ENS 50792: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 02/06/2015 12:27 CST | | event date = 02/06/2015 12:27 CST | ||
| last update date = 02/06/2015 | | last update date = 02/06/2015 | ||
| title = Automatic Reactor Scram Due | | title = Automatic Reactor Scram Due to Loss of Feedwater | ||
| event text = At 1227 CST on 06 Feb 2015, Dresden Unit 2 automatically scrammed due to a Reactor Water Level transient. Set up activities for weekend maintenance were being performed on the feedwater system at the time of the event. | | event text = At 1227 CST on 06 Feb 2015, Dresden Unit 2 automatically scrammed due to a Reactor Water Level transient. Set up activities for weekend maintenance were being performed on the feedwater system at the time of the event. | ||
All rods inserted to their full-in positions. | All rods inserted to their full-in positions. |
Latest revision as of 20:48, 1 March 2018
Where | |
---|---|
Dresden Illinois (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-1.57 h-0.0654 days <br />-0.00935 weeks <br />-0.00215 months <br />) | |
Opened: | Ryan Sears 16:53 Feb 6, 2015 |
NRC Officer: | Daniel Mills |
Last Updated: | Feb 6, 2015 |
50792 - NRC Website
| |