator Fuel Oil Storage Tanks
10001TA,C
HPCS Diesel Engine
1E11-S001
HPCS Water Leg Pump
1E22-C003
RHR Water Leg Pump
1E12-C003
RCIC Pump and Turbines
1E51-C001, C002
RCIC Gland Seal Compressor
IE51-C002
RCIC Water Leg Pump
1E51-C003
Standby Liquid Control Pumps
1C41-C001A,B
Control Room Chilled Water Pumps
OVC08PA,8
Switchgear Heat Removal Coolers
IVX01SA,B
RHR Room Coolers
IVYO65,07S
.
.
              RHR Room Coolers                                    IVYO65,07S
4
4
f
f
.,
.,
  I
I
                                                III-28
III-28
    .. . _ . .               ._     _     -.     _         _ _ - -       - _ . - __._ -.     -       -
..
. _ . .
._
_
-.
_
_ _ - -
- _ .
- __._ -.
-
-


IV. WELDING AND NOND5SNUCTiVs EXAMINATION
IV.
    A. Objective
WELDING AND NOND5SNUCTiVs EXAMINATION
      The objective of the appraisal of welding and nondestructive examination
A.
      (NDE) was to determine if Quality Control accepted work related to
Objective
      welding and NDE activities was controlled and performed in accordance
The objective of the appraisal of welding and nondestructive examination
      with design requirements, Safety Analysis Report commitments, and
(NDE) was to determine if Quality Control accepted work related to
      applicable codes and specifications. An additional objective was to
welding and NDE activities was controlled and performed in accordance
      determine if personnel involved in welding and NDE activities were
with design requirements, Safety Analysis Report commitments, and
      trained and qualified in accordance with established performance
applicable codes and specifications.
      standards and applicable code requirements.
An additional objective was to
    B. Discussion
determine if personnel involved in welding and NDE activities were
      To accomplish the above objectives, welds and welding details for
trained and qualified in accordance with established performance
      piping, pipe supports / restraints, field and shop fabricated tanks and
standards and applicable code requirements.
      heat exchangers, structural steel installations, heating, ventilating
B.
      and air conditioning (HVAC) installations, electrical supports, and
Discussion
      instrumentation and control tubing were inspected. The inspectedTelds
To accomplish the above objectives, welds and welding details for
      were selected to provide a representative sample of the licensee's
piping, pipe supports / restraints, field and shop fabricated tanks and
      contractor welding activities in terms of welding processes used,
heat exchangers, structural steel installations, heating, ventilating
      materials welded and existing weld-joint configurations.     Considerations
and air conditioning (HVAC) installations, electrical supports, and
      such as physical location, difficulty of welding and limited accessi-
instrumentation and control tubing were inspected.
      bility were also used in sample selection.
The inspectedTelds
      NDE activities were appraised through the review of radiographs for
were selected to provide a representative sample of the licensee's
      both field and vendor fabricated welds, the review of NDE procedures
contractor welding activities in terms of welding processes used,
      and personnel qualifications, the inspection of the calibration status
materials welded and existing weld-joint configurations.
      of NDE equipment, and the witnessing of in process NDE activities.
Considerations
      During the inspection of welds on pipe supports / restraints, the NRC
such as physical location, difficulty of welding and limited accessi-
      Construction Appraisal Team (CAT) identified welds which did not have
bility were also used in sample selection.
      the weld size specified by the Architect Engineer, Sargent & Lundy
NDE activities were appraised through the review of radiographs for
      Engineers (S&L). Undersized welds were found in both skewed and non-
both field and vendor fabricated welds, the review of NDE procedures
      skewed connections on pipe supports. S&L has evaluated most of the
and personnel qualifications, the inspection of the calibration status
      undersized welds and determined that the welds are adequate for the
of NDE equipment, and the witnessing of in process NDE activities.
      intended application. Undersized weld reinforcements were also found in
During the inspection of welds on pipe supports / restraints, the NRC
      nozzle to shell joints (ASME Code Category D joints) on tanks and heat
Construction Appraisal Team (CAT) identified welds which did not have
      exchangers. A detailed discussion concerning these welds is included
the weld size specified by the Architect Engineer, Sargent & Lundy
      in Sections IV.B.1 and 11, below.
Engineers (S&L).
      The licensee has instituted an Illinois Power Company (IP) Overinspec-
Undersized welds were found in both skewed and non-
      tion Program. The program provides for additional inspections to be
skewed connections on pipe supports.
      performed by the Baldwin Associates Field Verification (BAFV) Group and
S&L has evaluated most of the
      the IP Overinspection Group. Section VII, Design Change Control, of
undersized welds and determined that the welds are adequate for the
      this report provides additional discussion of the IP Overinspection
intended application.
      Program.
Undersized weld reinforcements were also found in
      The IP Overinspection Program was set up to include inspections of
nozzle to shell joints (ASME Code Category D joints) on tanks and heat
      welds in all of the major areas of plant construction such as electri-
exchangers.
      cal, piping, instrumentation, HVAC and structural steel. The NRC CAT
A detailed discussion concerning these welds is included
      inspectors inspected eleven pipe supports / restraints which were
in Sections IV.B.1 and 11, below.
      inspected under the scope of the program. In addition two supports
The licensee has instituted an Illinois Power Company (IP) Overinspec-
      in the electrical, two supports in the instrumentation, two supports in
tion Program.
                                      IV-1
The program provides for additional inspections to be
performed by the Baldwin Associates Field Verification (BAFV) Group and
the IP Overinspection Group.
Section VII, Design Change Control, of
this report provides additional discussion of the IP Overinspection
Program.
The IP Overinspection Program was set up to include inspections of
welds in all of the major areas of plant construction such as electri-
cal, piping, instrumentation, HVAC and structural steel.
The NRC CAT
inspectors inspected eleven pipe supports / restraints which were
inspected under the scope of the program.
In addition two supports
in the electrical, two supports in the instrumentation, two supports in
IV-1


                                                                                      l
                                                                                      l
the HVAC and two supports in the structural steel areas were inspected
the HVAC and two supports in the structural steel areas were inspected
to assess the adequacy of the welding overinspections.
to assess the adequacy of the welding overinspections.
In the area of NDE, the NRC CAT inspectors reviewed radiographs
In the area of NDE, the NRC CAT inspectors reviewed radiographs
supplied by various contractors and vendors. The NRC CAT inspectors
supplied by various contractors and vendors.
The NRC CAT inspectors
found radiographs which showed that some welds did not have the
found radiographs which showed that some welds did not have the
required weld quality or the NDE documentation did not accurately
required weld quality or the NDE documentation did not accurately
reflect the current status of the hardware. A detailed discussion
reflect the current status of the hardware.
A detailed discussion
concerning the welds and their associated deficiencies are provided in
concerning the welds and their associated deficiencies are provided in
Sections IV.B.1., 9, 10 and 11, below.
Sections IV.B.1., 9, 10 and 11, below.
Line 2,815: Line 4,631:
This effort involved the review and inspection of the following
This effort involved the review and inspection of the following
contractors:
contractors:
                                      Field Activities
Field Activities
1.           Sargent & Lundy Engineers:     Architect Engineer.
1.
2.           Baldwin Associates:   piping installation and piping supports /
Sargent & Lundy Engineers:
            restraints, instrumentation installation and instrumentation
Architect Engineer.
            supports, fire protection fabrication and installation, electrical
2.
            installation and supports, drywell wall field installation and
Baldwin Associates:
            structural steel erection and modification.
piping installation and piping supports /
3.           Chicago Bridge and Iron Company (CB&I):     containment liner and
restraints, instrumentation installation and instrumentation
            containment penetration fabrication and installation, tank
supports, fire protection fabrication and installation, electrical
            fabricator.
installation and supports, drywell wall field installation and
4.           Bristol Steel Company:   reactor pool and spent fuel pool liner
structural steel erection and modification.
            fabrication and installation, structural steel supplier.
3.
5.           Zack Company (Zack):   heating, ventilating and air conditioning.
Chicago Bridge and Iron Company (CB&I):
6.           General Electric Company:   reactor internals field modification and
containment liner and
            installation.
containment penetration fabrication and installation, tank
7.           Reactor Controls Inc.:   control drive mechanism piping
fabricator.
            installation.
4.
                                Shop Fabrication
Bristol Steel Company:
    1. Southwest Fabricating & Welding Company, Inc.:           shop fabricated
reactor pool and spent fuel pool liner
            piping spools.
fabrication and installation, structural steel supplier.
    2. Harnischfeger Corporation:           crane manufacturer.
5.
    3. General Electric Company:         nuclear steam supply system.
Zack Company (Zack):
    4. Anchor / Darling Valve Company:         valve manufacturer.
heating, ventilating and air conditioning.
    5. Progressive Fabricating Inc.:           pipe sleeve and cylinders supplier.
6.
                                        IV-2
General Electric Company:
_ _ _ _ _ .                                                       _   . . . -, . _
reactor internals field modification and
installation.
7.
Reactor Controls Inc.:
control drive mechanism piping
installation.
Shop Fabrication
1. Southwest Fabricating & Welding Company, Inc.:
shop fabricated
piping spools.
2. Harnischfeger Corporation:
crane manufacturer.
3. General Electric Company:
nuclear steam supply system.
4. Anchor / Darling Valve Company:
valve manufacturer.
5. Progressive Fabricating Inc.:
pipe sleeve and cylinders supplier.
IV-2
_ _ _ _ _ .
_
. . . -,
.
-
_


                                                                                . -
.
      6. Carrier Corporation:             chillers and coolers manufacturer.
-
      7. Pathway:       expansicn bellows supplier.
6. Carrier Corporation:
      8. RECO Industries Inc.:               tank fabricator.
chillers and coolers manufacturer.
      9. Posi Seal:       valve bodies supplier.
7. Pathway:
    10. Fisher Controls Inc.:               valve manufacturer.
expansicn bellows supplier.
    11. Rockwell:       flow diverters supplier.
8. RECO Industries Inc.:
    12. Lakeside Bridge and Steel:                 miscellaneous steel supplier.
tank fabricator.
    13. La Barge:       pipe supplier.
9. Posi Seal:
    14. Hub:       tube supplier,
valve bodies supplier.
    15. Yuba Heat Transfer Corporation:                   high pressure heater manufacturer.
10. Fisher Controls Inc.:
    16. Southern Boiler:               small tanks supplier.
valve manufacturer.
    17. Tube Turns:       penetration manufacturer.
11. Rockwell:
    18. Spencer Turbine Co.:             blow casing supplier.
flow diverters supplier.
    19. Chicago Tube and Iron:               tee tubes supplier.
12. Lakeside Bridge and Steel:
    20. Nooter: water storage tank supplier.
miscellaneous steel supplier.
    21. Guyon Alloys:       tube and fittings supplier.
13. La Barge:
    22. Gould:       valve supplier.
pipe supplier.
    23. Metal Bellows:       bellows manufacturer.
14. Hub:
    24. Atomic International:               hydrogen recombiner manufacturer.
tube supplier,
    25. Steward and Stevenson:               air receiver tank supplier.
15. Yuba Heat Transfer Corporation:
high pressure heater manufacturer.
16. Southern Boiler:
small tanks supplier.
17. Tube Turns:
penetration manufacturer.
18. Spencer Turbine Co.:
blow casing supplier.
19. Chicago Tube and Iron:
tee tubes supplier.
20. Nooter: water storage tank supplier.
21. Guyon Alloys:
tube and fittings supplier.
22. Gould:
valve supplier.
23. Metal Bellows:
bellows manufacturer.
24. Atomic International:
hydrogen recombiner manufacturer.
25. Steward and Stevenson:
air receiver tank supplier.
'
'
    26. W.J. Woolley Company:               containment vessel hatches fabricator
26. W.J. Woolley Company:
          and supplier.
containment vessel hatches fabricator
    27. G.W. Taylor:       material supplier.
and supplier.
    28. Trent Tube:       material supplier.
27. G.W. Taylor:
    29. Bingham-Willamette:             pump manufacturer.
material supplier.
    The results of the inspection activities involving each of these areas
28. Trent Tube:
    and contractors are documented in the following sections.
material supplier.
                                                IV-3
29. Bingham-Willamette:
  ..   ,       , . _           . . -_.           -     -   _ _ .                           . , . .
pump manufacturer.
The results of the inspection activities involving each of these areas
and contractors are documented in the following sections.
IV-3
..
,
, . _
. . -_.
-
-
_ _ .
. , . .


1. Pipe and Pipe Support Fabrication
1.
a. Inspection Scope
Pipe and Pipe Support Fabrication
  (1) Welding Activities
a.
        The NRC CAT inspectors reviewed activities relating to
Inspection Scope
        fabrication contracts in the areas of piping system welds,
(1) Welding Activities
        support / restraint welds, welding procedures, welder
The NRC CAT inspectors reviewed activities relating to
        qualifications, NDE procedures, personnel qualifications, and
fabrication contracts in the areas of piping system welds,
        the review of radiographic film for shop and field fabricated
support / restraint welds, welding procedures, welder
        welds.   Field welding involving pipe fabrication was performed
qualifications, NDE procedures, personnel qualifications, and
        by BA.   Southwest Fabricating and Welding supplied the shop
the review of radiographic film for shop and field fabricated
        fabricated piping spools.
welds.
        The NRC CAT inspected 56 pipe supports / restraints involving
Field welding involving pipe fabrication was performed
        approximately 550 welds in order to verify conformance of
by BA.
        welding to drawing requirements and confirm the visual
Southwest Fabricating and Welding supplied the shop
        acceptability of the welds. The inspection included 11 sup-
fabricated piping spools.
        ports consisting of 68 welds, which had been checked under
The NRC CAT inspected 56 pipe supports / restraints involving
        the IP Overinspection program in order to evaluate the effec-
approximately 550 welds in order to verify conformance of
        tiveness of that program. See Table IV-1 for a listing of
welding to drawing requirements and confirm the visual
        supports subjected to detailed inspection. Additionally,
acceptability of the welds.
        another 16 supports / restraints involving 400 welds were
The inspection included 11 sup-
        visually inspected to verify the quality of the completed
ports consisting of 68 welds, which had been checked under
        welds. See Table IV-2 for a listing of supports inspected.
the IP Overinspection program in order to evaluate the effec-
        The NRC CAT inspection of piping welds consisted of visual
tiveness of that program.
        inspection during walkdown of piping systems and inspection of
See Table IV-1 for a listing of
        pipe welds located near the supports / restraints being inspec-
supports subjected to detailed inspection. Additionally,
        ted. Approximately 44 piping spools involving 1400 American
another 16 supports / restraints involving 400 welds were
        Society of Mechanical Engineers (ASME) Class 1, 2 and 3 welds
visually inspected to verify the quality of the completed
        were inspected. Twenty-four of those piping spools were
welds.
        subjected to detailed inspection which included the review of
See Table IV-2 for a listing of supports inspected.
        pertinent QC documentation while the remaining 20 spools were
The NRC CAT inspection of piping welds consisted of visual
        only visually inspected. Both field and shop welds were
inspection during walkdown of piping systems and inspection of
        inspected in order to assure compliance with the requirements
pipe welds located near the supports / restraints being inspec-
        of the ASME Code. Some of the inspected socket welds were
ted.
        fabricated by Reactor Controls, Inc. (RCI) in conjunction with
Approximately 44 piping spools involving 1400 American
        the Control Drive Mechanism piping installation contract. See
Society of Mechanical Engineers (ASME) Class 1, 2 and 3 welds
        Tables IV-3 and IV-4 for listings of piping spools inspected.
were inspected.
        In addition, 75 welding filler metal test reports, 22 welder
Twenty-four of those piping spools were
        qualification test records and 4 welding procedures were
subjected to detailed inspection which included the review of
        reviewed for compliance with applicable specifications,
pertinent QC documentation while the remaining 20 spools were
        procedures and the ASME Code requirements.
only visually inspected.
  (2) Nondestructive Examination Activities
Both field and shop welds were
        The NRC CAT inspection of NDE activities for the pipe
inspected in order to assure compliance with the requirements
        fabrication area included the review of 62 shop and 75 field
of the ASME Code.
        fabricated welds which involved 1815 film. The field welds
Some of the inspected socket welds were
        were fabricated by BA and the shop fabricated pipe spools were
fabricated by Reactor Controls, Inc. (RCI) in conjunction with
        supplied by Southwest Fabricating and Welding. Three welds
the Control Drive Mechanism piping installation contract.
        involving 28 film supplied by RCI were also reviewed as a part
See
                              IV-4
Tables IV-3 and IV-4 for listings of piping spools inspected.
In addition, 75 welding filler metal test reports, 22 welder
qualification test records and 4 welding procedures were
reviewed for compliance with applicable specifications,
procedures and the ASME Code requirements.
(2) Nondestructive Examination Activities
The NRC CAT inspection of NDE activities for the pipe
fabrication area included the review of 62 shop and 75 field
fabricated welds which involved 1815 film.
The field welds
were fabricated by BA and the shop fabricated pipe spools were
supplied by Southwest Fabricating and Welding.
Three welds
involving 28 film supplied by RCI were also reviewed as a part
IV-4


          of this inspection.       In addition, 6 NDE procedures and 11 NDE
of this inspection.
          personnel qualification records were reviewed in order to
In addition, 6 NDE procedures and 11 NDE
          verify compliance with the governing codes and specifications.
personnel qualification records were reviewed in order to
          Six NDE technicians were observed while performing in process
verify compliance with the governing codes and specifications.
          inspections and were evaluated for their ability to follow the
Six NDE technicians were observed while performing in process
          applicable inspection procedures. Twenty pieces of NDE equip-
inspections and were evaluated for their ability to follow the
          ment were inspected for calibration and one quality assurance
applicable inspection procedures.
          NDE procedure was reviewed for adequacy.
Twenty pieces of NDE equip-
  b. Inspection Findings
ment were inspected for calibration and one quality assurance
    (1) Welding Activities                                                         '
NDE procedure was reviewed for adequacy.
          In general, the inspected pipe and pipe support / restraint
b.
          welding activities were found to comply with the governing
Inspection Findings
          codes and specifications. However, discrepancies were iden-
(1) Welding Activities
          tified involving undersized welds in both skewed and nonskewed
'
          welded connections. Forty-six of 950 structural welds inspec-
In general, the inspected pipe and pipe support / restraint
          ted, involving 56 pipe supports / restraints, were found to be
welding activities were found to comply with the governing
          deficient with respect to the specified acceptance criteria.
codes and specifications.
          Forty-four of the welds were undersized, one weld had overlap
However, discrepancies were iden-
          and lack of fusion, and another weld had undercut and was also
tified involving undersized welds in both skewed and nonskewed
          welded across the beam flange which violated the specification
welded connections.
          requirements. Nineteen of the undersized welds were found on
Forty-six of 950 structural welds inspec-
          hanger 1RH051R which had a total of 79 welds.       As a result of
ted, involving 56 pipe supports / restraints, were found to be
          this finding the BA personnel identified and reinspected the
deficient with respect to the specified acceptance criteria.
          remaining 20 hangers of similar design. A relatively high
Forty-four of the welds were undersized, one weld had overlap
          percentage of undersized welds were also found on those han-
and lack of fusion, and another weld had undercut and was also
          gers. Investigation revealed that the hangers were predomi-
welded across the beam flange which violated the specification
          nately shop fabricated by BA and the shop fabricated portion
requirements.
          was not inspected as closely as those welds which were made
Nineteen of the undersized welds were found on
          during installation.       See Table IV-1 for details. As a result
hanger 1RH051R which had a total of 79 welds.
          of this finding the applicant issued Nonconformance Reports
As a result of
          (NCRs) and the welds were determined to be adequate for the
this finding the BA personnel identified and reinspected the
          intended application.
remaining 20 hangers of similar design.
          Two of the 1400 pipe welds inspected were found to deviate from
A relatively high
          the specified acceptance criteria. The two welds and their
percentage of undersized welds were also found on those han-
          associated deficiencies are listed as follows:
gers.
          (a) An undersized reinforcing fillet weld between a small-
Investigation revealed that the hangers were predomi-
                diameter coupling and spool piece IRH-8-7 was found.     NCR
nately shop fabricated by BA and the shop fabricated portion
                32441 was written as a result of this finding.
was not inspected as closely as those welds which were made
          (b) Undersized welds were found on socket welds on the 3/4-inch
during installation.
                Schedule 160 piping connections on RCI work. NCR
See Table IV-1 for details. As a result
                CRD-185-48 was written as a result of this finding.     In
of this finding the applicant issued Nonconformance Reports
                addition, all pipe of this size and schedule was reinspec-
(NCRs) and the welds were determined to be adequate for the
                ted and accepted by the Architect Engineer without repair.
intended application.
l               Ten percent of the remaining RCI fillet welds were also
Two of the 1400 pipe welds inspected were found to deviate from
l               inspected, and these were found to be of the correct size
the specified acceptance criteria.
                since the connecting piping was Schedule 80 or lighter.
The two welds and their
associated deficiencies are listed as follows:
(a) An undersized reinforcing fillet weld between a small-
diameter coupling and spool piece IRH-8-7 was found.
NCR
32441 was written as a result of this finding.
(b) Undersized welds were found on socket welds on the 3/4-inch
Schedule 160 piping connections on RCI work.
NCR
CRD-185-48 was written as a result of this finding.
In
addition, all pipe of this size and schedule was reinspec-
ted and accepted by the Architect Engineer without repair.
l
Ten percent of the remaining RCI fillet welds were also
l
inspected, and these were found to be of the correct size
since the connecting piping was Schedule 80 or lighter.
i
i
l
l
                                  IV-5
IV-5
              ._           . .               _                               _ _ .
._
. .
_
_ _ .


    (2) Nondestructive Examination Activities
(2) Nondestructive Examination Activities
          In general, the inspected NDE activities were found to comply
In general, the inspected NDE activities were found to comply
        with the applicable codes and specifications.     However, during
with the applicable codes and specifications.
        the review of the radiographic film some irregularities were
However, during
          identified which involved the following two welds:
the review of the radiographic film some irregularities were
              Field Weld IVQ-B-1
identified which involved the following two welds:
              The radiographs for this weld covering view 2-3 were
Field Weld IVQ-B-1
              originally rejected for base metal gouging. The repair
The radiographs for this weld covering view 2-3 were
              film did not adequately cover the repaired area. As a
originally rejected for base metal gouging.
              result of this finding the applicant issued NCR 31598.
The repair
              Shop Weld IFC-2-13
film did not adequately cover the repaired area.
              This weld was reradiographed by BA. The weld traveler
As a
              FC-2-B misidentified weld IFC-2-13 as being weld
result of this finding the applicant issued NCR 31598.
              IFC-2-13-W-3. A visual examination of weld IFC-2-13
Shop Weld IFC-2-13
              confirmed that the radiographed weld is IFC-2-13. As a
This weld was reradiographed by BA.
              result of this finding the applicant issued NCR 31513.
The weld traveler
c. Conclusions
FC-2-B misidentified weld IFC-2-13 as being weld
  (1) Welding Activities
IFC-2-13-W-3.
        In general, the inspected welding activities were found to
A visual examination of weld IFC-2-13
        comply with the requirements of the applicable codes and
confirmed that the radiographed weld is IFC-2-13.
        specifications.     However, the NRC CAT found structural welds on
As a
        pipe supports / restraints which did not meet the weld specifi-
result of this finding the applicant issued NCR 31513.
        cations. The welds for these supports were evaluated by the
c.
        Architect Engineer and determined to be structurally adequate
Conclusions
        for the intended application.
(1) Welding Activities
  (2) Nondestructive Examination
In general, the inspected welding activities were found to
        In general, the inspected NDE activities were found to comply
comply with the requirements of the applicable codes and
        with the requirements of the governing codes and specifica-
specifications.
        tions. However, the NRC CAT found welds which were misidenti-
However, the NRC CAT found structural welds on
        fied and the repair areas did not have adequate radiographic
pipe supports / restraints which did not meet the weld specifi-
        coverage.
cations.
2. Reactor Internals Modification and Installation
The welds for these supports were evaluated by the
a. Inspection Scope
Architect Engineer and determined to be structurally adequate
  Apprvximately 20 feet of welded seam of the outer bank hood replace-
for the intended application.
  ment of the steam dryer and 6 new tie bar installation welds were
(2) Nondestructive Examination
  inspected. In addition, one welding procedure and the qualification
In general, the inspected NDE activities were found to comply
  test records for two welders were also reviewed for adequacy.       The
with the requirements of the governing codes and specifica-
  modification work was performed by General Electric Installation and
tions.
  Services Engineering Division.
However, the NRC CAT found welds which were misidenti-
                                IV-6
fied and the repair areas did not have adequate radiographic
                                                                  -
coverage.
2.
Reactor Internals Modification and Installation
a.
Inspection Scope
Apprvximately 20 feet of welded seam of the outer bank hood replace-
ment of the steam dryer and 6 new tie bar installation welds were
inspected.
In addition, one welding procedure and the qualification
test records for two welders were also reviewed for adequacy.
The
modification work was performed by General Electric Installation and
Services Engineering Division.
IV-6
-


b. Inspection Findings and Conclusions
b.
  No problems were identified in the area of inspected welding
Inspection Findings and Conclusions
  activities. Activities were found to meet the specified acceptance
No problems were identified in the area of inspected welding
  criteria.
activities.
3. Electrical Installation and Electrical Supports
Activities were found to meet the specified acceptance
a. Inspection Scope
criteria.
  The NRC CAT inspected approximately 100 field and 60 shop welds in
3.
  the area of electrical installation.     Two welding procedures and
Electrical Installation and Electrical Supports
  the qualification test records for six welders were reviewed.     In
a.
  addition, the personnel qualification test records for four welding
Inspection Scope
  inspectors were also reviewed and four inspectors were observed
The NRC CAT inspected approximately 100 field and 60 shop welds in
  and evaluated for their ability to follow the visual inspection
the area of electrical installation.
  procedures. The welding activities in the electrical area were
Two welding procedures and
  performed by BA.
the qualification test records for six welders were reviewed.
b. Inspection Findings and Conclusions
In
  No problems were identified in the area of inspected welding
addition, the personnel qualification test records for four welding
  activities. Activities were found to comply with the applicable
inspectors were also reviewed and four inspectors were observed
  construction codes and specifications.
and evaluated for their ability to follow the visual inspection
4. Instrumentation Tubing Installation and Instrumentation Supports
procedures.
a. Inspection Scope
The welding activities in the electrical area were
  Approximately 110 welds involving 18 instrumentation supports, 2
performed by BA.
  panels, and 80 tubing welds were visually inspected to ascertain
b.
  compliance with the specified acceptance criteria.     Two welding
Inspection Findings and Conclusions
  procedures and qualification test records for six welders were
No problems were identified in the area of inspected welding
  reviewed.   NDE procedures and qualification records for four NDE
activities.
  inspectors were also reviewed. Two visual welding inspectors and
Activities were found to comply with the applicable
  two liquid penetrant inspectors were observed and evaluated for
construction codes and specifications.
  their ability to follow the applicable inspection procedures.     The
4.
  welding in the instrumentation area was performed by BA.
Instrumentation Tubing Installation and Instrumentation Supports
b. Inspection Findings and Conclusions
a.
  No problems were identified in the area of inspected welding and
Inspection Scope
  NDE activities. Activities were found to comply with the
Approximately 110 welds involving 18 instrumentation supports, 2
  applicable construction codes and specifications.
panels, and 80 tubing welds were visually inspected to ascertain
5. Heating, Ventilating and Air Conditioning
compliance with the specified acceptance criteria.
  Installation and Supports
Two welding
a. Inspection Scope
procedures and qualification test records for six welders were
  Approximately 140 welds involving 20 supports were inspected for
reviewed.
  compliance with the specified acceptance criteria.     Six welding
NDE procedures and qualification records for four NDE
  procedures and the qualification test records for six welders were
inspectors were also reviewed.
  reviewed. In addition, four welding inspector personnel qualifi-
Two visual welding inspectors and
  cation test records were also reviewed and two welding inspectors
two liquid penetrant inspectors were observed and evaluated for
                            IV-7
their ability to follow the applicable inspection procedures.
The
welding in the instrumentation area was performed by BA.
b.
Inspection Findings and Conclusions
No problems were identified in the area of inspected welding and
NDE activities.
Activities were found to comply with the
applicable construction codes and specifications.
5.
Heating, Ventilating and Air Conditioning
Installation and Supports
a.
Inspection Scope
Approximately 140 welds involving 20 supports were inspected for
compliance with the specified acceptance criteria.
Six welding
procedures and the qualification test records for six welders were
reviewed.
In addition, four welding inspector personnel qualifi-
cation test records were also reviewed and two welding inspectors
IV-7


                                                                                  .   _
.
    were observed and evaluated for their ability to follow the visual
_
      inspection procedures. The welds on four duct pieces, two air
were observed and evaluated for their ability to follow the visual
    blowers, one air filter and four dampers were also included in this
inspection procedures.
      inspection.   The welding in the HVAC area was performed by Zack
The welds on four duct pieces, two air
    Company.
blowers, one air filter and four dampers were also included in this
                                                                                        J
inspection.
  b. Inspection Findings
The welding in the HVAC area was performed by Zack
    During the inspection of Hanger A-0082 a burn through the duct was
Company.
    observed in the welded joint between the duct and the duct companion
J
    flange. As a result of this finding, Zack Company issued NCR 912085
b.
    and the duct will be repaired as required.
Inspection Findings
  c. Conclusions
During the inspection of Hanger A-0082 a burn through the duct was
    In general, the inspected welded activities were found to comply
observed in the welded joint between the duct and the duct companion
    with the requirements specified by the Architect Engineer. With
flange.
    the exception of the minor finding (burn through duct in one
As a result of this finding, Zack Company issued NCR 912085
    isolated case) the inspected welding activities were found to comply
and the duct will be repaired as required.
    with the applicable codes and specifications.
c.
  6. Structural Steel Fabrication, Erection and Modification
Conclusions
  a. Inspection Scope
In general, the inspected welded activities were found to comply
    Approximately 150 welds comprising 80 field and 70 shop welds
with the requirements specified by the Architect Engineer.
,    involving 22 structural beams were visually inspected in order to
With
    ascertain compliance with the specified acceptance criteria.
the exception of the minor finding (burn through duct in one
    Five welding procedures and the qualification test records for six
isolated case) the inspected welding activities were found to comply
    welders were reviewed. Visual inspection procedures and the
with the applicable codes and specifications.
    qualification test records for five inspectors were also reviewed.
6.
    Three welding inspectors were observed and evaluated for their
Structural Steel Fabrication, Erection and Modification
    ability to follow the visual inspection procedures.       The structural
a.
    steel field welding was performed by BA. Rockwell Engineering and
Inspection Scope
    Bristol Steel supplied structural steel to the project.
Approximately 150 welds comprising 80 field and 70 shop welds
  b. Inspection Findings and Conclusions
involving 22 structural beams were visually inspected in order to
    No problems were identified in the area of inspected welding
,
    activities.     Activities were found to comply with the applicable
ascertain compliance with the specified acceptance criteria.
    construction codes and specifications.
Five welding procedures and the qualification test records for six
  7. Fuel Storage Pool and Refueling Cavity Liner Fabrication
welders were reviewed.
  a. Inspection Scope
Visual inspection procedures and the
    The NRC CAT visually inspected approximately 120 feet of welded
qualification test records for five inspectors were also reviewed.
    seam on the Fuel Storage Pool and the Refueling Cavity Liner. The
Three welding inspectors were observed and evaluated for their
    attachment welds for two gusset hooks and two pad plates were also
ability to follow the visual inspection procedures.
    inspected in order to ascertain compliance with the specified
The structural
    acceptance criteria.     In the area of NDE the NRC CAT reviewed the
steel field welding was performed by BA.
    radiographs for 100 feet of welded seam involving 234 film.       The
Rockwell Engineering and
    Fuel Storage Pool and Refueling Cavity Liner fabrication was
Bristol Steel supplied structural steel to the project.
    completed by Bristol Steel.
b.
                                  IV-8
Inspection Findings and Conclusions
                __.
No problems were identified in the area of inspected welding
                                                        __ -   -       . _ . -   .-
activities.
Activities were found to comply with the applicable
construction codes and specifications.
7.
Fuel Storage Pool and Refueling Cavity Liner Fabrication
a.
Inspection Scope
The NRC CAT visually inspected approximately 120 feet of welded
seam on the Fuel Storage Pool and the Refueling Cavity Liner.
The
attachment welds for two gusset hooks and two pad plates were also
inspected in order to ascertain compliance with the specified
acceptance criteria.
In the area of NDE the NRC CAT reviewed the
radiographs for 100 feet of welded seam involving 234 film.
The
Fuel Storage Pool and Refueling Cavity Liner fabrication was
completed by Bristol Steel.
IV-8
__.
__
-
-
. _ .
-
.-


  b. Inspection Findings and Conclusions
b.
    No problems were identified in the areas of inspected welding and
Inspection Findings and Conclusions
    NDE activities. Activities were found to comply with the
No problems were identified in the areas of inspected welding and
    applicable construction codes and specifications.
NDE activities. Activities were found to comply with the
  8. Fire Protection System Fabrication and Installation
applicable construction codes and specifications.
  a. Inspection Scope
8.
    Approximately 80 welds involving 10 pipe supports' and 15 pipe welds
Fire Protection System Fabrication and Installation
                                                          ,
a.
    involving 2 pipe spools were visually inspected. One welding
Inspection Scope
    procedure and the qualification test records for two welders were
Approximately 80 welds involving 10 pipe supports' and 15 pipe welds
    also reviewed for adequacy. The fire protection installation was
,
    completed by BA.
involving 2 pipe spools were visually inspected.
  b. Inspection Findings and Conclusions
One welding
    No problems were identified in the area of inspected welding and
procedure and the qualification test records for two welders were
    NDE activities. Activities were found to comply with the governing
also reviewed for adequacy.
    construction codes and specifications.
The fire protection installation was
  9. Containment Liner and Containment Penetration Installation
completed by BA.
  a. Inspection Scope
b.
    The NRC CAT visually inspected approximately 50 feet of liner seam,
Inspection Findings and Conclusions
    the welds on one pad plate, the attachment weld for one personnel
No problems were identified in the area of inspected welding and
    hatch, and the attachment welds for two mechanical and two
NDE activities.
    electrical penetrations.   In the area of NDE, the NRC CAT reviewed
Activities were found to comply with the governing
    the radiographs for 150 feet of liner seam which involved 450
construction codes and specifications.
    film.   One radiographic examination procedure was also reviewed as
9.
    a part of this inspection. The containment liner and penetrations
Containment Liner and Containment Penetration Installation
    were installed by CB&I.
a.
  b. Inspection Findings
Inspection Scope
    No problems were identified in the area of inspected welding
The NRC CAT visually inspected approximately 50 feet of liner seam,
    activities.   However, during the review of radiographs the NRC CAT
the welds on one pad plate, the attachment weld for one personnel
    inspectors identified 14 spot radiographs which did not meet the
hatch, and the attachment welds for two mechanical and two
    required weld quality.   As a result of this finding, the applicant
electrical penetrations.
    performed an evaluation of the affected liner welds and concluded
In the area of NDE, the NRC CAT reviewed
    that the welds are acceptable "as is" because every weld was sub-
the radiographs for 150 feet of liner seam which involved 450
    jected to and had passed magnetic particle and vacuum box inspec-
film.
    tions. In addition, in 1984, the applicant had reviewed 25 percent
One radiographic examination procedure was also reviewed as
    of the fabrication and erection documentation for the containment
a part of this inspection.
The containment liner and penetrations
were installed by CB&I.
b.
Inspection Findings
No problems were identified in the area of inspected welding
activities.
However, during the review of radiographs the NRC CAT
inspectors identified 14 spot radiographs which did not meet the
required weld quality.
As a result of this finding, the applicant
performed an evaluation of the affected liner welds and concluded
that the welds are acceptable "as is" because every weld was sub-
jected to and had passed magnetic particle and vacuum box inspec-
tions.
In addition, in 1984, the applicant had reviewed 25 percent
of the fabrication and erection documentation for the containment
liner. The review was conducted by the Authorized Nuclear Inspector
,
,
'
'
    liner. The review was conducted by the Authorized Nuclear Inspector
employed by the Hartford Steam Boiler Inspection and Insurance
    employed by the Hartford Steam Boiler Inspection and Insurance
Company. Twenty-six minor nonconforming conditions were identified
    Company. Twenty-six minor nonconforming conditions were identified
and no major discrepancies were found.
    and no major discrepancies were found.     Based upon these reviews the
Based upon these reviews the
    applicant has concluded that the overall liner weld quality is
applicant has concluded that the overall liner weld quality is
    acceptable to maintain the structural and leak tightness integrity
acceptable to maintain the structural and leak tightness integrity
    of the containment liner.
of the containment liner.
                                IV-9
IV-9
                                                      .   .       _.
.
.
_.


                                  __     _                               . _ _ _ _ _.
__
        The NRC CAT identified welded seams and their associated deficien-
_
        cies are listed as follows:
. _ _
            Purchase Order (P.O.) 409.27 7-8A-7C             139 porosity
_
                                              7-8A           146 porosity
_
                                              7-8B           144 porosity
_.
                                              7-88-7L         145 Incomplete Fusion
The NRC CAT identified welded seams and their associated deficien-
                                              513-A-5         142 porosity
cies are listed as follows:
                P.O. 409.29                   9-10B           176 linear indication
Purchase Order (P.O.) 409.27 7-8A-7C
                                              9-108           173 alligned indication
139 porosity
                P.O. 409.35                   11-128-12L 194 crack-like indication
7-8A
                P.O. 409.35                   170             219 porosity
146 porosity
                                              16A             10A crack-like indication
7-8B
                                              16A             4-5 crack-like indication
144 porosity
                P." 409.40                   517-11-7       280 incomplete fusion
7-88-7L
                                              51-B-7         275 aligned indication
145 Incomplete Fusion
                P.O. 409.44                   C0 Vert.       4-5 I.F. porosity
513-A-5
!     c. Conclusions
142 porosity
        In general, the inspected welding and NDE activities were found to                 4
P.O. 409.29
        comply with the requirements of the governing codes and
9-10B
i       specifications.     However, the NRC CAT found spot radiographs which
176 linear indication
        did not meet the specified weld quality. The welds were evaluated
9-108
        by the applicant and determined to be adequate for the intended
173 alligned indication
        application because every weld had passed magnetic particle and
P.O. 409.35
        vacuum box testing.
11-128-12L 194 crack-like indication
    10. Drywell Wall and Penetrations
P.O. 409.35
;     a. Inspection Scope
170
        The NRC CAT visually inspected approximately 40 feet of drywell wall
219 porosity
        seam and the attachment welds for one penetration. In the area of
16A
        NDE, the NRC CAT reviewed the radiographs for 220 feet of welded
10A crack-like indication
        seam which involved 340 film. One radiographic examination proce-
16A
        dure was also reviewed as a part of the inspection. The drywell
4-5 crack-like indication
        wall was fabricated by Mississippi Valley Steel Company and the
P."
        field installation of the prefabricated assemblies was done by BA.
409.40
i       The drywell locks and hatches were installed by CB&I.
517-11-7
280 incomplete fusion
51-B-7
275 aligned indication
P.O. 409.44
C0 Vert.
4-5 I.F. porosity
!
c.
Conclusions
In general, the inspected welding and NDE activities were found to
4
comply with the requirements of the governing codes and
i
specifications.
However, the NRC CAT found spot radiographs which
did not meet the specified weld quality.
The welds were evaluated
by the applicant and determined to be adequate for the intended
application because every weld had passed magnetic particle and
vacuum box testing.
10.
Drywell Wall and Penetrations
;
a.
Inspection Scope
The NRC CAT visually inspected approximately 40 feet of drywell wall
seam and the attachment welds for one penetration.
In the area of
NDE, the NRC CAT reviewed the radiographs for 220 feet of welded
seam which involved 340 film.
One radiographic examination proce-
dure was also reviewed as a part of the inspection.
The drywell
wall was fabricated by Mississippi Valley Steel Company and the
field installation of the prefabricated assemblies was done by BA.
i
The drywell locks and hatches were installed by CB&I.
.
.
      b. Inspection Findings
b.
Inspection Findings
,
,
        No problems were identified in the inspected welding activities.
No problems were identified in the inspected welding activities.
j       However, during the review of radiographs, the NRC CAT inspectors
j
        identified three welds which did not have the specified weld
However, during the review of radiographs, the NRC CAT inspectors
        quality.   The three welds   and their associated deficiencies are
identified three welds which did not have the specified weld
        identified as follows:
quality.
                                      IV-10
The three welds and their associated deficiencies are
  -.                                             _ _ . - - .     ____ _ . -.           . .
identified as follows:
IV-10
-.
_ _ . - - .
____ _ . -.
.
.


    *
*
          Seam weld No. 16, station 12 located at elevation 707' to 737',
Seam weld No. 16, station 12 located at elevation 707' to 737',
          column 173 contained an unacceptable linear indication. The
column 173 contained an unacceptable linear indication.
          weld was fabricated by BA. NCR 32686 was generated as a
The
          result of this finding.
weld was fabricated by BA.
          Seam weld No. 30, film A-8, view F-G contained an unacceptable
NCR 32686 was generated as a
          insufficient fusion indication. The weld was fabricated by
result of this finding.
          Mississippi Valley Steel Company. NCR 32294 was generated
Seam weld No. 30, film A-8, view F-G contained an unacceptable
          as a result of this finding.
insufficient fusion indication.
          One weld for P.O. 9993.1 on drywell locks and hatches assembly
The weld was fabricated by
          1A, weld seam 1-5-4 to 1-5-1, view 0-1 R1 contained an
Mississippi Valley Steel Company.
          unacceptable crack-like indication near station mark 1.     The
NCR 32294 was generated
          original film was rejected for a linear indication near station
as a result of this finding.
          mark 0 which indicated that the repair film was reversed from
One weld for P.O. 9993.1 on drywell locks and hatches assembly
          the original film position. This reversal had prevented the
1A, weld seam 1-5-4 to 1-5-1, view 0-1 R1 contained an
          interpreter from detecting the crack-like indication because he
unacceptable crack-like indication near station mark 1.
          was looking at the wrong area. NCR 32597 was generated as a
The
          result of this finding.     The radiographs were supplied by CB&I.
original film was rejected for a linear indication near station
c. Conclusions
mark 0 which indicated that the repair film was reversed from
    In general, the inspected welding and NDE activities were found to
the original film position.
    comply with the governing codes and specifications. However, three
This reversal had prevented the
    welds were found to contain unacceptable indications. As a result
interpreter from detecting the crack-like indication because he
    of this finding, the applicant has issued NCRs and the welds will
was looking at the wrong area.
    be evaluated and repaired as needed.
NCR 32597 was generated as a
11. Vendors and Shop Fabricators Other Than Those Previously Addressed
result of this finding.
a. Inspection Scope
The radiographs were supplied by CB&I.
    The NRC CAT visually inspected six vendor supplied tanks and heat
c.
    exchangers. See Table IV-5 for inspected vendor supplied equipment.
Conclusions
    In addition to the welds inspected and listed in Table IV-5, the NRC
In general, the inspected welding and NDE activities were found to
    CAT inspectors reviewed radiographs related to work performed by 28
comply with the governing codes and specifications.
    vendors which have supplied various equipments and hardware to the
However, three
    Clinton Power Station project. A total of 347 feet of welded seam
welds were found to contain unacceptable indications.
    involving 472 radiographs and 91 welds involving 771 film were
As a result
    reviewed. The radiographs for 19 valves involving 408 film, and
of this finding, the applicant has issued NCRs and the welds will
    the radiographs for 15 spot welds involving 33 film were also
be evaluated and repaired as needed.
    reviewed for compliance with the governing codes and specifications.
11.
b. Inspection Findings
Vendors and Shop Fabricators Other Than Those Previously Addressed
    During the inspection of tanks and heat exchangers supplied by the
a.
    vendors listed in Table IV-5, the NRC CAT found that the size of
Inspection Scope
    the nozzle and manway weld reinforcement did not meet the
The NRC CAT visually inspected six vendor supplied tanks and heat
    requirements stated in the vendor drawings. In addition, the welds
exchangers.
    on some of the inspected supports were also found to be undersized.
See Table IV-5 for inspected vendor supplied equipment.
    A total of six tanks and heat exchangers were found to deviate from
In addition to the welds inspected and listed in Table IV-5, the NRC
    the required drawing sizes. As a result of these findings, the
CAT inspectors reviewed radiographs related to work performed by 28
    applicant issued NCRs and this item will be reviewed and disposi-
vendors which have supplied various equipments and hardware to the
    tioned by S&L. See Table IV-5 for details. The NRC has issued
Clinton Power Station project.
    Information Notice No. 85-33 on the subject of undersized weld
A total of 347 feet of welded seam
                                IV-11
involving 472 radiographs and 91 welds involving 771 film were
reviewed.
The radiographs for 19 valves involving 408 film, and
the radiographs for 15 spot welds involving 33 film were also
reviewed for compliance with the governing codes and specifications.
b.
Inspection Findings
During the inspection of tanks and heat exchangers supplied by the
vendors listed in Table IV-5, the NRC CAT found that the size of
the nozzle and manway weld reinforcement did not meet the
requirements stated in the vendor drawings.
In addition, the welds
on some of the inspected supports were also found to be undersized.
A total of six tanks and heat exchangers were found to deviate from
the required drawing sizes.
As a result of these findings, the
applicant issued NCRs and this item will be reviewed and disposi-
tioned by S&L.
See Table IV-5 for details.
The NRC has issued
Information Notice No. 85-33 on the subject of undersized weld
IV-11


-
-
    reinforcement in ASME Code nozzle to shell joints. As a result of
reinforcement in ASME Code nozzle to shell joints.
    this notice, prior to the NRC CAT arrival, the licensee had inspec-
As a result of
    ted the nozzle welds on ten pressure vessels and tanks. Nine of the
this notice, prior to the NRC CAT arrival, the licensee had inspec-
    items were found to have undersized weld reinforcements around the
ted the nozzle welds on ten pressure vessels and tanks.
    nozzles. By the end of the NRC CAT inspection of this area, the
Nine of the
    licensee had initiated a complete reinspection of tanks and pressure
items were found to have undersized weld reinforcements around the
    vessels supplied by CBI and RECO industries.
nozzles.
    In the area of NDE, the NRC CAT inspectors identified irregularities
By the end of the NRC CAT inspection of this area, the
    relating to NDE documentation and radiographs supplied by two
licensee had initiated a complete reinspection of tanks and pressure
    vendors.   See Table IV-6 for details.
vessels supplied by CBI and RECO industries.
  c. Conclusions
In the area of NDE, the NRC CAT inspectors identified irregularities
    In general, the inspected welding and NDE activities were found to
relating to NDE documentation and radiographs supplied by two
    comply with the requirements of the governing codes and specifica-
vendors.
    tions. However, six tanks and heat exchangers were found to deviate
See Table IV-6 for details.
    from the requirements stated in the applicable drawings and
c.
    specifications.   In addition, the radiographs and NDE documentation
Conclusions
    supplied by two vendors were found to be deficient with respect to
In general, the inspected welding and NDE activities were found to
    the required quality.
comply with the requirements of the governing codes and specifica-
                                IV-12
tions.
However, six tanks and heat exchangers were found to deviate
from the requirements stated in the applicable drawings and
specifications.
In addition, the radiographs and NDE documentation
supplied by two vendors were found to be deficient with respect to
the required quality.
IV-12


                    .   .                   .     . - -       ..
.
                                    TABLE IV-1
.
                      LIST OF SUPPORTS WHICH WERE INSPECTED
.
                          AGAINST ORAWING REQUIREMENTS
. - -
  IMS280095 (1)               1MS28012C                   1RB21572R
..
  IMS860015                   1HP08009X (2)               ISX45003X (3)
TABLE IV-1
  1FC03091X (4)               1FC03002R (5)               1HP04019R
LIST OF SUPPORTS WHICH WERE INSPECTED
  1HP04005R (6)               1HP03042S                   1RH20007X
AGAINST ORAWING REQUIREMENTS
  1RH19002X                   1RH07004X (7)               1RH07003S
IMS280095 (1)
  1RH16036X                   1RH090895                   1LP03016S
1MS28012C
  1FB15018G*                 ILP04003R                   1R114019R
1RB21572R
  1RH09011R (8)               1MS07002G (10)             1RH04051R (9)
IMS860015
  1RH04035X                   1RH04042X (11)             IIA 16002G
1HP08009X (2)
  ISC01020R                   1RT03032R                   1RT11047X
ISX45003X (3)
  1RB13542G (12)             1MS27012S (Partial)         1MS63001G
1FC03091X (4)
  1FWO1008G                   1MS86001S                   1MS860105
1FC03002R (5)
  ISX30003V                   1HP03042S (13)             1RH090875 (14)
1HP04019R
  IMS86007V                   1MS86010X                   CLN-021-SP11 (17)
1HP04005R (6)
  CLN-021-SP16               ISX-01028R                 ISX-01017R
1HP03042S
  ISX-01050X                 1RH47013G*                 H-1RH-780-4* (15)
1RH20007X
  ISX42021R* (16)             ISX42019R*                 1RH34010X*
1RH19002X
  1RH71018G*                 1RH71016G*                 1SX52022X*
1RH07004X (7)
  1SC01020R*                 1RB22056G*
1RH07003S
  NOTES:
1RH16036X
                                                                                            ,
1RH090895
  1.  One fillet 1/32" undersized for full length due to member size.        NCR 31498.
1LP03016S
1FB15018G*
ILP04003R
1R114019R
1RH09011R (8)
1MS07002G (10)
1RH04051R (9)
1RH04035X
1RH04042X (11)
IIA 16002G
ISC01020R
1RT03032R
1RT11047X
1RB13542G (12)
1MS27012S (Partial)
1MS63001G
1FWO1008G
1MS86001S
1MS860105
ISX30003V
1HP03042S (13)
1RH090875 (14)
IMS86007V
1MS86010X
CLN-021-SP11 (17)
CLN-021-SP16
ISX-01028R
ISX-01017R
ISX-01050X
1RH47013G*
H-1RH-780-4* (15)
ISX42021R* (16)
ISX42019R*
1RH34010X*
1RH71018G*
1RH71016G*
1SX52022X*
1SC01020R*
1RB22056G*
NOTES:
,
,
  2. Two fillet welds undersized by 1/16".     NCR 31499.
1.
One fillet 1/32" undersized for full length due to member size.
NCR 31498.
,
2.
Two fillet welds undersized by 1/16".
NCR 31499.
l
l
I
I
  3. Two skewed fillet welds undersized by 1/16" for full length.         NCR 31497.
3.
Two skewed fillet welds undersized by 1/16" for full length.
NCR 31497.
!
!
!
!                                        IV-13
IV-13
!
!
i
i
                -_                     .- .               _ -                         ---
-_
.- .
_ -
---


  ._
._
                                                                                      .
.
                                TABLE IV-1 (Continued)
TABLE IV-1 (Continued)
                        LIST OF SUPPORTS WHICH WERE INSPECTED
LIST OF SUPPORTS WHICH WERE INSPECTED
                            AGAINST DRAWING REQUIREMENTS
AGAINST DRAWING REQUIREMENTS
.
.
      4. Two fillet welds 1/32" undersized.   NCR 31493.
4.
      5. One fillet weld 3/4" undersized for full length.     NCR 31496.
Two fillet welds 1/32" undersized.
      6. Two 1/4" fillet welds 3/32" undersized due to fit-up gap.
NCR 31493.
          NCR 31495.
5.
      7. One fillet weld 1/16" undersized.   NCR 31494.
One fillet weld 3/4" undersized for full length.
                                                                                          ,
NCR 31496.
      8. Four obtuse angle skewed welds and one right fillet weld undersized for
6.
          full length 1/16".   NCR 31542.
Two 1/4" fillet welds 3/32" undersized due to fit-up gap.
      9. Nineteen of 79 fillet welds 1/32" undersized.     NCR 31572.
NCR 31495.
    10. One fillet weld undersized by 1/16".     NCR 31541.
7.
    11. Obtuse angle fillet weld 3/32" undersized.     NCR 31574.
One fillet weld 1/16" undersized.
    12. Obtuse angle fillet weld 1/8" undersized due to too small attaching plate.
NCR 31494.
          NCR 31573.
,
    13. Three fillet welds 1/16" undersized.
8.
    14. Two obtuse angle fillet welds 1/8" undersized.     NCR 31611.
Four obtuse angle skewed welds and one right fillet weld undersized for
    15. Weld surface has overlap and lack of fusion.     NCR 31604 and NCR 31615.
full length 1/16".
    16. Undercut in excess of 1/32" in two places, unspecified welding across flange.
NCR 31542.
          NCR 31599.
9.
    17. Obtuse angle fillet weld undersized.   NCR CRD-186-48 (RCI work)
Nineteen of 79 fillet welds 1/32" undersized.
    *These items were subjected to Overinspection by Illinois Power QA.
NCR 31572.
                                        IV-14
10. One fillet weld undersized by 1/16".
                                                                                    -  _
NCR 31541.
                        ._       _         _     _  _.                 . _ . . _
11.
Obtuse angle fillet weld 3/32" undersized.
NCR 31574.
12.
Obtuse angle fillet weld 1/8" undersized due to too small attaching plate.
NCR 31573.
13.
Three fillet welds 1/16" undersized.
14.
Two obtuse angle fillet welds 1/8" undersized.
NCR 31611.
15. Weld surface has overlap and lack of fusion.
NCR 31604 and NCR 31615.
16.
Undercut in excess of 1/32" in two places, unspecified welding across flange.
NCR 31599.
17.
Obtuse angle fillet weld undersized.
NCR CRD-186-48 (RCI work)
*These items were subjected to Overinspection by Illinois Power QA.
IV-14
._
_
_
_
_.
. _ . . _
-
_


    _               _       ._
_
                                          _ _ _ - _ _ _ _ _ _ _ _ _ -                       -
_
._
_ _ _ - _ _ _ _ _ _ _ _ _ -
-
!
!
l
l
Line 3,345: Line 5,483:
!
!
!
!
                                                                      TABLE IV-2
TABLE IV-2
            LIST OF SUPPORTS WHICH WERE SUBJECTED TO VISUAL INSPECTION ONLY
LIST OF SUPPORTS WHICH WERE SUBJECTED TO VISUAL INSPECTION ONLY
      1RB22144G                           1CC50041G                             1RB22111G
1RB22144G
                                                                                              l
1CC50041G
      1FWO30115                           1RB22106G                             IIA 16002G   i
1RB22111G
      1RIl00095                           1RB22056G                             1RF07001G
l
      ILP09005G                           1RH40011X                             1RH40013G
1FWO30115
      1FB15015G                           1FB15006G                             1FB15008G
1RB22106G
      1FB15018
IIA 16002G
                                                                                              1
i
                                                                        IV-15
1RIl00095
  .
1RB22056G
            .
1RF07001G
                          _ _ _ _ _ - - _
ILP09005G
1RH40011X
1RH40013G
1FB15015G
1FB15006G
1FB15008G
1FB15018
1
IV-15
.
.
_ _ _ _ _ - - _


                                                                      _ _ _ _ ___ _ _ _ _       __      _-_
_ _ _ _ ___ _ _ _ _
e                                                TABLE IV-3
_-_
              LIST OF PIPING WHICH WAS SUBJECTED TO VISUAL INSPECTION ONLY
__
  Item                       Description             Pipe Size (in.)                         Material
TABLE IV-3
  G003-A-1                 Main Steam                       24                         Carbon Steel       i
e
  10C-21-1                 Component Cooling               10, 12                       Carbon Steel
LIST OF PIPING WHICH WAS SUBJECTED TO VISUAL INSPECTION ONLY
  1RH-16-1                 Residual Heat Removal             12                         Carbon Steel
Item
  1SX-15-3                 Shutdown Service Water           18                         Carbon Steel
Description
  1FC-12-8                 Fuel Pool Cooling                 14                         Stainless Steel
Pipe Size (in.)
  1FC-30-5                 Fuel Pool Cooling                 8                         Stainless Steel
Material
  1FC-30-14                 Fuel Pool Cooling                 14                         Stainless Steel
G003-A-1
  1RH-8-7 (1)               Residual Heat Removal             24                         Carbon Steel
Main Steam
  1RH-8-8                   Residual Heat Removal             24                         Carbon Steel
24
  1RH-8-9                   Residual Heat Removal             24                         Carbon Steel
Carbon Steel
  1RH-26-8                 Residual Heat Removal             4                         Carbon Steel
i
  1RH-26-5                 Residual Heat Removal             18                         Carbon Steel
10C-21-1
  1SX-17-11                 Shutdown Service Water           18, 24                       Carbon Steel
Component Cooling
  1SX-2-2                   Shutdown Service Water             12                         Carbon Steel
10, 12
  1RI-13-3ZA               Reactor Isolation                   4                       Carbon Steel
Carbon Steel
  1RI-13-3ZB               Reactor Isolatinn                   4                       Carbon Steel
1RH-16-1
  1RI-13-5B                 Reactor Isolation                   4                       Carbon Steel
Residual Heat Removal
  1RI-13-6                 Reactor Isolation                     t                       Carbon Steel
12
  1RI-13-7                 Reactor Isolation                   4                       Carbon Steel
Carbon Steel
  1RI-13-8                 Reactor Isolation                   4                       Carbon Steel
1SX-15-3
                                                    IV-16
Shutdown Service Water
                . _ _ _ ___
18
Carbon Steel
1FC-12-8
Fuel Pool Cooling
14
Stainless Steel
1FC-30-5
Fuel Pool Cooling
8
Stainless Steel
1FC-30-14
Fuel Pool Cooling
14
Stainless Steel
1RH-8-7 (1)
Residual Heat Removal
24
Carbon Steel
1RH-8-8
Residual Heat Removal
24
Carbon Steel
1RH-8-9
Residual Heat Removal
24
Carbon Steel
1RH-26-8
Residual Heat Removal
4
Carbon Steel
1RH-26-5
Residual Heat Removal
18
Carbon Steel
1SX-17-11
Shutdown Service Water
18, 24
Carbon Steel
1SX-2-2
Shutdown Service Water
12
Carbon Steel
1RI-13-3ZA
Reactor Isolation
4
Carbon Steel
1RI-13-3ZB
Reactor Isolatinn
4
Carbon Steel
1RI-13-5B
Reactor Isolation
4
Carbon Steel
1RI-13-6
Reactor Isolation
t
Carbon Steel
1RI-13-7
Reactor Isolation
4
Carbon Steel
1RI-13-8
Reactor Isolation
4
Carbon Steel
IV-16
. _ _ _ ___


  _.                                                                 . _ _ - _ _ - _ _ _ _ _ _ _ _ _     ____
_.
                                                                TABLE IV-4
. _ _ - _ _ - _ _ _ _ _ _ _ _ _
                          PORTIONS OF PIPING SYSTEMS VISUALLY EXAMINED AND
____
                                                  FOR WHICH DOCUMENTATION WAS REVIEWED
TABLE IV-4
          Item         Description                                       Pipe Size (in.)                     Material
PORTIONS OF PIPING SYSTEMS VISUALLY EXAMINED AND
          G003-A-1     Main Steam                                                                     24     Carbon Steel
FOR WHICH DOCUMENTATION WAS REVIEWED
          G004-A-1     Main Steam                                                                     24     Carbon Steel
Item
          G005-A-1     Main Steam                                                                     24     Carbon Steel ;
Description
l         1RI-13-9     Reactor Isolation                                                               4     Carbon Steel
Pipe Size (in.)
          1RI-13-7A   Reactor Isolation                                                               4     Carbon Steel
Material
          1RI-13-4ZA   Reactor Isolation                                                               4     Carbon Steel
G003-A-1
          1RI-13-4ZB   Reactor Isolation                                                               4     Carbon Steel l
Main Steam
          1RI-13-5AA   Reactor Isolation                                                               4     Carbon Steel j
24
          1RI-13-4A   Reactor Isolation                                                               4     Carbon Steel l
Carbon Steel
          1RI-13-6B   Reactor Isolation                                                               4     Carbon Steel
G004-A-1
          1FW-1-1     Feedwater                                                                       20     Carbon Steel
Main Steam
          1FW-1-2     Feedwater                                                                       18     Carbon Steel
24
          1FW-1-3     Feedwater                                                                       12     Carbon Steel
Carbon Steel
G005-A-1
Main Steam
24
Carbon Steel
;
l
1RI-13-9
Reactor Isolation
4
Carbon Steel
1RI-13-7A
Reactor Isolation
4
Carbon Steel
1RI-13-4ZA
Reactor Isolation
4
Carbon Steel
1RI-13-4ZB
Reactor Isolation
4
Carbon Steel
l
1RI-13-5AA
Reactor Isolation
4
Carbon Steel
j
1RI-13-4A
Reactor Isolation
4
Carbon Steel
l
1RI-13-6B
Reactor Isolation
4
Carbon Steel
1FW-1-1
Feedwater
20
Carbon Steel
1FW-1-2
Feedwater
18
Carbon Steel
1FW-1-3
Feedwater
12
Carbon Steel
i
i
          1FW-1-4     Feedwater                                                                       12     Carbon Steel
1FW-1-4
          1FW-1-5     Feedwater                                                                       12     Carbon Steel
Feedwater
          1FW-1-6     Feedwater                                                                       12     Carbon Steel
12
l         1FW-1-7     Feedwater                                                                       12     Carbon Steel
Carbon Steel
          1FW-1-8Z     Feedwater                                                                       20     Carbon Steel
1FW-1-5
          1FW-1-1A     Feedwater                                                                     Lugs     Carbon Steel
Feedwater
          1FW-1-1B     Feedwater                                                                     Lugs     Carbon Steel
12
          1FW-1-7J     Feedwater                                                                     Lugs     Carbon Steel
Carbon Steel
          1FW-1-7K     Feedwater                                                                     Lugs     Carbon Steel
1FW-1-6
          IFW-1-7L     Feedwater                                                                     Lugs     Carbon Steel
Feedwater
          1FW-1-7M     Feedwater                                                                     Lugs     Carbon Steel
12
                                                                  IV-17
Carbon Steel
    . ..       ..
l
                    .
1FW-1-7
                              _ _ _ _ _ _ _ _ _ _ _ _ . .
Feedwater
12
Carbon Steel
1FW-1-8Z
Feedwater
20
Carbon Steel
1FW-1-1A
Feedwater
Lugs
Carbon Steel
1FW-1-1B
Feedwater
Lugs
Carbon Steel
1FW-1-7J
Feedwater
Lugs
Carbon Steel
1FW-1-7K
Feedwater
Lugs
Carbon Steel
IFW-1-7L
Feedwater
Lugs
Carbon Steel
1FW-1-7M
Feedwater
Lugs
Carbon Steel
IV-17
. ..
..
.
_ _ _ _ _ _ _ _ _ _ _ _ . .


c
c
                                          TABLE IV-5
TABLE IV-5
-
VENDOR SUPPLIED TANKS AND HEAT EXCHANGERS
                        VENDOR SUPPLIED TANKS AND HEAT EXCHANGERS
-
                                WHICH WERE VISUALLY INSPECTED
WHICH WERE VISUALLY INSPECTED
                  ITEM                                     MANUFACTURER
ITEM
  Standby Liquid Control Tank 1C41-A001 (1)             Boeing Corporation
MANUFACTURER
  Fuel Oil Storage Tank 10001TC (2)                     RECO Industries, Inc.
Standby Liquid Control Tank 1C41-A001 (1)
  Fuel Oil Day Tank 1DG01TC (3)                         RECO Industries, Inc.
Boeing Corporation
  Accumulator Tank 1821-A003E (4)                       RECO Industries, Inc.
Fuel Oil Storage Tank 10001TC (2)
  Fuel Pool Cooling Heat Exchanger 1FC01AA (5)         Yuba Heat Exchanger Corp.
RECO Industries, Inc.
  Fuel Oil Storage Tank 1D001TA (6)                     CB&I Corporation
Fuel Oil Day Tank 1DG01TC (3)
  NOTES:
RECO Industries, Inc.
          (1) Five nozzle reinforcing fillet welds undersized.     NCR 32365.
Accumulator Tank 1821-A003E (4)
          (2) One nozzle reinforcing fillet weld and support fillet welds undersized.
RECO Industries, Inc.
                NCR 32364.
Fuel Pool Cooling Heat Exchanger 1FC01AA (5)
          (3) Undersized fillet welds on supports.     NCR 32363
Yuba Heat Exchanger Corp.
          (4) Two nozzle reinforcing fillet welds and support welds undersized.
Fuel Oil Storage Tank 1D001TA (6)
                NCR 32361.
CB&I Corporation
          (5) One nozzle reinforcing fillet weld undersized due to overgrinding, and
NOTES:
                support fillet welds undersized.   NCR 32362.
(1) Five nozzle reinforcing fillet welds undersized.
          (6) Nine nozzle reinforcing fillet welds undersized, manway reinforcing fillet
NCR 32365.
                welds undersized, support fillet welds undersized, head-to-shell mismatch in
(2) One nozzle reinforcing fillet weld and support fillet welds undersized.
                excess of that permitted by the Code and weld surface quality
NCR 32364.
                unacceptable.   NCR 32573.
(3) Undersized fillet welds on supports.
                                                                                            l
NCR 32363
                                            IV-18
(4) Two nozzle reinforcing fillet welds and support welds undersized.
NCR 32361.
(5) One nozzle reinforcing fillet weld undersized due to overgrinding, and
support fillet welds undersized.
NCR 32362.
(6) Nine nozzle reinforcing fillet welds undersized, manway reinforcing fillet
welds undersized, support fillet welds undersized, head-to-shell mismatch in
excess of that permitted by the Code and weld surface quality
unacceptable.
NCR 32573.
IV-18


                                      TABLE IV-6
TABLE IV-6
                              VENDOR RADIOGRAPHS REVIEWED
VENDOR RADIOGRAPHS REVIEWED
                                    Valve     Spot       Feet of
Valve
  Contractor             Welds     Pumps     Welds       Welds Film Notes
Spot
  General Electric         20                                     450
Feet of
  Yuba Heat Transfer                                       30     60
Contractor
  Progressive Fabricating                                   40   105
Welds
  RECO Industries         26                                     32
Pumps
  Pathway                                                   36     52
Welds
  Harnischfeger                                             16     12
Welds
  Anchor / Darling                     5                         160 (1)
Film
  Rockwell                 2                                     14
Notes
  Lakeside Bridge                                           22     54 (2)
General Electric
  & Steel
20
  Carrier                                                   6     9
450
  La Barge                                                 45     37
Yuba Heat Transfer
  Southern Boiler                                           15     10
30
  Tube Turns               6                                     12
60
  Fisher Controls                     2                           44
Progressive Fabricating
  Spencer Turbine Co.                                       13     22
40
  Chicago Tube and Iron     4                                     32
105
  Nooter                                         15               33
RECO Industries
  Guyon Alloys             6                                       9
26
  HUB                       1                                       2
32
  Gould                               2                           53
Pathway
  Atomic International     6                                     63
36
  Metal Bellows           10                                     68
52
  Steward and Stevenson                                     40     32
Harnischfeger
16
12
Anchor / Darling
5
160
(1)
Rockwell
2
14
Lakeside Bridge
22
54
(2)
& Steel
Carrier
6
9
La Barge
45
37
Southern Boiler
15
10
Tube Turns
6
12
Fisher Controls
2
44
Spencer Turbine Co.
13
22
Chicago Tube and Iron
4
32
Nooter
15
33
Guyon Alloys
6
9
HUB
1
2
Gould
2
53
Atomic International
6
63
Metal Bellows
10
68
Steward and Stevenson
40
32
'
'
                                        IV-19
IV-19
                                                                              !
ll
                                                                              l
                                                                            ll


                          .   _
.
                                                              -
_
                                  TABLE IV-6 (Continued)
-
                                VENDOR RADIOGRAPHS REVIEWED
TABLE IV-6 (Continued)
                                            Valve     Spot     Feet of
VENDOR RADIOGRAPHS REVIEWED
Contractor                 Welds           Pumps     Welds     Welds Film       Notes
Valve
Posi Seal                                     7                       106
Spot
W. J. Wooley                                                     12       19
Feet of
G. W. Taylor                                                     52     40
Contractor
Bingham-Willamette                             3                         45
Welds
Trent Tube                                                       30       20
Pumps
Welds
Welds
Film
Notes
Posi Seal
7
106
W. J. Wooley
12
19
G. W. Taylor
52
40
Bingham-Willamette
3
45
Trent Tube
30
20
NOTES:
NOTES:
(1) Film stuck together indicating that film was improperly packaged.
(1) Film stuck together indicating that film was improperly packaged.
(2) Reader sheet for piece mark 2-1-1 showed rejections for cracks and other
(2) Reader sheet for piece mark 2-1-1 showed rejections for cracks and other
      indications. The original film also showed rejections. The final acceptable
indications.
      film was not identifiable as being of the same area. Further investigation
The original film also showed rejections.
      indicated that a slot in the area of interest was welded, ground smooth and
The final acceptable
      re-radiographed. The final radiographs were identified and determined to be
film was not identifiable as being of the same area.
      acceptable.
Further investigation
                                                IV-20
indicated that a slot in the area of interest was welded, ground smooth and
            .-                 -   _ _ _ .       -   - - .           . . . ._ .       --
re-radiographed.
The final radiographs were identified and determined to be
acceptable.
IV-20
.-
-
_ _ _ .
-
- - .
. . .
._ .
--


                                                                                  l
V.
V. CIVIL AND STRUCTURAL CONSTRUCTION
CIVIL AND STRUCTURAL CONSTRUCTION
  A.   Objective
A.
        The objective of the appraisal of civil and structural construction was
Objective
        to determine by evaluation and review of Quality Control (QC) accepted
The objective of the appraisal of civil and structural construction was
        work and documentation whether civil and structural construction areas
to determine by evaluation and review of Quality Control (QC) accepted
        were completed in accordance with regulatory requirements, Safety
work and documentation whether civil and structural construction areas
        Analysis Report commitments, and project specifications, drawings and
were completed in accordance with regulatory requirements, Safety
        procedures.
Analysis Report commitments, and project specifications, drawings and
  B.   Discussion
procedures.
        The specific areas of civil and structural construction evaluated were
B.
        concrete, reinforcing steel configuration, cadwelds, structural steel
Discussion
        installation, high strength bolting, structural fill, and diesel genera-
The specific areas of civil and structural construction evaluated were
        tor exhaust silencer supports. A major part of the installed structural
concrete, reinforcing steel configuration, cadwelds, structural steel
        steel inspection sample was previously inspected by the Illinois Power
installation, high strength bolting, structural fill, and diesel genera-
        Overinspection (IPOI) Program.
tor exhaust silencer supports.
        For concrete, reinforcing steel configuration, structural steel install-
A major part of the installed structural
        ation, high strength bolting, und diesel generator exhaust silencers,
steel inspection sample was previously inspected by the Illinois Power
        a physical or hardware inspection and a QC documentation and field
Overinspection (IPOI) Program.
        procedures review were conducted. For cadwelds, concrete pours, and
For concrete, reinforcing steel configuration, structural steel install-
        structural fill, a review of QC documentation and field procedures was
ation, high strength bolting, und diesel generator exhaust silencers,
        performed.
a physical or hardware inspection and a QC documentation and field
        1.   Reinforced Concrete Construction
procedures review were conducted.
        a.   Inspection Scope
For cadwelds, concrete pours, and
            Reinforced concrete construction areas inspected by the NRC
structural fill, a review of QC documentation and field procedures was
            Construction Appraisal Team (CAT) included reinforcing steel
performed.
            configuration, activities for a concrete placement, and general
1.
            concrete surface quality.     These areas were checked for conformance
Reinforced Concrete Construction
            with Sargent and Lundy Engineers (S&L) design drawings and specifi-
a.
            cations. General concrete quality was examined from surrounding
Inspection Scope
            areas of completed concrete construction for conformance to site
Reinforced concrete construction areas inspected by the NRC
            specifications.
Construction Appraisal Team (CAT) included reinforcing steel
            For the reinforcing steel configuration inspection, the upper layers
configuration, activities for a concrete placement, and general
            of exposed rebar projecting from the east face of the base mat along
concrete surface quality.
            plant wall lines 200 and 202 and between the D wall line and the
These areas were checked for conformance
            south exterior wall line of the Diesel Generator Building wall were
with Sargent and Lundy Engineers (S&L) design drawings and specifi-
            reviewed for conformance to applicable drawings and specifications.
cations.
            One in process concrete placement for the personnel access hatch
General concrete quality was examined from surrounding
            door to the drywell was observed by the NRC CAT. These observations
areas of completed concrete construction for conformance to site
            occured from the time of mixing of the concrete at the site batch
specifications.
            plant to completion of the placement of the concrete in the steel
For the reinforcing steel configuration inspection, the upper layers
            formwork. Observations were made for slump tests, length of time
of exposed rebar projecting from the east face of the base mat along
            required for concrete placement, and preparation of concrete
plant wall lines 200 and 202 and between the D wall line and the
            cylinder test specimens.
south exterior wall line of the Diesel Generator Building wall were
                                        V-1
reviewed for conformance to applicable drawings and specifications.
One in process concrete placement for the personnel access hatch
door to the drywell was observed by the NRC CAT.
These observations
occured from the time of mixing of the concrete at the site batch
plant to completion of the placement of the concrete in the steel
formwork.
Observations were made for slump tests, length of time
required for concrete placement, and preparation of concrete
cylinder test specimens.
V-1
_ _ _ .


                                .
.
  QC documentation and appropriate field procedures were reviewed for
QC documentation and appropriate field procedures were reviewed for
  six concrete pour travelers and three cadweld travelers.
six concrete pour travelers and three cadweld travelers.
  The QC documentation reviewed for six concrete pour travelers and
The QC documentation reviewed for six concrete pour travelers and
  associated concrete pour package numbers are given in Table V-1.
associated concrete pour package numbers are given in Table V-1.
  Records reviewed and associated with the concrete placements
Records reviewed and associated with the concrete placements
  included concrete pour pre placement checklist, concrete pour
included concrete pour pre placement checklist, concrete pour
  placement and testing checklist, and report of concrete cylinders.
placement and testing checklist, and report of concrete cylinders.
  The reviews checked the forms for adequate completion by the QC
The reviews checked the forms for adequate completion by the QC
  inspectors, the existence of senior QC inspectors' signature for
inspectors, the existence of senior QC inspectors' signature for
  evaluation of completed forms, and acceptable coverage of attributes
evaluation of completed forms, and acceptable coverage of attributes
  by the documentation.
by the documentation.
  For the cadweld QC documentation and field procedures review, the
For the cadweld QC documentation and field procedures review, the
  following cadweld travelers were covered: CCW No. 1, CCW No. 2 and
following cadweld travelers were covered:
  CCW No. 3. Records were reviewed to identify whether the cadweld
CCW No. 1, CCW No. 2 and
  work was properly inspected before and after each cadweld was
CCW No. 3.
  performed and whether each cadwelder was adequately tested. In
Records were reviewed to identify whether the cadweld
  addition, the qualification records for 10 cadwelders (operator ID
work was properly inspected before and after each cadweld was
  Nos. 6, 15, 16, 17, 19, 20, 27, 30, 46, 48) in cadweld traveler CCW
performed and whether each cadwelder was adequately tested.
  No. 1 were reviewed to determine if they were properly qualified to
In
  perform cadwelds of each splice position, bar size and grade.
addition, the qualification records for 10 cadwelders (operator ID
  The requirements and acceptance criteria for reinforced concrete
Nos. 6, 15, 16, 17, 19, 20, 27, 30, 46, 48) in cadweld traveler CCW
  construction were obtained from the drawings listed in Table V-2 and
No. 1 were reviewed to determine if they were properly qualified to
  the following specifications and procedures:
perform cadwelds of each splice position, bar size and grade.
        S&L Specification K-2938, " Concrete Mix Design," Rev. 3, dated
The requirements and acceptance criteria for reinforced concrete
        April 14, 1981
construction were obtained from the drawings listed in Table V-2 and
        S&L Specification K-2944, " Concrete and Grout Work," Rev. 26,
the following specifications and procedures:
        dated July 13, 1984
S&L Specification K-2938, " Concrete Mix Design," Rev. 3, dated
        Baldwin Associates Project Procedure BAP 3.1.1, " Concrete,"
April 14, 1981
        Rev. 13, dated October 3, 1984
S&L Specification K-2944, " Concrete and Grout Work," Rev. 26,
        BAP 3.1.5, "Embedments/ Reinforcing Steel /Cadwelding," Rev. 10,
dated July 13, 1984
        October 3, 1984
Baldwin Associates Project Procedure BAP 3.1.1, " Concrete,"
b. Inspection Findings
Rev. 13, dated October 3, 1984
  Two areas were identified by the NRC CAT where the concrete place-
BAP 3.1.5, "Embedments/ Reinforcing Steel /Cadwelding," Rev. 10,
  ments did not meet site criteria in the AD wall line at elevation
October 3, 1984
  724'. Debris and rags were found embedded in the wall. It was also
b.
  identified that the 2-inch shake space between the containment and
Inspection Findings
  the adjacent structures had been violated.     Two areas were identi-
Two areas were identified by the NRC CAT where the concrete place-
  fied by the NRC CAT inspectors where concrete had encroached into     .
ments did not meet site criteria in the AD wall line at elevation
                                                                          '
724'.
  the 2-inch shake space between the containment and the adjacent
Debris and rags were found embedded in the wall.
  structures.   The licensee reinspected the rest of the shake space
It was also
  and identified 26 additional locations where the 2-inch shake space   l
identified that the 2-inch shake space between the containment and
  clearance requirements had not been met. Nonconformance Report
the adjacent structures had been violated.
  (NCR) 31579 was issued on this deficiency.
Two areas were identi-
                                                                          l
fied by the NRC CAT inspectors where concrete had encroached into
  The six concrete pour travelers were found to meet procedure           !
.
  requirements and demonstrate proper QC inspection.
'
                                V-2
the 2-inch shake space between the containment and the adjacent
                                                -
structures.
The licensee reinspected the rest of the shake space
and identified 26 additional locations where the 2-inch shake space
clearance requirements had not been met.
Nonconformance Report
(NCR) 31579 was issued on this deficiency.
l
The six concrete pour travelers were found to meet procedure
requirements and demonstrate proper QC inspection.
V-2
-


In the top steel reinforcement of the concrete base mat on the 200
In the top steel reinforcement of the concrete base mat on the 200
line and 202 line, one area was identified where the number and
line and 202 line, one area was identified where the number and
spacing of the rebar were not in accordance with the design drawing,
spacing of the rebar were not in accordance with the design drawing,
but were in accordance with the shop drawings approved by S&L. NCR
but were in accordance with the shop drawings approved by S&L.
NCR
31949 was written and the condition was evaluated and accepted by
31949 was written and the condition was evaluated and accepted by
S&L.
S&L.
Visual inspection ,equirements before and after the cadwelds were
Visual inspection ,equirements before and after the cadwelds were
performed were met. The 10 cadwelders reviewed for qualification
performed were met.
The 10 cadwelders reviewed for qualification
requirements were found to be properly qualified for cadwelding
requirements were found to be properly qualified for cadwelding
the appropriate bar size and grade and splice positions.
the appropriate bar size and grade and splice positions.
Line 3,616: Line 6,033:
reviewed. One discrepancy was a noncompliance with the cadweld
reviewed. One discrepancy was a noncompliance with the cadweld
tensile testing requirements in the Final Safety Analysis Report
tensile testing requirements in the Final Safety Analysis Report
(FSAR) and specifications. Appendix B, paragraph B.2.3.4 of the
(FSAR) and specifications.
Appendix B, paragraph B.2.3.4 of the
FSAR states "Sg srate sampling and testing cycles were established
FSAR states "Sg srate sampling and testing cycles were established
for cadweld oplices in horizontal, vertical, and diagonal bars, for
for cadweld oplices in horizontal, vertical, and diagonal bars, for
Line 3,624: Line 6,042:
grade for each shift (instead of for each cadweld operator).
grade for each shift (instead of for each cadweld operator).
This discrepancy was previously identified by Baldwin Associates
This discrepancy was previously identified by Baldwin Associates
(BA) in NCR 31282 written on May 18, 1985. The S&L disposition for
(BA) in NCR 31282 written on May 18, 1985.
The S&L disposition for
NCR 31282 was to use-as-is because the specification requirements
NCR 31282 was to use-as-is because the specification requirements
had been met.   However, the NRC CAT does not consider that the
had been met.
However, the NRC CAT does not consider that the
requirements of Paragraph 4.4.1(a) of the mechanical splice speci-
requirements of Paragraph 4.4.1(a) of the mechanical splice speci-
fication were met. The same sampling plan is provided in the FSAR.
fication were met.
The same sampling plan is provided in the FSAR.
It appeared that S&L's resolution was based on a general observation
It appeared that S&L's resolution was based on a general observation
of the records and not a complete review of the records.     Therefore,
of the records and not a complete review of the records.
Therefore,
the disposition of NCR 31282 is considered inadequate.
the disposition of NCR 31282 is considered inadequate.
The concern of the NRC CAT with this discrepancy is that one or more
The concern of the NRC CAT with this discrepancy is that one or more
Line 3,636: Line 6,058:
Since the cadweld tensile test sampling schedule was based on each
Since the cadweld tensile test sampling schedule was based on each
shift, rather than individual cadwelders, there could be deviations
shift, rather than individual cadwelders, there could be deviations
from the required testing frequency stated in the FSAR. The FSAR
from the required testing frequency stated in the FSAR.
The FSAR
requirements in Appendix B, paragraph B.2.3.4 for tensile testing
requirements in Appendix B, paragraph B.2.3.4 for tensile testing
frequency for each operator states:
frequency for each operator states:
      Separate sampling and testing cycles were established... for
Separate sampling and testing cycles were established... for
      each splicing operator as follows:
each splicing operator as follows:
      a. One production splice out of the first ten splices
a.
      b. one production and three sister splices for the next 90
One production splice out of the first ten splices
          production splices, and
b.
      c. one splice, either production or sister splices for the
one production and three sister splices for the next 90
          next subsequent units of 33 splices.   At least 1/4 of the
production splices, and
          tested number of splices tested were production splices.
c.
                            V-3
one splice, either production or sister splices for the
next subsequent units of 33 splices.
At least 1/4 of the
tested number of splices tested were production splices.
V-3


  The cadweld records do not easily permit a reconstruction of the
The cadweld records do not easily permit a reconstruction of the
  testing information to determine if the testing requirements were
testing information to determine if the testing requirements were
  met. However, a tabulation was made of the tensile testing
met.
  frequency for production splices of the three cadweld travelers
However, a tabulation was made of the tensile testing
  reviewed by the NRC CAT. Results of the tabulation are shown in
frequency for production splices of the three cadweld travelers
  Table V-3a and V-3b.
reviewed by the NRC CAT.
  Table V-3a shows four operators (I.D. Nos. 6, 16, 20, 30) whose
Results of the tabulation are shown in
  sampling did not meet the requirements of one production splice out
Table V-3a and V-3b.
  of the first ten splices. Table V-3b shows 13 additional operators
Table V-3a shows four operators (I.D. Nos. 6, 16, 20, 30) whose
  (I.D. Nos. 28, 35, 38, 45, 48, 49, 50, 51, 61, 62, 67, 68, 72) whose
sampling did not meet the requirements of one production splice out
  sampling did not meet the testing requirements.
of the first ten splices.
  The other discrepancy was found in the Cadweld Test Cycle Log. The
Table V-3b shows 13 additional operators
  Cadweld Test Cycle Log was to record the sequential order in which
(I.D. Nos. 28, 35, 38, 45, 48, 49, 50, 51, 61, 62, 67, 68, 72) whose
  the cadwelds were performed. However, numerous instances were found
sampling did not meet the testing requirements.
  where cadwelds were not in sequential order. Table V-4 shows
The other discrepancy was found in the Cadweld Test Cycle Log.
  numerous cadweld sequential discrepancies based on the dates
The
  obtained from the cadweld inspection check-off sheets for 17 Cadweld
Cadweld Test Cycle Log was to record the sequential order in which
  Test Cycle Log sheets. The remaining Cadweld Test Cycle Log sheets
the cadwelds were performed.
  contain over 20 other instances of improper ordering of cadweld
However, numerous instances were found
  production splices.
where cadwelds were not in sequential order.
c. Conclusion
Table V-4 shows
  The general concrete construction quality seems adequate. QC
numerous cadweld sequential discrepancies based on the dates
  documentation in the completed concrete pour travelers appeared
obtained from the cadweld inspection check-off sheets for 17 Cadweld
  adequate.   Procedures followed by site craft for the single
Test Cycle Log sheets.
  in process concrete pour work observed by the NRC CAT appeared to be
The remaining Cadweld Test Cycle Log sheets
  proper. The rags found in a completed concrete placement and the 28
contain over 20 other instances of improper ordering of cadweld
  locations with concrete in the shake space between the containment
production splices.
  and adjacent structures will require appropriate management atten-
c.
  tion.
Conclusion
  Records reviewed for cadweld work performed indicated that the
The general concrete construction quality seems adequate.
  frequency of tensile test sampling for many cadweld operators was
QC
  not satisfied. S&L's corrective action was not adequate.
documentation in the completed concrete pour travelers appeared
2. Structural Steel Installation
adequate.
a. Inspection Scon
Procedures followed by site craft for the single
  Installed and QC accepted structural steel were inspected by the NRC
in process concrete pour work observed by the NRC CAT appeared to be
  CAT.   A major part of the NRC CAT inspection sample was covered by
proper.
  the IP0I Program. Attributes inspected by the NRC CAT were member
The rags found in a completed concrete placement and the 28
  size, configuration, and high strength bolted connection configura-
locations with concrete in the shake space between the containment
  tion. High strength bolt friction and sliding connections were
and adjacent structures will require appropriate management atten-
  tested by using a calibrated torque wrench to determine whether the
tion.
  bolts were properly installed.       Most of the friction bolt connec-
Records reviewed for cadweld work performed indicated that the
  tions and all of the bolted sliding connections had been inspected
frequency of tensile test sampling for many cadweld operators was
  by the IPOI Program.
not satisfied.
  The samples used in the structural steel verification for correct
S&L's corrective action was not adequate.
  member size and configuration are described in Table V-5. A total of
2.
  59 structural steel members and 27 connections were inspected by the
Structural Steel Installation
                                  V-4
a.
        -   .-             -. _     .       .       _
Inspection Scon
                                                            . _ . _-     - _.
Installed and QC accepted structural steel were inspected by the NRC
CAT.
A major part of the NRC CAT inspection sample was covered by
the IP0I Program.
Attributes inspected by the NRC CAT were member
size, configuration, and high strength bolted connection configura-
tion.
High strength bolt friction and sliding connections were
tested by using a calibrated torque wrench to determine whether the
bolts were properly installed.
Most of the friction bolt connec-
tions and all of the bolted sliding connections had been inspected
by the IPOI Program.
The samples used in the structural steel verification for correct
member size and configuration are described in Table V-5.
A total of
59 structural steel members and 27 connections were inspected by the
V-4
-
.-
-. _
.
.
_
. _ .
_-
-
_.


                                                          _
_
      NRC CAT.   Samples were taken from areas previously covered by IP0I
NRC CAT.
      except for the framing to the Hydraulic Control Unit in Area 3 of
Samples were taken from areas previously covered by IP0I
      the Containment Building.
except for the framing to the Hydraulic Control Unit in Area 3 of
    Section VII, Design Change Control, of this report discusses
the Containment Building.
    deficiencies identified with the IPOI documentation for structural
Section VII, Design Change Control, of this report discusses
      steel beams. Four of the beams refered to in that section with
deficiencies identified with the IPOI documentation for structural
    documentation deficiencies were inspected by the NRC CAT to deter-
steel beams.
    mine if the hardware quality had been affected. This sample was
Four of the beams refered to in that section with
    part of the inspection sample in Table V-5.
documentation deficiencies were inspected by the NRC CAT to deter-
    The location, size, and number of the three different kinds of high
mine if the hardware quality had been affected.
    strength bolts for friction connections that were checked for
This sample was
      installation torque are shown in Table V-6. A total of 287 bolts
part of the inspection sample in Table V-5.
    were tested for minimum installation torque.           Test torque values of
The location, size, and number of the three different kinds of high
      IPOI were used for the NRC CAT inspection.
strength bolts for friction connections that were checked for
    The sample of sliding connections tested is described in Table V-7.
installation torque are shown in Table V-6.
    A total of 15 bolts spread over five connections were tested for
A total of 287 bolts
    maximum installation torque.
were tested for minimum installation torque.
    The requirements and acceptance criteria for structural steel
Test torque values of
    installation are included in the drawings listed in Table V-8 and
IPOI were used for the NRC CAT inspection.
    in the following specifications and procedures:
The sample of sliding connections tested is described in Table V-7.
            S&L Specification K-2947, " Furnish Structural Steel," Rev. 3,
A total of 15 bolts spread over five connections were tested for
            dated June 22, 1983
maximum installation torque.
            S&L Specification K-2948, " Erect Structural Steel," Rev. 9,
The requirements and acceptance criteria for structural steel
            dated March 9, 1984
installation are included in the drawings listed in Table V-8 and
            BAP 3.13, " Structural Steel Erection," Rev. 11, dated October
in the following specifications and procedures:
            22, 1984.
S&L Specification K-2947, " Furnish Structural Steel," Rev. 3,
  b. Inspection Findings
dated June 22, 1983
    Detailed findings of the erected structural steel member and con-
S&L Specification K-2948, " Erect Structural Steel," Rev. 9,
dated March 9, 1984
BAP 3.13, " Structural Steel Erection," Rev. 11, dated October
22, 1984.
b.
Inspection Findings
Detailed findings of the erected structural steel member and con-
nection inspection are provided in Tables V-5, V-6 and V-7.
The
'
'
    nection inspection are provided in Tables V-5, V-6 and V-7. The
comments portion of the tables contain an explanation of whether the
    comments portion of the tables contain an explanation of whether the
inspection sample had been covered by IPOI.
    inspection sample had been covered by IPOI.
Of the 59 members reviewed, there was one discrepancy found during
    Of the 59 members reviewed, there was one discrepancy found during
the structural member size and configuration inspection.
    the structural member size and configuration inspection. Modifica-
Modifica-
    tion 1AC for Detail 27-615 on Drawing S27-1458 requires a 7/8-inch
tion 1AC for Detail 27-615 on Drawing S27-1458 requires a 7/8-inch
    A36 side plate, continuous between the centerlines of Beams 2D and
A36 side plate, continuous between the centerlines of Beams 2D and
    2E, which had not been installed. The beam had previously been
2E, which had not been installed.
    inspected and accepted by IPOI. This seemed to be an isolated case
The beam had previously been
    rather than a program deficiency. The licensee indicated a complete
inspected and accepted by IPOI.
    reinspection of the beam would be performed, followed by an NCR.
This seemed to be an isolated case
    No hardware deficiencies were identified for the sample of four
rather than a program deficiency.
    beams associated with the IPOI documentation discrepancies discussed
The licensee indicated a complete
    in Section VII.B.3.
reinspection of the beam would be performed, followed by an NCR.
                                  V-5
No hardware deficiencies were identified for the sample of four
                        .-- _ _ .     _         _ _ _ _ _
beams associated with the IPOI documentation discrepancies discussed
in Section VII.B.3.
V-5
.--
_ _ .
_
_ _ _ _ _


      Of the 251 friction connection bolts tested by the NRC CAT and
Of the 251 friction connection bolts tested by the NRC CAT and
      previously by IP0I for minimum installation torque, only 2 bolts
previously by IP0I for minimum installation torque, only 2 bolts
    were found to be under-torqued. Of the 36 fixed connection bolts
were found to be under-torqued.
      tested by the NRC CAT, but not within the inspection sample of IP
Of the 36 fixed connection bolts
      OI, seven bolts were found under minimum acceptable installation
tested by the NRC CAT, but not within the inspection sample of IP
      torque including one just hand-tight.
OI, seven bolts were found under minimum acceptable installation
      Installation torque for the bolts of the sliding connections was
torque including one just hand-tight.
    defined as snug-tight. Procedures provided to the craft to ensure
Installation torque for the bolts of the sliding connections was
      the bolts were installed in a manner which may prevent the sliding
defined as snug-tight.
    connections to perform as intended were insufficient. A sample of
Procedures provided to the craft to ensure
      the bolting for two of the five sliding connections checked by the
the bolts were installed in a manner which may prevent the sliding
    NRC CAT were found to be over-tight. S&L was asked to evaluate this
connections to perform as intended were insufficient.
    condition. The subsequent response was considered inadequate by the
A sample of
    NRC CAT and requires further evaluation.
the bolting for two of the five sliding connections checked by the
    The floor grating inside the Containment Building was observed to
NRC CAT were found to be over-tight.
    not be fastened to the structural steel.     The NRC CAT is concerned
S&L was asked to evaluate this
    that the grating could become a missile under high energy pipe
condition. The subsequent response was considered inadequate by the
    break conditions. The licensee responded that the grating will be
NRC CAT and requires further evaluation.
      fastened to the structural steel with clips, but that the grating
The floor grating inside the Containment Building was observed to
    could still become a missile if subjected to the forces of high
not be fastened to the structural steel.
    energy break conditions. This matter was discussed with and will be
The NRC CAT is concerned
    referred to the NRR Auxiliary Systems Branch for review.
that the grating could become a missile under high energy pipe
  Another observation by the NRC CAT was that the structural steel
break conditions.
  within the Containment Building was coated with inorganic zine which
The licensee responded that the grating will be
  could generate hydrogen gas during a loss of coolant accident. The
fastened to the structural steel with clips, but that the grating
    licensee stated that the amount of zinc in the Containment Building
could still become a missile if subjected to the forces of high
    is being calculated and systems are being sized in consideration of
energy break conditions.
    the hydrogen gas that could be generated. Therefore, the NRC review
This matter was discussed with and will be
    of the calculations and system sizing criteria may be performed at
referred to the NRR Auxiliary Systems Branch for review.
  a later date.
Another observation by the NRC CAT was that the structural steel
c. Conclusion
within the Containment Building was coated with inorganic zine which
  The IPOI Program on the structural steel installation appears to be
could generate hydrogen gas during a loss of coolant accident.
  satisfactory with two exceptions. The inadequate implementation of
The
  the IPOI Program criteria resulted in not including the Hydraulic
licensee stated that the amount of zinc in the Containment Building
  Control Unit (HCU) framing in the scope of the IP0I Program.
is being calculated and systems are being sized in consideration of
  Furthermore, the installed torque of some of the high strength bolts
the hydrogen gas that could be generated.
  of the friction connections of the HCU structural steel not included
Therefore, the NRC review
    in the IPOI Program was found inadequate.       The evaluation by S&L of
of the calculations and system sizing criteria may be performed at
  the identified condition of the sliding connections did not address
a later date.
  the NRC CAT finding and the technical concern of additional loads
c.
  due to over-tightened bolts.
Conclusion
3. Structural Fill
The IPOI Program on the structural steel installation appears to be
a. Inspection Scope
satisfactory with two exceptions.
  The NRC CAT inspectors reviewed daily earthwork logs between June 3,
The inadequate implementation of
  1976 and June 13, 1976 for the safety-related Class B structural
the IPOI Program criteria resulted in not including the Hydraulic
  fill for the main power block structures.       Also, the following NCRs
Control Unit (HCU) framing in the scope of the IP0I Program.
  were reviewed: NCR S-S-S-0006, NCR 174, and NCR 1650.
Furthermore, the installed torque of some of the high strength bolts
                                  V-6
of the friction connections of the HCU structural steel not included
  . _ _ _             -.               -_                             _.
in the IPOI Program was found inadequate.
The evaluation by S&L of
the identified condition of the sliding connections did not address
the NRC CAT finding and the technical concern of additional loads
due to over-tightened bolts.
3.
Structural Fill
a.
Inspection Scope
The NRC CAT inspectors reviewed daily earthwork logs between June 3,
1976 and June 13, 1976 for the safety-related Class B structural
fill for the main power block structures.
Also, the following NCRs
were reviewed:
NCR S-S-S-0006, NCR 174, and NCR 1650.
V-6
. _ _ _
-.
-_
_.


    The requirements and acceptance criteria were included in the following
The requirements and acceptance criteria were included in the following
    documents:
documents:
      S&L Specification K-2942, " Earthwork," Amendment 9, dated
S&L Specification K-2942, " Earthwork," Amendment 9, dated
      July 13, 1984
July 13, 1984
  *
*
      U.S. Testing Company Procedure QCP-10 " Testing Procedures for
U.S. Testing Company Procedure QCP-10 " Testing Procedures for
      Earthwork," Rev. O, dated February 9, 1977 and Rev. 9, dated
Earthwork," Rev. O, dated February 9, 1977 and Rev. 9, dated
      January 2, 1985
January 2, 1985
      Fruin-Colnon " Compaction Test Section Report," dated April 1976.
Fruin-Colnon " Compaction Test Section Report," dated April 1976.
b. Inspection Findings
b.
  The daily earthwork logs were reviewed by the NRC CAT inspectors.
Inspection Findings
  A discrepancy was identified with the lift thickness requirements in
The daily earthwork logs were reviewed by the NRC CAT inspectors.
  the structural fill records.     Of the 15 compaction placement records
A discrepancy was identified with the lift thickness requirements in
  reviewed, 7 did not record the lift thickness used in placing the
the structural fill records.
  fill.   Section 2.5.4.5.1.5 of the FSAR states " Type B material used
Of the 15 compaction placement records
  as structural fill to support foundation loads was placed in near
reviewed, 7 did not record the lift thickness used in placing the
  horizontal lifts not exceeding 12 inches in loose thickness."
fill.
  Further, the applicable compaction test report also recommends that
Section 2.5.4.5.1.5 of the FSAR states " Type B material used
  the fill be placed in 12 inch lifts.     The NRC CAT review of the
as structural fill to support foundation loads was placed in near
  structural fill records do not indicate that the FSAR commitment was
horizontal lifts not exceeding 12 inches in loose thickness."
  satisfied. Approximately one-half of the records reviewed did not
Further, the applicable compaction test report also recommends that
  indicate any lift thickness measurement. In other records the lift
the fill be placed in 12 inch lifts.
  thickness was listed as 12 to 14 inches.
The NRC CAT review of the
  The dispositions for the three NCRs were questioned by the NRC CAT.
structural fill records do not indicate that the FSAR commitment was
  Nuclear density test data was used to accept fill placements where
satisfied.
  the sand cone test data had failed. This was contrary to the
Approximately one-half of the records reviewed did not
  project specification. Also, structural fill was placed over areas
indicate any lift thickness measurement.
  that had not been QC accepted.     Some of these areas were not
In other records the lift
  accepted for as long as two years; thus indicating untimely correc-
thickness was listed as 12 to 14 inches.
  tive action.
The dispositions for the three NCRs were questioned by the NRC CAT.
  The following is a brief review of the three NCRs referenced above.
Nuclear density test data was used to accept fill placements where
        NCR S-5-5-0006 was written by BA on June 11, 1976 to cover
the sand cone test data had failed.
        apparent errors in the correlation factor between sand cone
This was contrary to the
        tests and nuclear density tests for covered fills placed
project specification. Also, structural fill was placed over areas
        between May 29,1976 and June 10, 1976.
that had not been QC accepted.
        As part of S&L's resolution of this NCR, S&L found that the
Some of these areas were not
        perceived reduction in the correlation' factor had been cal-
accepted for as long as two years; thus indicating untimely correc-
        culated incorrectly and that the 73 test locations in question
tive action.
        were in accordance with the design requirements.     The S&L
The following is a brief review of the three NCRs referenced above.
        disposition also indicated that all soil tests reports in
NCR S-5-5-0006 was written by BA on June 11, 1976 to cover
        question were checked by BA QC and spot checked by S&L.     This
apparent errors in the correlation factor between sand cone
        check supposedly included all sand cone test data (approx-
tests and nuclear density tests for covered fills placed
        imately 367) up to May 24, 1976, correlation factors and all
between May 29,1976 and June 10, 1976.
        nuclear density test data.
As part of S&L's resolution of this NCR, S&L found that the
                                V-7
perceived reduction in the correlation' factor had been cal-
culated incorrectly and that the 73 test locations in question
were in accordance with the design requirements.
The S&L
disposition also indicated that all soil tests reports in
question were checked by BA QC and spot checked by S&L.
This
check supposedly included all sand cone test data (approx-
imately 367) up to May 24, 1976, correlation factors and all
nuclear density test data.
V-7


                                                                          l
l
*
*
      NCR 174 was written by BA on January 21, 1977 to cover failed
NCR 174 was written by BA on January 21, 1977 to cover failed
      sand cone tests between May 17, 1976 and August 19, 1976 and
sand cone tests between May 17, 1976 and August 19, 1976 and
      represented 45 zones (100x100x1 feet) in the structural fill.
represented 45 zones (100x100x1 feet) in the structural fill.
      These areas of structural fill were accepted based on the
These areas of structural fill were accepted based on the
      results of the nuclear density tests.   However, three of the
results of the nuclear density tests.
      failed sand cone tests were performed prior to May 24, 1976 and
However, three of the
      should have been evaluated as part of NCR S-S-S-0006. Sand
failed sand cone tests were performed prior to May 24, 1976 and
      cone test SC 320 performed on May 17,1976 was voided because
should have been evaluated as part of NCR S-S-S-0006.
      the results were " unreliable." A second sand cone test, SC 364
Sand
      performed on May 24, 1976, had a relative density of 65.3
cone test SC 320 performed on May 17,1976 was voided because
      percent. This was 20 percent below the acceptance criteria.
the results were " unreliable." A second sand cone test, SC 364
      On November 1, 1978 NCR 1650 was issued and stated that 16
performed on May 24, 1976, had a relative density of 65.3
      zones placed between April 29, 1976 and May 17, 1976 did not
percent.
      meet the specification requirements for frequency of testing
This was 20 percent below the acceptance criteria.
      before additional fill was placed.   This deficiency should have
On November 1, 1978 NCR 1650 was issued and stated that 16
      been identified by the prior review of all soil test reports
zones placed between April 29, 1976 and May 17, 1976 did not
      accomplished under NCR S-5-5-0006 and NCR 174.
meet the specification requirements for frequency of testing
      The 16 zones were accepted by S&L on the following basis:
before additional fill was placed.
      *
This deficiency should have
          Deviation in portions of the documentation does not
been identified by the prior review of all soil test reports
          necessarily dictate nonconforming physical properties in the
accomplished under NCR S-5-5-0006 and NCR 174.
          fill.
The 16 zones were accepted by S&L on the following basis:
          Zones in question were constructed with procedures similar to
*
          procedures used to construct the rest of the fill.
Deviation in portions of the documentation does not
      *
necessarily dictate nonconforming physical properties in the
          Average density of the fill is greater than that required by
fill.
          specification.
Zones in question were constructed with procedures similar to
          Small isolated confined pockets low in the fill will not
procedures used to construct the rest of the fill.
          influence the overall performance of the fill.
*
Average density of the fill is greater than that required by
specification.
Small isolated confined pockets low in the fill will not
influence the overall performance of the fill.
The daily earthwork logs and the basis for the disposition of the
The daily earthwork logs and the basis for the disposition of the
NCRs reviewed by the NRC CAT inspectors are not considered adequate
NCRs reviewed by the NRC CAT inspectors are not considered adequate
for the following reasons:
for the following reasons:
      The applicable specifications and procedures were changed four
The applicable specifications and procedures were changed four
      times during the placement of the fill. These revisions may
times during the placement of the fill.
      not have been sufficiently addressed by S&L's resolution of the
These revisions may
      NCRs.
not have been sufficiently addressed by S&L's resolution of the
NCRs.
*
*
      Some of the records did not show lift thicknesses used.     In some
Some of the records did not show lift thicknesses used.
      cases incorrect lift thicknesses were used.
In some
      The evaluation performed for the NCRs did not adequately
cases incorrect lift thicknesses were used.
      address the discrepancies found by the NRC CAT with the
The evaluation performed for the NCRs did not adequately
      apparent omissions in data for evaluations performed of soil
address the discrepancies found by the NRC CAT with the
      test data.
apparent omissions in data for evaluations performed of soil
                              V-8
test data.
                  _.         - .     -_             . . . _
V-8
_.
-
- .
-_
. .
. . . _


      t
t
                      *
*
                                    The acceptance of failed sand cone test data based on nuclear
The acceptance of failed sand cone test data based on nuclear
                                    density test data was inconsistent with the specifications.
density test data was inconsistent with the specifications.
                                    The intent was to have the less reliable nuclear density test
The intent was to have the less reliable nuclear density test
,                                    data supported with direct, sound sand cone test data and not
data supported with direct, sound sand cone test data and not
                                    vice versa.
,
                      *
vice versa.
                                    Based on our limited review, there was no indication of the
*
                                    size of unacceptable fill pockets.
Based on our limited review, there was no indication of the
                  c.   Conclusion
size of unacceptable fill pockets.
                      The licensee's program of corrective actions did not result in a
c.
                      timely, comprehensive evaluation and appropriate disposition of
Conclusion
                      known deficiencies in the testing and placement of structural fill
The licensee's program of corrective actions did not result in a
                      for the period reviewed by the NRC CAT. The deficiencies found in
timely, comprehensive evaluation and appropriate disposition of
                      the lift thickness of structural fill were also not identified or
known deficiencies in the testing and placement of structural fill
                      addressed by the corrective action taken. Therefore, current
for the period reviewed by the NRC CAT.
                      corrective action to ensure the adequacy of the structural fill
The deficiencies found in
                      requires additional management attention.
the lift thickness of structural fill were also not identified or
                  4.   Diesel Generator Exhaust Silencer Supports
addressed by the corrective action taken.
                  a.   Inspection Scope
Therefore, current
,
corrective action to ensure the adequacy of the structural fill
                      Installed torque values were checked for the sliding connections
requires additional management attention.
                      of the support pedestals of the diesel generator exhaust silencers.
4.
  '
Diesel Generator Exhaust Silencer Supports
                      Installation procedures required the nuts to be hand tight.
a.
                  b.   Inspection Findings
Inspection Scope
                      From the testing of the exhaust silencer support sliding connection
Installed torque values were checked for the sliding connections
                      bolts, only one of the bolts were hand tight.                     Installed torque
,
                      values found by the NRC CAT are shown in Table V-9.
'
                  c.   Conclusion
of the support pedestals of the diesel generator exhaust silencers.
                      An evaluation should be made concerning the over-tightened condition
Installation procedures required the nuts to be hand tight.
                      of the bolts.             These bolts should not prevent the exhaust silencers
b.
                      from sliding as designed for thermal growth.
Inspection Findings
!
From the testing of the exhaust silencer support sliding connection
bolts, only one of the bolts were hand tight.
Installed torque
values found by the NRC CAT are shown in Table V-9.
c.
Conclusion
An evaluation should be made concerning the over-tightened condition
of the bolts.
These bolts should not prevent the exhaust silencers
from sliding as designed for thermal growth.
!
;
;
                                                            V-9
V-9
    _  - - - - -   _     . - _ . _ _ _- - - _ _               .- _    ._. - _ - _ -           . _ - _ __ -- _ _
- - - - -
_
. - _ . _ _ _- - - _ _
.-
._.
- _ - _ -
. _ - _
__
-- _ _


                                                                                                      __    ._. -- - - - _ _ _ .
- --
                - --                                                                             - _
- _
    VI. MATERIAL TRACEABILITY AND CONTROL
_ _
        A.           Objective
._. -- - - - _ _ _ .
VI.
MATERIAL TRACEABILITY AND CONTROL
A.
Objective
a
a
                      The objective of this portion of the inspection was to examine trace-
The objective of this portion of the inspection was to examine trace-
ability and control of material and equipment and to determine the
'
'
                      ability and control of material and equipment and to determine the
adequacy of the licensee's program relative to these activities.
                      adequacy of the licensee's program relative to these activities.
B.
        B.           Discussion
Discussion
                      The approach to perform the inspection was to identify and select
The approach to perform the inspection was to identify and select
                      samples of various types of installed material and equipment for
samples of various types of installed material and equipment for
;                     examination. Some samples of installed material that were not
;
!                     accessible, such as rebar, were selected from records.                         The samples
examination.
                      also included uninstalled material that had been QC inspected, such as
Some samples of installed material that were not
,                      protective coating materials, located in warehouses or shops. A total
!
                      of 293 samples were examined.
accessible, such as rebar, were selected from records.
The samples
also included uninstalled material that had been QC inspected, such as
protective coating materials, located in warehouses or shops.
A total
,
of 293 samples were examined.
The following Baldwin Associates Project Procedures (BAP) provided the
,
,
'
                      The following Baldwin Associates Project Procedures (BAP) provided the
                      acceptance criteria for this inspection:
                              BAP 1.5, " Material Identification," Rev. 11, dated December 18,
                              1984; Change D, dated May 23, 1985
                              BAP 2.3, " Receiving and Issuance," Rev. 12, dated July 26,
                              1984; Change F, dated April 25, 1985
                              BAP 2.3.2, " Transfer of Material IP to BA," Rev. O, dated
                              April 19, 1985
                            * BAP 2.8, " Material Upgrading," Rev. 8, dated October 26, 1984;
                              Change A, dated March 28, 1985
                            * BAP 2.19, " Welding Filler Material Procurement, Storage and
                              Control," Rev. 3, dated June 19, 1984; Change B, dated December
                              18, 1984; Change C, dated May 31, 1985.
                      An inspection of installed material and equipment was conducted in the
                      plant to select and verify markings on various samples such as equipment
'
'
                      (mechanical, electrical and instrumentation), pipe, supports / restraints
acceptance criteria for this inspection:
                      and weld joints. Other samples were inspected in warehouses or shops.
BAP 1.5, " Material Identification," Rev. 11, dated December 18,
,
1984; Change D, dated May 23, 1985
                      Table VI-1, Summary of Samples, indicates the types and quantities of
BAP 2.3, " Receiving and Issuance," Rev. 12, dated July 26,
                      materials examined. Table VI-2, Weld Filler Material Compliance,
1984; Change F, dated April 25, 1985
                      contains a list of the 17 weld filler material samples selected.
BAP 2.3.2, " Transfer of Material IP to BA," Rev. O, dated
                      1.   Material Traceability and Control
April 19, 1985
                      a.   Inspection Scope
* BAP 2.8, " Material Upgrading," Rev. 8, dated October 26, 1984;
                          A total of 293 samples were selected and examined for traceability
Change A, dated March 28, 1985
                            to applicable drawings, specification, procurement, records,
* BAP 2.19, " Welding Filler Material Procurement, Storage and
j                         certified material test reports, certificates of compliance, heat
Control," Rev. 3, dated June 19, 1984; Change B, dated December
  l
18, 1984; Change C, dated May 31, 1985.
                          numbers or other required documentation.
An inspection of installed material and equipment was conducted in the
                                                      VI-1
plant to select and verify markings on various samples such as equipment
4
(mechanical, electrical and instrumentation), pipe, supports / restraints
          --~..-----w-         - --,--- ,. . ., ,~,               -,,-----,--,,---.-,----,--,-r-                   . - -         , - - - - , , , - , .
'
and weld joints.
Other samples were inspected in warehouses or shops.
Table VI-1, Summary of Samples, indicates the types and quantities of
,
materials examined.
Table VI-2, Weld Filler Material Compliance,
contains a list of the 17 weld filler material samples selected.
1.
Material Traceability and Control
a.
Inspection Scope
A total of 293 samples were selected and examined for traceability
to applicable drawings, specification, procurement, records,
j
certified material test reports, certificates of compliance, heat
l
numbers or other required documentation.
VI-1
4
--~..-----w-
- --,--- ,. . .,
,~,
-,,-----,--,,---.-,----,--,-r-
. - -
, - - - - ,
, , - , .


  b. Inspection Findings
b.
    In general, it was found that the traceability and control of
Inspection Findings
    material at the site was satisfactory, with the exception of a lack
In general, it was found that the traceability and control of
    of traceability for certain fastener materials. The following
material at the site was satisfactory, with the exception of a lack
    observations were made by the NRC Construction Appraisal Team (CAT)
of traceability for certain fastener materials. The following
    inspector:
observations were made by the NRC Construction Appraisal Team (CAT)
    (1) Manual and computerized records were used to control the
inspector:
              identification and status of material and equipment at the
(1) Manual and computerized records were used to control the
              site.
identification and status of material and equipment at the
    (2) Seventeen samples of weld filler materials listed in Table
site.
              VI-2 examined for traceability and compliance with specifi-
(2) Seventeen samples of weld filler materials listed in Table
              cations and codes were found to be acceptable.         Twenty-three
VI-2 examined for traceability and compliance with specifi-
              weld filler material holding ovens ir, two issue stations were
cations and codes were found to be acceptable.
              examined and found to meet requirements for temperature control
Twenty-three
              and the thermometer calibration records. The holding tempera-
weld filler material holding ovens ir, two issue stations were
              ture of 18 loaded portable ovens in the issue stations was
examined and found to meet requirements for temperature control
              measured using a pyrometer, and were found to be within the
and the thermometer calibration records. The holding tempera-
              established temperature range. Approximately 100 portable
ture of 18 loaded portable ovens in the issue stations was
              ovens in use were examined, and only two were found to be not
measured using a pyrometer, and were found to be within the
              operating satisfactorily. The heater indicator lights on these
established temperature range. Approximately 100 portable
              two ovens were not lit, and rods were warm to the touch but
ovens in use were examined, and only two were found to be not
              lower than 125 F, the specified temperature. The light of one
operating satisfactorily. The heater indicator lights on these
              unit lit when the power plug was moved in the outlet. The
two ovens were not lit, and rods were warm to the touch but
              other oven was checked at the issue station and found to be
lower than 125 F, the specified temperature.
              operating properly. The problem was identified as a loss
The light of one
              of power at the work station.
unit lit when the power plug was moved in the outlet.
      (3)     Indeterminate American Society for Testing and Materials
The
              (ASTM) A-36 steel plate material, which had been reported to
other oven was checked at the issue station and found to be
              the NRC as a potential 10 CFR 50.55(e) deficiency (55-84-18),
operating properly.
              is being stored in a segregated outside storage area. The
The problem was identified as a loss
              area is roped off and clearly marked to show that this material
of power at the work station.
              is on HOLD.
(3)
      (4) The inspector observed subdividing of stock materials by
Indeterminate American Society for Testing and Materials
              warehouse personnel. Prior to making the cut in steel plate
(ASTM) A-36 steel plate material, which had been reported to
              and structural steel, the identification marking was trans-
the NRC as a potential 10 CFR 50.55(e) deficiency (55-84-18),
              ferred to each piece cut from the stock.
is being stored in a segregated outside storage area.
l     (5) Material and equipment listed in Table VI-l were examined for
The
!             traceability and control. Most items examined were found to
area is roped off and clearly marked to show that this material
              have the required material traceability; however, some
is on HOLD.
              deficiencies were found regarding the traceability and control
(4) The inspector observed subdividing of stock materials by
              for large motor mounting bolts and other fastener materials as
warehouse personnel.
;             follows:
Prior to making the cut in steel plate
                  Mounting bolts used in the transition piece between certain
and structural steel, the identification marking was trans-
                  large pump-motor units as listed below are not traceable
ferred to each piece cut from the stock.
                  and do not have required washers. Documentation identifies
l
                  that American Society of Mechanical Engineers (ASME)
(5) Material and equipment listed in Table VI-l were examined for
                  SA-193, Grade 87 bolts are to be used between the transi-
!
                                    VI-2
traceability and control. Most items examined were found to
          -_.       __- __             . _ _ _       . _ . _ _ _ _             ._
have the required material traceability; however, some
                                                                                      - - -
deficiencies were found regarding the traceability and control
for large motor mounting bolts and other fastener materials as
;
follows:
Mounting bolts used in the transition piece between certain
large pump-motor units as listed below are not traceable
and do not have required washers. Documentation identifies
that American Society of Mechanical Engineers (ASME)
SA-193, Grade 87 bolts are to be used between the transi-
VI-2
-_.
__- __
. _ _ _
. _ .
_ _ _ _
._
-
- -


-.
-.
            tion piece and the pumps. Documentation does not identify
tion piece and the pumps. Documentation does not identify
            the grade of bolts to be used between the transition piece
the grade of bolts to be used between the transition piece
            and the motors. ASME SA-193, Grade B7 bolts were installed
and the motors. ASME SA-193, Grade B7 bolts were installed
            between the transition piece and the pumps. Society of
between the transition piece and the pumps.
            Automotive Engineers (SAE), Grade 5 bolts were installed
Society of
            between the transition piece and the motors. The supplier,
Automotive Engineers (SAE), Grade 5 bolts were installed
            General Electric Company, stated in a telephone conversa-
between the transition piece and the motors.
            tion to the licensee (to be followed up by a letter) that
The supplier,
            SAE, Grade 5 bolts were adequate for this application.
General Electric Company, stated in a telephone conversa-
            Additional investigation is required to confirm the proper
tion to the licensee (to be followed up by a letter) that
            bolts required for this application. However, no Noncon-
SAE, Grade 5 bolts were adequate for this application.
            forming Material Report (NCMR) was issued by the licensee
Additional investigation is required to confirm the proper
            during the NRC CAT inspection regarding the use and dis-
bolts required for this application. However, no Noncon-
            position of SAE, Grade 5 bolts. The pump motcr units
forming Material Report (NCMR) was issued by the licensee
            inspected and the NCMRs issued for the omission of washers
during the NRC CAT inspection regarding the use and dis-
            only, are as follows:
position of SAE, Grade 5 bolts.
              Low Pressure Core Spray Pump:     lE21-C001 - NCMR 2-0330
The pump motcr units
              High Pressure Core Spray Pump:     lE22-C001 - NCMR 2-0331
inspected and the NCMRs issued for the omission of washers
              Residual Heat Removal Pump:       lE12-C002
only, are as follows:
            Bolts installed to hold the Fuel Pool Cooling Pump motors
Low Pressure Core Spray Pump:
            1FC02PA and 1FCO2PB to the skids are unmarked or incon-
lE21-C001 - NCMR 2-0330
            sistently marked and of indeterminate material. ASTM A325
High Pressure Core Spray Pump:
            bolts are required. As a result of this NRC CAT finding,
lE22-C001 - NCMR 2-0331
            the licensee issued NCMR 02-0340 to initiate corrective
Residual Heat Removal Pump:
            action.
lE12-C002
        *  Bolts installed to hold the Reactor Core Isolation Cooling
Bolts installed to hold the Fuel Pool Cooling Pump motors
            Pump 1E51-C001 to the skid are marked SAE, Grade 5 where
1FC02PA and 1FCO2PB to the skids are unmarked or incon-
            ASME SA-193, Grade B7 is specified. The turbine (lE51-C002)
sistently marked and of indeterminate material. ASTM A325
            hold down bolts are unmarked and indeterminate. The
bolts are required.
            coupling end requires American Iron and Steel Institute
As a result of this NRC CAT finding,
            (AISI) GR 4037-4140, and the governor end requires ASTM
the licensee issued NCMR 02-0340 to initiate corrective
            A108-Gil70. As a result of these NRC CAT findings, the
action.
            licensee issuea .NCMR 02-0347 to initiate corrective action.
Bolts installed to hold the Reactor Core Isolation Cooling
        *
*
            Nuts on clamp bolts at the lower end of a number of spring
Pump 1E51-C001 to the skid are marked SAE, Grade 5 where
            can hangers in the recirculation piping are not properly
ASME SA-193, Grade B7 is specified.
            traceable. As a result of this NRC CAT finding the
The turbine (lE51-C002)
            licensee issued Nonconformance Report (NCR) 71314 to
hold down bolts are unmarked and indeterminate.
            initiate ccrrective action.
The
        *
coupling end requires American Iron and Steel Institute
            The load pin on hanger lLP02004V is an ASME Section III,
(AISI) GR 4037-4140, and the governor end requires ASTM
            Class 2 pin used in a Class 1 application. As a result
A108-Gil70. As a result of these NRC CAT findings, the
            of this NRC CAT finding the licensee issued NCR 32360 to
licensee issuea .NCMR 02-0347 to initiate corrective action.
            initiate corrective action.
Nuts on clamp bolts at the lower end of a number of spring
            Mounting bolts for HVAC control panel cabinets were
*
            unmarked and of indeterminate material. Refer to Section
can hangers in the recirculation piping are not properly
            II.B.3.b(7), of this report, for details.
traceable. As a result of this NRC CAT finding the
  (6) ASME piping, tubing and welded joints inspected were marked
licensee issued Nonconformance Report (NCR) 71314 to
        with the necessary traceability markings, except for a
initiate ccrrective action.
                              VI-3
The load pin on hanger lLP02004V is an ASME Section III,
                                                                          j
*
Class 2 pin used in a Class 1 application. As a result
of this NRC CAT finding the licensee issued NCR 32360 to
initiate corrective action.
Mounting bolts for HVAC control panel cabinets were
unmarked and of indeterminate material. Refer to Section
II.B.3.b(7), of this report, for details.
(6) ASME piping, tubing and welded joints inspected were marked
with the necessary traceability markings, except for a
VI-3
j


                                                _
_
                                      1/2 x 3/8 inch pipe-to-tube weld adapter in an instrument
1/2 x 3/8 inch pipe-to-tube weld adapter in an instrument
                                      tubing run. The travelers for installation of this adapter
tubing run.
                                      identified an incorrect Receiving Inspection Report (RIR 886)
The travelers for installation of this adapter
                                      which should have been RIR 6886.   The licensee issued NCR
identified an incorrect Receiving Inspection Report (RIR 886)
                                      32336 to correct documentation associated with this adapter.
which should have been RIR 6886.
                                (7) While inspecting the Control Rod Drive Mechanism, the inspector
The licensee issued NCR
                                      noted that direction control valve No. 123 had an arc strike
32336 to correct documentation associated with this adapter.
                                      which burned a hole through the solenoid housing. The licensee
(7) While inspecting the Control Rod Drive Mechanism, the inspector
                                      issued NCMR 2-0246 to initiate the necessary corrective action.
noted that direction control valve No. 123 had an arc strike
                                (8) Unmarked bolting materials, without manufacturer's identifica-
which burned a hole through the solenoid housing.
                                      tion, for non-ASME applications are purchased safety, commercial
The licensee
                                      grade, with certificates of conformance.       This material and
issued NCMR 2-0246 to initiate the necessary corrective action.
                                      documentation are receipt inspected by Illinois Power Company's
(8) Unmarked bolting materials, without manufacturer's identifica-
                                      Quality Control before releasing for construction.
tion, for non-ASME applications are purchased safety, commercial
                              c. Conclusions
grade, with certificates of conformance.
                                In general, except for certain fastener hardware, the material
This material and
                                traceability and control program was considered to be satisfactory.
documentation are receipt inspected by Illinois Power Company's
                                Lack of traceability was found for fastener materials, particularly
Quality Control before releasing for construction.
:                               for some vendor supplied pump-motor and pump-turbine assemblies
c.
                                mounted on skids. Also, deficiencies were found in traceability for
Conclusions
                                fasteners on certain hangers and HVAC control panel cabinets.
In general, except for certain fastener hardware, the material
traceability and control program was considered to be satisfactory.
Lack of traceability was found for fastener materials, particularly
:
for some vendor supplied pump-motor and pump-turbine assemblies
mounted on skids.
Also, deficiencies were found in traceability for
fasteners on certain hangers and HVAC control panel cabinets.
2
2
                                                            VI-4
VI-4
  - - . - ___ . _ - _ . _ - .           _
- - . - ___
                                              __.-.           -     _._   _ _ - ,---       -       _ - - _ - _ . -_
. _ - _ . _ - .
_
__.-.
-
_._
_ _ - ,---
-
_ - - _ -
_
. -_


                                  TABLE VI-1
TABLE VI-1
                                SUMMARY OF SAMPLES
SUMMARY OF SAMPLES
      Item                                         No. of Samples *
Item
Equipment                                               14
No. of Samples *
Pipe                                                     22 (L)
Equipment
Tubing (Weld Joints)                                     19 (L)
14
Steel-Structural                                         18 (L)
Pipe
Steel-Rebar                                               3 (L)
22 (L)
Steel-Tube                                               19 (L)
Tubing (Weld Joints)
Hangers / Supports / Restraints                           4 (L)
19 (L)
Embedments                                               16
Steel-Structural
Valves                                                   7
18 (L)
Mounting Bolts & Nuts                                   40
Steel-Rebar
Weld Filler Material                                   17 (L)
3 (L)
Weld Joints                                             17
Steel-Tube
Electrical Cable (Reels)                               24 (L)
19 (L)
Fasteners (Sets)                                       36
Hangers / Supports / Restraints
Coatings                                                 9 (L)
4 (L)
Unistrut                                                 5 (L)
Embedments
Raceway                                                   6 (L)
16
Shims                                                     1 (L)
Valves
TOTAL                                                 293
7
Mounting Bolts & Nuts
40
Weld Filler Material
17 (L)
Weld Joints
17
Electrical Cable (Reels)
24 (L)
Fasteners (Sets)
36
Coatings
9 (L)
Unistrut
5 (L)
Raceway
6 (L)
Shims
1 (L)
TOTAL
293
*(L) = Lots
*(L) = Lots
                                      VI-5
VI-5


              .__g         _ .a     ..__m   _.  a__ -
.__g
                                                          _a   # 2:v+-                   - - .                                         a m--._.-_u     1
_
                                                              TABLE VI-2
.a
                                          WELD FILLER MATERIAL COMPLIANCE
..__m
      Material                                     Heat No./                                                             Compliance
a__
      Designation                                   Material ID                                                               Comments
-
_a
#
2:v+-
- - .
a
m--._.-_u
1
_.
TABLE VI-2
WELD FILLER MATERIAL COMPLIANCE
Material
Heat No./
Compliance
Designation
Material ID
Comments
;
;
      E7052                                         065094                                                                 Acceptable
E7052
,
065094
      E70S2                                        32470                                                                 Acceptable
Acceptable
      E7052                                         065162/065163                                                         Acceptable
E70S2
      E308-16 3/32                                 616385                                                                 Acceptable
32470
      E308-16 5/32                                 6MSB Mix 12                                                           Acceptable
Acceptable
      E308-16 3/32                                 49986                                                                 Acceptable
,
      E308-16 1/8                                   0A0369                                                                 Acceptable
E7052
I   E309-16 3/32                                 0A10742                                                               Acceptable
065162/065163
      E316L-16 3/32                                 01353                                                                 Acceptable
Acceptable
      E316L-16 1/8                                 02754                                                                 Acceptable
E308-16 3/32
i   E502-16 1/8                                   432LO491                                                             Acceptable
616385
      E502-16 3/32                                 421P4461                                                             Acceptable
Acceptable
      E7018XLM 3/32                                 402A9061                                                             Acceptable
E308-16 5/32
      E7018XLM 1/8                                 22340                                                                 Acceptable
6MSB Mix 12
.    E7018 1/8                                     40461                                                                 Acceptable
Acceptable
E308-16 3/32
49986
Acceptable
E308-16 1/8
0A0369
Acceptable
I
E309-16 3/32
0A10742
Acceptable
E316L-16 3/32
01353
Acceptable
E316L-16 1/8
02754
Acceptable
i
E502-16 1/8
432LO491
Acceptable
E502-16 3/32
421P4461
Acceptable
E7018XLM 3/32
402A9061
Acceptable
E7018XLM 1/8
22340
Acceptable
E7018 1/8
40461
Acceptable
.
E7018 3/32
LOT 28112
Acceptable
'
'
      E7018 3/32                                   LOT 28112                                                            Acceptable
E7018 3/32
      E7018 3/32                                    28296                                                                 Acceptable
28296
Acceptable
!
!
i
i
                                                                      VI-6
VI-6
i
i
  _.
_.
                ..-,- - .     .- .             -.     -__ _             . . _ _ , - _       . _ _ . . _ . , _ - - - - _ _ _ - - _ _             . .   .. -.-
..-,- - .
.- .
-.
-__ _
. . _ _ , - _
. _ _ . . _ . , _ - - - - _ _ _ - - _ _
. .
.. -.-


  VII. DESIGN CHANGE CONTROL
VII.
      A. Objective
DESIGN CHANGE CONTROL
          The primary objective of the appraisal of design change control was to
A.
          determine whether the design and other related documents and activities
Objective
          which defined the installation and inspection of the as-built configu-
The primary objective of the appraisal of design change control was to
          ration, were controlled in accordance with regulatory requirements,
determine whether the design and other related documents and activities
          Safety Analysis Report commitments and approved licensee, engineer, con-
which defined the installation and inspection of the as-built configu-
          structor and vendor procedures.
ration, were controlled in accordance with regulatory requirements,
      B. Discussion
Safety Analysis Report commitments and approved licensee, engineer, con-
          The governing regulatory requirements for this appraisal are detailed in
structor and vendor procedures.
          10 CFR 50, Appendix B, Criterion III, " Design Control," and Criterion
B.
          VI, " Document Control." These requirements are elaborated in Regulatory
Discussion
          Guide (RG) 1.64, " Quality Assurance Requirements for the Design of
The governing regulatory requirements for this appraisal are detailed in
          Nuclear Power Plants," Rev. 2, dated June 1976, and American National
10 CFR 50, Appendix B, Criterion III, " Design Control," and Criterion
          Standards Institute (ANSI) Standard N45.2.11-1974, " Quality Assurance
VI, " Document Control." These requirements are elaborated in Regulatory
          Requirements for the Design of Nuclear Power Plants." The licensee's
Guide (RG) 1.64, " Quality Assurance Requirements for the Design of
          commitment to comply with RG 1.64 is stated in Chapter 17 of the Clinton
Nuclear Power Plants," Rev. 2, dated June 1976, and American National
          Power Station (CPS) Nuclear Power Plant Final Safety Analysis Report
Standards Institute (ANSI) Standard N45.2.11-1974, " Quality Assurance
          (FSAR).
Requirements for the Design of Nuclear Power Plants." The licensee's
          In the area of design charge control, the NRC Construction Appraisal
commitment to comply with RG 1.64 is stated in Chapter 17 of the Clinton
          Team (CAT) inspectors reviewed controlled documents which defined the
Power Station (CPS) Nuclear Power Plant Final Safety Analysis Report
          installation and inspection of completed structures and hardware, and
(FSAR).
          which defined or referenced design changes to in process or completed
In the area of design charge control, the NRC Construction Appraisal
          structures and hardware. The NRC CAT inspection also reviewed the
Team (CAT) inspectors reviewed controlled documents which defined the
          Baldwin Associates (BA) installation and inspection program and the
installation and inspection of completed structures and hardware, and
          Illinois Power (IP) Overinspection program. For each of these areas,
which defined or referenced design changes to in process or completed
          NRC CAT inspectors conducted interviews with responsible personnel,
structures and hardware.
          reviewed drawings, procedures, specifications, change documents and
The NRC CAT inspection also reviewed the
          reports, and reviewed installed and inspected structures and hardware.
Baldwin Associates (BA) installation and inspection program and the
          IP provided responses for the majority of the NRC CAT findings
Illinois Power (IP) Overinspection program.
          documented in this section of the report. Where the IP response was not
For each of these areas,
          considered sufficient to resolve the NRC CAT finding, this is speci-
NRC CAT inspectors conducted interviews with responsible personnel,
          fically noted.
reviewed drawings, procedures, specifications, change documents and
      1. Control of Design Documents
reports, and reviewed installed and inspected structures and hardware.
          Inspection Scope
IP provided responses for the majority of the NRC CAT findings
documented in this section of the report. Where the IP response was not
considered sufficient to resolve the NRC CAT finding, this is speci-
fically noted.
1.
Control of Design Documents
*
*
      a.
a.
          The following documents provide the basic acceptance criteria for the
Inspection Scope
          inspection:
The following documents provide the basic acceptance criteria for the
                Sargent & Lundy Engineers (S&L) General Quality Assurance (QA)
inspection:
                Procedure GQ-3.07, "Sargent & Lundy Drawings," Rev. 6, dated October
Sargent & Lundy Engineers (S&L) General Quality Assurance (QA)
                21, 1981
Procedure GQ-3.07, "Sargent & Lundy Drawings," Rev. 6, dated October
                S&L General QA Procedure GQ-3.12, " Project Status Reports," Rev. 4,
21, 1981
                dated August 24, 1984
S&L General QA Procedure GQ-3.12, " Project Status Reports," Rev. 4,
                                          VII-1
dated August 24, 1984
VII-1


                                                                                                              . _-__
. _-__
                                                                                                                      l
*
                                                                                                                      !
S&L General Quality Assurance Program Topical Report SL-TR-1A,
                                      *
Rev. 6, dated April 22, 1983
                                        S&L General Quality Assurance Program Topical Report SL-TR-1A,
*
                                        Rev. 6, dated April 22, 1983
BA Quality Assurance Manual, Rev. 15, dated April 5, 1985
                                        *
I
                                              BA Quality Assurance Manual, Rev. 15, dated April 5, 1985
BA Project Procedure BAP 2.0, " Document Control," Rev. 13,
                                                                                                                      I
Change B, dated April 5, 1985
                                              BA Project Procedure BAP 2.0, " Document Control," Rev. 13,
BAP 2.0.1, " Instructions for Maintaining Project Procedures /
                                              Change B, dated April 5, 1985
Specifications / Drawings," Rev. 2, Change B, dated January 31,
                                              BAP 2.0.1, " Instructions for Maintaining Project Procedures /
1985
                                              Specifications / Drawings," Rev. 2, Change B, dated January 31,
IP Nuclear Power Construction Quality Assurance Manual, Rev.
                                              1985
12, dated March 12, 1985
                                              IP Nuclear Power Construction Quality Assurance Manual, Rev.
IP Nuclear Power ASME Quality Assurance Manual, Rev. 5, dated
                                              12, dated March 12, 1985
March 5, 1985
                                              IP Nuclear Power ASME Quality Assurance Manual, Rev. 5, dated
IP Records Management System Standards No. 2.05, " Standard
                                              March 5, 1985
for the Maintenance of Distributed Documents," Rev. 1, dated
                                              IP Records Management System Standards No. 2.05, " Standard
March 7, 1985
                                              for the Maintenance of Distributed Documents," Rev. 1, dated
IP Nuclear Planning and Support Department (NP&S) Procedure No.
                                              March 7, 1985
2.51, " Document Control Procedure," Rev. O, dated June 11,
                                              IP Nuclear Planning and Support Department (NP&S) Procedure No.
1985.
                                              2.51, " Document Control Procedure," Rev. O, dated June 11,
NRC CAT inspectors interviewed engineering and construction personnel
                                              1985.
engaged in the distribution and control of S&L design drawings and
                                        NRC CAT inspectors interviewed engineering and construction personnel
specifications, BA design installation drawings, BA installation
                                        engaged in the distribution and control of S&L design drawings and
and inspection procedures, and vendor drawings.
                                        specifications, BA design installation drawings, BA installation
b.
                                        and inspection procedures, and vendor drawings.
Inspection Findings
                                      b. Inspection Findings
The primary intent of this review was to assess the adequacy of the
                                        The primary intent of this review was to assess the adequacy of the
design document control program implemented by the constructor,
                                        design document control program implemented by the constructor,
Baldwin Associates, for ensuring that correct S&L or BA design
                                        Baldwin Associates, for ensuring that correct S&L or BA design
documents were utilized for installation.
                                        documents were utilized for installation. This review was conducted
This review was conducted
                                        at the BA Document Control Center (DCC), the BA resident engineering
at the BA Document Control Center (DCC), the BA resident engineering
                                        (RE) offices in the civil and structural, piping and pipe support,
(RE) offices in the civil and structural, piping and pipe support,
                                        and electrical disciplines, and at the BA Field Document Center
and electrical disciplines, and at the BA Field Document Center
                                        (FDC).
(FDC).
                                        (1) The DCC distributes procedures, specifications, design drawings
(1) The DCC distributes procedures, specifications, design drawings
                                              and associated change documents which are controlled in
and associated change documents which are controlled in
                                              accordance with the BA QA Manual, BAP 2.0, " Document Control,"
accordance with the BA QA Manual, BAP 2.0, " Document Control,"
                                              and BAP 2.0.1, " Instructions for Maintaining Project Proce-
and BAP 2.0.1, " Instructions for Maintaining Project Proce-
                                              dures/ Specifications / Drawings."
dures/ Specifications / Drawings."
                                              Section 5.3 of BAP 2.0.1 requires that recipients of amendments
Section 5.3 of BAP 2.0.1 requires that recipients of amendments
                                              and addenda to specifications check all transM tted documents
and addenda to specifications check all transM tted documents
                                              for accuracy against the DCC transmittal, update the speci-
for accuracy against the DCC transmittal, update the speci-
                                              fication in accordance with the transmittal instructions,
fication in accordance with the transmittal instructions,
                                              replace superseded pages, verify that all change documents
replace superseded pages, verify that all change documents
                                              identified on the transmittal as outstanding are filed in front
identified on the transmittal as outstanding are filed in front
                                                                    VII-2
VII-2
_ _ _ _ _ _ _ _ _ - - _ - - _ _ _ _ _
- -
- -


  , - -- -     - --         . -       . .             - . - - - -       - - _ - _ _ .-
,
            of the specification, and sign, date and return a copy of the                   I
-
            transmittal to the DCC.
--
            Section 5.4 of BAP 2.0.1 requires that recipients of change
-
            documents issued against specifications check the documents
- --
            for accuracy against the DCC transmittal, revise the speci-                     .
.
,          fication in accordance with transmittal instructions, remove
-
            affected specification sheets or forms and destroy or return to
.
.
-
. - - - -
- - _ - _ _ .-
of the specification, and sign, date and return a copy of the
I
transmittal to the DCC.
Section 5.4 of BAP 2.0.1 requires that recipients of change
documents issued against specifications check the documents
for accuracy against the DCC transmittal, revise the speci-
.
fication in accordance with transmittal instructions, remove
,
affected specification sheets or forms and destroy or return to
!
!
DCC as directed, file the change documents in the front of the
'
'
            DCC as directed, file the change documents in the front of the
specification, and sign, date and return a copy of the trans-
            specification, and sign, date and return a copy of the trans-
mittal to the DCC.
            mittal to the DCC.
Section 5.5 of BAP 2.0.1 requires that recipients of change
            Section 5.5 of BAP 2.0.1 requires that recipients of change
documents [ Field Change Requests (FCRs), Nonconformance Reports
            documents [ Field Change Requests (FCRs), Nonconformance Reports
(NCRs), Engineering Change Notices (ECNs), and Field Engi-
            (NCRs), Engineering Change Notices (ECNs), and Field Engi-
neering Change Notice (FECNs)] issued against a drawing, check
            neering Change Notice (FECNs)] issued against a drawing, check
the documents for accuracy against the DCC transmittal, update
            the documents for accuracy against the DCC transmittal, update
the change documents block to reflect the change document
            the change documents block to reflect the change document
numbers, maintain a file of open change documents, and sign,
-
-
            numbers, maintain a file of open change documents, and sign,
1
1
            date and return a copy of the transmittal to the DCC.
date and return a copy of the transmittal to the DCC.
            Section 5.7 of BAP 2.0.1 requires that recipients of revisions
Section 5.7 of BAP 2.0.1 requires that recipients of revisions
            to procedures check the documents for accuracy against the
to procedures check the documents for accuracy against the
            DCC transmittal, remove superseded forms or procedures and
DCC transmittal, remove superseded forms or procedures and
            insert new or revised procedures or forms in accordance with
insert new or revised procedures or forms in accordance with
            transmittal instructions, and sign, date and return a copy of
transmittal instructions, and sign, date and return a copy of
,          the transmittal to the DCC.                                                    '
the transmittal to the DCC.
I          While BAP 2.0.1 controls the transmittal, distribution and
            receipt of changes to specifications, procedures and drawings,
                                                                                            '
'
            the overall status of all change documents outstanding against
          a given specification or drawing is provided by the Document
          Management System (DMS), a computer data base which is updated
          by DCC as required by Section 5.1.4 of BAP 2.0.
          Sections 6.4.2 and 6.4.3 of the BA QA Manual mandate a computer
          data base which maintains accountability and current status of
          all documents received or issued at the site including design,
            fabrication and installation drawings, design specifications,
          change documents and work packages and travelers.          There are            i
i          currently two computer data bases in use at the CPS which
          address this requirement: DMS, which lists active change
          documents issued at the site against the corresponding speci-
          fications and design drawings, and Construction Management
            Information (CMI), which lists all design change documents and
          the affected design drawings and specifications. A Traveler
          Tracking System (TTS), which is a subset of CMI, lists the
          status and location of traveler documents, and can optionally
          reference the associated design and change documents. IP is
'
'
          now in the process of developing a computer data base system to
,
l       provide for better tracking and integration of data in these
I
'
While BAP 2.0.1 controls the transmittal, distribution and
          computer data basis systems.
'
receipt of changes to specifications, procedures and drawings,
the overall status of all change documents outstanding against
'
a given specification or drawing is provided by the Document
Management System (DMS), a computer data base which is updated
by DCC as required by Section 5.1.4 of BAP 2.0.
Sections 6.4.2 and 6.4.3 of the BA QA Manual mandate a computer
data base which maintains accountability and current status of
all documents received or issued at the site including design,
fabrication and installation drawings, design specifications,
change documents and work packages and travelers.
There are
i
currently two computer data bases in use at the CPS which
i
address this requirement:
DMS, which lists active change
documents issued at the site against the corresponding speci-
fications and design drawings, and Construction Management
Information (CMI), which lists all design change documents and
the affected design drawings and specifications.
A Traveler
Tracking System (TTS), which is a subset of CMI, lists the
status and location of traveler documents, and can optionally
reference the associated design and change documents.
IP is
now in the process of developing a computer data base system to
'
l
provide for better tracking and integration of data in these
'
computer data basis systems.
4
4
1
1
]                                 VII-3
]
                                                  - - - -
VII-3
- - - -


  (2) Tables VII-1 and VII-2 list the drawings, specifications and
(2) Tables VII-1 and VII-2 list the drawings, specifications and
      procedures selected for review, as well as the BA locations
procedures selected for review, as well as the BA locations
      where copies of these controlled documents were accessed.         For
where copies of these controlled documents were accessed.
        this documentation sample, the following information was
For
      accessed:       the S&L transmittal letters, the DCC transmittal
this documentation sample, the following information was
      documents, the DMS computer data base lists of the active
accessed:
      change documents posted against each drawing and specification,
the S&L transmittal letters, the DCC transmittal
      and the index to the latest revisions of the BA installation
documents, the DMS computer data base lists of the active
      and inspection procedures.
change documents posted against each drawing and specification,
      Controlled copies of the drawings, specifications and proce-
and the index to the latest revisions of the BA installation
      dures listed in Tables VII-1 and VII-2 were reviewed in the RE
and inspection procedures.
      offices and the FDC to check that specifications were properly
Controlled copies of the drawings, specifications and proce-
      amended and that no superseded materials were present, and that
dures listed in Tables VII-1 and VII-2 were reviewed in the RE
      the change documents posted with the specifications were
offices and the FDC to check that specifications were properly
      consistent with the DMS computer data base listings of active
amended and that no superseded materials were present, and that
      change documents for those specifications. Drawings were
the change documents posted with the specifications were
      checked to confirm that the latest revision of the drawings
consistent with the DMS computer data base listings of active
      were with the stick file and that the active change documents
change documents for those specifications.
        listed in the change documents blocks by authorized BA
Drawings were
      personnel were consistent with the change documents listed in
checked to confirm that the latest revision of the drawings
were with the stick file and that the active change documents
listed in the change documents blocks by authorized BA
personnel were consistent with the change documents listed in
I
I
      the DMS computer data base. The BA installation and inspection
the DMS computer data base.
      procedures were checked to confirm that the latest revisions to       ,
The BA installation and inspection
      the procedures were posted, and that no superseded materials
procedures were checked to confirm that the latest revisions to
      were present.
,
      The NRC CAT inspectors identified three categories of defi-
the procedures were posted, and that no superseded materials
      ciencies during the course of this review: the presence of
were present.
      superseded or voided portions of specifications and procedures,
The NRC CAT inspectors identified three categories of defi-
      or inconsistencies between procedures; discrepancies between
ciencies during the course of this review:
      the active change documents listed in the DMS computer data
the presence of
      base for a given specification and the change document
superseded or voided portions of specifications and procedures,
      included with that specification; and discrepancies between the
or inconsistencies between procedures; discrepancies between
      active change documents listed in the OMS computer data base
the active change documents listed in the DMS computer data
      for a given drawing and the change documents included on the
base for a given specification and the change document
      change documents block.
included with that specification; and discrepancies between the
  (3) The NRC CAT inspectors documented the following discrepancies
active change documents listed in the OMS computer data base
      relative to superseded or voided portions of specifications and
for a given drawing and the change documents included on the
      procedures, inconsistencies between procedures, and of one
change documents block.
      instance of drawing illegibility:
(3) The NRC CAT inspectors documented the following discrepancies
      *
relative to superseded or voided portions of specifications and
            A superseded copy (dated March 4, 1985) of the S&L Document
procedures, inconsistencies between procedures, and of one
            Index System Foreign Document Report was on file at BA
instance of drawing illegibility:
            civil / structural (C/S) RE.   This document is distributed by
*
            BA DCC as received on site from S&L. Distribution of this
A superseded copy (dated March 4, 1985) of the S&L Document
Index System Foreign Document Report was on file at BA
civil / structural (C/S) RE.
This document is distributed by
BA DCC as received on site from S&L.
Distribution of this
!
!
            document is not controlled in accordance with BAP 2.0 and
document is not controlled in accordance with BAP 2.0 and
            its presence without stamping as an uncontrolled item could
its presence without stamping as an uncontrolled item could
            result in the RE's inappropriate use in preparation of work
result in the RE's inappropriate use in preparation of work
            packages.
packages.
      *
*
            The BA C/S RE-12 controlled copy of the BA Project Proce-
The BA C/S RE-12 controlled copy of the BA Project Proce-
j           dures Manual contained superseded copies of BAP 1.1 and BAP
j
t           2. 0.1. BAP 2.11 contained an Attachment A that was not
dures Manual contained superseded copies of BAP 1.1 and BAP
t
2. 0.1.
BAP 2.11 contained an Attachment A that was not
l
l
                                VII-4
VII-4


  .
.
              formally listed as an attachment in the procedure. BAP
formally listed as an attachment in the procedure.
              2.41 was incorrectly filed under tab number 2.40, but BAP
BAP
              2.40 was not on the distribution list for that controlled
2.41 was incorrectly filed under tab number 2.40, but BAP
              copy.     A superseded copy of BAP 3.1.8 was incorrectly
2.40 was not on the distribution list for that controlled
!             filed under tab number 3.1.4; however, the current revision
copy.
              of BAP 3.1.8 was correctly filed.
A superseded copy of BAP 3.1.8 was incorrectly
        *
!
              FDC files CL-series drawings on aperture cards. The five
filed under tab number 3.1.4; however, the current revision
              CL-series drawings listed in Table VII-2 were requested for
of BAP 3.1.8 was correctly filed.
              review. The aperture caros identified the correct revision
*
              numbers for the drawings, but were stamped "0RIGINAL DRWG.
FDC files CL-series drawings on aperture cards.
              NOT LEGIBLE FOR MICROFILM." Blowbacks of the cards con-
The five
              firmed drawing illegibility.     An examination of the
CL-series drawings listed in Table VII-2 were requested for
              full-size sepias at DCC indicated that one of the five
review.
              sepias could not be legibly reproduced. Whether the
The aperture caros identified the correct revision
              illegible sepia was used in producing drawings included
numbers for the drawings, but were stamped "0RIGINAL DRWG.
              with a traveler needs to be verified and the affect of its
NOT LEGIBLE FOR MICROFILM." Blowbacks of the cards con-
              use on construction determined.
firmed drawing illegibility.
        *
An examination of the
              Amendment 5 to the FDC copy of S&L specification K-2947
full-size sepias at DCC indicated that one of the five
              and Amendment 11 to the FDC copy of S&L specification
sepias could not be legibly reproduced.
              K-2948 had not been incorporated into the specifications.
Whether the
              Voided pages were not removed.
illegible sepia was used in producing drawings included
        *
with a traveler needs to be verified and the affect of its
              The BA Traveler Preparation Review Group (TPRG) copy V-530
use on construction determined.
              of S&L specification K-2882 contained a superseded copy of
*
              seven page Attachment 322.
Amendment 5 to the FDC copy of S&L specification K-2947
        *
and Amendment 11 to the FDC copy of S&L specification
              BAP 2.1.6 was filed with the TPRG copy of the BA Procedures
K-2948 had not been incorporated into the specifications.
              Manual, although shown deleted in the table of contents.
Voided pages were not removed.
        *
*
              BA QA Manual, subsection 6.5.3.1, requires that design
The BA Traveler Preparation Review Group (TPRG) copy V-530
              change documents be " posted and distributed by the Document
of S&L specification K-2882 contained a superseded copy of
              Control Center to the affected drawings or work controlling
seven page Attachment 322.
              documents as noted on the design change document." BAP
*
              2.0.1, subsection 5.5, requires the recipient of a change
BAP 2.1.6 was filed with the TPRG copy of the BA Procedures
              document to maintain a file of open change documents.
Manual, although shown deleted in the table of contents.
              However, BAP 2.0, subsection 5.1.3 was revised on April 5,
*
              1985 to note that stamp affixed change documents will no
BA QA Manual, subsection 6.5.3.1, requires that design
              longer be distributed directly to the holders of the
change documents be " posted and distributed by the Document
              affected documents.     This revision of BAP 2.0 is incon-
Control Center to the affected drawings or work controlling
              sistant with the current requirement of the BA QA Manual.
documents as noted on the design change document." BAP
              The interim IP response provided during the NRC CAT inspec-
2.0.1, subsection 5.5, requires the recipient of a change
              tion does not adequately address this finding.           ,
document to maintain a file of open change documents.
    (4) The following discrepancies were documented between the active
However, BAP 2.0, subsection 5.1.3 was revised on April 5,
        change documents posted in the DMS data base for a given
1985 to note that stamp affixed change documents will no
        specification and the change documents posted with that
longer be distributed directly to the holders of the
        specification.
affected documents.
        *
This revision of BAP 2.0 is incon-
I             FCR 35687 was not filed with the FDC copy of S&L speci-
sistant with the current requirement of the BA QA Manual.
l             fication K-2947, but was listed in DMS.     IP indicated
The interim IP response provided during the NRC CAT inspec-
tion does not adequately address this finding.
,
(4) The following discrepancies were documented between the active
change documents posted in the DMS data base for a given
specification and the change documents posted with that
specification.
*
I
FCR 35687 was not filed with the FDC copy of S&L speci-
l
fication K-2947, but was listed in DMS.
IP indicated
'
'
              that FCR 35687 is stamp affixed. IP will correct DMS to
that FCR 35687 is stamp affixed.
              list this change document as stamp-affixed.
IP will correct DMS to
                                VII-5
list this change document as stamp-affixed.
VII-5


"
"
  The following change documents were listed in DMS but were
The following change documents were listed in DMS but were
  not filed with the TPRG, V-530 copy of S&L specification
not filed with the TPRG, V-530 copy of S&L specification
  K-2882:   ECNs 4511, 4822, 4832, 4853 and 5234; FCRs 1847,
K-2882:
  26283, 26754, 28060, 30783 and 37478, and NCR 29249.
ECNs 4511, 4822, 4832, 4853 and 5234; FCRs 1847,
  IP indicated that the DMS listing of the ECNs is correct,
26283, 26754, 28060, 30783 and 37478, and NCR 29249.
  and that copies will be posted with the specification; FCR
IP indicated that the DMS listing of the ECNs is correct,
  1847 is a stamp-affixed change document. IP will correct
and that copies will be posted with the specification; FCR
  DMS to list FCR 1847 as stamp-affixed. DMS correctly lists
1847 is a stamp-affixed change document.
  the remaining FCRs and the NCR as outstanding against the
IP will correct
  specification, and copies of these change documents will be
DMS to list FCR 1847 as stamp-affixed.
  posted in the specification.
DMS correctly lists
the remaining FCRs and the NCR as outstanding against the
specification, and copies of these change documents will be
posted in the specification.
*
*
  The following change documents were filed with the TPRG,
The following change documents were filed with the TPRG,
  V-530 copy of S&L specification K-2882, but were not listed
V-530 copy of S&L specification K-2882, but were not listed
  in DMS: ECHs 3634, 3929, 3954, 3960, 3996, 4017, 4061,
in DMS:
  4265, 4281 and 4291; FCRs 17682, 19020, 20351, 20605,
ECHs 3634, 3929, 3954, 3960, 3996, 4017, 4061,
  20667, 20687, 20742, 21243, 21404, 21770, 21899, 22227,
4265, 4281 and 4291; FCRs 17682, 19020, 20351, 20605,
  22578, 22607, 22666, 22677, 22678, 22867, 23129, 23193,
20667, 20687, 20742, 21243, 21404, 21770, 21899, 22227,
  23360, 23640, 24317, 24407, 24559, 24654, 24682, 24655,
22578, 22607, 22666, 22677, 22678, 22867, 23129, 23193,
  24940, 25431, 28071, 30185, 30328, 31502 and 36345; FCR
23360, 23640, 24317, 24407, 24559, 24654, 24682, 24655,
  24416 was filed with the specification, and is not
24940, 25431, 28071, 30185, 30328, 31502 and 36345; FCR
  stanp-3ffixed, but is listed in DMS as a stamp-affixed
24416 was filed with the specification, and is not
  change document.     IP indicated that the ECNs and FCRs
stanp-3ffixed, but is listed in DMS as a stamp-affixed
  listed above had all been superseded or incorporated, and
change document.
  have been removed from the specification. IP will
IP indicated that the ECNs and FCRs
  correct DMS to list FCR 24416 as not stamp-affixed.
listed above had all been superseded or incorporated, and
have been removed from the specification.
IP will
correct DMS to list FCR 24416 as not stamp-affixed.
*
*
  The following change documents were listed in DMS but were
The following change documents were listed in DMS but were
  not filed with the TfRG, V-460, (P/DRFT) copy of S&L
not filed with the TfRG, V-460, (P/DRFT) copy of S&L
  specification K-2882: ECNs 4832, 4853, 4858, and 4943;
specification K-2882:
  FCRs 1847 and 34643, and NCR 29249. IP indicated that DMS
ECNs 4832, 4853, 4858, and 4943;
  correctly lists the ECNs as active against the specifica-
FCRs 1847 and 34643, and NCR 29249.
  tion, and copies of these change documents will be included
IP indicated that DMS
  with the specification.     IP will correct DMS to list FCR
correctly lists the ECNs as active against the specifica-
  1847 as a stamp-affixed change document. IP indicated
tion, and copies of these change documents will be included
  that DMS correctly lists FCR 34643 and NCR 29249 as active
with the specification.
  against the specification, and copies of these change
IP will correct DMS to list FCR
  documents will be posted with the specification.
1847 as a stamp-affixed change document.
IP indicated
that DMS correctly lists FCR 34643 and NCR 29249 as active
against the specification, and copies of these change
documents will be posted with the specification.
*
*
  The following change documents were filed with the TPRG,
The following change documents were filed with the TPRG,
  V-460 (P/DRFT) copy of S&L specification K-2882, but were
V-460 (P/DRFT) copy of S&L specification K-2882, but were
  not listed in DMS: ECNs 4380, 4469 and 4895; FCRs 22867,
not listed in DMS:
  24317, 28071, 30328 and 36345; FECNs 6639, 7529 # (stamp-
ECNs 4380, 4469 and 4895; FCRs 22867,
  affixed) and 9478. FCR 24416 which was filed with the
24317, 28071, 30328 and 36345; FECNs 6639, 7529 # (stamp-
  specification and was not stamp-affixed, was listed as
affixed) and 9478.
  stamp-affixed in DMS. IP indicated that the ECNs, FCRs
FCR 24416 which was filed with the
  and FECNs listed above were all superseded change docu-
specification and was not stamp-affixed, was listed as
  ments, and will be removed from the specification. IP will
stamp-affixed in DMS.
  correct DMS to list FCR 24416 as not stamp-affixed.
IP indicated that the ECNs, FCRs
and FECNs listed above were all superseded change docu-
ments, and will be removed from the specification.
IP will
correct DMS to list FCR 24416 as not stamp-affixed.
*
*
  The following change documents were listed in DMS, but
The following change documents were listed in DMS, but
  were not filed with the FDC, V-300 (FDC/R) copy of S&L
were not filed with the FDC, V-300 (FDC/R) copy of S&L
  specification K-2882: FCRs 1847, 6480 and 22962, and FECN
specification K-2882:
  8778. FECN 6639 and FCR 1874 were filed with the speci-
FCRs 1847, 6480 and 22962, and FECN
                    VII-6
8778.
                                                  . _ _ _ _ _ _ _ _ _ _ - - _ _ -
FECN 6639 and FCR 1874 were filed with the speci-
VII-6
.
- -
-


  fication but were not listed in DMS. IP will correct DMS
fication but were not listed in DMS.
  to list FCR 1847 as a stamp-affixed change document. IP
IP will correct DMS
  indicated that DMS correctly lists FCRs 6480 and 22962, and
to list FCR 1847 as a stamp-affixed change document.
  FECN 8778 as outstanding against the specification, and
IP
  copies of these change documents will be posted with the
indicated that DMS correctly lists FCRs 6480 and 22962, and
  specification; FECN 6639 is a superseded change document;
FECN 8778 as outstanding against the specification, and
  and FCR 1874 is incorrectly posted with the specification.
copies of these change documents will be posted with the
  Due to the results of the review of TPGR, V-460 and TPGR,
specification; FECN 6639 is a superseded change document;
  V-530 copies of specification K-2882, a followup review of
and FCR 1874 is incorrectly posted with the specification.
  a third copy of the five controlled copies of this specifi-
Due to the results of the review of TPGR, V-460 and TPGR,
  cation was performed.
V-530 copies of specification K-2882, a followup review of
  A new DMS printout was accessed and the 104 active design
a third copy of the five controlled copies of this specifi-
  change documents listed (all nonstamp-affixed) were
cation was performed.
  checked against the change documents filed with the TPRG,
A new DMS printout was accessed and the 104 active design
  V-460, (D-6) copy of specification K-2882. All change docu-
change documents listed (all nonstamp-affixed) were
  ments were on file, with one exception:     NCR-0114 (one of
checked against the change documents filed with the TPRG,
  seven active NCRs).     Approximately 200 pages associated with
V-460, (D-6) copy of specification K-2882.
  Amendment 11 to the specification were also audited, using
All change docu-
  the S&L transmittal listing the pages to be voided or
ments were on file, with one exception:
  inserted. There were no deficiencies identified.
NCR-0114 (one of
  IP's response to NRC CAT findings for the initial two
seven active NCRs).
  copies (V-460 and V-530) of specification K-2882 reviewed
Approximately 200 pages associated with
  noted that these copies have been permanently returned to
Amendment 11 to the specification were also audited, using
  Document Control and the third copy (06/V-460) will now be
the S&L transmittal listing the pages to be voided or
  used as the sole reference of the Piping Department.
inserted.
  Further, the licensee indicated that a full time Document
There were no deficiencies identified.
  Control clerk has been assigned the responsibility for
IP's response to NRC CAT findings for the initial two
  maintaining the controlled documents of the Piping Depart-
copies (V-460 and V-530) of specification K-2882 reviewed
  ment.
noted that these copies have been permanently returned to
Document Control and the third copy (06/V-460) will now be
used as the sole reference of the Piping Department.
Further, the licensee indicated that a full time Document
Control clerk has been assigned the responsibility for
maintaining the controlled documents of the Piping Depart-
ment.
*
*
  The following change documents were listed in DMS but were
The following change documents were listed in DMS but were
  not filed with the TPRG, V-460, (D-6) copy of S&L speci-
not filed with the TPRG, V-460, (D-6) copy of S&L speci-
  fication K-2884: ECNs 4683; FCRs 29144 and 32822, and NCR
fication K-2884:
  70021. FCR 24317 was filed with the specification, but was
ECNs 4683; FCRs 29144 and 32822, and NCR
  not listed in DMS. IP indicated that DMS correctly lists
70021.
  the ECNs, FCRs and the NCR as outstanding against the
FCR 24317 was filed with the specification, but was
  specification, and copies of these change documents will be
not listed in DMS.
  posted with the specification; FCR 24317 is a superseded
IP indicated that DMS correctly lists
  change document and will be removed from the specification.
the ECNs, FCRs and the NCR as outstanding against the
specification, and copies of these change documents will be
posted with the specification; FCR 24317 is a superseded
change document and will be removed from the specification.
*
*
  FCRs 27508 and 27545 were listed in DMS but were not filed
FCRs 27508 and 27545 were listed in DMS but were not filed
  with the FDC copy of S&L specification K-2999. NCR 51358
with the FDC copy of S&L specification K-2999.
  was listed in DMS but was not filed with the specification.
NCR 51358
  FCR 7113 had been removed from the file of change documents
was listed in DMS but was not filed with the specification.
  posted with the specification.     IP did not provide an
FCR 7113 had been removed from the file of change documents
  interim response during the NRC CAT inspection.
posted with the specification.
IP did not provide an
interim response during the NRC CAT inspection.
*
*
  FECN 5081 was filed with the V-465, E/McGUIRE copy of S&L
FECN 5081 was filed with the V-465, E/McGUIRE copy of S&L
  specification K-2999, but was not listed in DMS.     IP did
specification K-2999, but was not listed in DMS.
  not provide an interim response during the NRC CAT
IP did
  inspection.
not provide an interim response during the NRC CAT
                    VII-7
inspection.
VII-7
-
-
.
.


  _ -_-____ - ___ - __-___-__-_                       .     .-
_ -_-____ - ___ - __-___-__-_
                                (5) The following discrepancies were documented between the active
.
                                    change documents posted in the DMS data base for a given
.-
                                    drawing, the change documents posted with the drawing, and the
(5) The following discrepancies were documented between the active
                                    change documents listed on the change documents block:
change documents posted in the DMS data base for a given
                                    *
drawing, the change documents posted with the drawing, and the
                                          FCR 32933 is listed on the change documents blocks of the
change documents listed on the change documents block:
                                          C/S RE copies of BA drawing CL1-27-S-136 and S&L drawing
*
                                          S27-1001-03B, but is not listed in DMS.     IP indicated that
FCR 32933 is listed on the change documents blocks of the
                                          FCR 32933 was superseded by FCR 37573 and removed from DMS
C/S RE copies of BA drawing CL1-27-S-136 and S&L drawing
                                          on May 22, 1985. The transmittal receipt returned to
S27-1001-03B, but is not listed in DMS.
                                          DCC is dated May 24, 1985. The change documents blocks
IP indicated that
                                        were therefore not updated in a timely manner.
FCR 32933 was superseded by FCR 37573 and removed from DMS
                                    *
on May 22, 1985.
                                          FCR 35968 is listed on the change documents block of the
The transmittal receipt returned to
                                          C/S RE copy of S&L drawing S27-1003-03A, but is not listed
DCC is dated May 24, 1985.
                                          in DMS.   IP indicated that FCR 35968 was superseded by FCR
The change documents blocks
                                          37971 and was removed from DMS on May 25, 1985.       The
were therefore not updated in a timely manner.
                                          transmittal receipt returned to BA DCC is dated May 28,
*
                                          1985.   The change documents block was therefore not updated
FCR 35968 is listed on the change documents block of the
                                          in a timely manner.
C/S RE copy of S&L drawing S27-1003-03A, but is not listed
                                    *
in DMS.
                                          NCR 29699 is listed on the change documents block of the
IP indicated that FCR 35968 was superseded by FCR
                                          C/S RE copy of S&L drawing S28-1002-02A.     DMS lists NCR
37971 and was removed from DMS on May 25, 1985.
                                          29699 as stamp-affixed. IP indicated that DMS correctly
The
                                          lists NCR 29699 as stamp-affixed. The change document
transmittal receipt returned to BA DCC is dated May 28,
                                          should not be posted on the change documents block.
1985.
                                    *
The change documents block was therefore not updated
                                          FCR 25139 is not filed with the FDC copy of S&L drawing
in a timely manner.
                                          S29-1422, but is listed in DMS.     IP indicated that: DMS
*
                                          correctly lists FCR 25139 as outstanding against the
NCR 29699 is listed on the change documents block of the
                                          drawing, and that a copy of the change document will be
C/S RE copy of S&L drawing S28-1002-02A.
                                          posted with the drawing, the FCR is incorporated in both
DMS lists NCR
                                          travelers (53369 and S3370), and there is no impact on
29699 as stamp-affixed.
                                          hardware.
IP indicated that DMS correctly
                                    *
lists NCR 29699 as stamp-affixed.
                                          FCR 32686 is not filed with the FDC copy of S&L drawing
The change document
                                          M09-1001N, but is listed in DMS.     IP did not provide an
should not be posted on the change documents block.
                                          interim response for FCR 32686 during the NRC CAT inspec-
*
                                          tion.
FCR 25139 is not filed with the FDC copy of S&L drawing
                                    *
S29-1422, but is listed in DMS.
                                          ECN 3332 and NCR 5351 R/3 were listed in DMS but were not
IP indicated that:
DMS
correctly lists FCR 25139 as outstanding against the
drawing, and that a copy of the change document will be
posted with the drawing, the FCR is incorporated in both
travelers (53369 and S3370), and there is no impact on
hardware.
*
FCR 32686 is not filed with the FDC copy of S&L drawing
M09-1001N, but is listed in DMS.
IP did not provide an
interim response for FCR 32686 during the NRC CAT inspec-
tion.
*
ECN 3332 and NCR 5351 R/3 were listed in DMS but were not
t
t
                                          listed on the change documents block of the BA Start-Up
listed on the change documents block of the BA Start-Up
                                          Field (SU-F) office copies of S&L drawings M-1SX01017R,
Field (SU-F) office copies of S&L drawings M-1SX01017R,
                                          sheets 1 and 2. It appears that ECN 3332 has already been
sheets 1 and 2.
                                          incorporated into the drawings. IP indicated that ECN 3332
It appears that ECN 3332 has already been
                                          should not be outstanding against the drawing, and DMS will
incorporated into the drawings.
                                          be corrected. IP did not provide an interm response on NCR
IP indicated that ECN 3332
                                          5351 R/3.
should not be outstanding against the drawing, and DMS will
                                    *
be corrected.
                                          FCR 27389 is listed in DMS but was not listed on the
IP did not provide an interm response on NCR
                                          change documents block of the BA SU-F copy of S&L drawing
5351 R/3.
                                          M-1SX01048X.     IP indicated that DMS correctly lists FCR
*
                                          27389 as outstanding against the drawing. The transmittal
FCR 27389 is listed in DMS but was not listed on the
                                          receipt returned to BA DCC is dated August 29, 1984. The
change documents block of the BA SU-F copy of S&L drawing
                                          change documents block was therefore not properly updated.
M-1SX01048X.
                                                            VII-8
IP indicated that DMS correctly lists FCR
27389 as outstanding against the drawing.
The transmittal
receipt returned to BA DCC is dated August 29, 1984.
The
change documents block was therefore not properly updated.
VII-8


                                        ____________
____________
                                                                      -
-
      *
*
            ECN 3332 is listed in DMS but was not listed on the change
ECN 3332 is listed in DMS but was not listed on the change
            documents block of the SU-F copy of S&L drawings M-2SX01028R,
documents block of the SU-F copy of S&L drawings M-2SX01028R,
            sheets 1 and 2. It appears that ECN 3332 has already been
sheets 1 and 2.
            incorporated into the drawings. IP indicated that ECN 332
It appears that ECN 3332 has already been
            should not be outstanding against the drawing, and DMS will
incorporated into the drawings.
            be corrected.
IP indicated that ECN 332
  (6) NRC CAT inspectors reviewed the IP audit program to determine
should not be outstanding against the drawing, and DMS will
      whether the discrepancies identified in the construction design
be corrected.
      change control area had previously been addressed by IP audit
(6) NRC CAT inspectors reviewed the IP audit program to determine
      personnel.
whether the discrepancies identified in the construction design
      Sections 18 of the IP Nuclear Power American Society of
change control area had previously been addressed by IP audit
      Mechanical Engineers (ASME) QA manual and the IP Nuclear Power
personnel.
      Construction QA manual define the requirements for a planned
Sections 18 of the IP Nuclear Power American Society of
      system of periodic audits to verify compliance with the quality
Mechanical Engineers (ASME) QA manual and the IP Nuclear Power
      assurance program at CPS.
Construction QA manual define the requirements for a planned
      The IP audit program is also discussed on page IV-30 of IP
system of periodic audits to verify compliance with the quality
      report, Results of Quality Programs for Construction of Clinton
assurance program at CPS.
      Power Station, with Appendices, NRC Docket No. 50-461, dated
The IP audit program is also discussed on page IV-30 of IP
      February 1985. Appendix B of that report summarizes each of
report, Results of Quality Programs for Construction of Clinton
      the IP QA audits of the BA and IP organizations that were
Power Station, with Appendices, NRC Docket No. 50-461, dated
      scheduled and performed for the period 1982-1984.
February 1985.
      Table VII-3 lists the sample of IP audits of activities
Appendix B of that report summarizes each of
      reviewed by the NRC CAT inspectors. The activities reviewed by
the IP QA audits of the BA and IP organizations that were
      IP, as well as audit findings, indicate that a number of the
scheduled and performed for the period 1982-1984.
      NRC CAT inspection design document control findings in this
Table VII-3 lists the sample of IP audits of activities
      report were similar to those previously identified by IP.             For j
reviewed by the NRC CAT inspectors.
      example, IP audit report Q31-83-8, dated July 28, 1983, audit
The activities reviewed by
      finding PD-1, noted that BA procedures did not describe the
IP, as well as audit findings, indicate that a number of the
      activities associated with the use and updating of the DMS,
NRC CAT inspection design document control findings in this
      CMI or Aquarius (a historical file) computer programs. IP
report were similar to those previously identified by IP.
      audit personnel also documented discrepancies between these
For
      computer programs, and documented additional discrepancies when
j
      these computer programs were compared to the specific design
example, IP audit report Q31-83-8, dated July 28, 1983, audit
      documents and the Document Review and Record cards. This audit
finding PD-1, noted that BA procedures did not describe the
      finding was closed by IP on May 23, 1985. In another example,
activities associated with the use and updating of the DMS,
      IP audit report Q31-85-02, dated April 4, 1985, audit finding
CMI or Aquarius (a historical file) computer programs.
      10-1 noted seven procedure updating discrepancies in nine
IP
audit personnel also documented discrepancies between these
computer programs, and documented additional discrepancies when
these computer programs were compared to the specific design
documents and the Document Review and Record cards.
This audit
finding was closed by IP on May 23, 1985.
In another example,
IP audit report Q31-85-02, dated April 4, 1985, audit finding
10-1 noted seven procedure updating discrepancies in nine
copies of BAP QC piping and mechanical field office manuals.
,
,
      copies of BAP QC piping and mechanical field office manuals.
Therefore, IP has implemented an audit program to verify
      Therefore, IP has implemented an audit program to verify
compliance with the design document control provisions of the
      compliance with the design document control provisions of the
quality assurance program at CPS.
      quality assurance program at CPS.             However, based on NRC CAT
However, based on NRC CAT
      findings, IP audit program corrective actions were not
findings, IP audit program corrective actions were not
      effective since the acti^n -taken did not provide for the
effective since the acti^n -taken did not provide for the
      prevention of the excest.ve deficiencies identified by the NRC
prevention of the excest.ve deficiencies identified by the NRC
      CAT.
CAT.
                            VII-9
VII-9
                                    --                       _ _ _ _
--
_ _ _ _


            _ _ - _ ..
_ _ - _ ..
  c. Conclusions
c.
    Design document control is generally acceptable for the overall
Conclusions
    scope of items sampled with the exception of the high rate of
Design document control is generally acceptable for the overall
    discrepancies identified in certain areas.     These included the
scope of items sampled with the exception of the high rate of
    updating of procedures for the one sampled copy of a project pro-
discrepancies identified in certain areas.
    cedures manual, and the discrepancies between the active change
These included the
    documents listed in the DMS computer data bases against two con-
updating of procedures for the one sampled copy of a project pro-
    trolled copies of piping design specification K-2882 and the change
cedures manual, and the discrepancies between the active change
    documents physically posted with each copy of the specification. In
documents listed in the DMS computer data bases against two con-
    addition, examples of other discrepancies were identified such as:
trolled copies of piping design specification K-2882 and the change
    the timeliness of updating change document blocks or design change
documents physically posted with each copy of the specification.
    documents to be listed in DMS, the presence of an illegible sepia
In
    drawing at DCC, and the inconsistency of the revision of BAP 2.0
addition, examples of other discrepancies were identified such as:
    with the BA QA Manual.
the timeliness of updating change document blocks or design change
    The examples of discrepancies identified by the NRC CAT - as cur-
documents to be listed in DMS, the presence of an illegible sepia
    rently present in the controlled project procedures and in the
drawing at DCC, and the inconsistency of the revision of BAP 2.0
    listing of design change documents for controlled specifications,
with the BA QA Manual.
    drawings and their DMS computer data bases - are similar to the
The examples of discrepancies identified by the NRC CAT - as cur-
    deficiencies previously identified in those areas by IP QA audits
rently present in the controlled project procedures and in the
    and, in part, by NRC Region III and Resident inspectors. Therefore,
listing of design change documents for controlled specifications,
    the effectiveness of IP corrective action was apparently inadequate
drawings and their DMS computer data bases - are similar to the
    .
deficiencies previously identified in those areas by IP QA audits
    IP interim responses to NRC CAT findings in this area generally
and, in part, by NRC Region III and Resident inspectors.
    indicated that the causes of the individual discrepancies in design
Therefore,
    change or procedure document control will be determined and that
the effectiveness of IP corrective action was apparently inadequate
    corrective action would be taken. IP needs to address the generic
.
    implications of NRC CAT findings for the types of discrepancies
IP interim responses to NRC CAT findings in this area generally
    identified in the the project procedures manual and specification
indicated that the causes of the individual discrepancies in design
    K-2882.
change or procedure document control will be determined and that
  2. Control of Design Change Documents
corrective action would be taken.
  a. Inspection Scope
IP needs to address the generic
    The following documents provide the basic acceptance criteria for
implications of NRC CAT findings for the types of discrepancies
    the inspection:
identified in the the project procedures manual and specification
K-2882.
2.
Control of Design Change Documents
a.
Inspection Scope
The following documents provide the basic acceptance criteria for
the inspection:
,
,
          IP Corporate Nuclear Procedure (CNP) 3.03, " Nonconforming
IP Corporate Nuclear Procedure (CNP) 3.03, " Nonconforming
l         Material Report," Rev. 4, dated July 18, 1984
l
    *
Material Report," Rev. 4, dated July 18, 1984
l         IP Nuclear Station Engineering Department (NSED) Procedure
*
          D.8, " Handling Clinton Power Station Field Change Requests,"
l
          Rev. 4, dated September 27, 1984
IP Nuclear Station Engineering Department (NSED) Procedure
          IP NSED Procedure D.9, " Handling Clinton Power Station
D.8, " Handling Clinton Power Station Field Change Requests,"
          Field Problem Reports," Rev. 3, dated July 17, 1984
Rev. 4, dated September 27, 1984
          IP NSED Procedure D.12, " Preparation and Control of Field
IP NSED Procedure D.9, " Handling Clinton Power Station
          Engineering Change Notices," Rev. 1, dated November 19,
Field Problem Reports," Rev. 3, dated July 17, 1984
          1984
IP NSED Procedure D.12, " Preparation and Control of Field
                                VII-10
Engineering Change Notices," Rev. 1, dated November 19,
1984
VII-10


                            _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
  *
*
    IP CPS Procedure D.7, " Handling Clinton Power Station
IP CPS Procedure D.7, " Handling Clinton Power Station
    Nonconformance Reports," Rev. 6, dated February 28, 1985
Nonconformance Reports," Rev. 6, dated February 28, 1985
    IP Nuclear Power Construction Quality Assurance Manual,
IP Nuclear Power Construction Quality Assurance Manual,
    Rev. 12, dated March 12, 1985
Rev. 12, dated March 12, 1985
    IP Nuclear Power ASME Quality Assurance Manual, Rev. 5,
IP Nuclear Power ASME Quality Assurance Manual, Rev. 5,
    dated March 5, 1985
dated March 5, 1985
  *
*
    IP Records Management System Standards No. 2.05, " Standard
IP Records Management System Standards No. 2.05, " Standard
    for the Maintenance of Distributed Documents," Rev. 1,
for the Maintenance of Distributed Documents," Rev. 1,
    dated March 7, 1985
dated March 7, 1985
    IP NP&S Procedure No. 2.51, " Document Control Procedure," Rev.
IP NP&S Procedure No. 2.51, " Document Control Procedure," Rev.
    O, dated June 11, 1985
O, dated June 11, 1985
  *
*
    S&L General QA Procedure GQ-3.07, "Sargent & Lundy Drawings,"
S&L General QA Procedure GQ-3.07, "Sargent & Lundy Drawings,"
    Rev. 6, dated October 21, 1981
Rev. 6, dated October 21, 1981
    S&L General QA Procedure GQ-3.13, " Engineering Change
S&L General QA Procedure GQ-3.13, " Engineering Change
    Notices," Rev. 6, dated October 21, 1981
Notices," Rev. 6, dated October 21, 1981
    S&L General QA Procedure GQ-3.15, " Approved Procedural
S&L General QA Procedure GQ-3.15, " Approved Procedural
    Deviations," Rev. 1, dated January 26, 1981
Deviations," Rev. 1, dated January 26, 1981
  *
*
    S&L General QA Procedure GQ-4.01, " Procurement Specifica-
S&L General QA Procedure GQ-4.01, " Procurement Specifica-
    tions," Rev. 10, dated August 15, 1983
tions," Rev. 10, dated August 15, 1983
  *
*
    S&L Project Instruction PI-CP-003, " Processing a Baldwin
S&L Project Instruction PI-CP-003, " Processing a Baldwin
    Associates Field Change Request or Nonconformance Report,"
Associates Field Change Request or Nonconformance Report,"
    Rev. 13, dated May 31, 1984
Rev. 13, dated May 31, 1984
                                                                            l
l
    S&L PI-CP-004, " Control of Clinton Engineering Change
S&L PI-CP-004, " Control of Clinton Engineering Change
    Notice (ECN)," Rev. 10, dated November 7, 1984
Notice (ECN)," Rev. 10, dated November 7, 1984
  "
"
j   S&L PI-CP-021, " Processing an Illinois Power Company Field
j
    Problem Report," Rev. 5, dated November 7, 1984
S&L PI-CP-021, " Processing an Illinois Power Company Field
    S&L PI-CP-022, " Control of Clinton Field Engineering
Problem Report," Rev. 5, dated November 7, 1984
    Change Notices (FECN)," Rev. 5, dated October 5, 1984                   l
S&L PI-CP-022, " Control of Clinton Field Engineering
                                                                            !
Change Notices (FECN)," Rev. 5, dated October 5, 1984
    S&L PI-CP-046, " Processing an Illinois Power Company                   l
l
    Nonconforming Material Report (NCMR)," Rev. 2, dated                   l
!
    October 10, 1984                                                       '
S&L PI-CP-046, " Processing an Illinois Power Company
    BA QA Manual, Rev. 15, dated April 5, 1985
l
  *
Nonconforming Material Report (NCMR)," Rev. 2, dated
    BAP 1.0, "Nonconformances," Rev. 16, dated March 28, 1985
l
    BAP 1.2, " Field Change Requests," Rev. 12, Change C, dated
October 10, 1984
    November 19, 1984
'
  *
BA QA Manual, Rev. 15, dated April 5, 1985
    BAP 2.0, " Document Control," Rev. 13, Change B, dated April
*
    5, 1985
BAP 1.0, "Nonconformances," Rev. 16, dated March 28, 1985
                        VII-11
BAP 1.2, " Field Change Requests," Rev. 12, Change C, dated
                                                            _ _ _ _ _ _ _ _
November 19, 1984
*
BAP 2.0, " Document Control," Rev. 13, Change B, dated April
5, 1985
VII-11
_ _ _ _ _ _ _ _


                  -
-
    *
*
          BAP 2.0.1, " Instructions for Maintaining Project Proce-
BAP 2.0.1, " Instructions for Maintaining Project Proce-
          dures/ Specifications / Drawings," Rev. 2, Change B, dated
dures/ Specifications / Drawings," Rev. 2, Change B, dated
          January 31, 1985.
January 31, 1985.
  NRC CAT inspectors interviewed engineering and construction person-
NRC CAT inspectors interviewed engineering and construction person-
    nel engaged in the distribution and control of design change
nel engaged in the distribution and control of design change
  documents.
documents.
b. Inspection Findings
b.
  Site issued design change documents are processed through the DCC
Inspection Findings
  and distributed, with the recent exception of stamp-affixed change
Site issued design change documents are processed through the DCC
  documents, to all locations which maintain controlled copies of the
and distributed, with the recent exception of stamp-affixed change
  affected drawings and specifications, and to all affected travelers.
documents, to all locations which maintain controlled copies of the
  DCC updates the DMS computer data base to indicate that a given change
affected drawings and specifications, and to all affected travelers.
  document has become active against a drawing or specification, and
DCC updates the DMS computer data base to indicate that a given change
  copies of all active change documents are maintained with drawings
document has become active against a drawing or specification, and
  and specifications.         New travelers are issued, or supplements to
copies of all active change documents are maintained with drawings
  existing travelers are issued, to incorporate newly-issued change
and specifications.
  documents which impact in progress or completed structures and hard-
New travelers are issued, or supplements to
  ware.     Change documents must be referenced on, and physically
existing travelers are issued, to incorporate newly-issued change
  attached to, these work packages. As previously noted, TTS, the
documents which impact in progress or completed structures and hard-
  computer data base which lists the status and location of traveler
ware.
  documents, does not currently mandate that active change documents
Change documents must be referenced on, and physically
  be listed in TTS. As a consequence, travelers affected by a given
attached to, these work packages.
  design change document could not always be readily identified. This
As previously noted, TTS, the
  is not consistent with the requirements of Section 17.4 of the BA QA
computer data base which lists the status and location of traveler
  manual, which commits BA to an index system for records to be
documents, does not currently mandate that active change documents
  maintained in the Documents Record Center which will ensure the
be listed in TTS.
  rapid and orderly identification and retrieval of records.
As a consequence, travelers affected by a given
  NRC CAT inspectors selected the 24 design change documents listed
design change document could not always be readily identified.
  in Table VII-4. In majority, the sample was selected from the change
This
  document discrepancies the NRC CAT inspection had documented in Sec-
is not consistent with the requirements of Section 17.4 of the BA QA
  tion VII.B.1.b.(4) above, for a number of the controlled specifica-
manual, which commits BA to an index system for records to be
  tions available to REs for use in the preparation of work packages.
maintained in the Documents Record Center which will ensure the
  The review was primarily performed to assess the extent design change
rapid and orderly identification and retrieval of records.
  documents not properly included with the specification may not have
NRC CAT inspectors selected the 24 design change documents listed
  been implemented in work packages prepared by REs utilizing those
in Table VII-4.
  specifications.     IP was requested to provide the NRC CAT with an
In majority, the sample was selected from the change
  example of documentation which substantiated the intended disposition
document discrepancies the NRC CAT inspection had documented in Sec-
  of each of the 24 selected change notices.         The NRC CAT review of
tion VII.B.1.b.(4) above, for a number of the controlled specifica-
  the documentation provided by IP assessed the actual disposition of
tions available to REs for use in the preparation of work packages.
  each design change document for its incorporation in a work package,
The review was primarily performed to assess the extent design change
  i.e., either an amendment to a specification, procedure or a purchase
documents not properly included with the specification may not have
  order, or supplement to a traveler. The NRC CAT review identified
been implemented in work packages prepared by REs utilizing those
  the following discrepancies:
specifications.
        BA equipment installation traveler RH-024 does not appear to
IP was requested to provide the NRC CAT with an
        have been revised to incorporate FCR 27508. The change docu-
example of documentation which substantiated the intended disposition
        ment is dated August 25, 1984, and waives the provisions of
of each of the 24 selected change notices.
        American Welding Society (AWS) D1.1, paragraph 8.2.3 for
The NRC CAT review of
        qualification for weldability of American Iron and Steel
the documentation provided by IP assessed the actual disposition of
          Institute sAISI) C1010 to C1025 sheet steel.       The change
each design change document for its incorporation in a work package,
                                VII-12
i.e., either an amendment to a specification, procedure or a purchase
                        79-- -
order, or supplement to a traveler.
The NRC CAT review identified
the following discrepancies:
BA equipment installation traveler RH-024 does not appear to
have been revised to incorporate FCR 27508.
The change docu-
ment is dated August 25, 1984, and waives the provisions of
American Welding Society (AWS) D1.1, paragraph 8.2.3 for
qualification for weldability of American Iron and Steel
Institute sAISI) C1010 to C1025 sheet steel.
The change
VII-12
79--
-


.
.
          document requires that specification K-2999 be amended to
document requires that specification K-2999 be amended to
          incorporate this waiver.     DMS still lists FCR 27508 as out-
incorporate this waiver.
          standing against the specification.
DMS still lists FCR 27508 as out-
    *
standing against the specification.
          ECN 5282, dated June 3, 1985, allows the use of ASME Code
*
          Case N-413, Minimum Size of Fillet Welds for Linear Type
ECN 5282, dated June 3, 1985, allows the use of ASME Code
          Supports, Section III, Division 1, Subsection NF. Box 7 of the
Case N-413, Minimum Size of Fillet Welds for Linear Type
          change document was marked in error as it indicates
Supports, Section III, Division 1, Subsection NF.
          that an FSAR revision is not required. However, the IP letter
Box 7 of the
          S-5454 dated May 22, 1985, which is referenced in the ECN,
change document was marked in error as it indicates
          indicates that IP will draft an amendment to the CPS FSAR for
that an FSAR revision is not required.
          the use of this code case. NRC's letter of April 30, 1985 to
However, the IP letter
          IP indicates that the referenced code case may be used at the
S-5454 dated May 22, 1985, which is referenced in the ECN,
          CPS.
indicates that IP will draft an amendment to the CPS FSAR for
          FCR 27545 documents HVAC and electrical attachments welded
the use of this code case.
          to structural steel that were fireproofed without prior appli-
NRC's letter of April 30, 1985 to
          cation of a galvanox coat. The FCR requires that specifica-
IP indicates that the referenced code case may be used at the
          tions K-2910 and K-2999 be revised to permit a direct appli-
CPS.
          cation of CAFCOTE H fireproofing directly over welds which are
FCR 27545 documents HVAC and electrical attachments welded
to structural steel that were fireproofed without prior appli-
cation of a galvanox coat.
The FCR requires that specifica-
tions K-2910 and K-2999 be revised to permit a direct appli-
cation of CAFCOTE H fireproofing directly over welds which are
clean and free from slag and debris.
The original nonconform-
"
"
          clean and free from slag and debris. The original nonconform-
ing welds should have been documented on an NCR for an evalua-
          ing welds should have been documented on an NCR for an evalua-
tion as to their acceptability.
          tion as to their acceptability.
This review resulted in identifying only one instance where the
    This review resulted in identifying only one instance where the
change document (FCR 27508) was not referenced on the appropriate
    change document (FCR 27508) was not referenced on the appropriate
traveler revision, and two other apparent discrepancies in docu-
    traveler revision, and two other apparent discrepancies in docu-
mentation.
    mentation.   However, the sample of change documents listed in Table
However, the sample of change documents listed in Table
    VII-4 is not considered sufficiently large to confirm the actual
VII-4 is not considered sufficiently large to confirm the actual
    implementation of all design change control discrepancies identified
implementation of all design change control discrepancies identified
    by the NRC CAT.   The NRC CAT also could not confirm that the sample
by the NRC CAT.
    of work packages provided for review were prepared through the RE
The NRC CAT also could not confirm that the sample
    use of the TPRG V-530 and V-460 copies of the K-2882 controlled
of work packages provided for review were prepared through the RE
    specification found to contain an excessive number of deficiencies
use of the TPRG V-530 and V-460 copies of the K-2882 controlled
    in omitted design change documents.     Further, the NRC CAT followup
specification found to contain an excessive number of deficiencies
    review of a third copy of the five controlled copies of Specifica-
in omitted design change documents.
    tion K-2882, found only one such deficiency. This indicates that
Further, the NRC CAT followup
    travelers prepared by use of this third specification most likely
review of a third copy of the five controlled copies of Specifica-
    would implement the design change documents not included with the
tion K-2882, found only one such deficiency.
    V-530 and V-460 copies of the K-2882 specification. Therefore, the
This indicates that
    results of the verifications of the sample of work packages provided
travelers prepared by use of this third specification most likely
    for NRC CAT review may not be representative of the disposition of
would implement the design change documents not included with the
    the excessive change notice discrepancies identified in two of the
V-530 and V-460 copies of the K-2882 specification.
    five K-2882 specifications initially examined by the NRC CAT inspec-
Therefore, the
    tor.
results of the verifications of the sample of work packages provided
  c. Conclusions
for NRC CAT review may not be representative of the disposition of
    The program for control of design change documents was generally
the excessive change notice discrepancies identified in two of the
    determined to be in accordance with site procedures, with one
five K-2882 specifications initially examined by the NRC CAT inspec-
    exception.     The exception pertains to an inconsistency between the
tor.
    program instructions for TTS and the Index System of records. TTS
c.
    instructions allow that active design change documents need not be
Conclusions
                                VII-13
The program for control of design change documents was generally
determined to be in accordance with site procedures, with one
exception.
The exception pertains to an inconsistency between the
program instructions for TTS and the Index System of records.
TTS
instructions allow that active design change documents need not be
VII-13


    listed in TTS for a given traveler.       This option for TTS does not allow
listed in TTS for a given traveler.
    for the ready identification of travelers affected by a given change
This option for TTS does not allow
    notice. On the otherhand, the Index System for Records is required
for the ready identification of travelers affected by a given change
    to be maintained in a manner which will ensure the rapid and orderly
notice.
      identification and retrieval of records.       It is noted that IP's
On the otherhand, the Index System for Records is required
    current effort to integrate data in DMS and CMI into one data
to be maintained in a manner which will ensure the rapid and orderly
    system should resolve this inconsistency in procedural requirements.
identification and retrieval of records.
    For the sample of 24 change documents and related implementing
It is noted that IP's
    documents examined by the NRC CAT inspectors, all but one of the
current effort to integrate data in DMS and CMI into one data
    change documents was verified to be implemented as intended in a
system should resolve this inconsistency in procedural requirements.
    work package, i.e., either an amendment to a specification, proce-
For the sample of 24 change documents and related implementing
    dure, or purchase order or supplement to a traveler.       However,
documents examined by the NRC CAT inspectors, all but one of the
    the NRC CAT findings also indicated that IP corrective action, as
change documents was verified to be implemented as intended in a
    discussed in Section VII.B.1.c above, is warranted.
work package, i.e., either an amendment to a specification, proce-
  3. Illinois Power Company Overinspection Program
dure, or purchase order or supplement to a traveler.
    A consideration of the NRC CAT's selective examinaticns discussed in
However,
    most sections of this report was to include examination of a sample
the NRC CAT findings also indicated that IP corrective action, as
    of installed hardware that had been subject to the IP Overinspection
discussed in Section VII.B.1.c above, is warranted.
    Program.
3.
    The IP Overinspection Program was implemented in response to a
Illinois Power Company Overinspection Program
    series of stop work actions imposed in 1981 and 1982 due to iden-
A consideration of the NRC CAT's selective examinaticns discussed in
    tified deficiencies in the implementation of the BA QA Program for
most sections of this report was to include examination of a sample
    construction of various areas of CPS. The IP Overinspection Program
of installed hardware that had been subject to the IP Overinspection
    provides two levels of additional inspection in the functional work
Program.
    areas subject to the prior stop work actions.       The two adcitional
The IP Overinspection Program was implemented in response to a
    levels of inspection of work previously inspected by BA QC include a
series of stop work actions imposed in 1981 and 1982 due to iden-
    sample inspection conducted by the BA Field Verification (BAFV)
tified deficiencies in the implementation of the BA QA Program for
    Group and a subsequent sample inspection by the IP Overinspection
construction of various areas of CPS.
    (OI) Group. The intent and scope of the IP Overinspection Program
The IP Overinspection Program
    is summarized on pages V-1 and V-2 of 1P Report "Results of Quality
provides two levels of additional inspection in the functional work
    Programs for Construction of Clinton Power Station", with Appen-
areas subject to the prior stop work actions.
    dices, NRC Docket No. 50-461, dated February 1985. As noted
The two adcitional
    therein:
levels of inspection of work previously inspected by BA QC include a
            The purposes of the Overinspection Program are to verify
sample inspection conducted by the BA Field Verification (BAFV)
            that the structures, systems, and components within the
Group and a subsequent sample inspection by the IP Overinspection
            scope of the program are properly installed and to provide
(OI) Group.
            IP with assurance that BA is performing installation and
The intent and scope of the IP Overinspection Program
            inspection work that satisfies the applicable req,sirements
is summarized on pages V-1 and V-2 of 1P Report "Results of Quality
            of codes, standards, drawings, and specifications.     These
Programs for Construction of Clinton Power Station", with Appen-
            objectives are accomplished by performing additional inspec-
dices, NRC Docket No. 50-461, dated February 1985.
            tions of completed and inspected work, whether performed
As noted
            before issuance of stop work actions in 1982 (old work)
therein:
            or after the stop work actions were lifted (new work).     The
The purposes of the Overinspection Program are to verify
            inspections conducted under the Overinspection Program are
that the structures, systems, and components within the
            in addition to those normally performed as part of the QA
scope of the program are properly installed and to provide
            Program for CPS.   Therefore, the Overinspection Program is
IP with assurance that BA is performing installation and
            a supplement to the QA Program and not a substitute for it.
inspection work that satisfies the applicable req,sirements
                                VII-14
of codes, standards, drawings, and specifications.
                                                                                  ._
These
                                                            . .
objectives are accomplished by performing additional inspec-
tions of completed and inspected work, whether performed
before issuance of stop work actions in 1982 (old work)
or after the stop work actions were lifted (new work).
The
inspections conducted under the Overinspection Program are
in addition to those normally performed as part of the QA
Program for CPS.
Therefore, the Overinspection Program is
a supplement to the QA Program and not a substitute for it.
VII-14
,
,
. .
._


  Inspections in the IP Overinspection Program focus on installation
Inspections in the IP Overinspection Program focus on installation
  of safety-related, augmented class D (radioactive waste), and fire
of safety-related, augmented class D (radioactive waste), and fire
  protection items in the following areas:     large and small bore
protection items in the following areas:
  piping, mechanical equipment, structural steel, heating, ventilating
large and small bore
  and air conditioning, electrical hangers, electrical conduit and
piping, mechanical equipment, structural steel, heating, ventilating
  raceways, electrical terminations, electrical equipment, and
and air conditioning, electrical hangers, electrical conduit and
  electrical and mechanical instrumentation.
raceways, electrical terminations, electrical equipment, and
  Since the IP Overinspection Program supplements the BA QC program
electrical and mechanical instrumentation.
  and is not a substitute for that program, the NRC CAT inspectors
Since the IP Overinspection Program supplements the BA QC program
  in the area of design change control reviewed the BA installation and
and is not a substitute for that program, the NRC CAT inspectors
  QC inspection work packages in addition to the IP Overinspection
in the area of design change control reviewed the BA installation and
  Reports for the hardware sample listed in Tables VII-5 through
QC inspection work packages in addition to the IP Overinspection
  VII-7.   Other NRC CAT examinations of hardware previously inspected
Reports for the hardware sample listed in Tables VII-5 through
  by the IP Overinspection Program are discussed in the other sections
VII-7.
  of this report.
Other NRC CAT examinations of hardware previously inspected
a. Inspection Scope
by the IP Overinspection Program are discussed in the other sections
  The following documents provide the basic acceptance for the
of this report.
  inspection:
a.
  *
Inspection Scope
        BA Quality Assurance Manual, Rev. 15, dated April 5, 1985
The following documents provide the basic acceptance for the
  *
inspection:
        BA Quality and Technical Services Organization Chart,
*
        dated March 8, 1985
BA Quality Assurance Manual, Rev. 15, dated April 5, 1985
  *
*
        BA Quality Control Training and Qualification Manual,
BA Quality and Technical Services Organization Chart,
        Rev. 9, dated September 26, 1984
dated March 8, 1985
        BAP 3.1.3, " Structural Steel Erection," Rev. 11, Change B,
*
        dated May 17, 1985
BA Quality Control Training and Qualification Manual,
  *
Rev. 9, dated September 26, 1984
        BAP 3.2.5, " Piping Component Supports," Rev. 7, Change D,
BAP 3.1.3, " Structural Steel Erection," Rev. 11, Change B,
        dated May 13, 1985
dated May 17, 1985
        BAP 3.3.6, " Electrical Raceway Support Installation," Rev. 10,
*
        dated May 17, 1985
BAP 3.2.5, " Piping Component Supports," Rev. 7, Change D,
  *
dated May 13, 1985
        BAP 3.3.10, " Cable Tray Installation and Traveler Processing,"
BAP 3.3.6, " Electrical Raceway Support Installation," Rev. 10,
        Rev. 6, Change E, dated May 21, 1985
dated May 17, 1985
        BAP 3.6.3, " Repair of Welds, Material and Items," Rev. O,
*
        Change C, dated April 17, 1985
BAP 3.3.10, " Cable Tray Installation and Traveler Processing,"
        BAP 3.6.5, " Visual Inspections of Weldments," Rev. O,
Rev. 6, Change E, dated May 21, 1985
        Change B, dated March 26, 1985
BAP 3.6.3, " Repair of Welds, Material and Items," Rev. O,
        IP Nuclear Power Construction Quality Assurance Manual,
Change C, dated April 17, 1985
        Rev. 12, dated March 12, 1985
BAP 3.6.5, " Visual Inspections of Weldments," Rev. O,
        IP Nuclear ASME Quality Assurance Manual, Rev. 5, dated
Change B, dated March 26, 1985
        March 5, 1985
IP Nuclear Power Construction Quality Assurance Manual,
                                                                        ;
Rev. 12, dated March 12, 1985
                              VII-15                                     l
IP Nuclear ASME Quality Assurance Manual, Rev. 5, dated
                                                                        J
March 5, 1985
                                                                        ;
VII-15
l
J


                .
.
          IP Nuclear Power Program Organizational Chart, dated
IP Nuclear Power Program Organizational Chart, dated
          January 15, 1985
January 15, 1985
          IP Quality Assurance Instructions QAI-710.01,
IP Quality Assurance Instructions QAI-710.01,
          "Overinspection Program," Rev. 5, dated March 20, 1985
"Overinspection Program," Rev. 5, dated March 20, 1985
    *
*
IP (AI-710-08, "0verinspection Sample Plar..," Rev. 3, dated
<
<
          IP (AI-710-08, "0verinspection Sample Plar..," Rev. 3, dated
April 26, 1985
          April 26, 1985
*
    *
IP QAI-710.12, " Structural / Auxiliary Steel Oserinspection
          IP QAI-710.12, " Structural / Auxiliary Steel Oserinspection
Checklist," Rev. 7, dated February 22, 1985
          Checklist," Rev. 7, dated February 22, 1985
*
    *
IP QAI-710.13, " Mechanical Equipment Overinspection
          IP QAI-710.13, " Mechanical Equipment Overinspection
Checklist," Rev.1, dated January 13, 1984
          Checklist," Rev.1, dated January 13, 1984
IP QAI-710.14, " Piping / Valves / Instrumentation
          IP QAI-710.14, " Piping / Valves / Instrumentation
Overinspection Checklist," Rev. 4, dated November 15, 1984
          Overinspection Checklist," Rev. 4, dated November 15, 1984
IP QAI-710.15, " Component Support Overinspection
          IP QAI-710.15, " Component Support Overinspection
Checklist," Rev. 4, dated August 27, 1984
          Checklist," Rev. 4, dated August 27, 1984
IP QAI-710.18, " Electrical Raceway Support Overinspection
          IP QAI-710.18, " Electrical Raceway Support Overinspection
Checklist," Rev. 2, dated February 21, 1985
          Checklist," Rev. 2, dated February 21, 1985
IP QAI-710.19, " Electrical Raceway Support Overinspection
          IP QAI-710.19, " Electrical Raceway Support Overinspection
Checklist," Rev. 2, dated February 21, 1985
          Checklist," Rev. 2, dated February 21, 1985
NRC CAT inspectors interviewed engineering and construction person-
    NRC CAT inspectors interviewed engineering and construction person-
nel engaged in the preparation and contro? of BA installation and
    nel engaged in the preparation and contro? of BA installation and
inspection work packages and IPOI reports.
    inspection work packages and IPOI reports.
b.
  b. Inspection Findings
Inspection Findings
    Inspection findings for this review are categorized as discrepancies
Inspection findings for this review are categorized as discrepancies
    in computer data bases, BA installation and inspection work pack-
in computer data bases, BA installation and inspection work pack-
    ages, or in IPOI reports.
ages, or in IPOI reports.
    (1) As described in Section VII B.1.(b).(1) above, there are
(1) As described in Section VII B.1.(b).(1) above, there are
          currently two basic computer data 'asesu    in use at CPS: DMS,
currently two basic computer data 'ases in use at CPS:
          which lists active change documents issued at the site against
DMS,
          the correspcnding design drawings, and CMI, which lists all
u
          design change documents and the affected design drawings and
which lists active change documents issued at the site against
          specifications.   TTS, which is a subset of CMI, lists the
the correspcnding design drawings, and CMI, which lists all
          status and location of traveler documents, and can optionally
design change documents and the affected design drawings and
          reference the associated design and change documents.
specifications.
          The NRC CAT inspectors documented several discrepancies in
TTS, which is a subset of CMI, lists the
          these computer data bases during the course of this review
status and location of traveler documents, and can optionally
          of the use and relationship of the computer data with the
reference the associated design and change documents.
          work packages prepared for BA installation and inspection
The NRC CAT inspectors documented several discrepancies in
          and IP Overinspection activities.       These include:
these computer data bases during the course of this review
                              VII-16
of the use and relationship of the computer data with the
work packages prepared for BA installation and inspection
and IP Overinspection activities.
These include:
VII-16


              TTS lists the incorrect design drawing revision numbers for
TTS lists the incorrect design drawing revision numbers for
              the design drawing referenced in IPOI reports M-3330 and
the design drawing referenced in IPOI reports M-3330 and
              M-3338.
M-3338.
        *
*
              A systematic weakness in DMS is it does not reference
A systematic weakness in DMS is it does not reference
              the work packages and travelers associated with the S&L
the work packages and travelers associated with the S&L
              structural steel design drawings.
structural steel design drawings.
        *
*
              A systematic weakness in TTS is it does not reference
A systematic weakness in TTS is it does not reference
              th? design drawings associated with electrical cable tray
th? design drawings associated with electrical cable tray
              support travelers.
support travelers.
    (2) There is no uniform relationship between the hardware detailed
(2) There is no uniform relationship between the hardware detailed
        on a design drawing and the number of BA work packages and
on a design drawing and the number of BA work packages and
        travelers prepared by each construction discipline to document
travelers prepared by each construction discipline to document
        the installation and inspection of that hardware.     As an
the installation and inspection of that hardware.
        example, there is generally one-to-one correspondence between
As an
        the design drawing and the traveler for pipe and cable tray
example, there is generally one-to-one correspondence between
        supports, while for structural steel there are numerous work
the design drawing and the traveler for pipe and cable tray
        packages and travelers associated with each structural steel
supports, while for structural steel there are numerous work
        design drawing.   Structural steel inspections were documented
packages and travelers associated with each structural steel
        on either inspection forms, vendor drawings or welding
design drawing.
        travelers depending on whether the steel was vendor fabri-
Structural steel inspections were documented
        cated, field fabricated, bolted or welded.
on either inspection forms, vendor drawings or welding
        The NRC CAT inspectors note that the current computer data
travelers depending on whether the steel was vendor fabri-
        bases program does not readily relate the associated design,
cated, field fabricated, bolted or welded.
        fabrication, installation and inspection documents. Since
The NRC CAT inspectors note that the current computer data
        there is no current correlation in DMS between the structural
bases program does not readily relate the associated design,
        steel design drawings and the associated work packages and
fabrication, installation and inspection documents.
        travelers, some documentation proved difficult to access and
Since
        audit. For example, BA required approximately one week to
there is no current correlation in DMS between the structural
        access the welding travelers associated with the steel beams
steel design drawings and the associated work packages and
        listed in Table VII-5. Other NRC CAT inspectors indicated that
travelers, some documentation proved difficult to access and
        documentation proved difficult to access in their areas as
audit.
        well.   However, the requested work packages and travelers were
For example, BA required approximately one week to
        eventually accessed and, in general, were properly documented.
access the welding travelers associated with the steel beams
        The NRC CAT inspectors noted a number of documentation discre-
listed in Table VII-5.
        pancies in the BA installation and inspection work packages.
Other NRC CAT inspectors indicated that
        These included an incorrect Receiving Inspection Report number
documentation proved difficult to access in their areas as
        for a steel beam listed in a support traveler
well.
        (E26-1003-01A-H48, Rev. 11), an incorrect inspection attribute
However, the requested work packages and travelers were
        indicated on two of three pre-inspection checklists filed with
eventually accessed and, in general, were properly documented.
        a hanger traveler (E27-10002-018-H33), BA QC inspection forms
The NRC CAT inspectors noted a number of documentation discre-
,        for several steel beams do not reference the correct revisions
pancies in the BA installation and inspection work packages.
        of the S&L design drawings, a steel plate listed on the bill of
These included an incorrect Receiving Inspection Report number
        materials but not used on the hanger drawing, and inconsist-
for a steel beam listed in a support traveler
        ancy in documentation relative to the use of the surveyors'
(E26-1003-01A-H48, Rev. 11), an incorrect inspection attribute
        reports for verification of pipe support locations and Form
indicated on two of three pre-inspection checklists filed with
        JV-718 for verification of electrical hanger locations in
a hanger traveler (E27-10002-018-H33), BA QC inspection forms
        containment.
for several steel beams do not reference the correct revisions
                              VII-17
,
  .                                   -   .             .-     -
of the S&L design drawings, a steel plate listed on the bill of
materials but not used on the hanger drawing, and inconsist-
ancy in documentation relative to the use of the surveyors'
reports for verification of pipe support locations and Form
JV-718 for verification of electrical hanger locations in
containment.
VII-17
.
-
.
.-
-


  (3)   Illinois Power performed overinspection activities in accoi'd-
(3)
          ance with a series of overinspection checklists which defined
Illinois Power performed overinspection activities in accoi'd-
          the attributes to be inspected for a specific piece of hard-
ance with a series of overinspection checklists which defined
        ware. This list of attributes was generally a subset of the
the attributes to be inspected for a specific piece of hard-
        attributes that had been BA QC inspected for that piece of
ware.
          hardware.
This list of attributes was generally a subset of the
        The NRC CAT noted a number of generally minor documentation
attributes that had been BA QC inspected for that piece of
        discrepancies in the IP0I reports reviewed. These included
hardware.
          reports (S-0399, S-1490, M-3351, M-3329, E-3920) which
The NRC CAT noted a number of generally minor documentation
          referenced an incorrect drawing number, or drawing or revision
discrepancies in the IP0I reports reviewed.
        number, an incorrect building elevation, or an incorrect FECN;
These included
          two reports (M-3349, E-3762) which did not document an inspec-
reports (S-0399, S-1490, M-3351, M-3329, E-3920) which
          tion attribute or included the wrong form; and one report
referenced an incorrect drawing number, or drawing or revision
          (E-3623) which documents an incorrect drawing revision as being
number, an incorrect building elevation, or an incorrect FECN;
        used for the inspection.
two reports (M-3349, E-3762) which did not document an inspec-
          In addition an inconsistency similar to that discussed in
tion attribute or included the wrong form; and one report
        Section VII.B.3.b.(2), above, relative to surveyors' reports
(E-3623) which documents an incorrect drawing revision as being
        was found. QAI-710.18 requires location of electrical hangers
used for the inspection.
        be verified to design drawings and Form JV-718 is used as the
In addition an inconsistency similar to that discussed in
        documentation of the verification, while QAI-710.15 does not
Section VII.B.3.b.(2), above, relative to surveyors' reports
          require independent verification of pipe support locations in
was found.
        containment, but does require that the surveyors' report to be
QAI-710.18 requires location of electrical hangers
        attached to the verification checklist.
be verified to design drawings and Form JV-718 is used as the
  As noted in Section III, Mechanical Construction, and Section V,
documentation of the verification, while QAI-710.15 does not
  Civil and Structural Construction, of this report, the NRC CAT
require independent verification of pipe support locations in
  physically inspected a sample of hardware associated with the IPOI
containment, but does require that the surveyors' report to be
  report work packages reviewed. This included four of the steel
attached to the verification checklist.
  beams listed in Table V-5 and six of the pipe restraints listed in
As noted in Section III, Mechanical Construction, and Section V,
  Table III-3. The purpose of the field inspection was to substan-
Civil and Structural Construction, of this report, the NRC CAT
  tiate the technical content of the IPOI reports, including the
physically inspected a sample of hardware associated with the IPOI
  affect of a number of the apparent documentation discrepancies on
report work packages reviewed.
  the installation.     No deficiencies in the installed hardware were
This included four of the steel
  identified.
beams listed in Table V-5 and six of the pipe restraints listed in
c. Conclusions
Table III-3.
  For the overall scope of documentation items sampled during tnis
The purpose of the field inspection was to substan-
  NRC CAT review, the documentation of BA installation and inspec-
tiate the technical content of the IPOI reports, including the
  tion work packages and of IPOI reports, except for discrepancies
affect of a number of the apparent documentation discrepancies on
  noted, is generally adequate.
the installation.
  The majority of the discrepancies documented for this review are
No deficiencies in the installed hardware were
  considered minor in nature. The two systematic weaknesses in the
identified.
  computer basis (DMS and TTS) are considered to contribute to the
c.
  difficulty IP was having with the timely access of documentation.
Conclusions
  The NRC CAT review of the approximately 400 documentation attributes
For the overall scope of documentation items sampled during tnis
  for the 25 IPOI reports examined found that the reports were
NRC CAT review, the documentation of BA installation and inspec-
  generally well documented relative to the overinspection conducted,
tion work packages and of IPOI reports, except for discrepancies
  with some exceptions. In majority, the exceptions related to
noted, is generally adequate.
  documentation discrepancies which apparently had a minor effect on
The majority of the discrepancies documented for this review are
                              VII-18
considered minor in nature.
The two systematic weaknesses in the
computer basis (DMS and TTS) are considered to contribute to the
difficulty IP was having with the timely access of documentation.
The NRC CAT review of the approximately 400 documentation attributes
for the 25 IPOI reports examined found that the reports were
generally well documented relative to the overinspection conducted,
with some exceptions.
In majority, the exceptions related to
documentation discrepancies which apparently had a minor effect on
VII-18


    - -   .             - - -   .                     ..                 . ..       .             .             . . _                           _ - . - . . _ -                     - - .     .-
- -
  -
.
                                                                                                                                                                                                            !
- - -
                            the overinspection conducted.                               However, these errors in documenta-
.
                            tion indicate that a more critical management review of the infor-
..
                            mation recorded on the IPOI reports should be performed.
. ..
.
.
. . _
_ - . - . . _ -
- - .
.-
-
!
the overinspection conducted.
However, these errors in documenta-
tion indicate that a more critical management review of the infor-
mation recorded on the IPOI reports should be performed.
I
I
a
a
Line 5,127: Line 8,012:
i
i
i
i
                                                                                                                                                                                                          I
I
,
,
,
                                                                                                                                                                                                          ,
4
4
f
f
                                                                                                                                                                                                          F
F
,
,
4
4
i
i
                                                                                                                                                                                                          r
r
                                                                                                                                                                                                          l
l
i                                                                              VII-19
VII-19
t
i
        ,   . - . - . - - , - - .     , - - , - , _ , - _ . , - - . , - - -       ,a.   , . , - - , - , - , _ , _ -       - . . - - - - - - , - - -                 , - - - - - - - - , ~ , , . , - - -
t
,
. - . - . - - , - - .
, - - , - , _ , - _ . , - - . , - - -
,a.
, . , -
- , - , - , _ , _ -
- . . - - - - - - , - - -
, - - - - - - - - , ~ , , . , - - -


    .     .-   .         - _.       ._               .                         - ._ .           - - .           - -   . - _
.
.-
.
- _.
._
.
- ._ .
- - .
- -
. - _
.
.
P
P
k
k
                                                            TABLE VII-1
TABLE VII-1
                                    SPECIFICATIONS AND PROCEDURES REVIEWED
SPECIFICATIONS AND PROCEDURES REVIEWED
i
i
;           Document ID                                                     Location (s)
;
Document ID
Location (s)
.
.
      S&L Spec. K-2882, Rev. 11                           BA Traveler Preparation Review Group (TPRG) (3 copies)
S&L Spec. K-2882, Rev. 11
BA Traveler Preparation Review Group (TPRG) (3 copies)
!
!
                                                          BA Field Document Center (FDC)
BA Field Document Center (FDC)
!                                                         S&L Field Design Office
!
                                                          (to confirm filing of ECN 4832)
S&L Field Design Office
      S&L Spec. K-2884, Rev. 8                           BA TPRG
(to confirm filing of ECN 4832)
l.                                                         BA FDC
S&L Spec. K-2884, Rev. 8
.
BA TPRG
      S&L Spec. K-2944, Rev. 27                           BA Civil /Struc. (C/S) Res. Eng. (RE)
l.
1                                                         BA FDC
BA FDC
.
S&L Spec. K-2944, Rev. 27
BA Civil /Struc. (C/S) Res. Eng. (RE)
1
BA FDC
a
a
!
!
      S&L Spec. K-2947, Rev. 5                           BA C/S RE
S&L Spec. K-2947, Rev. 5
                                                          BA FDC
BA C/S RE
i      S&L Spec. K-2948, Rev. 11                           BA C/S RE
BA FDC
                                                          BA FDC
S&L Spec. K-2948, Rev. 11
      S&L Spec. K-2999 Rev. 11                           BA Electrical RE (2 copies)
BA C/S RE
                                                          BA FDC                                                                                     ,
i
                                                                                                                                                      t
BA FDC
      Baldwin Project Procedures                         BA C/S RE
S&L Spec. K-2999 Rev. 11
        (various revisions.)                             BA TPRG
BA Electrical RE (2 copies)
  i
BA FDC
                                                                                                                                                      ,
,
1
t
Baldwin Project Procedures
BA C/S RE
(various revisions.)
BA TPRG
i
,
1
5
5
  i
i
                                                                      VII-20
VII-20
  4
4
        v                   e   e,-         ..,.-----.n       - . - , .
v
                                                                            ,.e...       - ._-, ,.       - -- ,- -, .   _    - - - -.-, -_.,.-.---c
e
e,-
..,.-----.n
- . - ,
,.e...
- ._-, ,.
- -- ,- -, .
- - - -.-,
-_.,.-.---c
.
_


                                          TABLE VII-2
TABLE VII-2
                                        DRAWINGS REVIEWED
DRAWINGS REVIEWED
      Document ID                                     Location (s)
Document ID
  S&L Dwg. S26-1705, Rev. E                       BA C/S RE & BA FDC
Location (s)
  S&L Dwg. S26-1710, Rev. N                       BA C/S RE & BA FDC
S&L Dwg. S26-1705, Rev. E
  S&L Dwg. S26-1407, Rev. Y                       BA C/S RE & BA FDC
BA C/S RE & BA FDC
  S&L Dwg. S27-1001-03B, Rev. AH                   BA C/S RE & BA FDC
S&L Dwg. S26-1710, Rev. N
  S&L Dwg. S27-1002-01A, Rev. AY                   BA C/S RE & BA FDC
BA C/S RE & BA FDC
  S&L Dwg. S27-1003-03A, Rev. AM                   BA C/S RE & BA FDC
S&L Dwg. S26-1407, Rev. Y
  S&L Dwg. S27-1004-04A, Rev. AB                   BA C/S RE & BA FDC
BA C/S RE & BA FDC
  S&L Dwg. S27-1005-04A, Rev. AD                   BA C/S RE & BA FDC
S&L Dwg. S27-1001-03B, Rev. AH
  S&L Dwg. S28-1002-02A, Rev. S                   BA C/S RE & BA FDC
BA C/S RE & BA FDC
  S&L Dwg. S28-1003-05A, Rev. T                   BA C/S RE & BA FDC
S&L Dwg. S27-1002-01A, Rev. AY
  S&L Dwg. S28-1100-07C, Rev. K                   BA C/S RE & BA FDC
BA C/S RE & BA FDC
  BA Dwg. CL1-27-5-132, Rev. 4                     BA C/S RE &
S&L Dwg. S27-1003-03A, Rev. AM
  BA Dwg. CL1-27-5-136, Sheet 12, Rev. 2           BA FDC (aperture cards) &
BA C/S RE & BA FDC
  BA Dwg. CL1-27-S-136, Sheet 25, Rev. 2           BA DCC
S&L Dwg. S27-1004-04A, Rev. AB
  BA DWG. CL1-27-S-136, Sheet 37, Rev. 1
BA C/S RE & BA FDC
  BA Dwg. CL1-27-5-141, Sheet 18, Rev. 1
S&L Dwg. S27-1005-04A, Rev. AD
  S&L Dwg. M09-1001N, Sheet 1, Rev. N             BA TPRG &
BA C/S RE & BA FDC
  S&L Dwg. M09-1003N, Sheet 1, Rev. M             BA FDC
S&L Dwg. S28-1002-02A, Rev. S
  S&L Dwg. M09-1004N, Sheet 1, Rev. L
BA C/S RE & BA FDC
  S&L Dwg. M-1SX01048X, Rev. F
S&L Dwg. S28-1003-05A, Rev. T
  S&L Dwg. M-1SX01017R, Rev. H, Sheets 1&2
BA C/S RE & BA FDC
  S&L Dwg. M-INB010035, Rev. A
S&L Dwg. S28-1100-07C, Rev. K
  S&L Dwg. M-1NB01027X, Rev. A
BA C/S RE & BA FDC
  S&L Dwg. M-1CC06042G, Rev. B
BA Dwg. CL1-27-5-132, Rev. 4
  S&L Dwg. M-1RB24010G, Rev. C
BA C/S RE &
  S&L Dwg. M-1SX01050X, Rev. E
BA Dwg. CL1-27-5-136, Sheet 12, Rev. 2
  S&L Dwg. M-1SX01028R, Rev. J. Sheets 1&2
BA FDC (aperture cards) &
BA Dwg. CL1-27-S-136, Sheet 25, Rev. 2
BA DCC
BA DWG. CL1-27-S-136, Sheet 37, Rev. 1
BA Dwg. CL1-27-5-141, Sheet 18, Rev. 1
S&L Dwg. M09-1001N, Sheet 1, Rev. N
BA TPRG &
S&L Dwg. M09-1003N, Sheet 1, Rev. M
BA FDC
S&L Dwg. M09-1004N, Sheet 1, Rev. L
S&L Dwg. M-1SX01048X, Rev. F
S&L Dwg. M-1SX01017R, Rev. H, Sheets 1&2
S&L Dwg. M-INB010035, Rev. A
S&L Dwg. M-1NB01027X, Rev. A
S&L Dwg. M-1CC06042G, Rev. B
S&L Dwg. M-1RB24010G, Rev. C
S&L Dwg. M-1SX01050X, Rev. E
S&L Dwg. M-1SX01028R, Rev. J. Sheets 1&2
!
!
!
!
                                              VII-21
VII-21
                                    - -       _                     _     -_
- -
_
_
-_


                                                              1
1
                  TABLE VII-3
TABLE VII-3
                IP AUDIT SAMPLE
IP AUDIT SAMPLE
IP Audit
IP Audit
Report No.                 Organization Audited
Report No.
Q31-83-8       Baldwin Associates (BA) Quality Assurance
Organization Audited
Q31-84-01       BA Quality & Technical Services
Q31-83-8
Q31-84-02       BA Procurement
Baldwin Associates (BA) Quality Assurance
Q31-84-03       BA Piping / Mechanical
Q31-84-01
Q31-84-04       BA Document Review Group
BA Quality & Technical Services
Q31-84-05       BA Electrical Department
Q31-84-02
Q31-84-07       BA Field Verification
BA Procurement
Q31-84-09       BA Document Control Center (DCC) and
Q31-84-03
                Nonconformance Review Group
BA Piping / Mechanical
Q31-84-10   ' BA Systems Release and Completion
Q31-84-04
Q31-85-01       BA Electrical Reinspection Program
BA Document Review Group
Q31-85-02       BA Quality Control & Technical Services
Q31-84-05
Q31-85-04       BA Quality Engineering Systems, Quality
BA Electrical Department
                Engineering Procedures and DCC
Q31-84-07
Q31-85-05       BA Procurement, Receiving and Audits Sections
BA Field Verification
          ,
Q31-84-09
                    VII-22
BA Document Control Center (DCC) and
Nonconformance Review Group
Q31-84-10
' BA Systems Release and Completion
Q31-85-01
BA Electrical Reinspection Program
Q31-85-02
BA Quality Control & Technical Services
Q31-85-04
BA Quality Engineering Systems, Quality
Engineering Procedures and DCC
Q31-85-05
BA Procurement, Receiving and Audits Sections
,
VII-22


                                    TABLE VII-4
TABLE VII-4
                              CHANGE DOCUMENT SAMPLE
CHANGE DOCUMENT SAMPLE
Change                                         Required             Implementing
Change
Document         Description               Disposition             Document
Required
ECN 3332 Add Note to two support         Revise support drawings   Traveler Nos. H-SX-2-C,
Implementing
          drawings                       to incorporate note       H-SX-3-D
Document
ECN 4291 Modification to ECN 4061       Revise Paragraphs 326.7c, Generic
Description
                                          d of Specification K-2882,
Disposition
                                          Revise Dwg. M06-1000,
Document
                                          Sheet 12
ECN 3332
ECN 4683 Correct typographical           Revise Paragraph 302.4a   Generic
Add Note to two support
          error in ECN 524               of Specification K-2884
Revise support drawings
ECN 4822 Clarifications to Spec.         Revise Attachment 311.3   Clow Painting
Traveler Nos. H-SX-2-C,
          BA-K-2882-29                   of Specification K-2882   Procedure
drawings
                                                                    EPS 30-69-721
to incorporate note
ECN 4832 Response Spectra Data for       Revise Article 305.4 in   Generic
H-SX-3-D
          valves and actuators           Attachment 311.3 of
ECN 4291
                                          Specification K-2882.
Modification to ECN 4061
ECN 4853 Clarification of shop           Revise Attachment 311.3   Clow Painting
Revise Paragraphs 326.7c,
          painting requirements for       of Specification K-2882   Procedure
Generic
          valves installed in                                       EPS 30-69-721
d of Specification K-2882,
          containment b1dg.
Revise Dwg. M06-1000,
ECN 4943 Purchase and installation of Revise Attachment 311.2,     IP P0 X-19490, dated
Sheet 12
          nuclear safety-related         add Sections 327 and       dated April 3, 1985
ECN 4683
          heat tracing fo- CM and PR     Attachment 327 to
Correct typographical
          systems                         Specification K-2882
Revise Paragraph 302.4a
ECN 5263 Update list of Class D         Revise Attachment 302.50   Traveler No. 1WOLC6303
Generic
          support listed in Attach-       of Specification K-2882
error in ECN 524
          ment 302.50
of Specification K-2884
ECN 5282 Allow use of Code Case N-413 Revise Attachment 110.1 of Generic
ECN 4822
          for component supports         Specification K-2884
Clarifications to Spec.
NCR 29249 Use as-is dispositio,of         S&L Concurrence           Traveler No. DG-2
Revise Attachment 311.3
          pipe minimum                                               Supp. 15
Clow Painting
NCR 51358 Use as-is disposition of       Revise Specification       Traveler No. IVH25B
BA-K-2882-29
          control cable mechanical       K-2999
of Specification K-2882
          connection
Procedure
                                                                                            l
EPS 30-69-721
                                        VII-23
ECN 4832
                                                                                            l
Response Spectra Data for
Revise Article 305.4 in
Generic
valves and actuators
Attachment 311.3 of
Specification K-2882.
ECN 4853
Clarification of shop
Revise Attachment 311.3
Clow Painting
painting requirements for
of Specification K-2882
Procedure
valves installed in
EPS 30-69-721
containment b1dg.
ECN 4943
Purchase and installation of Revise Attachment 311.2,
IP P0 X-19490, dated
nuclear safety-related
add Sections 327 and
dated April 3, 1985
heat tracing fo- CM and PR
Attachment 327 to
systems
Specification K-2882
ECN 5263
Update list of Class D
Revise Attachment 302.50
Traveler No. 1WOLC6303
support listed in Attach-
of Specification K-2882
ment 302.50
ECN 5282
Allow use of Code Case N-413 Revise Attachment 110.1 of Generic
for component supports
Specification K-2884
NCR 29249
Use as-is dispositio,of
S&L Concurrence
Traveler No. DG-2
pipe minimum
Supp. 15
NCR 51358
Use as-is disposition of
Revise Specification
Traveler No. IVH25B
control cable mechanical
K-2999
connection
l
VII-23
l


                                                                                          I
I
                                                                                          l
TABLE VII-4 (Continued)
                              TABLE VII-4 (Continued)
CHANGE DOCUMENT SAMPLE
                              CHANGE DOCUMENT SAMPLE
Change
Change                                     Required               Implementing
Required
Document       Description               Disposition                 Document
Implementing
NCR 7002 Superseded by DR 5935;         S&L Concurrence           N/A
Document
          DR 5935 superseded by
Description
          10283; NCR 10283
Disposition
          documents use as-is
Document
          disposition for anchor
NCR 7002
          bolt which does not
Superseded by DR 5935;
          project beyond nut
S&L Concurrence
FCR 21404 Incorporate '81 Addenda to     Revise Paragraph 118 of   Traveler No. RR-759-A
N/A
          ASME Code for Minor Attach-     Specification K-2882
DR 5935 superseded by
FCR 21899 Revision of purchase           Revise Article 319.2 of   BA P0 C49800
10283; NCR 10283
          requirements for copper         Specification K-2882
documents use as-is
          refrigeration tubing
disposition for anchor
FCR 27389 Snubber substitution for       Incorporate design change Traveler No. H-SX-2-C
bolt which does not
          two supports                   drawings
project beyond nut
FCR 27508 Material clarification and     Revise Specification     Traveler No. RH-024
FCR 21404
          weld qualification infor-       K-2999                   has not reference to
Incorporate '81 Addenda to
          mation                                                   FCR 27389.
Revise Paragraph 118 of
FCR 27545 Use as-is disposition of       Revise Specification       Generic
Traveler No. RR-759-A
          fire proofed HVAC and           K-2910 and K-2999
ASME Code for Minor Attach-
          electrical attachment weld
Specification K-2882
          to structural steel without
FCR 21899
          galvanex
Revision of purchase
FCR 28060 Material substitution for     Revise Paragraph 118 of   Baldwin Purchase
Revise Article 319.2 of
          SA 307 GR A bolts and nuts     Specification K-2882       Order No. C48811
BA P0 C49800
FCR 29144 Clarification of safety-       Revise Specification       Generic
requirements for copper
          related requirements for       K-2884
Specification K-2882
          exempt items per NF-2121(b)
refrigeration tubing
          from basic engineers
FCR 27389
FCR 30783 Material substitution for     Revise Specification       Midway Industrial
Snubber substitution for
          primer and finish for         K-2882                     Contractors Form
Incorporate design change
          interior of diesel oil
Traveler No. H-SX-2-C
          storage tanks
two supports
FCR 32822 Clarification of hanger       Revise Specification       Generic
drawings
          support ID                     K-2884
FCR 27508
                                      VII-24
Material clarification and
Revise Specification
Traveler No. RH-024
weld qualification infor-
K-2999
has not reference to
mation
FCR 27389.
FCR 27545
Use as-is disposition of
Revise Specification
Generic
fire proofed HVAC and
K-2910 and K-2999
electrical attachment weld
to structural steel without
galvanex
FCR 28060
Material substitution for
Revise Paragraph 118 of
Baldwin Purchase
SA 307 GR A bolts and nuts
Specification K-2882
Order No. C48811
FCR 29144
Clarification of safety-
Revise Specification
Generic
related requirements for
K-2884
exempt items per NF-2121(b)
from basic engineers
FCR 30783
Material substitution for
Revise Specification
Midway Industrial
primer and finish for
K-2882
Contractors Form
interior of diesel oil
storage tanks
FCR 32822
Clarification of hanger
Revise Specification
Generic
support ID
K-2884
VII-24


                                                                                        1
1
                            TABLE VII-4 (Continued)                                   l
TABLE VII-4 (Continued)
                            CHANGE DOCUMENT SAMPLE
CHANGE DOCUMENT SAMPLE
Change                                     Required           Implementing
Change
Document       Description               Disposition             Document
Required
FCR 38578 Installation modifications     S&L Concurrence       Traveler No. CS1655
Implementing
          to beam connections due to
Document
          field interference
Description
FCR 36538 Clarification of installa-     Revise Paragraph 313.5 Traveler No. VG-3-8
Disposition
          tion and inspection require- of Specification K-2882
Document
          ments for Class O penetra-
FCR 38578
          tion assemblies
Installation modifications
FCR 36245 Hanger stiffener cannot be     Revise Hanger Drawing Traveler No. H-RR-995-F
S&L Concurrence
          installed due to inter-       1RB13521G
Traveler No. CS1655
          ference
to beam connections due to
                                      VII-25
field interference
FCR 36538
Clarification of installa-
Revise Paragraph 313.5
Traveler No. VG-3-8
tion and inspection require- of Specification K-2882
ments for Class O penetra-
tion assemblies
FCR 36245
Hanger stiffener cannot be
Revise Hanger Drawing
Traveler No. H-RR-995-F
installed due to inter-
1RB13521G
ference
VII-25


                                                                                  _ _ _ _ _ _ _
_ _ _ _ _ _ _
                                  TABLE VII-5
TABLE VII-5
                          STRUCTURAL STEEL IPOI SAMPLE
STRUCTURAL STEEL IPOI SAMPLE
DI Report         Elev.                                                         Bristol
DI Report
  No.   Bldg.   (Ft.)     S&L Drawing         Bristol Drawing             Piece Mark
Elev.
S-0826   Aux.     800   S26-1004-01A, Rev. F     F-02710, Sheet 5-8, Rev. 0   5-8B6
Bristol
S-0399   Fuel     800   526-1004-02A, Rev. F     Baldwin Detai1*               S2520A
No.
S-0825   Aux.     800   S26-1004-01A, Rev. F     F-0271D, Sheet 5-6, Rev. 0   5-683
Bldg.
S-0862   Aux.     800   S26-1004-02A, Rev. H     F-0271D, Sheet 5-9, Rev. 1   5-9B5
(Ft.)
S-1460   Contain. 778   527-1003-03A, Rev. AH   F-0271A, Sheet 3-14, Rev. 1   3-1483
S&L Drawing
S-1462   Contain. 778   S27-1003-03A, Rev. AH   F-0271A, Sheet F3-11, Rev. 2 F3-11B1
Bristol Drawing
S-1464   Contain. 778   S27-1003-03A, Rev. AH   F-0271A, Sheet F3-5, Rev. 2   F3-5B8
Piece Mark
S-1472   Contain. 778   S27-1003-03A, Rev. AH   Fab. Detail Per FCR 11690*         --
S-0826
S-1486   Contain. 778   S27-1004-01A, Rev. AA   F-0271A, Sheet F5-16, Rev. 1 F5-16BA
Aux.
S-1490   Contain. 803   S27-1004-01A, Rev. AB   F-0271A, Sheet F5-13, Rev. 1 F5-13B1
800
                                                                                                ,
S26-1004-01A, Rev. F
F-02710, Sheet 5-8, Rev. 0
5-8B6
S-0399
Fuel
800
526-1004-02A, Rev. F
Baldwin Detai1*
S2520A
S-0825
Aux.
800
S26-1004-01A, Rev. F
F-0271D, Sheet 5-6, Rev. 0
5-683
S-0862
Aux.
800
S26-1004-02A, Rev. H
F-0271D, Sheet 5-9, Rev. 1
5-9B5
S-1460
Contain.
778
527-1003-03A, Rev. AH
F-0271A, Sheet 3-14, Rev. 1
3-1483
S-1462
Contain.
778
S27-1003-03A, Rev. AH
F-0271A, Sheet F3-11, Rev. 2
F3-11B1
S-1464
Contain.
778
S27-1003-03A, Rev. AH
F-0271A, Sheet F3-5, Rev. 2
F3-5B8
S-1472
Contain.
778
S27-1003-03A, Rev. AH
Fab. Detail Per FCR 11690*
--
S-1486
Contain.
778
S27-1004-01A, Rev. AA
F-0271A, Sheet F5-16, Rev. 1
F5-16BA
S-1490
Contain.
803
S27-1004-01A, Rev. AB
F-0271A, Sheet F5-13, Rev. 1
F5-13B1
,
OSite Fabricated
OSite Fabricated
                                      VII-26                                                   l
VII-26
                                                                                                l
l
                                                                                                l


    .           - .           _ - -                           -.     - . -     - _ _ _ _ _ - - . - -
.
                                            TABLE VII-6
- .
                                    PIPE SUPPORT IPOI SAMPLE
_ - -
      DI Report           Elev.               S&L Drawing
-.
        No.         Bldg. (Ft.)     C1       (Support No.)                     Traveler No.
-
      M-2590   Contain.   737       A   M-1RH34010X, Rev. A               H-RH-20I, Rev. 3*
. -
      M-3155   Control   737       C   M-1SX52022X, Rev. A               H-SX-22K, Rev. 1FR*
- _ _ _ _ _ - - . -
      M-3328   Contain.   755       B   M-1RH71016G, Rev. C               H-RH-767-U, Rev. 1*
-
      M-3329   Aux.       737       B   BA Dwg. H-1-RH-780-4, Rev. 0       H-RH-780-D, Rev. IFR
TABLE VII-6
      M-3330   Contain.   755/762   B   M-1RH710185, Rev. E               H-RH-767-CC, Rev. 4
PIPE SUPPORT IPOI SAMPLE
      M-3338   Contain.   755       C   M-1RB22056G, Rev. B               H-RH-947H, Rev. 1
DI Report
      M-3349   Contain.   828       8   M-1RH22035X, Rev. F               H-RH-29F, Rev. 2
Elev.
      M-3351   Fuel       712       C   M-1SX42019R, Rev. C               H-SX-138, Rev. 15
S&L Drawing
      M-3354   Aux.       708       B   M-1RH47013G, Rev. A               H-RH-764-L, Rev. 1*
No.
      M-3421   Fuel       712       C   M1SX42021R, Rev. F                 H-SX-13P, Rev. 7*
Bldg.
      RTraveler Not Reviewed
(Ft.)
C1
(Support No.)
Traveler No.
M-2590
Contain.
737
A
M-1RH34010X, Rev. A
H-RH-20I, Rev. 3*
M-3155
Control
737
C
M-1SX52022X, Rev. A
H-SX-22K, Rev. 1FR*
M-3328
Contain.
755
B
M-1RH71016G, Rev. C
H-RH-767-U, Rev. 1*
M-3329
Aux.
737
B
BA Dwg. H-1-RH-780-4, Rev. 0
H-RH-780-D, Rev. IFR
M-3330
Contain.
755/762
B
M-1RH710185, Rev. E
H-RH-767-CC, Rev. 4
M-3338
Contain.
755
C
M-1RB22056G, Rev. B
H-RH-947H, Rev. 1
M-3349
Contain.
828
8
M-1RH22035X, Rev. F
H-RH-29F, Rev. 2
M-3351
Fuel
712
C
M-1SX42019R, Rev. C
H-SX-138, Rev. 15
M-3354
Aux.
708
B
M-1RH47013G, Rev. A
H-RH-764-L, Rev. 1*
M-3421
Fuel
712
C
M1SX42021R, Rev. F
H-SX-13P, Rev. 7*
RTraveler Not Reviewed
!
!
,
,
!
!
t..
t..
L                                               VII-27
L
VII-27
1
1
L
L


                                    TABLE VII-7
TABLE VII-7
                    ELECTRICAL CABLE TRAY HANGER IPOI SAMPLE
ELECTRICAL CABLE TRAY HANGER IPOI SAMPLE
01 Report           Elev.           BA Drawing
01 Report
  No.     Bldg.   (Ft.)           (Hanger No.)                 Traveler No.
Elev.
E-3762     Contain. 755       1002-018-H24, Rev. 04         E27-1002-018-H24, Rev. 5
BA Drawing
E-3920   Aux.     781       1003-01A-H47, Rev. 04         E26-1003-01A-H47, Rev. 8
No.
E-3921   Aux.     781       1003-01A-H48, Rev. 02         E26-1003-01A-H48, Rev. 12
Bldg.
E-4010   Contain. 768       1002-01B-H33, Rev. 04         E27-1002-01B-H33, Rev. 5
(Ft.)
E-4541   Control   800       1004-04A-H10,                 E30-1004-04A-H10, Rev. 23
(Hanger No.)
                                  Sheet 1, Rev. 03 &
Traveler No.
                                  Sheet 2, Rev. 01
E-3762
01 Report           Elev.
Contain.
  No.       Bldg. (Ft.)             S&L Drawing               Traveler No.
755
E-3623   Control   800       1004-00A-CPR, Rev. E         RT425, Rev. 6
1002-018-H24, Rev. 04
                              1942, Rev. Y
E27-1002-018-H24, Rev. 5
                              (Items 10510K, M, N)
E-3920
Aux.
781
1003-01A-H47, Rev. 04
E26-1003-01A-H47, Rev. 8
E-3921
Aux.
781
1003-01A-H48, Rev. 02
E26-1003-01A-H48, Rev. 12
E-4010
Contain.
768
1002-01B-H33, Rev. 04
E27-1002-01B-H33, Rev. 5
E-4541
Control
800
1004-04A-H10,
E30-1004-04A-H10, Rev. 23
Sheet 1, Rev. 03 &
Sheet 2, Rev. 01
01 Report
Elev.
No.
Bldg.
(Ft.)
S&L Drawing
Traveler No.
E-3623
Control
800
1004-00A-CPR, Rev. E
RT425, Rev. 6
1942, Rev. Y
(Items 10510K, M, N)
* SCI - Seismic Category I
* SCI - Seismic Category I
                                      VII-28
VII-28


                                  .
.
VIII. CORRECTIVE ACTION SYSTEMS
VIII. CORRECTIVE ACTION SYSTEMS
        A. Objective
A.
          The corrective action systems and related activities were examined to
Objective
          determine whether measures were established and implemented to assure
The corrective action systems and related activities were examined to
          that nonconformances and other conditions adverse to quality were promptly
determine whether measures were established and implemented to assure
          identified and corrected.
that nonconformances and other conditions adverse to quality were promptly
        B. Discussion
identified and corrected.
          An examination was made of the licensca's program for identification and
B.
          control of corrective actions, including review of sample documents and
Discussion
          inspection of some material and equipment for verification of actual
An examination was made of the licensca's program for identification and
          corrective actions in the plant.
control of corrective actions, including review of sample documents and
          The following procedures by Baldwin Associates (BA) and Illinois Power
inspection of some material and equipment for verification of actual
          Company (IP) protided the acceptance criteria for this inspection:
corrective actions in the plant.
              * BA Project Procedure (BAP) 1.0,     "Nonconformance Report (NCR),"
The following procedures by Baldwin Associates (BA) and Illinois Power
                  Rev. 17, dated May 24, 1985
Company (IP) protided the acceptance criteria for this inspection:
                  IP Nuclear Station Engineering Instructions (NSEI) ME-2,
* BA Project Procedure (BAP) 1.0,
                  " Interaction Analysis Program," Rev. O, dated March 4, 1985
"Nonconformance Report (NCR),"
                  IP Quality Assurance Procedure QAP-115.02, " Nonconforming
Rev. 17, dated May 24, 1985
                  Material Report (NCMR)," Rev. 4, dated February 8, 1985
IP Nuclear Station Engineering Instructions (NSEI) ME-2,
              * QAP-116.04, " Reporting of Deficiencies per 10 CFR 50.55(e),"
" Interaction Analysis Program," Rev. O, dated March 4, 1985
                  Rev. 4, dated February 14, 1985
IP Quality Assurance Procedure QAP-115.02, " Nonconforming
                  QAP-116.05, " Evaluation and Reporting of Defects and Noncon-
Material Report (NCMR)," Rev. 4, dated February 8, 1985
                  formances per 10 CFR 21," Rev. 2, dated June 20, 1983
* QAP-116.04, " Reporting of Deficiencies per 10 CFR 50.55(e),"
              * QAP-116.06, " Project Trend Analysis Program," Rev. 7, dated
Rev. 4, dated February 14, 1985
                  May 15, 1985
QAP-116.05, " Evaluation and Reporting of Defects and Noncon-
                  QAP-116.07, " Management Corrective Action Requests (MCAR),"
formances per 10 CFR 21," Rev. 2, dated June 20, 1983
                  Rev. 7, dated February 14, 1985
* QAP-116.06, " Project Trend Analysis Program," Rev. 7, dated
                  QAP-116.08, " CPS Condition Report (CR)," Rev. 5, dated July 27,
May 15, 1985
                  1984
QAP-116.07, " Management Corrective Action Requests (MCAR),"
                  IP Startup Administrative Instruction SAI-7, " Control of Condi-
Rev. 7, dated February 14, 1985
                  tions Adverse to Quality," Rev. 5, dated February 25, 1985
QAP-116.08, " CPS Condition Report (CR)," Rev. 5, dated July 27,
              * IP Startup Administrative Procedure SAP-1, " System Subsystem
1984
                  Turnover," Rev. 12, dated July 18, 1984
IP Startup Administrative Instruction SAI-7, " Control of Condi-
              * SAP-2, " Construction Work Requests," Rev. 13, dated December 20,
tions Adverse to Quality," Rev. 5, dated February 25, 1985
                  1984
* IP Startup Administrative Procedure SAP-1, " System Subsystem
                  SAP-6, " System Release and Return," Rev. 5, dated December 7,
Turnover," Rev. 12, dated July 18, 1984
                  1984
* SAP-2, " Construction Work Requests," Rev. 13, dated December 20,
                                            VIII-1
1984
SAP-6, " System Release and Return," Rev. 5, dated December 7,
1984
VIII-1


                                                                _ - _ _
_ - _ _
      SAP-9, " Maintenance Work Requests-Startup Group," Rev. 5 dated
SAP-9, " Maintenance Work Requests-Startup Group," Rev. 5 dated
    August 24, 1984
August 24, 1984
    SAP-20, " Preventative Maintenance," Rev. O, dated March 30, 1984.
SAP-20, " Preventative Maintenance," Rev. O, dated March 30, 1984.
1. Corrective Action Measures Inspection
1.
a. Inspection Scope
Corrective Action Measures Inspection
  A review was performed of applicable portions of the Quality
a.
  Assurance (QA) program and procedures. A total of 231 samples
Inspection Scope
  of corrective action documents including Nonconformance Reports
A review was performed of applicable portions of the Quality
  (NCRs), Nonconforming Material Reports (NCMRs) and Condition Reports
Assurance (QA) program and procedures.
  (CRs) were reviewed. Five material and equipment samples were
A total of 231 samples
  inspected for verification of corrective actions in the plant. Three
of corrective action documents including Nonconformance Reports
  samples of risk releases were selected for field verification of
(NCRs), Nonconforming Material Reports (NCMRs) and Condition Reports
  control and status of work on material and equipment to correct
(CRs) were reviewed.
  the deficient condition involved. Also, 26 samples of corrective
Five material and equipment samples were
  action documents which identified documentation revisions to show
inspected for verification of corrective actions in the plant. Three
  as-built conditions for their disposition, were reviewed to verify
samples of risk releases were selected for field verification of
  that the required documentation revision had been completed.
control and status of work on material and equipment to correct
  Samples were selected to cover various disciplines and activities.
the deficient condition involved.
  The activities included the normal program activities of BA, Zack
Also, 26 samples of corrective
  Company, IP and the additional activities of BA Field Verification
action documents which identified documentation revisions to show
  and IP Overinspection.
as-built conditions for their disposition, were reviewed to verify
  Open items requiring corrective action after turnover from BA to IP
that the required documentation revision had been completed.
  were also reviewed.
Samples were selected to cover various disciplines and activities.
  Corrective actions dispositioned use-as-is were evaluated to
The activities included the normal program activities of BA, Zack
  determine if sound engineering was used for the disposition.
Company, IP and the additional activities of BA Field Verification
b. Inspection Findings
and IP Overinspection.
  In general, it was found that satisfactory procedures were in place
Open items requiring corrective action after turnover from BA to IP
  for corrective action systems to identify and correct conditions
were also reviewed.
  adverse to quality at the site.     Except for a high rate of errors
Corrective actions dispositioned use-as-is were evaluated to
  found in a limited sample of open items identified in the IP Startup
determine if sound engineering was used for the disposition.
  Punch List, the corrective action measures were found to be accept-
b.
  able. The following details the NRC CAT inspector's findings:
Inspection Findings
  (1) With approximately 80 percent of the systems turned over to IP,
In general, it was found that satisfactory procedures were in place
        more than 6000 open items are identified on the IP Startup
for corrective action systems to identify and correct conditions
        Punch List Tracking System. The document packages for four
adverse to quality at the site.
        open items were selected for a detailed review by the NRC CAT.
Except for a high rate of errors
        The criteria used for the sample selection was that the item
found in a limited sample of open items identified in the IP Startup
        was identified as an open item and corrective action was required.
Punch List, the corrective action measures were found to be accept-
        Discrepancies were found in the posting of documents against
able.
        two of the open items which prevented the open items from being
The following details the NRC CAT inspector's findings:
        closed although the work had been accomplished. Because of the
(1) With approximately 80 percent of the systems turned over to IP,
        high percentage of problems identified in this small sample, two
more than 6000 open items are identified on the IP Startup
        additional sample packages were selected for review. Problems
Punch List Tracking System.
        were identified in both of these additional packages.         The high
The document packages for four
                                VIII-2                                           l
open items were selected for a detailed review by the NRC CAT.
                                          -_ --_
The criteria used for the sample selection was that the item
was identified as an open item and corrective action was required.
Discrepancies were found in the posting of documents against
two of the open items which prevented the open items from being
closed although the work had been accomplished.
Because of the
high percentage of problems identified in this small sample, two
additional sample packages were selected for review.
Problems
were identified in both of these additional packages.
The high
VIII-2
-_ --_


                                  .-   - -               ..
.-
              percentage of open item packages with problems identified by
- -
              the NRC CAT inspector indicates that additional management atten-
..
              tion to this matter is required.
percentage of open item packages with problems identified by
>
the NRC CAT inspector indicates that additional management atten-
              The packages examined are as follows:
tion to this matter is required.
              *
The packages examined are as follows:
                  ISA0069 Install Permanent Cable Between E21-N049 and JB
>
                  BA #61 -- Satisfactory
*
              *
ISA0069 Install Permanent Cable Between E21-N049 and JB
                  ISA0009 Change Wiring of NSIV-LC Valves -- Satisfactory
BA #61 -- Satisfactory
              *
,                DGA0349 Division II Overhaul, Rust on Cylinder Liner, NCR
*
*
                  17583 -- Unsatisfactory, See Table VIII-1
ISA0009 Change Wiring of NSIV-LC Valves -- Satisfactory
                  LPA0109 Water Leg Pump Seal Piping Discrepancies
*
                  ILP-1P2 -- Unsatisfactory, See Table VIII-2
DGA0349 Division II Overhaul, Rust on Cylinder Liner, NCR
                  DGA0153 Lube Oil Strainer Element Opening --
,
                  Unsatisfactory, See Table VIII-3
17583 -- Unsatisfactory, See Table VIII-1
            *
*
                  ISA0074 1E32-F008 Torque Switch Not Working in the Closed
LPA0109 Water Leg Pump Seal Piping Discrepancies
                  Position -- Unsatisfactory, See Table VIII-4
ILP-1P2 -- Unsatisfactory, See Table VIII-2
        (2) Manual and computerized records were used to track the status
DGA0153 Lube Oil Strainer Element Opening --
            and to trend nonconformances.
Unsatisfactory, See Table VIII-3
        (3) Work had been completed and inspected for five samples
*
            selected which required rework to correct a nonconformance.
ISA0074 1E32-F008 Torque Switch Not Working in the Closed
        (4) Three samples of the nonconformance documents reviewed
Position -- Unsatisfactory, See Table VIII-4
            permited work to continue on a conditional release before a
(2) Manual and computerized records were used to track the status
            final disposition could be made. The corrective action docu-
and to trend nonconformances.
            ments were still open and were controlled through the project's
(3) Work had been completed and inspected for five samples
            nonconformance program.
selected which required rework to correct a nonconformance.
        (5) The appropriate revisicns to design documents for a sample of
(4) Three samples of the nonconformance documents reviewed
            26 corrective action reports which identified document revi-
permited work to continue on a conditional release before a
            sions to show as-built conditions for their disposition, were
final disposition could be made.
            found to be posted or incorporated into the design documents.
The corrective action docu-
            The only exception was three documents identified on an NCR
ments were still open and were controlled through the project's
            which had not been completed at the time of the NRC CAT
nonconformance program.
            inspection.
(5) The appropriate revisicns to design documents for a sample of
        (6) Sections II.B.3.b(2), V.B.1.b and V.B.3.b of this report iden-
26 corrective action reports which identified document revi-
            tify NCRs dispositioned use-as-is without providing sufficient
sions to show as-built conditions for their disposition, were
            documentation to substantiate compliance with requirements.
found to be posted or incorporated into the design documents.
            Section III.B.4.b of this report identifies the use of an FECN
The only exception was three documents identified on an NCR
            when an NCR was required by project procedures.
which had not been completed at the time of the NRC CAT
        (7) Section VII.B.1.b(7) of this report identifies ineffective
inspection.
            corrective actions for IP QA audit program findings for the
(6) Sections II.B.3.b(2), V.B.1.b and V.B.3.b of this report iden-
            area of design document control.     The NRC CAT inspectors found
tify NCRs dispositioned use-as-is without providing sufficient
            similar deficiencies in the same area previously identified by
documentation to substantiate compliance with requirements.
            IP QA audits.
Section III.B.4.b of this report identifies the use of an FECN
                                      VIII-3
when an NCR was required by project procedures.
  . -_       _                                             - - -
(7) Section VII.B.1.b(7) of this report identifies ineffective
corrective actions for IP QA audit program findings for the
area of design document control.
The NRC CAT inspectors found
similar deficiencies in the same area previously identified by
IP QA audits.
VIII-3
.
-_
_
- - -


                                    -.     . _ _ _ .-     - . _ . . - . .
-.
. _ _ _
.-
- . _ . . - . .
t
t
    (8) Documentation reviewed for NCRs written due to BA Field Veri-
(8) Documentation reviewed for NCRs written due to BA Field Veri-
          fication and IP Overinspection findings, was found to be satis-
fication and IP Overinspection findings, was found to be satis-
          factory.
factory.
  c. Conclusion
c.
    The corrective action system was found to be generally acceptable
Conclusion
    except for the following:
The corrective action system was found to be generally acceptable
    "
except for the following:
          Lack of control of entries into the IP Startup Punch List after
"
          turnover of systems for startup testing.     The number of problems
Lack of control of entries into the IP Startup Punch List after
          found with the limited NRC CAT sample of open items reviewed
turnover of systems for startup testing.
          indicates that this matter requires additional management
The number of problems
          attention.
found with the limited NRC CAT sample of open items reviewed
          Failure to apply effective corrective actions in the area of
indicates that this matter requires additional management
          document control for IP QA audit findings.
attention.
          Disposition of nonconformances use-as-is without providing
Failure to apply effective corrective actions in the area of
          a basis to substantiate this disposition.
document control for IP QA audit findings.
                                  VIII-4
Disposition of nonconformances use-as-is without providing
a basis to substantiate this disposition.
VIII-4


                                      TABLE VIII-1
TABLE VIII-1
                      REVIEW 0F OPEN PUNCH LIST ITEM DGA0349
REVIEW 0F OPEN PUNCH LIST ITEM DGA0349
              DIVISION II OVERHAUL, RUST ON CYLINDER LINER, NCR 17583
DIVISION II OVERHAUL, RUST ON CYLINDER LINER, NCR 17583
Documents
Documents
Issued /Date                                     Comments
Issued /Date
NCR 17583                 Identified light rust bloom on number 6 cylinder liner
Comments
  (5/2/84)                 of 16 cylinder diesel, 1DG01KB. This NCR was superseded
NCR 17583
                          by NCMR 1-0809 (4/15/85) which is not identified on the
Identified light rust bloom on number 6 cylinder liner
                          punchlist.   IP NSED investigated rust problem on all DGs
(5/2/84)
                          (memo Y-72291) under NCR 17583, recommendation was to
of 16 cylinder diesel, 1DG01KB.
                          " rework" and the position taken, "the rust will be
This NCR was superseded
                          removed, after turnover, during disassembly of the
by NCMR 1-0809 (4/15/85) which is not identified on the
                          engine to replace power assembly lower seal by
punchlist.
                          mechanical maintenance."
IP NSED investigated rust problem on all DGs
MWR B02134                 Work request to inspect engine turbocharger via the
(memo Y-72291) under NCR 17583, recommendation was to
  (4/1/85)*               inspection ports, for 16 cylinder engine. General
" rework" and the position taken, "the rust will be
                          maintenance and inspection, visual inspection performed.
removed, after turnover, during disassembly of the
MWR B02133                 Work request to remove power assembly and perform work
engine to replace power assembly lower seal by
  (4/1/85)*               as per instruction provided, for 16 cylinder engine.
mechanical maintenance."
                          General maintenance and inspection activities.
MWR B02134
MWR 802135                 Work request to replace viscous damper as per
Work request to inspect engine turbocharger via the
  (4/1/85)*               instructions provided, for 16 cylinder engine.
(4/1/85)*
                          Maintenance work.
inspection ports, for 16 cylinder engine.
MWR B02138                 Same as MWR 802133, except for 12 cylinder engine.
General
  (4/1/85)*
maintenance and inspection, visual inspection performed.
MWR B02139                 Same as MWR B02134, except for 12 cylinder engine.
MWR B02133
  (4/1/85)*
Work request to remove power assembly and perform work
MWR 802140                 Same as MWR B02135, except for 12 cylinder engine.
(4/1/85)*
  (4/1/85)*
as per instruction provided, for 16 cylinder engine.
NCMR Q-01-08290           Written as the result of Condition Report, CR 1-85-04-054
General maintenance and inspection activities.
  (4/19/85)               which identified what the inspector believed to be a
MWR 802135
                          flaw in the weld area of the upper water jacket for
Work request to replace viscous damper as per
                          cylinders 8 and 9 of the 12 cylinder engine. Engineering
(4/1/85)*
                          investigation and evaluation found this condition to be
instructions provided, for 16 cylinder engine.
                          normal.
Maintenance work.
NCMR Q-02-018900           Written to identify scoring of connecting rod bearing
MWR B02138
  (4/26/85)               surface, cylinders 1-9 of 16 cylinder engine, found
Same as MWR 802133, except for 12 cylinder engine.
                          while performing MWR 802135.
(4/1/85)*
MWR B17342               Work request for pressure test of 12 cylinder engine
MWR B02139
  (5/2/85)                 cooling water system per instructions provided.
Same as MWR B02134, except for 12 cylinder engine.
(4/1/85)*
MWR 802140
Same as MWR B02135, except for 12 cylinder engine.
(4/1/85)*
NCMR Q-01-08290
Written as the result of Condition Report, CR 1-85-04-054
(4/19/85)
which identified what the inspector believed to be a
flaw in the weld area of the upper water jacket for
cylinders 8 and 9 of the 12 cylinder engine.
Engineering
investigation and evaluation found this condition to be
normal.
NCMR Q-02-018900
Written to identify scoring of connecting rod bearing
(4/26/85)
surface, cylinders 1-9 of 16 cylinder engine, found
while performing MWR 802135.
MWR B17342
Work request for pressure test of 12 cylinder engine
(5/2/85)
cooling water system per instructions provided.
* Written 10/29/84, and, while not applicable to this subject item, were entered
* Written 10/29/84, and, while not applicable to this subject item, were entered
  4/1/85.
4/1/85.
                                            VIII-5
VIII-5
                                                                    _ -       -     -
-- -_
                                      _
_
_ -
-
-


                        . _ _ _ _ _ _ _      . _ - _ -             .   ._-     _   . -_
. _ _ _ _ _ _
                                        TABLE VIII-l (Continued)
. _ - _ -
                    REVIEW OF OPEN PUNCH LIST ITEM DGA0349
.
            DIVISION II OVERHAUL, RUST ON CYLINDER LINER, NCR 17583
._-
_
. -_
_
TABLE VIII-l (Continued)
REVIEW OF OPEN PUNCH LIST ITEM DGA0349
DIVISION II OVERHAUL, RUST ON CYLINDER LINER, NCR 17583
Documents
Documents
Issued /Date                                                 Comments
Issued /Date
MWR B17351                     Same as MWR B17342, except for 16 cylinder engine.
Comments
  (5/22/85)
MWR B17351
MWR B17364                   Work request to replace 12 cylinder, engine AMOT valve
Same as MWR B17342, except for 16 cylinder engine.
(5/28/85)                     element housing bolts per disposition of NCMR 2-0216.
(5/22/85)
Problem:                     Of the twelve corrective action documents identified for
MWR B17364
                              punch list item DGA0349, only NCR 17583 appears to be
Work request to replace 12 cylinder, engine AMOT valve
                              related to the item description.       NCMR 1-0809 which
(5/28/85)
                              should have been identified, is missing. The       initially
element housing bolts per disposition of NCMR 2-0216.
                                identified open item has not been closed out.
Problem:
                                                        VIII-6
Of the twelve corrective action documents identified for
                                                                                            i
punch list item DGA0349, only NCR 17583 appears to be
related to the item description.
NCMR 1-0809 which
should have been identified, is missing.
The initially
identified open item has not been closed out.
VIII-6
i


                                                TABLE VIII-2
TABLE VIII-2
                                REVIEW 0F OPEN PUNCH LIST ITEM LPA0109
REVIEW 0F OPEN PUNCH LIST ITEM LPA0109
                          WATER LEG PUMP SEAL PIPING DISCREPANCIES ILP-1P2
WATER LEG PUMP SEAL PIPING DISCREPANCIES ILP-1P2
          Documents
Documents
          Issued /Date                                         Comments
Issued /Date
          NCMR Q-00-02400         Unrelated NCMR entered in error and not removed from
Comments
            (12/16/83)           punch list.           Related NCMR is Q-01-02400.
NCMR Q-00-02400
          FPR 3288                 Identified that pump IE21-C002 was different from the
Unrelated NCMR entered in error and not removed from
            (8/27/84)           other pumps in that seal injection piping was missing.
(12/16/83)
          CR 1-84-09-00400         Identified seal bypass piping on LPCS pump 1E21-C0002
punch list.
            (9/6/84)             was missing.
Related NCMR is Q-01-02400.
          NCR 021710               Identified the nonconformance.
FPR 3288
            (9/6/84)
Identified that pump IE21-C002 was different from the
          NCMR Q-01-02400         Replaced NCR 021710 for corrective action control
(8/27/84)
            (10/2/84)           after turnover.
other pumps in that seal injection piping was missing.
          CWR 11334               Work request to install seal by pass piping.           NCR
CR 1-84-09-00400
            (11/3/84)             021710, not NCMR Q-01-02400, identified the nonconfor-
Identified seal bypass piping on LPCS pump 1E21-C0002
                                  mance. This work request was closed out 1/14/85.
(9/6/84)
          Problem:               Work has been completed, NCR 021710 has been closed
was missing.
                                  out. NCMR Q-01-02400 has not been closed out and is
NCR 021710
                                  preventing this open item from being closed out.
Identified the nonconformance.
(9/6/84)
NCMR Q-01-02400
Replaced NCR 021710 for corrective action control
(10/2/84)
after turnover.
CWR 11334
Work request to install seal by pass piping.
NCR
(11/3/84)
021710, not NCMR Q-01-02400, identified the nonconfor-
mance.
This work request was closed out 1/14/85.
Problem:
Work has been completed, NCR 021710 has been closed
out.
NCMR Q-01-02400 has not been closed out and is
preventing this open item from being closed out.
l
l
l
l
!
!
I
I
                                                            VIII-7
VIII-7
  _ . _ -   _ __             _
_ . _ -
                                          _  . _ . . .                         -__ _-_     _
_ __
_
.
. . .
-__
_-_
_
_


                                TABLE VIII-3
TABLE VIII-3
                  REVIEW OF OPEN PUNCH LIST ITEM DGA0153
REVIEW OF OPEN PUNCH LIST ITEM DGA0153
                    LUBE OIL STAINER ELEMENT OPENING
LUBE OIL STAINER ELEMENT OPENING
Documents
Documents
Issued /Date                             Comments
Issued /Date
MWR B00183         Identified provisions for the diesel generator lube
Comments
  (9/18/84)       oil flush.
MWR B00183
CR 1-84-10-540     Identified lube oil strainer had manufacturer's defect.
Identified provisions for the diesel generator lube
  (10/19/84)
(9/18/84)
NCMR Q-01-052100   Identified the nonconformance with disposition to scrap
oil flush.
  (1/9/85)         defective strainer and replace with a new strainer.
CR 1-84-10-540
FDDR LH1-5151       Provided GE's disposition for NCMR Q-01-052100.
Identified lube oil strainer had manufacturer's defect.
  (1/15/85)
(10/19/84)
MWR B03584         Prepared to replace strainer.     Note: This work had been
NCMR Q-01-052100
  (3/5/85)-       performed under MWR B00183 which was never closed out.
Identified the nonconformance with disposition to scrap
                    MWR 803584 was closed out because the work had been
(1/9/85)
                    previously completed.
defective strainer and replace with a new strainer.
-Problem:           MWR B00183 is still identified as an open item of the
FDDR LH1-5151
                    punch list, preventing this item from being closed out.
Provided GE's disposition for NCMR Q-01-052100.
                                      VIII-8
(1/15/85)
MWR B03584
Prepared to replace strainer.
Note:
This work had been
(3/5/85)-
performed under MWR B00183 which was never closed out.
MWR 803584 was closed out because the work had been
previously completed.
-Problem:
MWR B00183 is still identified as an open item of the
punch list, preventing this item from being closed out.
VIII-8


                                                                                        _
_
l
TABLE VIII-4
REVIEW 0F OPEN PUNCH LIST ITEM ISA0074
1E32-F008 TORQUE SWITCH NOT WORKING IN THE CLOSED POSITION
Documents
Issued /Date
Comments
MWR 807829
Repair of identified problem with new Torque switch.
Switch was replaced 4/17/85 and documentation closed
out 4/19/85.
NCR 07082900
Nonconformance, spectacle flange, 1E32-D307, paper work
(3/2/85)
indicated that an ASME Class NF flange was being used
where a Class NC flange is required.
CWR C013430
Was prepared to replace the flange with an ASME NC
l
(3/28/85)
flange as required.
Problem:
Tne NCR and CWR were initially entered into the punch
l
l
                                        TABLE VIII-4
list tracking system under ISA0074.
                          REVIEW 0F OPEN PUNCH LIST ITEM ISA0074
The operator deleted
              1E32-F008 TORQUE SWITCH NOT WORKING IN THE CLOSED POSITION
l
  Documents
the problem descripticn but did not delete the NCR and
  Issued /Date                                    Comments
CWR.
  MWR 807829                Repair of identified problem with new Torque switch.
ISA0074 was then reused for MWR B07829 with the NCR
                            Switch was replaced 4/17/85 and documentation closed
and CWR identified as documentation related to the open
                            out 4/19/85.
item.
  NCR 07082900              Nonconformance, spectacle flange, 1E32-D307, paper work
All the work for the MWR has been completed.
    (3/2/85)                indicated that an ASME Class NF flange was being used
The
                            where a Class NC flange is required.
licensee had made the necessary corrections and removed
  CWR C013430              Was prepared to replace the flange with an ASME NC            l
this item from the open punch list prior to the NRC CAT
    (3/28/85)                flange as required.
inspection exit meeting.
  Problem:                  Tne NCR and CWR were initially entered into the punch
l                            list tracking system under ISA0074. The operator deleted
l                           the problem descripticn but did not delete the NCR and
                            CWR.     ISA0074 was then reused for MWR B07829 with the NCR
                            and CWR identified as documentation related to the open
                            item. All the work for the MWR has been completed. The
                            licensee had made the necessary corrections and removed
                            this item from the open punch list prior to the NRC CAT
                            inspection exit meeting.
l
l
I
I
!
!
                                              VIII-9
VIII-9


                                        _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
                                                                                                          ATTACHMENT A
ATTACHMENT A
  A. Persons Contacted
A.
      The following list identifies licensee representatives and NRC personnel
Persons Contacted
      present at the exit meeting, and licensee discipline coordinators and key
The following list identifies licensee representatives and NRC personnel
      individuals contacted during the inspection for each area.
present at the exit meeting, and licensee discipline coordinators and key
      1.   Exit Meeting
individuals contacted during the inspection for each area.
      a.   Licensee and Contractors
1.
            G. Bell               D. Hall                                                 M. Pacy
Exit Meeting
            W. Connell           R. Heider                                               D. Selva
a.
            H. Daniels           S. Johnson                                             D. Shelton
Licensee and Contractors
            G. Gandsey           W. Kelley                                               H. Victor
G. Bell
            W. Gerstner           A. King                                                 J. Wilson                   l
D. Hall
            J. Green              L. Osborne                                              S. Zabel
M. Pacy
      b.    State of Illinois
W. Connell
            R. Hubbard            A. Samelson                                            S. Swartz
R. Heider
      c.    NRC and Consultants
D. Selva
            T. Chan              J. McCormack                                            R. Serb
H. Daniels
            A. DuBouchet          T. McLellan                                            B. Siegel
S. Johnson
            G. Georgiev          0. Mallon                                              R. Smeenge
D. Shelton
            T. Gwynn              W. Marini                                              W. Sperko
G. Gandsey
            J. Harrison          E. Martindale                                          S. Stein
W. Kelley
            R. Heishman          J. Nemoto                                              J. Taylor
H. Victor
            D. Johnson *          M. Peranich                                            R. Warnick
W. Gerstner
            H. Livermore
A. King
!    2.    Licensee Coordinators and Contacts
J. Wilson
                  Area                                                              Name
            Team Leader                                                        G. Bell        D. Shelton
l
l
J. Green
L. Osborne
S. Zabel
b.
State of Illinois
R. Hubbard
A. Samelson
S. Swartz
c.
NRC and Consultants
T. Chan
J. McCormack
R. Serb
A. DuBouchet
T. McLellan
B. Siegel
G. Georgiev
0. Mallon
R. Smeenge
T. Gwynn
W. Marini
W. Sperko
J. Harrison
E. Martindale
S. Stein
R. Heishman
J. Nemoto
J. Taylor
D. Johnson *
M. Peranich
R. Warnick
H. Livermore
!
2.
Licensee Coordinators and Contacts
Area
Name
Team Leader
G. Bell
D. Shelton
l
l
                                                                              D. Hall
D. Hall
            Electrical and                                                     E. Bailey       R. Kennedy
l
              Instrumentation                                                 D. Gilbert     L. Ratliff
Electrical and
                                                                              B. Johnson
E. Bailey
            Mechanical                                                         D. Adams       K. Danner
R. Kennedy
                                                                              B. Buffie       R. Kennedy
Instrumentation
1
D. Gilbert
                                                                              L. Clark       A. Sherwood
L. Ratliff
                                                                              L. Combs       B. Taylor
B. Johnson
      * Institute of Nuclear Power Operations observer
Mechanical
                                                        AA-1
D. Adams
K. Danner
B. Buffie
R. Kennedy
1
L. Clark
A. Sherwood
L. Combs
B. Taylor
* Institute of Nuclear Power Operations observer
AA-1


                                _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                   ______
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
        Welding and NDE                                                       J. Carson     T. Wilmoth
______
        Civil and Structural                                                   T. Parrent   K. Smith
Welding and NDE
        Material Traceability                                                 J. Gruber
J. Carson
        Design Change Control                                                 G. Buffington J. Greene
T. Wilmoth
                                                                              R. Collins   S. Lyons
Civil and Structural
                                                                              W. Connell
T. Parrent
        Corrective Action Systems                                             T. Warnick
K. Smith
                                                                                                        l
Material Traceability
  In addition to the above personnel, numerous other inspectors, engineers                             I
J. Gruber
  and supervisors were also contacted.
Design Change Control
B. Documents Reviewed
G. Buffington
  The types of documents listed below were reviewed by the NRC CAT members
J. Greene
  to the extent necessary to satisfy the inspection objectives stated in
R. Collins
  Section I of tnis report.   References to specific procedures, specifica-
S. Lyons
  tions, and drawings are contained within the body of the report.
W. Connell
    1. Final Safety Analysis Report
Corrective Action Systems
    2. Quality assurance manual
T. Warnick
    3. Quality assurance procedures and instructions
l
    4. Quality control procedures
In addition to the above personnel, numerous other inspectors, engineers
    5. Administrative procedures
I
    6. General electrical installation procedures and specifications
and supervisors were also contacted.
    7. General instrumentation installation procedures
B.
    8. General piping and pipe support installation procedures and
Documents Reviewed
        specifications
The types of documents listed below were reviewed by the NRC CAT members
    9. General mechanical equipment installation procedures and
to the extent necessary to satisfy the inspection objectives stated in
        specifications
Section I of tnis report.
  10. General concrete specifications
References to specific procedures, specifica-
  11. As-built drawings
tions, and drawings are contained within the body of the report.
  12. Welding and NDE procedures
1.
  13.   Personnel qualification records
Final Safety Analysis Report
  14. Material traceability procedures
2.
  15.   Procedures for processing design changes
Quality assurance manual
                                                                            AA-2
3.
Quality assurance procedures and instructions
4.
Quality control procedures
5.
Administrative procedures
6.
General electrical installation procedures and specifications
7.
General instrumentation installation procedures
8.
General piping and pipe support installation procedures and
specifications
9.
General mechanical equipment installation procedures and
specifications
10.
General concrete specifications
11.
As-built drawings
12. Welding and NDE procedures
13.
Personnel qualification records
14.
Material traceability procedures
15.
Procedures for processing design changes
AA-2


  16. Procedures for document control
16.
  17. Procedures for controlling as-built drawings
Procedures for document control
  18. Procedures for processing nonconformances
17.
            .
Procedures for controlling as-built drawings
                                                    I
18.
                                  AA-3
Procedures for processing nonconformances
\.
.
AA-3
\\.


                                                        ATTACHMENT B
ATTACHMENT B
                              GLOSSARY OF ABBREVIATIONS
GLOSSARY OF ABBREVIATIONS
AISC - American Institute of Steel Construction
AISC - American Institute of Steel Construction
AISI - American Iron and Steel Institute
AISI - American Iron and Steel Institute
Line 5,797: Line 9,221:
ASME - American Society of Mechanical engineers
ASME - American Society of Mechanical engineers
ASTM - American Society for Testing and Materials
ASTM - American Society for Testing and Materials
AWG   - American Wire Gauge
AWG
AWS   - American Welding Society
- American Wire Gauge
BA     - Baldwin Associates
AWS
- American Welding Society
BA
- Baldwin Associates
BAFV - Baldwin Associates Field Verification
BAFV - Baldwin Associates Field Verification
BAP   - Baldwin Associates Project Procedure
BAP
BE     - Basic Engineering
- Baldwin Associates Project Procedure
80M   - Bill of Materials
BE
- Basic Engineering
80M
- Bill of Materials
BQAI - Baldwin Associates Quality Assurance Instruction
BQAI - Baldwin Associates Quality Assurance Instruction
*C     - Degree Celsius
*C
CAT   - Construction Appraisal Team (NRC)
- Degree Celsius
CAT
- Construction Appraisal Team (NRC)
CB&I - Chicago Bridge and Iron Company
CB&I - Chicago Bridge and Iron Company
CEA   - Concrete Expansion Anchor
CEA
CHI   - Construction Management Information
- Concrete Expansion Anchor
CPS   - Clinton Power Station
CHI
CR     - Condition Report
- Construction Management Information
C/S   - Civil / Structural
CPS
CRD   - Control Rod Drive
- Clinton Power Station
CWR   - Construction Work Request
CR
dc     - Direct Current
- Condition Report
DCC   - Document Control Center
C/S
DMS   - Document Management Systen
- Civil / Structural
ECN   - Engineering Change Notice
CRD
  F   - Degree Fahrenheit
- Control Rod Drive
FCR   - Field Change Request
CWR
FDC   - Field Document Center
- Construction Work Request
dc
- Direct Current
DCC
- Document Control Center
DMS
- Document Management Systen
ECN
- Engineering Change Notice
F
- Degree Fahrenheit
FCR
- Field Change Request
FDC
- Field Document Center
FECN - Field Engineering Change Notice
FECN - Field Engineering Change Notice
FSAR - Final Safety Analysis Report
FSAR - Final Safety Analysis Report
GE     - General Electric Company
GE
HCU   - Hydraulic Control Unit
- General Electric Company
HCU
- Hydraulic Control Unit
HPCS - High Pressure Core Spray
HPCS - High Pressure Core Spray
HVAC - Heating, Ventilating and Air Conditioning
HVAC - Heating, Ventilating and Air Conditioning
IE     - Office of Inspection and Enforcement (NRC)
IE
- Office of Inspection and Enforcement (NRC)
IEEE - Institute of Electrical and Electronic Engineers
IEEE - Institute of Electrical and Electronic Engineers
IP     - Illinois Power Ccmaany
IP
- Illinois Power Ccmaany
IPCEA - Insulated Power Ca)le Engineers Association
IPCEA - Insulated Power Ca)le Engineers Association
IP0I - Illinois Power Company Overinspection
IP0I - Illinois Power Company Overinspection
k     - One Thousand
k
- One Thousand
LPCS - Low Pressure Core Spray
LPCS - Low Pressure Core Spray
MCM   - One Thousand Circular Mils
MCM
MWR   - Maintenance Work Request
- One Thousand Circular Mils
MWR
- Maintenance Work Request
NCMR - Nonconforming Material Report
NCMR - Nonconforming Material Report
NCR   - Nonconformance Report
NCR
NDE   - Nondestructive Examination
- Nonconformance Report
NDE
- Nondestructive Examination
NP&S - Nuclear Planning and Support
NP&S - Nuclear Planning and Support
NRC   - United States Nuclear Regulatory Commission
NRC
- United States Nuclear Regulatory Commission
NSED - Nuclear Station Engineering Department
NSED - Nuclear Station Engineering Department
                                        AB-1
AB-1


NSEI - Nuclear Station Engineering Instructions
NSEI - Nuclear Station Engineering Instructions
PGCC - Power Generation Control Complex
PGCC - Power Generation Control Complex
PI   - Project Instruction
PI
- Project Instruction
PIR - Potential Interaction Report
PIR - Potential Interaction Report
PSA - Pacific Scientific Arrestor
PSA - Pacific Scientific Arrestor
PSAR - Preliminary Safety Evaluation Report
PSAR - Preliminary Safety Evaluation Report
QA   - Quality Assurance
QA
- Quality Assurance
QAI - Quality Assurance Instructions
QAI - Quality Assurance Instructions
QAP - Quality Assurance Procedure
QAP - Quality Assurance Procedure
QC   - Quality Control
QC
- Quality Control
RCI - Reactor Controls, Inc.
RCI - Reactor Controls, Inc.
RCIC - Reactor Core Isolation Cooling
RCIC - Reactor Core Isolation Cooling
RE   - Resident Engineer
RE
- Resident Engineer
RHR - Residual Heat Removal
RHR - Residual Heat Removal
RG   - Regulatory Guide (NRC)
RG
- Regulatory Guide (NRC)
RIR - Receiving Inspection Report
RIR - Receiving Inspection Report
SAE - Society of Automotive Engineers
SAE - Society of Automotive Engineers
Line 5,866: Line 9,327:
SU-F - Startup Field Office
SU-F - Startup Field Office
TPRG - Traveler Preparation Review Group
TPRG - Traveler Preparation Review Group
TS   - Technical Services             -
TS
- Technical Services
-
TTS - Traveler Tracking System
TTS - Traveler Tracking System
USI - Unresolved Safety Issue (NRC)
USI - Unresolved Safety Issue (NRC)
V   - Volt (s)
V
                                      AB-2
- Volt (s)
                            - . _
AB-2
                  _ _ . _ .        _   __      _ _
_ _ . _ .
                                                    ___ __ _ . _ _ _ _ , _ _ . __.
- . _
_
_ _
_
_
_
. _ _ _ _ , _ _ .
__.


r-                                           _ic
r-
_ic
,
,
!
!
  NRC Form 8-C
NRC Form 8-C
      (4-79)
(4-79)
    NRCM O240
NRCM O240
                                COVER SHEET FOR CORRESPONDENCE
COVER SHEET FOR CORRESPONDENCE
                    Use this Cover Sheet to Protect Originals of Multi-Page Correspondence.
Use this Cover Sheet to Protect Originals of Multi-Page Correspondence.
                                                                                            1
i
                  i
!
!
i
i
l
l
                \
\\
}}
}}

Latest revision as of 05:38, 12 December 2024

Const Appraisal Team Insp Rept 50-461/85-30 on 850520-31 & 0610-21.Deficiencies Noted:Inadequate Control of Design Documents & Programs for Verification of Electrical Separation & Ineffective Control of Work Performed
ML20134F787
Person / Time
Site: Clinton 
Issue date: 08/06/1985
From: Chan T, Georgiev G, Heishman R, Mclellan T, Nemoto J, Peranich M, Smeenge R, Stein S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
Shared Package
ML20134F777 List:
References
50-461-85-30, NUDOCS 8508210250
Download: ML20134F787 (125)


See also: IR 05000461/1985030

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

DIVISION OF INSPECTION PROGRAffS

REACTOR CONSTRUCTION PROGRAMS BRANCH

Report No.:

50-461/85-30

Docket No.:

50-461

Licensee:

Illinois Power Company

Facility Name:

Clinton Power Station

Inspection At:

Clinton, Illinois

Inspection Conducted:

flay 20-31 and June 10-21, 1985

Inspectors:

/ [ //Mor/Ed

/I

~ h, Chief, Construction Programs /

Date Signed

li. W. Per

c

CAT S

ion Team Le

$6/85

ons uction Engineer

Date Signed

T.(L.#LhaT, Reactor

P A ,e

M'

S h5

G. B. g giev,L5r. Rdactor Co

uction Engineer

Date'51gned

VO b.J

bbW

T. K. McLellan, Reactor Construction Engineer

Date Signed

0

(/f

8/fo/85

I. Nemoto, Reactor Construction Engineer

Da'te signed

//b Aff97fc^

R///SV

[R.J.5meenge,ReactorInspector(RegionIII)

Date Signed

2 st A u n?'

warc

[4

5. R. Stein, Reactor Construction Engineer

Date Signed

~

Consultants:

A. V. DuBouchet, D. C. Ford, J. B. McCormack,

0. P. Mallon, W. S. Marini, E. Y. ifartindale,

R. E. Serb and W. J. Sperko, Jr.

Approved By:

c

M

Robert F. Heishman, Chief

Date Signed

Reactor Construction Programs Branch

8508210250 850015

DR

ADOCK 050

1

_ - _ _ - _ - - _ -

-

.

.

,

1

l

TABLE OF CONTENTS

,

1

1

TOPIC

SECTION

INSPECTION SCOPE AND OBJECTIVES..................................

I

ELECTRICAL AND INSTRUMENTATION CONSTRUCTION......................

II

MECHANICAL CONSTRUCTION..........................................

III

WELDING AND NONDESTRUCTIVE EXAMINATION...........................

IV

CIVIL AND STRUCTURAL CONSTRUCTION................................

V

MATERIAL TRACEABILITY AND CONTR0L................................

VI

DESIGN CHANGE CONTR0L............................................

VII

CORRECTIVE ACTION SYSTEMS........................................

VIII

ATTACHMENT A - PERSONS CONTACTED AND DOCUMENTS REVIEWED

ATTACHMENT B - GLOSSARY OF ABBREVIATIONS

l

l

l

l

I

l

_____s

_

I.

INSPECTION SCOPE AND OBJECTIVES

The objective of this inspection was to evaluate the adequacy of

construction at the Clinton Power Station site.

This objective was accom-

plished through review of the construction program, evaluation of project

construction controls, and review of selected portions of the Quality

Assurance Program, with emphasis on the installed hardware in the field.

The scope and significance of identified problems were also determined.

In

addition, a sample of the results of the licensee's Overinspection Program

were compared with the NRC CAT inspection findings in applicable areas

inspected.

Within the areas examined, the inspection consisted of a detailed examina-

tion of selected hardware subsequent to quality control inspections, a

selective examination of procedures and representative records, and limited

observation of in process work.

For each of the areas inspected, the following was determined:

Were project construction controls adequate to assure quality

'

construction?

Was the hardware or product fabricated or installed as designed?

Were quality verifications performed during the work process with

applicable hold points?

i

Was there adequate documentation to determine the acceptability of

installed hardware or product?

Are systems turned over to the startup organization in operable

condition and are they being properly maintained?

I-l

_

_-

.

_ _ -

_

. _ _ _ . . _ _

__

.-

_

.

II.

ELECTRICAL AND INSTRUMENTATION CONSTRUCTION

A.

Objective

The primary objective of the appraisal of electrical and instrumentation

construction was to determine whether safety-related components and

,

systems were installed in accordance with regulatory requirements,

Safety Analysis Report commitments, and approved vendor and construction

specifications and drawings.

Additional objectives were to determine

whether procedures, instructions and drawings used to accomplish

construction activities were adequate and whether quality related

records accurately reflected the completed work.

B.

Discussion

Within the broad categories of electrical and instrumentation

construction, attention was given to several specific areas.

These

included electrical cable, raceways and raceway supports, electrical

equipment, and instrumentation piping and components. Additionally,

a review was made of a selected number of documents associated with

design change control and nonconformance reporting.

A number of inspection samples in several areas coincided with either

Baldwin Associates' Field Verification (BAFV) Program or Illinois

Power Company's Overinspection (IPOI) Program.

These are identified

in the following sections along with an assessment of the programs'

findings compared to the observations of this inspection.

Refer to

Section VII, Design Change Control, of this report for further

discussion of the IPOI Program.

1.

Electrical Raceway Installation

a.

Inspection Scope

Seventy segments of installed Class 1E cable tray, representing a

total length of about 1,200 feet, were selected from various plant

areas for detailed examination by the NRC Construction Appraisal

Team (CAT).

These segments were inspected for compliance to

requirements relative to routing, location, separation, identifica-

tion, protection, physical loading, support spacing and support

configuration.

Additionally, 31 runs of installed conduit, with an

aggregate length of about 1,000 feet, were inspected for compliance

to specified requirements such as routing, location, separation,

bend radii, support spacing and associated fittings.

The BAFV

records for a number of the conduit runs inspected were also

reviewed.

Thirteen raceway supports were examined in detail for such items

as location, material, anchor spacing, weld quality, bolt torque

and installed configuration.

See Table II-1 for a listing of the cable tray, conduit and raceway

support samples.

II-1

--

-

- -

-

-

The following documents provided the basic acceptance for the

inspection:

Sargent & Lundy Clinton Power Station Unit 1 Specification

K-2999, " Electrical Installation," Amd. 10

Baldwin Associates Project Procedure BAP 3.3.1, " Exposed

Conduit Installation and Traveler Processing," Rev. 18

BAP 3.3.6, " Electrical Raceway Support Installation,"

Rev. 9

OAP 3.3.10, " Cable Tray Installation and Traveler Pro-

c?ssing," Rev. 6

BA) 2.3.11, " Cable Tray Attachment Installation," Rev. 6

BAP 3.3.14, " Conduit Support Installation," Rev. 1 Change B

Baldwin Associates Quality Assurance Instruction BQAI-190-8,

" Electrical Raceway Hanger / Supports Field Verification,"

Rev. 4

BQAI-190-9, " Electrical Raceway Field Verification,"

Rev. 4.

b.

Inspection Findings

The NRC CAT inspectors observed that, in general, Class 1E raceway

installations were in accordance with applicable design criteria.

Important quality attributes such as material type, location,

identification and installed configuration were found to be as shown

on approved construction drawings.

However, several construction

deficiencies were identified and are discussed in the following

sections.

(1) Raceway Separation

The requirement to establish physically independent and

redundant cable raceway systems is specified in the Clinton

Power Station (CPS) Final Safety Analysis Report (FSAR).

Section 8.3.1.4, entitled " Independence of Redundant Systems,"

describes requirements for physical arrangement of raceways in

order to comply with the requirements of Regulatory Guide (RG)

1.75.

The CPS raceway design includes four safety-related divisions

to serve the Engineered Safety Features systems and two

nonsafety-related divisions which serve the balance of plant

systems.

Minimum spatial separation between raceways

comprising each of these divisions has been established in

accordance with the guidelines specified in the Institute of

Electrical and Electronic Engineers (IEEE) Standard 384-1974.

II-2

NRC CAT inspectors reviewed documents which explained the CPS

electrical separation design philosophy.

In summary, Sargent

& Lundy Engineers (S&L) as the Architect Engineer controls

electrical separation through their design process.

Location

dimensions on electrical raceway installation drawings are used

for maintaining proper separation.

Consequently, specific

separation criteria is purposely not included in the specifica-

tions and instructions issued to the electrical contractor for

installation and inspection.

This has resulted in an inspec-

tion program which verifies the correct location of raceway

components but does not include attributes for inspection of

electrical separation.

To verify the adequacy of controls established through the

design process, NRC CAT inspectors selected a sample of com-

pleted raceway installations for review.

During the examina-

tion the inspectors identified numerous installations which did

not maintain spatial separation as described in the FSAR.

Several deficiencies existed between components of redundant

safety divisions, but deficiencies primarily occurred between

safety and nonsafety-related components.

Specific cable tray

deficiencies were then compared to design drawings to determine

if required fire barriers (i.e., tray covers) had been detailed

for installations which exhibited less than the required

spatial separation.

It was noted that in many cases barriers

had not been specified on the applicable drawing.

Reference

Table II-2 for a listing of raceway separation deficiencies

identified by the NRC CAT inspectors.

Discussions with the licensee indicate that they had become

aware of the need to perform specific walkdowns for electrical

separation because field installation tolerances could not be

controlled by design drawings.

As such, field walkdowns of

raceway for seismic interaction were incorporated into S&L's

Clinton Project Instruction PI-CP-034, Interaction Analysis

Procedure, early in 1983.

However, incorporation of specific

electrical raceway separation criteria was not accomplished

until mid 1985.

In order to evaluate this program, NRC CAT inspectors reviewed

the walkdown procedure, examined the plant area previously

inspected by the separation walkdown team, and interviewed the

engineers responsible for performing the walkdown.

The

following concerns were identified as a result of this

evaluation:

Separation criteria detailed in the walkdown procedure is

not complete in that spatial separation between raceway

and exposed electrical cable has not been addressed.

Personnel performing separation walkdowns have not

received training adequate to assure that they are

knowledgeable of all accept / reject criteria.

II-3

_

_

-.

The program represents the final inspection and acceptance

of raceway for the attribute of electrical separation.

As

such, it lacks appropriate involvement from the quality

assurance (QA) organization.

In connection with this issue, review of Sargent & Lundy

Electrical Department Standard ESI-180 indicates that analysis

has been used to justify many of the installations which

exhibit less than the required spatial separation.

NRC CAT

inspectors noted that this does not satisfy the requirement of

section 8.1.6.14 position C.6 of the CPS FSAR which states,

"The analysis 'out' given in paragraphs 4.5(3), 4.6.2 and

5.1.1.2 has not been used."

An S&L calculation, No. 19-BD-13, was cited as justification

for the examples of lessor separation identified by the NRC CAT

between non-Class 1E raceway run above Class 1E cable tray.

A

review of the analysis indicates that it does not meet the

requirements of IEEE-384 paragraph 5.1.1.2 in that it is not

based on tests of proposed installations and does not consider

actual raceway arrangements.

The analysis only addresses non-

Class 1E raceway which crosses over Class IE cable tray and

states that covers are not required for the Class 1E tray as

the heat from a fire or fault in the upper raceway will rise.

Discussions with the licensee revealed that an amendment to

the CPS FSAR has been prepared which would allow the use of

analysis to establish adequate electrical separation.

As a

result, further evaluation of this issue will be required by

NRC personnel.

In summary, the review of design, construction, and inspection

activities indicates that existing design and quality verifica-

tion programs have not been adequate to assure that commitments

relative to electrical separation have been met.

As a result

of this observation, the licensee has indicated that a program

evaluation will be performed.

Additionally, based upon

results of the evaluation and concerns addressed in this

report, program requirements may be revised.

(2) Raceway Supporting Scaffolding

BAP 3.3.10 permits the use of installed cable tray to support

temporary scaffolding with notification of BA quality control

(QC) by the area electrical supervisor, and the procedure

provides inspection criteria following removal of the scaf-

folding.

The NRC CAT inspectors questioned the procedure

controls that would alert BA QC whenever Class 1E cable trays

were used to support scaffolding and assure inspection of the

trays after removal of the scaffolding.

Since the controls were not well documented, BA's Deputy

Project Manager subsequently issued letter EPR-160-85 June 4,

1985.

The letter only permits placing scaffolds on Class 1E

cable tray on an exception basis requiring Superintendent

II-4

. = -

-.

-

approval.

The letter also requires documentation in a depart-

mental log and written notification to BA QC.

Section III, Mechanical Construction, of this report, also

discusses support of temporary scaffolding.

(3) Electrical Conduit

In general, the installation of conduit conforms to design

requirements. A number of separation violations were noted

between conduits, and between conduits and cable tray and are

included in the discussion in Section II.B.1.b(1), above.

In what the NRC CAT inspectors considcr an isolated case, con-

duits C9822, C9823, and C9824 are not attached to support E29-

1000-02C-122 as required by drawing E29-1000-02C-EIH.

The

licensee subsequently issued Nanconformance Report (NCR) 31717

to document the condition.

(4) Raceway Supports

The examination of seismic raceway supports was accomplished

for both cable tray and conduit installations.

In general,

attributes such as location, material type and size, anchor

spacing, welds (location, size and general quality) and

installed configuration were found to be in accordance with

design requirements.

c.

Conclusions

The use of engineering analysis to establish adequate electrical

separation is not consistent with current FSAR commitments, and an

analysis to justify separation between Class IE and non-Class IE

raceway was found to be technically inadequate.

The licensee's existing programs of design and quality verification

activities have not been adequate to assure that raceway

installations conform to FSAR commitments for electrical separation.

With the exception of compliance with electrical separation

criteria, conduit and support installations appear to be in

conformance with requirements.

2.

Electrical Cable Installation

a.

Inspection Scope

The NRC CAT inspectors selected a sample of installed Class IE

cable runs that had been previously accepted by BA QC inspectors.

The sample included medium and low voltage power, control, and

instrumentation cables.

For each of the cable runs, physical

inspection was made to ascertain compliance with applicable design

criteria relative to size, type, location, routing, bend radii,

protection, separation, identification and support.

In addition,

II-5

..

. _ .

-

,

IPOI records for installation and termination of those cables marked

with an *, below, were reviewed.

The NRC CAT inspectors selected approximately 270 cable ends for

examination.

These were inspected to applicable design and

installation documents for items such as lug size and type, proper

terminal point configuration, correct identification of cable and

conductors, proper crimping of lugs or connectors, and absence of

insulation or jacket damage.

See Table II-3 for a listing of cable

terminations examined.

The following medium and low voltage power cables, totaling about

1,650 feet, were selected from different systems, electrical trains

and locations:

Cable

Type

1HP03C-P3E

3 Conductor 750 MCM

  • 1HP08A-P3E

3 Conductor 500 MCM

1RH02A-P2E

3 Conductor 1/0 AWG

  • 1RH27A-P1E

3 Conductor 19/22 AWG

  • 1CC08A-P2E

3 Conductor 19/22 AWG

1DC01B-P1E

3 Conductor 4/0 AWG

  • 1LP01A-PIE

3 Conductor 500 MCM

ILP03A-P1E

3 Conductor 19/22 AWG

The following control cables totaling approximately 1,020 feet were

selected from different systems, electrical trains and locations:

Cable

Type

1HP08E-C3E

2 Conductor 19/22 AWG

1DG01C-CIE

15 Conductor 19/25 AWG

1DC01E-C1E

4 Conductor 19/25 AWG

  • 1IA028-CIE

12 Conductor 19/25 AWG

The following instrument cables totaling approximately 560 feet

were selected from different systems, electrical trains and

locations:

Cable

Type

1LD41F-K2E

1 Pair 16 AWG Twisted Wire Shielded

ISC76A-K1E

1 Pair 16 AWG Twisted Wire Shielded

IDC06G-K4E

1 Pair 16 AWG Twisted Wire Shielded

  • 1NR758-KIN

1 Pair 16 AWG Twisted Wire Shielded

The following documents provided the basic acceptance criteria for

the inspection:

S&L Clinton Power Station Specification K-2999, " Electrical

Installation," Amd. 10

BAP 3.3.2, " Cable Installation," Rev. 14

II-6

,

BAP 3.3.3, " Cable Terminations," Rev. 6

BAP 3.3.9, " Cable Protection," Rev. 6

BQAI-190-12, " Electrical Cable Installation Field

Verification"

BQAI-190-7, " Electrical Cable Termination Field

Ve ri fication. "

b.

Inspection Findings

(1) Ro ut.i_ng

n

In ceneral, the routing of Class 1E cables through design

designated raceway systems was found to be in accordance with

specified criteria.

Each of the Class IE cables examined by

NRC CAT inspectors had been installed in accordance with the

roul.ing detailed on the applicable computer generated Cable

Pu'l Ticket.

One instance of improper routing was identified in the Power

Generation Control Complex (PGCC).

NRC CAT inspectors noted

that nonsafety-related cable C11A-XX-030 had been looped into

a Division 2 safety-related floor section near panel H13-P652.

Investigation indicated that this condition was the result of

improper distribution of excessive slack in the cable.

A

review of the applicable design document, Panel Module

Wirelist 287A5660, Rev. 11 showed a correct routing of this

cable through nonsafety-related floor sections.

As a result of this observation, the licensee has issued

Nonconforming Material Report (NCMR) 2-0304 and Construction

'

Work Request (CWR) 6271 to document and correct this condition.

(2) Separation

During the inspection of Class IE cables NRC CAT inspectors

identified a number of cable and wiring installations which

did not conform to specified requirements for electrical

separation.

Examples identified include wiring deficiencies

which were located inside of control room operator panels.

In

this area, examination revealed that vendor installed wiring

had been routed through flexible metalic conduit.

In several

areas conduits which contained redundant Class 1E wiring had

been installed in physical contact with one another.

Examples

of this condition were observed in the following panels:

P800-62, 63, 64, 65

P870-55, 57, 58, 59, 61

P601-19, 22

Additionally, inadequate spatial separation was observed be-

tween exposed Class IE wiring in several of the control panel

sections.

II-7

_

_

__

NRC CAT inspectors examined the documents whic.h control the

design and installation of equipment in the cortrol room area.

The General Electric Company (GE) Topical Repor?. NEDO-10466-A

provides design criteria and safety evaluation 1or components

comprising the PGCC.

In accordance with the definition pro-

vided by this document, the PGCC consists of 1) a set of steel

floor sections, 2) a set of termination cabinets, and 3) a set

of interpanel cables.

Other control room panels, such as operator and signal

conditioning panels, are not considered part of the PGCC

and were designed by Sargent & Lundy Engineers.

However,

internal separation for all control room panels was to be

in accordance with the requirements of GE document 22A7472

" Electrical Equipment, Independence For Nuclear Safety-

Related Systems."

In reviewing these documents NRC CAT inspectors raised

questions concerning the use of flexible conduit as a fire

rated barrier within control room panels.

Discussions with

licensee personnel indicate that the use of flexible conduit

in the PGCC panels and ficor sections has been justified by

test and analysis as stated in Section 8.3.1.4.5.5 of the

FSAR and that this analysis provides justification for use

of flexible conduit in other control room panels as well.

However, based upon subsequent discussions with the NRR staff,

NRC CAT inspectors concluded that analysis of components

outside the scope of the PGCC has not been provided.

As such,

the wiring configurations described above do not comply with

FSAR requirements.

Additionally, the use of flexible conduit as a fire rated

barrier and the fire protection adequacy of control room panels

outside the scope of the PGCC installation are issues requiring

further evaluation by the NRC.

In connection with this issue a program weakness was identified

concerning the review of vendor issued specifications.

GE

specification 22A7472 was issued in April of 1981 and, as pre-

viously indicated, provides requirements for separation within

electrical equipment.

However, the S&L review of this spec-

ification did not occur until January of 1985.

The S&L approval

of this specification stipulates that " contractor may proceed

in accordance with specification based on making the revisions

noted and resubmit." NRC CAT inspectors expressed concerns re-

garding the timeliness of this review in light of the fact that

S&L revisions and comments to the specification were extensive

and that much of the equipment affected by the requirements of

the specification had previously been installed and, in some

cases, turned over to operations.

The licensee should deter-

mine whether S&L's specification changes are being incorporated

into the installed equipment.

II-8

Separation deficiencies were also identified in 4160V switch-

'

gear E22-5004.

However, this deficiency and the adequacy of

the installation are addressed in Potential Deficiency Report

81-05.

Construction activity in connection with resolution of

l

this report has not been completed.

Separation Leficiencies also exist between exposed electrical

cable and raceway components.

As discussed in Section

II.B.1.b(1) above, these deficiencies had not been identified

by the licensee due to inadequate incorporation of accept /

reject criteria into separation walkdown procedures.

(3) Power Cable Spacing and Derating

CPS power cable installations have been designed in accordance

with Insulated Power Cable Engineers Association (IPCEA) publi-

cations P-46-426 " Power Cable Ampacities - Volume I - Copper

Conductors" and P-54-440 "Ampacities - Cables in Open Top Cable

Trays." The power cables have been derated in accordance with

the IPCEA standards such that cables sharing raceways may be in

contact.

Additionally, ampacities for power cables are based

on a 2-inch average depth of fill in cable tray.

As a result,

cables in solid metal trays could be installed without

maintained spacing.

The project's power cable ampacities calculation, S&L No.

19-G-1, was reviewed and compared to the FSAR commitments.

The calculation takes the appropriate values from tables in

IPCEA P-54-440, adjusts the values for actual cable

diameters and applys a five percent general derating factor

for tray covers.

The ampacities are derated an additional

10 percent as required by IPCEA P-54-440 for a 50 C ambient

temperature and it is these values that are listed in the

FSAR Section 8.3.

No deficiencies were identified in this area.

(4) Cable Damage

With the exception of the Class 1E cables damaged as a result

of the watt transducer fire in 4160V switchgear 1E22-5004

discussed in Section II.B.3, below, no deficiencies were

identified in this area.

(5) Cable Identification

In general, the identification of Class 1E cable installations

was found to be in accordance with applicable design

criteria.

No construction deficiencies were identified.

(6) Terminations

In general, cable termination activities performed by

construction personnel conformed to requirements.

However,

two types of deficiencies were observed and are discussed

below,

i

II-9

}

(a) The NRC CAT examined four 5kV terminations in switchgear

and found three which were not insulated as required by

specification.

These were the "from" ends of cables

1LP01A-PIE, 1HP08A-P3E and 1HP030-P3E.

Section 1004.1C2

of S&L Specification K-2999 and paragraph 4.12.la of BAP

3.3.3 require all SkV terminations in switchgear to be

insulated with termination kits or insulating boots.

The

BA QC Inspection Checklists for the three terminations and

IPOI's checklist for ILP01A accepted the installations

indicating that insulation was not required.

The terminations for 1HP08A and 1HP03D in switchgear

1E22-S004 were subsequently documented on NCR 32232 and

Field Change Request (FCR) 38981 and dispositioned use-

as-is.

This was based on S&L's determination that the

busses for this particular switchgear were not required

to be insulated and, therefore, the cable terminations

need not be.

IP startup had identified uninsulated bus

to breaker connections in the switchgear containing cable

ILP01A, but had not identified the uninsulated cable

terminations.

Although discussions with the licensee indicate there may

be technical justifications for certain uninsulated SkV

terminations, the installations identified by the NRC CAT

inspectors do not conform to current specification require-

ments.

(b) A field-installed jumper wire in the remote shutdown panel

was found by the NRC CAT to be a type which is not qualified

for Class 1E service.

This jumper wire is located on ter-

minal strip GG, between terminal points 18 and 26, and is

depicted on drawing E03-1C61-P001, sheet 6, Rev. K.

Further

investigation of this finding revealed the following:

Startup discovered, during system checkout, that the

required jumper between these points was missing and

initiated Maintenance Work Request (MWR) B02288 in

order to have plant operating staff personnel install

the missing jumper wire.

The MWR form was improperly reviewed, thus the K R

was processed as a nonsafety-related work order.

Due to the error in the processing of the MWR form,

non-Class 1E qualified jumper wire was obtained from

the operations warehouse and installed by plant

operating staff personnel, and QC inspection of this

installation was not performed.

Subsequently, the licensee has issued MWR-B11255 and

Condition Report 1-85-06-007 to document this NRC CAT

finding.

However, the condition report inaccurately

indicates that use of unqualified wire does not involve

^

nonconforming material and, therefore, does not indicate

II-10

~_.

_

___ _.

the appropriate safety classification for the condition

being reported.

It should be noted that, due to a similar finding by the

NRC CAT at another facility, the licensee had previously

instituted a program to assure that all field-installed

wiring was accomplished using Class 1E qualified wire.

This included the removal of all unqualified wire from

the construction warehouses to preclude its inadvertent

use.

However, this purge of unqualified wire did not

extend into IP's operations warehouse.

The NRC CAT inspectors then selected an additional 10

safety-related MWRs which involved termination activi-

ties requested by startup and performed by plant staff.

The MWRs selected are: 804831, B1000, B10039, A13589,

B10038, A16980, A14412, A17116, A17112, and 810159.

These

were reviewed for proper processing of the form and evi-

dence of the application of adequate QA program require-

ments to the work performed.

In addition, the NRC CAT

inspectors physically inspected the completed hardware

pertaining to each MWR.

The results of this review are as follows:

Two additional instances of unqualified jumper wire

were discovered.

These were related to MWRs A16980

and A17116 and involved internal wiring in

safety-related motor operated valves ISX004C and

1SX006C.

The form for MWR A14412 indicated that no QC inspection

was required.

The work associated with this MWR is the

splicing of internal motor leads to field cable in

safety-related motor operated valve ISX004C,

Sargent

& Lundy Standard EA-209 requires these splices to be

insulated, either with Class IE qualified insulating

and jacketing tapes, or with Class IE qualified heat-

shrinkable tubing.

The completed configurations of

either of these methods renders it impossible to

determine whether or not qualified materials were

used and were properly installed.

Therefore, in order

to assure the adequacy of these splices, an in process

witnessing inspection by QC was necessary.

MWR 81000 involves the swapping of two motor leads at

the Residual Heat Removal pump 1C motor in order to

achieve proper phase rotation of the motor.

Review of

the MWR form and associated QC inspection documentation

indicates that the work was properly accomplished and

inspected.

However, no documentation was generated

which would inform the designer of the change in motor

phasing.

Therefore, the currently approved design doc-

ument (wiring diagram E03-1RH00, SH.9, Rev. D) is in

II-11

---

_ _ _

___

._ .____.._._ __

_ _ _ - _ _ _ . _ - -

. -

_

conflict with the as-installed configuration of the in-

sta11ation.

The licensee stated that the disposition of

FCR 24896 allows motor terminations to be changed with-

out initiating a design change document and that the

4

designer need not be notified of such changes in motor

!

phasing.

A review of this FCR reveals that, although

it does state " connections may be modified as required

to obtain proper motor rotation", it does not indicate

'

that approved design drawings (wiring diagrams) do not

1

i

have to depict the as-installed wiring configurations.

j

In addition, on page 2 of 5 of the "Clinton Power

'

Station As-built Program" dated May 2, 1985, the

licensee has committed to maintain wiring diagrams

l

in an as-built condition.

In summary, of 11 maintenance work orders reviewed, 6

instances of either unqualified material, improperly

documented or missed inspections, and conflict between

as-built configuration and approved drawing were observed.

This indicates that the Maintenance Work Request Program

is ineffective in identifying safety-related work and

prescribing the appropriate QA requirements for the work.

c.

Conclusions

Wiring installations in a number of control panels are not in

I

accordance with applicable electrical separation requirements.

Additionally, the use of flexible conduit as a fire rated barrier

and the fire protection adequacy of certain control room panels are

issues requiring further evaluation by the NRC.

A number of Class

IE 4160V cable terminations have not been completed in accordance

with applicable design requirements.

The hardware and QA program deficiencies identified in the area of

l

'

"

the Maintenance Work Request program indicate a need for additional

management attention in order to assure that safety-related wiring

remains in conformance with applicable requirements subsequent to

turnover from construction.

3.

Electrical Equipment Installation

a.

Inspection Scope

Over 30 pieces of installed or partially installed electrical

equipment and associated hardware items were inspected.

Samples

J

were based on system function and safety classification.

The following specific electrical components were inspected in

detail:

(1) Motors

The installation of four motors and associated hardware was

inspected for such items as location, anchoring, grounding,

i

identification and protection.

The motors inspected were:

,

.

II-12

_

_-

-

._ -

_- , _ .

._

. --

__

- - - -

.

.

. _ _

_

- - - - - - - - - -

_ ____

_

_

__.

__

___

-- - _

.

_ - - . - _

__-

_

-

.

_

l

Residual Heat Removal Pump Motor

1AP07EG-1A

l

Residual Heat Removal Pump Motor

JAP 09ED-1B

Low Pressure Core Spray Pump Motor

1AP07EE

High Pressure Core Spray Pump Motor

IE22-S001

(2) Electrical Penetration Assemblies

The following containment penetration assemblies were

inspected:

1EE10E-1P2E

Power

IEE22E-1C3E

Control

1EE33E-1K2E

Neutron Monitoring

!

1EE18E-1C1E

Control

The location, type, mounting and identification of these

penetrations were compared with the installation drawings

and vendor manual.

(3) Circuit Breakers

Circuit breakers for the following Class IE pump motors were

examined to determine compliance with design and installation

l

documents for size, type, system interface and maintenance.

Low Pressure Core Spray

i

High Pressure Core Spray

Residual Heat Removal Pump 1A

(4) Switchgear and Motor Control Centers

l

The following switchgear and motor control centers were

inspected:

Motor Control Center

1AP30E-18

l

Motor Control Center

1AP60E-1A

Motor Control Center

1AP73E-1A

4160V Switchgear

1AP07E-1A1

4160V Switchgear

1AP09E-181

4160V Switchgear

1E22-5004-101

(5) Station Batteries and Racks

The 125V battery rooms including the installed batteries,

battery racks and associated equipment were inspected.

The

location, mounting, maintenance and environmental control for

installation of the batteries were compared with the applicable

requirements cnd quality records.

i

125V DC Battery

1DC06E-1A

,

i

125V DC Battery

10C01E-1B

II-13

,

- . , , . .

- - - ,

-

r-

- . . . - . -

.,----------.,n

- , - - ,.,_-- - - - -

--~-------rm-.

._

_

(6) 125V DC System Equipment

The following equipment comprising portions of the 125V dc

systems were inspected for compliance to design documents

for such items as location, mounting (welds, concrete anchors

and bolting) and proper configuratfor

Battery Charger

10C06E-1A

Battery Charger

1DC07E-1A

125V DC Motor Control Center

1DC14E-1B

125V DC Distribution Panel

1DC14E-4A

Static Inverter

1C71-S001A

Static Inverter

1C71-S0018

(7) Conteql Panels

A number of safety-related electrical control panels were

inspected for compliance to requirements for items such as

location, mounting and type.

The panels inspected were:

Remote Shutdown Panel

1C61-P001

Diesel Generator Control Panel

IPL12JA

Diesel Generator Control Panel

1PL12JB

Operator Main Control Panels

(8) Motor Operated Valves

Four motor operated valves were examined in detail.

1E12-F004A

1E12-F0278

1E12-F0248

1E12-F047A

The following documents provided the basic acceptance criteria for

the inspections:

S&L Clinton Power Station Specification K-2999, " Electrical

Installation," Amd. 10

BAP 2.10, " Equipment Installation," Rev. 6

BQAI-190-6, " Electrical Equipment Field Verification," Rev. 4.

b.

Inspection Findings

(1) Motors

Motors examined were found to have been installed in accordance

with applicable design criteria.

Nameplate data such as operat-

ing voltage, horsepower and speed were compared with FSAR re-

quirements and found to be acceptable. Maintenance records for

the High Pressure Core Spray pump motor were reviewed and also

found to be acceptable.

II-14

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

._

During the examination of the Low Pressure Core Spray pump motor

NRC CAT inspectors raised questions concerning the adequacy of

materials used to mount the motor to its pedestal. This issue

is discussed further in Section VI, Material Traceability and

l

Control, of this report.

(2) Electrical Penetrations

Penetrations examined were found to be in accordance with

design documents.

Installation and inspection procedures were

thorough, and associated inspection and maintenance records

were detailed and complete.

During the examination of the electrical penetration assemblies

it was noted that a pipe restraint had been welded to the

nozzle of penetration IEE27E.

Discussion with the licensee

regarding this issue disclosed that nonconformance reports (NCR

l

28725 and NCMR 1-0971) had previously been issued to document

this condition and had been dispositioned use-as-is by engi-

neering.

Based upon the information available, NRC CAT

inspectors could not determine whether this activity had

adversely affected the penetration gas boundary or components

.

within the penetration sleeve, or whether the disposition of

'

the nonconformance reports is adequate.

Further evaluation by the licensee is required.

(3) Circuit Breakers

The examination of the selected circuit breakers indicated

that they had been installed and maintained in accordance

with applicable design documents.

Important installation

attributes such as proper alignment and main contact pene-

tration were verified by physical inspection of the equip-

ment and review of construction and startup test records.

(4) Switchgear and Motor Control Centers

Several construction deficiencies were identified in Class 1E

switchgear installations.

The examination of switchgear 1AP09E

disclosed that the switchgear unit had been floor mounted using

American Society for Testing and Materials (ASTM) A-307 bolting

'

materials corresponding to Society of Automotive Engineers

(SAE) Grade 2.

In reviewing the vendor (Westinghouse) manual

NRC CAT inspectors noted that SAE Grade 5 bolting material had

been specified for this installation.

Additionally, the review

of the seismic qualification report for this equipment indi-

cates that Grade 5 bolting materials had been used to mount the

test unit to the shake table for qualification.

This item was discussed with licensee personnel who produced

NCR 24174 which had been issued in December of 1984 to document

this condition.

Subsequently, this item was transferred to

and dispositioned on CPS NCMR 1-0413 in accordance with site

procedures for items turned over to operations.

The disposi-

II-15

.

..

.

-

-__-__-

--

-

tion of the NCMR requires that all of the existing bolting

material be replaced with the specified SAE Grade 5 material.

NRC CAT inspectors noted that the switchgear unit is energized

and provides the Class 1E power feed for many of the plant

systems currently under test.

Consequently, although this

deficiency had been properly identified by the licensee, the

delay in initiating the specified corrective action could ad-

versely affect other plant systems.

During the examination of switchgear 1E22-5004 NRC CAT inspec-

tors noted that watt transducer 1JY-AP778 located inside of

cubicle 1 of the switchgear had burned. Additionally, the trans-

ducer associated wiring and Class 1E field cables located above

the device had also been damaged as a result of the transducer

fire.

Discussions with licensee personnel revealed that MWR B08649

had been issued to document and correct this condition.

A

review of this document indicates that the disposition,

" Procure, calibrate and install new transducer and associated

wiring as necessary," is inadequate in that it fails to

consider damage done to the Class 1E field cables located

in proximity to the device.

Wiring separation deficiencies were also identified inside of

various cubicles of switchgear 1E22-5004.

This item is identi-

fied as part of Potential Reportable Deficiency 81-05 dated

February 5,1982 and specified rework is scheduled to be

accomplished in accordance with the resolution of this docu-

ment.

The examination of switchgear 1AP07E and the motor control

centers selected indicate that they have been installed in

accordance with applicable requirements.

(5) Station Batteries and Racks

i

!

The condition of the 125V battery rooms was found to be clean,

free of debris and in good order.

Although permanent ventila-

tion systems had not been installed, temporary systems were in

place and provided adequate ventilation for the areas examined.

Access to these areas was controlled by keyed entry.

The 125V batteries were examined in detail and found to be

in good condition.

Maintenance activities were reviewed and

in general had been performed in accordance with requirements.

(6) 125V DC System

Inspection of components comprising the 125V de system

disclosed a deficier.cy in the installation of battery chargers

1DC07E and 1DC06E.

Design documents which specify

installation details for this equipment show mounting pad

I

dimensions which differ from the actual field configuration.

'

II-16

_

_ _ _ _ _ _ _ _ _ _ _ _ _ _

_

.

_ _ _ _ _ _ _

_ ____ _

__ .

l

IDC07E - Design Dimensions 48 inches W x 40 inches D

Actual Dimensions 47 inches W x 36 inches D

IDC06E - Design Dimensions 48 inches W x 40 inches D

Actual Dimensions 47 inches W x 38 inches D

l

The review of applicable records indicates $ hat the

l

appropriate design change document had been initiated for the

conditions noted on charger 1DC-06E.

However, technical

justification for the discrepancies identified on charger

1DC-07E was not provided.

As a result of this observation the licensee has issued NCR

l

32598 to document and correct this condition.

l

Other 125V dc system components examined were found to have

been installed in accordance with requirements.

(7) Control Panels

In general, the installation of Class 1E control panels was

found to be in accordance with applicable requirements.

Six

panels were identified which had been mounted using bolts of

indeterminate material type.

The following panels exhibited

this condition:

Switchgear HVAC Control Panel

1PL65JC

Switchgear HVAC Control Panel

IPL65JB

Diesel Generator HVAC Panel

1PL54JA

Shutdown Service Water Panel

1PL53JA

Shutdown Service Water Panel

1PL53JB

Shutdown Service Water Panel

1PL53JC

i

The use of indeterminate bolting materials in safety-related

applications is discussed in detail in Section VI, Material

Traceability and Control, of this report.

During the examination of the Divisions 1 and 2 Class 1E Diesel

Generator Control panels, NRC CAT inspectors noted that physical

identification of the panels was not in compliance with FSAR

requirements for identification of Class 1E equipment.

Name-

plates supplied by the vendor (Stewart & Stevenson) are not of

the color coding required for safety-related Divisions 1 and 2

electrical equipment.

Discussions with the licensee indicate that the requirements of

Specification K-2861, to which these panels were purchased, may

have been implemented prior to the FSAR commitment for color

coding of equipment.

Consequently, these panels had not been

properly identified.

As a result of this observation the licen-

see has issued Field Engineering Change Notice (FECN) 10305 to

document and correct this condition.

II-17

.

.

In addition, the NRC CAT inspectors reviewed a licensee surveil-

lance of vendor panels.

Based on an NRC inspection at another

site, the licensee's QA organization initiated a special surveil-

lance of vendor panels concentrating on those turned over to IP

startup and initially tested.

The surveillance findings indica-

ted a number of problems and resulted in IP QC performing a

broader scope inspection program.

However, the scope of the IP

QC inspection program does not include panels manufactured by

MCC Powers and a number of GE panels.

The NRC CAT specifically inspected a number of panels excluded

from the IP QC program and identified a number of discrepancies:

IPL54JA (MCC Powers)

Separation between non-Class 1E

field installed lighting circuit

and Class 1E vendor wires; minimum

bend radius of Class 1E vendor

wires (subsequently documented on

NCMR 2-0350); mounting bolts of

indeterminate material.

IPL53JA (MCC Powers)

Separation between non-Class 1E

field cable IVH79A and Class 1E

vendor wires; mounting bolts of

indeterminate material.

1PL53JB and JC (MCC

Mounting bolts of indeterminate

Powers)

material.

H22-P028 (GE)

Misidentification of Class 1E

associated vendor wiring as non-

Class 1E; separation between

Class 1E vendor wiring and non-

Class IE lighting and utility

circuits; isolation or analysis of

the interface between Class 1E

associated vendor wiring and non-

Class 1E field wiring.

Subsequently

addressed on Field Deviation

Disposition Request, LH1-3027

Rev. O.

The NRC CAT findings indicate that the scope of the IP QC

inspection program for vendor supplied control panels needs to

be enlarged.

The discrepancies found in the MCC Powers equip-

ment and the GE panel indicate t, hat the 63 panels manufactured

by these two companies originally omitted from the inspection

program should be included.

Inspection attributes, such as the

interface between field wiring and vendor wiring, mounting

details, and minimum bend radius should be added to the QC

inspection program.

(8) Motor Operated Valves

Motor operated valves examined were installed and maintained

in accordance with applicable design documents.

II-18

_-

_- -

_

_

.

~

. . _ . .

_

- -

- - - - .

_ _ - .

. -

..

i

l

I

c.

Conclusions

l

In general, the installation of electrical equipment has been

i

accomplished in accordance with requirements.

However, of concern

j

were the examples of hardware deficiencies which exist in equipment

i

which has been turned over for operation.

l

Items such as internal panel separation and the mounting of

l

1

seismically qualified equipment are concerns which will require

i

additional attention by the licensee.

i

i

4.

Instrumentation Installation

a.

Inspection Scope

i

i

The NRC CAT inspectors selected a sample of 15 completed runs of

instrument piping, comprising about 930 feet, for a detailed

,

j

examination in accordance with specification requirements and

j

isometric drawings.

four instrument racks and ten piping supports were examined for

'

i

conformance with requirements including installed configuration,

mounting details, material conformance, identification, and loca-

l

tion.

Eleven instruments were examined for conformance with requirements

'

for location, mounting details, and instrument type and range.

i

See Table II-4 for a listing of piping runs, supports, racks, and

l

1

instruments included in the sample, and identification of those

j

items previously inspected by BAFV or IPOI programs.

The following documents provided the acceptance criteria for the in-

spections:

f

l

S&L Clinton Power Station Specification K-2883, " Erection of

l

Phase I Piping Systems and Equipment," Amd. 13

BAP 2.6, " Instrumentation," Rev. 7 Change F

f

Applicable design drawings and change documents.

I~

b.

Inspection Findings

l

In general, the installation of instruments, racks, piping runs,

j.

and supports conformed to the appropriate requirements.

However, a

'

number of deficiencies were identified and are discussed below:

,

l

l

(1) The weld symbol for weld number 1 of support 1AB35011G on

!

drawing M-1AB35011G, Rev. B does not indicate the required

fillet weld size.

The licensee subsequently issued NCR 32421

j

to document this condition.

It should be noted that this

i

support had undergone reinspection under the BAFV program, and

,

this drawing deficiency was not identified.

4

!

il

j

11-19

t

!

. - --.~,..._ _ . ,_,,-_ _ .- _

, _..

- ,_. - _ _ . -

._ - - _ ___... - - .. _ ,... ._ . _ _ _ _. - - -

s

(2)

Instrument line RH-919-7C was found bent in two locations (due

to construction traffic in the area) near support 1AB01034G.

The licensee subsequently issued NCMR 2-0338 to document this

condition.

(3) The support clamp for piping run IE12-N015A "LO" on support

1AB02204G was found to be missing.

Further review revealed

that this condition had been previously discovered by the BAFV

program and documented on NCR 80367 and NCMR 1-1005.

(4)

Instruments 1E12-N015C, 1E12-N055C, and 1E12-N056C are mounted

on instrument rack 1E22-P005 using bolts containing no identi-

fication markings on their bolt heads.

The NRC CAT inspectors

observed that all other bolts used to mount instruments to this

and other instrument racks contain markings which identify them

as ASTM A-307 (SAE Class 2) bolts.

The licensee has subsequently

issued NCMR 2-0335 to document this condition.

This NCMR states

that Rosemont Instruction Manual 4302, Rev. 8, Model 1153 re-

quires these bolts to be ASTM A-193, Grade B8, which would indi-

cate that all bolts used to mount instruments to racks are non-

conforming.

Further review by the licensee is necessary to ac-

curately define the material requirements for these bolts.

(5) Three instances were observed of installed instrument piping

in physical contact with other items.

These are:

Instrument line 1MS31AB-3/4 is in contact with 6-inch

diameter pipe 1HG05BA

Instrument line IMS31JB-3/4 is in contact with 3-inch

diameter pipe ISC02DA

Instrument line 1NB05BB-3/4 is in contact with heating,

ventilating and air conditioning duct support P-4010.

In the first two cases, the licensee's Interaction Analysis

Group had previously documented these points of contact on

Potential Interference Reports (PIRs) C-2007 and C-2008, which

have been dispositioned use-as-is by S&L.

Further discussions

with the Interaction Analysis Group reveals that the analysis

supporting the use-as-is dispositions only addresses possible

seismic interaction and may not consider thermal expansion or

movement of either the instrument lines or the pipe involved.

In the third case, discussions with the Interaction Analysis

Group indicates that interactions of this type are considered

to be a generic exclusion to their criteria and, as such, they

are not required to document this on a PIR.

However, following

further discussion with the licensee, NCMR 2-0334 was issued to

document this condition as a construction deficiency instead of

a seismic interaction.

The NRC CAT questions the prudence of

the generic exclusion for such an item.

Identified construc-

tion deficiencies in completed and QC accepted installations

need to be recorded and evaluated in accordance with existing

QA requirements.

II-20

__

.__

Refer to Section III, Mechanical Construction, of this report

for a further discussion of the licensee's Interaction

Analysis Program.

- j

c.

Conclusions

The NRC CAT inspectors determined that, in general, instrumentation,

tubing, and support installations conform to applicable require-

ments.

The activities of the Interaction Analysis Group and

subsequent dispositioning of identified PIRs by S&L require further

review by the licensee.

1

II-21

_

l

TABLE II-1

,

RACEWAY INSPECTION SAMPLE

Cable Tray:

189A(P2E)

188A(P2E)

187A(P2E)

186A(P2E)

185A(P2E)

'

184A(P2E)

183E(P2E)

182A(P2E)

181A(P2E)

18R9(P2E)

1892G(P2E)

1893G(P2E)

16297G(P2E)

1894G(P2E)

1895G(P2E)

16296G(P2E)

16295G(P2E)

16294G(P2E)

16293G(P2E)

16292G(P2E)

16291G(P2E)

16260G(P2E)

16259G(P2E)

16257G(P2E)

1071D(P2E)

1072D(P2E)

1070D(P2E)

10690(P2E)

1068D(P2E)

10670(P2E)

,

i

1063D(P2E)

1064D(P2E)

1065D(P2E)

1066D(P2E)

169D(P2E)

168D(P2E)

167D(P2E)

166D(P2E)

165D(P2E)

164D(P2E)

i

163D(P2E)

162D(P2E)

161D(P2E)

16R1(P2E)

16413K(C4E)

16412K(C4E)

16411K(C4E)

16410K(C4E)

10510K(C1E)

16R9(C1E)

1614B(C1E)

17R12(K1E)

17111C(K1E)

17112C(K1E)

17115C(K1E)

17116C(K1E)

17117C(K1E)

17R55(K1E)

17220C(K1E)

17222C(K1E)

17223C(K1E)

17224C(K1E)

17R80(K1E)

19120D(P3E)

19121D(P3E)

19122D(P3E)

19123D(P3E)

Cable Tray Supports:

Support Number

Drawing Number

1000-0180H3

E26-1000-018-H3

E26-1000-018-CPH

1001-03A-H24

E26-1001-03A-H24

E26-1001-03A-CPH

l

1003-01A-H57

E26-1003-01A-H57

E26-1003-01A-CPH

1005-04A-H44

E30-1005-04A-H44

'

E30-1005-04A-CPH

1004-04A-H2

E30-1004-04A-H2

E30-1004-04A-CPH

1002-01A-H1

E27-1002-01A-H1

E27-1002-01A-CPH

1003-01C-H9

E27-1003-01C-H9

i

E27-1002-01C-CPH

-

!

i

i

!

!

II-22

4

- - - - - -

--,e--.-.

- -

,

n

-

-

- . , ~ , - -

,,

, - --- -

,

,,-,-,.-w,, - - - . . ,-,,,v-

,,,-,-,- - , - , ---- -- - - - .

_

_. _

_

_

I

TABLE II-1 (Continued)

RACEWAY INSPECTION SAMPLE

Conduit Supports:

E26-1003-03A-TCC-2

'

E26-1003-01A-CC-CP-2

E26-1002-04A-CC-17

E26-1002-04A-JS-1

E26-1003-01A-CC-57

E26-1003-01A-WH-3

Conduits:

Conduit No.

Length (feet)

Conduit No.

Length (feet)

C2301

8

C61490

36

  • C2305

10

  • C61545

29

C2318

19

  • C62867

31

  • C2319

10

C71191

37

C2341

8

C71192

39

C629

48

  • C72183

45

C633

48

  • C71365

110

C6404

33

  • C71543

46

C6438

23

C71855

50

C6141

52

C9822

43

C61039

17

C9823

43

C61066

27

C9824

43

C61069

28

  • C91230

23

C61371

25

C91523

21

C61386

16

C91527

20

C61394

27

l

NOTE:

The (*) indicates conduits inspected under the Baldwin Associates

Field Verification Program.

1

II-23

-_

- - _ _ _ - -

...

. _ _ _ . _ _ . . _ _ .

_

_ . .

.__

_

_.

_ - _

TABLE II-2

SEPARATION FINDINGS

,

j

Raceway segments listed in the A columns do not maintain required separation from

!

the corresponding raceway segments in B columns.

The (*) indicates physical

separation of less than one inch between the two raceway segments.

I

!

Column A

Column B

Column A

Column B

l

C9713(K1E)

IPB999(P2E)

C6207(B)

167D(P2E)

C92709(C18) *

C92757(P1E)

C659(B)

168D(P2E)

'

C92709(C18)

C92758(C1E)

C0357(B)

1065E(C2E)

C73991(C28)

C71191(C2E)

C02522(B)

1065E(C2E)

j

C73991(C28)

C71192(P2E)

C8926(B)

187A(P2E)

1

C71365(C2E)

C73639(K18)

C8133(B)

187A(P2E)

,

'

C71365(C2E) *

C7894 (C1E)

C8578(B)

184A(P2E)

1

)

C71365(C2E)

C71991(K3N)

C8579(B)

184B(C2E)

j

C71365(C2E)

C73218(C28)

C8137(B)

184A(P2E)

{

C71365(C2E) *

C72235(K18)

C8300(B)

183A(P2E)

!

C71991(K3N)

C72030(K28)

C8538(B)

C81649(2E)

j

-C72717(C2E)

C72812(K1E)

C8699(C3E)

1875D(P28)

i

C7891 (C2E) *

C73287(K1B)

C81775(2E)

1833D(P3E)'

f-

C62367(K4E) *

C61069(C2E)

C81777(2E)

1833D(P3E)

C62367(K4E)

C62084(P2E)

C81776(2E)

1833D(P3E)

C62367(K4E) *

C61068(P2E)

C81778(2E)

1833D(P3E)

'

}

C62367(K4E) *

C62100(K18)

C81257(B)

18926(P2E)

l-

C6141 (CIE) *

1PB695(P18)

C0224(B)

1061D(P2E)

i

16300K(C4E)

C61039(C2E)

C0223(B)

1061D(P2E)

j

16300K(C4E)

C61037(C2E)

1068D(P2E)

C0372(B)

j

16300K(C4E)

C61038(C2E)

1068C(C2E)

C0372(B)

!

16300K(C4E)

C62876(C2E)

C72997(1E) *

C72514(4E)

C6947 (P1B)

C6949 (PIE)

C72296(1E) *

C72514(4E)

,

j

C61066(P2E) *

C61364(K1E)

C72297(1E) *

C71570(3E)

j

C61371(C2E)

C6934 (P28)

C71570(3E) *

C72296(1E)

!

C73255(CIE)

IPB7107(DIV.2)

C72888(1E) *

C71541(2E)

i

C71855(K3E) *

17128C(K1B)

C73160(B)

C73666(1E)

l

C6917(B)

16279G(P2E)

1H13-P70GA(1E) 10360A(C1B)

i;

C61364(1E)

C61066(2E)

1H13-P701A(1E) 10347A(C1B)

.

C61374(1E)

16257B(C2E)

1H13-P731F(IE) 10344A(C1B)

!

C61373(1E)

16257A(C2E)

C62382(B)

16390E(C3E)

i

C61258(P28)

C61373(1E)

C62381(B)

16390E(C3E)

'

C6249(B)

161D(P2E)

10602(C1B)

10603K(P2E)

C6303(B)

167E(C2E)

10602B(CIB)

10631A(P1E)

i

I

1

i

a

II-24

_. .. _ _ _ . . _ . _ , _ . _ _ _ _ _ . . _ . _ . _ . _ _ _ _ . . , _ . _ . . . _ . . _ - , - _ . - _ . _ - . ,

TABLE II-2 (Continued)

SEPARATION FINDINGS

Column A

Column B

10632B(C1E)

10603K(P2E)

10603K(P2E)

10632A(PIE)

10611D(P28)

10615K(P2E)

10611E(C28)

10615L(C2E)

10600E(C28)

10632B(C1E)

C1079(B)

10632B(C1E)

10600K-P2E

10632A(PIE)

C6901(P28)

16257G(P2E)

C6901(P28)

16258A(C2E)

C6901(P28)

16258G(P2E)

C6901(P28)

16259G(P2E)1

C0409(B)

C9866(1E)1

10358B(C1B)

1H13-P706F(1E)1

C0409(B)

1992B(C1E)

C9866(B)

C9831(C1E)

C0410(B)

1989B(C1E)

C9713(K1E)

IPB999(P2E)

C9804(B)

1992A(PIE)

C9657(2E)

C9617(B)

'

C9657(2E)

C9615(B)

C74311(B)

C72514(4E)

NOTE:

1These separation deficiencies also involve raceway to cable.

11-25

TABLE II-3

CABLE TERMINATION INSPECTION SAMPLE

PGCC Termination Cabinet 1H13-P743

Cables:

1VD038,

IVD18E,

IVD11F,

IVD03D,

IVD06B,

1VD03C,

IVD06C,

IVH09E,

1VH098,

IVH09D,

IVX218,

IVX188,

1VX09B,

IVX128,

IVY 098,

IVY 088,

1D003C,

1HP21P,

1HP75A,

1HP75B,

1HP75C,

1HP75D,

100798,

ID079A,

1SX750,

ISX75C,

1SX55A,

1SX08C,

1SX03D,

ISX038.

PGCC Termination Cabinet 1H13-P742

Cables:

1VC068,

IVC 088,

IVD05C,

IVD02D,

IVD028,

IVD10F,

1VD18C,

IVD02C,

IVF07J,

IVC 40L,

IVG35K,

IVC 02C,

IVC 45H,

IVC 148,

IVC 45F,

1AP23G,

1DG31G,

1AP23B,

1DG21f,

1AP290,

LAP 21G,

1AP23F,

IAP21M,

IDG31L,

IAP60D,

IAP29C,

1AP29K,

ICC08C,

ICC09C.

PGCC Termination Cabinet 1H13-P741

Cables:

1AP220,

IDG11G,

1AP28E,

1AP228,

1DGG1D,

1AP20G,

IAP22G,

1AP20M,

ICC11F,

ICC14G,

IDG11L,

1AP28K,

ICC14C,

ICC11C,

ICC17L,

ICY 05C,

IRP11E,

ICY 09C.

Diesel Generator IA Control Panel 1PL12JA

Cables:

IDG02A,

IDG020,

IDG11F,

IDG11S,

1DG02B,

IDG11C,

1DG11T,

1DG11E,

1DG11D,

1DG01D,

1DG02F,

1DG04A,

1DG06A,

IDG098,

10G09C,

1DG10C,

1DG108,

IDG05A,

1DG07A,

IDG02C,

1DG02E,

1DG02G,

1DG75E,

10G11R,

1DG75C,

IAP20K,

1AP22J,

1DG08A,

IDG01E,

10G01Q,

IAP20M,

IAP22K,

IDG015,

IDG01Q,

IDG01R.

Division 3 Optical Isolator Cabinet IPL49J

Cables:

IMIO5A,

1HP110,

1HP17J,

ISX03E.

Remote Shutdown Panel 1C61-P001

Cables:

1RH55F,

1RH55E,

1RH40D,

1RH40C,

1RH310,

1RH31C,

1RH27D,

1RH27C,

1RH070,

IRH07C,

1RH12D,

1RH12E,

1RH12C,

1RH01G,

IRH01H,

1Ril01C,

1RS02A,

1RH22E,

1RH09F,

1RH09D,

1RH09C,

1RH18D,

1RH18C,

IRH16D,

1RH16C,

1RH61F,

1RH61E,

1RH380,

1RH38C,

1RH63F,

1RH63E,

1SX20C,

ISX20N,

1RH220,

1RH22C,

IRI13E,

IRI13C,

1RIl0D,

IRIl0C,

IRIO3D,

IRIO3C,

IRIO60,

1RIO6C,

1RI26D,

1RI26C,

1RIO5D,

IRIO5C,

IRIO8D,

IRIO8C,

IRI25C,

1RI258,

IRI248,

IRI24A,

IRI27F,

IRI27G,

1NB380,

1RH73L,

IRI12E,

IRI12C,

IRIO9G,

1RIO9C,

IRI24J,

IRI24H,

1RI24G,

IRI24K,

1RSO4A,

1RS06A,

1RS82A,

IRIllD,

IRI11C,

IRIO7D,

IRIO7C,

IRIO40,

IRIO4C,

1RS05C,

1RH13D,

1RH13C,

IRH13E,

IRH17F,

1RH17E,

1RS05B,

1RH10E,

1RH23D,

1RIO2F,

IRI15F,

IRI27J,

IRI27H,

IRI15E,

IRI170,

IRI17C,

1RH37C,

1RH37D,

INB390,

IRS 05A,

1NB35A,

1NB35C,

II-26

TABLE II-3 (Continued)

CABLE TERMINATION INSPECTION SAMPLE

Remote Shutdown Panel 1C61-P001 (Continued)

Cables:

1RI760,

IRI76G,

IRI76E,

IRI76C,

IRI85C,

1RS75A,

1RS768,

1RS76D,

IRI858,

IRI85A,

1RS03A,

ISX59D,

1SX59C,

1RH240,

1RH24C,

1RH33D,

IRH33C,

1RH360,

1RH36C,

1RH500,

1RH50C,

ISX14K,

1SX14L,

ISX14M,

1SX30E,

1SX170,

1SX33D,

1SX37E,

1SX10F,

ISX20Q,

ISX14C,

1SX14F,

1SX14J,

ISX30C,

ISX17C,

1SX33C,

1SX37C,

1SX10C,

1SX11C,

ISX25J,

ISX25Q,

ISX50F,

1SX20J,

1SX50K,

ISX25X,

ISX25V,

ISX110,

1RS80A,

1RS798,

1RS79D,

INB35M,

INB35B,

IRIO2G,

IRIO2F.

4160 V Power Cables in Switchgear

Cables:

1RH02A,

1LP01A,

1HP08A,

1RH27A,

ILP03A,

1HP03D.

11-27

_

TABLE II-4

INSTRUMENTATION INSPECTION SAMPLE

Instrument Racks:

1H22-P005

BA

OI

IH22-P026

BA

OI

1H22-P027

BA

01

1H22-P042

BA

Instrument Pipe Supports:

ISPS-CM096A

-

1AB35004G

BA

1AB35003G

BA

1AB35002G

BA

1AB35011G

BA

1RB31511R

BA

1RB32518G

BA

1RB22538G

BA

1RB21572R

BA

1RB21576X

Instrument Piping Runs:

1PT-CM034/1PT-CH256

BA

1E31-N088C "HI"

1E31-N088C "LO"

BA

1E31-N0888 "HI"

BA

1E31-N0888 "LO"

BA

1E12-N015C "HI"

BA

DI

1E12-N015C "LO"

1E12-N015B "HI"

OI

1E12-N015B "LO"

BA

1E12-N015A "HI"

1E12-N015A "LO"

BA

1821-N078A

BA

1B21-N081A "HI"

1821-N0788

BA

1821-N0818 "HI"

Instruments:

1E31-N088C

1E31-N0888

1821-N081B

1E12-N015A

1E12-N0158

1E12-N015C

1PT-CM034

IPT-CM256

1821-N078A

1821-N0788

1821-N081A

NOTE:

8A indicates inclusion in Baldwin Associates Field Verification.

OI

indicates inclusion in Illinois Power Company Overinspection.

II-28

III.

MECHANICAL CONSTRUCTION

A.

Objective

The objective of the appraisal of mechanical construction was to deter-

mine if installed and Quality Control (QC) accepted mechanical items

conformed to engineering design, regulatory requirements and licensee

commitments.

B.

Discussion

The specific areas of mechanical construction evaluated were piping,

pipe supports / restraints, concrete expansion anchors, mechanical

equipment, and heating, ventilating and air conditioning (HVAC)

systems.

To accomplish the above objective, a field inspection of a

sample of QC accepted hardware was performed in each area.

In

addition, certain programs, procedures and documentation were reviewed

as required to support or clarify hardware inspection findings.

The inspection samples in a number of these areas included items

covered by the Illinois Power ~ Company (IP) Overinspection Program.

Section VII, Design Change Control, of this report provides further

discussion of the IP Overinspection Program.

1.

Piping

a.

Inspection Scope

Piping depicted on the 11 Baldwin Associates (BA) and 3 Reactor

Controls, Inc. (RCI) drawings listed in Tables III-la and b was

inspected by the NRC Construction Appraisal Team (CAT).

In all

cases, piping inspected by the NRC CAT had been previously inspected

and accepted by the responsible QC organizations.

The piping

samples included portions of the High Pressure Core Spray (HPCS),

Low Pressure Core Spray, Reactor Core Isolation Cooling (RCIC),

Reactor Water Clean-Up, Shutdown Service Water, Main Steam Isolation

Valve Leakage Control, Nuclear Boiler, and Control Rod Drive ('RD)

systems.

In addition, some of the NRC CAT samples included piping

covered by the IP Overinspection Program.

Attributes inspected

included configuration (i.e., component orientation and dimensions),

component locations and types, and valve operator orientations.

Pipe support locations and types were inspected against hanger

design drawings to the extent indicated in Table III-1.

Site

construction practice as it affected installed components was

observed and component material specifications were compared to

drawing bills of material on a random basis.

The sample of BA piping selected for inspection included all American

Society of Mechanical Engineers (ASME) pipe classes and ranged in

size from 1 to 20 inches.

The sample included approximately 600

feet of large bore (greater than 2-inch diameter) and approximately

275 feet of small bore (less than or equal to 2-inch diameter)

piping located in the containment, auxiliary, fuel and diesel

generator buildings.

QC verified isometric drawings were used to

III-1

1

perform the inspection.

Subsequently, field data compiled by the

NRC CAT was also compared to walkdown record copies (NRC IE Bulletin

79-14) of piping design drawings to the extent indicated in Table

III-1.

Observations associated with the inspected piping are listed

in Tables III-la and b.

A sample of approximately 125 feet of RCI

piping associated with the insert and withdraw of the CRD was

inspected by the NRC CAT.

The inspection utilized walkdown record

copies of the RCI drawings listed in Table III-lb.

Thirteen piping samples representing approximately 200 feet of pipe

were selected to determine whether ASME requirements for pipe wall

thickness were met.

The measured pipe wall thicknesses were com-

pared against the minimum wall thickness requirement specified by

ASME (12.5 percent below nominal thickness).

Pipe wall thickness

was measured using ultrasonic methods, with personnel and equipment

provided by the licensee.

Circumferential measurements were taken

at the ends and the center of the samples; other measurements along

the length of the pipe were also obtained for those samples in

which a potential for violating minimum wall thickness requirements

appeared likely.

See Table III-2 for the inspection sample and

observations.

The following documents provided the acceptance criteria and back-

ground information:

BA Project Procedure (BAP) 2.14, " Fabrication / Installation of

Items, Systems, and Components," Rev. 10, Change F

BAP 3.2.9, " Piping 'As-Builts'," Rev. O, Change A

BAP 3.6.6, " Control of Welded Temporary Attachments," Rev. O

i

Sargent & Lundy Engineers (S&L) Project Instruction

PI-CP-028, " Field Installation Data Required to Permit

Confirmation of Piping Subsystem Analysis," Rev. 2

S&L Drawing M09-1001N, " Component Support Installation

Tolerances ... " Sheet 1, Rev. N and Sheet 12, Rev. N

S&L Specification K-2882, " Nuclear Safety Related and

Non-Nuclear Safety Related Specifications for Phase II

Piping, Miscellaneous Equipment, and Equipment Erection,"

through Amendment 11

S&L Nuclear Station Engineering Instructions (NSEI) ME-2,

" Interaction Analysis Program," Rev. 0

S&L Project Instruction PI-CP-034, " Interaction Analysis,"

Rev. 4

RCI Quality Assurance Instruction QAI-10-1, " Instruction

for Quality Control Inspection," Rev. 6

III-2

RCI QAI-8-4, " Instruction for As-Built Inspection / Verification

Walkdown," Rev. 5

RCI Document No. RCI-FPC-4, " Friction Clamp for 1" Withdraw

CRD Pipe," Rev. 6

RCI Document No. CLN-TOL-1, "Clinton Field Tolerances,"

through Rev. 3

RCI Document No. CLN-TOL-2, "Clinton Interface Tolerances,"

Rev. 1.

b.

Inspection Findings

In general, the NRC CAT inspected piping conformed to installation

requirements and tolerances.

However, the following observations

and discrepancies warrant additional attention.

(1) Baldwin Associates

Pipe spool 1-NB-751-4 depicted on Drawing NB-751 is routed

through and is in contact with the tube steel support for

electrical box lJB729.

This configuration is in accordance

with the support design drawing, No. E27-1602-038-EIT and

the piping design drawing, No. M27-1602-03B-03BK except

that the current pipe to support steel contact is not

identified by either drawing.

According to BAP 2.14 (Form

JV-734) and BA QC personnel, this contact is regarded as an

interference to be identified during the QC walkdown

inspection.

Also, according to the BA Resident Engineer,

such contact must be identified during preparation of the

as-built drawings.

There was no evidence presented to the NRC CAT inspector

that this pipe to electrical support steel contact was

identified by either the QC inspection or the as-built

walkdown for evaluation by the piping design organization.

Since no similar instances of obvious interference with

piping were encountered by the NRC CAT, this finding is

considered an isolated case which requires appropriate

engineering disposition.

At pipe spool pieces 1-RI-758-3 and 1-RI-758-5A, a temporary

pipe support was not removed at the time of the NRC CAT

inspection.

Procedure BAP 2.14 specifically noted that

removal of temporary supports need not be verified for QC

acceptance of the piping.

BA QC personnel noted that

removal of each temporary support was controlled by the

discipline superintendent and the dismantling was performed

in accordance with BAP 3.6.6.

As discussed with BA QC

however, neither that procedure nor any other presented

to the NRC CAT inspector provided assurance that all

-

temporary supports would be removed.

The NRC CAT is

III-3

concerned that the QC inspection and acceptance of piping

prior to the removal of temporary supports may result in

undetected unacceptable conditions once the temporary

supports are removed, or that if the supports are not

removed, that unanalyzed constraints may be imposed on

the piping.

Various dimensional discrepancies were also noted among

the inspected piping.

Two instances were observed where

the three inch tolerance for fitting to fitting dimensions,

as specified by the piping specification K-2882, had been

exceeded.

As a result of the NRC CAT observations, the

licensee has prepared Nonconforming Material Reports

(NCMRs) addressing the discrepant dimensions.

In related inspection observations, three instances were

noted where dimensions between components, or components

and supports were found to differ from the as-built

dimensions by one inch or more.

Procedure BAP 3.2.9

required that as-built dimensions be checked and recorded

to the closest inch.

The maximum out of tolerance conditions and maximum dif-

ference between as-built and measured dimensions were

two inches for both cases.

The magnitude of these dis-

crepancies when considered with regard to the pipe sizes

involved, are not large.

The NRC CAT did not identify a

large number of discrepancies of this nature, and thus,

does not consider the occurrences of the discrepant con-

ditions to be of significant concern.

(2) Reactor Controls, Inc.

With respect to RCI installed piping, no discrepant conditions

were found by the NRC CAT during the inspection.

However, the

following observations are provided.

During inspection of the CR0 piping, the RCI document

which specified the design of friction clamps used for

axial restraint of withdraw piping was reviewed.

Based

on this review and discussions with RCI engineering and

QC personnel, it was determined that no inspection

tolerance or minimum clearance was specified for the gap

between the clamp halves (ears).

To function as designed,

the clamp must develop bearing between the clamp and pipe

by the controlled application of torque to the clamp bolts.

Contact between the clamp ears would result in reduced

clamp to pipe bearing, and therefore reduced capacity of

clamp restraint in the axial (pipe) direction.

Although

not a QC inspection attribute, RCI stated that the need to

maintain a minimum gap was known and that in all cases,

such a gap was maintained by construction.

III-4

Random inspection of RCI supports by the NRC CAT included

an inspection for a minimum clearance between clamp ears on

approximately 60 axial clamps associated with the CRD

" withdraw" piping.

No cases of contact between the clamp

ears were observed, but several clamp ears exhibited

clearances of only one to two mils indicating that this

attribute may warrant QC inspection.

In conjunction with the inspection of RCI installed

piping, their as-building and stress reconciliation effort

was also reviewed.

As a result, it was observed that

portions of piping associated with the Hydraulic Control

Units (HCU) to which RCI piping interfaced, had not been

walked-down for as-built reconciliation of the RCI piping

since the HCUs had been installed by BA.

Subsequent clari-

fication provided by RCI stated that RCI would incorporate

the piping associated with the HCUs into their walkdown.

Because the previously completed walkdowns did not include

the HCU piping, the need exists for the licensee to assure

that the additional piping is incorporated into the

as-building effort, and to recognize the potential for

deficiencies arising from construction interfaces.

(3) Piping Minimum Wall Verification

With regard to the 13 piping samples selected for minimum wall

thickness verification, none of the samples were found to be

below the specified minimum values.

Only one sample was within

seven mils of the minimum wall thickness limit.

The various

sa.mples ranged in diameter from

inch to 24 inches, and were

,

s'ecified to meet the ASME Boiler and Pressure Vessel Code,

p

"

Section III, Class 1, 2 and MC requirements (as appropriate).

(4)

Interaction Analysis Program

.

In conjunction with the review of piping systems, the NRC CAT

reviewed the licensee's Interaction Analysis Program as it

related to Unresolved Safety Issue (USI) A-17, " Systems

Interaction in Nuclear Power Plants," discussed in the Clinton

Power Station (CPS) Safety Evaluation Report (NUREG-0853).

NSEI ME-2 and Project Instruction PI-CP-034 were the guidance

documents used for the interactions inspection program.

The scope of the program originally considered only the

seismic displacement of components (e.g., piping, supports,

cable trays).

The allowable clearance criteria stated in the

above identified instructions included a built-in incremental

clearance for thermal displacement.

Conditions which violated

the acceptable clearance criteria (under categories identified

in the procedures) were identified on Potential Interaction

Reports (PIRs).

These PIRs were then evaluated for their

acceptability.

III-5

-- -

-

.

-- -

. - _ _

_ -

-

During the initial implementation of the program approximately

4000 PIRs were generated of which only 2 required rework; the

remainder were dispositioned use-as-is.

Based on these results

(Report No. EMD-050518, " Generic Evaluation of Interaction

Between Seismically Designed Components"),

the licensee

-

'

developed exclusions for which certain categories of potential

interactions need not be considered or documented.

In future revisions to the Interaction Analysis Program, the

scope of the program will be expanded to address the thermal

'

effects of piping with respect to the overheating of electrical

l

components due to proximate hot piping, interferences with

!

installation of piping insulation, and interferences with

pipe expansion resulting in piping overstress or interferences

with components.

(The Interaction Analysis Program as it

relates to electrical and instrumentation components, cables

and conduits is discussed in Section II, Electrical and Instru-

mentation Construction, of this report).

The NRC CAT considers the guidance procedures to be difficult

to understand due to their apparent piecemeal compilation and

fragmented incorporation of information.

Further, although the

NRC CAT did not identify any deviations regarding the applica-

tion of the current procedures, observations of hardware

indicate that the program revision will need to ensure the

appropriate identification of thermal clearance violations

for the certain categories of interactions previously excluded.

c.

Conclusions

Piping was found to generally conform to design requirements and

,

specifications.

Site inspection and engineering personnel were

knowledgeable of requirements and responsibilities. No significant

problems regarding construction practice as it affected installed

piping hardware were observed by the NRC CAT.

However, the lack of

control regarding the removal of temporary supports, and the

piecemeal formulation of the program for identification and evalua-

l

tion of potential interferences and interactions warrants additional

attention.

2.

Pipe Supports / Restraints

a.

Inspection Scope

Twenty-six ASME Class 1, 2 and 3, and ten Class D pipe supports /

restraints which represented a variety of types, sizes, systems and

locations were selected for detailed inspection.

These supports /

restraints were inspected for proper configuration, clearances,

member size, location, weld size, fasteners, and damage.

All but

two supports had been QC inspected and accepted.

Included in the

ASME supports sample were two supports / restraints reviewed under the

IP Independent Design Review which was performed by Bechtel Power

Corporation and six supports / restraints reviewed under the IP

III-6

_ . . _ _

_ _ _ _

.

. _ _ ,

__..._ _ . _ __ _ _ __

__

- _ _ _ _ _

._

-

- - - .

_.

. _ -

_

Overinspection Program.

See Table III-3 for a listing of the

inspection sample.

In addition, approximately 70 other supports / restraints were

observed at random in the field for obvious deficiencies such as

loose or missing fasteners, improper clearances or angularity,

improper locking devices, disassembled items, damage and improper

concrete expansion anchor spacing.

Installation traveler packages for the supports were examined and

compared with drawings and change notices to verify that the

required attributes were inspected and that inspections were per-

formed to the latest design documents.

BA Field Verification and IP

Overinspection reports were also reviewed to assess the effective-

ness of the program in this area.

Acceptance criteria for these inspections were contained in the

following documents:

S&L Specification K-2882, " Phase II Piping, Miscellaneous

Equipment, and Equipment Erection," through Amendment 11

S&L Specification K-2884, " Component Supports," through

Amendment 8

S&L Specification K-2884-001, " Basic Engineers Load Capacity

Data Sheet Manual"

S&L Drawing No. M09-1001N, " Component Support Installation

Tolerances ... " Rev. N

S&L Drawing No. M09-1003N, " Component Support Installation

Tolerances ...." Rev. M

IP QAI-710.15, " Component Support Overinspection Checklist,"

Rev. 4

"IP Nuclear Power Construction QA Manual," Appendix A,

Rev. 10

BAP 3.2.5, " Piping Component Supports," Rev. 7, Change B

BA Quality Assurance Instruction BQAI-190-5, " Component

Support Field Verification," Rev. 4

Applicable design drawings and change documents.

!

b.

Inspection Findings

Approximately 94 percent of the nearly 11,300 component supports

(large bore and small bore safety related, and fire protection

j

related) had been installed and QC accepted.

Approximately 65

percent of the 545 Class D (quality inspectable) supports had been

installed and QC accepted.

III-7

I

-.

--

-

- _ - -

.

_

-.

-

- -

--

- - -

-

The inspection activities for pipe support / restraint installation

was controlled by BAP 3.2.5 which included a three phase inspection

program that required the preparation of travelers for each

inspectable support / restraint.

Phase I inspet. tion covers the installation of the support's

primary attachment to the building, and verification of its

location and orientation to the building.

Phase II inspection covers the inspection and verification of

the installed support per the design drawings.

Phase III inspection includes restroking of snubbers, load

stamping of constant spring supports, and setting of variable

spring supports.

In general, pipe supports / restraints were in conformance with the

specified requirements.

The inspection checklists for attributes

used by QC personnel were found to be comprehensive and detailed.

Several discrepancies were identified and are discussed below.

These discrepancies included incorrect modelling and analysis of

certain Class I supports, pipe shear lugs not in contact with the

riser clamp as required by the design drawing, thread length

mismatch between a snubber body and its extension piece, incorrect

substitution of material, and scaffold in contact with or supported

by pipe support / restraint components.

See Table III-4 for a listing

of inspection observations.

Welding deficiencies are discussed in

Section IV, Welding and Nondestructive Examination, of this report.

The lower pipe shear lugs on support M-ISX010285 were not in

contact with the riser clamp as required by the design drawing.

Gaps between the clamp and lugs ranged from 1/32 inch to 3/16

inch.

In addition, one shear lug was observed to be 1-1/4

inches wide when the specified width was 2-1/2 inches.

Engi-

neering documentation authorizing the variation of shear lug

sizes were not provided to the NRC CAT.

NCMR 2-0327 was

generated for this condition.

While this support was inspected

during the IP Independent Design Review performed by Bechtel

Power Corporation, these deficiencies were not identified

during that review.

"

Two Pacific Scientific Arrestor PSA 35 snubbers, for supports

M-1MS31002S and M-1RH080925, were identified by the NRC CAT

inspector as exhibiting a 1/4 inch thread length mismatch

between the extension piece and the snubber body.

The exten-

sion piece was provided by Basic Engineering (BE); the snubber

was provided by Pacific Scientific Company.

This mismatch was

a result of the male threads of the extension piece being

longer than the female threads of the snubber.

Upon

disassembly, it was discovered that the extension piece was

fully seated against the internal dust cover.

The NRC CAT is

concerned that the extension piece could be tighten beyond the

1-1/4 inch depth of the female threads of the snubber body and

push the dust cover into the inertia mass, thus causing the

III-8

malfunction of the snubber.

We are also concerned with the

potential generic implications of this condition on other

supports which use Basic Engineering supplied extension pieces.

The licensee is currently evaluating the extent and signifi-

cance of this condition.

The licensee did not have a construction or QC procedure that

included inspection attributes which would prevent the over-

tightening of these components.

However, as a result of these

observations, the licens:e is in the process of incorporating

the necessary changes into their inspection program to ensure

that such conditions are identified.

Two ASME Class 1 snubber supports were found to have been

modelled and analyzed in a manner contrary to Final Safety

Analysis Report (FSAR) commitments.

According to S&L, supports

M-1NB01003S and M-1NB010025 of the Nuclear Boiler System were

modelled as rigid supports.

The FSAR states that the Nuclear

Steam Supply System (of which the Nuclear Boiler System is

included) shall be modelled as flexible supports.

The NRC

CAT is concerned that this deviation could affect the adequacy

of the design of the supports, and considers that this devia-

tion in design warrants additional attention by the licensee.

The NRC CAT observed that the rear bracket (Part No. BE-410-5)

on support M-1SX01028S did not have an "N"

suffix as part of

the part number.

The "N" suffix was observed on all of the

ASME support components in our sample.

The NRC CAT was con-

cerned about the material traceability aspects of the component

and the significance of the "N"

suffix.

According to the

licensee, traceability is determined by a Receiving Inspection

Report (RIR) number which is etched on each part or assembly.

From the RIR, the part or assembly can be traced to the

purchase order, packing slip, and Certificate of Compliance (C

of C).

Part number BE-410-5 was obtained from the BE parts

catalog which did not list the "N" suffix.

BE-410-5 and

BE-410N-5 were identical parts, thus no specific distinctions

were made between the two.

Safety-related supports / restraints

are required to have C of Cs and RIRs.

These documents are

verified by BE QC, BA vendor surveillance and receiving QC

personnel.

The licensee indicated that these supports will be

reinspected for material compliance under Corrective Action

Request 222 reinspection and verification program.

Based on

this program, adequate traceability appears to be provided.

Evidence of a lack of attention to detail by QC personnel

during their inspections of Class D pipe supports / restraints

was observed by the NRC CAT during the inspection of Class D

seismic supports, even though the inspection checklist for

attributes was thorough in content.

The NRC CAT identified

discrepancies in four of the ten supports selected for detailed

review, such as the unauthorized substitution of shaped steel

with one of a similar shape but smaller size, binding contact

between a pipe clamp and eye nut, and various weld quality

III-9

_ .

~ . .

---

- - -

_ - _ _

- __ -

-

_ .

.-

--

. -_

_

_

,

irregularities.

The NRC CAT reviewed the traveler packages for

these supports and in general, found them to be accurate and

acceptable.

However, the above discrepancies were not iden-

.

'

tified in the traveler packages associated with the supports.

!

'

Numerous instances of wooden scaffold in contact with or supported

by permanent support components were observed.

In one case,

scaffold was supported by a spring can and its support rod.

In

each case, there was no apparent damage to the support compo-

nents when the scaffolding was removed.

The licensee did not have a formalized program which controlled

the erection of temporary scaffold on permanent supports as was

l

evidenced by the numerous observations.

The NRC CAT is con-

l

cerned about the lack of control on the erection of scaffold

and its effects on the hardware, since physical damage is not

restricted to that which is readily visible.

Further, damage

,

to previously QC accepted supports could result in undetected

!

,

unacceptable conditions.

As a result of the NRC CAT observa-

!

tion, the licensee has issued a project memorandum addressing

the erection of scaffolding.

Section II, Electrical and

Instrumentation Construction, of this report also discusses the

support of temporary scaffolding.

l

During the review of piping (Section III.B.1, above), three box type

l

restraints were found not to exhibit the minimum gap requirement

l

between the pipe and the support frame steel.

The S&L M09 series

!

drawings specify minimum pipe to support steel clearances based on

'

system temperatures.

For the Shutdown Service Water piping of

Drawing SX-27, a minimum clearance of 0.015 inches is required.

Furthermore, for any system regardless of temperature, an " air

i

gap" must be maintained.

For the three supports listed in Table

III-la against Drawing SX-27, the required clearance was found not

to exist.

For two of these (supports ISX11014R and ISX11016R),

support frame steel was found to be in contact with the top and

bottom of the pipe such that the requirement to maintain an air

gap was also violated.

As a result of the NRC CAT observations,

BA has reviewed the supports in question and other similar Shut-

down Service Water supports.

Two Nonconformance Reports (NCRs)

addressing a total of six cases, including the three addressed

here, of less than required pipe to steel clearances were written

following this review.

The NRC CAT considers these discrepancies

to be isolated occurrences.

The installation and inspection travelers of six ASME and ten Class

D supports / restraints were reviewed, and were found to exhibit

proper chronological inspection verification and acceptance of

handling, installation processes and sequences.

In addition,

six BA Field Verification packages and IP Overinspection reports

were reviewed and were found to accurately reflect the condition of

i

l

the hardware.

III-10

-

-

.-

_

.

- - - - _ -

- -

-_ _

. _ _ _ _

- - -

.

_ - - _ - _ . -

- - _

- -

!

!

c.

Conclusions

ASME Class 1, 2, and 3 pipe supports / restraints were found to be in

general conformance to design requirements.

Site engineering and

inspection personnel were knowledgeable of procedures, requirements

!

and responsibilities.

Procedures and inspection checklists were

!

thorough and detailed.

However, the NRC CAT is concerned with the

'

potential damage and generic implications regarding the thread

l

1ength mismatch between snubber assembly components, and concludes

that additional attention is warranted.

We are also concerned that

i

certain Class 1 supports may not be properly modelled and analyzed.

,

l

Class D pipe supports / restraints were generally found to be in

conformance with design requirements.

However, additional attention

to detail by QC personnel during their inspections is warranted.

Observations regarding scaffolding in contact with permanent

!

supports indicates a deficiency in the control of the erection of

l

scaffold.

l

3.

Concrete Expansion Anchors

!

a.

Inspection Scope

Seventy-one concrete expansion anchors on 12 pipe supports /

restraints and 61 anchors on 8 HVAC restraints were inspected for

proper diameter, length stamp, embedment, edge distance, damage,

washers and residual torque (an indication of anchor preload).

In

addition, the length of the expansion anchors were verified by

ultrasonic testing.

The anchors inspected were selected at random

on a variety of systems and ranged in diameter from one-half to one

inch.

Anchors were torqued to the BA or Zack Company (Zack)

specified post installation test torque.

Table III-5 provides a

listing of the anchors inspected.

l

Acceptance criteria for the field inspections were contained in the

i

following documents:

BAP 2.16 " Concrete Expansion Anchors Work," (sic) Rev. 12-5

Zack Procedure FQCP-12. " Inspection of Concrete Expansion

1

Anchors," Rev. 5-3

b.

Inspection Findings

Pipe support / restraint expansion anchors were installed by BA, and

HVAC restraint anchors were installed by the HVAC subcontractor,

Zack Company.

Expansion anchor installations were inspected by the

respective subcontractor QC personnel.

The BA and Zack procedures

were nearly identical in substance.

However, two fundamental dif-

l

ferences existed with respect to inspections.

BA QC inspected and

!

witnessed 100 percent of the anchor bolts installed.

Zack QC

inspected a minimum of one concrete expansion anchor of each

diameter on each anchor plate assembly, or a minimum of one concrete

l

l

III-11

. .

-

expansion anchor in every ten of each diameter, whichever was

greater.

For the NRC CAT inspection the anchor nuts were torqued to the

specified retightening (BA) or testing (Zack) torque.

Fourteen

anchors for pipe supports out of seventy-one tested exhibited

insignificant nut rotation at less than the retightening torque

with a maximum of 1/8 turn (which was within the BAP 2.16 acceptance

criteria).

Seven anchors for HVAC supports out of sixty-one tested

exhibited insignificant nut rotation at less than the testing torque

with a maximum of 1/16 turn.

Since Zack procedures did not specify

any allowable nut rotation, job plans to retorque each of the

affected anchor nuts were issued for the associated anchor plate

assemblies.

All other features inspected by the NRC CAT for both BA and Zack

installed anchors were in conformance with requirements.

c.

Conclusions

Concrete expansion anchors inspected by the NRC CAT were installed

in accordance with design and procedural requirements.

The results

of the torque tests are typical of normal wedge type expansion

anchor installations and do not indicate installation deficiencies.

4.

Heating, Ventilating and Air Conditioning

a.

Inspection Scope

Six HVAC seismic restraints were selected at random and inspected

for location, configuration, member size, weld size and connection

details.

Approximately 150 feet of duct adjacent to the restraints

and others selected at random were examined for proper attachment to

anchors, companion angle size and joint makeup.

Thirteen fire

dampers were inspected for proper installation, operability and

condition.

IP Overinspection documents were also reviewed to assess

the effectiveness of the program in this area.

HVAC concrete

expansion anchor installation was inspected and is discussed in

Section III.B.3, above.

See Table III-6 for a listing of inspected

items.

The following documents provided the acceptance criteria for the

inspection of HVAC hardware installations:

Zack Procedure FQCP-5, " Fabrication and Installation

Inspection," Rev. 8-1

"

Zack Procedure FQCP-10.7, " System Walkdown for Turnover,"

Rev. 2-1

"

IP QAI-710.20 "HVAC Overinspection Checklist," Rev. 4

S&L Specification K-2910, " General HVAC Specification"

!!I-12

.

-

- -

- - -

- - - - - - - - - - - -

- - -




.

S&L PI-CP-024, "Non-Category I Verification Program," Rev. 2

S&L Design Criteria DC-ME-17-CP, " Design Criteria for

Interaction Analysis in Category I Buildings," Rev. 1

Applicable design drawings, duct standards and change

documents.

b.

Inspection Findings

HVAC systems were designed by S&L and detailed on the Zack layout

drawings.

Hardware for fabrication and installation were detai ed

l

on duct fabrication details and hanger details.

The installation and inspection of HVAC seismic supports / restraints

are controlled through the use of " job plans." A job plan is

essentially a traveler which details the activities to be performeo

and the required inspection activities.

Installation and inspection

criteria are delineated on the job plans.

The inspections are

documented on hanger inspection checklists, which then become part

of the job plan package.

In general, the inspected HVAC seismic restraints conformed to

design documents and specification requirements.

One minor brace

angle discrepancy (four degrees out of tolerance) and one minor

dimensional discrepancy were noted.

The duct assemblies exhibited

proper weld stitches to supports and companion angles, placement of

reinforcements, proper fasteners, and in general, conformed to

specified requirements.

However, two documentation related

anomalies were noted for support R-7037.

NCR 911376 recorded stiffener plates missing from its vertical

channel members, and was dispositioned use-as-is.

The NRC CAT

requested the calculations for the support which formed the basis

for the disposition, and upon review noticed that the configuration

used to disposition the NCR differed significantly from that

depicted on the current design drawing.

Subsequent calculations

utilizing as-built information reconfirmed that the use-as-is

disposition was still acceptable.

This same support also had a

Field Engineering Change Notice (FECN) posted against it (FECN

7718) when in fact a nonconformance report should have been

generated.

The FECN changed a weld symbol to match a field

configuration which had been erroneously QC accepted.

Support

R-7037 had undergone IP Overinspection, and the inspection results

were documented on Inspection Report No. H2030 prior to the

inspection by the NRC CAT.

These two anomolies are r.ot significant

in the engineering context and are considered to be isolated

occurrences.

With respect to the licensee's inspection program of Class D

(nonsafety-related) seismic supports and duct, Zack Procedure

FQCP-5 required that the Class D seismic assemblies receive the

same level of inspection as the safety-related seismic Category I

assemblies.

The job plan packages of the Class D seismic supports

III-13

-

which were reviewed by the NRC CAT contained the appropriate

inspection reports.

The concerns of Position C.2 of Regulatory

Guide 1.29, " Seismic Design Classification," have been adequately

considered and implemented by the licensee through the documents

PI-CP-024 and DC-ME-17-CP.

With regard to the 13 fire dampers which were subjected to a release

test, all of the dampers released as designed and provided the

required isolation.

It should be noted however, that Zack and S&L

are currently evaluating the impact of defects in certain fire

dampers described in a 10 CFR 21 notification by the manufacturer of

the fire dampers (Ruskin Manufacturing Company).

This notification,

in part, stated that certain models of fire dampers were found not

to close properly under air flow conditions, and recommended that

the affected dampers be tested under the appropriate flow condi-

tions.

S&L intends to evaluate the functionality of the dampers through

the use of test models.

Test criteria have been developed; modelled

configurations. included horizontal and vertical duct runs, the use

of balancing dampers, and multiple damper configurations.

The

ducting ranged in size from 24x24 inches to 60x50 inches.

The

tests were conducted at the vendor's facilities with the use of an

S&L approved test procedure (XHV-85-41), which was originally

developed by Ruskin Manufacturing Company (415850Y-NIBD-23).

At the time of the NRC CAT inspection, S&L was reviewing the results

of the tests.

c.

Conclusions

The inspected HVAC hardware generally conforms to design require-

ments and specifications, and the 10 CFR 21 notification regarding

fire dampers is receiving adequate licensee attention and followup.

5.

Mechanical Equipment

a.

Inspection Scope

Twenty-four pieces of equipment for seven systems were inspected

for proper configuration, location, condition and bolt size.

Installation documentation for these components were reviewed for

content, clarity, consistency and thoroughness.

IP Overinspection

and BA Field Verification documents were also reviewed in order to

assess the effectiveness of these programs in this area.

Equipment

examined included the Emergency Diesel Generators, Diesel Generator

Day Tanks, and the Standby Liquid Control Pumps.

The NRC CAT

inspector examined documentation for components which were considered

to be completely installed, and those which were still in process.

Equipment which had received final alignment or whose foundation

anchor bolts had been tensioned or torqued were considered to have

been completely installed.

Table III-7 provides a listing of

irsper.ted items.

III-14

-_

..

-__

The following documents provided the basic acceptance criteria for

the inspections:

BAP-2.10, " Equipment Installation," Rev. 10-D

BQAI-190-3, " Mechanical Equipment Field Verification," Rev. 3

i

IP QAI-710.3, " Mechanical Equipment Overinspection Checklist,"

Rev. 1

Applicable equipment details and foundations drawings.

b.

Inspection Findings

Installation inspection reports generally exhibited the desired

sequencing of installation activities and inspections.

However,

BAP 2.10 which governed the preparation of equipment installation

travelers, did not require work to be performed in the sequence in

which they appear in the traveler unless specifically noted.

As

such, any designated QC holdpoint did not disallow the initiation

or completion of work activities (which may fall sequentially later

in the traveler) prior to the sign-off of the QC holdpoint.

Rather,

only a QC verification need be performed for that particular

operation or activity at its completion.

Of the 24 components for which installation documentation was

reviewed, all had been inspected and found acceptable by QC for

those attributes examined by the NRC CAT inspector.

Of these

components, the NRC CAT identified only one discrepancy between

installation requirements and as-installed conditions.

Diesel Fuel

Oil Storage Tank 0001TC was found to be missing washers at the

foundation anchor attachment.

Further, this was the only discre-

pancy identified between the sampled as-installed hardware and

the associated BA Field Verification or IP Overinspection reports.

It was noted however, that five components manufactured by Goulds

Pumps Inc.

(HPCS Water Leg Pump, Residual Heat Removal Water Leg

Pump, RCIC Water Leg Pump and the Control Room Chilled Water Pumps)

appeared to nave been improperly fastened to the foundation anchor

bolts in that the foundation anchor nuts were tightened to a " snug

l

tight plus \\ turn" condition rather than the torque value specified

by the vendor drawings.

For each water leg pump, this potential

discrepancy was originally documented by licensee QC personnel

on NCR 6639.

This NCR was dispositioned use-as-is by the invocation

/

of Field Change Request (FCR) 3477 which specified the snug tight

'

condition "unless otherwise specified." Due to the ambiguous and

imprecise language in both FCR 3477 and NCR 6639, the NCR appeared

to have been improperly dispositioned.

A review of NCR G571, which

dispositioned a similar discrepancy (for the Spent Fuel Cooling

Pumps) in the same manner, revealed that the licensee's position was

that S&L's requirements prevailed over vendor recommendations as the

component installations were governed by S&L drawings and documents.

The NRC CAT thus considers NCR 6639 to have been appropriately dis-

III-15

- _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

positioned and the equipment to have been properly installed.

The

licensee has agreed to provide clarification regarding the tighten-

ing of foundation anchor bolts.

The NRC CAT inspector also reviewed the seismic analyses for the

HPCS, RCIC and Residual Heat Removal Water Leg Pumps, RCIC Pump,

Turbine and Gland Seal Compressor, and the Diesel Generator Day

Tanks for consistency between the foundation anchor bolt material

type assumed in the analyses, and the as-installed material.

No

discrepancies were identified.

During the review of equipment installation travelers, the traveler

package covering the modification of the lube oil system for the

HPCS diesel generator was examined.

Documentation showed a history

of queries by licensee personnel regarding the appropriateness of

the safety classification of the materials to be used during the

modification; nonsafety-related material and components were

purchased for the modification.

These questions arose as a result

of a disparity between a vendor generated Field Deviation

Disposition Request (FDDR LH1-482) which categorized the lube

oil system to have been safety-related, and a General Electric

Quickletter dated March 4, 1985 which stated that the material to

be used in the modification need not be safety-related.

Ultimately, the use of nonsafety-related materials was approved

by the supplier of the HPCS diesel generator in FCR 37073.

The

NRC CAT inspector reviewed documents germaine to this concern and

concludes that the specified use of nonsafety related materials

and components as described in FCR 37073 is consistent with

licensee commitments as evaluated in Section 9.5.7 of the

CPS Safety Evaluation Report (NUREG-0853).

'

c.

Conclusions

Mechanical equipment installations generally conformed to design

and installation requirements.

Equipment travelers adequately

documented work activities.

I

i

III-16

_ _ _ _ _ _ _

,_- _ _ _ _ _____ _ _ - _ _ _ _ _ - _

TABLE III-la

PIPING INSPECTION SAMPLE - LARGE BORE

Baldwin Associates Piping

!

No. of

Support

Drawing

Pipe

Diameter

Locations

Number

Class

(inches)

Inspected

Notes

Observations

Design

As-Built

l

l

HP-2

2

20, 16

15

15

1

10'0" design dwg.

Rev. 10L

dimension measures

9'7"

LP-1

1

10

5

5

2

Rev. 8G

RI-7

2

6

12

12

Rev. 10M

RI-14

1

4

-

-

3

Rev. 8J

I

RT-47

3

4, 3

14

14

Rev. SK

l

SX-25

3

8

18

18

4

6'10" as-built

l

Rev. 8J

dimension from

Support 1SX13003X

to upstream elbovi

measures 6'8"

!

!

SX-27

3

8

15

15

4'0" as-built

Rev. 7P

dimension from

Support 1SX11016R

to Support ISX11015X

l

measures 4'1"

Pipe to support steel

minimum gap does not

exist at Supports

ISX11012R, 1SX11014R

and 1SX110016R

III-17

,.

..

..

. _ _ _

-

.

-

.. -

. - .

.

-_ -

__

-

.

I

TABLE III-lb

,

PIPING INSPECTION SAMPLE - SMALL BORE

Baldwin Associates Piping

i

No. of

Support

Drawing

Pipe

Diameter

Locations

,

<

Number

Class

(inches)

Inspected

Notes

Observations

Design

As-Built

.

!

HP-753

2

2, 1

10

5

5

2'6" as-built

Rev. 15

dimension measures

2'7"

15-754

1, 2

1,2

23

0

6

3'9" design dwg.

'

Rev. 12

dimension measures

3'5 "

1

'

NB-751

1, 3

2

-

-

3

Interference between

Rev. 6

pipe and support for

4

"

electric box IJB729

!

not documented for

piping design

-

incorporation

RI-758

2

2

0

0

7

Temporary pipe

Rev. 17

support not

dismantled at two

locations

Reactor Controls, Inc. Piping

.

No. of

'

Support

Drawing

Pipe

Diameter

Locations

Number

Class

(inches)

Inspected

Notes

Observations

Design

As-Built

SA-489

2

1

-

4

8

Rev. 3

j

SA-490

2

1

-

5

8

i

Rev. 5

l

SA-501

2

1k

-

4

8

Rev. 3

i

{

III-18

. _

_ - . - .

, _ - - . . _ _ . . _ , _

. -

.

,

_

_ . . -

TABLES III-la and b (Continued)

PIPING INSPECTION SAMPLE

NOTES

1.

' Piping dimensions inside containment wall not inspected.

2.

Piping dimensions outside containment wall not inspected.

3.

Selected piping components inspected by NR'. CAT - Piping layout not

inspected.

4.

Piping between floor at elevation 737'0" and support M-1SX13004R not

inspected by NRC CAT.

5.

As-built walkdown is not required for all piping shown.

6.

As-built data not inspected.

7.

As-built walkdown not required for piping shown.

8.

Walkdown design data recorded (March 29, 1985) on listed mathematical

model revision inspected by NRC CAT.

III-19

I

.

__

_

_

_

TABLE III-2

PIPE WALL THICKNESS SAMPLE AND OBSERVATIONS

i

Specified Nominal /

Minimum Wall

2

Manufacturer /

Pipe Size /

ASME

Minimum Wall

Thickness Measured

(Heat No.)

Schedule

Class

Thickness (Inches)

(Inches)

B&W (59768)

2 /xxs

2

0.552/0.483

0.501

C-W (14-390)

12/40s

1

0.375/0.328

0.434

!

C-W (13-419)

12/80s

1

0.688/0.602

0.715

!

J&L (631675)

12/40

2

0.406/0.355

0.377

J&L (364557)

4/80

2

0.337/0.295

0.316

S

(466139)

1/80s

2

0.179/0.157

0.170

i

S

(465835)

\\/40s

2

0.109/0.095

0.106

S

(462337)

6/40s

2

0.280/0.245

0.267

PSC (60834)

8/80

2

0.500/0.438

0.473

TCS (93563)

3/4/40s

2

0.113/0.099

0.109

USS (L-24722)

6/40

2

0.280/0.245

0.279

1

SF (1-RI-14-5)

4/120

1

0.438/0.383

0.390

(1E51-D306)

24/

MC

1.000/0.875

1.096

NOTES:

IB&W - Babcock & Wilcox Tubular Products Division

C-W - Curtiss-Wright Corporation

J&L - Jones & Laughlin Steel Corporation

S

- Sandvik, Inc.

SF

- Southwest Fabricating & Welding Company, Inc.

PSC - Phoenix Steel Corporation

TCS - Teledyne Columbia - Summerill

USS - U.S. Steel Corporation

,

i

e

1

III-20

- ..

_ - -

. - .

-_

_ _ _ _ _ - _

TABLE III-3

PIPE SUPPORT / RESTRAINT INSPECTION SAMPLE

2

Size

Pipe

S/R Number 1

Type

Class

(Inches)

Location 3

Comments 4

M-1MS32002S Rev. C

Snubber

C

12

Cont.

M-1MS31002S Rev. C

Snubber

C

12

Cont.

BA

M-1MS33009S Rev. O

Snubber

C

12

Cont.

BA

M-1MS31009C Rev. F

Spring

C

12

Cont.

M-1NB01003S Rev. A

Snubber

A

2

Cont.

M-1NB01002S Rev. 8

Snubber

A

2

Cont.

M-1NB01008S Rev. C

Snubber

A

2

Cont.

M-1NB01027X Rev. A

Box

A

2

Cont.

H-1RH-780-4 Rev. 0

U-bolt

B

3/4

Aux.

IP

M-1RH47013G Rev. A

Box

B

1-1/2

Aux.

IP

M-1RH71016G Rev. C

Box

C

1-1/2

Cont.

IP

M-1RH34010X Rev. A

Strut

A

18

Cont.

IP

M-1RH140095 Rev. D

Snubber

B

8

Aux.

M-1RH14006S Rev. C

Snubber

B

8

Aux.

TVL

M-1RI14025G Rev. B

Box

B

1

Aux.

M-1RI14018G Rev. D

Box

B

2

Aux.

BA, TVL

M-1RI14002G Rev. D

Box

B

2

Aux.

BA, TVL

M-1RI14015G Rev. E

Box

B

2

Aux.

BA, TVL

M-1RI14001G Rev. G

Box

B

2

Aux.

BA, TVL

M-1SX42021R Rev. F

Strut

C

2-1/2

Aux.

IP, TVL

M-1SX42019R Rev. C

Strut

C

1-1/2

Aux.

IP

M-1SX01048X Rev. F

Strut

C

30

Screen

M-1SX01017R Rev. H

Riser Clamp C

30

Screen

M-ISX01050X Rev. E

Strut

C

30

Screen

M-1SX01028R Rev. J

Riser Clamp C

30

Screen

M-1SX21002G Rev. B

Box

C

2

Aux.

M-1CC06042G Rev. B

Box

D

14

Fuel

TVL*

M-1CC06016X Rev. B

Strut

D

14

Fuel

TVL*

M-1CC12007C Rev. D

Spring

D

3

Cont.

TVL

M-1CC07014R Rev. D

Rod

D

14

Fuel

TVL

M-1CC06035X Rev. A

Strut

D

14

Fuel

TVL

M-1CC07050X Rev. C

Strut

D

14

Fuel

TVL

M-1CY23002G Rev. C

Box

D

3

Aux.

TVL

M-1FWO30145 Rev. C

Snubber

D

20

Turbine

TVL

M-1HP03024R Rev. C

Rod

D

10

Fuel

TVL

M-1VQ03003R Rev. E

Strut

D

10

Cont.

TVL

III-21

,

TABLE III-3 (Continued)

PIPE SUPPORT / RESTRAINT INSPECTION SAMPLE

NOTES:

1CC - Component Cooling Water

CY - Cycled Condensate

FW - Feedwater

HP - High Pressure Core Spray

MS - Main Steam

NB - Nuclear Boiler

RH - Residual Heat Removal

RI - Reactor Core Insolation Cooling

SX - Shutdown Service Water

VQ - Drywell Purge

2A - ASME Class 1

8 - ASME Class 2

C - Asme Class 3

3 Cont.

- Containment Building

Aux.

- Auxiliary Building

Screen - Screen House

Fuel

- Fuel Building

Turbine - Turbine Building

4BA - BA Field Verification Records Reviewed by NRC CAT

IP - IP Overinspection Records Reviewed by NRC CAT

TVL - Traveler Package Reviewed by NRC CAT

- Not QC Inspected at Time of NRC CAT Inspection

4

1

III-22

. _ _ _ -

TABLE III-4

PIPE SUPPORT / RESTRAINT INSPECTION OBSERVATIONS

From Support Sample

Support / Restraint

Observations

M-1MS310025 Rev. C

Mismatch of thread engagement of BE extension

piece and PSA 35 snubber.

Extension piece

male threads measured 1-1/2 inches and snubber

body threads were 1-1/4 inches.

Extension

piece was in contact with internal dust cover.

1/4 inch of threading exposed on extension

piece when assembled with snubber body.

M-1MS31009C Rev. F

Scaffold contacting against riser clamp.

M-1MS330095 Rev. D

Exessive debris in W-beam i)1ocks drainage

of water.

M-1NB01003S Rev. A

Incorrect lock wiring.

Not modelled per

FSAR commitment.

M-1NB01002S Rev. B

Not modelled per FSAR commitment.

M-1NB01008S Rev. C

Weld of item 2 to item 3 not welded as

shown on design drawing.

M-1NB01027X Rev. A

Elevation of 2-1/2 x 2-1/2-inch angle is

2-7/8 inches above drawing location.

Thickness of 2-1/2 x 2-1/2-inch angle is not

listed as 3/8 inch on FCR 33320.

M-1RH14006S Rev. C

Zero inch gap on top between telescoping

cylinder and support cylinder of snubber.

1/8

inch gap on bottom between telescoping cylinder

and support cylinder of snubber.

M-1RH140095 Rev. O

Cotter pin not spread.

Loose locknut on

extension piece.

Zero inch gap on top

between telescoping cylinder and support

cylinder of snubber.

1/8 inch gap on bottom

between telescoping cylinder and support

cylinder of snubber.

l

III-23

-

- - _ _ _ _ _ _ _ _

TABLE III-4 (Continued)

PIPE SUPPORT / RESTRAINT INSPECTION OBSERVATIONS

From Support Sample

n:

Support / Restraint

Observations

M-1RI14002G Rev. D

Zero inch clearance between top horizontal

member and pipe.

Pipe not supported by bottom

horizontal member; 0.046 inch clearance between

bottom member and pipe.

M-1SX01048X Rev. F

Sheet 1, item 6 calls for rear bracket

(Ref. Dwg. No. M-1SX01017R)

BE-410-5, no "N"

suffix.

Extra rear bracket

of a BE strut was incorrectly listed on NCR

26414.

M-1SX01017R Rev. H

Support was not listed on NCR 26414 with

reference tc the extra rear bracket shown on

Drawing M-1SX01048X.

M-1SX01028R Rev. J

Bottom lugs were not in contact with riser

clamp.

Gaps measured 1/32 inch through 3/16

inch.

Bottom lug width of 1-1/4 inch did not

meet the design requirements of 2-1/2 inches.

M-1CY23002G Rev. C

1/8 inch grind depth at weld tie-in on east

vert member.

M-1CC07014R Rev. D

Pipe clamp ears binding against eye nut.

Cotter

pin not spread.

M-1CC07050X Rev. C

Undercut on main structural member (Item 6)

greater than 1/16 inch.

Members not welded

as shown on design drawing (Item 6 to Item 7).

Hole in weld of west rear bracket.

M-1CC06042G Rev. 8

Debris between pipe and south vertical support

steel.

Support was not QC inspected.

M-1CC12007C Rev. O

Structural steel shape M4 x 13 was substituted

for a W4 x 13 shape.

3/16" x 3" x 6-1/4"

plate was substituted for two 3" x 3" washer

plates without proper documentation.

III-24

-.

.

,

TABLE III-4 (Continued)

PIPE SUPPORT / RESTRAINT INSPECTION OBSERVATIONS

From Random Sample

i

Support / Restraint

Observations

M-1FC02003R

Scaffold interfering with support.

M-1FP46005

Sway strut in contact with conduit C6513.

M-1HP03024R

Scaffold resting on pipe support.

M-1MS23006C

Scaffold platform resting on riser clamp.

M-1RH14010S

Scaffold in contact with snubber.

M-1RH13036S

Cotter pin not spread on rear bracket.

M-1RH09049X

Loose locknut on pipe clamp.

M-1RH16031X

Nail substituted for cotter pin in rear

bracket of sway strut.

M-1RH07053X

Auxiliary steel for conduit support E-26-1001-

02B-CP-13 is in contact with rear bracket pin

on sway strut.

M-1RH08092S

Mismatch of thread engagement of BE extension

piece and PSA 35 snubber.

Extension piece

"

male threads measures 1-1/2 inches and

snubber body threads were 1-1/4 inches.

Extension piece was in contact with internal

dust cover.

1/4 inch of threads exposed on

extension piece when assembled with snubber.

M-1SX18022V

Scaffold in contact with spring can.

M-1SX17028X

Rear bracket binding eye bolt of sway strut.

Pipe clamp was 2 inches lower than design

elevation.

WS00520G

U-bolt damaged (nonsafety).

M-1VC02003R

Scaffold interfering with support.

Valve No. 2SX017A

Scaffold interfering with valve.

III-25

-

- ._

a

TABLE III-5

CONCRETE EXPANSION ANCHOR SAMP3.E AND OBSERVATIONS

Number of Bolts

Turned Prior to

Number of Turns

Achieving

to Achieve

Pipe Support

Number of

Retightening or

Retightening or

Drawing (BA)

Bolts - Diameter

Testing Torque

Testing Torque

3

M-IVC 04017X

15-3/4

6

1/12, 1/12, 1/12

1/8, 1/12, 1/32

M-IVC 04001V

4-1/2

0

-

M-1CC06042G

6-1

1

1/16

M-1RI27003G

3-3/4

1

1/8

M-1RIO3017R

8-3/4

0

-

M-ISX75015G

4-1

1

1/16

M-1SX78008R

8-3/4

2

1/32, 1/16

M-1SX77020X

4-3/4

1

1/32

M-1SX21002G

4-1

0

-

M-1SX23008V

4-3/4

1

1/32

M-1RI14001G

2-3/4,

1

1/32

1-1

M-1RI14019R

8-1

0

-

Number of Bolts

Turned Prior to

Nunber of Turns

Achieving

to Achieve

HVAC Support

Number of

Retightening or

Retightening or

Drawing (Zack)

Bolts - Diameter

Testing Torque

Testing Torque

C-3163

6-3/4

3

1/16, 1/64, 1/64

C-3162

6-3/4

0

-

D-4308

15-3/4

1

1/64

C-3211

8-3/4*

1

1/16

C-3151

8-3/4

1

1/64

D-0121

6-3/4

0

-

C-1109-3

4-1

0

-

C-4103

8-3/4

1

1/64

  • 0ne anchor bolt is recessed into the nut and one thread of the nut is visible.

NCR No. 912167 issued.

.

III-26

-

. . .

---

-

-

.

_

.

_.

_

-

.

TABLE III-6

HVAC INSPECTION SAMPLE AND OBSERVATIONS

Supports / Restraints

Support I.D.

Location

Observations

R5008

Containment

Acceptable.

R7022

Containment

"E" and "X" dimensions were

15/16 inches longer than

that shown on dwg.

R7033

Containment

Brace angle exceeded dwg.

requirements by 4 degrees.

NCR 911376 was dispositioned

using wrong configuration.

C3163

Control Building

Acceptable.

C6335

Control Building

Acceptable.

D4324

Diesel Generator

Acceptable.

Building

Fire Dampers

Damper I.D.

Quantity

HVAC System

OVC42YF

4

Control Building

OVC103Y

1

Control Building

OVC104Y

1

Control Building

OVL68Y

1

Laboratory HVAC

OVL70Y

1

Laboratory HVAC

1VX08YC

1

Switchgear Heat Removal

IVX82Y

2

Switchgear Heat Removal

IVX86Y

2

Switchgear Heat Removal

III-27

-

.

-

.

-.

- - _

TABLE III-7

,

MECHANICAL EQUIPMENT SAMPLE

Diesel Generator Air Start Skid

1DG06SA

Diesel Generator Day Tanks

1DG01TA,B,C

Diesel Generators

1DG01KA,B

Diesel Generator Oil Transfer Pumps

10001PA,C

Diesel Generator Fuel Oil Storage Tanks

10001TA,C

HPCS Diesel Engine

1E11-S001

HPCS Water Leg Pump

1E22-C003

RHR Water Leg Pump

1E12-C003

RCIC Pump and Turbines

1E51-C001, C002

RCIC Gland Seal Compressor

IE51-C002

RCIC Water Leg Pump

1E51-C003

Standby Liquid Control Pumps

1C41-C001A,B

Control Room Chilled Water Pumps

OVC08PA,8

Switchgear Heat Removal Coolers

IVX01SA,B

RHR Room Coolers

IVYO65,07S

.

4

f

.,

I

III-28

..

. _ . .

._

_

-.

_

_ _ - -

- _ .

- __._ -.

-

-

IV.

WELDING AND NOND5SNUCTiVs EXAMINATION

A.

Objective

The objective of the appraisal of welding and nondestructive examination

(NDE) was to determine if Quality Control accepted work related to

welding and NDE activities was controlled and performed in accordance

with design requirements, Safety Analysis Report commitments, and

applicable codes and specifications.

An additional objective was to

determine if personnel involved in welding and NDE activities were

trained and qualified in accordance with established performance

standards and applicable code requirements.

B.

Discussion

To accomplish the above objectives, welds and welding details for

piping, pipe supports / restraints, field and shop fabricated tanks and

heat exchangers, structural steel installations, heating, ventilating

and air conditioning (HVAC) installations, electrical supports, and

instrumentation and control tubing were inspected.

The inspectedTelds

were selected to provide a representative sample of the licensee's

contractor welding activities in terms of welding processes used,

materials welded and existing weld-joint configurations.

Considerations

such as physical location, difficulty of welding and limited accessi-

bility were also used in sample selection.

NDE activities were appraised through the review of radiographs for

both field and vendor fabricated welds, the review of NDE procedures

and personnel qualifications, the inspection of the calibration status

of NDE equipment, and the witnessing of in process NDE activities.

During the inspection of welds on pipe supports / restraints, the NRC

Construction Appraisal Team (CAT) identified welds which did not have

the weld size specified by the Architect Engineer, Sargent & Lundy

Engineers (S&L).

Undersized welds were found in both skewed and non-

skewed connections on pipe supports.

S&L has evaluated most of the

undersized welds and determined that the welds are adequate for the

intended application.

Undersized weld reinforcements were also found in

nozzle to shell joints (ASME Code Category D joints) on tanks and heat

exchangers.

A detailed discussion concerning these welds is included

in Sections IV.B.1 and 11, below.

The licensee has instituted an Illinois Power Company (IP) Overinspec-

tion Program.

The program provides for additional inspections to be

performed by the Baldwin Associates Field Verification (BAFV) Group and

the IP Overinspection Group.

Section VII, Design Change Control, of

this report provides additional discussion of the IP Overinspection

Program.

The IP Overinspection Program was set up to include inspections of

welds in all of the major areas of plant construction such as electri-

cal, piping, instrumentation, HVAC and structural steel.

The NRC CAT

inspectors inspected eleven pipe supports / restraints which were

inspected under the scope of the program.

In addition two supports

in the electrical, two supports in the instrumentation, two supports in

IV-1

the HVAC and two supports in the structural steel areas were inspected

to assess the adequacy of the welding overinspections.

In the area of NDE, the NRC CAT inspectors reviewed radiographs

supplied by various contractors and vendors.

The NRC CAT inspectors

found radiographs which showed that some welds did not have the

required weld quality or the NDE documentation did not accurately

reflect the current status of the hardware.

A detailed discussion

concerning the welds and their associated deficiencies are provided in

Sections IV.B.1., 9, 10 and 11, below.

The welding and NDE activities were examined in order to ascertain

compliance with the governing construction codes and specifications.

This effort involved the review and inspection of the following

contractors:

Field Activities

1.

Sargent & Lundy Engineers:

Architect Engineer.

2.

Baldwin Associates:

piping installation and piping supports /

restraints, instrumentation installation and instrumentation

supports, fire protection fabrication and installation, electrical

installation and supports, drywell wall field installation and

structural steel erection and modification.

3.

Chicago Bridge and Iron Company (CB&I):

containment liner and

containment penetration fabrication and installation, tank

fabricator.

4.

Bristol Steel Company:

reactor pool and spent fuel pool liner

fabrication and installation, structural steel supplier.

5.

Zack Company (Zack):

heating, ventilating and air conditioning.

6.

General Electric Company:

reactor internals field modification and

installation.

7.

Reactor Controls Inc.:

control drive mechanism piping

installation.

Shop Fabrication

1. Southwest Fabricating & Welding Company, Inc.:

shop fabricated

piping spools.

2. Harnischfeger Corporation:

crane manufacturer.

3. General Electric Company:

nuclear steam supply system.

4. Anchor / Darling Valve Company:

valve manufacturer.

5. Progressive Fabricating Inc.:

pipe sleeve and cylinders supplier.

IV-2

_ _ _ _ _ .

_

. . . -,

.

-

_

.

-

6. Carrier Corporation:

chillers and coolers manufacturer.

7. Pathway:

expansicn bellows supplier.

8. RECO Industries Inc.:

tank fabricator.

9. Posi Seal:

valve bodies supplier.

10. Fisher Controls Inc.:

valve manufacturer.

11. Rockwell:

flow diverters supplier.

12. Lakeside Bridge and Steel:

miscellaneous steel supplier.

13. La Barge:

pipe supplier.

14. Hub:

tube supplier,

15. Yuba Heat Transfer Corporation:

high pressure heater manufacturer.

16. Southern Boiler:

small tanks supplier.

17. Tube Turns:

penetration manufacturer.

18. Spencer Turbine Co.:

blow casing supplier.

19. Chicago Tube and Iron:

tee tubes supplier.

20. Nooter: water storage tank supplier.

21. Guyon Alloys:

tube and fittings supplier.

22. Gould:

valve supplier.

23. Metal Bellows:

bellows manufacturer.

24. Atomic International:

hydrogen recombiner manufacturer.

25. Steward and Stevenson:

air receiver tank supplier.

'

26. W.J. Woolley Company:

containment vessel hatches fabricator

and supplier.

27. G.W. Taylor:

material supplier.

28. Trent Tube:

material supplier.

29. Bingham-Willamette:

pump manufacturer.

The results of the inspection activities involving each of these areas

and contractors are documented in the following sections.

IV-3

..

,

, . _

. . -_.

-

-

_ _ .

. , . .

1.

Pipe and Pipe Support Fabrication

a.

Inspection Scope

(1) Welding Activities

The NRC CAT inspectors reviewed activities relating to

fabrication contracts in the areas of piping system welds,

support / restraint welds, welding procedures, welder

qualifications, NDE procedures, personnel qualifications, and

the review of radiographic film for shop and field fabricated

welds.

Field welding involving pipe fabrication was performed

by BA.

Southwest Fabricating and Welding supplied the shop

fabricated piping spools.

The NRC CAT inspected 56 pipe supports / restraints involving

approximately 550 welds in order to verify conformance of

welding to drawing requirements and confirm the visual

acceptability of the welds.

The inspection included 11 sup-

ports consisting of 68 welds, which had been checked under

the IP Overinspection program in order to evaluate the effec-

tiveness of that program.

See Table IV-1 for a listing of

supports subjected to detailed inspection. Additionally,

another 16 supports / restraints involving 400 welds were

visually inspected to verify the quality of the completed

welds.

See Table IV-2 for a listing of supports inspected.

The NRC CAT inspection of piping welds consisted of visual

inspection during walkdown of piping systems and inspection of

pipe welds located near the supports / restraints being inspec-

ted.

Approximately 44 piping spools involving 1400 American

Society of Mechanical Engineers (ASME) Class 1, 2 and 3 welds

were inspected.

Twenty-four of those piping spools were

subjected to detailed inspection which included the review of

pertinent QC documentation while the remaining 20 spools were

only visually inspected.

Both field and shop welds were

inspected in order to assure compliance with the requirements

of the ASME Code.

Some of the inspected socket welds were

fabricated by Reactor Controls, Inc. (RCI) in conjunction with

the Control Drive Mechanism piping installation contract.

See

Tables IV-3 and IV-4 for listings of piping spools inspected.

In addition, 75 welding filler metal test reports, 22 welder

qualification test records and 4 welding procedures were

reviewed for compliance with applicable specifications,

procedures and the ASME Code requirements.

(2) Nondestructive Examination Activities

The NRC CAT inspection of NDE activities for the pipe

fabrication area included the review of 62 shop and 75 field

fabricated welds which involved 1815 film.

The field welds

were fabricated by BA and the shop fabricated pipe spools were

supplied by Southwest Fabricating and Welding.

Three welds

involving 28 film supplied by RCI were also reviewed as a part

IV-4

of this inspection.

In addition, 6 NDE procedures and 11 NDE

personnel qualification records were reviewed in order to

verify compliance with the governing codes and specifications.

Six NDE technicians were observed while performing in process

inspections and were evaluated for their ability to follow the

applicable inspection procedures.

Twenty pieces of NDE equip-

ment were inspected for calibration and one quality assurance

NDE procedure was reviewed for adequacy.

b.

Inspection Findings

(1) Welding Activities

'

In general, the inspected pipe and pipe support / restraint

welding activities were found to comply with the governing

codes and specifications.

However, discrepancies were iden-

tified involving undersized welds in both skewed and nonskewed

welded connections.

Forty-six of 950 structural welds inspec-

ted, involving 56 pipe supports / restraints, were found to be

deficient with respect to the specified acceptance criteria.

Forty-four of the welds were undersized, one weld had overlap

and lack of fusion, and another weld had undercut and was also

welded across the beam flange which violated the specification

requirements.

Nineteen of the undersized welds were found on

hanger 1RH051R which had a total of 79 welds.

As a result of

this finding the BA personnel identified and reinspected the

remaining 20 hangers of similar design.

A relatively high

percentage of undersized welds were also found on those han-

gers.

Investigation revealed that the hangers were predomi-

nately shop fabricated by BA and the shop fabricated portion

was not inspected as closely as those welds which were made

during installation.

See Table IV-1 for details. As a result

of this finding the applicant issued Nonconformance Reports

(NCRs) and the welds were determined to be adequate for the

intended application.

Two of the 1400 pipe welds inspected were found to deviate from

the specified acceptance criteria.

The two welds and their

associated deficiencies are listed as follows:

(a) An undersized reinforcing fillet weld between a small-

diameter coupling and spool piece IRH-8-7 was found.

NCR

32441 was written as a result of this finding.

(b) Undersized welds were found on socket welds on the 3/4-inch

Schedule 160 piping connections on RCI work.

NCR

CRD-185-48 was written as a result of this finding.

In

addition, all pipe of this size and schedule was reinspec-

ted and accepted by the Architect Engineer without repair.

l

Ten percent of the remaining RCI fillet welds were also

l

inspected, and these were found to be of the correct size

since the connecting piping was Schedule 80 or lighter.

i

l

IV-5

._

. .

_

_ _ .

(2) Nondestructive Examination Activities

In general, the inspected NDE activities were found to comply

with the applicable codes and specifications.

However, during

the review of the radiographic film some irregularities were

identified which involved the following two welds:

Field Weld IVQ-B-1

The radiographs for this weld covering view 2-3 were

originally rejected for base metal gouging.

The repair

film did not adequately cover the repaired area.

As a

result of this finding the applicant issued NCR 31598.

Shop Weld IFC-2-13

This weld was reradiographed by BA.

The weld traveler

FC-2-B misidentified weld IFC-2-13 as being weld

IFC-2-13-W-3.

A visual examination of weld IFC-2-13

confirmed that the radiographed weld is IFC-2-13.

As a

result of this finding the applicant issued NCR 31513.

c.

Conclusions

(1) Welding Activities

In general, the inspected welding activities were found to

comply with the requirements of the applicable codes and

specifications.

However, the NRC CAT found structural welds on

pipe supports / restraints which did not meet the weld specifi-

cations.

The welds for these supports were evaluated by the

Architect Engineer and determined to be structurally adequate

for the intended application.

(2) Nondestructive Examination

In general, the inspected NDE activities were found to comply

with the requirements of the governing codes and specifica-

tions.

However, the NRC CAT found welds which were misidenti-

fied and the repair areas did not have adequate radiographic

coverage.

2.

Reactor Internals Modification and Installation

a.

Inspection Scope

Apprvximately 20 feet of welded seam of the outer bank hood replace-

ment of the steam dryer and 6 new tie bar installation welds were

inspected.

In addition, one welding procedure and the qualification

test records for two welders were also reviewed for adequacy.

The

modification work was performed by General Electric Installation and

Services Engineering Division.

IV-6

-

b.

Inspection Findings and Conclusions

No problems were identified in the area of inspected welding

activities.

Activities were found to meet the specified acceptance

criteria.

3.

Electrical Installation and Electrical Supports

a.

Inspection Scope

The NRC CAT inspected approximately 100 field and 60 shop welds in

the area of electrical installation.

Two welding procedures and

the qualification test records for six welders were reviewed.

In

addition, the personnel qualification test records for four welding

inspectors were also reviewed and four inspectors were observed

and evaluated for their ability to follow the visual inspection

procedures.

The welding activities in the electrical area were

performed by BA.

b.

Inspection Findings and Conclusions

No problems were identified in the area of inspected welding

activities.

Activities were found to comply with the applicable

construction codes and specifications.

4.

Instrumentation Tubing Installation and Instrumentation Supports

a.

Inspection Scope

Approximately 110 welds involving 18 instrumentation supports, 2

panels, and 80 tubing welds were visually inspected to ascertain

compliance with the specified acceptance criteria.

Two welding

procedures and qualification test records for six welders were

reviewed.

NDE procedures and qualification records for four NDE

inspectors were also reviewed.

Two visual welding inspectors and

two liquid penetrant inspectors were observed and evaluated for

their ability to follow the applicable inspection procedures.

The

welding in the instrumentation area was performed by BA.

b.

Inspection Findings and Conclusions

No problems were identified in the area of inspected welding and

NDE activities.

Activities were found to comply with the

applicable construction codes and specifications.

5.

Heating, Ventilating and Air Conditioning

Installation and Supports

a.

Inspection Scope

Approximately 140 welds involving 20 supports were inspected for

compliance with the specified acceptance criteria.

Six welding

procedures and the qualification test records for six welders were

reviewed.

In addition, four welding inspector personnel qualifi-

cation test records were also reviewed and two welding inspectors

IV-7

.

_

were observed and evaluated for their ability to follow the visual

inspection procedures.

The welds on four duct pieces, two air

blowers, one air filter and four dampers were also included in this

inspection.

The welding in the HVAC area was performed by Zack

Company.

J

b.

Inspection Findings

During the inspection of Hanger A-0082 a burn through the duct was

observed in the welded joint between the duct and the duct companion

flange.

As a result of this finding, Zack Company issued NCR 912085

and the duct will be repaired as required.

c.

Conclusions

In general, the inspected welded activities were found to comply

with the requirements specified by the Architect Engineer.

With

the exception of the minor finding (burn through duct in one

isolated case) the inspected welding activities were found to comply

with the applicable codes and specifications.

6.

Structural Steel Fabrication, Erection and Modification

a.

Inspection Scope

Approximately 150 welds comprising 80 field and 70 shop welds

involving 22 structural beams were visually inspected in order to

,

ascertain compliance with the specified acceptance criteria.

Five welding procedures and the qualification test records for six

welders were reviewed.

Visual inspection procedures and the

qualification test records for five inspectors were also reviewed.

Three welding inspectors were observed and evaluated for their

ability to follow the visual inspection procedures.

The structural

steel field welding was performed by BA.

Rockwell Engineering and

Bristol Steel supplied structural steel to the project.

b.

Inspection Findings and Conclusions

No problems were identified in the area of inspected welding

activities.

Activities were found to comply with the applicable

construction codes and specifications.

7.

Fuel Storage Pool and Refueling Cavity Liner Fabrication

a.

Inspection Scope

The NRC CAT visually inspected approximately 120 feet of welded

seam on the Fuel Storage Pool and the Refueling Cavity Liner.

The

attachment welds for two gusset hooks and two pad plates were also

inspected in order to ascertain compliance with the specified

acceptance criteria.

In the area of NDE the NRC CAT reviewed the

radiographs for 100 feet of welded seam involving 234 film.

The

Fuel Storage Pool and Refueling Cavity Liner fabrication was

completed by Bristol Steel.

IV-8

__.

__

-

-

. _ .

-

.-

b.

Inspection Findings and Conclusions

No problems were identified in the areas of inspected welding and

NDE activities. Activities were found to comply with the

applicable construction codes and specifications.

8.

Fire Protection System Fabrication and Installation

a.

Inspection Scope

Approximately 80 welds involving 10 pipe supports' and 15 pipe welds

,

involving 2 pipe spools were visually inspected.

One welding

procedure and the qualification test records for two welders were

also reviewed for adequacy.

The fire protection installation was

completed by BA.

b.

Inspection Findings and Conclusions

No problems were identified in the area of inspected welding and

NDE activities.

Activities were found to comply with the governing

construction codes and specifications.

9.

Containment Liner and Containment Penetration Installation

a.

Inspection Scope

The NRC CAT visually inspected approximately 50 feet of liner seam,

the welds on one pad plate, the attachment weld for one personnel

hatch, and the attachment welds for two mechanical and two

electrical penetrations.

In the area of NDE, the NRC CAT reviewed

the radiographs for 150 feet of liner seam which involved 450

film.

One radiographic examination procedure was also reviewed as

a part of this inspection.

The containment liner and penetrations

were installed by CB&I.

b.

Inspection Findings

No problems were identified in the area of inspected welding

activities.

However, during the review of radiographs the NRC CAT

inspectors identified 14 spot radiographs which did not meet the

required weld quality.

As a result of this finding, the applicant

performed an evaluation of the affected liner welds and concluded

that the welds are acceptable "as is" because every weld was sub-

jected to and had passed magnetic particle and vacuum box inspec-

tions.

In addition, in 1984, the applicant had reviewed 25 percent

of the fabrication and erection documentation for the containment

liner. The review was conducted by the Authorized Nuclear Inspector

,

'

employed by the Hartford Steam Boiler Inspection and Insurance

Company. Twenty-six minor nonconforming conditions were identified

and no major discrepancies were found.

Based upon these reviews the

applicant has concluded that the overall liner weld quality is

acceptable to maintain the structural and leak tightness integrity

of the containment liner.

IV-9

.

.

_.

__

_

. _ _

_

_

_.

The NRC CAT identified welded seams and their associated deficien-

cies are listed as follows:

Purchase Order (P.O.) 409.27 7-8A-7C

139 porosity

7-8A

146 porosity

7-8B

144 porosity

7-88-7L

145 Incomplete Fusion

513-A-5

142 porosity

P.O. 409.29

9-10B

176 linear indication

9-108

173 alligned indication

P.O. 409.35

11-128-12L 194 crack-like indication

P.O. 409.35

170

219 porosity

16A

10A crack-like indication

16A

4-5 crack-like indication

P."

409.40

517-11-7

280 incomplete fusion

51-B-7

275 aligned indication

P.O. 409.44

C0 Vert.

4-5 I.F. porosity

!

c.

Conclusions

In general, the inspected welding and NDE activities were found to

4

comply with the requirements of the governing codes and

i

specifications.

However, the NRC CAT found spot radiographs which

did not meet the specified weld quality.

The welds were evaluated

by the applicant and determined to be adequate for the intended

application because every weld had passed magnetic particle and

vacuum box testing.

10.

Drywell Wall and Penetrations

a.

Inspection Scope

The NRC CAT visually inspected approximately 40 feet of drywell wall

seam and the attachment welds for one penetration.

In the area of

NDE, the NRC CAT reviewed the radiographs for 220 feet of welded

seam which involved 340 film.

One radiographic examination proce-

dure was also reviewed as a part of the inspection.

The drywell

wall was fabricated by Mississippi Valley Steel Company and the

field installation of the prefabricated assemblies was done by BA.

i

The drywell locks and hatches were installed by CB&I.

.

b.

Inspection Findings

,

No problems were identified in the inspected welding activities.

j

However, during the review of radiographs, the NRC CAT inspectors

identified three welds which did not have the specified weld

quality.

The three welds and their associated deficiencies are

identified as follows:

IV-10

-.

_ _ . - - .

____ _ . -.

.

.

Seam weld No. 16, station 12 located at elevation 707' to 737',

column 173 contained an unacceptable linear indication.

The

weld was fabricated by BA.

NCR 32686 was generated as a

result of this finding.

Seam weld No. 30, film A-8, view F-G contained an unacceptable

insufficient fusion indication.

The weld was fabricated by

Mississippi Valley Steel Company.

NCR 32294 was generated

as a result of this finding.

One weld for P.O. 9993.1 on drywell locks and hatches assembly

1A, weld seam 1-5-4 to 1-5-1, view 0-1 R1 contained an

unacceptable crack-like indication near station mark 1.

The

original film was rejected for a linear indication near station

mark 0 which indicated that the repair film was reversed from

the original film position.

This reversal had prevented the

interpreter from detecting the crack-like indication because he

was looking at the wrong area.

NCR 32597 was generated as a

result of this finding.

The radiographs were supplied by CB&I.

c.

Conclusions

In general, the inspected welding and NDE activities were found to

comply with the governing codes and specifications.

However, three

welds were found to contain unacceptable indications.

As a result

of this finding, the applicant has issued NCRs and the welds will

be evaluated and repaired as needed.

11.

Vendors and Shop Fabricators Other Than Those Previously Addressed

a.

Inspection Scope

The NRC CAT visually inspected six vendor supplied tanks and heat

exchangers.

See Table IV-5 for inspected vendor supplied equipment.

In addition to the welds inspected and listed in Table IV-5, the NRC

CAT inspectors reviewed radiographs related to work performed by 28

vendors which have supplied various equipments and hardware to the

Clinton Power Station project.

A total of 347 feet of welded seam

involving 472 radiographs and 91 welds involving 771 film were

reviewed.

The radiographs for 19 valves involving 408 film, and

the radiographs for 15 spot welds involving 33 film were also

reviewed for compliance with the governing codes and specifications.

b.

Inspection Findings

During the inspection of tanks and heat exchangers supplied by the

vendors listed in Table IV-5, the NRC CAT found that the size of

the nozzle and manway weld reinforcement did not meet the

requirements stated in the vendor drawings.

In addition, the welds

on some of the inspected supports were also found to be undersized.

A total of six tanks and heat exchangers were found to deviate from

the required drawing sizes.

As a result of these findings, the

applicant issued NCRs and this item will be reviewed and disposi-

tioned by S&L.

See Table IV-5 for details.

The NRC has issued

Information Notice No. 85-33 on the subject of undersized weld

IV-11

-

reinforcement in ASME Code nozzle to shell joints.

As a result of

this notice, prior to the NRC CAT arrival, the licensee had inspec-

ted the nozzle welds on ten pressure vessels and tanks.

Nine of the

items were found to have undersized weld reinforcements around the

nozzles.

By the end of the NRC CAT inspection of this area, the

licensee had initiated a complete reinspection of tanks and pressure

vessels supplied by CBI and RECO industries.

In the area of NDE, the NRC CAT inspectors identified irregularities

relating to NDE documentation and radiographs supplied by two

vendors.

See Table IV-6 for details.

c.

Conclusions

In general, the inspected welding and NDE activities were found to

comply with the requirements of the governing codes and specifica-

tions.

However, six tanks and heat exchangers were found to deviate

from the requirements stated in the applicable drawings and

specifications.

In addition, the radiographs and NDE documentation

supplied by two vendors were found to be deficient with respect to

the required quality.

IV-12

.

.

.

. - -

..

TABLE IV-1

LIST OF SUPPORTS WHICH WERE INSPECTED

AGAINST ORAWING REQUIREMENTS

IMS280095 (1)

1MS28012C

1RB21572R

IMS860015

1HP08009X (2)

ISX45003X (3)

1FC03091X (4)

1FC03002R (5)

1HP04019R

1HP04005R (6)

1HP03042S

1RH20007X

1RH19002X

1RH07004X (7)

1RH07003S

1RH16036X

1RH090895

1LP03016S

1FB15018G*

ILP04003R

1R114019R

1RH09011R (8)

1MS07002G (10)

1RH04051R (9)

1RH04035X

1RH04042X (11)

IIA 16002G

ISC01020R

1RT03032R

1RT11047X

1RB13542G (12)

1MS27012S (Partial)

1MS63001G

1FWO1008G

1MS86001S

1MS860105

ISX30003V

1HP03042S (13)

1RH090875 (14)

IMS86007V

1MS86010X

CLN-021-SP11 (17)

CLN-021-SP16

ISX-01028R

ISX-01017R

ISX-01050X

1RH47013G*

H-1RH-780-4* (15)

ISX42021R* (16)

ISX42019R*

1RH34010X*

1RH71018G*

1RH71016G*

1SX52022X*

1SC01020R*

1RB22056G*

NOTES:

,

1.

One fillet 1/32" undersized for full length due to member size.

NCR 31498.

,

2.

Two fillet welds undersized by 1/16".

NCR 31499.

l

I

3.

Two skewed fillet welds undersized by 1/16" for full length.

NCR 31497.

!

!

IV-13

!

i

-_

.- .

_ -

---

._

.

TABLE IV-1 (Continued)

LIST OF SUPPORTS WHICH WERE INSPECTED

AGAINST DRAWING REQUIREMENTS

.

4.

Two fillet welds 1/32" undersized.

NCR 31493.

5.

One fillet weld 3/4" undersized for full length.

NCR 31496.

6.

Two 1/4" fillet welds 3/32" undersized due to fit-up gap.

NCR 31495.

7.

One fillet weld 1/16" undersized.

NCR 31494.

,

8.

Four obtuse angle skewed welds and one right fillet weld undersized for

full length 1/16".

NCR 31542.

9.

Nineteen of 79 fillet welds 1/32" undersized.

NCR 31572.

10. One fillet weld undersized by 1/16".

NCR 31541.

11.

Obtuse angle fillet weld 3/32" undersized.

NCR 31574.

12.

Obtuse angle fillet weld 1/8" undersized due to too small attaching plate.

NCR 31573.

13.

Three fillet welds 1/16" undersized.

14.

Two obtuse angle fillet welds 1/8" undersized.

NCR 31611.

15. Weld surface has overlap and lack of fusion.

NCR 31604 and NCR 31615.

16.

Undercut in excess of 1/32" in two places, unspecified welding across flange.

NCR 31599.

17.

Obtuse angle fillet weld undersized.

NCR CRD-186-48 (RCI work)

  • These items were subjected to Overinspection by Illinois Power QA.

IV-14

._

_

_

_

_.

. _ . . _

-

_

_

_

._

_ _ _ - _ _ _ _ _ _ _ _ _ -

-

!

l

!

!

!

TABLE IV-2

LIST OF SUPPORTS WHICH WERE SUBJECTED TO VISUAL INSPECTION ONLY

1RB22144G

1CC50041G

1RB22111G

l

1FWO30115

1RB22106G

IIA 16002G

i

1RIl00095

1RB22056G

1RF07001G

ILP09005G

1RH40011X

1RH40013G

1FB15015G

1FB15006G

1FB15008G

1FB15018

1

IV-15

.

.

_ _ _ _ _ - - _

_ _ _ _ ___ _ _ _ _

_-_

__

TABLE IV-3

e

LIST OF PIPING WHICH WAS SUBJECTED TO VISUAL INSPECTION ONLY

Item

Description

Pipe Size (in.)

Material

G003-A-1

Main Steam

24

Carbon Steel

i

10C-21-1

Component Cooling

10, 12

Carbon Steel

1RH-16-1

Residual Heat Removal

12

Carbon Steel

1SX-15-3

Shutdown Service Water

18

Carbon Steel

1FC-12-8

Fuel Pool Cooling

14

Stainless Steel

1FC-30-5

Fuel Pool Cooling

8

Stainless Steel

1FC-30-14

Fuel Pool Cooling

14

Stainless Steel

1RH-8-7 (1)

Residual Heat Removal

24

Carbon Steel

1RH-8-8

Residual Heat Removal

24

Carbon Steel

1RH-8-9

Residual Heat Removal

24

Carbon Steel

1RH-26-8

Residual Heat Removal

4

Carbon Steel

1RH-26-5

Residual Heat Removal

18

Carbon Steel

1SX-17-11

Shutdown Service Water

18, 24

Carbon Steel

1SX-2-2

Shutdown Service Water

12

Carbon Steel

1RI-13-3ZA

Reactor Isolation

4

Carbon Steel

1RI-13-3ZB

Reactor Isolatinn

4

Carbon Steel

1RI-13-5B

Reactor Isolation

4

Carbon Steel

1RI-13-6

Reactor Isolation

t

Carbon Steel

1RI-13-7

Reactor Isolation

4

Carbon Steel

1RI-13-8

Reactor Isolation

4

Carbon Steel

IV-16

. _ _ _ ___

_.

. _ _ - _ _ - _ _ _ _ _ _ _ _ _

____

TABLE IV-4

PORTIONS OF PIPING SYSTEMS VISUALLY EXAMINED AND

FOR WHICH DOCUMENTATION WAS REVIEWED

Item

Description

Pipe Size (in.)

Material

G003-A-1

Main Steam

24

Carbon Steel

G004-A-1

Main Steam

24

Carbon Steel

G005-A-1

Main Steam

24

Carbon Steel

l

1RI-13-9

Reactor Isolation

4

Carbon Steel

1RI-13-7A

Reactor Isolation

4

Carbon Steel

1RI-13-4ZA

Reactor Isolation

4

Carbon Steel

1RI-13-4ZB

Reactor Isolation

4

Carbon Steel

l

1RI-13-5AA

Reactor Isolation

4

Carbon Steel

j

1RI-13-4A

Reactor Isolation

4

Carbon Steel

l

1RI-13-6B

Reactor Isolation

4

Carbon Steel

1FW-1-1

Feedwater

20

Carbon Steel

1FW-1-2

Feedwater

18

Carbon Steel

1FW-1-3

Feedwater

12

Carbon Steel

i

1FW-1-4

Feedwater

12

Carbon Steel

1FW-1-5

Feedwater

12

Carbon Steel

1FW-1-6

Feedwater

12

Carbon Steel

l

1FW-1-7

Feedwater

12

Carbon Steel

1FW-1-8Z

Feedwater

20

Carbon Steel

1FW-1-1A

Feedwater

Lugs

Carbon Steel

1FW-1-1B

Feedwater

Lugs

Carbon Steel

1FW-1-7J

Feedwater

Lugs

Carbon Steel

1FW-1-7K

Feedwater

Lugs

Carbon Steel

IFW-1-7L

Feedwater

Lugs

Carbon Steel

1FW-1-7M

Feedwater

Lugs

Carbon Steel

IV-17

. ..

..

.

_ _ _ _ _ _ _ _ _ _ _ _ . .

c

TABLE IV-5

VENDOR SUPPLIED TANKS AND HEAT EXCHANGERS

-

WHICH WERE VISUALLY INSPECTED

ITEM

MANUFACTURER

Standby Liquid Control Tank 1C41-A001 (1)

Boeing Corporation

Fuel Oil Storage Tank 10001TC (2)

RECO Industries, Inc.

Fuel Oil Day Tank 1DG01TC (3)

RECO Industries, Inc.

Accumulator Tank 1821-A003E (4)

RECO Industries, Inc.

Fuel Pool Cooling Heat Exchanger 1FC01AA (5)

Yuba Heat Exchanger Corp.

Fuel Oil Storage Tank 1D001TA (6)

CB&I Corporation

NOTES:

(1) Five nozzle reinforcing fillet welds undersized.

NCR 32365.

(2) One nozzle reinforcing fillet weld and support fillet welds undersized.

NCR 32364.

(3) Undersized fillet welds on supports.

NCR 32363

(4) Two nozzle reinforcing fillet welds and support welds undersized.

NCR 32361.

(5) One nozzle reinforcing fillet weld undersized due to overgrinding, and

support fillet welds undersized.

NCR 32362.

(6) Nine nozzle reinforcing fillet welds undersized, manway reinforcing fillet

welds undersized, support fillet welds undersized, head-to-shell mismatch in

excess of that permitted by the Code and weld surface quality

unacceptable.

NCR 32573.

IV-18

TABLE IV-6

VENDOR RADIOGRAPHS REVIEWED

Valve

Spot

Feet of

Contractor

Welds

Pumps

Welds

Welds

Film

Notes

General Electric

20

450

Yuba Heat Transfer

30

60

Progressive Fabricating

40

105

RECO Industries

26

32

Pathway

36

52

Harnischfeger

16

12

Anchor / Darling

5

160

(1)

Rockwell

2

14

Lakeside Bridge

22

54

(2)

& Steel

Carrier

6

9

La Barge

45

37

Southern Boiler

15

10

Tube Turns

6

12

Fisher Controls

2

44

Spencer Turbine Co.

13

22

Chicago Tube and Iron

4

32

Nooter

15

33

Guyon Alloys

6

9

HUB

1

2

Gould

2

53

Atomic International

6

63

Metal Bellows

10

68

Steward and Stevenson

40

32

'

IV-19

ll

.

_

-

TABLE IV-6 (Continued)

VENDOR RADIOGRAPHS REVIEWED

Valve

Spot

Feet of

Contractor

Welds

Pumps

Welds

Welds

Film

Notes

Posi Seal

7

106

W. J. Wooley

12

19

G. W. Taylor

52

40

Bingham-Willamette

3

45

Trent Tube

30

20

NOTES:

(1) Film stuck together indicating that film was improperly packaged.

(2) Reader sheet for piece mark 2-1-1 showed rejections for cracks and other

indications.

The original film also showed rejections.

The final acceptable

film was not identifiable as being of the same area.

Further investigation

indicated that a slot in the area of interest was welded, ground smooth and

re-radiographed.

The final radiographs were identified and determined to be

acceptable.

IV-20

.-

-

_ _ _ .

-

- - .

. . .

._ .

--

V.

CIVIL AND STRUCTURAL CONSTRUCTION

A.

Objective

The objective of the appraisal of civil and structural construction was

to determine by evaluation and review of Quality Control (QC) accepted

work and documentation whether civil and structural construction areas

were completed in accordance with regulatory requirements, Safety

Analysis Report commitments, and project specifications, drawings and

procedures.

B.

Discussion

The specific areas of civil and structural construction evaluated were

concrete, reinforcing steel configuration, cadwelds, structural steel

installation, high strength bolting, structural fill, and diesel genera-

tor exhaust silencer supports.

A major part of the installed structural

steel inspection sample was previously inspected by the Illinois Power

Overinspection (IPOI) Program.

For concrete, reinforcing steel configuration, structural steel install-

ation, high strength bolting, und diesel generator exhaust silencers,

a physical or hardware inspection and a QC documentation and field

procedures review were conducted.

For cadwelds, concrete pours, and

structural fill, a review of QC documentation and field procedures was

performed.

1.

Reinforced Concrete Construction

a.

Inspection Scope

Reinforced concrete construction areas inspected by the NRC

Construction Appraisal Team (CAT) included reinforcing steel

configuration, activities for a concrete placement, and general

concrete surface quality.

These areas were checked for conformance

with Sargent and Lundy Engineers (S&L) design drawings and specifi-

cations.

General concrete quality was examined from surrounding

areas of completed concrete construction for conformance to site

specifications.

For the reinforcing steel configuration inspection, the upper layers

of exposed rebar projecting from the east face of the base mat along

plant wall lines 200 and 202 and between the D wall line and the

south exterior wall line of the Diesel Generator Building wall were

reviewed for conformance to applicable drawings and specifications.

One in process concrete placement for the personnel access hatch

door to the drywell was observed by the NRC CAT.

These observations

occured from the time of mixing of the concrete at the site batch

plant to completion of the placement of the concrete in the steel

formwork.

Observations were made for slump tests, length of time

required for concrete placement, and preparation of concrete

cylinder test specimens.

V-1

_ _ _ .

.

QC documentation and appropriate field procedures were reviewed for

six concrete pour travelers and three cadweld travelers.

The QC documentation reviewed for six concrete pour travelers and

associated concrete pour package numbers are given in Table V-1.

Records reviewed and associated with the concrete placements

included concrete pour pre placement checklist, concrete pour

placement and testing checklist, and report of concrete cylinders.

The reviews checked the forms for adequate completion by the QC

inspectors, the existence of senior QC inspectors' signature for

evaluation of completed forms, and acceptable coverage of attributes

by the documentation.

For the cadweld QC documentation and field procedures review, the

following cadweld travelers were covered:

CCW No. 1, CCW No. 2 and

CCW No. 3.

Records were reviewed to identify whether the cadweld

work was properly inspected before and after each cadweld was

performed and whether each cadwelder was adequately tested.

In

addition, the qualification records for 10 cadwelders (operator ID

Nos. 6, 15, 16, 17, 19, 20, 27, 30, 46, 48) in cadweld traveler CCW

No. 1 were reviewed to determine if they were properly qualified to

perform cadwelds of each splice position, bar size and grade.

The requirements and acceptance criteria for reinforced concrete

construction were obtained from the drawings listed in Table V-2 and

the following specifications and procedures:

S&L Specification K-2938, " Concrete Mix Design," Rev. 3, dated

April 14, 1981

S&L Specification K-2944, " Concrete and Grout Work," Rev. 26,

dated July 13, 1984

Baldwin Associates Project Procedure BAP 3.1.1, " Concrete,"

Rev. 13, dated October 3, 1984

BAP 3.1.5, "Embedments/ Reinforcing Steel /Cadwelding," Rev. 10,

October 3, 1984

b.

Inspection Findings

Two areas were identified by the NRC CAT where the concrete place-

ments did not meet site criteria in the AD wall line at elevation

724'.

Debris and rags were found embedded in the wall.

It was also

identified that the 2-inch shake space between the containment and

the adjacent structures had been violated.

Two areas were identi-

fied by the NRC CAT inspectors where concrete had encroached into

.

'

the 2-inch shake space between the containment and the adjacent

structures.

The licensee reinspected the rest of the shake space

and identified 26 additional locations where the 2-inch shake space

clearance requirements had not been met.

Nonconformance Report

(NCR) 31579 was issued on this deficiency.

l

The six concrete pour travelers were found to meet procedure

requirements and demonstrate proper QC inspection.

V-2

-

In the top steel reinforcement of the concrete base mat on the 200

line and 202 line, one area was identified where the number and

spacing of the rebar were not in accordance with the design drawing,

but were in accordance with the shop drawings approved by S&L.

NCR

31949 was written and the condition was evaluated and accepted by

S&L.

Visual inspection ,equirements before and after the cadwelds were

performed were met.

The 10 cadwelders reviewed for qualification

requirements were found to be properly qualified for cadwelding

the appropriate bar size and grade and splice positions.

Two discrepancies were found in the cadweld traveler packages

reviewed. One discrepancy was a noncompliance with the cadweld

tensile testing requirements in the Final Safety Analysis Report

(FSAR) and specifications.

Appendix B, paragraph B.2.3.4 of the

FSAR states "Sg srate sampling and testing cycles were established

for cadweld oplices in horizontal, vertical, and diagonal bars, for

each bar grade and size, and for each splicing operator." However,

the cadweld records showed that separate sampling and test cycles

were established for cadweld splices in each position, bar size and

grade for each shift (instead of for each cadweld operator).

This discrepancy was previously identified by Baldwin Associates

(BA) in NCR 31282 written on May 18, 1985.

The S&L disposition for

NCR 31282 was to use-as-is because the specification requirements

had been met.

However, the NRC CAT does not consider that the

requirements of Paragraph 4.4.1(a) of the mechanical splice speci-

fication were met.

The same sampling plan is provided in the FSAR.

It appeared that S&L's resolution was based on a general observation

of the records and not a complete review of the records.

Therefore,

the disposition of NCR 31282 is considered inadequate.

The concern of the NRC CAT with this discrepancy is that one or more

operators may have been tested at less than the required frequency.

Since the cadweld tensile test sampling schedule was based on each

shift, rather than individual cadwelders, there could be deviations

from the required testing frequency stated in the FSAR.

The FSAR

requirements in Appendix B, paragraph B.2.3.4 for tensile testing

frequency for each operator states:

Separate sampling and testing cycles were established... for

each splicing operator as follows:

a.

One production splice out of the first ten splices

b.

one production and three sister splices for the next 90

production splices, and

c.

one splice, either production or sister splices for the

next subsequent units of 33 splices.

At least 1/4 of the

tested number of splices tested were production splices.

V-3

The cadweld records do not easily permit a reconstruction of the

testing information to determine if the testing requirements were

met.

However, a tabulation was made of the tensile testing

frequency for production splices of the three cadweld travelers

reviewed by the NRC CAT.

Results of the tabulation are shown in

Table V-3a and V-3b.

Table V-3a shows four operators (I.D. Nos. 6, 16, 20, 30) whose

sampling did not meet the requirements of one production splice out

of the first ten splices.

Table V-3b shows 13 additional operators

(I.D. Nos. 28, 35, 38, 45, 48, 49, 50, 51, 61, 62, 67, 68, 72) whose

sampling did not meet the testing requirements.

The other discrepancy was found in the Cadweld Test Cycle Log.

The

Cadweld Test Cycle Log was to record the sequential order in which

the cadwelds were performed.

However, numerous instances were found

where cadwelds were not in sequential order.

Table V-4 shows

numerous cadweld sequential discrepancies based on the dates

obtained from the cadweld inspection check-off sheets for 17 Cadweld

Test Cycle Log sheets.

The remaining Cadweld Test Cycle Log sheets

contain over 20 other instances of improper ordering of cadweld

production splices.

c.

Conclusion

The general concrete construction quality seems adequate.

QC

documentation in the completed concrete pour travelers appeared

adequate.

Procedures followed by site craft for the single

in process concrete pour work observed by the NRC CAT appeared to be

proper.

The rags found in a completed concrete placement and the 28

locations with concrete in the shake space between the containment

and adjacent structures will require appropriate management atten-

tion.

Records reviewed for cadweld work performed indicated that the

frequency of tensile test sampling for many cadweld operators was

not satisfied.

S&L's corrective action was not adequate.

2.

Structural Steel Installation

a.

Inspection Scon

Installed and QC accepted structural steel were inspected by the NRC

CAT.

A major part of the NRC CAT inspection sample was covered by

the IP0I Program.

Attributes inspected by the NRC CAT were member

size, configuration, and high strength bolted connection configura-

tion.

High strength bolt friction and sliding connections were

tested by using a calibrated torque wrench to determine whether the

bolts were properly installed.

Most of the friction bolt connec-

tions and all of the bolted sliding connections had been inspected

by the IPOI Program.

The samples used in the structural steel verification for correct

member size and configuration are described in Table V-5.

A total of

59 structural steel members and 27 connections were inspected by the

V-4

-

.-

-. _

.

.

_

. _ .

_-

-

_.

_

NRC CAT.

Samples were taken from areas previously covered by IP0I

except for the framing to the Hydraulic Control Unit in Area 3 of

the Containment Building.

Section VII, Design Change Control, of this report discusses

deficiencies identified with the IPOI documentation for structural

steel beams.

Four of the beams refered to in that section with

documentation deficiencies were inspected by the NRC CAT to deter-

mine if the hardware quality had been affected.

This sample was

part of the inspection sample in Table V-5.

The location, size, and number of the three different kinds of high

strength bolts for friction connections that were checked for

installation torque are shown in Table V-6.

A total of 287 bolts

were tested for minimum installation torque.

Test torque values of

IPOI were used for the NRC CAT inspection.

The sample of sliding connections tested is described in Table V-7.

A total of 15 bolts spread over five connections were tested for

maximum installation torque.

The requirements and acceptance criteria for structural steel

installation are included in the drawings listed in Table V-8 and

in the following specifications and procedures:

S&L Specification K-2947, " Furnish Structural Steel," Rev. 3,

dated June 22, 1983

S&L Specification K-2948, " Erect Structural Steel," Rev. 9,

dated March 9, 1984

BAP 3.13, " Structural Steel Erection," Rev. 11, dated October

22, 1984.

b.

Inspection Findings

Detailed findings of the erected structural steel member and con-

nection inspection are provided in Tables V-5, V-6 and V-7.

The

'

comments portion of the tables contain an explanation of whether the

inspection sample had been covered by IPOI.

Of the 59 members reviewed, there was one discrepancy found during

the structural member size and configuration inspection.

Modifica-

tion 1AC for Detail 27-615 on Drawing S27-1458 requires a 7/8-inch

A36 side plate, continuous between the centerlines of Beams 2D and

2E, which had not been installed.

The beam had previously been

inspected and accepted by IPOI.

This seemed to be an isolated case

rather than a program deficiency.

The licensee indicated a complete

reinspection of the beam would be performed, followed by an NCR.

No hardware deficiencies were identified for the sample of four

beams associated with the IPOI documentation discrepancies discussed

in Section VII.B.3.

V-5

.--

_ _ .

_

_ _ _ _ _

Of the 251 friction connection bolts tested by the NRC CAT and

previously by IP0I for minimum installation torque, only 2 bolts

were found to be under-torqued.

Of the 36 fixed connection bolts

tested by the NRC CAT, but not within the inspection sample of IP

OI, seven bolts were found under minimum acceptable installation

torque including one just hand-tight.

Installation torque for the bolts of the sliding connections was

defined as snug-tight.

Procedures provided to the craft to ensure

the bolts were installed in a manner which may prevent the sliding

connections to perform as intended were insufficient.

A sample of

the bolting for two of the five sliding connections checked by the

NRC CAT were found to be over-tight.

S&L was asked to evaluate this

condition. The subsequent response was considered inadequate by the

NRC CAT and requires further evaluation.

The floor grating inside the Containment Building was observed to

not be fastened to the structural steel.

The NRC CAT is concerned

that the grating could become a missile under high energy pipe

break conditions.

The licensee responded that the grating will be

fastened to the structural steel with clips, but that the grating

could still become a missile if subjected to the forces of high

energy break conditions.

This matter was discussed with and will be

referred to the NRR Auxiliary Systems Branch for review.

Another observation by the NRC CAT was that the structural steel

within the Containment Building was coated with inorganic zine which

could generate hydrogen gas during a loss of coolant accident.

The

licensee stated that the amount of zinc in the Containment Building

is being calculated and systems are being sized in consideration of

the hydrogen gas that could be generated.

Therefore, the NRC review

of the calculations and system sizing criteria may be performed at

a later date.

c.

Conclusion

The IPOI Program on the structural steel installation appears to be

satisfactory with two exceptions.

The inadequate implementation of

the IPOI Program criteria resulted in not including the Hydraulic

Control Unit (HCU) framing in the scope of the IP0I Program.

Furthermore, the installed torque of some of the high strength bolts

of the friction connections of the HCU structural steel not included

in the IPOI Program was found inadequate.

The evaluation by S&L of

the identified condition of the sliding connections did not address

the NRC CAT finding and the technical concern of additional loads

due to over-tightened bolts.

3.

Structural Fill

a.

Inspection Scope

The NRC CAT inspectors reviewed daily earthwork logs between June 3,

1976 and June 13, 1976 for the safety-related Class B structural

fill for the main power block structures.

Also, the following NCRs

were reviewed:

NCR S-S-S-0006, NCR 174, and NCR 1650.

V-6

. _ _ _

-.

-_

_.

The requirements and acceptance criteria were included in the following

documents:

S&L Specification K-2942, " Earthwork," Amendment 9, dated

July 13, 1984

U.S. Testing Company Procedure QCP-10 " Testing Procedures for

Earthwork," Rev. O, dated February 9, 1977 and Rev. 9, dated

January 2, 1985

Fruin-Colnon " Compaction Test Section Report," dated April 1976.

b.

Inspection Findings

The daily earthwork logs were reviewed by the NRC CAT inspectors.

A discrepancy was identified with the lift thickness requirements in

the structural fill records.

Of the 15 compaction placement records

reviewed, 7 did not record the lift thickness used in placing the

fill.

Section 2.5.4.5.1.5 of the FSAR states " Type B material used

as structural fill to support foundation loads was placed in near

horizontal lifts not exceeding 12 inches in loose thickness."

Further, the applicable compaction test report also recommends that

the fill be placed in 12 inch lifts.

The NRC CAT review of the

structural fill records do not indicate that the FSAR commitment was

satisfied.

Approximately one-half of the records reviewed did not

indicate any lift thickness measurement.

In other records the lift

thickness was listed as 12 to 14 inches.

The dispositions for the three NCRs were questioned by the NRC CAT.

Nuclear density test data was used to accept fill placements where

the sand cone test data had failed.

This was contrary to the

project specification. Also, structural fill was placed over areas

that had not been QC accepted.

Some of these areas were not

accepted for as long as two years; thus indicating untimely correc-

tive action.

The following is a brief review of the three NCRs referenced above.

NCR S-5-5-0006 was written by BA on June 11, 1976 to cover

apparent errors in the correlation factor between sand cone

tests and nuclear density tests for covered fills placed

between May 29,1976 and June 10, 1976.

As part of S&L's resolution of this NCR, S&L found that the

perceived reduction in the correlation' factor had been cal-

culated incorrectly and that the 73 test locations in question

were in accordance with the design requirements.

The S&L

disposition also indicated that all soil tests reports in

question were checked by BA QC and spot checked by S&L.

This

check supposedly included all sand cone test data (approx-

imately 367) up to May 24, 1976, correlation factors and all

nuclear density test data.

V-7

l

NCR 174 was written by BA on January 21, 1977 to cover failed

sand cone tests between May 17, 1976 and August 19, 1976 and

represented 45 zones (100x100x1 feet) in the structural fill.

These areas of structural fill were accepted based on the

results of the nuclear density tests.

However, three of the

failed sand cone tests were performed prior to May 24, 1976 and

should have been evaluated as part of NCR S-S-S-0006.

Sand

cone test SC 320 performed on May 17,1976 was voided because

the results were " unreliable." A second sand cone test, SC 364

performed on May 24, 1976, had a relative density of 65.3

percent.

This was 20 percent below the acceptance criteria.

On November 1, 1978 NCR 1650 was issued and stated that 16

zones placed between April 29, 1976 and May 17, 1976 did not

meet the specification requirements for frequency of testing

before additional fill was placed.

This deficiency should have

been identified by the prior review of all soil test reports

accomplished under NCR S-5-5-0006 and NCR 174.

The 16 zones were accepted by S&L on the following basis:

Deviation in portions of the documentation does not

necessarily dictate nonconforming physical properties in the

fill.

Zones in question were constructed with procedures similar to

procedures used to construct the rest of the fill.

Average density of the fill is greater than that required by

specification.

Small isolated confined pockets low in the fill will not

influence the overall performance of the fill.

The daily earthwork logs and the basis for the disposition of the

NCRs reviewed by the NRC CAT inspectors are not considered adequate

for the following reasons:

The applicable specifications and procedures were changed four

times during the placement of the fill.

These revisions may

not have been sufficiently addressed by S&L's resolution of the

NCRs.

Some of the records did not show lift thicknesses used.

In some

cases incorrect lift thicknesses were used.

The evaluation performed for the NCRs did not adequately

address the discrepancies found by the NRC CAT with the

apparent omissions in data for evaluations performed of soil

test data.

V-8

_.

-

- .

-_

. .

. . . _

t

The acceptance of failed sand cone test data based on nuclear

density test data was inconsistent with the specifications.

The intent was to have the less reliable nuclear density test

data supported with direct, sound sand cone test data and not

,

vice versa.

Based on our limited review, there was no indication of the

size of unacceptable fill pockets.

c.

Conclusion

The licensee's program of corrective actions did not result in a

timely, comprehensive evaluation and appropriate disposition of

known deficiencies in the testing and placement of structural fill

for the period reviewed by the NRC CAT.

The deficiencies found in

the lift thickness of structural fill were also not identified or

addressed by the corrective action taken.

Therefore, current

corrective action to ensure the adequacy of the structural fill

requires additional management attention.

4.

Diesel Generator Exhaust Silencer Supports

a.

Inspection Scope

Installed torque values were checked for the sliding connections

,

'

of the support pedestals of the diesel generator exhaust silencers.

Installation procedures required the nuts to be hand tight.

b.

Inspection Findings

From the testing of the exhaust silencer support sliding connection

bolts, only one of the bolts were hand tight.

Installed torque

values found by the NRC CAT are shown in Table V-9.

c.

Conclusion

An evaluation should be made concerning the over-tightened condition

of the bolts.

These bolts should not prevent the exhaust silencers

from sliding as designed for thermal growth.

!

V-9

- - - - -

_

. - _ . _ _ _- - - _ _

.-

._.

- _ - _ -

. _ - _

__

-- _ _

- --

- _

_ _

._. -- - - - _ _ _ .

VI.

MATERIAL TRACEABILITY AND CONTROL

A.

Objective

a

The objective of this portion of the inspection was to examine trace-

ability and control of material and equipment and to determine the

'

adequacy of the licensee's program relative to these activities.

B.

Discussion

The approach to perform the inspection was to identify and select

samples of various types of installed material and equipment for

examination.

Some samples of installed material that were not

!

accessible, such as rebar, were selected from records.

The samples

also included uninstalled material that had been QC inspected, such as

protective coating materials, located in warehouses or shops.

A total

,

of 293 samples were examined.

The following Baldwin Associates Project Procedures (BAP) provided the

,

'

acceptance criteria for this inspection:

BAP 1.5, " Material Identification," Rev. 11, dated December 18,

1984; Change D, dated May 23, 1985

BAP 2.3, " Receiving and Issuance," Rev. 12, dated July 26,

1984; Change F, dated April 25, 1985

BAP 2.3.2, " Transfer of Material IP to BA," Rev. O, dated

April 19, 1985

  • BAP 2.8, " Material Upgrading," Rev. 8, dated October 26, 1984;

Change A, dated March 28, 1985

  • BAP 2.19, " Welding Filler Material Procurement, Storage and

Control," Rev. 3, dated June 19, 1984; Change B, dated December

18, 1984; Change C, dated May 31, 1985.

An inspection of installed material and equipment was conducted in the

plant to select and verify markings on various samples such as equipment

(mechanical, electrical and instrumentation), pipe, supports / restraints

'

and weld joints.

Other samples were inspected in warehouses or shops.

Table VI-1, Summary of Samples, indicates the types and quantities of

,

materials examined.

Table VI-2, Weld Filler Material Compliance,

contains a list of the 17 weld filler material samples selected.

1.

Material Traceability and Control

a.

Inspection Scope

A total of 293 samples were selected and examined for traceability

to applicable drawings, specification, procurement, records,

j

certified material test reports, certificates of compliance, heat

l

numbers or other required documentation.

VI-1

4

--~..-----w-

- --,--- ,. . .,

,~,

-,,-----,--,,---.-,----,--,-r-

. - -

, - - - - ,

, , - , .

b.

Inspection Findings

In general, it was found that the traceability and control of

material at the site was satisfactory, with the exception of a lack

of traceability for certain fastener materials. The following

observations were made by the NRC Construction Appraisal Team (CAT)

inspector:

(1) Manual and computerized records were used to control the

identification and status of material and equipment at the

site.

(2) Seventeen samples of weld filler materials listed in Table

VI-2 examined for traceability and compliance with specifi-

cations and codes were found to be acceptable.

Twenty-three

weld filler material holding ovens ir, two issue stations were

examined and found to meet requirements for temperature control

and the thermometer calibration records. The holding tempera-

ture of 18 loaded portable ovens in the issue stations was

measured using a pyrometer, and were found to be within the

established temperature range. Approximately 100 portable

ovens in use were examined, and only two were found to be not

operating satisfactorily. The heater indicator lights on these

two ovens were not lit, and rods were warm to the touch but

lower than 125 F, the specified temperature.

The light of one

unit lit when the power plug was moved in the outlet.

The

other oven was checked at the issue station and found to be

operating properly.

The problem was identified as a loss

of power at the work station.

(3)

Indeterminate American Society for Testing and Materials

(ASTM) A-36 steel plate material, which had been reported to

the NRC as a potential 10 CFR 50.55(e) deficiency (55-84-18),

is being stored in a segregated outside storage area.

The

area is roped off and clearly marked to show that this material

is on HOLD.

(4) The inspector observed subdividing of stock materials by

warehouse personnel.

Prior to making the cut in steel plate

and structural steel, the identification marking was trans-

ferred to each piece cut from the stock.

l

(5) Material and equipment listed in Table VI-l were examined for

!

traceability and control. Most items examined were found to

have the required material traceability; however, some

deficiencies were found regarding the traceability and control

for large motor mounting bolts and other fastener materials as

follows:

Mounting bolts used in the transition piece between certain

large pump-motor units as listed below are not traceable

and do not have required washers. Documentation identifies

that American Society of Mechanical Engineers (ASME)

SA-193, Grade 87 bolts are to be used between the transi-

VI-2

-_.

__- __

. _ _ _

. _ .

_ _ _ _

._

-

- -

-.

tion piece and the pumps. Documentation does not identify

the grade of bolts to be used between the transition piece

and the motors. ASME SA-193, Grade B7 bolts were installed

between the transition piece and the pumps.

Society of

Automotive Engineers (SAE), Grade 5 bolts were installed

between the transition piece and the motors.

The supplier,

General Electric Company, stated in a telephone conversa-

tion to the licensee (to be followed up by a letter) that

SAE, Grade 5 bolts were adequate for this application.

Additional investigation is required to confirm the proper

bolts required for this application. However, no Noncon-

forming Material Report (NCMR) was issued by the licensee

during the NRC CAT inspection regarding the use and dis-

position of SAE, Grade 5 bolts.

The pump motcr units

inspected and the NCMRs issued for the omission of washers

only, are as follows:

Low Pressure Core Spray Pump:

lE21-C001 - NCMR 2-0330

High Pressure Core Spray Pump:

lE22-C001 - NCMR 2-0331

Residual Heat Removal Pump:

lE12-C002

Bolts installed to hold the Fuel Pool Cooling Pump motors

1FC02PA and 1FCO2PB to the skids are unmarked or incon-

sistently marked and of indeterminate material. ASTM A325

bolts are required.

As a result of this NRC CAT finding,

the licensee issued NCMR 02-0340 to initiate corrective

action.

Bolts installed to hold the Reactor Core Isolation Cooling

Pump 1E51-C001 to the skid are marked SAE, Grade 5 where

ASME SA-193, Grade B7 is specified.

The turbine (lE51-C002)

hold down bolts are unmarked and indeterminate.

The

coupling end requires American Iron and Steel Institute

(AISI) GR 4037-4140, and the governor end requires ASTM

A108-Gil70. As a result of these NRC CAT findings, the

licensee issuea .NCMR 02-0347 to initiate corrective action.

Nuts on clamp bolts at the lower end of a number of spring

can hangers in the recirculation piping are not properly

traceable. As a result of this NRC CAT finding the

licensee issued Nonconformance Report (NCR) 71314 to

initiate ccrrective action.

The load pin on hanger lLP02004V is an ASME Section III,

Class 2 pin used in a Class 1 application. As a result

of this NRC CAT finding the licensee issued NCR 32360 to

initiate corrective action.

Mounting bolts for HVAC control panel cabinets were

unmarked and of indeterminate material. Refer to Section

II.B.3.b(7), of this report, for details.

(6) ASME piping, tubing and welded joints inspected were marked

with the necessary traceability markings, except for a

VI-3

j

_

1/2 x 3/8 inch pipe-to-tube weld adapter in an instrument

tubing run.

The travelers for installation of this adapter

identified an incorrect Receiving Inspection Report (RIR 886)

which should have been RIR 6886.

The licensee issued NCR

32336 to correct documentation associated with this adapter.

(7) While inspecting the Control Rod Drive Mechanism, the inspector

noted that direction control valve No. 123 had an arc strike

which burned a hole through the solenoid housing.

The licensee

issued NCMR 2-0246 to initiate the necessary corrective action.

(8) Unmarked bolting materials, without manufacturer's identifica-

tion, for non-ASME applications are purchased safety, commercial

grade, with certificates of conformance.

This material and

documentation are receipt inspected by Illinois Power Company's

Quality Control before releasing for construction.

c.

Conclusions

In general, except for certain fastener hardware, the material

traceability and control program was considered to be satisfactory.

Lack of traceability was found for fastener materials, particularly

for some vendor supplied pump-motor and pump-turbine assemblies

mounted on skids.

Also, deficiencies were found in traceability for

fasteners on certain hangers and HVAC control panel cabinets.

2

VI-4

- - . - ___

. _ - _ . _ - .

_

__.-.

-

_._

_ _ - ,---

-

_ - - _ -

_

. -_

TABLE VI-1

SUMMARY OF SAMPLES

Item

No. of Samples *

Equipment

14

Pipe

22 (L)

Tubing (Weld Joints)

19 (L)

Steel-Structural

18 (L)

Steel-Rebar

3 (L)

Steel-Tube

19 (L)

Hangers / Supports / Restraints

4 (L)

Embedments

16

Valves

7

Mounting Bolts & Nuts

40

Weld Filler Material

17 (L)

Weld Joints

17

Electrical Cable (Reels)

24 (L)

Fasteners (Sets)

36

Coatings

9 (L)

Unistrut

5 (L)

Raceway

6 (L)

Shims

1 (L)

TOTAL

293

  • (L) = Lots

VI-5

.__g

_

.a

..__m

a__

-

_a

2:v+-

- - .

a

m--._.-_u

1

_.

TABLE VI-2

WELD FILLER MATERIAL COMPLIANCE

Material

Heat No./

Compliance

Designation

Material ID

Comments

E7052

065094

Acceptable

E70S2

32470

Acceptable

,

E7052

065162/065163

Acceptable

E308-16 3/32

616385

Acceptable

E308-16 5/32

6MSB Mix 12

Acceptable

E308-16 3/32

49986

Acceptable

E308-16 1/8

0A0369

Acceptable

I

E309-16 3/32

0A10742

Acceptable

E316L-16 3/32

01353

Acceptable

E316L-16 1/8

02754

Acceptable

i

E502-16 1/8

432LO491

Acceptable

E502-16 3/32

421P4461

Acceptable

E7018XLM 3/32

402A9061

Acceptable

E7018XLM 1/8

22340

Acceptable

E7018 1/8

40461

Acceptable

.

E7018 3/32

LOT 28112

Acceptable

'

E7018 3/32

28296

Acceptable

!

i

VI-6

i

_.

..-,- - .

.- .

-.

-__ _

. . _ _ , - _

. _ _ . . _ . , _ - - - - _ _ _ - - _ _

. .

.. -.-

VII.

DESIGN CHANGE CONTROL

A.

Objective

The primary objective of the appraisal of design change control was to

determine whether the design and other related documents and activities

which defined the installation and inspection of the as-built configu-

ration, were controlled in accordance with regulatory requirements,

Safety Analysis Report commitments and approved licensee, engineer, con-

structor and vendor procedures.

B.

Discussion

The governing regulatory requirements for this appraisal are detailed in

10 CFR 50, Appendix B, Criterion III, " Design Control," and Criterion

VI, " Document Control." These requirements are elaborated in Regulatory

Guide (RG) 1.64, " Quality Assurance Requirements for the Design of

Nuclear Power Plants," Rev. 2, dated June 1976, and American National

Standards Institute (ANSI) Standard N45.2.11-1974, " Quality Assurance

Requirements for the Design of Nuclear Power Plants." The licensee's

commitment to comply with RG 1.64 is stated in Chapter 17 of the Clinton

Power Station (CPS) Nuclear Power Plant Final Safety Analysis Report

(FSAR).

In the area of design charge control, the NRC Construction Appraisal

Team (CAT) inspectors reviewed controlled documents which defined the

installation and inspection of completed structures and hardware, and

which defined or referenced design changes to in process or completed

structures and hardware.

The NRC CAT inspection also reviewed the

Baldwin Associates (BA) installation and inspection program and the

Illinois Power (IP) Overinspection program.

For each of these areas,

NRC CAT inspectors conducted interviews with responsible personnel,

reviewed drawings, procedures, specifications, change documents and

reports, and reviewed installed and inspected structures and hardware.

IP provided responses for the majority of the NRC CAT findings

documented in this section of the report. Where the IP response was not

considered sufficient to resolve the NRC CAT finding, this is speci-

fically noted.

1.

Control of Design Documents

a.

Inspection Scope

The following documents provide the basic acceptance criteria for the

inspection:

Sargent & Lundy Engineers (S&L) General Quality Assurance (QA)

Procedure GQ-3.07, "Sargent & Lundy Drawings," Rev. 6, dated October

21, 1981

S&L General QA Procedure GQ-3.12, " Project Status Reports," Rev. 4,

dated August 24, 1984

VII-1

. _-__

S&L General Quality Assurance Program Topical Report SL-TR-1A,

Rev. 6, dated April 22, 1983

BA Quality Assurance Manual, Rev. 15, dated April 5, 1985

I

BA Project Procedure BAP 2.0, " Document Control," Rev. 13,

Change B, dated April 5, 1985

BAP 2.0.1, " Instructions for Maintaining Project Procedures /

Specifications / Drawings," Rev. 2, Change B, dated January 31,

1985

IP Nuclear Power Construction Quality Assurance Manual, Rev.

12, dated March 12, 1985

IP Nuclear Power ASME Quality Assurance Manual, Rev. 5, dated

March 5, 1985

IP Records Management System Standards No. 2.05, " Standard

for the Maintenance of Distributed Documents," Rev. 1, dated

March 7, 1985

IP Nuclear Planning and Support Department (NP&S) Procedure No.

2.51, " Document Control Procedure," Rev. O, dated June 11,

1985.

NRC CAT inspectors interviewed engineering and construction personnel

engaged in the distribution and control of S&L design drawings and

specifications, BA design installation drawings, BA installation

and inspection procedures, and vendor drawings.

b.

Inspection Findings

The primary intent of this review was to assess the adequacy of the

design document control program implemented by the constructor,

Baldwin Associates, for ensuring that correct S&L or BA design

documents were utilized for installation.

This review was conducted

at the BA Document Control Center (DCC), the BA resident engineering

(RE) offices in the civil and structural, piping and pipe support,

and electrical disciplines, and at the BA Field Document Center

(FDC).

(1) The DCC distributes procedures, specifications, design drawings

and associated change documents which are controlled in

accordance with the BA QA Manual, BAP 2.0, " Document Control,"

and BAP 2.0.1, " Instructions for Maintaining Project Proce-

dures/ Specifications / Drawings."

Section 5.3 of BAP 2.0.1 requires that recipients of amendments

and addenda to specifications check all transM tted documents

for accuracy against the DCC transmittal, update the speci-

fication in accordance with the transmittal instructions,

replace superseded pages, verify that all change documents

identified on the transmittal as outstanding are filed in front

VII-2

- -

- -

,

-

--

-

- --

.

-

.

.

-

. - - - -

- - _ - _ _ .-

of the specification, and sign, date and return a copy of the

I

transmittal to the DCC.

Section 5.4 of BAP 2.0.1 requires that recipients of change

documents issued against specifications check the documents

for accuracy against the DCC transmittal, revise the speci-

.

fication in accordance with transmittal instructions, remove

,

affected specification sheets or forms and destroy or return to

!

DCC as directed, file the change documents in the front of the

'

specification, and sign, date and return a copy of the trans-

mittal to the DCC.

Section 5.5 of BAP 2.0.1 requires that recipients of change

documents [ Field Change Requests (FCRs), Nonconformance Reports

(NCRs), Engineering Change Notices (ECNs), and Field Engi-

neering Change Notice (FECNs)] issued against a drawing, check

the documents for accuracy against the DCC transmittal, update

the change documents block to reflect the change document

numbers, maintain a file of open change documents, and sign,

-

1

date and return a copy of the transmittal to the DCC.

Section 5.7 of BAP 2.0.1 requires that recipients of revisions

to procedures check the documents for accuracy against the

DCC transmittal, remove superseded forms or procedures and

insert new or revised procedures or forms in accordance with

transmittal instructions, and sign, date and return a copy of

the transmittal to the DCC.

'

,

I

While BAP 2.0.1 controls the transmittal, distribution and

'

receipt of changes to specifications, procedures and drawings,

the overall status of all change documents outstanding against

'

a given specification or drawing is provided by the Document

Management System (DMS), a computer data base which is updated

by DCC as required by Section 5.1.4 of BAP 2.0.

Sections 6.4.2 and 6.4.3 of the BA QA Manual mandate a computer

data base which maintains accountability and current status of

all documents received or issued at the site including design,

fabrication and installation drawings, design specifications,

change documents and work packages and travelers.

There are

i

currently two computer data bases in use at the CPS which

i

address this requirement:

DMS, which lists active change

documents issued at the site against the corresponding speci-

fications and design drawings, and Construction Management

Information (CMI), which lists all design change documents and

the affected design drawings and specifications.

A Traveler

Tracking System (TTS), which is a subset of CMI, lists the

status and location of traveler documents, and can optionally

reference the associated design and change documents.

IP is

now in the process of developing a computer data base system to

'

l

provide for better tracking and integration of data in these

'

computer data basis systems.

4

1

]

VII-3

- - - -

(2) Tables VII-1 and VII-2 list the drawings, specifications and

procedures selected for review, as well as the BA locations

where copies of these controlled documents were accessed.

For

this documentation sample, the following information was

accessed:

the S&L transmittal letters, the DCC transmittal

documents, the DMS computer data base lists of the active

change documents posted against each drawing and specification,

and the index to the latest revisions of the BA installation

and inspection procedures.

Controlled copies of the drawings, specifications and proce-

dures listed in Tables VII-1 and VII-2 were reviewed in the RE

offices and the FDC to check that specifications were properly

amended and that no superseded materials were present, and that

the change documents posted with the specifications were

consistent with the DMS computer data base listings of active

change documents for those specifications.

Drawings were

checked to confirm that the latest revision of the drawings

were with the stick file and that the active change documents

listed in the change documents blocks by authorized BA

personnel were consistent with the change documents listed in

I

the DMS computer data base.

The BA installation and inspection

procedures were checked to confirm that the latest revisions to

,

the procedures were posted, and that no superseded materials

were present.

The NRC CAT inspectors identified three categories of defi-

ciencies during the course of this review:

the presence of

superseded or voided portions of specifications and procedures,

or inconsistencies between procedures; discrepancies between

the active change documents listed in the DMS computer data

base for a given specification and the change document

included with that specification; and discrepancies between the

active change documents listed in the OMS computer data base

for a given drawing and the change documents included on the

change documents block.

(3) The NRC CAT inspectors documented the following discrepancies

relative to superseded or voided portions of specifications and

procedures, inconsistencies between procedures, and of one

instance of drawing illegibility:

A superseded copy (dated March 4, 1985) of the S&L Document

Index System Foreign Document Report was on file at BA

civil / structural (C/S) RE.

This document is distributed by

BA DCC as received on site from S&L.

Distribution of this

!

document is not controlled in accordance with BAP 2.0 and

its presence without stamping as an uncontrolled item could

result in the RE's inappropriate use in preparation of work

packages.

The BA C/S RE-12 controlled copy of the BA Project Proce-

j

dures Manual contained superseded copies of BAP 1.1 and BAP

t

2. 0.1.

BAP 2.11 contained an Attachment A that was not

l

VII-4

.

formally listed as an attachment in the procedure.

BAP

2.41 was incorrectly filed under tab number 2.40, but BAP

2.40 was not on the distribution list for that controlled

copy.

A superseded copy of BAP 3.1.8 was incorrectly

!

filed under tab number 3.1.4; however, the current revision

of BAP 3.1.8 was correctly filed.

FDC files CL-series drawings on aperture cards.

The five

CL-series drawings listed in Table VII-2 were requested for

review.

The aperture caros identified the correct revision

numbers for the drawings, but were stamped "0RIGINAL DRWG.

NOT LEGIBLE FOR MICROFILM." Blowbacks of the cards con-

firmed drawing illegibility.

An examination of the

full-size sepias at DCC indicated that one of the five

sepias could not be legibly reproduced.

Whether the

illegible sepia was used in producing drawings included

with a traveler needs to be verified and the affect of its

use on construction determined.

Amendment 5 to the FDC copy of S&L specification K-2947

and Amendment 11 to the FDC copy of S&L specification

K-2948 had not been incorporated into the specifications.

Voided pages were not removed.

The BA Traveler Preparation Review Group (TPRG) copy V-530

of S&L specification K-2882 contained a superseded copy of

seven page Attachment 322.

BAP 2.1.6 was filed with the TPRG copy of the BA Procedures

Manual, although shown deleted in the table of contents.

BA QA Manual, subsection 6.5.3.1, requires that design

change documents be " posted and distributed by the Document

Control Center to the affected drawings or work controlling

documents as noted on the design change document." BAP

2.0.1, subsection 5.5, requires the recipient of a change

document to maintain a file of open change documents.

However, BAP 2.0, subsection 5.1.3 was revised on April 5,

1985 to note that stamp affixed change documents will no

longer be distributed directly to the holders of the

affected documents.

This revision of BAP 2.0 is incon-

sistant with the current requirement of the BA QA Manual.

The interim IP response provided during the NRC CAT inspec-

tion does not adequately address this finding.

,

(4) The following discrepancies were documented between the active

change documents posted in the DMS data base for a given

specification and the change documents posted with that

specification.

I

FCR 35687 was not filed with the FDC copy of S&L speci-

l

fication K-2947, but was listed in DMS.

IP indicated

'

that FCR 35687 is stamp affixed.

IP will correct DMS to

list this change document as stamp-affixed.

VII-5

"

The following change documents were listed in DMS but were

not filed with the TPRG, V-530 copy of S&L specification

K-2882:

ECNs 4511, 4822, 4832, 4853 and 5234; FCRs 1847,

26283, 26754, 28060, 30783 and 37478, and NCR 29249.

IP indicated that the DMS listing of the ECNs is correct,

and that copies will be posted with the specification; FCR

1847 is a stamp-affixed change document.

IP will correct

DMS to list FCR 1847 as stamp-affixed.

DMS correctly lists

the remaining FCRs and the NCR as outstanding against the

specification, and copies of these change documents will be

posted in the specification.

The following change documents were filed with the TPRG,

V-530 copy of S&L specification K-2882, but were not listed

in DMS:

ECHs 3634, 3929, 3954, 3960, 3996, 4017, 4061,

4265, 4281 and 4291; FCRs 17682, 19020, 20351, 20605,

20667, 20687, 20742, 21243, 21404, 21770, 21899, 22227,

22578, 22607, 22666, 22677, 22678, 22867, 23129, 23193,

23360, 23640, 24317, 24407, 24559, 24654, 24682, 24655,

24940, 25431, 28071, 30185, 30328, 31502 and 36345; FCR

24416 was filed with the specification, and is not

stanp-3ffixed, but is listed in DMS as a stamp-affixed

change document.

IP indicated that the ECNs and FCRs

listed above had all been superseded or incorporated, and

have been removed from the specification.

IP will

correct DMS to list FCR 24416 as not stamp-affixed.

The following change documents were listed in DMS but were

not filed with the TfRG, V-460, (P/DRFT) copy of S&L

specification K-2882:

ECNs 4832, 4853, 4858, and 4943;

FCRs 1847 and 34643, and NCR 29249.

IP indicated that DMS

correctly lists the ECNs as active against the specifica-

tion, and copies of these change documents will be included

with the specification.

IP will correct DMS to list FCR

1847 as a stamp-affixed change document.

IP indicated

that DMS correctly lists FCR 34643 and NCR 29249 as active

against the specification, and copies of these change

documents will be posted with the specification.

The following change documents were filed with the TPRG,

V-460 (P/DRFT) copy of S&L specification K-2882, but were

not listed in DMS:

ECNs 4380, 4469 and 4895; FCRs 22867,

24317, 28071, 30328 and 36345; FECNs 6639, 7529 # (stamp-

affixed) and 9478.

FCR 24416 which was filed with the

specification and was not stamp-affixed, was listed as

stamp-affixed in DMS.

IP indicated that the ECNs, FCRs

and FECNs listed above were all superseded change docu-

ments, and will be removed from the specification.

IP will

correct DMS to list FCR 24416 as not stamp-affixed.

The following change documents were listed in DMS, but

were not filed with the FDC, V-300 (FDC/R) copy of S&L

specification K-2882:

FCRs 1847, 6480 and 22962, and FECN

8778.

FECN 6639 and FCR 1874 were filed with the speci-

VII-6

.

- -

-

fication but were not listed in DMS.

IP will correct DMS

to list FCR 1847 as a stamp-affixed change document.

IP

indicated that DMS correctly lists FCRs 6480 and 22962, and

FECN 8778 as outstanding against the specification, and

copies of these change documents will be posted with the

specification; FECN 6639 is a superseded change document;

and FCR 1874 is incorrectly posted with the specification.

Due to the results of the review of TPGR, V-460 and TPGR,

V-530 copies of specification K-2882, a followup review of

a third copy of the five controlled copies of this specifi-

cation was performed.

A new DMS printout was accessed and the 104 active design

change documents listed (all nonstamp-affixed) were

checked against the change documents filed with the TPRG,

V-460, (D-6) copy of specification K-2882.

All change docu-

ments were on file, with one exception:

NCR-0114 (one of

seven active NCRs).

Approximately 200 pages associated with

Amendment 11 to the specification were also audited, using

the S&L transmittal listing the pages to be voided or

inserted.

There were no deficiencies identified.

IP's response to NRC CAT findings for the initial two

copies (V-460 and V-530) of specification K-2882 reviewed

noted that these copies have been permanently returned to

Document Control and the third copy (06/V-460) will now be

used as the sole reference of the Piping Department.

Further, the licensee indicated that a full time Document

Control clerk has been assigned the responsibility for

maintaining the controlled documents of the Piping Depart-

ment.

The following change documents were listed in DMS but were

not filed with the TPRG, V-460, (D-6) copy of S&L speci-

fication K-2884:

ECNs 4683; FCRs 29144 and 32822, and NCR

70021.

FCR 24317 was filed with the specification, but was

not listed in DMS.

IP indicated that DMS correctly lists

the ECNs, FCRs and the NCR as outstanding against the

specification, and copies of these change documents will be

posted with the specification; FCR 24317 is a superseded

change document and will be removed from the specification.

FCRs 27508 and 27545 were listed in DMS but were not filed

with the FDC copy of S&L specification K-2999.

NCR 51358

was listed in DMS but was not filed with the specification.

FCR 7113 had been removed from the file of change documents

posted with the specification.

IP did not provide an

interim response during the NRC CAT inspection.

FECN 5081 was filed with the V-465, E/McGUIRE copy of S&L

specification K-2999, but was not listed in DMS.

IP did

not provide an interim response during the NRC CAT

inspection.

VII-7

-

-

.

.

_ -_-____ - ___ - __-___-__-_

.

.-

(5) The following discrepancies were documented between the active

change documents posted in the DMS data base for a given

drawing, the change documents posted with the drawing, and the

change documents listed on the change documents block:

FCR 32933 is listed on the change documents blocks of the

C/S RE copies of BA drawing CL1-27-S-136 and S&L drawing

S27-1001-03B, but is not listed in DMS.

IP indicated that

FCR 32933 was superseded by FCR 37573 and removed from DMS

on May 22, 1985.

The transmittal receipt returned to

DCC is dated May 24, 1985.

The change documents blocks

were therefore not updated in a timely manner.

FCR 35968 is listed on the change documents block of the

C/S RE copy of S&L drawing S27-1003-03A, but is not listed

in DMS.

IP indicated that FCR 35968 was superseded by FCR

37971 and was removed from DMS on May 25, 1985.

The

transmittal receipt returned to BA DCC is dated May 28,

1985.

The change documents block was therefore not updated

in a timely manner.

NCR 29699 is listed on the change documents block of the

C/S RE copy of S&L drawing S28-1002-02A.

DMS lists NCR

29699 as stamp-affixed.

IP indicated that DMS correctly

lists NCR 29699 as stamp-affixed.

The change document

should not be posted on the change documents block.

FCR 25139 is not filed with the FDC copy of S&L drawing

S29-1422, but is listed in DMS.

IP indicated that:

DMS

correctly lists FCR 25139 as outstanding against the

drawing, and that a copy of the change document will be

posted with the drawing, the FCR is incorporated in both

travelers (53369 and S3370), and there is no impact on

hardware.

FCR 32686 is not filed with the FDC copy of S&L drawing

M09-1001N, but is listed in DMS.

IP did not provide an

interim response for FCR 32686 during the NRC CAT inspec-

tion.

ECN 3332 and NCR 5351 R/3 were listed in DMS but were not

t

listed on the change documents block of the BA Start-Up

Field (SU-F) office copies of S&L drawings M-1SX01017R,

sheets 1 and 2.

It appears that ECN 3332 has already been

incorporated into the drawings.

IP indicated that ECN 3332

should not be outstanding against the drawing, and DMS will

be corrected.

IP did not provide an interm response on NCR

5351 R/3.

FCR 27389 is listed in DMS but was not listed on the

change documents block of the BA SU-F copy of S&L drawing

M-1SX01048X.

IP indicated that DMS correctly lists FCR

27389 as outstanding against the drawing.

The transmittal

receipt returned to BA DCC is dated August 29, 1984.

The

change documents block was therefore not properly updated.

VII-8

____________

-

ECN 3332 is listed in DMS but was not listed on the change

documents block of the SU-F copy of S&L drawings M-2SX01028R,

sheets 1 and 2.

It appears that ECN 3332 has already been

incorporated into the drawings.

IP indicated that ECN 332

should not be outstanding against the drawing, and DMS will

be corrected.

(6) NRC CAT inspectors reviewed the IP audit program to determine

whether the discrepancies identified in the construction design

change control area had previously been addressed by IP audit

personnel.

Sections 18 of the IP Nuclear Power American Society of

Mechanical Engineers (ASME) QA manual and the IP Nuclear Power

Construction QA manual define the requirements for a planned

system of periodic audits to verify compliance with the quality

assurance program at CPS.

The IP audit program is also discussed on page IV-30 of IP

report, Results of Quality Programs for Construction of Clinton

Power Station, with Appendices, NRC Docket No. 50-461, dated

February 1985.

Appendix B of that report summarizes each of

the IP QA audits of the BA and IP organizations that were

scheduled and performed for the period 1982-1984.

Table VII-3 lists the sample of IP audits of activities

reviewed by the NRC CAT inspectors.

The activities reviewed by

IP, as well as audit findings, indicate that a number of the

NRC CAT inspection design document control findings in this

report were similar to those previously identified by IP.

For

j

example, IP audit report Q31-83-8, dated July 28, 1983, audit

finding PD-1, noted that BA procedures did not describe the

activities associated with the use and updating of the DMS,

CMI or Aquarius (a historical file) computer programs.

IP

audit personnel also documented discrepancies between these

computer programs, and documented additional discrepancies when

these computer programs were compared to the specific design

documents and the Document Review and Record cards.

This audit

finding was closed by IP on May 23, 1985.

In another example,

IP audit report Q31-85-02, dated April 4, 1985, audit finding

10-1 noted seven procedure updating discrepancies in nine

copies of BAP QC piping and mechanical field office manuals.

,

Therefore, IP has implemented an audit program to verify

compliance with the design document control provisions of the

quality assurance program at CPS.

However, based on NRC CAT

findings, IP audit program corrective actions were not

effective since the acti^n -taken did not provide for the

prevention of the excest.ve deficiencies identified by the NRC

CAT.

VII-9

--

_ _ _ _

_ _ - _ ..

c.

Conclusions

Design document control is generally acceptable for the overall

scope of items sampled with the exception of the high rate of

discrepancies identified in certain areas.

These included the

updating of procedures for the one sampled copy of a project pro-

cedures manual, and the discrepancies between the active change

documents listed in the DMS computer data bases against two con-

trolled copies of piping design specification K-2882 and the change

documents physically posted with each copy of the specification.

In

addition, examples of other discrepancies were identified such as:

the timeliness of updating change document blocks or design change

documents to be listed in DMS, the presence of an illegible sepia

drawing at DCC, and the inconsistency of the revision of BAP 2.0

with the BA QA Manual.

The examples of discrepancies identified by the NRC CAT - as cur-

rently present in the controlled project procedures and in the

listing of design change documents for controlled specifications,

drawings and their DMS computer data bases - are similar to the

deficiencies previously identified in those areas by IP QA audits

and, in part, by NRC Region III and Resident inspectors.

Therefore,

the effectiveness of IP corrective action was apparently inadequate

.

IP interim responses to NRC CAT findings in this area generally

indicated that the causes of the individual discrepancies in design

change or procedure document control will be determined and that

corrective action would be taken.

IP needs to address the generic

implications of NRC CAT findings for the types of discrepancies

identified in the the project procedures manual and specification

K-2882.

2.

Control of Design Change Documents

a.

Inspection Scope

The following documents provide the basic acceptance criteria for

the inspection:

,

IP Corporate Nuclear Procedure (CNP) 3.03, " Nonconforming

l

Material Report," Rev. 4, dated July 18, 1984

l

IP Nuclear Station Engineering Department (NSED) Procedure

D.8, " Handling Clinton Power Station Field Change Requests,"

Rev. 4, dated September 27, 1984

IP NSED Procedure D.9, " Handling Clinton Power Station

Field Problem Reports," Rev. 3, dated July 17, 1984

IP NSED Procedure D.12, " Preparation and Control of Field

Engineering Change Notices," Rev. 1, dated November 19,

1984

VII-10

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _

IP CPS Procedure D.7, " Handling Clinton Power Station

Nonconformance Reports," Rev. 6, dated February 28, 1985

IP Nuclear Power Construction Quality Assurance Manual,

Rev. 12, dated March 12, 1985

IP Nuclear Power ASME Quality Assurance Manual, Rev. 5,

dated March 5, 1985

IP Records Management System Standards No. 2.05, " Standard

for the Maintenance of Distributed Documents," Rev. 1,

dated March 7, 1985

IP NP&S Procedure No. 2.51, " Document Control Procedure," Rev.

O, dated June 11, 1985

S&L General QA Procedure GQ-3.07, "Sargent & Lundy Drawings,"

Rev. 6, dated October 21, 1981

S&L General QA Procedure GQ-3.13, " Engineering Change

Notices," Rev. 6, dated October 21, 1981

S&L General QA Procedure GQ-3.15, " Approved Procedural

Deviations," Rev. 1, dated January 26, 1981

S&L General QA Procedure GQ-4.01, " Procurement Specifica-

tions," Rev. 10, dated August 15, 1983

S&L Project Instruction PI-CP-003, " Processing a Baldwin

Associates Field Change Request or Nonconformance Report,"

Rev. 13, dated May 31, 1984

l

S&L PI-CP-004, " Control of Clinton Engineering Change

Notice (ECN)," Rev. 10, dated November 7, 1984

"

j

S&L PI-CP-021, " Processing an Illinois Power Company Field

Problem Report," Rev. 5, dated November 7, 1984

S&L PI-CP-022, " Control of Clinton Field Engineering

Change Notices (FECN)," Rev. 5, dated October 5, 1984

l

!

S&L PI-CP-046, " Processing an Illinois Power Company

l

Nonconforming Material Report (NCMR)," Rev. 2, dated

l

October 10, 1984

'

BA QA Manual, Rev. 15, dated April 5, 1985

BAP 1.0, "Nonconformances," Rev. 16, dated March 28, 1985

BAP 1.2, " Field Change Requests," Rev. 12, Change C, dated

November 19, 1984

BAP 2.0, " Document Control," Rev. 13, Change B, dated April

5, 1985

VII-11

_ _ _ _ _ _ _ _

-

BAP 2.0.1, " Instructions for Maintaining Project Proce-

dures/ Specifications / Drawings," Rev. 2, Change B, dated

January 31, 1985.

NRC CAT inspectors interviewed engineering and construction person-

nel engaged in the distribution and control of design change

documents.

b.

Inspection Findings

Site issued design change documents are processed through the DCC

and distributed, with the recent exception of stamp-affixed change

documents, to all locations which maintain controlled copies of the

affected drawings and specifications, and to all affected travelers.

DCC updates the DMS computer data base to indicate that a given change

document has become active against a drawing or specification, and

copies of all active change documents are maintained with drawings

and specifications.

New travelers are issued, or supplements to

existing travelers are issued, to incorporate newly-issued change

documents which impact in progress or completed structures and hard-

ware.

Change documents must be referenced on, and physically

attached to, these work packages.

As previously noted, TTS, the

computer data base which lists the status and location of traveler

documents, does not currently mandate that active change documents

be listed in TTS.

As a consequence, travelers affected by a given

design change document could not always be readily identified.

This

is not consistent with the requirements of Section 17.4 of the BA QA

manual, which commits BA to an index system for records to be

maintained in the Documents Record Center which will ensure the

rapid and orderly identification and retrieval of records.

NRC CAT inspectors selected the 24 design change documents listed

in Table VII-4.

In majority, the sample was selected from the change

document discrepancies the NRC CAT inspection had documented in Sec-

tion VII.B.1.b.(4) above, for a number of the controlled specifica-

tions available to REs for use in the preparation of work packages.

The review was primarily performed to assess the extent design change

documents not properly included with the specification may not have

been implemented in work packages prepared by REs utilizing those

specifications.

IP was requested to provide the NRC CAT with an

example of documentation which substantiated the intended disposition

of each of the 24 selected change notices.

The NRC CAT review of

the documentation provided by IP assessed the actual disposition of

each design change document for its incorporation in a work package,

i.e., either an amendment to a specification, procedure or a purchase

order, or supplement to a traveler.

The NRC CAT review identified

the following discrepancies:

BA equipment installation traveler RH-024 does not appear to

have been revised to incorporate FCR 27508.

The change docu-

ment is dated August 25, 1984, and waives the provisions of

American Welding Society (AWS) D1.1, paragraph 8.2.3 for

qualification for weldability of American Iron and Steel

Institute sAISI) C1010 to C1025 sheet steel.

The change

VII-12

79--

-

.

document requires that specification K-2999 be amended to

incorporate this waiver.

DMS still lists FCR 27508 as out-

standing against the specification.

ECN 5282, dated June 3, 1985, allows the use of ASME Code

Case N-413, Minimum Size of Fillet Welds for Linear Type

Supports,Section III, Division 1, Subsection NF.

Box 7 of the

change document was marked in error as it indicates

that an FSAR revision is not required.

However, the IP letter

S-5454 dated May 22, 1985, which is referenced in the ECN,

indicates that IP will draft an amendment to the CPS FSAR for

the use of this code case.

NRC's letter of April 30, 1985 to

IP indicates that the referenced code case may be used at the

CPS.

FCR 27545 documents HVAC and electrical attachments welded

to structural steel that were fireproofed without prior appli-

cation of a galvanox coat.

The FCR requires that specifica-

tions K-2910 and K-2999 be revised to permit a direct appli-

cation of CAFCOTE H fireproofing directly over welds which are

clean and free from slag and debris.

The original nonconform-

"

ing welds should have been documented on an NCR for an evalua-

tion as to their acceptability.

This review resulted in identifying only one instance where the

change document (FCR 27508) was not referenced on the appropriate

traveler revision, and two other apparent discrepancies in docu-

mentation.

However, the sample of change documents listed in Table

VII-4 is not considered sufficiently large to confirm the actual

implementation of all design change control discrepancies identified

by the NRC CAT.

The NRC CAT also could not confirm that the sample

of work packages provided for review were prepared through the RE

use of the TPRG V-530 and V-460 copies of the K-2882 controlled

specification found to contain an excessive number of deficiencies

in omitted design change documents.

Further, the NRC CAT followup

review of a third copy of the five controlled copies of Specifica-

tion K-2882, found only one such deficiency.

This indicates that

travelers prepared by use of this third specification most likely

would implement the design change documents not included with the

V-530 and V-460 copies of the K-2882 specification.

Therefore, the

results of the verifications of the sample of work packages provided

for NRC CAT review may not be representative of the disposition of

the excessive change notice discrepancies identified in two of the

five K-2882 specifications initially examined by the NRC CAT inspec-

tor.

c.

Conclusions

The program for control of design change documents was generally

determined to be in accordance with site procedures, with one

exception.

The exception pertains to an inconsistency between the

program instructions for TTS and the Index System of records.

TTS

instructions allow that active design change documents need not be

VII-13

listed in TTS for a given traveler.

This option for TTS does not allow

for the ready identification of travelers affected by a given change

notice.

On the otherhand, the Index System for Records is required

to be maintained in a manner which will ensure the rapid and orderly

identification and retrieval of records.

It is noted that IP's

current effort to integrate data in DMS and CMI into one data

system should resolve this inconsistency in procedural requirements.

For the sample of 24 change documents and related implementing

documents examined by the NRC CAT inspectors, all but one of the

change documents was verified to be implemented as intended in a

work package, i.e., either an amendment to a specification, proce-

dure, or purchase order or supplement to a traveler.

However,

the NRC CAT findings also indicated that IP corrective action, as

discussed in Section VII.B.1.c above, is warranted.

3.

Illinois Power Company Overinspection Program

A consideration of the NRC CAT's selective examinaticns discussed in

most sections of this report was to include examination of a sample

of installed hardware that had been subject to the IP Overinspection

Program.

The IP Overinspection Program was implemented in response to a

series of stop work actions imposed in 1981 and 1982 due to iden-

tified deficiencies in the implementation of the BA QA Program for

construction of various areas of CPS.

The IP Overinspection Program

provides two levels of additional inspection in the functional work

areas subject to the prior stop work actions.

The two adcitional

levels of inspection of work previously inspected by BA QC include a

sample inspection conducted by the BA Field Verification (BAFV)

Group and a subsequent sample inspection by the IP Overinspection

(OI) Group.

The intent and scope of the IP Overinspection Program

is summarized on pages V-1 and V-2 of 1P Report "Results of Quality

Programs for Construction of Clinton Power Station", with Appen-

dices, NRC Docket No. 50-461, dated February 1985.

As noted

therein:

The purposes of the Overinspection Program are to verify

that the structures, systems, and components within the

scope of the program are properly installed and to provide

IP with assurance that BA is performing installation and

inspection work that satisfies the applicable req,sirements

of codes, standards, drawings, and specifications.

These

objectives are accomplished by performing additional inspec-

tions of completed and inspected work, whether performed

before issuance of stop work actions in 1982 (old work)

or after the stop work actions were lifted (new work).

The

inspections conducted under the Overinspection Program are

in addition to those normally performed as part of the QA

Program for CPS.

Therefore, the Overinspection Program is

a supplement to the QA Program and not a substitute for it.

VII-14

,

. .

._

Inspections in the IP Overinspection Program focus on installation

of safety-related, augmented class D (radioactive waste), and fire

protection items in the following areas:

large and small bore

piping, mechanical equipment, structural steel, heating, ventilating

and air conditioning, electrical hangers, electrical conduit and

raceways, electrical terminations, electrical equipment, and

electrical and mechanical instrumentation.

Since the IP Overinspection Program supplements the BA QC program

and is not a substitute for that program, the NRC CAT inspectors

in the area of design change control reviewed the BA installation and

QC inspection work packages in addition to the IP Overinspection

Reports for the hardware sample listed in Tables VII-5 through

VII-7.

Other NRC CAT examinations of hardware previously inspected

by the IP Overinspection Program are discussed in the other sections

of this report.

a.

Inspection Scope

The following documents provide the basic acceptance for the

inspection:

BA Quality Assurance Manual, Rev. 15, dated April 5, 1985

BA Quality and Technical Services Organization Chart,

dated March 8, 1985

BA Quality Control Training and Qualification Manual,

Rev. 9, dated September 26, 1984

BAP 3.1.3, " Structural Steel Erection," Rev. 11, Change B,

dated May 17, 1985

BAP 3.2.5, " Piping Component Supports," Rev. 7, Change D,

dated May 13, 1985

BAP 3.3.6, " Electrical Raceway Support Installation," Rev. 10,

dated May 17, 1985

BAP 3.3.10, " Cable Tray Installation and Traveler Processing,"

Rev. 6, Change E, dated May 21, 1985

BAP 3.6.3, " Repair of Welds, Material and Items," Rev. O,

Change C, dated April 17, 1985

BAP 3.6.5, " Visual Inspections of Weldments," Rev. O,

Change B, dated March 26, 1985

IP Nuclear Power Construction Quality Assurance Manual,

Rev. 12, dated March 12, 1985

IP Nuclear ASME Quality Assurance Manual, Rev. 5, dated

March 5, 1985

VII-15

l

J

.

IP Nuclear Power Program Organizational Chart, dated

January 15, 1985

IP Quality Assurance Instructions QAI-710.01,

"Overinspection Program," Rev. 5, dated March 20, 1985

IP (AI-710-08, "0verinspection Sample Plar..," Rev. 3, dated

<

April 26, 1985

IP QAI-710.12, " Structural / Auxiliary Steel Oserinspection

Checklist," Rev. 7, dated February 22, 1985

IP QAI-710.13, " Mechanical Equipment Overinspection

Checklist," Rev.1, dated January 13, 1984

IP QAI-710.14, " Piping / Valves / Instrumentation

Overinspection Checklist," Rev. 4, dated November 15, 1984

IP QAI-710.15, " Component Support Overinspection

Checklist," Rev. 4, dated August 27, 1984

IP QAI-710.18, " Electrical Raceway Support Overinspection

Checklist," Rev. 2, dated February 21, 1985

IP QAI-710.19, " Electrical Raceway Support Overinspection

Checklist," Rev. 2, dated February 21, 1985

NRC CAT inspectors interviewed engineering and construction person-

nel engaged in the preparation and contro? of BA installation and

inspection work packages and IPOI reports.

b.

Inspection Findings

Inspection findings for this review are categorized as discrepancies

in computer data bases, BA installation and inspection work pack-

ages, or in IPOI reports.

(1) As described in Section VII B.1.(b).(1) above, there are

currently two basic computer data 'ases in use at CPS:

DMS,

u

which lists active change documents issued at the site against

the correspcnding design drawings, and CMI, which lists all

design change documents and the affected design drawings and

specifications.

TTS, which is a subset of CMI, lists the

status and location of traveler documents, and can optionally

reference the associated design and change documents.

The NRC CAT inspectors documented several discrepancies in

these computer data bases during the course of this review

of the use and relationship of the computer data with the

work packages prepared for BA installation and inspection

and IP Overinspection activities.

These include:

VII-16

TTS lists the incorrect design drawing revision numbers for

the design drawing referenced in IPOI reports M-3330 and

M-3338.

A systematic weakness in DMS is it does not reference

the work packages and travelers associated with the S&L

structural steel design drawings.

A systematic weakness in TTS is it does not reference

th? design drawings associated with electrical cable tray

support travelers.

(2) There is no uniform relationship between the hardware detailed

on a design drawing and the number of BA work packages and

travelers prepared by each construction discipline to document

the installation and inspection of that hardware.

As an

example, there is generally one-to-one correspondence between

the design drawing and the traveler for pipe and cable tray

supports, while for structural steel there are numerous work

packages and travelers associated with each structural steel

design drawing.

Structural steel inspections were documented

on either inspection forms, vendor drawings or welding

travelers depending on whether the steel was vendor fabri-

cated, field fabricated, bolted or welded.

The NRC CAT inspectors note that the current computer data

bases program does not readily relate the associated design,

fabrication, installation and inspection documents.

Since

there is no current correlation in DMS between the structural

steel design drawings and the associated work packages and

travelers, some documentation proved difficult to access and

audit.

For example, BA required approximately one week to

access the welding travelers associated with the steel beams

listed in Table VII-5.

Other NRC CAT inspectors indicated that

documentation proved difficult to access in their areas as

well.

However, the requested work packages and travelers were

eventually accessed and, in general, were properly documented.

The NRC CAT inspectors noted a number of documentation discre-

pancies in the BA installation and inspection work packages.

These included an incorrect Receiving Inspection Report number

for a steel beam listed in a support traveler

(E26-1003-01A-H48, Rev. 11), an incorrect inspection attribute

indicated on two of three pre-inspection checklists filed with

a hanger traveler (E27-10002-018-H33), BA QC inspection forms

for several steel beams do not reference the correct revisions

,

of the S&L design drawings, a steel plate listed on the bill of

materials but not used on the hanger drawing, and inconsist-

ancy in documentation relative to the use of the surveyors'

reports for verification of pipe support locations and Form

JV-718 for verification of electrical hanger locations in

containment.

VII-17

.

-

.

.-

-

(3)

Illinois Power performed overinspection activities in accoi'd-

ance with a series of overinspection checklists which defined

the attributes to be inspected for a specific piece of hard-

ware.

This list of attributes was generally a subset of the

attributes that had been BA QC inspected for that piece of

hardware.

The NRC CAT noted a number of generally minor documentation

discrepancies in the IP0I reports reviewed.

These included

reports (S-0399, S-1490, M-3351, M-3329, E-3920) which

referenced an incorrect drawing number, or drawing or revision

number, an incorrect building elevation, or an incorrect FECN;

two reports (M-3349, E-3762) which did not document an inspec-

tion attribute or included the wrong form; and one report

(E-3623) which documents an incorrect drawing revision as being

used for the inspection.

In addition an inconsistency similar to that discussed in

Section VII.B.3.b.(2), above, relative to surveyors' reports

was found.

QAI-710.18 requires location of electrical hangers

be verified to design drawings and Form JV-718 is used as the

documentation of the verification, while QAI-710.15 does not

require independent verification of pipe support locations in

containment, but does require that the surveyors' report to be

attached to the verification checklist.

As noted in Section III, Mechanical Construction, and Section V,

Civil and Structural Construction, of this report, the NRC CAT

physically inspected a sample of hardware associated with the IPOI

report work packages reviewed.

This included four of the steel

beams listed in Table V-5 and six of the pipe restraints listed in

Table III-3.

The purpose of the field inspection was to substan-

tiate the technical content of the IPOI reports, including the

affect of a number of the apparent documentation discrepancies on

the installation.

No deficiencies in the installed hardware were

identified.

c.

Conclusions

For the overall scope of documentation items sampled during tnis

NRC CAT review, the documentation of BA installation and inspec-

tion work packages and of IPOI reports, except for discrepancies

noted, is generally adequate.

The majority of the discrepancies documented for this review are

considered minor in nature.

The two systematic weaknesses in the

computer basis (DMS and TTS) are considered to contribute to the

difficulty IP was having with the timely access of documentation.

The NRC CAT review of the approximately 400 documentation attributes

for the 25 IPOI reports examined found that the reports were

generally well documented relative to the overinspection conducted,

with some exceptions.

In majority, the exceptions related to

documentation discrepancies which apparently had a minor effect on

VII-18

- -

.

- - -

.

..

. ..

.

.

. . _

_ - . - . . _ -

- - .

.-

-

!

the overinspection conducted.

However, these errors in documenta-

tion indicate that a more critical management review of the infor-

mation recorded on the IPOI reports should be performed.

I

a

)-

i

i

I

,

,

4

f

F

,

4

i

r

l

VII-19

i

t

,

. - . - . - - , - - .

, - - , - , _ , - _ . , - - . , - - -

,a.

, . , -

- , - , - , _ , _ -

- . . - - - - - - , - - -

, - - - - - - - - , ~ , , . , - - -

.

.-

.

- _.

._

.

- ._ .

- - .

- -

. - _

.

P

k

TABLE VII-1

SPECIFICATIONS AND PROCEDURES REVIEWED

i

Document ID

Location (s)

.

S&L Spec. K-2882, Rev. 11

BA Traveler Preparation Review Group (TPRG) (3 copies)

!

BA Field Document Center (FDC)

!

S&L Field Design Office

(to confirm filing of ECN 4832)

S&L Spec. K-2884, Rev. 8

BA TPRG

l.

BA FDC

.

S&L Spec. K-2944, Rev. 27

BA Civil /Struc. (C/S) Res. Eng. (RE)

1

BA FDC

a

!

S&L Spec. K-2947, Rev. 5

BA C/S RE

BA FDC

S&L Spec. K-2948, Rev. 11

BA C/S RE

i

BA FDC

S&L Spec. K-2999 Rev. 11

BA Electrical RE (2 copies)

BA FDC

,

t

Baldwin Project Procedures

BA C/S RE

(various revisions.)

BA TPRG

i

,

1

5

i

VII-20

4

v

e

e,-

..,.-----.n

- . - ,

,.e...

- ._-, ,.

- -- ,- -, .

- - - -.-,

-_.,.-.---c

.

_

TABLE VII-2

DRAWINGS REVIEWED

Document ID

Location (s)

S&L Dwg. S26-1705, Rev. E

BA C/S RE & BA FDC

S&L Dwg. S26-1710, Rev. N

BA C/S RE & BA FDC

S&L Dwg. S26-1407, Rev. Y

BA C/S RE & BA FDC

S&L Dwg. S27-1001-03B, Rev. AH

BA C/S RE & BA FDC

S&L Dwg. S27-1002-01A, Rev. AY

BA C/S RE & BA FDC

S&L Dwg. S27-1003-03A, Rev. AM

BA C/S RE & BA FDC

S&L Dwg. S27-1004-04A, Rev. AB

BA C/S RE & BA FDC

S&L Dwg. S27-1005-04A, Rev. AD

BA C/S RE & BA FDC

S&L Dwg. S28-1002-02A, Rev. S

BA C/S RE & BA FDC

S&L Dwg. S28-1003-05A, Rev. T

BA C/S RE & BA FDC

S&L Dwg. S28-1100-07C, Rev. K

BA C/S RE & BA FDC

BA Dwg. CL1-27-5-132, Rev. 4

BA C/S RE &

BA Dwg. CL1-27-5-136, Sheet 12, Rev. 2

BA FDC (aperture cards) &

BA Dwg. CL1-27-S-136, Sheet 25, Rev. 2

BA DCC

BA DWG. CL1-27-S-136, Sheet 37, Rev. 1

BA Dwg. CL1-27-5-141, Sheet 18, Rev. 1

S&L Dwg. M09-1001N, Sheet 1, Rev. N

BA TPRG &

S&L Dwg. M09-1003N, Sheet 1, Rev. M

BA FDC

S&L Dwg. M09-1004N, Sheet 1, Rev. L

S&L Dwg. M-1SX01048X, Rev. F

S&L Dwg. M-1SX01017R, Rev. H, Sheets 1&2

S&L Dwg. M-INB010035, Rev. A

S&L Dwg. M-1NB01027X, Rev. A

S&L Dwg. M-1CC06042G, Rev. B

S&L Dwg. M-1RB24010G, Rev. C

S&L Dwg. M-1SX01050X, Rev. E

S&L Dwg. M-1SX01028R, Rev. J. Sheets 1&2

!

!

VII-21

- -

_

_

-_

1

TABLE VII-3

IP AUDIT SAMPLE

IP Audit

Report No.

Organization Audited

Q31-83-8

Baldwin Associates (BA) Quality Assurance

Q31-84-01

BA Quality & Technical Services

Q31-84-02

BA Procurement

Q31-84-03

BA Piping / Mechanical

Q31-84-04

BA Document Review Group

Q31-84-05

BA Electrical Department

Q31-84-07

BA Field Verification

Q31-84-09

BA Document Control Center (DCC) and

Nonconformance Review Group

Q31-84-10

' BA Systems Release and Completion

Q31-85-01

BA Electrical Reinspection Program

Q31-85-02

BA Quality Control & Technical Services

Q31-85-04

BA Quality Engineering Systems, Quality

Engineering Procedures and DCC

Q31-85-05

BA Procurement, Receiving and Audits Sections

,

VII-22

TABLE VII-4

CHANGE DOCUMENT SAMPLE

Change

Required

Implementing

Document

Description

Disposition

Document

ECN 3332

Add Note to two support

Revise support drawings

Traveler Nos. H-SX-2-C,

drawings

to incorporate note

H-SX-3-D

ECN 4291

Modification to ECN 4061

Revise Paragraphs 326.7c,

Generic

d of Specification K-2882,

Revise Dwg. M06-1000,

Sheet 12

ECN 4683

Correct typographical

Revise Paragraph 302.4a

Generic

error in ECN 524

of Specification K-2884

ECN 4822

Clarifications to Spec.

Revise Attachment 311.3

Clow Painting

BA-K-2882-29

of Specification K-2882

Procedure

EPS 30-69-721

ECN 4832

Response Spectra Data for

Revise Article 305.4 in

Generic

valves and actuators

Attachment 311.3 of

Specification K-2882.

ECN 4853

Clarification of shop

Revise Attachment 311.3

Clow Painting

painting requirements for

of Specification K-2882

Procedure

valves installed in

EPS 30-69-721

containment b1dg.

ECN 4943

Purchase and installation of Revise Attachment 311.2,

IP P0 X-19490, dated

nuclear safety-related

add Sections 327 and

dated April 3, 1985

heat tracing fo- CM and PR

Attachment 327 to

systems

Specification K-2882

ECN 5263

Update list of Class D

Revise Attachment 302.50

Traveler No. 1WOLC6303

support listed in Attach-

of Specification K-2882

ment 302.50

ECN 5282

Allow use of Code Case N-413 Revise Attachment 110.1 of Generic

for component supports

Specification K-2884

NCR 29249

Use as-is dispositio,of

S&L Concurrence

Traveler No. DG-2

pipe minimum

Supp. 15

NCR 51358

Use as-is disposition of

Revise Specification

Traveler No. IVH25B

control cable mechanical

K-2999

connection

l

VII-23

l

I

TABLE VII-4 (Continued)

CHANGE DOCUMENT SAMPLE

Change

Required

Implementing

Document

Description

Disposition

Document

NCR 7002

Superseded by DR 5935;

S&L Concurrence

N/A

DR 5935 superseded by

10283; NCR 10283

documents use as-is

disposition for anchor

bolt which does not

project beyond nut

FCR 21404

Incorporate '81 Addenda to

Revise Paragraph 118 of

Traveler No. RR-759-A

ASME Code for Minor Attach-

Specification K-2882

FCR 21899

Revision of purchase

Revise Article 319.2 of

BA P0 C49800

requirements for copper

Specification K-2882

refrigeration tubing

FCR 27389

Snubber substitution for

Incorporate design change

Traveler No. H-SX-2-C

two supports

drawings

FCR 27508

Material clarification and

Revise Specification

Traveler No. RH-024

weld qualification infor-

K-2999

has not reference to

mation

FCR 27389.

FCR 27545

Use as-is disposition of

Revise Specification

Generic

fire proofed HVAC and

K-2910 and K-2999

electrical attachment weld

to structural steel without

galvanex

FCR 28060

Material substitution for

Revise Paragraph 118 of

Baldwin Purchase

SA 307 GR A bolts and nuts

Specification K-2882

Order No. C48811

FCR 29144

Clarification of safety-

Revise Specification

Generic

related requirements for

K-2884

exempt items per NF-2121(b)

from basic engineers

FCR 30783

Material substitution for

Revise Specification

Midway Industrial

primer and finish for

K-2882

Contractors Form

interior of diesel oil

storage tanks

FCR 32822

Clarification of hanger

Revise Specification

Generic

support ID

K-2884

VII-24

1

TABLE VII-4 (Continued)

CHANGE DOCUMENT SAMPLE

Change

Required

Implementing

Document

Description

Disposition

Document

FCR 38578

Installation modifications

S&L Concurrence

Traveler No. CS1655

to beam connections due to

field interference

FCR 36538

Clarification of installa-

Revise Paragraph 313.5

Traveler No. VG-3-8

tion and inspection require- of Specification K-2882

ments for Class O penetra-

tion assemblies

FCR 36245

Hanger stiffener cannot be

Revise Hanger Drawing

Traveler No. H-RR-995-F

installed due to inter-

1RB13521G

ference

VII-25

_ _ _ _ _ _ _

TABLE VII-5

STRUCTURAL STEEL IPOI SAMPLE

DI Report

Elev.

Bristol

No.

Bldg.

(Ft.)

S&L Drawing

Bristol Drawing

Piece Mark

S-0826

Aux.

800

S26-1004-01A, Rev. F

F-02710, Sheet 5-8, Rev. 0

5-8B6

S-0399

Fuel

800

526-1004-02A, Rev. F

Baldwin Detai1*

S2520A

S-0825

Aux.

800

S26-1004-01A, Rev. F

F-0271D, Sheet 5-6, Rev. 0

5-683

S-0862

Aux.

800

S26-1004-02A, Rev. H

F-0271D, Sheet 5-9, Rev. 1

5-9B5

S-1460

Contain.

778

527-1003-03A, Rev. AH

F-0271A, Sheet 3-14, Rev. 1

3-1483

S-1462

Contain.

778

S27-1003-03A, Rev. AH

F-0271A, Sheet F3-11, Rev. 2

F3-11B1

S-1464

Contain.

778

S27-1003-03A, Rev. AH

F-0271A, Sheet F3-5, Rev. 2

F3-5B8

S-1472

Contain.

778

S27-1003-03A, Rev. AH

Fab. Detail Per FCR 11690*

--

S-1486

Contain.

778

S27-1004-01A, Rev. AA

F-0271A, Sheet F5-16, Rev. 1

F5-16BA

S-1490

Contain.

803

S27-1004-01A, Rev. AB

F-0271A, Sheet F5-13, Rev. 1

F5-13B1

,

OSite Fabricated

VII-26

l

.

- .

_ - -

-.

-

. -

- _ _ _ _ _ - - . -

-

TABLE VII-6

PIPE SUPPORT IPOI SAMPLE

DI Report

Elev.

S&L Drawing

No.

Bldg.

(Ft.)

C1

(Support No.)

Traveler No.

M-2590

Contain.

737

A

M-1RH34010X, Rev. A

H-RH-20I, Rev. 3*

M-3155

Control

737

C

M-1SX52022X, Rev. A

H-SX-22K, Rev. 1FR*

M-3328

Contain.

755

B

M-1RH71016G, Rev. C

H-RH-767-U, Rev. 1*

M-3329

Aux.

737

B

BA Dwg. H-1-RH-780-4, Rev. 0

H-RH-780-D, Rev. IFR

M-3330

Contain.

755/762

B

M-1RH710185, Rev. E

H-RH-767-CC, Rev. 4

M-3338

Contain.

755

C

M-1RB22056G, Rev. B

H-RH-947H, Rev. 1

M-3349

Contain.

828

8

M-1RH22035X, Rev. F

H-RH-29F, Rev. 2

M-3351

Fuel

712

C

M-1SX42019R, Rev. C

H-SX-138, Rev. 15

M-3354

Aux.

708

B

M-1RH47013G, Rev. A

H-RH-764-L, Rev. 1*

M-3421

Fuel

712

C

M1SX42021R, Rev. F

H-SX-13P, Rev. 7*

RTraveler Not Reviewed

!

,

!

t..

L

VII-27

1

L

TABLE VII-7

ELECTRICAL CABLE TRAY HANGER IPOI SAMPLE

01 Report

Elev.

BA Drawing

No.

Bldg.

(Ft.)

(Hanger No.)

Traveler No.

E-3762

Contain.

755

1002-018-H24, Rev. 04

E27-1002-018-H24, Rev. 5

E-3920

Aux.

781

1003-01A-H47, Rev. 04

E26-1003-01A-H47, Rev. 8

E-3921

Aux.

781

1003-01A-H48, Rev. 02

E26-1003-01A-H48, Rev. 12

E-4010

Contain.

768

1002-01B-H33, Rev. 04

E27-1002-01B-H33, Rev. 5

E-4541

Control

800

1004-04A-H10,

E30-1004-04A-H10, Rev. 23

Sheet 1, Rev. 03 &

Sheet 2, Rev. 01

01 Report

Elev.

No.

Bldg.

(Ft.)

S&L Drawing

Traveler No.

E-3623

Control

800

1004-00A-CPR, Rev. E

RT425, Rev. 6

1942, Rev. Y

(Items 10510K, M, N)

  • SCI - Seismic Category I

VII-28

.

VIII. CORRECTIVE ACTION SYSTEMS

A.

Objective

The corrective action systems and related activities were examined to

determine whether measures were established and implemented to assure

that nonconformances and other conditions adverse to quality were promptly

identified and corrected.

B.

Discussion

An examination was made of the licensca's program for identification and

control of corrective actions, including review of sample documents and

inspection of some material and equipment for verification of actual

corrective actions in the plant.

The following procedures by Baldwin Associates (BA) and Illinois Power

Company (IP) protided the acceptance criteria for this inspection:

  • BA Project Procedure (BAP) 1.0,

"Nonconformance Report (NCR),"

Rev. 17, dated May 24, 1985

IP Nuclear Station Engineering Instructions (NSEI) ME-2,

" Interaction Analysis Program," Rev. O, dated March 4, 1985

IP Quality Assurance Procedure QAP-115.02, " Nonconforming

Material Report (NCMR)," Rev. 4, dated February 8, 1985

Rev. 4, dated February 14, 1985

QAP-116.05, " Evaluation and Reporting of Defects and Noncon-

formances per 10 CFR 21," Rev. 2, dated June 20, 1983

  • QAP-116.06, " Project Trend Analysis Program," Rev. 7, dated

May 15, 1985

QAP-116.07, " Management Corrective Action Requests (MCAR),"

Rev. 7, dated February 14, 1985

QAP-116.08, " CPS Condition Report (CR)," Rev. 5, dated July 27,

1984

IP Startup Administrative Instruction SAI-7, " Control of Condi-

tions Adverse to Quality," Rev. 5, dated February 25, 1985

  • IP Startup Administrative Procedure SAP-1, " System Subsystem

Turnover," Rev. 12, dated July 18, 1984

  • SAP-2, " Construction Work Requests," Rev. 13, dated December 20,

1984

SAP-6, " System Release and Return," Rev. 5, dated December 7,

1984

VIII-1

_ - _ _

SAP-9, " Maintenance Work Requests-Startup Group," Rev. 5 dated

August 24, 1984

SAP-20, " Preventative Maintenance," Rev. O, dated March 30, 1984.

1.

Corrective Action Measures Inspection

a.

Inspection Scope

A review was performed of applicable portions of the Quality

Assurance (QA) program and procedures.

A total of 231 samples

of corrective action documents including Nonconformance Reports

(NCRs), Nonconforming Material Reports (NCMRs) and Condition Reports

(CRs) were reviewed.

Five material and equipment samples were

inspected for verification of corrective actions in the plant. Three

samples of risk releases were selected for field verification of

control and status of work on material and equipment to correct

the deficient condition involved.

Also, 26 samples of corrective

action documents which identified documentation revisions to show

as-built conditions for their disposition, were reviewed to verify

that the required documentation revision had been completed.

Samples were selected to cover various disciplines and activities.

The activities included the normal program activities of BA, Zack

Company, IP and the additional activities of BA Field Verification

and IP Overinspection.

Open items requiring corrective action after turnover from BA to IP

were also reviewed.

Corrective actions dispositioned use-as-is were evaluated to

determine if sound engineering was used for the disposition.

b.

Inspection Findings

In general, it was found that satisfactory procedures were in place

for corrective action systems to identify and correct conditions

adverse to quality at the site.

Except for a high rate of errors

found in a limited sample of open items identified in the IP Startup

Punch List, the corrective action measures were found to be accept-

able.

The following details the NRC CAT inspector's findings:

(1) With approximately 80 percent of the systems turned over to IP,

more than 6000 open items are identified on the IP Startup

Punch List Tracking System.

The document packages for four

open items were selected for a detailed review by the NRC CAT.

The criteria used for the sample selection was that the item

was identified as an open item and corrective action was required.

Discrepancies were found in the posting of documents against

two of the open items which prevented the open items from being

closed although the work had been accomplished.

Because of the

high percentage of problems identified in this small sample, two

additional sample packages were selected for review.

Problems

were identified in both of these additional packages.

The high

VIII-2

-_ --_

.-

- -

..

percentage of open item packages with problems identified by

the NRC CAT inspector indicates that additional management atten-

tion to this matter is required.

The packages examined are as follows:

>

ISA0069 Install Permanent Cable Between E21-N049 and JB

BA #61 -- Satisfactory

ISA0009 Change Wiring of NSIV-LC Valves -- Satisfactory

DGA0349 Division II Overhaul, Rust on Cylinder Liner, NCR

,

17583 -- Unsatisfactory, See Table VIII-1

LPA0109 Water Leg Pump Seal Piping Discrepancies

ILP-1P2 -- Unsatisfactory, See Table VIII-2

DGA0153 Lube Oil Strainer Element Opening --

Unsatisfactory, See Table VIII-3

ISA0074 1E32-F008 Torque Switch Not Working in the Closed

Position -- Unsatisfactory, See Table VIII-4

(2) Manual and computerized records were used to track the status

and to trend nonconformances.

(3) Work had been completed and inspected for five samples

selected which required rework to correct a nonconformance.

(4) Three samples of the nonconformance documents reviewed

permited work to continue on a conditional release before a

final disposition could be made.

The corrective action docu-

ments were still open and were controlled through the project's

nonconformance program.

(5) The appropriate revisicns to design documents for a sample of

26 corrective action reports which identified document revi-

sions to show as-built conditions for their disposition, were

found to be posted or incorporated into the design documents.

The only exception was three documents identified on an NCR

which had not been completed at the time of the NRC CAT

inspection.

(6) Sections II.B.3.b(2), V.B.1.b and V.B.3.b of this report iden-

tify NCRs dispositioned use-as-is without providing sufficient

documentation to substantiate compliance with requirements.

Section III.B.4.b of this report identifies the use of an FECN

when an NCR was required by project procedures.

(7)Section VII.B.1.b(7) of this report identifies ineffective

corrective actions for IP QA audit program findings for the

area of design document control.

The NRC CAT inspectors found

similar deficiencies in the same area previously identified by

IP QA audits.

VIII-3

.

-_

_

- - -

-.

. _ _ _

.-

- . _ . . - . .

t

(8) Documentation reviewed for NCRs written due to BA Field Veri-

fication and IP Overinspection findings, was found to be satis-

factory.

c.

Conclusion

The corrective action system was found to be generally acceptable

except for the following:

"

Lack of control of entries into the IP Startup Punch List after

turnover of systems for startup testing.

The number of problems

found with the limited NRC CAT sample of open items reviewed

indicates that this matter requires additional management

attention.

Failure to apply effective corrective actions in the area of

document control for IP QA audit findings.

Disposition of nonconformances use-as-is without providing

a basis to substantiate this disposition.

VIII-4

TABLE VIII-1

REVIEW 0F OPEN PUNCH LIST ITEM DGA0349

DIVISION II OVERHAUL, RUST ON CYLINDER LINER, NCR 17583

Documents

Issued /Date

Comments

NCR 17583

Identified light rust bloom on number 6 cylinder liner

(5/2/84)

of 16 cylinder diesel, 1DG01KB.

This NCR was superseded

by NCMR 1-0809 (4/15/85) which is not identified on the

punchlist.

IP NSED investigated rust problem on all DGs

(memo Y-72291) under NCR 17583, recommendation was to

" rework" and the position taken, "the rust will be

removed, after turnover, during disassembly of the

engine to replace power assembly lower seal by

mechanical maintenance."

MWR B02134

Work request to inspect engine turbocharger via the

(4/1/85)*

inspection ports, for 16 cylinder engine.

General

maintenance and inspection, visual inspection performed.

MWR B02133

Work request to remove power assembly and perform work

(4/1/85)*

as per instruction provided, for 16 cylinder engine.

General maintenance and inspection activities.

MWR 802135

Work request to replace viscous damper as per

(4/1/85)*

instructions provided, for 16 cylinder engine.

Maintenance work.

MWR B02138

Same as MWR 802133, except for 12 cylinder engine.

(4/1/85)*

MWR B02139

Same as MWR B02134, except for 12 cylinder engine.

(4/1/85)*

MWR 802140

Same as MWR B02135, except for 12 cylinder engine.

(4/1/85)*

NCMR Q-01-08290

Written as the result of Condition Report, CR 1-85-04-054

(4/19/85)

which identified what the inspector believed to be a

flaw in the weld area of the upper water jacket for

cylinders 8 and 9 of the 12 cylinder engine.

Engineering

investigation and evaluation found this condition to be

normal.

NCMR Q-02-018900

Written to identify scoring of connecting rod bearing

(4/26/85)

surface, cylinders 1-9 of 16 cylinder engine, found

while performing MWR 802135.

MWR B17342

Work request for pressure test of 12 cylinder engine

(5/2/85)

cooling water system per instructions provided.

  • Written 10/29/84, and, while not applicable to this subject item, were entered

4/1/85.

VIII-5

-- -_

_

_ -

-

-

. _ _ _ _ _ _

. _ - _ -

.

._-

_

. -_

_

TABLE VIII-l (Continued)

REVIEW OF OPEN PUNCH LIST ITEM DGA0349

DIVISION II OVERHAUL, RUST ON CYLINDER LINER, NCR 17583

Documents

Issued /Date

Comments

MWR B17351

Same as MWR B17342, except for 16 cylinder engine.

(5/22/85)

MWR B17364

Work request to replace 12 cylinder, engine AMOT valve

(5/28/85)

element housing bolts per disposition of NCMR 2-0216.

Problem:

Of the twelve corrective action documents identified for

punch list item DGA0349, only NCR 17583 appears to be

related to the item description.

NCMR 1-0809 which

should have been identified, is missing.

The initially

identified open item has not been closed out.

VIII-6

i

TABLE VIII-2

REVIEW 0F OPEN PUNCH LIST ITEM LPA0109

WATER LEG PUMP SEAL PIPING DISCREPANCIES ILP-1P2

Documents

Issued /Date

Comments

NCMR Q-00-02400

Unrelated NCMR entered in error and not removed from

(12/16/83)

punch list.

Related NCMR is Q-01-02400.

FPR 3288

Identified that pump IE21-C002 was different from the

(8/27/84)

other pumps in that seal injection piping was missing.

CR 1-84-09-00400

Identified seal bypass piping on LPCS pump 1E21-C0002

(9/6/84)

was missing.

NCR 021710

Identified the nonconformance.

(9/6/84)

NCMR Q-01-02400

Replaced NCR 021710 for corrective action control

(10/2/84)

after turnover.

CWR 11334

Work request to install seal by pass piping.

NCR

(11/3/84)

021710, not NCMR Q-01-02400, identified the nonconfor-

mance.

This work request was closed out 1/14/85.

Problem:

Work has been completed, NCR 021710 has been closed

out.

NCMR Q-01-02400 has not been closed out and is

preventing this open item from being closed out.

l

l

!

I

VIII-7

_ . _ -

_ __

_

.

. . .

-__

_-_

_

_

TABLE VIII-3

REVIEW OF OPEN PUNCH LIST ITEM DGA0153

LUBE OIL STAINER ELEMENT OPENING

Documents

Issued /Date

Comments

MWR B00183

Identified provisions for the diesel generator lube

(9/18/84)

oil flush.

CR 1-84-10-540

Identified lube oil strainer had manufacturer's defect.

(10/19/84)

NCMR Q-01-052100

Identified the nonconformance with disposition to scrap

(1/9/85)

defective strainer and replace with a new strainer.

FDDR LH1-5151

Provided GE's disposition for NCMR Q-01-052100.

(1/15/85)

MWR B03584

Prepared to replace strainer.

Note:

This work had been

(3/5/85)-

performed under MWR B00183 which was never closed out.

MWR 803584 was closed out because the work had been

previously completed.

-Problem:

MWR B00183 is still identified as an open item of the

punch list, preventing this item from being closed out.

VIII-8

_

l

TABLE VIII-4

REVIEW 0F OPEN PUNCH LIST ITEM ISA0074

1E32-F008 TORQUE SWITCH NOT WORKING IN THE CLOSED POSITION

Documents

Issued /Date

Comments

MWR 807829

Repair of identified problem with new Torque switch.

Switch was replaced 4/17/85 and documentation closed

out 4/19/85.

NCR 07082900

Nonconformance, spectacle flange, 1E32-D307, paper work

(3/2/85)

indicated that an ASME Class NF flange was being used

where a Class NC flange is required.

CWR C013430

Was prepared to replace the flange with an ASME NC

l

(3/28/85)

flange as required.

Problem:

Tne NCR and CWR were initially entered into the punch

l

list tracking system under ISA0074.

The operator deleted

l

the problem descripticn but did not delete the NCR and

CWR.

ISA0074 was then reused for MWR B07829 with the NCR

and CWR identified as documentation related to the open

item.

All the work for the MWR has been completed.

The

licensee had made the necessary corrections and removed

this item from the open punch list prior to the NRC CAT

inspection exit meeting.

l

I

!

VIII-9

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

ATTACHMENT A

A.

Persons Contacted

The following list identifies licensee representatives and NRC personnel

present at the exit meeting, and licensee discipline coordinators and key

individuals contacted during the inspection for each area.

1.

Exit Meeting

a.

Licensee and Contractors

G. Bell

D. Hall

M. Pacy

W. Connell

R. Heider

D. Selva

H. Daniels

S. Johnson

D. Shelton

G. Gandsey

W. Kelley

H. Victor

W. Gerstner

A. King

J. Wilson

l

J. Green

L. Osborne

S. Zabel

b.

State of Illinois

R. Hubbard

A. Samelson

S. Swartz

c.

NRC and Consultants

T. Chan

J. McCormack

R. Serb

A. DuBouchet

T. McLellan

B. Siegel

G. Georgiev

0. Mallon

R. Smeenge

T. Gwynn

W. Marini

W. Sperko

J. Harrison

E. Martindale

S. Stein

R. Heishman

J. Nemoto

J. Taylor

D. Johnson *

M. Peranich

R. Warnick

H. Livermore

!

2.

Licensee Coordinators and Contacts

Area

Name

Team Leader

G. Bell

D. Shelton

l

D. Hall

l

Electrical and

E. Bailey

R. Kennedy

Instrumentation

D. Gilbert

L. Ratliff

B. Johnson

Mechanical

D. Adams

K. Danner

B. Buffie

R. Kennedy

1

L. Clark

A. Sherwood

L. Combs

B. Taylor

  • Institute of Nuclear Power Operations observer

AA-1

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

______

Welding and NDE

J. Carson

T. Wilmoth

Civil and Structural

T. Parrent

K. Smith

Material Traceability

J. Gruber

Design Change Control

G. Buffington

J. Greene

R. Collins

S. Lyons

W. Connell

Corrective Action Systems

T. Warnick

l

In addition to the above personnel, numerous other inspectors, engineers

I

and supervisors were also contacted.

B.

Documents Reviewed

The types of documents listed below were reviewed by the NRC CAT members

to the extent necessary to satisfy the inspection objectives stated in

Section I of tnis report.

References to specific procedures, specifica-

tions, and drawings are contained within the body of the report.

1.

Final Safety Analysis Report

2.

Quality assurance manual

3.

Quality assurance procedures and instructions

4.

Quality control procedures

5.

Administrative procedures

6.

General electrical installation procedures and specifications

7.

General instrumentation installation procedures

8.

General piping and pipe support installation procedures and

specifications

9.

General mechanical equipment installation procedures and

specifications

10.

General concrete specifications

11.

As-built drawings

12. Welding and NDE procedures

13.

Personnel qualification records

14.

Material traceability procedures

15.

Procedures for processing design changes

AA-2

16.

Procedures for document control

17.

Procedures for controlling as-built drawings

18.

Procedures for processing nonconformances

.

AA-3

\\.

ATTACHMENT B

GLOSSARY OF ABBREVIATIONS

AISC - American Institute of Steel Construction

AISI - American Iron and Steel Institute

ANSI - American National Standards Institute

ASME - American Society of Mechanical engineers

ASTM - American Society for Testing and Materials

AWG

- American Wire Gauge

AWS

- American Welding Society

BA

- Baldwin Associates

BAFV - Baldwin Associates Field Verification

BAP

- Baldwin Associates Project Procedure

BE

- Basic Engineering

80M

- Bill of Materials

BQAI - Baldwin Associates Quality Assurance Instruction

  • C

- Degree Celsius

CAT

- Construction Appraisal Team (NRC)

CB&I - Chicago Bridge and Iron Company

CEA

- Concrete Expansion Anchor

CHI

- Construction Management Information

CPS

- Clinton Power Station

CR

- Condition Report

C/S

- Civil / Structural

CRD

- Control Rod Drive

CWR

- Construction Work Request

dc

- Direct Current

DCC

- Document Control Center

DMS

- Document Management Systen

ECN

- Engineering Change Notice

F

- Degree Fahrenheit

FCR

- Field Change Request

FDC

- Field Document Center

FECN - Field Engineering Change Notice

FSAR - Final Safety Analysis Report

GE

- General Electric Company

HCU

- Hydraulic Control Unit

HPCS - High Pressure Core Spray

HVAC - Heating, Ventilating and Air Conditioning

IE

- Office of Inspection and Enforcement (NRC)

IEEE - Institute of Electrical and Electronic Engineers

IP

- Illinois Power Ccmaany

IPCEA - Insulated Power Ca)le Engineers Association

IP0I - Illinois Power Company Overinspection

k

- One Thousand

LPCS - Low Pressure Core Spray

MCM

- One Thousand Circular Mils

MWR

- Maintenance Work Request

NCMR - Nonconforming Material Report

NCR

- Nonconformance Report

NDE

- Nondestructive Examination

NP&S - Nuclear Planning and Support

NRC

- United States Nuclear Regulatory Commission

NSED - Nuclear Station Engineering Department

AB-1

NSEI - Nuclear Station Engineering Instructions

PGCC - Power Generation Control Complex

PI

- Project Instruction

PIR - Potential Interaction Report

PSA - Pacific Scientific Arrestor

PSAR - Preliminary Safety Evaluation Report

QA

- Quality Assurance

QAI - Quality Assurance Instructions

QAP - Quality Assurance Procedure

QC

- Quality Control

RCI - Reactor Controls, Inc.

RCIC - Reactor Core Isolation Cooling

RE

- Resident Engineer

RHR - Residual Heat Removal

RG

- Regulatory Guide (NRC)

RIR - Receiving Inspection Report

SAE - Society of Automotive Engineers

S&L - Sargent & Lundy Engineers

SSW - Shutdown Service Water

SU-F - Startup Field Office

TPRG - Traveler Preparation Review Group

TS

- Technical Services

-

TTS - Traveler Tracking System

USI - Unresolved Safety Issue (NRC)

V

- Volt (s)

AB-2

_ _ . _ .

- . _

_

_ _

_

_

_

. _ _ _ _ , _ _ .

__.

r-

_ic

,

!

NRC Form 8-C

(4-79)

NRCM O240

COVER SHEET FOR CORRESPONDENCE

Use this Cover Sheet to Protect Originals of Multi-Page Correspondence.

i

!

i

l

\\