10 CFR 50.55(e) initial notification for a failure to comply with requirements of
10 CFR 50 Appendix B associated with AP1000 nuclear power plant construction by
Chicago Bridge & Iron Company (
CB&I) at the V.C. Summer Units 2 & 3 construction site.
This 50.55(e) initial notification addresses a failure to comply by CB&I, an agent of South Carolina Electric & Gas Company (SCE&G) for V.C. Summer Units 2 & 3, to meet the requirements of Appendix B, Criteria V and XV. It is concluded that Quality Assurance programmatic issues, as identified by CB&I Root Cause Analysis 2015-0539, could have produced a defect and this condition is reportable in accordance with 10 CFR 50.55(e)(3)(iii)(C). Root Cause Analysis 2015-0539 investigated the causes that lead to impingement of safety related reinforcing steel and the steel containment vessel during concrete core drilling operations within the Unit 2 containment structure. No defect has been identified.
This condition is associated with NRC special inspection report number 05200027/2015-009.
This notification closes the Interim Part 21 report submitted on April 16th, 2015, by CB&I.
This 50.55(e) Initial Notification is being submitted pursuant to the requirements of 10 CFR 50.55(e)(3)(iii)(C).
The licensee notified the NRC Resident Inspector.