Forwards Const Team Insp Rept 50-443/85-15 on 850603-14 & Notice of Violation
ML20137Z854
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 10/03/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrison R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20137Z860 List:
References
NUDOCS 8510080392
Download: ML20137Z854 (2)


See also: IR 05000443/1985015

Text

,

OCT C 31985

Docket No. 50-443

Public Service Company of New Hampshire

ATTN: Mr. Robert J. Harrison

President and Chief Executive Officer

P. O. Box 330

Manchester, New Hampshire 03105

Gentlemen:

Subject: Inspection Report No. 50-443/85-15

This refers to the special construction team inspection conducted by

Dr. P. K. Eapen of this office on June 3-14, 1985, at Seabrook Station, Unit

1, Seabrook, New Hampshire, of activities authorized by NRC Construction Permit

No. CPPR-135 and to the discussions of our findings held by Dr. Eapen with

Mr. W. B. Derrickson and others of your staff at the conclusion of the

inspection. _

The areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, independent measurements made by the

inspectors, and observations by the inspectors.

Based on the results of this inspection, it appears that certain of your

activities were not conducteri in full compliance with NRC requirements, as sat

forth in the Notice of Violation, enclosed herewith as Appendix A. These vio-

lations have been categorized by severity level in accordance with the revised

NRC Enforcement Policy (10 CFR 2, Appendix C). You are required to respond to , -

this letter and in preparing your response, you should follow the instructions'

in Appendix A.

.

In addition to the apparent violations discussed in Appendix A, the team

identified several weaknesses and strengths in your construction program. The

observed weaknesses and strengths are summarized in Appendices B and C,

respectively.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

8510000392 85 j43

PDR ADOCK O PDR

G

0FFICIAL RECORD COPY CTI SEABROOK 85-15 - 0001.0.0

09/12/85

EEd/ 4(

. _-.

7

Public Service Company of 2

New Hampshire

Your cooperation with us in this matter is appreciated.

Sincerely,

' Origis*,1 Kig:sE Br9

Stercrt D. Raastigg'

Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosures:

1. Appendix A, Notice of Violation

2. Appendix B, Licensee Weaknesses

3. Appendix C, Licensee Strengths

4. NRC Region I Inspection Report Number 50-443/85-15

cc w/encls:

John DeVincentis, Director, Engineering and Licensing

William B. Derrickson, Senior Vice President

Warren Hall, Operational Services Supervisor

Donald E. Moody, Station Manager - Seabrook Station

Gerald F. Mcdonald, Construction QA Manager

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

bec w/encls:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encls)

R. W. Gallo, Section Chief, DRP

Jane Grant, DRP

RI: RI:

Ys

RI:)RS RI:DRS

G 'jd C 6 Cheung Finkel Manaly

i

W gg

8 f/85 8/) /85 8//f//85 8/3f/85 8/2//85

RI

Re ' ds

R

E

RS

Bettenhausen

RI:Dh

Ebne Mr

8/AY85 8//b/85 cflg/85 }@/(/85

CFFICIAL RECORD COPY CTI SEABROOK 85-15 - 0002.0.0

08/13/85