ML20195E734

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Table 3.6.3-1, Primary Containment Isolation Valves, Extending Isolation Time for Valve E51-F007 to 30 Until 861206
ML20195E734
Person / Time
Site: Brunswick 
Issue date: 06/04/1986
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20195E713 List:
References
NUDOCS 8606090208
Download: ML20195E734 (1)


Text

m (BSEP-2-89)

TABLE 3.6.3-1 (Continued) t, g

PRIMARY CONTAINHENT ISOLATION VALVES 5C ISOLATION TIHE h

II VALVE FUNCTION VALVE CROUP (Seconds)

IIPCI steam line isolation valves 4

50

.O E41-F002 U

E41-F003 w

!!PCI torus suction isolation valves 4

80 E41-F042 E41-F041 l

RCIC steam line isolation valves 5

20*

E51-F007 E51-F008 Drywell purge exhaust backup valve 6

15 wg CAC-V10 i

Containment air purge isolation valve 6

15 G

CAC-V15 Suppression chamber vent valve 6

15 CAC-V22

~

Drywell purge exhaust valve 6

15 CAC-V23

  • The Isolation Time for valve E51-F007 is extended to 30 seconds until December 6, 1986 at which I

time the 20 second limit will be re-established.

E 8"

8606090208 860604 z

PDR ADOCK 05000324 P

png

'