{{#Wiki_filter:m
{{#Wiki_filter:m
    '
'
.
.
      .     .
.
  4
.
          In Reply Refer To:                         9 I3 m
4
        Docket:   50-298/88-25
In Reply Refer To:
        fiebraska Public Power District
9 I3 m
        ATTri: George A. Trevers
Docket:
                Division Manager - fluclear Support
50-298/88-25
        P.O. Box 499
fiebraska Public Power District
        Colunbus, flE   68601
ATTri: George A. Trevers
        Gentlen:en:
Division Manager - fluclear Support
        This refers to the inspection conducted by Messrs. G. L. Madsen and
P.O. Box 499
        W. R. Bennett of this office during the period August 1-31, 1988, of activities
Colunbus, flE
        authorized by tiRC Operating License DPR-46 fnr Cooper fluclear Stattun, and to
68601
        the discussion of our findings with Mr. G. R. Horn and other traters of your
Gentlen:en:
        staff at the conclusion of the inspection.
This refers to the inspection conducted by Messrs. G. L. Madsen and
        Areas examined during the inspection included Information fictice followup,
W. R. Bennett of this office during the period August 1-31, 1988, of activities
        operational safety verification, nonthly surveillance and r.aintenance
authorized by tiRC Operating License DPR-46 fnr Cooper fluclear Stattun, and to
        observations, ESF walkdown, radiological protection, and security. Within
the discussion of our findings with Mr. G. R. Horn and other traters of your
        these areas, the inspection consisted of selective examination of procedures
staff at the conclusion of the inspection.
        and representative records, interviews with personnel, and observations by the
Areas examined during the inspection included Information fictice followup,
        tiRC inspector. The inspection findings are docurrented in the enclosed
operational safety verification, nonthly surveillance and r.aintenance
        inspection report.
observations, ESF walkdown, radiological protection, and security.
        Within the scope of the inspection, no violations or deviations were
Within
        identified.
these areas, the inspection consisted of selective examination of procedures
        We have also examined actions you have taken with regaro' to previously
and representative records, interviews with personnel, and observations by the
        identified inspection findings. The status of these items is identified in
tiRC inspector. The inspection findings are docurrented in the enclosed
        paragraph 3 of the enclosed report.
inspection report.
        Should you have any questions concerning this inspection, we will be pleased to
Within the scope of the inspection, no violations or deviations were
        discuss them with you.
identified.
                                                    Sincerely,
We have also examined actions you have taken with regaro' to previously
                                                    Onpal Shef By>
identified inspection findings. The status of these items is identified in
                                                      A B. BEACH
paragraph 3 of the enclosed report.
                                                    L. J. Callan, Director
Should you have any questions concerning this inspection, we will be pleased to
                                                    Division of Reactor Projects
discuss them with you.
        Enclosure:
Sincerely,
        Appendix - t;EC Inspection Report
Onpal Shef By>
            50-298/E8-25
A B. BEACH
        cc w/ enclosure: (see next page)
L. J. Callan, Director
        RIV:SRlJfmh           AC $         DRP/Ch,e'       C,Ch9         04 P
Division of Reactor Projects
        LRCennett;sn           MEEr erson   GLitadsen       GLCM5 table   LvCollan
Enclosure:
        9 / 6 /88             R/$/68       9 / e /88         9/tt/88       9 /12./88
Appendix - t;EC Inspection Report
                                                                                            b
50-298/E8-25
                                                                                          p~
cc w/ enclosure: (see next page)
                8809190152 880913
RIV:SRlJfmh
                {M   ADOCK 050002?S
AC $
                                    PDC                                                 j
DRP/Ch,e'
C,Ch9
04 P
LRCennett;sn
MEEr erson
GLitadsen
GLCM5 table
LvCollan
9 / 6 /88
R/$/68
9 / e /88
9/tt/88
9 /12./88
b
8809190152 880913
p~
{M
ADOCK 050002?S
PDC
j


    __                                                                                   _ __ _________
__
        .
_
__ _________
.
.
.
.
.
          .      .
'
      '
t
  t
Nebraska Public Power District
            Nebraska Public Power District         -2-
-2-
            cc w/ enc *losure:
cc w/ enc *losure:
            Cooper Nuclear Station
Cooper Nuclear Station
            ATTN: Guy R. Horn, Division Manager
ATTN: Guy R. Horn, Division Manager
                      of Nuclear Operations
of Nuclear Operations
            P.O. Box 98
P.O. Box 98
            Brownville, Nebraska   68321
Brownville, Nebraska
            Kansas Radiation Control Program Director
68321
            Nebraska Radiation Control Program Director
Kansas Radiation Control Program Director
            bectoDMB(IE01)
Nebraska Radiation Control Program Director
            bec dist*ib. by RIV:
bectoDMB(IE01)
            *RRI R. $ Martin, RA
bec dist*ib. by RIV:
            *SectionChief(DRP/C)             *A. B. Beach
*RRI R. $ Martin, RA
            *RPB-DRSS                           Lisa Shea, RM/ALF
*SectionChief(DRP/C)
            *RIV File                         * MIS System
*A. B. Beach
            *RSTS Operator                   * Project Engineer, DRP/C
*RPB-DRSS
            *DRS                             *W. Long, NRR Project Manager
Lisa Shea, RM/ALF
            *DRP                             *M. E. Emerson, AC
*RIV File
            *Allegathns Coordinator
* MIS System
            *w/766
*RSTS Operator
                                                                    .-__-_- _ _____ _ ___
* Project Engineer, DRP/C
*DRS
*W. Long, NRR Project Manager
*DRP
*M. E. Emerson, AC
*Allegathns Coordinator
*w/766
.-
- -
}}
}}

Latest revision as of 01:03, 11 December 2024

Forwards Insp Rept 50-298/88-25 on 880801-31.No Violations or Deviations Noted
ML20154E836
Person / Time
Site: Cooper 
Issue date: 09/13/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20154E839 List:
References
NUDOCS 8809190152
Download: ML20154E836 (2)


See also: IR 05000298/1988025

Text

m

'

.

.

.

4

In Reply Refer To:

9 I3 m

Docket:

50-298/88-25

fiebraska Public Power District

ATTri: George A. Trevers

Division Manager - fluclear Support

P.O. Box 499

Colunbus, flE

68601

Gentlen:en:

This refers to the inspection conducted by Messrs. G. L. Madsen and

W. R. Bennett of this office during the period August 1-31, 1988, of activities

authorized by tiRC Operating License DPR-46 fnr Cooper fluclear Stattun, and to

the discussion of our findings with Mr. G. R. Horn and other traters of your

staff at the conclusion of the inspection.

Areas examined during the inspection included Information fictice followup,

operational safety verification, nonthly surveillance and r.aintenance

observations, ESF walkdown, radiological protection, and security.

Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations by the

tiRC inspector. The inspection findings are docurrented in the enclosed

inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regaro' to previously

identified inspection findings. The status of these items is identified in

paragraph 3 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Onpal Shef By>

A B. BEACH

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

Appendix - t;EC Inspection Report

50-298/E8-25

cc w/ enclosure: (see next page)

RIV:SRlJfmh

AC $

DRP/Ch,e'

C,Ch9

04 P

LRCennett;sn

MEEr erson

GLitadsen

GLCM5 table

LvCollan

9 / 6 /88

R/$/68

9 / e /88

9/tt/88

9 /12./88

b

8809190152 880913

p~

{M

ADOCK 050002?S

PDC

j

__

_

__ _________

.

.

.

.

'

t

Nebraska Public Power District

-2-

cc w/ enc *losure:

Cooper Nuclear Station

ATTN: Guy R. Horn, Division Manager

of Nuclear Operations

P.O. Box 98

Brownville, Nebraska

68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bectoDMB(IE01)

bec dist*ib. by RIV:

  • RRI R. $ Martin, RA
  • SectionChief(DRP/C)
  • A. B. Beach
  • RPB-DRSS

Lisa Shea, RM/ALF

  • RIV File
  • MIS System
  • RSTS Operator
  • Project Engineer, DRP/C
  • DRS
  • W. Long, NRR Project Manager
  • DRP
  • M. E. Emerson, AC
  • Allegathns Coordinator
  • w/766

.-

- -