In Reply Refer To:
9 I3 m
Docket:
50-298/88-25
fiebraska Public Power District
ATTri: George A. Trevers
Division Manager - fluclear Support
P.O. Box 499
Colunbus, flE
68601
Gentlen:en:
This refers to the inspection conducted by Messrs. G. L. Madsen and
W. R. Bennett of this office during the period August 1-31, 1988, of activities
authorized by tiRC Operating License DPR-46 fnr Cooper fluclear Stattun, and to
the discussion of our findings with Mr. G. R. Horn and other traters of your
staff at the conclusion of the inspection.
Areas examined during the inspection included Information fictice followup,
operational safety verification, nonthly surveillance and r.aintenance
observations, ESF walkdown, radiological protection, and security.
Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observations by the
tiRC inspector. The inspection findings are docurrented in the enclosed
inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regaro' to previously
identified inspection findings. The status of these items is identified in
paragraph 3 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Onpal Shef By>
A B. BEACH
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - t;EC Inspection Report
50-298/E8-25
cc w/ enclosure: (see next page)
RIV:SRlJfmh
AC $
DRP/Ch,e'
C,Ch9
04 P
LRCennett;sn
MEEr erson
GLitadsen
GLCM5 table
LvCollan
9 / 6 /88
R/$/68
9 / e /88
9/tt/88
9 /12./88
b
8809190152 880913
p~
{M
ADOCK 050002?S
j
__
_
__ _________
.
.
.
.
'
t
Nebraska Public Power District
-2-
cc w/ enc *losure:
Cooper Nuclear Station
ATTN: Guy R. Horn, Division Manager
of Nuclear Operations
P.O. Box 98
Brownville, Nebraska
68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bectoDMB(IE01)
bec dist*ib. by RIV:
- RRI R. $ Martin, RA
- SectionChief(DRP/C)
- A. B. Beach
- RPB-DRSS
Lisa Shea, RM/ALF
- RIV File
- MIS System
- RSTS Operator
- Project Engineer, DRP/C
- DRS
- W. Long, NRR Project Manager
- DRP
- M. E. Emerson, AC
- Allegathns Coordinator
- w/766
.-
- -