OPERATING DATA REPORT DOCKET NO. 50-336 DATE 7/is/as COMPLETED BY G. Neron TELEPHONE (203) 447-1791 Extension 4417 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO. 50-336 DATE 7/is/as COMPLETED BY G. Neron TELEPHONE (203) 447-1791 Extension 4417 OPERATING STATUS 1.
: 1. Unit Name: Millstone Unit 2                             Notes Items 21 and 22
Unit Name: Millstone Unit 2 Notes Items 21 and 22 2.
: 2. Reporting Period: June 1985                                   cumulative are weighted
Reporting Period: June 1985 cumulative are weighted 3.
: 3. Licensed Thermal Power (MWt):     2700                       averages. Unit operated
Licensed Thermal Power (MWt):
: 4. Nameplate . Rating (Gross MWe):   909                         at 2560 MW thermal prior
2700 averages.
: 5. Design Electrical Rating (Net MWe):     870                   to its uprating to the
Unit operated 4.
: 6. Maximum Dependable Capacity (Gross MWe): 866.25               current 2700 MW thermal
Nameplate. Rating (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe): 833.25                 power level.
909 at 2560 MW thermal prior 5.
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Design Electrical Rating (Net MWe):
870 to its uprating to the 6.
Maximum Dependable Capacity (Gross MWe):
866.25 current 2700 MW thermal 7.
Maximum Dependable Capacity (Net MWe):
833.25 power level.
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last' Report, Give Reasons:
Since Last' Report, Give Reasons:
N/A
N/A 9.
: 9. Power Level To Which Restricted, If Any.(Net MWe):     .
Power Level To Which Restricted, If Any.(Net MWe):
N/A
N/A
: 10. Reasons For Restrictions, If Any:
: 10. Reasons For Restrictions, If Any:
N/A This Month       Yr.-to-Date       Cumulative l       11. Hours In Reporting Period                     720                 4343           83399
N/A This Month Yr.-to-Date Cumulative l
: 12. Number Of Hours Reactor Was Critical             2.8               1114.9         58077
: 11. Hours In Reporting Period 720 4343 83399
: 13. Reactor Reserve Shutdown Hours                   0                   0           2205.5
: 12. Number Of Hours Reactor Was Critical 2.8 1114.9 58077
: 14. Hours Generator On-Line                         0                 1109.8         55502.8
: 13. Reactor Reserve Shutdown Hours 0
: 15. Unit Reserve Shutdown Hours                     0                   0             468.2
0 2205.5
: 16. Gross Thermal Energy Generated (MWH)             0             2895103       140579560
: 14. Hours Generator On-Line 0
: 17. Gross Elec. Energy Generated (MWH)               0             945800         45627479
1109.8 55502.8
: 18. Net Electrical Energy Generated (MWH)           (-4874)         895827         43719350
: 15. Unit Reserve Shutdown Hours 0
: 19. Unit Service Factor                             0                   25.6             66.6
0 468.2
: 20. Unit Availability Factor                         0                   25.6 -           67.1
: 16. Gross Thermal Energy Generated (MWH) 0 2895103 140579560
: 21. Unit Capacity Factor (Using MDC Net)             0                   24.8             62.9
: 17. Gross Elec. Energy Generated (MWH) 0 945800 45627479
: 22. Unit Capacity Factor (Using DER Net)             0                   23.7             62.0
: 18. Net Electrical Energy Generated (MWH)
: 23. Unit Forced Outage Rate                         0                   0               16.8
(-4874) 895827 43719350
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 19. Unit Service Factor 0
N/A
25.6 66.6
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
: 20. Unit Availability Factor 0
        ' 26. Units In Test Status (Prior to Commercial Operation):                   Torecast Achieved INITIAL CRITICALITY                                     N/A         N/A
25.6 -
                              -INITIAL ELECTRICITY                                     N/A         N/A CO M ERCIAL OPERATION                                   N/A         N/A 8509110262 850715 PDR   ADOCK 05000336 R                   PDR by
67.1
: 21. Unit Capacity Factor (Using MDC Net) 0 24.8 62.9
: 22. Unit Capacity Factor (Using DER Net) 0 23.7 62.0
: 23. Unit Forced Outage Rate 0
0 16.8 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
' 26. Units In Test Status (Prior to Commercial Operation):
Torecast Achieved INITIAL CRITICALITY N/A N/A
-INITIAL ELECTRICITY N/A N/A CO M ERCIAL OPERATION N/A N/A 8509110262 850715 PDR ADOCK 05000336 R
PDR by


      ,'                          AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-336 UNIT Millstone 2 DATE 7/15/85 COMPLETED BY G. Neron TELEPHONE (203) 447-1791 Extension 4417
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-336 UNIT Millstone 2 DATE 7/15/85 COMPLETED BY G. Neron TELEPHONE (203) 447-1791 Extension 4417 MONTH June 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
!      MONTH June 1985 DAY     AVERAGE DAILY POWER LEVEL                 DAY       AVERAGE DAILY POWER LEVEL (MWe-Net)                                         (MWe-Net)
(MWe-Net)
I                         O                       17                         0 2                         0                       18                         0 3                         0                       19                         0 4                         0                       20                         0 5                         0                       21                         0 6                         0                       22                         0 7                         0                       23'                         0 8                         0                       24                         0 9                         0                         25                         0 10                         0                         26                         0 11                         0                         27                         0 12                         0                         28                         0 4
I O
13                         0                         29       -
17 0
0 i
2 0
14                         0                         30                         0 2
18 0
15-                       0                         31 16                         0                                                                                 .
3 0
4 INSTRUCTIONS On this format,-. list the average daily unit power level -in MWe-Net' for each day in the reporting month. Compute to the nearest whole_ megawatt.                                                                     .,
19 0
i l
4 0
i 1
20 0
                                                                              ,                                                              I
5 0
21 0
6 0
22 0
7 0
23' 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
4 13 0
29 i
0 14 0
30 0
2 15-0 31 16 0
4 INSTRUCTIONS On this format,-. list the average daily unit power level -in MWe-Net' for each day in the reporting month.
Compute to the nearest whole_ megawatt.
i i
1 I


i DOCKET NO. 50-336                   .
i DOCKET NO. 50-336 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 2 l
UNIT SHUTDOWNS AND POWER REDUCTIONS       UNIT NAME Millstone 2           .'      .
DATE 7/15/85 COMPLETED BY G. Neron-l REPORT MONTH June TELEPHONE (203) 447-1791' Extension 4417 l
l                                                                                            DATE 7/15/85             '.
2 No.
COMPLETED BY G. Neron-
.Date_
* l REPORT MONTH June                   TELEPHONE (203) 447-1791' Extension 4417 No.                 l                    2
. Type Duration Reason Method of Licensee Systeg Compogent Cause & Corrective (Hours)
        .Date_   . Type   Duration     Reason     Method of   Licensee     Systeg   Compogent       Cause & Corrective (Hours)                   Shutting 3 Event         Code     Code               Action to Down Reactor Report #-                               Prevent Recurrence:
Shutting Event Code Code Action to 3
Down Reactor Report #-
Prevent Recurrence:
I i
I i
1-   ~ 850216     S     720           C           1         N/A           N/A       N/A-       Continuation of Refuel Maintenance Outage from previous-month.
1-
1             2                                                         3                       4 F: Forced     Reason:                                                   Method:               Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain)                               1-Manual               for Preparation of Data B-Maintenance or Test.                                     2-Manual. Scram-       Enter Sheets for LicensG
~ 850216 S
                  'C-Refueling                                               3-Automatic' Scram     Event Report'(LER) File D-Regulatory Restriction                                   4-Continued from       (NUREG-0161)
720 C
                  -E-Operator Training & License Examination                     previous month F-Administrative                                           5-Power Reduction 5 G-Operational Error (Explain)                                 (Duration = 0)     Exihibit 1 - Same ' Source H-Other (Explain)                                         9-Other (Explain)
1 N/A N/A N/A-Continuation of Refuel Maintenance Outage from previous-month.
1 2
3 4
F:
Forced Reason:
Method:
Exhibit G - Instructions S:
Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test.
2-Manual. Scram-Enter Sheets for LicensG
'C-Refueling 3-Automatic' Scram Event Report'(LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)
-E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5 G-Operational Error (Explain)
(Duration = 0)
Exihibit 1 - Same ' Source H-Other (Explain) 9-Other (Explain)


                                ~
~
L D:ckst N2. 50-336             ,
L D:ckst N2. 50-336 Date 7/1sfas Unit Name Millstone 2 t
Date 7/1sfas
Completed By G. Neron Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SUPMARY FOR SAFETY RELATED. EQUIPMENT REPORT MONTH June 1985.
* t Unit Name Millstone 2   -
DATE SYSTEM COMPONENT MAINTENANCE ACTION f
Completed By G. Neron             .
2/22/85 Reactor Coolant'& Vessel Spare Pressurizer Replaced precision resistor valued 9 i
Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SUPMARY FOR SAFETY RELATED. EQUIPMENT REPORT MONTH June 1985.
Transmitter N-E11GM 25.01 ohms.
DATE           SYSTEM             COMPONENT                           MAINTENANCE ACTION f 2/22/85   Reactor Coolant'& Vessel       Spare Pressurizer             Replaced precision resistor valued 9 i                                           Transmitter N-E11GM           25.01 ohms.
l 4/30/85--
l 4/30/85-- Reactor Coolant & Vessel       Pressure Transmitters.         Grease and replace transmitter "0" l                                           PT-100Y and PT-100X           rings, torque covers.
Reactor Coolant & Vessel Pressure Transmitters.
6/3/85     Reactor Coolant & Vessel       RCP Speed Sensor Pulse         Verified connections, corrected Transmitter                     leads on TB-9 lower from 5, 6, 7 & 8 to 1, 2, 3 & 4.
Grease and replace transmitter "0" l
6/3/85-   Safety Injection Tanks         SIT T390 Low Level Alarm       Installed new microswitch #BZR241.
PT-100Y and PT-100X rings, torque covers.
l 6/3/85     Safety Injection Tanks         SIT T390 Pressure               Installed new seal tite assembly.
6/3/85 Reactor Coolant & Vessel RCP Speed Sensor Pulse Verified connections, corrected Transmitter leads on TB-9 lower from 5, 6, 7 & 8 to 1, 2, 3 & 4.
Transmitter 6/8/85     Containment Structure         CTMT Electrical Penetration     Replaced broken teritii:41 with spare l                                           SEX-E6                         Wiedmuller terminal.
l 6/3/85-Safety Injection Tanks SIT T390 Low Level Alarm Installed new microswitch #BZR241.
6/8/85     Containment Structure         CTMT Electrical Penetration-   Replaced broken terminal with spare.
6/3/85 Safety Injection Tanks SIT T390 Pressure Installed new seal tite assembly.
SWX-E5 3/12/85   Service Water                 SW Pump PSB Filter Pressure     Installed new switch and calibrated.
Transmitter 6/8/85 Containment Structure CTMT Electrical Penetration Replaced broken teritii:41 with spare l
SEX-E6 Wiedmuller terminal.
6/8/85 Containment Structure CTMT Electrical Penetration-Replaced broken terminal with spare.
SWX-E5 3/12/85 Service Water SW Pump PSB Filter Pressure Installed new switch and calibrated.
Diff Switch
Diff Switch


D:ck t N2. 50-336         -
D:ck t N2. 50-336 Date 7/15/85 Unit Name Millstone 2 Completed By G. Neron l
Date 7/15/85
Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SUPMARY FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 l
* Unit Name Millstone 2       -
DATE SYSTEM COMPONENT MAINTENANCE ACTION
Completed By G. Neron l                                                                                             Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SUPMARY FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 l
'6/20/85 Incore Nuclear Monitor Incore Detector E20 Replaced mineral cable.
DATE             SYSTEM             COMPONENT                           MAINTENANCE ACTION
Incore Detector F19 Incore Detector J7 Incore Detector T2 6/13/85 Incore Nuclear Monitor Incore Detector L18 Replaced ICI L-18 cable.
        '6/20/85     Incore Nuclear Monitor       Incore Detector E20           Replaced mineral cable.
l l
Incore Detector F19 Incore Detector J7 Incore Detector T2 6/13/85     Incore Nuclear Monitor       Incore Detector L18           Replaced ICI L-18 cable.
5/31/85 ESAS Automatic Test Inserter Replaced lamp socket.
l l       5/31/85     ESAS                         Automatic Test Inserter       Replaced lamp socket.
L 6/17/85 ESAS Bus 24C LNP (A3) UV Trip Replaced bistable trip module BA-212.
L
l Bistable l
!        6/17/85     ESAS                         Bus 24C LNP (A3) UV Trip       Replaced bistable trip module BA-212.
6/17/85 Reactor Protection Power Ratio Calculator Replaced the B2-3 Module.
l                                                   Bistable l
3/26/85 Reactor Protection S/G #2 Pressure Transmitter-Installed new amplifier, calibrated, replaced "0" ring and torqued cover.
6/17/85     Reactor Protection           Power Ratio Calculator         Replaced the B2-3 Module.
3/16/85 Reactor Protection Reactor Protection System Replaced all noise suppressor diodes on RPS Channel A thru D and checked.
3/26/85     Reactor Protection           S/G #2 Pressure Transmitter-   Installed new amplifier, calibrated, replaced "0" ring and torqued cover.
5/10/85 Reactor Protection Reactor Protection System Performed component swap of CR1 and l
3/16/85     Reactor Protection           Reactor Protection System       Replaced all noise suppressor diodes on RPS Channel A thru D and checked.
R3 for Channels A, B & C.
5/10/85     Reactor Protection           Reactor Protection System       Performed component swap of CR1 and l                                                                                   R3 for Channels A, B & C. Installed l                                                                                   new Channel "D" pre-amp assembly.
Installed l
new Channel "D" pre-amp assembly.


Docket No. 50-336
Docket No. 50-336 Date 7/15/85 Unit Name Millstone 2 -
* Date 7/15/85                               ,
Completed By G. Neron
Unit Name Millstone 2 -
. Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SUMARY FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE SYSTEM COMPONENT MAINTENANCE ACTION 4/9/85 Reactor Protection Reactor Protection System Cleaned contacts on trip test relay K1-on Channel A, B & D.
* Completed By G. Neron                             .
4/11/85 Reactor Protection Reactor Protection System Replaced trip test pots on Channel "A" thru "D" RPS linear range drawers.
                                                                                                . Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SUMARY FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE               SYSTEM               COMPONENT                                 MAINTENANCE ACTION 4/9/85   Reactor Protection                 Reactor Protection System     Cleaned contacts on trip test relay K1-
l 4/9/85 Reactor Protection Calibration and Indication Burnished K1 relay contacts and Panel RPS-C reinstalled / verified proper operation.
!                                                                              on Channel A, B & D.
6/11/85 Reactor Protection Calibration and Indication Replaced old fuse holder with new holder.
4/11/85   Reactor Protection                 Reactor Protection System   Replaced trip test pots on Channel "A" l
Panel RPS-D 6/19/85 Reactor Protection Wide Range Log Channel D Replaced Channel "D" Wide' Range Detector.
thru "D" RPS linear range drawers.
6/17/85 Reactor Protection Wide Range Drawer RPS-D Replaced Scaling Resistor.
4/9/85   Reactor Protection                 Calibration and Indication   Burnished K1 relay contacts and Panel RPS-C                   reinstalled / verified proper operation.
l 6/19/85 Reactor Regulating RRS Channel X Neutron Installed new detector in well #12.
6/11/85   Reactor Protection                 Calibration and Indication   Replaced old fuse holder with new holder.
l Detector 4/16/85 Reactor Regulating Reactor Coolant Loop 2A Installed new RTD, S/N 963.
Panel RPS-D 6/19/85   Reactor Protection               Wide Range Log Channel D       Replaced Channel "D" Wide' Range Detector.
Cold Leg Temp 6/13/85 CEA Position Indication Reed Switch Assembly Replaced reed switch "A" cable for switch 09.
6/17/85   Reactor Protection               Wide Range Drawer RPS-D       Replaced Scaling Resistor.
l
6/19/85   Reactor Regulating                 RRS Channel X Neutron       Installed new detector in well #12.
l .                                              Detector 4/16/85   Reactor Regulating                 Reactor Coolant Loop 2A     Installed new RTD, S/N 963.
Cold Leg Temp 6/13/85   CEA Position Indication             Reed Switch Assembly         Replaced reed switch "A"           cable for switch 09.
i l
i l
l t               -                        -
l t


Dockst No. 50-336     -
Dockst No. 50-336 Date 7/15/85 Unit Name Millstone 2 Completed By G. Neron Telephone (203) 447-1791~
Date 7/15/85                 ,
Unit Name Millstone 2     -
Completed By G. Neron             .
Telephone (203) 447-1791~
Extension 4417 CORRECTIVE MAINTENANCE  
Extension 4417 CORRECTIVE MAINTENANCE  


==SUMMARY==
==SUMMARY==
FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE             SYSTEM             COMPONENT                           MAINTENANCE ACTION 4/11/85   Reactor Coolant & Vessel       Reactor Internals - UGS       Removed three (3) bent CEA extension shafts.
FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE SYSTEM COMPONENT MAINTENANCE ACTION 4/11/85 Reactor Coolant & Vessel Reactor Internals - UGS Removed three (3) bent CEA extension shafts.
4/23/85   Reactor Coolant & Vessel       Reactor Internals -           Cut locks and removed #5 cluster.
4/23/85 Reactor Coolant & Vessel Reactor Internals -
ICI Plate 6/8/85   Reactor Coolant & Vessel       Reactor Coolant Pump         Overhauled M-2 RCP seal.
Cut locks and removed #5 cluster.
6/12/85   Reactor Coolant & Vessel       RCP Suction Line Drain       Repacked 2-RC-0358.
ICI Plate 6/8/85 Reactor Coolant & Vessel Reactor Coolant Pump Overhauled M-2 RCP seal.
Isolation Valve 5/29/85   Reactor Coolant & Vessel       Pressurizer PORV Assembly     Removed flange elbow and spool piece, straightened spool piece and welded-new flange and elbow onto 2-RC-404.
6/12/85 Reactor Coolant & Vessel RCP Suction Line Drain Repacked 2-RC-0358.
3/1/85   Fuel / Reactor Component       Spent Fuel Handling Tool     Replaced old grapple with new grapple Handling                                                     assembly, replaced upper tool section and inner sections of old tool with sections from spare tool.
Isolation Valve 5/29/85 Reactor Coolant & Vessel Pressurizer PORV Assembly Removed flange elbow and spool piece, straightened spool piece and welded-new flange and elbow onto 2-RC-404.
6/20/85   CVCS                           "A" Charging Pump             Repacked pump, torqued plunger head nuts.
3/1/85 Fuel / Reactor Component Spent Fuel Handling Tool Replaced old grapple with new grapple Handling assembly, replaced upper tool section and inner sections of old tool with sections from spare tool.
6/20/85 CVCS "A" Charging Pump Repacked pump, torqued plunger head nuts.


Dockat No. 50-336       -
Dockat No. 50-336 Date 7/15/85 Unit Name Millstone 2 Completed By G. Neron Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SUPMARY FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE SYSTEM COMPONENT MAINTENANCE ACTION 6/22/85 Safety Injection Tanks Hanger #410018 for 12-CCA-5 Removed hanger base plate, drilled Piping new Hilti-Bolt holes, installed new hanger base plate and welded to hanger.
Date   7/15/85
3/30/85 HPSI "B" Header Relief Valve Bench tested and set valve at 1740 PSI.
* Unit Name Millstone 2
6/2/85 HPSI "A" Header to Loop 1A Removed stem nut and installed new Injection Valve Motor operator on 2-SI-617.
* Completed By G. Neron               .
6/2/85 HPSI "B" Header to Loop IB Removed stem nut and installed new i
Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SUPMARY FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE             SYSTEM             COMPONENT                           MAINTENANCE ACTION 6/22/85             Safety Injection Tanks         Hanger #410018 for 12-CCA-5   Removed hanger base plate, drilled Piping                         new Hilti-Bolt holes, installed new hanger base plate and welded to hanger.
Injection Valve Motor operator on 2-SI-626.
3/30/85             HPSI                           "B" Header Relief Valve       Bench tested and set valve at 1740 PSI.
4/23/85 HPSI "A" Header to Loop Replaced MOV with a new MOV and new l
6/2/85               HPSI                           "A" Header to Loop 1A         Removed stem nut and installed new Injection Valve Motor         operator on 2-SI-617.
IB Injection Valve Motor stem nut, set limits and adjusted flow.
6/2/85               HPSI                           "B" Header to Loop IB         Removed stem nut and installed new i
6/6/85 HPSI HPSI Pump Suction Pipe Replaced missing pipe clamp bolt with j
Injection Valve Motor         operator on 2-SI-626.
3/4" x 7" stud and four (4) nuts.
,                        4/23/85             HPSI                           "A" Header to Loop             Replaced MOV with a new MOV and new l
4/24/85 Shutdown Cooling Pipe Hanger #402008 Retorqued bolts on mounting plate to proper torque values.
IB Injection Valve Motor       stem nut, set limits and adjusted flow.
5/3/85 Containment and Enclosure CTMT Purge Supply Isolation Installed new T-ring and tested.
6/6/85               HPSI                           HPSI Pump Suction Pipe         Replaced missing pipe clamp bolt with j                                                                                                           3/4" x 7" stud and four (4) nuts.
Building Purge Valve Assy (Inside CTMT) 6/5/85 EBFS Motor Operated Damper Assy Replaced motor operator.
4/24/85               Shutdown Cooling               Pipe Hanger #402008           Retorqued bolts on mounting plate to proper torque values.
5/3/85               Containment and Enclosure     CTMT Purge Supply Isolation   Installed new T-ring and tested.
Building Purge                 Valve Assy (Inside CTMT) 6/5/85               EBFS                           Motor Operated Damper Assy     Replaced motor operator.


                                                      . - . - - - ~         . - .    . .- - _ -  - - . -.          - . ---.        -    --            ---  --
. -. - - - ~
\
\\
Dockst No. 50-336           -
Dockst No. 50-336 Date 7/15/85 Unit Name Millstone 2
Date 7/15/85                     '
~
Unit Name Millstone 2         -
Completed By G. Neron l
                                                                                                                                                                        ~
Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SIM4ARY FOR SAFETY-RELATED EQUIPMENT l
Completed By G. Neron                   .
l                                                                                                                                      Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SIM4ARY FOR SAFETY-RELATED EQUIPMENT l
REPORT MONTH June 1985 l
REPORT MONTH June 1985 l
DATE                       SYSTEM                 COMPONENT                               MAINTENANCE ACTION-1 4/9/85           Service Water                           Underground SVC Water Pipe         Applied belzona super metal, grout 16-KE-1                           and burlap.
DATE SYSTEM COMPONENT MAINTENANCE ACTION-1 4/9/85 Service Water Underground SVC Water Pipe Applied belzona super metal, grout 16-KE-1 and burlap.
,                          6/7/85           Service Water                           Isolation Valve 2-SW-181A         Temporary Weld Repair of Pipe.
6/7/85 Service Water Isolation Valve 2-SW-181A Temporary Weld Repair of Pipe.
l                                                                                     Flange j                                                                                     Isolation Valve 2-SW-1818 Flange Isolation Valve 2-SW-181C Flange 4/17/85           Service Water                           Inlet Valve 2-SW-3.1B Assy         Repaired Manual Operator by making new clutch mechanism.
l Flange j
!                          6/19/85           Service water.                         Inlet Valve 2-SW-3.1B Assy.         Installed new dual valves, attached l                                                                                                                       sealtight. Made up air fittings, lugged wires and added C-fittings w/ covers. Ring terminals bolted tight and tapped. Covers installed.
Isolation Valve 2-SW-1818 Flange Isolation Valve 2-SW-181C Flange 4/17/85 Service Water Inlet Valve 2-SW-3.1B Assy Repaired Manual Operator by making new clutch mechanism.
l                           4/22/85           Service Water                         Stop Valve 2-SW-3.2A Assy.         Remounted connection box, two limit l                                                                                                                       switches, two solenoid valves and replaced a 3/4" elbow.       Installed valve 2-SW-3.2A and piping.
6/19/85 Service water.
4/23/85           Service Water                         Stop Valve 2-SW-3.28 Assy.         Replaced wire between terminal box and solenoid.
Inlet Valve 2-SW-3.1B Assy.
                                                                      ,-          -                            - n.                         . , ,
Installed new dual valves, attached l
sealtight. Made up air fittings, lugged wires and added C-fittings w/ covers.
Ring terminals bolted tight and tapped.
Covers installed.
l 4/22/85 Service Water Stop Valve 2-SW-3.2A Assy.
Remounted connection box, two limit l
switches, two solenoid valves and replaced a 3/4" elbow.
Installed valve 2-SW-3.2A and piping.
4/23/85 Service Water Stop Valve 2-SW-3.28 Assy.
Replaced wire between terminal box and solenoid.
4 n.


Dock;t No. 50-336     -
Dock;t No. 50-336 Date 7/15/85 Unit Name Millstone 2 Completed By G. Neron Telephone 1203)447-1791 Extension 4417 CORRECTIVE MAINTENANCE  
Date 7/15/85               .
Unit Name Millstone 2     -
Completed By G. Neron Telephone 1203)447-1791 Extension 4417 CORRECTIVE MAINTENANCE  


==SUMMARY==
==SUMMARY==
FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE           SYSTEM             COMPONENT                           MAINTENANCE ACTION 5/5/85   Service Water                 Stop Valve 2-SW-55A           Replaced valve.
FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE SYSTEM COMPONENT MAINTENANCE ACTION 5/5/85 Service Water Stop Valve 2-SW-55A Replaced valve.
6/3/85   Service Water                 Stop Valve 2-SW-8A             Installed new gasket and retightened flange.
6/3/85 Service Water Stop Valve 2-SW-8A Installed new gasket and retightened flange.
4/13/85   Service Water                 Discharge Pipe Header from     Installed new cross tie between SW Pumps (Above Ground)       2-SW-17A and 2-SW-97B.
4/13/85 Service Water Discharge Pipe Header from Installed new cross tie between SW Pumps (Above Ground) 2-SW-17A and 2-SW-97B.
3/19/85   Service Water                 Discharge Pipe from SW Pumps Pad welded eroded area and (Above Ground)                 repainted.
3/19/85 Service Water Discharge Pipe from SW Pumps Pad welded eroded area and (Above Ground) repainted.
4/23/85   Service Water                 Discharge Pipe from SW Pumps Modified studs to "6". Cut old studs (Above Ground) - Flange       off and removed them. Reconnected lines using new gaskets.
4/23/85 Service Water Discharge Pipe from SW Pumps Modified studs to "6".
6/5/85   Service Water                 SW Outlet Pipe 24-JGD-6       Performed weld repair on 24-JGD-6.
Cut old studs (Above Ground) - Flange off and removed them.
4/24/85   RBCCW                         "C" RBCCW Pump Motor           Cleaned motor, redrilled lower pump i                                                                                           side bearing for RTD. Filled both
Reconnected lines using new gaskets.
)                                                                                           bearings with oil.
6/5/85 Service Water SW Outlet Pipe 24-JGD-6 Performed weld repair on 24-JGD-6.
;                    4/28/85   RBCCW                         "B" Heat Exchanger             Removed shellfish shells from heat i                                                                                           exchanger.
4/24/85 RBCCW "C" RBCCW Pump Motor Cleaned motor, redrilled lower pump i
side bearing for RTD.
Filled both
)
bearings with oil.
4/28/85 RBCCW "B" Heat Exchanger Removed shellfish shells from heat i
exchanger.
l l
l l
l l
l l


Docket No. 50-336                               .
Docket No. 50-336 Date 7/15/85 Unit Name Millstone 2 Completed By G. Neron Telephone (203) 447-1791
Date 7/15/85                                 .
. Extension 4417 CORRECTIVE MAINTENANCE St# MARY FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE SYSTEM COMPONENT MAINTENANCE ACTION 4/14/85 RBCCW "C" Heat Exchanger Plugged one tube.
Unit Name Millstone 2                       .
5/14/85 RBCCW Inlet Valve 2-RB-28.1A Af ter testing T-ring was adjusted.
Completed By G. Neron Telephone (203) 447-1791
5/11/85 RBCCW Outlet Valve 2-RB-28.2A After testing T-ring was adjusted.
                                                                                                                                    . Extension 4417 CORRECTIVE MAINTENANCE St# MARY FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE           SYSTEM             COMPONENT                           MAINTENANCE ACTION 4/14/85   RBCCW                         "C" Heat Exchanger           Plugged one tube.
Outlet Valve 2-RB-28.2C Outlet Valve 2-RB-28.3A 3/28/85-R8CCW Outlet Valve 2-RB-28.38 Assy. Adjusted T ring.
5/14/85   RBCCW                         Inlet Valve 2-RB-28.1A       Af ter testing T-ring was adjusted.
l 3/26/85 RBCCW Relief Valve 2-RB-314 Disassembled valve, replaced disc, machined seat, reassembled and set at 150 psig lift.
5/11/85   RBCCW                         Outlet Valve 2-RB-28.2A       After testing T-ring was adjusted.
l 3/23/85 R8CCW Drain Valve 2-RB-898 Disassembled bonnet and reassembled with new bonnet gasket.
'                                                                              Outlet Valve 2-RB-28.2C Outlet Valve 2-RB-28.3A 3/28/85-   R8CCW                         Outlet Valve 2-RB-28.38 Assy. Adjusted T ring.       '
6/2/85 Aerated Liquid Radwaste Isolation Valve 2-SSP-16.1 Disassembled, cleaned internals and inspected disc and seat.
l 3/26/85   RBCCW                         Relief Valve 2-RB-314         Disassembled valve, replaced disc, machined seat, reassembled and set at 150 psig lift.
4/24/85 Gaseous Radwaste Isolation Valve 2-GR-11.2 Lapped valve to seat, replaced Assy.
l                                     3/23/85   R8CCW                         Drain Valve 2-RB-898           Disassembled bonnet and reassembled with new bonnet gasket.                             ,
diaphragm and replaced flex gasket.
6/2/85     Aerated Liquid Radwaste       Isolation Valve 2-SSP-16.1     Disassembled, cleaned internals and inspected disc and seat.
4/24/85   Gaseous Radwaste             Isolation Valve 2-GR-11.2     Lapped valve to seat, replaced Assy.                         diaphragm and replaced flex gasket.


Dock;t No. 50-336       -
Dock;t No. 50-336 Date 7/15/85 Unit Name Millstone 2 Completed By G. Neron Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE  
Date 7/15/85
* Unit Name Millstone 2         -
Completed By G. Neron Telephone (203) 447-1791               .
Extension 4417 CORRECTIVE MAINTENANCE  


==SUMMARY==
==SUMMARY==
FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE           SYSTEM               COMPONENT                                 MAINTENANCE ACTION 6/20/85'   Station Elec. Service           24G to 24C Feeder Breaker           Disassembled trip latch mechanism.
FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE SYSTEM COMPONENT MAINTENANCE ACTION 6/20/85' Station Elec. Service 24G to 24C Feeder Breaker Disassembled trip latch mechanism.
4.16 KV                         (A302)                               Cleaned, lubricated and reassembled.
4.16 KV (A302)
Cleaned, lubricated and reassembled.
Adjusted depth of set screw in tripper shaft.
Adjusted depth of set screw in tripper shaft.
3/20/85   Station Elec. Service           Breaker - Diesel Generator           Overhauled ML-13 operating device 4.16 KV                         15G-130-2 (A401)                     and replaced 13 bushings (2 TUF-LOC)                   ;
3/20/85 Station Elec. Service Breaker - Diesel Generator Overhauled ML-13 operating device 4.16 KV 15G-130-2 (A401) and replaced 13 bushings (2 TUF-LOC) with new aluminum-bronze bushings.
with new aluminum-bronze bushings.
Cleaned and lubed moving parts.
Cleaned and lubed moving parts.
3/23/85   Station Elec. Service           Breaker - Safety Injection           Cleaned and replaced TUF-LOC 4.16 KV                         Pump 2403-2 (A404)                   bushings with al-bronze bushings.
3/23/85 Station Elec. Service Breaker - Safety Injection Cleaned and replaced TUF-LOC 4.16 KV Pump 2403-2 (A404) bushings with al-bronze bushings.
l   3/20/85   Station Elec. Service           Breaker - RBCCW Pump 24D1-2         Cleaned and replaced TUF-LOC I             4.16 KV                         (A402)                               bushings with al-bronze bushings.
l 3/20/85 Station Elec. Service Breaker - RBCCW Pump 24D1-2 Cleaned and replaced TUF-LOC I
4/13/85   Station Elec. Service           Breaker - Aux Feed Pump             Readjusted pick-up of relay coil.
4.16 KV (A402) bushings with al-bronze bushings.
4.16 KV                         24D5-2 (A406) 3/23/85   Station Elec. Service           Breaker - SVC Wtr Pump               Disassembled, cleaned and replaced 4.16 KV                         2406-2 (A407)                       all TUF-LOC bushings with brass bushings.
4/13/85 Station Elec. Service Breaker - Aux Feed Pump Readjusted pick-up of relay coil.
4.16 KV 24D5-2 (A406) 3/23/85 Station Elec. Service Breaker - SVC Wtr Pump Disassembled, cleaned and replaced 4.16 KV 2406-2 (A407) all TUF-LOC bushings with brass bushings.
L I
L I
i
i


Docket No. 50-336             .
Docket No. 50-336 Date 7/15/85 Unit Name Millstone 2 Completed By G. Neron Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SUM 4ARY FOR SAFETY RELATED EQUIPMENT l
Date 7/15/85             -
REPORT MONTH June 1985 1
Unit Name Millstone 2       .
DATE SYSTEM COMP 0NENT MAINTENANCE ACTION l
Completed By G. Neron Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SUM 4ARY FOR SAFETY RELATED EQUIPMENT l
3/22/85 Station Elec. Service Breaker - 24D to 24E Tie Lubricated elevator mechanism and l
REPORT MONTH June 1985                                                           ,
4.16 KV 240-2T-2 (A408) adjusted drive wheel of elevator motor.
1 DATE             SYSTEM                   COMP 0NENT                         MAINTENANCE ACTION l     3/22/85     Station Elec. Service             Breaker - 24D to 24E Tie     Lubricated elevator mechanism and
3/22/85 Station Elec. Service Breaker - Bus 24D to 22F Disassembled, installed new bushings.
'                  4.16 KV                           240-2T-2 (A408)               adjusted drive wheel of elevator motor.
l 4.16 KV 4160/480 Xfmr Feeder 24D7-2 l-(A409) 3/21/85 Station Elec. Service Bus 24B to 24D Tie 240-1T-2 Replaced all TUF-LOC bushings with l
3/22/85     Station Elec. Service             Breaker - Bus 24D to 22F     Disassembled, installed new bushings.
4.16 KV (A410)
l                 4.16 KV                           4160/480 Xfmr Feeder 24D7-2 l-                                                   (A409) 3/21/85     Station Elec. Service             Bus 24B to 24D Tie 240-1T-2   Replaced all TUF-LOC bushings with l                 4.16 KV                           (A410)                       Al-Bronze bushings.
Al-Bronze bushings.
l l     3/23/85     Station Elec. Service             Bus 24G to 24D Feeder         Cleaned out metal shavings and j                 4.16 KV                           Breaker 2253-24D-2 (A411)     replaced bushings.
l l
i l     6/13/85     Station Elec. Service             Breaker - PSB SVC Water Pump Cleaned, lubricated and reassembled l                 4.16 KV                           24El-2 (A502)                 trip latch assembly.
3/23/85 Station Elec. Service Bus 24G to 24D Feeder Cleaned out metal shavings and j
l i     4/4/85       Station Elec. Service             Breaker - RBCCW Pump 24E3-2   Replaced TUF-LOC bushings with l
4.16 KV Breaker 2253-24D-2 (A411) replaced bushings.
4.16 KV                           (A504)                       Al-Bronze bushings.
i l
3/28/85     Station Elec. Service             Breaker - RBCCW Pump 24E3-2   Replaced broken fuse holder in 4.16 KV                           (A504)                       4.16 KV cabinet, breaker A504.
6/13/85 Station Elec. Service Breaker - PSB SVC Water Pump Cleaned, lubricated and reassembled l
,    4/5/85       Station Elec. Service             Breaker - Bus 24F to 24E Tie Cleaned and replaced bushings.
4.16 KV 24El-2 (A502) trip latch assembly.
l                 4.16 KV                           2153-24E-2 (A505)
l i
4/4/85 Station Elec. Service Breaker - RBCCW Pump 24E3-2 Replaced TUF-LOC bushings with l
4.16 KV (A504)
Al-Bronze bushings.
3/28/85 Station Elec. Service Breaker - RBCCW Pump 24E3-2 Replaced broken fuse holder in 4.16 KV (A504) 4.16 KV cabinet, breaker A504.
4/5/85 Station Elec. Service Breaker - Bus 24F to 24E Tie Cleaned and replaced bushings.
l 4.16 KV 2153-24E-2 (A505)


Dockst No. 50-336       -
Dockst No. 50-336 Date 7/15/85 Unit Name Millstone 2-Completed By G. Neron Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE St# NARY FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 l
Date 7/15/85                 ,
DATE SYSTEM COMPONENT MAINTENANCE ACTION i-l' 4/5/85 Station Elec. Service Breaker - Bus 24F to 24E Lubricated mechanism.
Unit Name Millstone 2-     ,
i 4.16 KV Feed (A602)
Completed By G. Neron Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE St# NARY FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 l                                                                                                                                           -
I-3/8/85 Station Elec. Service Breaker - Spare, S/N Welded striker plate.
DATE           SYSTEM                     COMPONENT                         MAINTENANCE ACTION i-l' 4/5/85   Station Elec. Service                 Breaker - Bus 24F to 24E   Lubricated mechanism.
4.16 KV 0228A2415-003 i
i                           4.16 KV                               Feed (A602)
3/12/85-Station Elec. Service Breaker - Spere, S/N Deburred Al-Bronze bushings, l
I-3/8/85   Station Elec. Service                 Breaker - Spare, S/N       Welded striker plate.
4.16 KV 0228A2415-003 cleaned and reassembled with l
4.16 KV                               0228A2415-003 i                 3/12/85- Station Elec. Service                 Breaker - Spere, S/N       Deburred Al-Bronze bushings, l                           4.16 KV                               0228A2415-003               cleaned and reassembled with                       ...
11 new Al-Bronze bushings.
l                                                                                              11 new Al-Bronze bushings.
l 2/20/85 480 V Load Centers Breaker - F14B C. A.R. Fan Straightened track lock link.
l 2/20/85   480 V Load Centers                     Breaker - F14B C. A.R. Fan Straightened track lock link.
L (B0605) i j
L                                                                 (B0605) i j                 3/9/85   480 V Load Centers                     Breaker - DC2 "B" DC       Split breaker, installed new/
3/9/85 480 V Load Centers Breaker - DC2 "B" DC Split breaker, installed new/
f                                                                 Battery Bus Battery Charger rebuilt EC-2A series overcurrent-l, (80607)                     devices, cleaned and lubricated.
f Battery Bus Battery Charger rebuilt EC-2A series overcurrent-l, (80607) devices, cleaned and lubricated.
!                6/20/85   125 Volt DC                           "B" 125 Volt DC Station     Cut end rail of battery rack to l                                                                 Battery                     adjust clearance approx. " for l                                                                                             cell #12 and #43. Adjusted end                       ;
6/20/85 125 Volt DC "B" 125 Volt DC Station Cut end rail of battery rack to l
i rail of cell #13 and #42.
Battery adjust clearance approx.
4/23/85   ESAS                                   Channel "D" Stop Valve     Removed bonnet and plug, lapped 2-AC-99                     plug and seat, installed bonnet with new flex gasket.
" for l
cell #12 and #43. Adjusted end i
rail of cell #13 and #42.
4/23/85 ESAS Channel "D" Stop Valve Removed bonnet and plug, lapped 2-AC-99 plug and seat, installed bonnet with new flex gasket.
4 l
4 l
l l-
l l-


            .                                                          Docket No. 50-336 Date: 7/15/85 Completed By: G. Neron Telephone: (203) 447-1791 Extension 4417 REFUELING INFORMATION REQUEST
Docket No. 50-336 Date:
: 1. Name of facility:   Millstone 2
7/15/85 Completed By: G. Neron Telephone: (203) 447-1791 Extension 4417 REFUELING INFORMATION REQUEST 1.
: 2. Scheduled date for next refueling shutdown:     September 1986
Name of facility:
: 3. Schedule date for restart following refueling: N/A
Millstone 2 2.
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Scheduled date for next refueling shutdown:
N/A
September 1986 3.
: 5. Scheduled date(s) for submitting licensing action and supporting information:
Schedule date for restart following refueling: N/A 4.
A. Technical support information for reracking the spent fuel pool will be submitted approximately July 31, 1985 to support a proposed license ammendment.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
: 8. Results of the sleeving and plugging of the steam generator tubes was submitted to the NRC on June 18, 1985.
N/A 5.
: 6. Important licensing considerations associated with refueling, e.g.,
Scheduled date(s) for submitting licensing action and supporting information:
A.
Technical support information for reracking the spent fuel pool will be submitted approximately July 31, 1985 to support a proposed license ammendment.
8.
Results of the sleeving and plugging of the steam generator tubes was submitted to the NRC on June 18, 1985.
6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None.
None.
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
7.
(a) In Core: 217           (b) 449
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
(a) In Core: 217 (b) 449 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Currently 667 Plans are being formulated to rerack the spent fuel pool beginning in August 1985, to increase the storage capacity to 1106 fuel assemblies.
Currently 667 Plans are being formulated to rerack the spent fuel pool beginning in August 1985, to increase the storage capacity to 1106 fuel assemblies.
: 9. The' projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
9.
The' projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1965, Spent Fuel Pool, Full core off load capacity is reached.
1965, Spent Fuel Pool, Full core off load capacity is reached.
1987, Core Full, Spent Fuel Pool contains 648 bundles.}}
1987, Core Full, Spent Fuel Pool contains 648 bundles.}}

Latest revision as of 02:37, 12 December 2024

Monthly Operating Rept for June 1985
ML20135C022
Person / Time
Site: Millstone 
Issue date: 06/30/1985
From: Neron G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20135C015 List:
References
NUDOCS 8509110262
Download: ML20135C022 (15)


Text

OPERATING DATA REPORT DOCKET NO. 50-336 DATE 7/is/as COMPLETED BY G. Neron TELEPHONE (203) 447-1791 Extension 4417 OPERATING STATUS 1.

Unit Name: Millstone Unit 2 Notes Items 21 and 22 2.

Reporting Period: June 1985 cumulative are weighted 3.

Licensed Thermal Power (MWt):

2700 averages.

Unit operated 4.

Nameplate. Rating (Gross MWe):

909 at 2560 MW thermal prior 5.

Design Electrical Rating (Net MWe):

870 to its uprating to the 6.

Maximum Dependable Capacity (Gross MWe):

866.25 current 2700 MW thermal 7.

Maximum Dependable Capacity (Net MWe):

833.25 power level.

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last' Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any.(Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative l

11. Hours In Reporting Period 720 4343 83399
12. Number Of Hours Reactor Was Critical 2.8 1114.9 58077
13. Reactor Reserve Shutdown Hours 0

0 2205.5

14. Hours Generator On-Line 0

1109.8 55502.8

15. Unit Reserve Shutdown Hours 0

0 468.2

16. Gross Thermal Energy Generated (MWH) 0 2895103 140579560
17. Gross Elec. Energy Generated (MWH) 0 945800 45627479
18. Net Electrical Energy Generated (MWH)

(-4874) 895827 43719350

19. Unit Service Factor 0

25.6 66.6

20. Unit Availability Factor 0

25.6 -

67.1

21. Unit Capacity Factor (Using MDC Net) 0 24.8 62.9
22. Unit Capacity Factor (Using DER Net) 0 23.7 62.0
23. Unit Forced Outage Rate 0

0 16.8 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down At End Of Report Period, Estimated Date of Startup: N/A

' 26. Units In Test Status (Prior to Commercial Operation):

Torecast Achieved INITIAL CRITICALITY N/A N/A

-INITIAL ELECTRICITY N/A N/A CO M ERCIAL OPERATION N/A N/A 8509110262 850715 PDR ADOCK 05000336 R

PDR by

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-336 UNIT Millstone 2 DATE 7/15/85 COMPLETED BY G. Neron TELEPHONE (203) 447-1791 Extension 4417 MONTH June 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

I O

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23' 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

4 13 0

29 i

0 14 0

30 0

2 15-0 31 16 0

4 INSTRUCTIONS On this format,-. list the average daily unit power level -in MWe-Net' for each day in the reporting month.

Compute to the nearest whole_ megawatt.

i i

1 I

i DOCKET NO. 50-336 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 2 l

DATE 7/15/85 COMPLETED BY G. Neron-l REPORT MONTH June TELEPHONE (203) 447-1791' Extension 4417 l

2 No.

.Date_

. Type Duration Reason Method of Licensee Systeg Compogent Cause & Corrective (Hours)

Shutting Event Code Code Action to 3

Down Reactor Report #-

Prevent Recurrence:

I i

1-

~ 850216 S

720 C

1 N/A N/A N/A-Continuation of Refuel Maintenance Outage from previous-month.

1 2

3 4

F:

Forced Reason:

Method:

Exhibit G - Instructions S:

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test.

2-Manual. Scram-Enter Sheets for LicensG

'C-Refueling 3-Automatic' Scram Event Report'(LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)

-E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5 G-Operational Error (Explain)

(Duration = 0)

Exihibit 1 - Same ' Source H-Other (Explain) 9-Other (Explain)

~

L D:ckst N2. 50-336 Date 7/1sfas Unit Name Millstone 2 t

Completed By G. Neron Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SUPMARY FOR SAFETY RELATED. EQUIPMENT REPORT MONTH June 1985.

DATE SYSTEM COMPONENT MAINTENANCE ACTION f

2/22/85 Reactor Coolant'& Vessel Spare Pressurizer Replaced precision resistor valued 9 i

Transmitter N-E11GM 25.01 ohms.

l 4/30/85--

Reactor Coolant & Vessel Pressure Transmitters.

Grease and replace transmitter "0" l

PT-100Y and PT-100X rings, torque covers.

6/3/85 Reactor Coolant & Vessel RCP Speed Sensor Pulse Verified connections, corrected Transmitter leads on TB-9 lower from 5, 6, 7 & 8 to 1, 2, 3 & 4.

l 6/3/85-Safety Injection Tanks SIT T390 Low Level Alarm Installed new microswitch #BZR241.

6/3/85 Safety Injection Tanks SIT T390 Pressure Installed new seal tite assembly.

Transmitter 6/8/85 Containment Structure CTMT Electrical Penetration Replaced broken teritii:41 with spare l

SEX-E6 Wiedmuller terminal.

6/8/85 Containment Structure CTMT Electrical Penetration-Replaced broken terminal with spare.

SWX-E5 3/12/85 Service Water SW Pump PSB Filter Pressure Installed new switch and calibrated.

Diff Switch

D:ck t N2. 50-336 Date 7/15/85 Unit Name Millstone 2 Completed By G. Neron l

Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SUPMARY FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 l

DATE SYSTEM COMPONENT MAINTENANCE ACTION

'6/20/85 Incore Nuclear Monitor Incore Detector E20 Replaced mineral cable.

Incore Detector F19 Incore Detector J7 Incore Detector T2 6/13/85 Incore Nuclear Monitor Incore Detector L18 Replaced ICI L-18 cable.

l l

5/31/85 ESAS Automatic Test Inserter Replaced lamp socket.

L 6/17/85 ESAS Bus 24C LNP (A3) UV Trip Replaced bistable trip module BA-212.

l Bistable l

6/17/85 Reactor Protection Power Ratio Calculator Replaced the B2-3 Module.

3/26/85 Reactor Protection S/G #2 Pressure Transmitter-Installed new amplifier, calibrated, replaced "0" ring and torqued cover.

3/16/85 Reactor Protection Reactor Protection System Replaced all noise suppressor diodes on RPS Channel A thru D and checked.

5/10/85 Reactor Protection Reactor Protection System Performed component swap of CR1 and l

R3 for Channels A, B & C.

Installed l

new Channel "D" pre-amp assembly.

Docket No. 50-336 Date 7/15/85 Unit Name Millstone 2 -

Completed By G. Neron

. Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SUMARY FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE SYSTEM COMPONENT MAINTENANCE ACTION 4/9/85 Reactor Protection Reactor Protection System Cleaned contacts on trip test relay K1-on Channel A, B & D.

4/11/85 Reactor Protection Reactor Protection System Replaced trip test pots on Channel "A" thru "D" RPS linear range drawers.

l 4/9/85 Reactor Protection Calibration and Indication Burnished K1 relay contacts and Panel RPS-C reinstalled / verified proper operation.

6/11/85 Reactor Protection Calibration and Indication Replaced old fuse holder with new holder.

Panel RPS-D 6/19/85 Reactor Protection Wide Range Log Channel D Replaced Channel "D" Wide' Range Detector.

6/17/85 Reactor Protection Wide Range Drawer RPS-D Replaced Scaling Resistor.

l 6/19/85 Reactor Regulating RRS Channel X Neutron Installed new detector in well #12.

l Detector 4/16/85 Reactor Regulating Reactor Coolant Loop 2A Installed new RTD, S/N 963.

Cold Leg Temp 6/13/85 CEA Position Indication Reed Switch Assembly Replaced reed switch "A" cable for switch 09.

i l

l t

Dockst No. 50-336 Date 7/15/85 Unit Name Millstone 2 Completed By G. Neron Telephone (203) 447-1791~

Extension 4417 CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE SYSTEM COMPONENT MAINTENANCE ACTION 4/11/85 Reactor Coolant & Vessel Reactor Internals - UGS Removed three (3) bent CEA extension shafts.

4/23/85 Reactor Coolant & Vessel Reactor Internals -

Cut locks and removed #5 cluster.

ICI Plate 6/8/85 Reactor Coolant & Vessel Reactor Coolant Pump Overhauled M-2 RCP seal.

6/12/85 Reactor Coolant & Vessel RCP Suction Line Drain Repacked 2-RC-0358.

Isolation Valve 5/29/85 Reactor Coolant & Vessel Pressurizer PORV Assembly Removed flange elbow and spool piece, straightened spool piece and welded-new flange and elbow onto 2-RC-404.

3/1/85 Fuel / Reactor Component Spent Fuel Handling Tool Replaced old grapple with new grapple Handling assembly, replaced upper tool section and inner sections of old tool with sections from spare tool.

6/20/85 CVCS "A" Charging Pump Repacked pump, torqued plunger head nuts.

Dockat No. 50-336 Date 7/15/85 Unit Name Millstone 2 Completed By G. Neron Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SUPMARY FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE SYSTEM COMPONENT MAINTENANCE ACTION 6/22/85 Safety Injection Tanks Hanger #410018 for 12-CCA-5 Removed hanger base plate, drilled Piping new Hilti-Bolt holes, installed new hanger base plate and welded to hanger.

3/30/85 HPSI "B" Header Relief Valve Bench tested and set valve at 1740 PSI.

6/2/85 HPSI "A" Header to Loop 1A Removed stem nut and installed new Injection Valve Motor operator on 2-SI-617.

6/2/85 HPSI "B" Header to Loop IB Removed stem nut and installed new i

Injection Valve Motor operator on 2-SI-626.

4/23/85 HPSI "A" Header to Loop Replaced MOV with a new MOV and new l

IB Injection Valve Motor stem nut, set limits and adjusted flow.

6/6/85 HPSI HPSI Pump Suction Pipe Replaced missing pipe clamp bolt with j

3/4" x 7" stud and four (4) nuts.

4/24/85 Shutdown Cooling Pipe Hanger #402008 Retorqued bolts on mounting plate to proper torque values.

5/3/85 Containment and Enclosure CTMT Purge Supply Isolation Installed new T-ring and tested.

Building Purge Valve Assy (Inside CTMT) 6/5/85 EBFS Motor Operated Damper Assy Replaced motor operator.

. -. - - - ~

\\

Dockst No. 50-336 Date 7/15/85 Unit Name Millstone 2

~

Completed By G. Neron l

Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SIM4ARY FOR SAFETY-RELATED EQUIPMENT l

REPORT MONTH June 1985 l

DATE SYSTEM COMPONENT MAINTENANCE ACTION-1 4/9/85 Service Water Underground SVC Water Pipe Applied belzona super metal, grout 16-KE-1 and burlap.

6/7/85 Service Water Isolation Valve 2-SW-181A Temporary Weld Repair of Pipe.

l Flange j

Isolation Valve 2-SW-1818 Flange Isolation Valve 2-SW-181C Flange 4/17/85 Service Water Inlet Valve 2-SW-3.1B Assy Repaired Manual Operator by making new clutch mechanism.

6/19/85 Service water.

Inlet Valve 2-SW-3.1B Assy.

Installed new dual valves, attached l

sealtight. Made up air fittings, lugged wires and added C-fittings w/ covers.

Ring terminals bolted tight and tapped.

Covers installed.

l 4/22/85 Service Water Stop Valve 2-SW-3.2A Assy.

Remounted connection box, two limit l

switches, two solenoid valves and replaced a 3/4" elbow.

Installed valve 2-SW-3.2A and piping.

4/23/85 Service Water Stop Valve 2-SW-3.28 Assy.

Replaced wire between terminal box and solenoid.

4 n.

Dock;t No. 50-336 Date 7/15/85 Unit Name Millstone 2 Completed By G. Neron Telephone 1203)447-1791 Extension 4417 CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE SYSTEM COMPONENT MAINTENANCE ACTION 5/5/85 Service Water Stop Valve 2-SW-55A Replaced valve.

6/3/85 Service Water Stop Valve 2-SW-8A Installed new gasket and retightened flange.

4/13/85 Service Water Discharge Pipe Header from Installed new cross tie between SW Pumps (Above Ground) 2-SW-17A and 2-SW-97B.

3/19/85 Service Water Discharge Pipe from SW Pumps Pad welded eroded area and (Above Ground) repainted.

4/23/85 Service Water Discharge Pipe from SW Pumps Modified studs to "6".

Cut old studs (Above Ground) - Flange off and removed them.

Reconnected lines using new gaskets.

6/5/85 Service Water SW Outlet Pipe 24-JGD-6 Performed weld repair on 24-JGD-6.

4/24/85 RBCCW "C" RBCCW Pump Motor Cleaned motor, redrilled lower pump i

side bearing for RTD.

Filled both

)

bearings with oil.

4/28/85 RBCCW "B" Heat Exchanger Removed shellfish shells from heat i

exchanger.

l l

l l

Docket No. 50-336 Date 7/15/85 Unit Name Millstone 2 Completed By G. Neron Telephone (203) 447-1791

. Extension 4417 CORRECTIVE MAINTENANCE St# MARY FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE SYSTEM COMPONENT MAINTENANCE ACTION 4/14/85 RBCCW "C" Heat Exchanger Plugged one tube.

5/14/85 RBCCW Inlet Valve 2-RB-28.1A Af ter testing T-ring was adjusted.

5/11/85 RBCCW Outlet Valve 2-RB-28.2A After testing T-ring was adjusted.

Outlet Valve 2-RB-28.2C Outlet Valve 2-RB-28.3A 3/28/85-R8CCW Outlet Valve 2-RB-28.38 Assy. Adjusted T ring.

l 3/26/85 RBCCW Relief Valve 2-RB-314 Disassembled valve, replaced disc, machined seat, reassembled and set at 150 psig lift.

l 3/23/85 R8CCW Drain Valve 2-RB-898 Disassembled bonnet and reassembled with new bonnet gasket.

6/2/85 Aerated Liquid Radwaste Isolation Valve 2-SSP-16.1 Disassembled, cleaned internals and inspected disc and seat.

4/24/85 Gaseous Radwaste Isolation Valve 2-GR-11.2 Lapped valve to seat, replaced Assy.

diaphragm and replaced flex gasket.

Dock;t No. 50-336 Date 7/15/85 Unit Name Millstone 2 Completed By G. Neron Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 DATE SYSTEM COMPONENT MAINTENANCE ACTION 6/20/85' Station Elec. Service 24G to 24C Feeder Breaker Disassembled trip latch mechanism.

4.16 KV (A302)

Cleaned, lubricated and reassembled.

Adjusted depth of set screw in tripper shaft.

3/20/85 Station Elec. Service Breaker - Diesel Generator Overhauled ML-13 operating device 4.16 KV 15G-130-2 (A401) and replaced 13 bushings (2 TUF-LOC) with new aluminum-bronze bushings.

Cleaned and lubed moving parts.

3/23/85 Station Elec. Service Breaker - Safety Injection Cleaned and replaced TUF-LOC 4.16 KV Pump 2403-2 (A404) bushings with al-bronze bushings.

l 3/20/85 Station Elec. Service Breaker - RBCCW Pump 24D1-2 Cleaned and replaced TUF-LOC I

4.16 KV (A402) bushings with al-bronze bushings.

4/13/85 Station Elec. Service Breaker - Aux Feed Pump Readjusted pick-up of relay coil.

4.16 KV 24D5-2 (A406) 3/23/85 Station Elec. Service Breaker - SVC Wtr Pump Disassembled, cleaned and replaced 4.16 KV 2406-2 (A407) all TUF-LOC bushings with brass bushings.

L I

i

Docket No. 50-336 Date 7/15/85 Unit Name Millstone 2 Completed By G. Neron Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE SUM 4ARY FOR SAFETY RELATED EQUIPMENT l

REPORT MONTH June 1985 1

DATE SYSTEM COMP 0NENT MAINTENANCE ACTION l

3/22/85 Station Elec. Service Breaker - 24D to 24E Tie Lubricated elevator mechanism and l

4.16 KV 240-2T-2 (A408) adjusted drive wheel of elevator motor.

3/22/85 Station Elec. Service Breaker - Bus 24D to 22F Disassembled, installed new bushings.

l 4.16 KV 4160/480 Xfmr Feeder 24D7-2 l-(A409) 3/21/85 Station Elec. Service Bus 24B to 24D Tie 240-1T-2 Replaced all TUF-LOC bushings with l

4.16 KV (A410)

Al-Bronze bushings.

l l

3/23/85 Station Elec. Service Bus 24G to 24D Feeder Cleaned out metal shavings and j

4.16 KV Breaker 2253-24D-2 (A411) replaced bushings.

i l

6/13/85 Station Elec. Service Breaker - PSB SVC Water Pump Cleaned, lubricated and reassembled l

4.16 KV 24El-2 (A502) trip latch assembly.

l i

4/4/85 Station Elec. Service Breaker - RBCCW Pump 24E3-2 Replaced TUF-LOC bushings with l

4.16 KV (A504)

Al-Bronze bushings.

3/28/85 Station Elec. Service Breaker - RBCCW Pump 24E3-2 Replaced broken fuse holder in 4.16 KV (A504) 4.16 KV cabinet, breaker A504.

4/5/85 Station Elec. Service Breaker - Bus 24F to 24E Tie Cleaned and replaced bushings.

l 4.16 KV 2153-24E-2 (A505)

Dockst No. 50-336 Date 7/15/85 Unit Name Millstone 2-Completed By G. Neron Telephone (203) 447-1791 Extension 4417 CORRECTIVE MAINTENANCE St# NARY FOR SAFETY RELATED EQUIPMENT REPORT MONTH June 1985 l

DATE SYSTEM COMPONENT MAINTENANCE ACTION i-l' 4/5/85 Station Elec. Service Breaker - Bus 24F to 24E Lubricated mechanism.

i 4.16 KV Feed (A602)

I-3/8/85 Station Elec. Service Breaker - Spare, S/N Welded striker plate.

4.16 KV 0228A2415-003 i

3/12/85-Station Elec. Service Breaker - Spere, S/N Deburred Al-Bronze bushings, l

4.16 KV 0228A2415-003 cleaned and reassembled with l

11 new Al-Bronze bushings.

l 2/20/85 480 V Load Centers Breaker - F14B C. A.R. Fan Straightened track lock link.

L (B0605) i j

3/9/85 480 V Load Centers Breaker - DC2 "B" DC Split breaker, installed new/

f Battery Bus Battery Charger rebuilt EC-2A series overcurrent-l, (80607) devices, cleaned and lubricated.

6/20/85 125 Volt DC "B" 125 Volt DC Station Cut end rail of battery rack to l

Battery adjust clearance approx.

" for l

cell #12 and #43. Adjusted end i

rail of cell #13 and #42.

4/23/85 ESAS Channel "D" Stop Valve Removed bonnet and plug, lapped 2-AC-99 plug and seat, installed bonnet with new flex gasket.

4 l

l l-

Docket No. 50-336 Date:

7/15/85 Completed By: G. Neron Telephone: (203) 447-1791 Extension 4417 REFUELING INFORMATION REQUEST 1.

Name of facility:

Millstone 2 2.

Scheduled date for next refueling shutdown:

September 1986 3.

Schedule date for restart following refueling: N/A 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

N/A 5.

Scheduled date(s) for submitting licensing action and supporting information:

A.

Technical support information for reracking the spent fuel pool will be submitted approximately July 31, 1985 to support a proposed license ammendment.

8.

Results of the sleeving and plugging of the steam generator tubes was submitted to the NRC on June 18, 1985.

6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

None.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) In Core: 217 (b) 449 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Currently 667 Plans are being formulated to rerack the spent fuel pool beginning in August 1985, to increase the storage capacity to 1106 fuel assemblies.

9.

The' projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1965, Spent Fuel Pool, Full core off load capacity is reached.

1987, Core Full, Spent Fuel Pool contains 648 bundles.