ENS 48910
ENS Event | |
---|---|
12:00 Dec 6, 2012 | |
Title | Failure to Comply with Conditions of Construction Permit |
Event Description | 50.55(e) initial notification for failure to comply with requirements of 10 CFR 50 Appendix B, Criterion VII for procurement of safety-related components associated with AP1000 Nuclear Power Plant construction by CB&I (formerly Shaw Nuclear).
This 50.55(e) initial notification addresses a failure to comply by CB&I, an agent of South Carolina Electric & Gas (SCE&G) for Virgil C. Summer 2 & 3, to meet the requirements of Appendix B, Criterion VII. It is concluded that the QA programmatic issues, as identified by the root cause analysis associated with NRC violation 05200025/2012-004-02, could have produced a defect and this condition is reportable in accordance with 10 CFR 50.55(e)(3)(iii)(C). The root cause of the programmatic procurement problems was that the existing Shaw Nuclear procurement and quality oversight and inspection program did not include a sufficiently strategic, integrated, and graded approach to assure the required quality of material, equipment, and services. This notification closes the interim report submitted on February 4, 2013 by SCE&G. This 50.55(e) initial notification is being submitted pursuant to the requirements of 10 CFR 50.55(e)(3)(iii)(C). The licensee has notified the NRC Resident Inspector. |
Where | |
---|---|
Summer ![]() South Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.55(e) | |
Time - Person (Reporting Time:+3005.73 h125.239 days <br />17.891 weeks <br />4.117 months <br />) | |
Opened: | J. Findlay Salter 16:44 Apr 10, 2013 |
NRC Officer: | Dong Park |
Last Updated: | Apr 10, 2013 |
48910 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48910\u003C/a\u003E - \u003Ca href=\"/Summer\" title=\"Summer\"\u003ESummer\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EFailure to Comply with Conditions of Construction Permit\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48910 - Summer\n","link":"","lat":34.29653611111111,"lon":-81.31628333333333,"icon":"/w/images/6/6b/South_Carolina_Electric_%26_Gas_Company_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Under Construction (0 %) |
After | Under Construction (0 %) |
Unit 3 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Under Construction (0 %) |
After | Under Construction (0 %) |
WEEKMONTHYEARENS 511582015-02-17T12:00:00017 February 2015 12:00:00
[Table view]10 CFR 50.55(e) Quality Assurance Programmatic Issues ENS 508152014-08-25T12:00:00025 August 2014 12:00:00 10 CFR 50.55(e) Breakdown in the Quality Assurance Program for V. C. Summer 2 & 3 Construction Project ENS 504422014-03-13T12:00:00013 March 2014 12:00:00 10 CFR 50.55(e) Welding Program Deviations During Construction ENS 495822013-09-24T13:00:00024 September 2013 13:00:00 10 CFR 50.55(e) Deficiency Identified in Quality Assurance Program ENS 489102012-12-06T12:00:0006 December 2012 12:00:00 10 CFR 50.55(e) Failure to Comply with Conditions of Construction Permit 2015-02-17T12:00:00 | |