ML20195E734: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:m                                                                                                                                                                 ,
{{#Wiki_filter:m (BSEP-2-89)
(BSEP-2-89)
TABLE 3.6.3-1 (Continued) t, g
TABLE 3.6.3-1 (Continued)                               t, g                                                   PRIMARY CONTAINHENT ISOLATION VALVES 5
PRIMARY CONTAINHENT ISOLATION VALVES 5C ISOLATION TIHE h
C                                                                                              ISOLATION TIHE h     VALVE FUNCTION                                         VALVE CROUP II                      (Seconds)
II VALVE FUNCTION VALVE CROUP (Seconds)
IIPCI steam line isolation valves                           4                                 50
IIPCI steam line isolation valves 4
                                    .O             E41-F002 U     E41-F003 w
50
                                                    !!PCI torus suction isolation valves                         4                                 80 E41-F042 E41-F041 RCIC steam line isolation valves                             5                                 20*     l E51-F007 E51-F008 w      Drywell purge exhaust backup valve                           6                                 15 g      CAC-V10 i     Containment air purge isolation valve                       6                                 15 G     CAC-V15 Suppression chamber vent valve                               6                                 15 CAC-V22
.O E41-F002 U
                                                                                                                          ~
E41-F003 w
Drywell purge exhaust valve                                 6                                 15 CAC-V23
!!PCI torus suction isolation valves 4
* The Isolation Time for valve E51-F007 is extended to 30 seconds until December 6, 1986 at which I     time the 20 second limit will be re-established.
80 E41-F042 E41-F041 l
E 8
RCIC steam line isolation valves 5
8606090208 860604 z PDR   ADOCK 05000324 P                   png   '
20*
__________ _ ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _}}
E51-F007 E51-F008 Drywell purge exhaust backup valve 6
15 wg CAC-V10 i
Containment air purge isolation valve 6
15 G
CAC-V15 Suppression chamber vent valve 6
15 CAC-V22
~
Drywell purge exhaust valve 6
15 CAC-V23
* The Isolation Time for valve E51-F007 is extended to 30 seconds until December 6, 1986 at which I
time the 20 second limit will be re-established.
E 8"
8606090208 860604 z
PDR ADOCK 05000324 P
png
'}}

Latest revision as of 18:51, 10 December 2024

Proposed Tech Spec Table 3.6.3-1, Primary Containment Isolation Valves, Extending Isolation Time for Valve E51-F007 to 30 Until 861206
ML20195E734
Person / Time
Site: Brunswick 
Issue date: 06/04/1986
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20195E713 List:
References
NUDOCS 8606090208
Download: ML20195E734 (1)


Text

m (BSEP-2-89)

TABLE 3.6.3-1 (Continued) t, g

PRIMARY CONTAINHENT ISOLATION VALVES 5C ISOLATION TIHE h

II VALVE FUNCTION VALVE CROUP (Seconds)

IIPCI steam line isolation valves 4

50

.O E41-F002 U

E41-F003 w

!!PCI torus suction isolation valves 4

80 E41-F042 E41-F041 l

RCIC steam line isolation valves 5

20*

E51-F007 E51-F008 Drywell purge exhaust backup valve 6

15 wg CAC-V10 i

Containment air purge isolation valve 6

15 G

CAC-V15 Suppression chamber vent valve 6

15 CAC-V22

~

Drywell purge exhaust valve 6

15 CAC-V23

  • The Isolation Time for valve E51-F007 is extended to 30 seconds until December 6, 1986 at which I

time the 20 second limit will be re-established.

E 8"

8606090208 860604 z

PDR ADOCK 05000324 P

png

'