ML20137Z854: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter:,
                                                          OCT C 31985
OCT C 31985
Docket No. 50-443
Docket No. 50-443
Public Service Company of New Hampshire
Public Service Company of New Hampshire
ATTN: Mr. Robert J. Harrison
ATTN: Mr. Robert J. Harrison
        President and Chief Executive Officer
President and Chief Executive Officer
P. O. Box 330
P. O. Box 330
Manchester, New Hampshire 03105
Manchester, New Hampshire 03105
Gentlemen:
Gentlemen:
Subject:   Inspection Report No. 50-443/85-15
Subject:
This   refers to the     special   construction   team   inspection   conducted by
Inspection Report No. 50-443/85-15
This
refers to the
special
construction
team
inspection
conducted by
Dr. P. K. Eapen of this office on June 3-14, 1985, at Seabrook Station, Unit
Dr. P. K. Eapen of this office on June 3-14, 1985, at Seabrook Station, Unit
1, Seabrook, New Hampshire, of activities authorized by NRC Construction Permit
1, Seabrook, New Hampshire, of activities authorized by NRC Construction Permit
No. CPPR-135 and to the discussions of our findings held by Dr. Eapen with
No. CPPR-135 and to the discussions of our findings held by Dr. Eapen with
Mr. W.   B. Derrickson and others of your staff at the conclusion of the
Mr. W.
inspection.   _
B.
Derrickson and others of your staff at the conclusion of the
inspection.
_
The areas examined during this inspection are described in the NRC Region I
The areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
Inspection Report which is enclosed with this letter. Within these areas, the
Line 41: Line 51:
Based on the results of this inspection, it appears that certain of your
Based on the results of this inspection, it appears that certain of your
activities were not conducteri in full compliance with NRC requirements, as sat
activities were not conducteri in full compliance with NRC requirements, as sat
forth in the Notice of Violation, enclosed herewith as Appendix A. These vio-
forth in the Notice of Violation, enclosed herewith as Appendix A.
These vio-
lations have been categorized by severity level in accordance with the revised
lations have been categorized by severity level in accordance with the revised
NRC Enforcement Policy (10 CFR 2, Appendix C). You are required to respond to , -
NRC Enforcement Policy (10 CFR 2, Appendix C). You are required to respond to , -
this letter and in preparing your response, you should follow the instructions'
this letter and in preparing your response, you should follow the instructions'
in Appendix A.
in Appendix A.
                                .
.
In addition to the apparent violations discussed in Appendix A,           the team
In addition to the apparent violations discussed in Appendix A,
the team
identified several weaknesses and strengths in your construction program. The
identified several weaknesses and strengths in your construction program. The
observed weaknesses and strengths are summarized in Appendices B and C,
observed weaknesses and strengths are summarized in Appendices B and
C,
respectively.
respectively.
The responses directed by this letter and the accompanying Notice are not
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
required by the Paperwork Reduction Act of 1980, PL 96-511.
8510000392     85     j43
8510000392 85
PDR     ADOCK O     PDR
j43
PDR
ADOCK O
PDR
G
G
                        0FFICIAL RECORD COPY CTI SEABROOK 85-15 - 0001.0.0
0FFICIAL RECORD COPY CTI SEABROOK 85-15 - 0001.0.0
                                                09/12/85
09/12/85
                                                                            EEd/ 4(
EEd/ 4(


                                                                              . _-.
7
7
  Public Service Company of                 2
.
    New Hampshire
_-.
  Your cooperation with us in this matter is appreciated.
Public Service Company of
                                            Sincerely,
2
                                              ' Origis*,1 Kig:sE Br9
New Hampshire
                                                Stercrt D. Raastigg'
Your cooperation with us in this matter is appreciated.
                                            Stewart D. Ebneter, Director
Sincerely,
                                            Division of Reactor Safety
' Origis*,1 Kig:sE Br9
  Enclosures:
Stercrt D. Raastigg'
  1.     Appendix A, Notice of Violation
Stewart D. Ebneter, Director
  2.     Appendix B, Licensee Weaknesses
Division of Reactor Safety
  3.     Appendix C, Licensee Strengths
Enclosures:
  4.     NRC Region I Inspection Report Number 50-443/85-15
1.
  cc w/encls:
Appendix A, Notice of Violation
  John DeVincentis, Director, Engineering and Licensing
2.
  William B. Derrickson, Senior Vice President
Appendix B, Licensee Weaknesses
  Warren Hall, Operational Services Supervisor
3.
  Donald E. Moody, Station Manager - Seabrook Station
Appendix C, Licensee Strengths
  Gerald F. Mcdonald, Construction QA Manager
4.
  Public Document Room (PDR)
NRC Region I Inspection Report Number 50-443/85-15
  Local Public Document Room (LPDR)
cc w/encls:
  Nuclear Safety Information Center (NSIC)
John DeVincentis, Director, Engineering and Licensing
  NRC Resident Inspector
William B. Derrickson, Senior Vice President
  State of New Hampshire
Warren Hall, Operational Services Supervisor
  bec w/encls:
Donald E. Moody, Station Manager - Seabrook Station
  Region I Docket Room (with concurrences)
Gerald F. Mcdonald, Construction QA Manager
  Senior Operations Officer (w/o encls)
Public Document Room (PDR)
  R. W. Gallo, Section Chief, DRP
Local Public Document Room (LPDR)
  Jane Grant, DRP
Nuclear Safety Information Center (NSIC)
  RI:                             RI:
NRC Resident Inspector
                                                    Ys
State of New Hampshire
                                                    RI:)RS           RI:DRS
bec w/encls:
  G       'jd     C         6   Cheung           Finkel           Manaly
Region I Docket Room (with concurrences)
          i
Senior Operations Officer (w/o encls)
                  W                                                   gg
R. W. Gallo, Section Chief, DRP
  8   f/85         8/) /85         8//f//85       8/3f/85           8/2//85
Jane Grant, DRP
  RI
Ys
  Re ' ds
RI:
                  R
RI:
                  E
RI:)RS
                        RS
RI:DRS
                                  Bettenhausen
G
                                                  RI:Dh
'jd
                                                    Ebne Mr
C
  8/AY85           8//b/85       cflg/85         }@/(/85
6
                            CFFICIAL RECORD COPY CTI SEABROOK 85-15 - 0002.0.0
Cheung
                                                  08/13/85
Finkel
Manaly
i
W
gg
8
f/85
8/) /85
8//f//85
8/3f/85
8/2//85
RI:Dh
RI
R
RS
Re ' ds
E
Bettenhausen
Ebne Mr
8/AY85
8//b/85
cflg/85
}@/(/85
CFFICIAL RECORD COPY CTI SEABROOK 85-15 - 0002.0.0
08/13/85
.
-
-
- - -
-
-
-
-
-
}}
}}

Latest revision as of 20:22, 11 December 2024

Forwards Const Team Insp Rept 50-443/85-15 on 850603-14 & Notice of Violation
ML20137Z854
Person / Time
Site: Seabrook 
Issue date: 10/03/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrison R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20137Z860 List:
References
NUDOCS 8510080392
Download: ML20137Z854 (2)


See also: IR 05000443/1985015

Text

,

OCT C 31985

Docket No. 50-443

Public Service Company of New Hampshire

ATTN: Mr. Robert J. Harrison

President and Chief Executive Officer

P. O. Box 330

Manchester, New Hampshire 03105

Gentlemen:

Subject:

Inspection Report No. 50-443/85-15

This

refers to the

special

construction

team

inspection

conducted by

Dr. P. K. Eapen of this office on June 3-14, 1985, at Seabrook Station, Unit

1, Seabrook, New Hampshire, of activities authorized by NRC Construction Permit

No. CPPR-135 and to the discussions of our findings held by Dr. Eapen with

Mr. W.

B.

Derrickson and others of your staff at the conclusion of the

inspection.

_

The areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, independent measurements made by the

inspectors, and observations by the inspectors.

Based on the results of this inspection, it appears that certain of your

activities were not conducteri in full compliance with NRC requirements, as sat

forth in the Notice of Violation, enclosed herewith as Appendix A.

These vio-

lations have been categorized by severity level in accordance with the revised

NRC Enforcement Policy (10 CFR 2, Appendix C). You are required to respond to , -

this letter and in preparing your response, you should follow the instructions'

in Appendix A.

.

In addition to the apparent violations discussed in Appendix A,

the team

identified several weaknesses and strengths in your construction program. The

observed weaknesses and strengths are summarized in Appendices B and

C,

respectively.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

8510000392 85

j43

PDR

ADOCK O

PDR

G

0FFICIAL RECORD COPY CTI SEABROOK 85-15 - 0001.0.0

09/12/85

EEd/ 4(

7

.

_-.

Public Service Company of

2

New Hampshire

Your cooperation with us in this matter is appreciated.

Sincerely,

' Origis*,1 Kig:sE Br9

Stercrt D. Raastigg'

Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosures:

1.

Appendix A, Notice of Violation

2.

Appendix B, Licensee Weaknesses

3.

Appendix C, Licensee Strengths

4.

NRC Region I Inspection Report Number 50-443/85-15

cc w/encls:

John DeVincentis, Director, Engineering and Licensing

William B. Derrickson, Senior Vice President

Warren Hall, Operational Services Supervisor

Donald E. Moody, Station Manager - Seabrook Station

Gerald F. Mcdonald, Construction QA Manager

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

bec w/encls:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encls)

R. W. Gallo, Section Chief, DRP

Jane Grant, DRP

Ys

RI:

RI:

RI:)RS

RI:DRS

G

'jd

C

6

Cheung

Finkel

Manaly

i

W

gg

8

f/85

8/) /85

8//f//85

8/3f/85

8/2//85

RI:Dh

RI

R

RS

Re ' ds

E

Bettenhausen

Ebne Mr

8/AY85

8//b/85

cflg/85

}@/(/85

CFFICIAL RECORD COPY CTI SEABROOK 85-15 - 0002.0.0

08/13/85

.

-

-

- - -

-

-

-

-

-