m

'

.

.

.

4

In Reply Refer To:

9 I3 m

Docket:

50-298/88-25

fiebraska Public Power District

ATTri: George A. Trevers

Division Manager - fluclear Support

P.O. Box 499

Colunbus, flE

68601

Gentlen:en:

This refers to the inspection conducted by Messrs. G. L. Madsen and

W. R. Bennett of this office during the period August 1-31, 1988, of activities

authorized by tiRC Operating License DPR-46 fnr Cooper fluclear Stattun, and to

the discussion of our findings with Mr. G. R. Horn and other traters of your

staff at the conclusion of the inspection.

Areas examined during the inspection included Information fictice followup,

operational safety verification, nonthly surveillance and r.aintenance

observations, ESF walkdown, radiological protection, and security.

Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations by the

tiRC inspector. The inspection findings are docurrented in the enclosed

inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regaro' to previously

identified inspection findings. The status of these items is identified in

paragraph 3 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Onpal Shef By>

A B. BEACH

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

Appendix - t;EC Inspection Report

50-298/E8-25

cc w/ enclosure: (see next page)

RIV:SRlJfmh

AC $

DRP/Ch,e'

C,Ch9

04 P

LRCennett;sn

MEEr erson

GLitadsen

GLCM5 table

LvCollan

9 / 6 /88

R/$/68

9 / e /88

9/tt/88

9 /12./88

b

8809190152 880913

p~

{M

ADOCK 050002?S

PDC

j

__

_

__ _________

.

.

.

.

'

t

Nebraska Public Power District

-2-

cc w/ enc *losure:

Cooper Nuclear Station

ATTN: Guy R. Horn, Division Manager

of Nuclear Operations

P.O. Box 98

Brownville, Nebraska

68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bectoDMB(IE01)

bec dist*ib. by RIV:

  • RRI R. $ Martin, RA
  • SectionChief(DRP/C)
  • A. B. Beach
  • RPB-DRSS

Lisa Shea, RM/ALF

  • RIV File
  • MIS System
  • RSTS Operator
  • Project Engineer, DRP/C
  • DRS
  • W. Long, NRR Project Manager
  • DRP
  • M. E. Emerson, AC
  • Allegathns Coordinator
  • w/766

.-

- -