ML20135A824: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.      .
{{#Wiki_filter:.
4 COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL INSTRUCTION SHEET (Page 1 of 1)
4 COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL INSTRUCTION SHEET (Page 1 of 1)
The following instructional information and checklist is being furnished to help insert Revision 22 into the Comanche Peak Steam Electric Station TRM.
The following instructional information and checklist is being furnished to help insert Revision 22 into the Comanche Peak Steam Electric Station TRM.
Discard the old sheets- and insert the new sheets, as listed below.
Discard the old sheets-and insert the new sheets, as listed below.
Remove                                                             Insert Section 1 1-2                                                               1-2 1-7                                                               1-7 List of Effective Paaes EPL-1 through EPL-4                                               EPL-1 thru EPL-4 NOTE: Please complete the entry for insertion of Revison 22 on the " Record of Changes" form located at the beginning of the TRM.                           -
Remove Insert Section 1 1-2 1-2 1-7 1-7 List of Effective Paaes EPL-1 through EPL-4 EPL-1 thru EPL-4 NOTE: Please complete the entry for insertion of Revison 22 on the " Record of Changes" form located at the beginning of the TRM.
9702270422 970224 PDR   ADOCK 05000445-P                   P DR.;
9702270422 970224 PDR ADOCK 05000445-P P DR.;


CPSES/TRM TECHNICAL REQUIREMENT 1.1 Table 1.1.1 REACTOR TRIP SYSTEM INSTRUMENTATION RESPONSE TIMES FUNCTIONAL UNIT                                                                               RESPONSE TIME
CPSES/TRM TECHNICAL REQUIREMENT 1.1 Table 1.1.1 REACTOR TRIP SYSTEM INSTRUMENTATION RESPONSE TIMES FUNCTIONAL UNIT RESPONSE TIME
: 1. . Manual Reactor Trip                                                                       N.A.
: 1.. Manual Reactor Trip N.A.
: 2.       Power Range. Neutron Flux                                                           s 0.5 second*                                               ,
2.
l
Power Range. Neutron Flux s 0.5 second*
: 3.       Power Range, Neutron Flux l-                     High Positive Rate                                                                   N.A.
3.
i l
Power Range, Neutron Flux l
l             4.       Not Used                                                                                                                                   19
l-High Positive Rate N.A.
!                                                                                                                                                                        i
l i
: 5.       Intermediate Range, Neutron Flux                                                     N.A.                                                       i
l 4.
: 6.       Source Range, Neutron Flux                                                           N.A.                                                 21
Not Used 19 i
: 7.       Overtemperature N-16                                                                 5 7 seconds *# (Unit 1)                             22 5 8 seconds *# (Unit 2)                             22 j             8.       Overpower N-16                                                                       s 7 seconds *#
5.
: 9.       Pressurizer Pressure-Low                                                             s 2 seconds
Intermediate Range, Neutron Flux N.A.
: 10. Pressurizer Pressure-High                                                                 s 2 seconds                                                 i
i 6.
!            11. Pressurizer Water Level-High                                                               N.A.                                                         ;
Source Range, Neutron Flux N.A.
* Neutron / gamma detectors are exempt from response time testing. Response time of                                                                         l the neutron / gamma flux signal portion of the channel shall be measured from                                                                               '
21 7.
detector output or input of first electronic component in a channel.
Overtemperature N-16 5 7 seconds *# (Unit 1) 22 5 8 seconds *# (Unit 2) 22 j
              # Response time includes the thermal well response time.
8.
Overpower N-16 s 7 seconds *#
9.
Pressurizer Pressure-Low s 2 seconds
: 10. Pressurizer Pressure-High s 2 seconds i
: 11. Pressurizer Water Level-High N.A.
* Neutron / gamma detectors are exempt from response time testing. Response time of the neutron / gamma flux signal portion of the channel shall be measured from detector output or input of first electronic component in a channel.
# Response time includes the thermal well response time.
l l
l l
l I
l I
i l             COMANCHE PEAK - UNITS 1 AND 2                                                       1-2                                 Revision 22 February 24. 1997
i l
COMANCHE PEAK - UNITS 1 AND 2 1-2 Revision 22 February 24. 1997


      '                                      CPSES/TRM
CPSES/TRM TECHNICAL REOUIREMENT 1.2 (continuedl TABLE 1.2.1 (continued)
  ,                              TECHNICAL REOUIREMENT 1.2 (continuedl TABLE 1.2.1 (continued)
ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATION SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS 3.
ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATION SIGNAL AND FUNCTION                         RESPONSE TIME IN SECONDS
Pressurizer Pressure--Low a.
: 3. Pressurizer Pressure--Low
Safety Injection (ECCS) 527 (1.5a.10)/ 27 (4,5b.10) 21 b.
: a.       Safety Injection (ECCS)                   527 (1.5a.10)/ 27 (4,5b.10)     21
Reactor Trip 5 2 un c.
: b.       Reactor Trip                             5 2 un
Feedwater Isolation s7 d.
: c.       Feedwater Isolation                       s7
Phase "A" Isolation 5 17 (2)/27 (1) e.
: d.       Phase "A" Isolation                     5 17 (2)/27 (1)
Containment Ventilation Isolation s 5 (6) 9 II) f.
: e.       Containment Ventilation Isolation         s 5 (6)                         9
Motor-Driven Auxiliary Feedwater s 60 21 g.
: f.       Motor-Driven Auxiliary Feedwater               II) s 60                             21
Station Service Water N.A.
: g.       Station Service Water                     N.A.
h.
: h.       Component Cooling Water                   N.A.
Component Cooling Water N.A.
: i.       Essential Ventilation Systems             N.A.
i.
j       Emergency Diesel Generator Operation                                 5 12
Essential Ventilation Systems N.A.
: k.       Turbine Trip                             N.A.
j Emergency Diesel Generator Operation 5 12 k.
: 1.       Control Room Emergency Recirculation                             N.A.
Turbine Trip N.A.
: m.       Containment Spray Pump                   N.A.                             9 COMANCHE PEAK - UNITS 1 AND 2               1-7 February 24. 1997
1.
Control Room Emergency Recirculation N.A.
m.
Containment Spray Pump N.A.
9 COMANCHE PEAK - UNITS 1 AND 2 1-7 February 24. 1997


COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)
COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)
EFFECTIVE PAGE LISTING BELOW IS A LEGEND FOR THE EFFECTIVE PAGE LISTING:
EFFECTIVE PAGE LISTING BELOW IS A LEGEND FOR THE EFFECTIVE PAGE LISTING:
Original _                                   Submitted July 21, 1989 Revision 1                                   September 15, 1989 Revision 2                                   January 15, 1990 Revision 3                                   July 20, 1990 Revision 4                                   April 24,1991 Revision 5                                   September 6, 1991 Revision 6                                   November 22, 1991 Revision 7                                   March 18, 1992 Revision 8                                   June 30, 1992 Revision 9                                   December 18, 1992 Revision 10                                   January 22, 1993 Revision 11                                   February 3, 1993 Revision 12                                   July 15, 1993 Revision 13                                   September 14, 1993 Revision 14                                   November 30, 1993 Revision 15                                   April 15,1994 Revision 16                                   May 11, 1994 Revision 17                                   February 24, 1995 Revision 18                                   April 14,1995 Revision 19                                   May 15, 1995 Revision 20                                   June 30, 1995                           i Revision 21                                   January 24, 1996 Revision 22                                   Feoruary 24, 1997                       )
Original _
i i
Submitted July 21, 1989 Revision 1 September 15, 1989 Revision 2 January 15, 1990 Revision 3 July 20, 1990 Revision 4 April 24,1991 Revision 5 September 6, 1991 Revision 6 November 22, 1991 Revision 7 March 18, 1992 Revision 8 June 30, 1992 Revision 9 December 18, 1992 Revision 10 January 22, 1993 Revision 11 February 3, 1993 Revision 12 July 15, 1993 Revision 13 September 14, 1993 Revision 14 November 30, 1993 Revision 15 April 15,1994 Revision 16 May 11, 1994 Revision 17 February 24, 1995 Revision 18 April 14,1995 Revision 19 May 15, 1995 Revision 20 June 30, 1995 i
l l
Revision 21 January 24, 1996 Revision 22 Feoruary 24, 1997
l EPL-1                               February 24, 1997
)
i EPL-1 February 24, 1997


l COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)
l COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)
EFFECTIVE PAGE LISTING I
EFFECTIVE PAGE LISTING l
l TRM-Tab                                                         Original                           1 Record of Changes                                               February 24, 1995 TRM-Title Page                                                   June 30. 1992 Table of Contents-Tab                                           Original                           !
TRM-Tab Original 1
1                                                                February 24, 1995                   i Administrative Controls-Tab                                     Original l   Administrative Controls-Title Page                               June 30, 1995
Record of Changes February 24, 1995 TRM-Title Page June 30. 1992 Table of Contents-Tab Original 1
                                                                                                          )
February 24, 1995 i
0-1                                                             Revision 20                         J 0-2                                                             Revision 20                         l 0-3                                                             Revision 20                         1 0-4                                                             Revision 20                         I Technical Requirements-Tab                                       Original Original Section 1-Tab                                                                                       )
Administrative Controls-Tab Original l
1-1                                                             Revision 20 1-2                                                             Revision 22 1-3                                                             Revision 21                         :
Administrative Controls-Title Page June 30, 1995 0-1 Revision 20 J
1-4                                                             Revision 20                         l 1-5                                                             June 30, 1995 1-6                                                             Revision 21 17                                                               February 24, 1997 1-8                                                             Revision 21 1-9                                                             Revision 21 1-10                                                             June 30, 1995 1-11                                                             Revision 21 1-12                                                             June 30, 1995 1-13                                                             June 30. 1995                       )
0-2 Revision 20 0-3 Revision 20 0-4 Revision 20 I
1-14                                                             June 30. 1995                       !
Technical Requirements-Tab Original Section 1-Tab Original
1-15                                                             June 30, 1995 1-16                                                             June 30, 1995                       i 1-17                                                             June 30. 1995 1-18                                                             June 30. 1995                       1 1-19                                                             June 30, 1995                       )
)
Sec. 2-Tab                                                       Original                           l 2-1                                                             Revision 20                         l 2-2                                                             June 30. 1995                       )
1-1 Revision 20 1-2 Revision 22 1-3 Revision 21 1-4 Revision 20 1-5 June 30, 1995 1-6 Revision 21 17 February 24, 1997 1-8 Revision 21 1-9 Revision 21 1-10 June 30, 1995 1-11 Revision 21 1-12 June 30, 1995 1-13 June 30. 1995
2-3                                                             Revision 21                         )
)
2-4                                                             June 30, 1995                       1 2-5                                                             June 30, 1995 2-6                                                             June 30, 1995 i
1-14 June 30. 1995 1-15 June 30, 1995 1-16 June 30, 1995 i
2-7                                                             Revision 21                         1 l    2-8                                                             June 30, 1995 l
1-17 June 30. 1995 1-18 June 30. 1995 1
2-9                                                             Revision 21 EPL-2                             February 24. 1997         l l
1-19 June 30, 1995
)
Sec. 2-Tab Original 2-1 Revision 20 2-2 June 30. 1995
)
2-3 Revision 21
)
1 2-4 June 30, 1995 2-5 June 30, 1995 2-6 June 30, 1995 i
2-7 Revision 21 1
2-8 June 30, 1995 l
l 2-9 Revision 21 EPL-2 February 24. 1997 l


COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)                       -
COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)
EFFECTIVE PAGE LISTING 2-10                                               June 30, 1995 2-11                                               June 30, 1995 2-12                                               June 30. 1995 2-13                                               June 30, 1995 2-14                                               June 30, 1995 2-15                                               June 30, 1995 2-16                                               June 30, 1995 2-17                                               June 30, 1995 2-18                                               June 30, 1995 2-19                                               June 30. 1995 2-20                                               June 30, 1995 2-21                                               June 30, 1995 2-22                                               June 30, 1995 2-23                                               June 30, 1995 2-24                                               June 30. 1995               j 2-25                                               Revision 21 2-26                                               June 30. 1995 2-27                                               Revision 20 2-28                                               June 30, 1995 Sec. 3-Tab                                         Original                   y 3-1                                                 Revision 20                 i 3-2                                                 June 30, 1995 3-3                                                 June 30, 1995               !
EFFECTIVE PAGE LISTING 2-10 June 30, 1995 2-11 June 30, 1995 2-12 June 30. 1995 2-13 June 30, 1995 2-14 June 30, 1995 2-15 June 30, 1995 2-16 June 30, 1995 2-17 June 30, 1995 2-18 June 30, 1995 2-19 June 30. 1995 2-20 June 30, 1995 2-21 June 30, 1995 2-22 June 30, 1995 2-23 June 30, 1995 2-24 June 30. 1995 j
3-4                                                 June 30, 1995 3-5                                                 June 30. 1995               :
2-25 Revision 21 2-26 June 30. 1995 2-27 Revision 20 2-28 June 30, 1995 Sec. 3-Tab Original y
3-6                                                 June 30, 1995               '
3-1 Revision 20 3-2 June 30, 1995 3-3 June 30, 1995 3-4 June 30, 1995 3-5 June 30. 1995 3-6 June 30, 1995 3-7 June 30, 1995 3-8 June 30, 1995 3-9 June 30, 1995 3-10 June 30, 1995 Sec. 4-Tab Original 4-1 Revision 20 4-2 June 30. 1995 4-3 June 30, 1995 4-4 June 30, 1995 4-5 June 30, 1995 4-6 June 30, 1995 4-7 June 30, 1995 4-8 June 30, 1995 4-9 June 30. 1995 4-10 June 30, 1995 4-11 June 30, 1995 EPL-3 February 24, 1997 4
3-7                                                 June 30, 1995 3-8                                                 June 30, 1995 3-9                                                 June 30, 1995               l 3-10                                               June 30, 1995 Sec. 4-Tab                                         Original 4-1                                                 Revision 20 4-2                                                 June 30. 1995 4-3                                                 June 30, 1995 4-4                                                 June 30, 1995 4-5                                                 June 30, 1995 4-6                                                 June 30, 1995 4-7                                                 June 30, 1995 4-8                                                 June 30, 1995 4-9                                                 June 30. 1995 4-10                                               June 30, 1995 4-11                                               June 30, 1995 EPL-3                               February 24, 1997 4


COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)
COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)
EFFECTIVE PAGE LISTING 4-12                                                 June 30, 19!15 4-13                                                 June 30, 1955 4-14                                                 June 30, 1995 4-15                                                 June 30, 1995 4-16                                                 June 30, 1995 4-17                                                 June 30, 1995 4-18                                                 June 30, 1995 4-19                                                 June 30, 1995 4-20                                                 June 30. 1995 4-21                                                 June 30, 1995 4-22                                                 June 30, 1995 4-23                                                 June 30, 1995 4-24                                                 June 30, 1995 4-25                                                 June 30, 1995 4-26                                                 June 30, 1995 4-27                                                 June 30, 1995 4-28                                                 June 30. 1995 4-29                                                 June 30, 1995 EPL-Tab                                               Original EPL-1                                                 February 24, 1997 EPL-2                                                 February 24, 1997 EPL-3                                                 February 24. 1997 EPL-4                                                 February 24, 1997 EPL-4                               February 24, 1997}}
EFFECTIVE PAGE LISTING 4-12 June 30, 19!15 4-13 June 30, 1955 4-14 June 30, 1995 4-15 June 30, 1995 4-16 June 30, 1995 4-17 June 30, 1995 4-18 June 30, 1995 4-19 June 30, 1995 4-20 June 30. 1995 4-21 June 30, 1995 4-22 June 30, 1995 4-23 June 30, 1995 4-24 June 30, 1995 4-25 June 30, 1995 4-26 June 30, 1995 4-27 June 30, 1995 4-28 June 30. 1995 4-29 June 30, 1995 EPL-Tab Original EPL-1 February 24, 1997 EPL-2 February 24, 1997 EPL-3 February 24. 1997 EPL-4 February 24, 1997 EPL-4 February 24, 1997}}

Latest revision as of 02:51, 12 December 2024

Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual
ML20135A824
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/24/1997
From:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20135A815 List:
References
PROC-970224, NUDOCS 9702270422
Download: ML20135A824 (7)


Text

.

4 COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL INSTRUCTION SHEET (Page 1 of 1)

The following instructional information and checklist is being furnished to help insert Revision 22 into the Comanche Peak Steam Electric Station TRM.

Discard the old sheets-and insert the new sheets, as listed below.

Remove Insert Section 1 1-2 1-2 1-7 1-7 List of Effective Paaes EPL-1 through EPL-4 EPL-1 thru EPL-4 NOTE: Please complete the entry for insertion of Revison 22 on the " Record of Changes" form located at the beginning of the TRM.

9702270422 970224 PDR ADOCK 05000445-P P DR.;

CPSES/TRM TECHNICAL REQUIREMENT 1.1 Table 1.1.1 REACTOR TRIP SYSTEM INSTRUMENTATION RESPONSE TIMES FUNCTIONAL UNIT RESPONSE TIME

1.. Manual Reactor Trip N.A.

2.

Power Range. Neutron Flux s 0.5 second*

3.

Power Range, Neutron Flux l

l-High Positive Rate N.A.

l i

l 4.

Not Used 19 i

5.

Intermediate Range, Neutron Flux N.A.

i 6.

Source Range, Neutron Flux N.A.

21 7.

Overtemperature N-16 5 7 seconds *# (Unit 1) 22 5 8 seconds *# (Unit 2) 22 j

8.

Overpower N-16 s 7 seconds *#

9.

Pressurizer Pressure-Low s 2 seconds

10. Pressurizer Pressure-High s 2 seconds i
11. Pressurizer Water Level-High N.A.
  • Neutron / gamma detectors are exempt from response time testing. Response time of the neutron / gamma flux signal portion of the channel shall be measured from detector output or input of first electronic component in a channel.
  1. Response time includes the thermal well response time.

l l

l I

i l

COMANCHE PEAK - UNITS 1 AND 2 1-2 Revision 22 February 24. 1997

CPSES/TRM TECHNICAL REOUIREMENT 1.2 (continuedl TABLE 1.2.1 (continued)

ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATION SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS 3.

Pressurizer Pressure--Low a.

Safety Injection (ECCS) 527 (1.5a.10)/ 27 (4,5b.10) 21 b.

Reactor Trip 5 2 un c.

Feedwater Isolation s7 d.

Phase "A" Isolation 5 17 (2)/27 (1) e.

Containment Ventilation Isolation s 5 (6) 9 II) f.

Motor-Driven Auxiliary Feedwater s 60 21 g.

Station Service Water N.A.

h.

Component Cooling Water N.A.

i.

Essential Ventilation Systems N.A.

j Emergency Diesel Generator Operation 5 12 k.

Turbine Trip N.A.

1.

Control Room Emergency Recirculation N.A.

m.

Containment Spray Pump N.A.

9 COMANCHE PEAK - UNITS 1 AND 2 1-7 February 24. 1997

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING BELOW IS A LEGEND FOR THE EFFECTIVE PAGE LISTING:

Original _

Submitted July 21, 1989 Revision 1 September 15, 1989 Revision 2 January 15, 1990 Revision 3 July 20, 1990 Revision 4 April 24,1991 Revision 5 September 6, 1991 Revision 6 November 22, 1991 Revision 7 March 18, 1992 Revision 8 June 30, 1992 Revision 9 December 18, 1992 Revision 10 January 22, 1993 Revision 11 February 3, 1993 Revision 12 July 15, 1993 Revision 13 September 14, 1993 Revision 14 November 30, 1993 Revision 15 April 15,1994 Revision 16 May 11, 1994 Revision 17 February 24, 1995 Revision 18 April 14,1995 Revision 19 May 15, 1995 Revision 20 June 30, 1995 i

Revision 21 January 24, 1996 Revision 22 Feoruary 24, 1997

)

i EPL-1 February 24, 1997

l COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING l

TRM-Tab Original 1

Record of Changes February 24, 1995 TRM-Title Page June 30. 1992 Table of Contents-Tab Original 1

February 24, 1995 i

Administrative Controls-Tab Original l

Administrative Controls-Title Page June 30, 1995 0-1 Revision 20 J

0-2 Revision 20 0-3 Revision 20 0-4 Revision 20 I

Technical Requirements-Tab Original Section 1-Tab Original

)

1-1 Revision 20 1-2 Revision 22 1-3 Revision 21 1-4 Revision 20 1-5 June 30, 1995 1-6 Revision 21 17 February 24, 1997 1-8 Revision 21 1-9 Revision 21 1-10 June 30, 1995 1-11 Revision 21 1-12 June 30, 1995 1-13 June 30. 1995

)

1-14 June 30. 1995 1-15 June 30, 1995 1-16 June 30, 1995 i

1-17 June 30. 1995 1-18 June 30. 1995 1

1-19 June 30, 1995

)

Sec. 2-Tab Original 2-1 Revision 20 2-2 June 30. 1995

)

2-3 Revision 21

)

1 2-4 June 30, 1995 2-5 June 30, 1995 2-6 June 30, 1995 i

2-7 Revision 21 1

2-8 June 30, 1995 l

l 2-9 Revision 21 EPL-2 February 24. 1997 l

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING 2-10 June 30, 1995 2-11 June 30, 1995 2-12 June 30. 1995 2-13 June 30, 1995 2-14 June 30, 1995 2-15 June 30, 1995 2-16 June 30, 1995 2-17 June 30, 1995 2-18 June 30, 1995 2-19 June 30. 1995 2-20 June 30, 1995 2-21 June 30, 1995 2-22 June 30, 1995 2-23 June 30, 1995 2-24 June 30. 1995 j

2-25 Revision 21 2-26 June 30. 1995 2-27 Revision 20 2-28 June 30, 1995 Sec. 3-Tab Original y

3-1 Revision 20 3-2 June 30, 1995 3-3 June 30, 1995 3-4 June 30, 1995 3-5 June 30. 1995 3-6 June 30, 1995 3-7 June 30, 1995 3-8 June 30, 1995 3-9 June 30, 1995 3-10 June 30, 1995 Sec. 4-Tab Original 4-1 Revision 20 4-2 June 30. 1995 4-3 June 30, 1995 4-4 June 30, 1995 4-5 June 30, 1995 4-6 June 30, 1995 4-7 June 30, 1995 4-8 June 30, 1995 4-9 June 30. 1995 4-10 June 30, 1995 4-11 June 30, 1995 EPL-3 February 24, 1997 4

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING 4-12 June 30, 19!15 4-13 June 30, 1955 4-14 June 30, 1995 4-15 June 30, 1995 4-16 June 30, 1995 4-17 June 30, 1995 4-18 June 30, 1995 4-19 June 30, 1995 4-20 June 30. 1995 4-21 June 30, 1995 4-22 June 30, 1995 4-23 June 30, 1995 4-24 June 30, 1995 4-25 June 30, 1995 4-26 June 30, 1995 4-27 June 30, 1995 4-28 June 30. 1995 4-29 June 30, 1995 EPL-Tab Original EPL-1 February 24, 1997 EPL-2 February 24, 1997 EPL-3 February 24. 1997 EPL-4 February 24, 1997 EPL-4 February 24, 1997