ML20137Z854: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:, | {{#Wiki_filter:, | ||
OCT C 31985 | |||
Docket No. 50-443 | Docket No. 50-443 | ||
Public Service Company of New Hampshire | Public Service Company of New Hampshire | ||
ATTN: Mr. Robert J. Harrison | ATTN: Mr. Robert J. Harrison | ||
President and Chief Executive Officer | |||
P. O. Box 330 | P. O. Box 330 | ||
Manchester, New Hampshire 03105 | Manchester, New Hampshire 03105 | ||
Gentlemen: | Gentlemen: | ||
Subject: | Subject: | ||
This | Inspection Report No. 50-443/85-15 | ||
This | |||
refers to the | |||
special | |||
construction | |||
team | |||
inspection | |||
conducted by | |||
Dr. P. K. Eapen of this office on June 3-14, 1985, at Seabrook Station, Unit | Dr. P. K. Eapen of this office on June 3-14, 1985, at Seabrook Station, Unit | ||
1, Seabrook, New Hampshire, of activities authorized by NRC Construction Permit | 1, Seabrook, New Hampshire, of activities authorized by NRC Construction Permit | ||
No. CPPR-135 and to the discussions of our findings held by Dr. Eapen with | No. CPPR-135 and to the discussions of our findings held by Dr. Eapen with | ||
Mr. W. | Mr. W. | ||
inspection. | B. | ||
Derrickson and others of your staff at the conclusion of the | |||
inspection. | |||
_ | |||
The areas examined during this inspection are described in the NRC Region I | The areas examined during this inspection are described in the NRC Region I | ||
Inspection Report which is enclosed with this letter. Within these areas, the | Inspection Report which is enclosed with this letter. Within these areas, the | ||
| Line 41: | Line 51: | ||
Based on the results of this inspection, it appears that certain of your | Based on the results of this inspection, it appears that certain of your | ||
activities were not conducteri in full compliance with NRC requirements, as sat | activities were not conducteri in full compliance with NRC requirements, as sat | ||
forth in the Notice of Violation, enclosed herewith as Appendix A. These vio- | forth in the Notice of Violation, enclosed herewith as Appendix A. | ||
These vio- | |||
lations have been categorized by severity level in accordance with the revised | lations have been categorized by severity level in accordance with the revised | ||
NRC Enforcement Policy (10 CFR 2, Appendix C). You are required to respond to , - | NRC Enforcement Policy (10 CFR 2, Appendix C). You are required to respond to , - | ||
this letter and in preparing your response, you should follow the instructions' | this letter and in preparing your response, you should follow the instructions' | ||
in Appendix A. | in Appendix A. | ||
. | |||
In addition to the apparent violations discussed in Appendix A, | In addition to the apparent violations discussed in Appendix A, | ||
the team | |||
identified several weaknesses and strengths in your construction program. The | identified several weaknesses and strengths in your construction program. The | ||
observed weaknesses and strengths are summarized in Appendices B and C, | observed weaknesses and strengths are summarized in Appendices B and | ||
C, | |||
respectively. | respectively. | ||
The responses directed by this letter and the accompanying Notice are not | The responses directed by this letter and the accompanying Notice are not | ||
subject to the clearance procedures of the Office of Management and Budget as | subject to the clearance procedures of the Office of Management and Budget as | ||
required by the Paperwork Reduction Act of 1980, PL 96-511. | required by the Paperwork Reduction Act of 1980, PL 96-511. | ||
8510000392 | 8510000392 85 | ||
PDR | j43 | ||
PDR | |||
ADOCK O | |||
PDR | |||
G | G | ||
0FFICIAL RECORD COPY CTI SEABROOK 85-15 - 0001.0.0 | |||
09/12/85 | |||
EEd/ 4( | |||
7 | 7 | ||
. | |||
_-. | |||
Public Service Company of | |||
2 | |||
New Hampshire | |||
Your cooperation with us in this matter is appreciated. | |||
Sincerely, | |||
' Origis*,1 Kig:sE Br9 | |||
Stercrt D. Raastigg' | |||
Stewart D. Ebneter, Director | |||
Division of Reactor Safety | |||
Enclosures: | |||
1. | |||
Appendix A, Notice of Violation | |||
2. | |||
Appendix B, Licensee Weaknesses | |||
3. | |||
Appendix C, Licensee Strengths | |||
4. | |||
NRC Region I Inspection Report Number 50-443/85-15 | |||
cc w/encls: | |||
John DeVincentis, Director, Engineering and Licensing | |||
William B. Derrickson, Senior Vice President | |||
Warren Hall, Operational Services Supervisor | |||
Donald E. Moody, Station Manager - Seabrook Station | |||
Gerald F. Mcdonald, Construction QA Manager | |||
Public Document Room (PDR) | |||
Local Public Document Room (LPDR) | |||
Nuclear Safety Information Center (NSIC) | |||
NRC Resident Inspector | |||
State of New Hampshire | |||
bec w/encls: | |||
Region I Docket Room (with concurrences) | |||
Senior Operations Officer (w/o encls) | |||
R. W. Gallo, Section Chief, DRP | |||
Jane Grant, DRP | |||
Ys | |||
RI: | |||
RI: | |||
RI:)RS | |||
RI:DRS | |||
G | |||
'jd | |||
C | |||
6 | |||
Cheung | |||
Finkel | |||
Manaly | |||
i | |||
W | |||
gg | |||
8 | |||
f/85 | |||
8/) /85 | |||
8//f//85 | |||
8/3f/85 | |||
8/2//85 | |||
RI:Dh | |||
RI | |||
R | |||
RS | |||
Re ' ds | |||
E | |||
Bettenhausen | |||
Ebne Mr | |||
8/AY85 | |||
8//b/85 | |||
cflg/85 | |||
}@/(/85 | |||
CFFICIAL RECORD COPY CTI SEABROOK 85-15 - 0002.0.0 | |||
08/13/85 | |||
. | |||
- | |||
- | |||
- - - | |||
- | |||
- | |||
- | |||
- | |||
- | |||
}} | }} | ||
Latest revision as of 20:22, 11 December 2024
| ML20137Z854 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 10/03/1985 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Harrison R PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| Shared Package | |
| ML20137Z860 | List: |
| References | |
| NUDOCS 8510080392 | |
| Download: ML20137Z854 (2) | |
See also: IR 05000443/1985015
Text
,
OCT C 31985
Docket No. 50-443
Public Service Company of New Hampshire
ATTN: Mr. Robert J. Harrison
President and Chief Executive Officer
P. O. Box 330
Manchester, New Hampshire 03105
Gentlemen:
Subject:
Inspection Report No. 50-443/85-15
This
refers to the
special
construction
team
inspection
conducted by
Dr. P. K. Eapen of this office on June 3-14, 1985, at Seabrook Station, Unit
1, Seabrook, New Hampshire, of activities authorized by NRC Construction Permit
No. CPPR-135 and to the discussions of our findings held by Dr. Eapen with
Mr. W.
B.
Derrickson and others of your staff at the conclusion of the
inspection.
_
The areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, independent measurements made by the
inspectors, and observations by the inspectors.
Based on the results of this inspection, it appears that certain of your
activities were not conducteri in full compliance with NRC requirements, as sat
forth in the Notice of Violation, enclosed herewith as Appendix A.
These vio-
lations have been categorized by severity level in accordance with the revised
NRC Enforcement Policy (10 CFR 2, Appendix C). You are required to respond to , -
this letter and in preparing your response, you should follow the instructions'
in Appendix A.
.
In addition to the apparent violations discussed in Appendix A,
the team
identified several weaknesses and strengths in your construction program. The
observed weaknesses and strengths are summarized in Appendices B and
C,
respectively.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
8510000392 85
j43
ADOCK O
G
0FFICIAL RECORD COPY CTI SEABROOK 85-15 - 0001.0.0
09/12/85
EEd/ 4(
7
.
_-.
Public Service Company of
2
Your cooperation with us in this matter is appreciated.
Sincerely,
' Origis*,1 Kig:sE Br9
Stercrt D. Raastigg'
Stewart D. Ebneter, Director
Division of Reactor Safety
Enclosures:
1.
Appendix A, Notice of Violation
2.
Appendix B, Licensee Weaknesses
3.
Appendix C, Licensee Strengths
4.
NRC Region I Inspection Report Number 50-443/85-15
cc w/encls:
John DeVincentis, Director, Engineering and Licensing
William B. Derrickson, Senior Vice President
Warren Hall, Operational Services Supervisor
Donald E. Moody, Station Manager - Seabrook Station
Gerald F. Mcdonald, Construction QA Manager
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Hampshire
bec w/encls:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encls)
R. W. Gallo, Section Chief, DRP
Jane Grant, DRP
Ys
RI:
RI:
RI:)RS
RI:DRS
G
'jd
C
6
Cheung
Finkel
Manaly
i
W
gg
8
f/85
8/) /85
8//f//85
8/3f/85
8/2//85
RI:Dh
RI
R
RS
Re ' ds
E
Bettenhausen
Ebne Mr
8/AY85
8//b/85
cflg/85
}@/(/85
CFFICIAL RECORD COPY CTI SEABROOK 85-15 - 0002.0.0
08/13/85
.
-
-
- - -
-
-
-
-
-