ML20135C036

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Apr 1985
ML20135C036
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/30/1985
From: Neron G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20135C015 List:
References
NUDOCS 8509110266
Download: ML20135C036 (1)


Text

-. _ -

OPERATING DATA REPORT DOCKET NO. 50-336 DATE 7/15/85 COMPLETED BY G. Neron TELEPHONE (203) 447-1791 Extension 4417 OPERATING STATUS 1.

Unit Name: Millstone Unit 2 Notes Items 21 and 22 2.

Reporting Period: April 1985 cumulative are weighted 3.

Licensed Thermal Power (MWt):

2700 averages.

Unit operated 4.

Nameplate Rating (Gross MWe):

909 at 2560 MW thermal prior i

5.

Design Electrical Rating (Net MWe):

870 to its uprating to the 6.

Maximum Dependable Capacity (Gross MWe):

866.25 current 2700 MW thermal 7.

Maximum Dependable Capacity (Net MWe):

833.25 power level.

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date cumulative

11. Hours In Reporting Period 719 2879 81935
12. Number Of Hours Reactor Was Critical 0

1112.1 58074.2 13.

Reactor Reserve Shutdown Hours 0

0 2205.5

14. Hours Generator On-Line 0

1109.8 55502.8

15. Unit Reserve Shutdown Hours 0

0 468.2

16. Gross Thermal Energy Generated (MWH) 0 2895103 140579560
17. Gross Elec. Energy Generated (MWH) 0 945800 45627479 18.

Net Electrical Energy Generated (MWH)

(-3153) 903387 43726910

19. Unit Service Factor 0

38.5 67.7 20.

Unit Availability Factor 0

38.5 -

68.3 21.

Unit Capacity Factor (Using MDC Net) 0 37.7 63.5 22.

Unit Capacity Factor (Using DER Net) 0 36.1 62.6 1

23. Unit Forced Outage Rate 0

0 16.8 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down At End Of Report Period, Estimated Date of Startup: June 1985 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMERCIAL OPERATION N/A N/A B509110266 850715 DR ADOCK 0 y

,y

,~-,,v-y-

.a e-

-,,.,g,,,--.-,+--ve-

,,-------se 7..--gn.

ee-

--,,e

.--,~e

-.r

,,..un-.-

-