ENS 49582: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 09/24/2013 08:00 EST
| event date = 09/24/2013 08:00 EST
| last update date = 11/26/2013
| last update date = 11/26/2013
| title = Deficiency Identified In Quality Assurance Program
| title = Deficiency Identified in Quality Assurance Program
| event text = This is a 10 CFR 50.55(e) initial notification for a significant breakdown in the Quality Assurance (QA) program of Chicago Bridge & Iron (CB&I) Lake Charles facility, a sub-supplier of CB&I. CB&I Lake Charles supplies safety-related structural sub modules for the Virgil C. Summer Units 2 & 3 construction project.
| event text = This is a 10 CFR 50.55(e) initial notification for a significant breakdown in the Quality Assurance (QA) program of Chicago Bridge & Iron (CB&I) Lake Charles facility, a sub-supplier of CB&I. CB&I Lake Charles supplies safety-related structural sub modules for the Virgil C. Summer Units 2 & 3 construction project.
In September 2013, CB&I Lake Charles issued a root cause analysis report for deviations associated with sub-modules being supplied to domestic AP1000 construction projects. An evaluation of the root cause analysis results concluded that a significant QA program breakdown had occurred that could have produced a defect. No defect has been identified.
In September 2013, CB&I Lake Charles issued a root cause analysis report for deviations associated with sub-modules being supplied to domestic AP1000 construction projects. An evaluation of the root cause analysis results concluded that a significant QA program breakdown had occurred that could have produced a defect. No defect has been identified.

Latest revision as of 21:52, 1 March 2018

ENS 49582 +/-
Where
Summer South Carolina Electric & Gas Company icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.55(e)
Time - Person (Reporting Time:+1511.73 h62.989 days <br />8.998 weeks <br />2.071 months <br />)
Opened: Findlay Salter
13:44 Nov 26, 2013
NRC Officer: Steve Sandin
Last Updated: Nov 26, 2013
49582 - NRC Website
Loading map...