The implications of the Chernobyl Accident
    .                                                for the U.S. Nuclear Power Program Remarks by Comissioner James K. Asselstine U.S. Nuclear Regulatory Connission Before the New England Conference of Public Utilities Comissioners 1996 Annual Symposium Chatham, Massachusetts June 9,1986 Good evening, ladies and gentlemen.                                                    It is a great pleasure to be here this        -
evening te discuss the implicaticns of the April 26, 1986 accident at the Chernobyl reactor in the Soviet Union for the U.S. nuclear power program.
I want to begin with a brief sumary of what we do and do not know at this peint about the Chernobyl accident. I should say at the outset that I do net have any surprises as to cur understanding of the events during and following the accidant.
I believe that the available infor ation has been quite well publi:ized.
We believe that the accident resulted in a large early release of radiation from the plant that continued for several days.                                                      Based upon back calculations from actual contaNination levels experienced in western Europe, principally in Sweden, we ertirate that between 30 and 60 percent of the radioactive icdine and                                                __ _
cesium contained in the reactor core was rellased offsite. For comparison purposes, this relates tom offsite                                                          ,
(          releases that are sombat less than the worst releases predicted in the Comission's Reactor Safety Study.                                                      In the parlance of the Rea;ter 5#.fety 8810250327 080914 NS      -198 PDR
 
,            Study, SST-1 and SST-2 accidents, the horst considered, would result in the release of 70 per:ent of the iodine and /* percent of the cesium. The next most serious sequence, SST-3, would result in the release of or.ly 20 percent of the iodine and cesium. Thus, the Chernobyl release would equate to something between the SST-2 and SST-3 levels. We also believe that the
          - graphite fire provided a strong driving force which, by creating a chimney effect, aided in the offsite release of the radiation, particularly oser the longer distances.
l The effects of the release have been fairly well publicized, with se'hething ap; reaching 30 f atalities thus far, with the cea.taminatten of substar.tial areas arcund the plant, with the need to evacuate large numbers of pecple from the vicinity of the plant, unfortunately tr.any hours af ter the release began, and with the need to monitor the futy,hylth of per,halsgrary,as 100.000 rec:le. It is also w:rth noting that during the course of the accider.t. EFA's prever.tive pr:te:tive action guides were exceeded by the contamination in several western European countries including Sweden, Finland, Norway, West Gemany, Italy, and the United Kingdom. While these l
preventive protective action guides are admittedly fairly conservative i
levels -- 1.5 rem to the thyroid and 0.5 rem whole-body exposure, this              l t
provides sone indication of the world-wide impact of this accident.
l 1 should emphasize that our knowledge of the accident is still very limited. Our estimates of the radiation releases from the plant are still' based upcn back calculations over long distances rather than upon actual
* measurements in the Soviet Union, and we still do not have a clear
 
o j        .                                                                                                                                                            .
l .
                                                                              -  3-I understanding of the sequence of events that caused the accident. Nor do i
l we have detailed design information for the Chernobyl plant as yet.                                                              The            ;
Soviet Unien has agreed to provide a full accounting of the accident to the l
_ - -        /'    j Inttrnational Atomic Energy Agency by September, and perhaps as early as
                                                                                                                                                                      ,j        ;
l                              July. I suspect that our many questions about how this accident began and l                              progressed to a catastrophic early release of radiation, and how effectively the Soviet Union is dealing with its aftermath, will not be                                                                          I fully answered until then.      Clearly, this detailed accounting is important                                                                  )
to us, as it is to many other countries. But I do not believe that we need                                                                      !
to wait until then to begin learning the lessons of this accident for' our nuclear goaer pr:; a..
Unfortunately, it is not clear that these lessons are being heeded, either, by the industry or by the Nuclear Regulatory Comission.                                                    In fact, the initial reacticn frc many in the U.S. nuclePr industry and in gevernment
                              'swellha'.beeneneofd,ea.iaj. We are toit that such an a'eticent cculd not happen here because of the trany differences in design ottween this l                              Soviet ret eter and U.S. reactors, because of our stronger comitment to l                              safety, and because of the existence of an independent regulatory process l
l                              in the United States.      Interestingly, in support of this thesis, the nuclear industry points to the willingness on the part of the governnent regulator, the Nuclear Regulatory Comission, to insist upon continuing l                ,
safety ir provements 'n the U.S. plants and to the use of an open regulatory process that welcones public involvenent.                            For these reasons, many in w                                                  --
industry and governner.t argue that there are few, if any, lessons for us in
* the Chernebyl accident.
l            __  _ _ _ _ _      _-.        ._.        -  .    --- - _ _        - - - - - - - - -      - - - - - - - - - - - - - - ~ - - - - - -                  -
 
                ,                                                                                      -4 i
I disagree.                                To be sure, there are some rather significant design a
differences between the Chernobyl plant and the U.S. light water reactors that comprise the bulk of the 100 operating nuclear power plants and the 20 plants now under construction in this country.                                                                                      Perhaps chief among these differences is the combination of large amounts of uranium fuel, zirconium, water and graphite in the reactor core of the Soviet plant which creates the potential for generating substantial quantities of explosive hydrogen                                                                                                                l under accident conditions.                                              And there may be differences as well in the containment capabilities of the U.S. and Soviet designs, alth.: ugh we do not yet have sufficient information on the design of the Chernobyl plant 'to reach an inf:r ed cen:1usion on the degree of similarity or difference                                                                                                                  t between the Soviet and U.S. containment capability.                                                                                                        I would also agree that our safety philose;hy and system of regulation are different than the Soviet syste . But we wculd be remiss if we ignored so e of the broader
;                                                                                                                                                                                                              l 1
l lessons of the Chernctyl accident that tgscend these design differences.                                                                                                      ,          {
In ry judg ent, there are several lessons that apply to the U.S. nuclear j                    progran.                      Some of these lessons reinforce previous safety decisions r.ade here.      In this vein, the thern:byl accident seems to demonstrate the wisdom
;                _of some cf the new safety recuireG adopted in t.he United States in the 1
wake of the Three Mile Island accident in 1979.                                                                                        One example is irn tved emergency planning around comercial nuclear power plants, which provides an added metsure of public protection, independent of plant safety systems,                                                                                                              ;
I to mitigate the consequences of an accident resultirg in the offsite                                                                                                            '
;                    release of radioactivity. Ancther example is the addition of hydrogen
* 1 j                    Control features on fertain types of plants which are intended to prevent I
1 i                                                                                                                                                                                                              1 i
 
5-large scale hyc rogen explosions that could breach the reactor containment.
And still anet'ter example is the environmental qualification of electrical equipment, w'sich is intended to ensure that nraessary safety equipment will continue to function under s. tous accident conditions such as heat, moisture and radiation.
All of these measures reflected a recognition af ter the Three Mile Island accident that severe reactor accidents involving the melting of the reactor core and the potential release of substantial amounts of radioactivity can
            .                in fact occur. Obviously,theChernobylaccidentreinforcesthevalidity                                                                              ;
of that judg ent. A m:re detailed understanding cf the Chernebyl accident gy              p        may tell us that we need to revisit some of these issues, such as emergency
  '.,g p1anning and hydregen contrel.
                  '. - )
h.'
!                            The Chernebyl accident a150 de enstrates quite vividly that nuclear safecy 1
J j                            is truly a glotal issue. It is nc= clear that the effects of a severe
{                            reactor accident are not necessarily limited to the imediate vicinity of the plant, and that such accidents can affect many other countries.                                          In a very real sense, we are all hostage to each other's performance, s
But perhaps the most important lesson of the Chernobyl accident has to f.io with the acceptability of a severe accident in the United States and the adequacy of the measures new being '6aken by the industry and the NRC to 4
prevent such an accident. For tnis accident brings home the fact that                                              *
(                    severe reactor accidents which involve melting of the reactor core, the l                            potential for dangerous expcsures to radiation, the potential for extensive i
                                  - ---    - --            as-.- -. -- -. .---, ,_ ,      - - ,  .,.n.- ,-- .- - -    - , -- - - , ,, -  r-- --  - _,- - . , - . ----.
 
      .                                                  land contamination, and public stress and trauma, can occur. The fundamental lesson from Chernobyl inust be that such an accident is simply unacceptable, and we must make every effort to reduce or eliminate the chance of such an accident in this country. The central question I want to
                                                                        ~
incus on shis evening is whether our present regulatory approach and the level of perfomance of the U.S. plants are fully consistent with t.his. .most.
fundamental lesson of Chernobyl. 1 must conclude, based upon the experience of the past few years, that they are not, and that we should be pursuing additional measures both to reduce the possibility of a core
                                                                                ~
meltdown accident in this country and to mitigate the adverse effects of such an acticent sh:uld one occur.
To support ry conclusion, I want to turn first to an examination of several actions by the NRC over the past several years which evidence an N  increasingly co placent attitude on safety and a reluctance to insist u;en further safety ir;roveMnts in the plants that would substantially reduce the risk of c:re meltdown accidents. I want to begin my analysis with a historical look at the period irnediately following the Three Mile Island accident,    in the af temath of TM1, the President's Comission on the Three Mile Island Accident charted a new safety philosophy for the country, particu'tarly with respect to the prevention and mitigation of core ultdown accidents. In the words of the President's Comission:
1 Whether in this particular case we came close to a catastrophic accident or not, this accident was too serious. Accidents as serious as TM1 shculd not be allowed to occur in the future. The accident g:t sufficiently out of hand so that those atteepting to control it were 1
operating sonwhat in the dark... Once an accident reaches this stage, ene that goes beyond well-understeed principles, and puts those i
 
controlling the accident into an experimental mode ... the uncertainty of whether an accident could result in major releases of
  .                      r Mioactivity is too high. Adding to this the enormous damage to the plant, the expensive and potentially dangerous cleanup process that rerains, and the great cost of the accident, we must conclude that --
whatever worse could have happened -- the accident had already gone              <
too far to make it tolerable. Wnile ... we emphasize that fundamental changes are necessary to prevent accidents as serious as THI, we sust not assume that an accident of this or greater seriousness cannot happen again, even if the changes we recomend are made. Therefore, in addition to doing everything to prevent such accidents, we must be fully prepared to minimize the potential impact of such an accident on public health and safety, should one occur in the future. (Repert of the President's Comission on the Accident at Three Mile Island, p.15.)
The Comission adcpted this safety philosophy in favor of new safety                        l
                                                                                              ~
improvements both to prevent serious accidents and to mitigate their c ce s e cue r.c e s . Acccrdingly, in the years iriediately fellcwing the TM!
recident, the NRC developed and imposed on the industry a substantial, ny ber of new requirerents to address many of the specific weaknesses that had been identified at TMI.          Thesenewrequirementshaveresultedinmg ex:eeie4:ti_Ld.better. trained personnel at the plants, it;r:ved.pr:cedures f
                ,Qc'ing        with acticeat s],gtions, better plant instree-tation and                    i plant diagnostic teols, and up;raded emergency pitnning and response capabilities.          Satisfying these new requirements took a considerable effort
          , p by the utilities, state and 1ccal governments, and the NRC, and ecst the i
          .E    utilities and their ratepayers en the order of $50 mhlien per plant.
i l              In addition to it;: sing these near-term safety improvements, the NR0 1      .
cemitted itself to a number of longer-tenn efforts aimed at reassessing the risk of core reltdown accidents and developing eere fundanental safety' improvements,          The 1er.;er-tern cemitgtnts teck the fod of an imediate        -    '
!              reappraisal of the risk of core celtdown accidents at the east heavily i
I l
t l
 
                ,+
4
        .,t
                      .s1                                                              g
        , [#            f s.g s
        't, *:                    IMAGE EVAL.U ATION
['"////      [%
  \\\\/o
            '' , ",      <' 8 6'
      ,/        '                  TEST TARGET (MT-3)                          'gN/    f'. , ''c' %
                                                                                                  ' N'
                                                                                      /
gp
                                                                        //j/
        +                                                                            v I.0      l' :'"    '22 c v.            .
                                                  'p        " 2 0, I.l                =  "
n l.8
                                                          !m I.25    gi 1.4
                                        <=      W2        mWi ll        1.6 l
4                          150mm                                  >
d --                -- -- 6 "                                        >
l 1
f4%pp i
    ;f                  %g,
          $,,,>,y,                                                              *3,
 
            .+
                'j
      ':{+p o
g  .. .
IMAGE EVALUATION                                          . ('    e,
\ fg :,q ?' ' 89' TEST TARGET (MT-3)                                      ,O' '''      s, h s\(/
sp              9f9                                                                              .,l*
4                                                                                    y 1
l l
l 1.0        ll            ".
                                                        ,_ "          22 c    #"
                                                        ?~ ? '        20, l,l                      a2 1.'l I.8 1' w I.25      '
l i m.4  ,    9 i.6
                                          =;                    %
4                                    150mm -                                  >
: g.          -
6"                                    >
        .b' '
:a
: %y
                ,y,                                                          f4%
                                                                              % ,sh
    ~
        &,,,,,                                                                            %3'                l
 
        +
    ,p      g4 X, e5      A IMAGE EVALUATION                                                    ////gf 4%          '
//o// '('" ,f7
(            TEST TARGET (MT-3)                                                                [, , ''.' ' %
  \ff                                                                                              3                    o 1.0    LM
                                                    ~~
                                                              '  M n
t; 7,.      e :-
:- p.  ' 2_0_
l,l                t2 R l.8
: rs; I l.05  y I.4 a  q L6 i s-m    u        e 1
4-                          -
150mm -                                                    >
4    .--
                            -- -- - - 6 "                                        --
h' l%                                                                                                A4%
Og,,f,/            E' f4N
        }                                                                                                th        &
J
                      ''m m '.eAw u,;                                        s
 
                                                                    -8.
            ,Thi' populated reactor sites in the country, focusing onplan-                              the near New York City, and a broader examination of measu                              redut the risk due to core reltdown accidents at G existing                            and u ure plants.
f But as time passed and the memory of the Threeent                              Mile    Isla faded, the Comission's enthusiasm for both of these efforts                        wane.
bega And in three decisions last year, the Comission                _              out an gn
_ urther efforts
(
both to reduce the possibility of a core meltdown accident e United States in the future, and to minimize the consequences o should one occur.                                                              _ accident In those decisions, the Comission effectively re the vigilant and forward-looking approach to safety that ha n advocatec by the President's Corr.ission on the Three Mile Island Acc S                                                                                                  .
e          The    firstplants.
Indian Point    of these decisions involved the Lev e
e Despite projections of severe consequences from core meltdcwn accident at Indian Foint involving the offsite radiatier., anc despite the long-standing difficultiesnginadequate                  providi erergency planning for the heavily popula,te,d Indian                        , the Point site Comission declared the two Indian Point ,.reactors
                                                                                                      ~
f e n,          ac rejected all of ,the croposed safety improvecents, including        ._
for tht pla
{                  the relatively straightforward safety improvements                          ur own urged b technical staff and our hearing board.
These improvements would have cut the severe accident risk at Indian Point                            in hall.its In reaching decision, the Comission improperly placed heavye reliance                                        on bottom-line results of probabilistic risk assessments and ignored the                                '
uncertainties in the risks associated with the operatien of the Point reactors.
1
 
10 -
safety perfomance that would reduce the possibility of a severe accident or minimize the consequences of such an accident.
A review of recent safety studies of U.S. nuclear power plants and actual operating experience with the plants demonstrates that the Comission's new-found philosophy of safety complacency is inconsistent not only with the advice of the President's Comission on the Three Mile Island Accident but also with the lessons of the Chernobyl accident as well. Safety analyses of a nur.ber of U.S. plants indicate that even with the improve.
        -                                                                                              ~
ments made af ter the Th! accident, there is about a 45 percent chance of a        ,
cere reltdown at one cf the 100 plants new in o;eratien in this country over the next 20 years, a              -          -
in addition, plant operating experience dem:nstrates that losses of reactor
* stfety syste .s, r.ultiple and simultane:us ecuipment failures, human errors, peer raintenance practices, p: r maragement and rapid ur.plahned reactor h      shutdowns are still frequent occurrences,at nuclear power plants in this country. These weaknesses in plant performance can serve both as the initiating events for accidents and as complicating factors that can turn less serious operating events into severe accident situations. Last year, these weaknesses in plant operations caused se_veral significant operating N  #
events which created the potential for a much more serious accident in this cour:ry.
These operating events included the total loss of feedwater evLnt              n at the Levis-Besse plant in Ohio, the water hanner event at the San Onofre '
Unit 1 plant in Calif:rnia, the severe overcooling event at the Rancho Seco
* plant in California, and the many crerating events at the Tennessee Valley O
 
Authority plants leading to the collapse of the TVA nuclear management structure and the iginite shutdown of all five of TVA's operating plants, u
The number cf serious safety events at our nuclear power plants together with the existing safety analyses which show a high likelihoo'd of a core reltdown in the United States over the next 20 years provide clear evidence that we are not yet at the point where we can relax our search for practical safety improvements. Many other countries appear to have learned this lesson, and are achieving substantial improvements in reactor safety at reasw.able cost that go beyced what this country is now requiring.
( Japan. West Germany and Sweden have achieved outstanding quality in the construction of their plants and in the material condition of plant
          \cceponents and equiprent.      This high quality in plant equipment is r.ain-tained thrcughout the cperating life of the plant through extensive preventive raintenance pr:grar.s. In addition, each of these countries consistently achieves outstanding levels of human perferr.ance. As a result, plant reliability is very high, with few unplanned shutdowns, equipment failures and persennel errors.      Serious operating events involving widespread equipment failures, losses of safety systems, and the potential for a more serious accident are virtually nonexistent.
in addition, the United Kingdom is considering the addition of extensive new safety features beyond those found in U.S. plints for their preposed
* new light water reactor at Si:ewell. The purpose of these new fectures is
* to further reduce the risk of a core meltdown accident. West Gerr.any,
 
12 -
Sweden, Belgium and the Netherlands have also added or ar2 adding new safety features to their plants, which go considerably beyond the designs of U.S. plants. The purpose of these new design features is either to reduce the itkelihcod of a core meltdown or to mitigate the consequences of a meltdown to the public. These advances in achieving true excellence in plant performance and improvements in accident risk fer existing as well as future plants means that many ofrthese e=+de are already well ahead of X
the United States.in reducing the risk of a core meltdown accident. -
This foreign experience dem:nstrates that there are practical and reasenable c; tier,s available to reduce the severe accicer.t risk in this country as well.
I would pre;cse a three-part program to achieve this cbjective.
First, each of the 100 operating plants in the U.S. should be T
reexamined to identify design deficiencies and vulnerabilities, of the type
                                -.-----t-...-...-.                                                                        .
sten in cur recent sericus op ating events and plant safety analyses, that could_-cause or centribute..to p severe accident. Se:end, imp'rovement 3
                                                        . .                                , ,  .    ...      e programs should be required in areas of demonstrated weak perforr.ance at the U.S. plants such as gnagement, esintena_nce, personnel performance and equip.ent relgity. Q[ective should be to bring bl U.S. plants up
,              to the highestltandards of operating perfomance being achieved in other countries. We should insist upon rapid improvement in the case of those '
U.S. plants with a history of poor perfomance.
V gd.,new design features should be considered for existing and future U.S. plants which have the potential to reduce b.th the l.i.kelihood and the                _ . .    - -
              .censequences of a cere meltdoc accident. The design features being added*
e
 
in foreign plants, such as an added indeoendent decay heat removal system, improvements in the reliability of reactor control systems and emergency                    l
                                                                                          ~
oower sucoly_ systems, systems to protect against th_ e loss of power te grate o      cooling and safecy systems, and systems to allow the controlled venting from some reactor containments, provide a good starting point for this review.                                                                                  l Taken together, these measures should lead to a substantial reduction in the risk of a core meltdown accident in this country. They would also represent a return to the vigilant and forward-looking safety philosophy advecated by the Presider.t's CcT.issien on the Three Mile Island Accident.                  '
If we are to heed the lessens of the Chernobyl accident, we must return to i
a safety approach that stresses the need to improve plant perfomance, to                      i i
learn the lessens of operating experience, and to pursue practical safety                    l improvements in existing as well as any future plants in order to recute the risk of a core meltdoan to a level that is as low as reasenably
,                  achievable. Protection of the public, protection of the sizeable investment rade by the utilities in the 100 operating plants, and public confidence in our nuclear program demand nothing less. Thank you.
                                                                                                          .      1 l
 
  .                                                                                                        ~.
                                                                                                ~,  -
                                                                                                  ,,, { pl OOSTON ROl50N                            %
1 7
                                                                                                '.      \
CMtomille Troieseg Center                            V PO eos1065                                                      5
    ,                                Ptymowth. Massachwsens 02360 N)J4/ .(' s July 25.1986 A.L.Oasen v.ce resident                                                        Vi'PO #56-83
,      Ncieer operatiens Hr. Peter Agnes, Jr.
Asst. Secretary of P.blic Safety Coracnwealth of Massa:husetts Executive Office of Public Safety 1 Ashturten Place - Re:m 0133 Ecston, MA        0:1C3
 
==Dear Mr. A;nes:==
 
As re;uested, please find en:1cted the status, effective June 25, 1986, of Boston Ecison's plant-s;e:ific co mitments in res;cnse to INFO's 1955 evaluati:n cf Pilgri.. fiaclea- P wer Station.
If I ca- te cf anj f.    .tr assistan:e, clease d; r.:t hes' tate to c:nta:t te.
Viry traly y:.rt.
r
                                                              /
6)--y;y.
A. L. Oxsen Enclesure                                                                                        .
9
 
sanoing      . 4-1) The im seek and e6pevi.n ter ewh section u.e b                                                                                                            .
de icred sha farus en careccent hao.n prohica.s. I'.cse taa'                              'he 1986 goals /objectiv::s developed for each    ,
                                    .ad e,rc e..n ..n be maa.iored accordance . 2h noe w.                                          :llon are helng revisited la Ilght c,f the          ~
M            h M mgN~d hm M W occurred at PHPS. The goals / objectives will be re-af firmed / revised to rddress present direction by July 198f>.
Finding (OA.3-1) Act          cas ha.e bem va6ea s. reassica ad=iaise,asi.e ras 6s that The Site Procurement Support Group is in
                                  .e,e e,aa.i.comier daac t,y r.,se. .ae sur-,.. sons. Aoshar.ra a has bem rece..ed i. sorm a s.ie rear.,ement c...p and ' place and functioning, although all positions have not Ma.asmaare riaanerig            Ca,.f.                          Cmarbda tes  ha.c  been  been filled with BECo personnel yet. He still lack one ease,..e.ed, and the v.aan sei < e                            pus, .: the rv.. ess es =
r <t'en.                                                                                    senior-Icvel person and the engineering function is
                                  ,,an. gam ,aTh.s      t'*',P
                                                      ..n  n  "'n c,  be  t.aics.orut                  by Atarch 9EA. Ibc
                                                                  ,she s..,.,,..s..s s shes o.,y ca,.                        curr.*ntly being addressed with contractors.
iar and d.ect f.ekt acii....cs so .,,y,o.c she a.-as acord po.,s.ae maaag - sc.,, ar, cur casir esvahi;shed :" *""" DECO personnel and has been involved in two unplanned the erreci.. earn .: s.v.er.i ars ,a caro c=g h,gh na~s <ds.                                outages where they were of great assistance.
W II M            d 6 km a we cohesive and effective group.
fleid observation guidelines are being developed to assist / standardize monitoring of fleid activities.
Fleding (0A.3-2) rriorieirati.in .as co -d aavien er resources                                      .,e
                                .    .gh th, in s.. . pi a.              The r*.rscar orcaa.,an.ca n esvaws.shed On May 29. 1986, the Nuclear Operations Manager.
                                ...,, , ancu.cg a~s a.i.5-.c base-saa.:                                6 v. o., es aa. .h.c h 01 rector of Outage Manngement. Sect 1on Managers, a
                                  . r Ni                                                        **'"'                        rcpresentative Irom Planning and Scheduling, and other
: s. t.
n., d,,,sa              "*~'Uin''*~~
art s
                                                                                                *'[ d u .i,N ~ rya'EsYin key personnc1 were sequestered off-s1te for 10 day 5 to d :, ,44,en sh, probie. ,,cas aosed aho., aa. .. :
t, ..,.,pa, a ied .a.a ihe i.ac erem paa,.                        ..th appe .pria c  revicw anil develop ac11ons to improve our abiIIty to pr.-.tr 8,y f et wa<r 8'ss.                                                                  Control and mJnage the operatlon of PNPS. The concerns tach ace.ca plaa .ill ha.c a resprwis.ble indi wn.al an.gr.ed =ho of IllCo. NRC, and IMPO t ere reviewed and prioritized in
                                ..n be xce-asabic for ,ae-i., estabi.shed - iesiaaes.                                      order that we may develop long-standing leprovements.          '
As part of this review. It was determined that our Work Control /long-Term Plan process needed considerable attention. There was inconsistent understanding of the
                                                                                                                ~
process; definitions of what should be la the process were weak /nnn-existent; there was no confidence in our ability to project manpower requirements; and the current prinritization process does not meet the organizational.needs.                ,
BECo management is currently reviewing and revising the process to provide a system that will assure activities are properly prioritized, coordinated, assigned owners.
resource constralned, and followed up.                        ,
m______      _ _ _      _______                ___            _            _ _ _ _ _ _ _ _ _ _                                        _ _ _ __
 
    . -  _ _  - - _ -        _ _ _ - - . - _ -                            _. .-            _- --                    _          -- --              . _ = - _ _ - _ .
Br5PON5(                                                                                  $1A35      .
i        finding (OA.3-3)          u.a.gns .ad super isms ne                          a. -          .cc.a*.h'e      far
* i p,,so,--e or w.r pmirie ia ihe =c. at ha.aeheerar =ah                                              The first "CycIlt" evaluation of the Housekeeping p, . cur, empum on cor,cei.as the p,ot. sees aoicd aba e.                                        Service Assistance requests is nearing compietion W W11 k            MM                                          h sa .dd ii          incre.wd emph ses = pt.as seuse6eepes us beca and additional attentlon.
;                                                                    o,e                                                                                                                                              '
                                    .ppi,,d        o. ,ch                ,s e.hiname,i                .:    a ,. . r s . e-
                                    .,s.g            s. 3..e p, -a w.- inca .ss.g-ed                          h.iusekeepas
                                    , esp, s. ,.i. .es to, spn.r.c wci.nas er w si e.aa.
                                    ,..i .=,. .e o s ia.,wseep.ag se...cc asm:4- e ,e<r.nis -.it A cres.c Tour inspection checklists are being Jeweloped b, .,s. ,,ed i. .nrerm m.a.gemen . she                                  *-a ums candd""'        which address all the issues of concern. These d.,r. g ho ,6,ep.ag . men sam 8. ..d = uca s.ag ad as-sser will be used by the Maintenance (.roup area owners
              ,                    si. -            ,w6cep g coad. -=.                Adda.na.n          v    . ==~rms .as during July 1986. Comments from the owners will s..pn.na,s ,e aa. cona. ime ,cevin asper e-s ia ssas o-crini.. .ns or is -cas .r o.c ha.nescer.ag e ege. -                                              be intnrporated into revised chectllsts which will he used to develop a training module targeted for ri.a. pm,a.mes ..i mes., .a                        e,..e-          or she e s.-nese, pag coepietlon by August 1986.
re *C'.m        .ad .dd. .on.          i,..n.pg    en .mpet i.ar. se* i--'r,s by
                                    $4.sch 8996.
1 1
e' f ni.a.gers .ad super.isars are held arca..ni.hle                                      far she g,er rorm. ace or she.r propie .n she                .,c. . .adhner . s resy by Finding (OA 5-1)              e.e.e- .r t,w .nd shop .c i,.it.cs.
The on-site industrial safety representative now saaneri.: u ses , is a integ,                    p= er o e ae- tw=,wteepiac reports directly to the Nuclear Operations p, og, .m. o r g iad.cunws                          he me. .-ans -.n ee. e.., Manager, thus emphasizing the leportance of
                                  .dd.i.en.1 dwectuw. ed trie.r role w.sh reg.,d . . . =<w h er at INPS.
safety i
                                  ..eie,c,= e i. pe,sonnel s rciy pr neci.e.i requ.,emeans and                                                                                                                    .
l cormieas ureir .,mds      a        ..ih.a ihe- ,c .
a      e..i The first "Cyclic" evaluation of the Housekeeping
                                  ..n se .ured      ian i.r      o-
                                                                  =r-mHm    cseep.acos m.n.gement            ser. iheice    Assist-c
                                                                                                            .s-r..ad  .msonu' re p.esis Service Assistance requests is nearing completion ureir condai s v.                  ..d      =  nead-,g .ad                                      and will be used to assess areas for leprovements r advocasas c usn. ureer der.c. enc.cs.                                    ca,,co-c "* and addi tional a t tentior-
)
saipse.aeni.ii.n .t v ese .cii                  . n in conpieved 6, ai , im.
4 I
j l
;        Finding (0%.8-1) TI e Qu iivy Assur.are (QA) M.a.ger bs ,eemph. sired i.
ou.iii, rion<.ntorm. ass,ace
                                                        .arep erc,  posona  -c :nas  th.: ihe or rur.cicarr                  is,p.-epy in addltion to our Inttla1 response, a revislon to she . air pr.., nws rar Nuclear Organization Procedure (NOP) 8349 eeperi.ng chse,ved def.r.cas c.nel.8-ms.                                Sie Ms . msi,uc ied oAroc pns es sus *-r essa u.e o.e et.s.gn- so mue Hana9ement Corrective Action Process *" has been i
ei. mien. ace aimi,.cc, n.4-4.g.c.: occurrence ,,pmis. .ms draf ted which provides a formal methanism for r..wciu.it.e cs c. .eparts heihe, ther .<e ,ci.ied .. spec.r.c
                                  'et"'*'"r c.aiph. ace w ,mi.                                                                    reporting and resolving non-regulatory issues.
sa .4s. s.n, is Nuclew O,g.mr.ii.a penannel M.c tice,,
This    revision is currently under review and                                  ,
                                  <em.nded ih.: et is the ,esiums. belsey or the ind..wa I wt- comment wIth anticipated approval In July I986.
{
  !                              ebse..*4 she d,r.rseas c,w.i.e.na v. .n.i
  ;                              car,n i,.e p. ,,. -6 i. su e ,e ie the .it'*f" 84 5-s.
  \ -- -- -      . _ _ _                . _ . --        . _ _ - -                _          __ _ . -                  -_.      _    _                            -  ._ _  _ _ _
 
                                                                                                                                                                              ~
RISPONSE                                                                    STATlf$
finding (OP.1-1) Aw*.rir vi.a w iarre.* .,erew c-          . a tr - n sa Je The ten (10) additional operators authorized in s ,we..e4      w      4 , sm. T. .s. w. r..e .4s. .aa.:      Nov. 198',were on board in Feb. 1986 as planned.
Ir*I.'.,Nm c                          M ~.v W,7 I [Ee'c'E'. A one-time agrcement wiih the Union ta reIaa the c w-aced b J a nory Im e. tr.m new s-vuia t is asum.e 5 tate Ii(ense requirement aIlowed ihe hlrIng oI
                      -8'cea'+d d=''e* = *** * *P "aced a*a-''cea'                    personnel with much more favorable backgrounds c me en.wed ne. . rexe , ''e    .  .w i*cas.ag .'d  :2sses*****
Joe, am. si is ai.c.p.ied eh        3 per.r.,s ..is .nece u , ).sr        1han previously.
es.ss.                                                                                              -
In Feb. 1986, two (2) BECo senior-level management e,iA U 7                      "
ea
                                                        "*'',*'"","j'h'"",,*,',
: e. g Individua15 wIth eatens1ve operating and operator o c sur. 6,. ,h rhys.rs. .as ec . sis .a m errar  ..it me .acioned
                                                        -e p.,s..aari.        The    training enperience vere assigned io the iraining ihe s. - cain inatus      Grotrp and are directly involved in the licensed "P""-
operator training programs.
Seven (7) of the operators hired in Jan./ reb.1986 completed the cupanded non-licensed nuclear plant operator tour training. Results of the quizzes.
cuans, and oral evaluations showed a high degree of knowledge and excellent attitudes. A second class consisting of ten (10) operators began in March and will be completed in August 1986.
The reactor operator licensing class was esamined by the Nuclear Regulatory Commission in May 1986, and we have received verbal notification that all four operators pasred with high scores. A new class began in June with nine (g) candidates and will complete training in April 1987.
The apprenticeship programs for operators health physics tcrknicians, radio-chemistry technicians.
maintenante, and instrument and control technicians have been accepted as part of the contrac t negotiations just completed. Our current plans call for developing training programs and resource .equirements to laplement apprentice training in 1987.
O
_- -- - - . --- ~ -- - --
 
l Findine                                                                                                                                                                          'tation Proced:re 2.1.16 (Operat:;rs Tour) has L -
: 1) t.evept pr.<eanpersonaci                                      2.1. 5.un cers--        h .e been ei .a iimtructed ie r ..ich brtau re.ie. ca.a Ccren.''s u
221. d.ted December 20,17:3. A gael .ill be estahinhed b)                                                                                  vised to incorporate a requirement that the' ree,u ,r ses rar e.ch ..ech ear.aeer .ad es e .v.ar. s..re<= sa,                                                                        educlear llatch Engineer 10peratIng Supervisor
: i. spend i.. consecuti.c ho. s . -ih ..th e.ch aua i.ccawd                                                                              conduct periodic tours with the non-lltensed opn. .,                                                              ihe- sh.    , eonhn.g .,ws estruc .ca.                            NucIcar l'Iant Operator.
: b. .dd.i.na. ..ich eng.neers .ad eper.iing super.isce s er.fi coa 4.r u .adecea+-as sours . seas .r rie tr .a. - e may 4,v,,p.or.,s oie.e w..,er,                                                                    ,erieried ca ihe a. -s- eawd Although the Hatch Engineers / Operating Supervisors cper.e,- s saur sheet.
An .ssessmeni et the                        tw eased are spendin3 more time coaching and instructing t
opn.ia, ons.,per..w.s pnry,a. ore ..u t.e - ic .. ccr. ..,i,                                                                              non-licin..-d operators, a means to formally ut.aa 46e i. co,.cci                                                                        y noica de. i ,. re.~. . r .e                dactement this has not been established. Ihis will r~ 'm =*ar e-                                                                                                                            he adifrened by July 1986.
The assenment of sinsupervised performance of non-licen,ed operators still needs to be addressed. This will also be formalized by July i
1986.
finding (OP.3-1)' *                                            *'"'d                                  '' '' t' i" '* ''' ' '*" * * '          ""'''""d
                                                                                                                                                                                                        ** '"""'' r I I.
                                                                                                                                                                                                            ' "''"' "    Tag audits have been conducted on a regular basis; s,'rI,c                                                              .c u. sI.'s  c        .,'                                        however, all were not being performed monthly.
A me                                                    ..s issued (CR 36-09) conrera.ag *NA* cr "ISC .s This has been corrected. A review of those a , cess.,,                                                          und ,, she esai.e.aas seri.~. .s ao
                                                                                                                                                                                                            ~.r.er be =t performed indicates stronger aClion required to 3., hmered by it, ..ich eag.acer. Au nos i-s ..is                                                                                      t, prcvent deviations from occurrin9- Ihi5 action i5 doc-i,d.                                                                                                                                  heing ianen.
ua iner i.g                                                              s.es ..it be pee re,-ed i. ca.,e the .ve.5 . sed 1                                                                            .ha.e .,e                                                              ddressed. An .ti.chmen: ..it be .Sied to the g    -
g g yg        9 gy l                                                                            u ..ai.                                            m c p eg..-si                  (uns usin t s't reove. .. e = rs -.s                  protective tags was not Issued in March as Thew us.aas ..u i, .-c u mense.s by pianned.
i I
                                                                                .ppi.r.sa, s. sh., u p.
M.nb I'pt&.                                                                                                                                          IL wiII be in effect by July 1986.
  !                                f i ndi ng (OP.3-2) An s,sie n ideovir.ed .s reer ,ct.ied by oper.iians reare<6,e                                                                                                    24 of the 27 identified procedures have been 7.8.88 h..e bec ve.ie.ed i. em.we dauble -ev.f or.i.a. .s                                                                                WWM            M Adh M NMW* W par-med .ad d <umeased pracair. A ne. . .: srsiem                                                                                        remaining three (3) procedures required additional pret,6,,s dei,,..aed eh. . . . .r 2r proce+,es .,e sa be
                                                                                ''*"'d.                                          N ewwe6,n ..n boe.ised br u nh am                                                      work heyond double verification and are scheduled for approv.il in July 1986.
Finding (OP.4-1) The ,e.ie. .t occa a is .an ag. A mem dated neeen.ber 20                                                                                                            Training in watchstanding practices has been i
1981 (CR 81-221) .nstruried ..ich eag.neers .a.: crer.s                                                                                  incItided into the curriculum since April 1986 and e-r.no,s in                                                          c..e. ihe i., ..th she Ntreos t., <.su s.'aCg
    ,                                                                            .ad -s e,ue s.an.                                                            sa .45. .aa. . ,
                                                                                                                                                                                                    . . . sa. . d, sh. is stressed with each candidate during his surn.na r cer-i . .ssess pic perfarm <e .: e h retteo on-watch training. The licensed senior operator
                                                                                *a 5'"fi * *8= aasmat-                                                                                                                    assigned to Training personally emphasizes i
The                                  -process NtNPo coni.a.                                        in..a.at p, ate.- caan.nn            professionaiIsm  with each student several tines 1                                                                          arde.c,t.acs..agbas.< inca),aads, sics.                                                                                      r,.  .ag . during ihc coursc. Additiona11y, the watch j                                                                          ..icr4i ad.ag p, c s.res ..u be .ncio sed by Ar,.i im.                                                                                    engineers are actively assisting the Training Group by overseeing the candidates' progress in j                                                                                                                                                                                                                    this area prior to signing off their qualification cards.
 
R[Sipl5[                                                                                STATil5 rinding (OP.5-1) reece.hsre ih,          . g. ,c..e 1.it is meias d re..si re-hed    i iarsude besser d-eci.aa a i A draf t copy of Procedure 1.3.4 which incorporated
                                                                                                                        .t porea,n. n..s ,e' "'"
                                                          ..S sus.m.iied t. INPO for commeats. .ad thene caewaeaisappropriate                                            .''ere      somments by INPO and BECo Quality c.os.de. a rar .acorp.- i.a                              iai. Fore +-n. once s.l.* .s Assurance Organization was reviewed in detall by the
                                                          .pr o.ed. . <,.ai..csor ..inne rei..ned s                              e. -.a.ie ni.ere-.s.on                Nuclear Operations Manager and the Section Managers
                                                          . ,.nie g ror,4,n. r,. peer                                r rus.t.ed pi.ai rasaaari ..n                    in April 1985. Ihts extensive review resulted in re..e. ihe gworedure f,v settv..c.I canien: *: .dera.r y p,.o,
                                                          , , , , , , , , , , , , , , , , , , , , , , , . Au p,.re.5-n ..u he en.            s          : .e co        numerous comments and process revisions. The e., 2. , star. A sui.n .e ine s.. gens ..u be r.no.she.i .nh ihe                                              comrrents hav> been incorporated and another review
                                                                    --aaih p','s' e ** ,ero,i-has been scheduled because of the organizational thanges which have occurred. It is anticipated that the new procedure will be in place in July 1986.
Iinding (OP.f-1)                                        5.'''d*-a* hr                                                    .a<'                                    The wits down of area 5 to Identify equipment re rarmg                  .de ..r  =".r.5i--.8i..nhe <aa*.r      ied . 8aio,e'J..nc de esi.oi.si.e.:
e.r.'r'aea im.
o re .:.ans                        per-s ..u de              ch.,ce at she t.hri e sicar.'                  requiring identificatlon was impacted by 5trlke
                                                          ==i nc .,.e.: . su.i. die un es ro.,wi .a si.,
                                                          .,e
                                                                                                                                            ... aua cca.,ni            PreParatiens and ofher comeltecnts of resources and Is currently sir (6) months behind schedule.
n o per. ;aas c , .p .;is 6 , respoos.t.se io i h ,i e,r..p m e r,ca. the inn. As esgs ,e s de ihey ..el be one r, by Ope,. .ons                                            A Hatch Inalneer J        was recent1y  e      assioned to coordinate r -
pers ace. t..t.ein.g .as be coa.picie nr ruce                                      , im.                    thl; ef fort and progress is being made. The areas                                    ,
                                                              . .+s.          a. . ,,ogr.m v. cas.ne eg. cm,a 6.srai.r;r.i- i.h'''                                    belt.3 concentrated on first are those normally
                                                          .,e repi. red. . hen ,. ceded, due se tass er dam ge .13 te .a                                        inaccessible durIng operations and are to be ef f e<.i br M r am.                                                                                        completed prior to startup from the current outage.
The program to ensure that labels are maintained will also be in place prior to startup from the d
current outage.
(
O e
_ _ _ . _ _ _ _ . _      _ _ _ . _ _ _ _                                      _ _ _    _m            _          m          -.                                        - --          -- _ - _ _          _ _ _ _ _ _    m _ _ ___ ___
 
_ = -                        _ _ _ = _ _ _ _ _ - _ _ . _ . __ _ _ . . _ _
MSP_DNSE                                                                                          ..
SMILIS
* Firdle.,                            . 13-1)Tw chemic. control Technici Traiainccreg . h.s beca p ecarco. ead er.
ag ing.a ia ).au.tr sm.
* aa-w'r.* 8            An assessment of Chemistry personnel's knowledge level N"rrNs's. ' TUrc~iY#                  =.      7s~e pr' '.'s"o$.''~N,Y'y''' was conduc t ed in March 1986, and the resu orparimeas tar sne aa 4-iar.es .a.s .o.m...ce-c i .m.ac .s incorpnrated into the training program. As stated in rweded ne amerewe the ever.316poeledge level .aw r g themistry our original response, training began in January 1986; pers-i. c,mi.au.ag vr.m-g for chem.c.i c.ac ..: ies ha.c.*"' hOwever, allendance was Inconsistent because of Station
                                                                                                                              =.lt be saplemented by June tits.                                          needs. In April 1986, authorization was received to Increase con =plement from nine (9) to eleven (11) technicians to allow personnel to attend training while Stat'an needs are met. A strike by the Union prevented fil'
                                                                                                                                                                                                                .9 of those positions expeditiously.
The contracts have beca settled, and tre expect to have all positions filled by July 1986.
F i nd i ng (NA .1-1 ) '""'''*E '*' "f"'# '"pn= nam has teen Jarss,4 by obe
                                                                                                                          '*"**"'E*c"*"'                                                                  The site Prncurement Support Group and Hafntenance
                                                                                                                                          .. rarm.  .a. .:
a r,acuremene 3..pna,e c.ra..p in Planning Group are in place and functioning. He are comb.aes the cura : one.pemes for                          currently  evaluating the effects these groups have had prwurea-an dncunicans                        p.o cu.ag on reducing unnecessary adelnistrative tasks to I
: b.                                                              determine what addlllonal leprovements Can be made.
ess.bl.shmeat tea m e s.epererche a separate pt.naing . art seher6.I.ag
                                                                                                                                              '*                        .aienaare xi....ese.,apr.:
Iniphasis has been placed on hiring needed superylsion c.
                                                                                                                                              .a.irsis er the neticities et supervisars ia o,se,mia, and is still ongoing. He are currently short one (1) maa.i.on.i ruaci.ons th    c.a be r,.u.gaea na.o.,rs      IEC Supervisors from the 1985 authorized complement.
However, the Senior II.C Engineer was promoted and a N['D.. C .lc."aT*"''" **
                                                                                                                                              $N. .ans                                                    Mechanical Maintenance Supervisor is out on long-term disability giving us two (2) additional openings.
: e.                                                                Additionally, authorization was recelved to raise the pot.cr =~2.are rar eaaducims peria.s.c otaer m'a 's er mami      ace ci...i.es pre.. ora i. sus e..s, by pay grade for it.C Supervisors which has improved our M 11    M MrL A status with .cs.nas conipteW *e deve win b? iactuded in the s.e-month gwegress repart, i                                                                                                                                                                                                        The pollcy gutdance for conducting periodic observatton I                                                                                                                                                                                          -
gg ,3ggggggggp ggggyggjgg $ghgdg)gd [gr M3rCh I$ $tl11 under development and scheduled for implementation by July 1986.
1
                                                                                                                                                                                                      .-                                                      , s
 
                                                                                                                                                                        >IAlus
                                                                                                                        ,a4 res
                                                                                                              .*'d ce "*,.r.-            e      The first "Cyclic" evaluation cf the
_. f .pf.res pari er itsee
                                                                                                . o, an.r.a,d mt. aus.
                                                                                          ..e cy.n. m an llousekeeping Service Assistance requests i
ih, rese=r*se ~ a.rer . u                              Is nearing completion and will l'e used to
                                                                          .suvera.: der.r.em y repari.ag. Tbc f=*at **          assess arcas for improvements and
                                                                .    .4 ..ll repw  t. b, zoalu. sed .ad summar. red m additlonal attention.
                  .1-3)                      wewm .., b        u.
                                    **- . cruc i., .i. Tw -                  inform.i -                  svu,m              .                Th
: e. Ih,s m        ..,s.svu ,m ..a m ,s ..., .,,as.n
                                  <~ ri,s a 4.ves :::                                              .,4.              ,o., ,.p,a,,i.e            :: resent work status information iaen.mse,%          p,oo sei..i,4          .a is,es , s ..es              u s <i,d            systcm has been restructured to provide repar e. sa <*e recoac i,4 br St r ms. . the si.ivs or . i. ,,,,,us ..g,,,,                                    n ti, current information with regard to Preventive equipment            maintenance calibration.          tasks and tes''
The 1981 and 1982 validated and theHaintenance Requests are curre 1983-1986 Maintenance t
Requests the data base.
are being inventoried to update l-    ricding (HA.2-1)        A ca m ce*i'e imp                                                                                              compleled by August 1986,These efforts will be in..:                =*as Face.=
caan. .aa n+u,i.,m          ess.6:na          f*
wrc**'-
                                                                                                  .s.                  'be pi.ars
                            .6,                                                    c e e,.e,                                              T8, .i,iv
                                    .iw p.gr.gscu.r.r.n,
                                                      .. 1 . hu .i  * . ara    us                ..u    u,      .ar-  ,,5 aa'ed The Hilntenance Organization is planning w,,as a,. <-,,e,i acy i.gwi.ag.
                                                                        ,.4, we, sca .i.su,a .p.,..,4
                                                                                                                            .o. o,,        routine activities dering normal mare g,anic 4,r.                                    ,r he.
                                                                                                    ... u r                                operations on a weekly basis with has,5,eperc s ace.c.,ar.,s            shan $.e cor,eci,.                                          ii.e
                                                        =~                                                  .a isc u.iu=                  partIcular attentlon being glven to the arcas oI plant in5trumentation:
                            *.,inpeo br o, rem 6-r a m ar,na .4s.iion. . ere.e grease                                                      fi.e progr.,,      rar piseal
                                                                                                                                                      /oll leaks;    : p,s, .. iaa leaks    ..:: d and i.apiemratea a., A.:, mi.                                      deIicienties; and valwe problems. pump Aa e.wvii.e s.mmu,y rec ,n senaa,.        recart 4
                                                    .r ewe co:n-.      acc-.g.iin mpiah- be is,
                                                                                                ,a rurais...m            hed    it, Projects and planned worlt are identified
                                                        .r.s.ic      p ,, ,as pog,n,                        us                .a4        by Hednesday of each week for inclusion
                                                                                                    .                                    Into the schedule.
In addition to the above, a concentrated effort is being made during the current ontage to complete as many diesel Finding (MA.3-1)                                                                                                                    generator deficiencies as possible.
1                          A pl.aniag .=f ert,4Ww.g te.m coatinw.g of edoc.pr.ac ..it be misce t>, St.rch im ... pi.aaer in each saag. ,,m work sched.i,s.ra              is ..n meim.  .c p.m.e.i, Tws, ,p      .aa.. ,, i.aa.:
: e. o..        4., ,,4r      The Actions identlfled in our. response j
They ..t: h..e si., e                                                  have been completed. and we are l                        1 2-a actica se .4 dress the ebe.e c= e,a                                  s.
                                                                                                              ,sp...s.tus. y i,evaiuating to identify areas for
\,
shauto eedure .orh b.cb1cg .ad .mpto.c co.,4 a.iihese S'a"PS-                                                                        .
carorn improvement.
r                                                                                                  .oa mar.g e
e
 
                                                                                                                      ,                                                              1                ,'
S d                                                                                                                                                          .
n                                                                  r                                  s a      e      e              dh                                                  dn                                        e h
e r      a r
l v              ec wi              e qo nf        i n      eo pi es ra l
u                            -
t                                    o              oe              eh          nrr i
ny          a . ot                      uh                  d                              -
s    l        vv            iw                                          tdl c .                    d                      e                              _
n                                i        e      ni              v          iao f
nt          reees                      et                  h i                          e        v      nrie                    es          es                ai          ecvSm                      cr                    c dn g                    cer              no            c        re          sed l l pil cne edel e          oo rpe s
nh eeojh e                                  i ul e                                                      ppce ei                        at pnsacr                                gc            tt bl hi              hb t v                        n                                                                      dait rgt o                                    unh eh stuirmi                              nn          ol e                                                                                                          -
ca -                                  e          hl              ie          t vg              nl ti en                    r          esat .
r t t            upowa                      ei            ir a i s w pi y p a
c            n                                      _
nieo                  t                  bc                                              x eb                  nret                                                -
uhN                                                                                                                            e i
t r                      iwh            rs        st st a              gves eb                                aot a so                        a        t      t    ek  n              ef i
rct oa                aarm  aesene t s            nt nh                                                _
md          ti ms e                    re          s        e l
l r ecit S          i eyasi at                                                                      l s r eh                  t aa nf%
U                4                  h      wb        ytT o                  ad          i er                uoebeamt                              nrMe I            e                      t e            ph -              p        sl vca rn              dsHol                    e            it                      r ei          r                          aneu B                                                                                                                                  h vt S
r 3.k wveo n1 ii duPl evrh ust g l    .ys
                                                                                      . t a ri eady hv pnnl              cr .
pecl c rioe moh s Ct n e                                                                  or.          ueau              seneah vr                            f                      e bo ef          e te evhad  drl o
gtfk en l
aaf sfi pe et n st nd -
J f uioo pom            wnrio o      .t o
o rao          ried              ost sh s                    c        ns                                                    _
esM vt i
arnt c      aiiHn eet se w        get r i      g nyc mi t
oapl f moa              rd vg a        wel nal osd i een t
osl                  icnb              i f e        sgen l
eernsinl                              ta gi rdo h e                        sead        .sna                                                        f veirl oi                                      i anm se m                si at      du e.-    s s a c k ganir pi r et r cno envo niei dt s oscoesw nrb nsd r d ovt i r oa                                                  _
rei r e i t i i s n                                                            apoeiier                            l pr z .                                                _
s v v u i gt ef o          } ec        l a          e      rm        t    vupe                  a            pi t i      w    rd          eugl                                          g        vn k u                      ' i i ct nnn -                                                  t id rr  g                                                  ne r q                    Rt O              s eiige sid u        e dl np                      I ee              s a                i nam R r.eid    dnieeair oe                                                                            l aim            escppeun                              e            e9 Hr                                          mh msp looe              I t    n uveo Cebc h aiu uhl a Thf cst pH h sers TibOI re '. i.t dsbod
                      ,T h
                                . e p e s                                                                                                                  i nsd          -
h  .r r
e        arf f      s n *a .
t dr n 'rm r
eo i
m.
t s .
r r ahe t.
sew d.c. a o e s .d w
g                                                                                                                  ou."
m r
e s.
v .s  s
                      , e -    rt . c. r t
c.
e
                                                                                                                                                                                  .
* e.
                    *,soee e-            t sb          6
                                                    .                                                                                                    Lrt..s,. s s
: r.
* u.
e    .      b                                                                                                                        ,              p.          c
                                                                                                                                                                                .      c-
                    ;nv.  . e. de o er :5                                                                                                                      o    .e.
ome.                                                                                                                                                    r.                              _
i s                                                                                                                      s    .*,.                                            _
dr      d s .                                                                                                                    r cd v.c b m s.ona-e      f          r s                                                                                                              i.    .
r r
                                                                                                                                                                                ,      e                              _
d.deeaparce        v t                e. ie              r
-        s          w
                    . i. n, g                ob                                                                                                                n, c.,  s c.p i i.5
-        N          e r h. .r    ie                                                                                                                                        i, p              .
p                              r          e                                                                                                          4,    .c        r.
s s
p t
n rm.s.mcd a                f e ei. e r . e o e. sa r
                                                                                                                                                                ,r.r.
r s
                                                                                                                                                                ,sww. eedi      es ,
                                                                                                                                                                                          =.
-      B          se en ci i
i .t.iep ib. c
                                                                                                                                                                ,m e . n. g
:    s s ep
                  -      ae.l b            a i
m                                                                                                            r.
u          i 1      .o.
: i. n h .c                                                                                                                                            ece 4..,,.
                          .n te e_
s:
r w g e h.d e
                                                                                                                                                                .mhw          n n e.r                                                                                                                                                    r.r t                                                                                                                                              t o i. o                                                                                                                                  ;m. e                o        .                        _
ii~, n etn.n.sc.            n.
s                                                                                                                                              i: u                  n                            _
n.e          n          us.                                                                                                                    n s. a n. g
: i.                    .
                                                                                                                                                                    . ie.h
: e. g n M m a.                                                                                                                            ,
                                                                                                                                                              ,            e e i
gn                            i
                                                                                                                                                              ,.re.s i
s ,. s        m d.e.      e ci                                                                                                                    u            e:
es                                                                                                                                            .
: m. u.,
                              .                                                                                                                                o s o4.e i,
cwr se    . sesye, r
sw                                                                                                              i, a,w ei cn                  a                                                                                                                          s. e. 4c rw.e,e i                        t
: d. a,, s ic.or c.
v ycmuepe i, o i                            i
                )
  .            1                                                                                                                                        )
                  -                                                                                                                                    1
_            4                                                                                                                                            -
6 A
M                                                                                                                                        A                                                  *
(
    .                                                                                                                                                    M
                ]                                                                                                                                        (
n                                                                                                                                          :
i d                                                                                                                                          i n
n                                                                                                                                        d
.            i F                                                                                                                                            n i
F
,l                                                                                                                                        jl'                              i        !        q  . !J    <      \
 
(gji?NT 5 - T MININ" A!O PEI EE M) g  2.JE:il\'! :                ENSURE TEMICRS ARE READY TO USE PLAfiT FEATURES TO EEST ADVANTAGE IN SEVERE A*CIDENTS EQJLLR.EfitaS :                                                                                          -
                                  .l .      C EAR SYMPTO'. BASED STRATEGIES (INTEGMTED)
: 2.          EEMOV;L 0: U'nECESSARY IN':lEIT10ii                                -
: s.          .i. .. ,.,
I,. ., fi4 .: / . . C .n. , , . . .:. v. . ,:. :
      .. .      !. L L.*mg,,,... c .                        ..
                                                                                    ;.                    ...-*;g
                                                                                    ... k i.
            .      ;;i.
                                      . . . i ; i,. ; - . - . e .
J ...            .i.            ...t                        . .    . 4.i.. r. w.e,i .:..i.i
                                                                                                                                . ; ; i . p...t ,
P . . . . . n. . .;; .g  . ..7. ,i...y. .. 9.l 9. . . , .t.; . .
                                                                                    .            i c                  7 ;. ; ..
F :. . .a ; t.
                                            .t    ..< .
                                                          . a; .;.                    ,        .            .*
                                                                            . . . . - v, . ~i . 6 :2 . i . .. ., . . .. t ;; ....
m ;; ::=.
a..        ...$            ....';                                                                        ,
 
RC5mE                                                                              STATUS Finding (MA.8-1)                              D gr.d 4 -ir e sliess ha.e sie,a re=a.ed from se,ere.                                                          Statinn Procedure 3.M.1-14 has been
                                                            .w su. , c au.e. .,e p cc i. cas e ih.s e,r peaca ''                                                            revised to provide adelnistratIye i sc aed and/or rep ned pr,or i. is                      i                ace.
controfs.
A program .li be developed ased irap'eeinented frw the control of pers.6:e t.frias e.r,.pmeat i>r r -.i im. t ie='' '' 'h' i.er,e                                ..n - i.,i,.t ,i      t,e i ied i en        $.c .aspeci.on.              All portable lifting equipment was
                                                                . sci.ne.                          d 4,gr.oed e.r p-cas.                                                  removed from service inspected. and those that were acceptable were made available for issue /use.
i The'nnly remaining issue is to develop an automatic requal process so that required inspettlons are performed.
finding (MA.9-1)                          A rrarure- sarcart c e go has t e4 r-d aad has                                                                      At the present time, the Nuclear Steam ni.e.:.ss-d .. . p,.o . , ih, ,ed s. e r r,e s..ei,                                  ..m  erneare                  Supply Systems (NSSS) spare parts lists
,                                                      su c                                    ,a,s .a.co .,,          .r.c.  .on irsi- .. n she si.in."
ysiem/suttsyseem Jes.gn.v.ca.                                                                                      are undergoing a review by CE utl11:Ing Our spare parts catalog. and comparing rre, ess .ad si.e.,s reparts ..: noe sars sed - is, s;. -= cash                                                      the itens against their latest part j                                                      :-et nues**'-
nunOcrs for the component / system regaired. This cross-reference will actoirpilsh the following:
(1) establish latest part number identification; (2) estabitsh safety class; i'
(3) sort out obsolete parts;
;                                                                                                                                                                          (4) provide cross-references between part numbers and BECo stock, symbols and i
* establish a numbering system tonsistent with GE. Our major supplier of spare parts.
L                                                                                                                                      '
i 1he l'alance-of-plant spare parts shall be
:                                                                                                                                                                      donc upon completion of the MSSS spares.                !
l I
l                                                                                                                                                                                                                              ..
J                                                                                                                                                      *
                                  .                                                                                                                  \    ,8                                                                  . f l                              - - - - - - -        - - _ - - - - - - - - - - - - - - _ -                                                                      - - - -        _ _ -
 
BESPONSE                                                                                                  STATUS Tindin.; (MA.9-2)                      T'- Praru ~aeat 5.w-t Cr.,                                      .n ci-ab.e =                          e gr., .is te, ee. .          f.=ct. s                            ensur i. s . ..e r an., ~.""'                                      The newly-forened Procurement $ifpport
: d. - isd.,eeivy..                            ,,,e ac yd,p ..eis.i                                          45.i.r          Group has reduced Purchase Order the g,    ., s>.n 4.sem.in                                .n de. . n. e, e n e m as .aspec..*a*-
s.wi.e,    s, dev.iations and the con 5tructIon material 1ists to what Is considered normal work
                                                          .er.--, is ..n t.e                          + m ehe .a..e i.: s,si- . r.c.de .                                          attivitles 8n these areas. In addltion, u.ss-,e fe. car e me                    ee. ca                  enis.                      v e.,  rr  .,e ~.          .jppro=Imately 2.000 items have been 5 re.-s c,=, =u .44 ess .ad c~,e. t ehe .et.e re n S aeed
                                                          *""#-                                                                                                                      transferred to automatic re-order based on usage, availability, and delivery lead time.
He are investigating the .nossibility of creating a lobby stock area for common 1
non-safety-related parts to make
;                                                                                                                                                                                  available items such as fittings.
washcrs, belts, etc. to Station personnel and maintain Inventory levels within the warehouse as backup.
Finding (TS.1-1)                              5e. iaa Prwe**** ' 3 *. **r"' Caa.Pe'er 8 'rda''.* ha' 6*"'
ec,'. sed t. re g.we darv e ied tMhn.c.t rew.ews .ad .s centenifyStatlon                                                                  Procedure 9.14* "Process Computer 4,i sh, .pp          .s p.,,ss. An .ds.                            a.s pore 4 e .e...                          ..u w          lipdate., was revised to rectulre
: t. ,+.,, e sari-ne o                                  en. .h-e .cr uc.we. to t-                                    dorumented tethr1 cal rev1ews post-change in.ed t.                  ..e.:.v.,d                  accepi. ace        er.in..                        .a4  , e'"" 5
                                                    *"'"""*"d*''*'"*'''''
testing, and acceptance requirements for i
sof1 ware / hardware changes.
j                                                    tws,,%e                      ts-in de :m a. :e4 by u.<rh itss.
Finding (T5.3-2)                              A re-ie- of tw 'e=ra.=v ch a"'''y 'ai.aa*.at w - ****
5tation Procedere 1.5.9*
* Temporary 6,.      pi        sysie e ..n de p ,fer e4 =~s arrrrrr ie n.su. .        c.,2,.es -si.e.ied or u neh im. P.t.se                                                                Modifications . was revised to 5trengthen p, ,, ,,.rps.,s eh. ps..g .a,. .es .c ee,ere xses = a tw 1
                                                            .,.n,d .s p ,s.e,se t 4s. They =u se s. -,ed '* **""'
the design review process. However.
si        *-y d. aat e. reed tw desica cap.h.her .I she -e8*at                                                                further review Indicate 5 a need for
                                                    .,,,,,,s.        id t.f.ed                  e. .na- t<=ce.a.d.or. =~f as.=f .4                                                  addltiona1 changes. These changes will c        ..n.d f. ,      ..r.i.a                    n          ,,.cr.= -in be - eine by Ap.:                                  he incorporated by Airjust 1986.
196.
                                                                                                                                                    ~
AH te=per.ry .ned fir.tions i.e e'fect for a e th.n sis                                                          en.hs
;                                                                e, ,..i .,d .. de.n- < t a.e,: re                                                            t-I se...cc te.p.ests h.w been .n.ti. ed far inese to tw                                                                de
]                                                  per          e t. .n4 t:rget d.tes hs.e bec.e , ,s.bt.shed for thase se be re          ed. l                    4 9.t w . s inar ti age gw.e ess f s bee j                                                    de= eloped th.t o.d redure et.e                                        Mess.t y t. e.e.l.re the                                                                        ,
sempa,.ry s ad.f.c...na p.ress.
T+ ape,.ry Mad. fir.iin P,acedure t.3.9 ..it t.e revised s.
l                                                  y ase god.are far twefer wg desq eew.e-s. Darumenied des.ga eew.e-s w lt be perforwed far .It f t.n, sempar.ry v                                                    .nad.firsi.cas piar la easi.u.t.ne                                      These .< temas                        sts f.e s                      L p      ;c-sed by ).aw 8986.                                                                            ,    ,
_ _ _ _ _ _ _        _ _ _ _ _ _    _ . - _ _ _ _ _                      _ _ - _ _ . _ .          _.__.__.-.              _ _ _ _ _ . _ _ _ -                                    -          __          __  ______r  -  _-          - --            -----
 
I                                                                                                                                                ,
Rf5PlW3C SLARIS Tindin.) 0:P.1-1) er      a.r,    ae is ca==.*ved            6.*ias  .a e ress ,as nP
: r. x m ,,ws.. ,s.n.'a.easspec.r.cne                          a. A tour ,;iside checkilst was d,~...'~ied for use by 7                                                              ..ute Radiological Protection man gement personnel to p r
                            ,a        .
e,,,        wn.ise, r ,ser : , esse      ..n beta  *=8. t            assist in standardizing (f.elr tours. These e,, masc      .ae
                                                                        ..n i.e a. * .
rs,< par.,=. ace. Ih. ..e nega                checklists provide formal feedback to the e,rren. ,y sm.                                                        RadiofogicaI SectIon Manager.
: h.                                                                  b. One of the Radiological Protection supervisors was The n 1.:, ca.              .cn.iiaa .in s, ri ea e=''*
s..p,,w.sary .ticat w. t. em ,e pape, s,uem .ad in      c      pn r.r assigned specific responsibility for the whole-body i
unch im.
ace. TN ..n i., au.          ,4 b,        counter-and four (4) technicians received specific training on its operation. These techniclans will be the only ones assigned to operate the unit until additional ones are trained.
: c. r,ar,6,,, ., se                                                C-6 p e pn r e..,.,4 .a4 ,,..-
                                                  ,i .a4 c, va,ae p.,ra,.          ,
sa
                                                                                    .a.,
Il'e ('') of twe' sty-f1ve (25) programmatic 4=r-a e 81.,        e a;.'r of    <*=t's. ins ..in t.e radiological procedures have been revised. The s
ca=r ,ted    tw it.,,h 8 98'.                                        remaining procedures are scheduled for revjslon by August 198(3.
: 4. w.ii          :1-e.noremeces ins,p ed,4a.r ne d.
p          i i. c., e                .. - c .a .~
Additional Radiological Protection personnel have
                            +,.ae.          ..an p g .a      .a.e    .ne g a.ar, ca, been provided to contaminatlos control and tha. i. .a ,.      :.,4 c.a. a .    .a...:        decontaelnat1on prograos. Due to contractor and e,..c,. is i,,.ng e,.cior,4 .a4 ..n 6, .a pi.r, o r                  BECo labor strikes. the training on use of standard Ap.s tm.
contamination control devices has slipped and is currently scheduled for completion by August 1986.
: e. Actina, h e ti n ia;ii.ied i. ess.6:; n                        e.
e.em.cs.-e ..u          ,,4.co err,r,i.,
regr.m, net.s==s .=
BECo has leased a Cry Active Haste Systen whlch
                                      '                        "                                provides the seans for sorting. shredding, purc Yie . N .: Y c h i , $ 4 r i,7                                  "0"IIO[ing. compacting and packaging. This unit is operational.
: r. rer nr en                : ..n                                f.
v.nny .e.
6 ,  .r eu..e,-,.      ..        The Radiological Section Manager was scheduled to e-i.ricue c                              .      .g .a mm e
* h=''aa = 8 *-                                                    participate in two (2) INPO evaluations; however.
plant conilitions necessitated they be postponed.
lie will reschedule for later in the year if possibic.
t
* TIndina            ''
                                      * -2) h Ced.at-t r.1 secti a si..d .im ee.sc. the acwe separ's                                                                                                      .
c e ih.: ..g r.c : e,c 9, .re 6deaeir. d .ad ter 'ed a                                        'atlon Proredura 6.1-20g. "Rad!'.;1ogicci Occurrt I        '
appar i..e se.es. .f =.a.ce-cas ad ,e<..saer pres.~wl .*                                        . sorts.' em revised to cddress the deficiencics      J.
anen.r y.                                                        .                                                                ,
ror s'Ca'f'c.at RORs. . testw=ne fr.m the resgwesible e .r r.is.w
                                                ..!! t. enr red i.e -r.t.ag ..th ident.f.c.t.w. et the ecce t ne of the errarverre. The e e..e. .a.e upg..de ei the NOft gwweAre .15 be rempleted by M rcts 1936.
I revi g.c 3      meries ee aet ..fi c                        tia..e 4. be g.    .ded in appapr te le.els of m.a.t* ment.
f inding (RP.1-3)                ^*,,8',"
                                                    ,      .j ms              ,
                                                                                          -                e ch seniaa ..n *.esap As discussed in finding (OA.2-1). the Section goals are at ..rects .e e,.e e.d                      c.r : g,.e ci ' pat,                    ruro being reviisited in light of the current events and c.a+i.ae s>-coe ..n be ined v. .sme                                the *.ciacment er ihev .cs        pt                                                                          sunagement thanges that Isave occurred at PflPS.
A .        ia.-um.            .ii
                                              .. e th.: the.r .erk gene.ps' perfars
                                                                                    .ad caaer.cs.e super.is.,.                    ..u h, a ae The tour guide checklist referenced in finalnq (RP.1-1) e .n e.a.alag.r.1 pr ,ce                  sapars            .ad ..n ne . exiac sa s                  e **      {$ being gged by 73d{gigg)g3] ggpgry)$gr$, }hg p ,ra.                                      r%.aa.as unch s,ss, v. pee. . checitlist his been made available to other e e..i
                                              . .n i.e ee r.3 ed 8. a.6e e='e'"'.' *** * *f the ''''"a = . Incorporat.nor into their tour programs.
Sertions for mao.,i,.m ,od pc +                                    .n e. ecc . .a r a .iac.r.:
c s,              d            i.,c reern          ar e. n oui w n be          ."'a **
7.I . ..*u C",",Sc .5 .
* pni ea..
N          *'    '  '  *
                                                                                                                    .re[~'.,, Q R.idiological Protection Section. Realistic                esposure budgets ar This was delayed because of probicas with the Radiological Information N,*                    O7",*e *,'                        '      '        System (RIH 5), a computerlZed data base of eirposure
                                              ,                                                                          .t 7 ,'~6 j history.
l wi re.                      The ar nep.,imene ..ne This was necessary so that the budgets would c.a.,.        s . re.ine.c. but ch.ne .ag ..i e..de.smi                    inio care . be realistic. The ALARA Group is developing dose Pe cs.cc 84P.643 ..it be ened es . referewe for esi.htesh.ag . reduction plans for each Section as required.
do.c ree.r_t.se pl for e.ch depert nee.i.
ser .,.e                                                                                    RHP's are I cing tracked and trended. This has improved
                                                            .ad ria.siaen ..n Sc we dre s. **cem.ae c 6: ems.
P e perfer.ners .a t9es ere. .13 be smeed s actesury v.                                      the timeliness and use problems identifled by 19:00.
                                              .d        credless delays .ad e.r.arcessary espasur es to lir a cc tm.r ..ne. This tr cb.ag .11 beg.a rebruary I936.
e r
finding (RP.2-1) ns >-e                rebruny
: s. Aad. a,es. a.: r .ha.:.r HPmanim    techa.cl.as            .in h e re..e ed %OcR The RadloIDqlcal SeC1 Ion Manager has established
                                                                                                          , u. ag .cu.~w          '8**
ied ses                a e., n..                              p"  Technician Required Reading tora. All personnel ~
                                                                .nsaso..nd Ses a .ad cmoert in*=.c                                  ,ve,.% s.
wc=..-        n .v .*,. ...ii T. c.r.  ..ri  .w i.ie  Perfrirmin1 the function of Radiation Protection
                                                                                          . d ae. pw e              n.
Terhnician are required to review the contents of this book, da il y. A $1gn-off sheet is provided in the front of the boot.. Each Individual is required to Indicate that the m.nlerial has been reviewed and that they understand the material. The sign-off sheets are reviewed weckly by supervision to ensure that all
\
n                                                                                                          . technicians have compiled.                                          *
[,
 
                                                                                                                                                                                                                              ~      . ..
R(SPONg                                                                                                                                SIATUS          -                    -
fireding (RP.3-1) Th r'**at aack h.
                              .        ...,. .h,w,-a,-o,'S~a  r, 6 =*'d"d'*'".reis.e        ch,. 6- tr it        medi.r '* -~'"''' In addition to the leproved check-off sheet for the co ., in.v .n .=6ns us.sr.co.ra c.-r                              r ie wem b ne=.                                                              frisking practical exercise, electronic tleers have
                                        -                                                                                                                                    been provided to ensure trainees get .1 feel for how long a i. hole-body frisk takes.
Tindiner (RP.4-1)      roca.,e raa's h. e kea n'*'sh-o f- 85 e,                                                                              Y*$, g i. ..n Ef forts are cont inuing to address the areas of
                                    ,r'.ie4 -.i. o.
g.
: d. 89 . --e6 8r. .ad 8 t s :.n.na . ..ra w h,s4 m < a.
                                                                                                              'a=
e',*.-6            -*-t contern.
eu,                                                                  .e.e, s.- 6,.                                                                  The Radiatlon Hork Permit process has been c'=cs ca t = =.ar e-        it*
                                                                =*'ea'* *8 -.d-t -'' '*.'=., . revised to address pre-job ALARA reviews based on
                            ..n u .e en,4 :evauch "'e =" *f '*d e'' '*f"''**                                      '**"s
                            ,4.i.        o.,    ,.ir    ni.hinwa Atan^ twers r'd Ca"""                                                          8a projected esposures. (The higher the projected
                            ..it rene. the other .,4.s er e.m eds.ie centces assag ite.r exposure, the greater lead time required for ALARA
                              ,.. x,,44,4
                            ,, r y      mai n.,
                                                    ,ci  g. sp,r.r.c .ci - e.
                                                          .s.,4 4s.en ihn, review.) In addition, a lead Radiation Protection
                            ..n w        ,w-eated by J.ae t*.          sw .i.----il. si.e-s ,epari saa Technician Is assigned to any job which has a
                                                      ,,, crr,ce..ea,n.^<i =* ia :--re,n .e s h* suhstant lai potent ial for rad! alogical harards
                            -.-e4    3. *in                                                                                                                                                                                . Use of respiratory protection devices has been reduced.
Radiation Hork Permit usage is being trended, and significant leprovements have been made in RWP usage and efficiency.
The improved sample sinets scheduled for Installation during RIO #7 will reduce cuposure of Chem. Techalcians due to inadequ.ste on-line monitors. A storage area for l                                                                                                                                                                    radioactive samples has been provided outside the                      ,
i Chemistry lab.
f i nd i ng ( RP. 4-2).n                P Aa **ddn'.r*~'aaa'a'
: 4. .w A t* *^ "t~"                                ca''' a ha' **ea The ALARA staff was lacreased as specified. However, u in g th, Atana                                  ..tr c= ,^ = ' ''
I,M~,2n ',        3
                                                                                                      ~~'"'~~"
                                                        ""'"ItNA r. c. r - *< n , complement has not been achieved. It 15 anticipated due to internal transfers and the labor action, full b,.ag 4,,,i.p,4 *s. ,4            mro c dehar a ro%                                    ..n be
:=p =ad by 2,.e sm.                                                              -
that the additional engineer will be in place in July g935, w,as,    g 4.are          ac re. ,n .w,, ,
c.- .        ea w
                                                                                                              .i.      .a.:
                                                    *-sap,4.a4 6nt,c aewie4v.,at.,,n sm. scien..,-,..n w<e4,,4b,eccas.-~i- .a4                                                                                            The ALARA program procedures are scheduled for w    .i.e.m .s.ephc.6w - caan.a as o.ia.                                                                                                g ,pice,ntatlon in August 1986.
Written guidance on ventilation a'nd containment was provided as scheduled.
n                                                                                                            -
e
 
Bf5Poust                                                                                                Sulus                      -
Finds.., (RP.7 1) The septicab'e racedures f- ** era'W *f * *r                                                                          ***'e Station Temporary Prce.edure TP 84-64 requires that all                                        ~
b id.ag ..n be ,,                                and me4.r.ed n ace,,,-...e se e                            s..'
that all masse es chett.e4 far 181u.d centent. ins =.It be waste is thecked for liquid content.
                                          ; A.-.;=ed by Agwel I?96.
* BECo has ! cased a Dry Active Waste System which
                                          $as'" Nang''* N o m              t                    [*                er                        t$dIt/ provides the means for sorting, shredding, monitoring,
                                          .aue. iws a .ars e th, s-1, g .r -aue s.an-< ted to oc tempacting, and packaging.
et,s by as t This unit is operational.
n., c - ta m.aas.s,a.
Tws e m t.re ..n he
                                          ; g- ; =ed n - = e.,,.ca.cr e es e-chu,.t.                                                          tasied. and par e.e.ncs                  rettevi.          Yt.c statwo et stese a(s                              s ..rt be    Clean wastc receptacles have been Erovided at the
                                            .,n. seed i the s..-ei.smth erec.cu rep t.                                                                        entrdnce to the RCA, and instructions on minimizing Artwies ha e already lieces sabeve se collect (fesa =aste items waste has~licen enhanced in our General Employee
,                                        lefare they enter cA.eingiratty conte,tled a<en. Thew act aas                                                        Iraining*
88 I.e estem4ed te other g.saat a.cas te n.r br ee the me of < 8eaa
                                          =au, re-eptarses at the h                              wta.scs of ead e-c. cast, < ee sied seems. 'sks e,its te completed by March 8996. 814, ement of cleme easte ceregwarles ens.de esdeelagurally ter ***4ted aceas
                                          ..it e.at crew esafit waste .egeegata=. eq upment aa.8I w''ed wes see awa.lable.
laste.srtwwi in the appregwiste doresal of cleaa. cantam.nated sad eews ble saaversals ..It sne g..ess to all stasease a.=f ransear saw g.ersa.wwl by Pgws4 8996. Segweennes it stress the omgwwtm re of es a.misarig waste and 8.old workers a(s c.sne bte for per far enaate.
Finding (RP.g-1)              s-, o.ed centres or thc oacaeng *c-am ation                          m                  errart oisa be ar<e-.pieshed tw .rh narrene 8 ust--> =aaareme-t - ersm'n. The first "Cyclic" evaluation of the Housekeeping I
netsnaeag March 8996, a m.emtier of 19.e stassen seaff well be Service As Istance r                                                                        est is neariOS c      letlon* TnI
:.eid d.ectiy area atahn-                                s.,  St.e e n fe,.n                        , er the number t.f contaminated areas is identified by square
                                        .ent-wa mat.ast erra,s. rweassai.nai.en etrarts                                                      aren ..th sga.fscaat red.atwee espas.sre rates wall cere.we thew e.sg'e                                                        footage anel contamination levels in this report.
s ew.ew. f orm.we unit be saw*w.used stem gh gwe-pe s.nweys to adentef y the sences et coavamenatesse as the area.
Areas that are escentaa mased =itt be dersnaented and
  !                                    sawestb ted e.i St8"'Its ist screrdenre th the seier-mece et the errwe eare.                    Ident.f.ed ca.nas of eccoetsensaatawe . 18 be carrecsed.
71.e escraN effectiveness of 59te abacountaestanation effort eritt ter
  )*                                    evali.ated fresysently by statica manage 1wne. To f akeletate tbs.
ehe easet ee of contamenated areas *.It be treaser.s by ssp.are fantage and contaemenat.asi le.cl Tract'aC S'I f aat**"*ated
;                                      areas ..H begwe in yes s996.
G S.                                                                                                                                                                                                                    *
                                                                                                                                                    ,      q
 
l RESPON5E                                                      STATUS finding (RP.9-2) nea.c. ,,,www ==6n,                      n me em er .sen's-use                The original CET tape prepared by the n c ,c,,.      i.r rew r sm. o==5 es as -
are. s.e - .w , -.u          Nuclear Operations Manager was shown c- ,...n . .,                  6, car-r ,,we , ,.A ,            . a3 6,<- ece e .ce - . ,,,,,,          during the Febrnary sonth1y safety
                                  . vo                  reer .a.are :-.4 ica, w .r.,a      pons .ad            meetings 1o re-emphas1ze that
: c. .: .              4.ie, -.n t,, v,ww,4 6, . s . -.w, --h sec.'
radiological safety is an Integral part
                                  '""' N                                                                        of their~ job. All new hires and annual requals view a revised tape of the same information.        .
Performance probicos identified in ll0R's are distu. sed with the Individual by his supervisor, and the supervisor is required to determine root cause, corrective action to prevent recurrence, and appropriate discipilnary action if i                                                                                                                required.
l l                                                                                                              Significant performance problems which
!                                                                                                              result in an HP hold on a job or l                                                                                                              esclusion of an Individual from the l                                                                                                              process buildings require a meeting with the Nuclear Operations Manager, the                            ,
indivivual, his supervisor, the MP                            '
Individual who stopped the job or pulled the person's access, and the l                                                                                                              Radiological Section Manager / Chief l
l Radiological Engineer.
l l
l g
I l
l l
e
 
1 pr5tortst                                  -
SM105                                      _
Find.    . . .-1 ) A wiia, per          : r.cw w : ,,r.ics h., n,.. ,,tc.eea c .+      r....,a erre,        s. :, s s er .r.ar ** - s - Sr ar          .ce Chlef Chemical Englacer was hired la ADrli 1-                            '*
cw e -r..      .. w o t cw .r.or cn.,er . ,e.te,,,                    and we are currently interviewing for the last Senior                              ~
we p.or...,s. s p.e              ,,-        e*.ie e.-r+ n.s ..n t.,      CheniraI Ingineer.
te,intea en terrett.ag stir retde==1 e.eied.
A design cirige is currently scheduled to be Impicmented during RIO #7 to resolve the pro *.lem with controlling sample temperature.                                                        1 He have identified and corrected a major source of our air in-lealage to the condensate-feedwa.er. Just prior to shutdown for the current outage, cuygen levels had I
been redured by 50 percent.
A temporary modification was installed to automatically trip the tcriparary makc-up 5ystes whee poor quality water is genrrated and a continuous recorder was installed.
The Chesistry Group has implearnted a program of monitoring and make-up of sodium nitrate to the Closed                                  '
Cooling H. iter Systems, and Maintenance has corrected several deficiencies. At this time, the Reactor nullding Closed Cooling Mater Sv,rees are under control.        The Turbine 8vilding Closed Cooling Mater System. although being maintained in specification, is using an c cessive amount of chemicals. The Technical Group is investigating to determine cause.
Additional procedures have been developed and impicmented. The only remaining procedure to be written is one for PH measurement currently scheduled for July 1986.
The Turbine Building equipment sump no longer pumps to the condenser. It is now directed to radwaste. In addition a temporary system has been Installed to process some drains highly contaminated with nitrates.
Trending and review of cheelstry. data has been significantly improved.
                                                    ~
 
REsf985E                                                                                                          STATUS                                        .
Tinding (CY.2-1) The                  Cwaeres prep.,,4  .aa sr.ia.,c      c ated
                                                                          >      Tech
                                                                                    .a Jea <y s tes. na ki a %iases Pr.tr.= w. twea An assessment af Cheelstry personne1*s i,4c, 4,,,:
                                        ..s,..-- a .t .n o.e ain,cn sm.
u    r  ca.==-1                                  :: > e. r -ved t y knowledge Icvel was conducted in March s
15., ,, an ..a w pr w e s. sw r,.
o ,p . . ~ r ,.a. - * .eice. m .-4 . + - - sen .ac or..= r. .g                                                              1986, and the resvits are being ne,+ 4e.      ,, e e,-                .i.sa                  i,4ccse : ==-c ,,                                c.uF Incorparated into the training program.
                                        '*"~~''''                                                                                                                  As stated in our original response.
training bc<pn in January 1986; however.
attendance as inconsistent because of 5tation needs. Iai April 1986.
authorliation was received to increase compiceent from nine (9) to eleven (II) technicians. A strike by the (Jnlon prevented filling of those positions expeditiously.
The contracts have been settled, and we capect to have all posillons filled by July 1986.
finding (CY.3-1)                T**    '' < * =.ic.I c.**r*8            c
;                                      ,,. e4.g.m .a                . .e.sah,'es'a 4.aaa ,pdr.ft 6. cwrea'tr k g A draft site chemical control progras
: e.          it.ec****
                                      -.n w ,,.., 4                  .eem,n,-              .e.gc r.                                  twi      ' .'... has been devcloped. It Is cerrently l
                                      ,es,c, J u c.
                                                      ,, stes. se.p pi 4a.. . ..as w *r.a,4 .-.e                                                scheduled for revlev 1.i July 1986.
_r                              =-s a.r ,*, r I's'. Car e <> - rtaa r
l
: i. 4r.e%d,                  -. ,      . ;.tre /.te -.88 k fwra.stwd ea st-
                                          .      ,* p.eren eep v.
Finding (CY.3-2) .u,,..,"4      6'vr* *      **" ia '* **** """d 'i"8 e            .. . ,,' .rs                              p c*P'"''''
                                                                                                                        .g..-            rre","<."."'a' The design change for new sample sinks
                                      ,rc,
                                              .us      p ca. sa, to- -. ,,
4 .e w J.m r                                          t. wasa e.aa rar.=~ c,'e                                    with leproved on-line mostforlag has i unmi          nar
                                                                                --i.m .e so., e.a 4 .e 4                                              . o.        heen approved. The welts have been
                                                                            .me'e,<t,sg                                            e.g er=h,4*4 b' '. " *' 8 *-                                                                                                              ordered anet are being manufactured.
1 hey will be installed darlag Rf0 M.
I
 
n n wit.
F1ndinr                                                                                                                                    b                                    >M W)
                                    ) The Ters r.: c,c, s s                              .n;g.wd ehe i. 6 .r e..
                                                                                                                                              .                                                                                              ~
                                          - pt e    c.< m
                                                            . ,,.,,,,            . 4 ,
                                                                                .e c.,,m-                  , e . - .ae-6.'"                        P. Chcolstry Gropp has Isplemented a progras of
                                                                  .no        .              co e m                                                                                                                                              7 The    e..i
                                        .ae ec.ui,,g c.,veo..e .ct rt ..n t.e impi,=. eased by mEnitoring and make-up of sodium nitrate Arr889sa.                                                                                                                                                                                                    to the Coolfrig Hater Systems, and Maintenance has corrected several deficiencies. At this time, the Reactor
* Building Closed Cooling Hater Systes is under control.
1he Turbine Building Closed Cooling Mater System.
although being maintained in specification. 15 using an escessive amount of chemicals.
investigating to determine cause.The Technical Group is Finding (CY.4-1) so,evim .:
g=_ _ .rs; m ww t,m ,,5m ,e som vs
                                      ** - em rac..a              --. -s.w
                                                    ..nn,cu              -, --,4m eh, p. , .- ear-.
                                                                    ,ir4,r                                                                , Station Procedure 7.10.1 and 7.10.2 define the
;                                                                                          4 u :
                                      .m.                                                            r .- - - ce ved ' e Lt r. *'. Cheststry Quai 1ty Progran at PNPS.
1 Tindi ng ((.Y.4-2) 8'-= Wa e'*r' ire' 6
                                              ~e. o .u - -4 s ,'s = e.                e****" "."rv~s 4, y c**ed  c n .r .'a n w.s. s. 6*s                  s        e4
                                                                                                                                      '' The proposed espan".1on of the chcolstry Iab wis
                                    . , u .g. . .                  o,.e          c.w      .ce    .c.re  u .-. m......e                  Impacted by 1he Iabor actlons and i5 currenfly behInd i
p-e,      :          ic.i ~.y e.c                                . i.n . . ., , , , , .. a scheda1c.
i,*ii ., .. > -e-n .
Finding (Cf.4-3) p.e c , er ewmews, :=ce :e=s.ce.6 -woi bi > a.=,
                                    . cw wye .r. sea m. 6ee= <.- ecsed-r Al though we have corrected th e Identified problem.
;                                                                                                                                            other inherent deficiencies with the old equipment has provided justification for replacement. He have i                                                                                                                                            received authorization, selected the new equipment, and rinding (0".1-1) w .rit-i enoi se .**e= *.e .6                                                                                            espect to have It on-site in July 1986.
e c cm i.              .n.-u
;                                          ..        se as=<*
w sm
                                                                      ,... ame              mesi        ..n w. .,- eh, an                The      effectiveness
                                                                                                                                                  'ndependent  evaluator.review was conducted in June 1986 by
                                                                .                ,4 s, nero                                                                                                  The resulting
                                                    . --. <            h.o.4 a , .e., .,e.a...e.erre.                      6,.. com          plan.recommendatlens    will              be  incorporated  into an action ened. yr L 4% Ceartrere ce est die e thesh.8 gy se 3-.                                                                                                                                                !
1
!                                        in.
The st.t.ase -itt .er.esap mq:- _4-we.ed m8ppeti.e. .ad trsteri, by Ayrsi l'SA
: c.      An effeos.e.ne 8996,                        re..ew .ift be tsad ened 0 7 My i
d.
l                                                A.e ayer.s'w ig e,pce.e re effeos.cnew ee..e .n.g re.nete=g
                                                ).sae899 correce,e .cs se pt e =.tt be prep.,ed t y I,
_ - . _ , - - -                -        --                              ~
 
                                                                                                    .,              l
,      PME to. 00001 06/25/C SCG Status                                                          l i    amm            SCzR      me.                                                                    f.l  .
l
      .MDE            No.        No. ASS 23@ ACTICtJS PDD!tC COGTrr2CH l                                                                                                                1 182009C2      62-09      2      frc:, /1770 '!C R&QD to Mr i2 IN SCER 82-09. SEE ):Dio PNCE                '
04-392. 70 BE ItC1J.DID IN PKC.
18201301 52-13      1    PulOW UP Qi PCN 10 PKC1 DURE 1.4.8, PEVIDE ClOSE G7f DCrn:D.'mT!Qi Mci COTLEnD l
l 16201303      52-13      3    CODU':T S%DY MD DGU2c27 CCEF2CTnT /CT!QiS BASID CN REL'!.TS T S%DY i
18201305      E2-13      5    ACKEIFT7ATnt Catr7CL T USE T }NICZ2AMD oct2CALS MD CIRS-UP T N/CD1 RESIDUE 18201401      E2-14      1      Ds Dr.T P7z\r.Tnr Manl:UNCE ND NCCID F.EZPUG Sh'SnM TCR HPCI ND 3CIC SYSW.S 183C01C1      63-01      1    Du CD:UA7CR T7r.rtrnT MAD?:rX2 PKC7AM FICU27Dc2?IS                          ,
l 153001C2      E.3-01      2    EG Ca?Tra MD PFCSCT:Cti SYS7Dt COUCC?:S it'.S, c':1;t.1tc                  '
35PEC'.7CN RD A:UUSDr?:S                                                  i
      '81300103    f.3-01      3    IG PM PPCC7AM PCR CLEMinG, LEM CCRMCTICti MD TIGf;D?!!C T ICCCE PAF:TS MD CO: pct;DlIS                                  ,
26300120      E3-01      12A  D:STil.L kAn;:!G F:.A;UES 04 Sk77CEIS "O CQtTEL P2 W.'TE IN r.<J:','P m'.5, Cl2:CLE PER !E 84-105                                        l 1E3CC12.1    E3-01      1:3  Fr.*2!T C7II. "':L7, FTCC. "O \TF!!Y ':1AT TME J@Tl MD J@F2 AFI Cc2IIG! .!D hMILE EG Di S".Ft 183C0122      83-01      1:C  ISR 6.442.14CE MAW. TCR J@F-18 2 D7JG2"ID MCIE CG IN S?d' e USE A5 !!;FL'; 70 IG UCLTI.E llAW.
1M00303      f.3-03      3    Fr.*IDI, D77C'T U?.U TR \'DIT21AT!Cti ':0 PME 0 U1"AT2tG                    i IID'X2D !!?.TP::D TAILLTIS                                                  !
l IE300505      863 - 0 3  5    CQ1SIDG RJS TFASSTER D'FFCYD.r.:?IS TCR !!?.UCIR PA2"P TOCR S.TPLUS AE300305      83-03      6      !!c:.t'SICt T tnt?:ID C27C.'!T BCAID ND CR CAP /C270R RITIX.D227 D4 W. PNGMM 1E3C0307      E.3-0 3    7    D;!L*RE PAD?T PKC TCR 2??T.PJS 2iC11DE ACD[UA"I PF3rKTICliS JCAINST ifJ'Ri D7CR If300308      f.3-03      6    PIN"- CP PP"tT25 TCR CC1tT7tL T IVCr 72r2KDF.27,                    .
                                      !!?.T.ST: CAT:O;S T TAILt7"CS 13C0309    E3-C3      9    It?.USD It? mN. F7JEI.U, TF#iTCICR Uf-TSTICAT:CI' NR              ,.
1::3: C;.T.*:A7:24 Ci?I22??S
 
PA2 to. 00001                -
04/2VC3 SCm Status          .
    .COCVIIR      SCO  Puc .
KDE          Ho. Ib . P2rOtrDAT20iS C14CID S!!CE 2AST tim 2W. TEAT 2Cti l u01002    E-10  1      FKCIDt.mE 2.1.5 ATpcite.Ts A, I', & G PEVIEID 70 CIARDY S1:G nCE O' MMCAL 4160 TRANFD8.
18500101    85-01 1-3    ESR 85-57 C10SID C17t. SIZ NED C5-259, 85-114 4, M-113, STA 85-126 NC ICI!b 04 PRCC. 7E.'252CNS.
1 l
1 M00101    M-01  1      t7m CLv. IPPo MAS DE':IW.!!sD 'nAT 7E25 PZCQtDCATION DCES tCT AFTLY 70 FIl4RDd. (IS 600) .
I 1 M00103    N-01  3      cm2D C17t. Nu TO SCO U-13 Mc NEWOE DM 25 600.
IM00104      M-01  4      CGID CLv. MER iV Scm u-13 Mc NEWo* DM 25 600.
I M00105    W-01  5      CccD CLi. 72TER to SCG u-13 MD NIWCM Dt:74 25 600.
1 Me: ce    M-:1  e      cum Ctv u ic mt.:m r r:. wrs to tra em ss (CO.
1M00110      M-01  10    crcD CL7 M tm APrLICA!!:2 TO Ik7s FD PC6 cm IS 600.
4 9
 
                                                                                                                                                                          ~
APPth.                                                                                  -
                                                                                                                                                                              ~
i                                                                                                                                                                                                      .
{
                                                                                                                                                                            ~
                                                    ![STOKSC                                                                                    5iATUS j        finding 4MA.g.1)        A Materials Management. Accounts (1984)                                                                                            The full laylementation of 9904PP5 is not regelred to Payable, and Purchasing System                                              correct the findings defined by 914.9-1 (1964).
)                                  (tetAPPS) will he implemented at                                            Processing has leproved.
)                                  Pilgrim Station la mid-1965.
;                                  Additionally the Nuclear Organtiation                                        a) By co e lning the Station procurement functions i                                  has reviewed and recommended changes                                                          into one group, the timeliness of Purchzse i                                  to the procurement process to reduce                                                        Order processing has leproved.
s paperwork, eliminate cacessive
}                                  1ayers of approval, and relocate                                            b) In-house procedures control the issuing of i
quality assurance, auc: car engineering,                                                    safety work to only approved ved ars.
and procurement perst,anel to the                                                                                                                                          ,
Station to espedite resolution of c) A computertz:nl male.tenance program for inventory i                                Pw chase Order and materlat management                                                      of materlat provides automatic reorder
)                                problems. Relocation 15 cepected to                                                            information sin months prsor to espiration date.
occur in January 1985.
d) In deallag w'th items from the N555 vendor.                                                  '
items needing evaluation are placed on hold in the warehouse sotll an evaluation is performed i
or until items are received to replace them.
* This practice is beleg considered for espaaston to other items.
i i
!        finding (04.6-1)        bro will review Good Practice MA-304                                        Twenty-seven (27) manuals remain to be approved
!            (1984)              conduct a survey of sister utilities,                                      and are scheduled for completion by July 1986.
and saayle significant vendors to i              -
determine methods being utilized or                                                                                                                                          '
i                                planned to control vendor echnical I
information. Using the results of this effort the Nuclear Orgmiration
                                  =l13 develop a plan for controlling                  ,
vendor information that addresses                                                                                                                                          ,
I                                the problems noted above. 14e plan i                                will be formulated by April 1985, and
)                                an laplementation schedule will be i                                provided in the sir. month status
!                                report.                                                                                                                                                                    '
                                      ~
j                                                                                                                                                                            .
 
                                                                                                                                                                                                  \l 6Ptin j'.                                            -
BCSP0MSE                                                                                        -.
Finding (OP.5-2)                                                                        STATUS 1
A reduction in the number of immediate actions has been achieved                    The DECO Nuclear Safety Review and Audit in some of the procedures revised                    Comelttee has questioned the approach PNPS is under the Procedure Update Program (PUP).              taking in reducing immediate actions in the PUP review and revision of Emergency                  abnormal and emergency procedures. The Operating Procedures, coupled with use                revision process in on hold until this can of the generic guidelines, will result                be resolved.
in additional improvement in procedure content and make possible the retirement of some procedures. Once this is accomplished, the remaining procedures will be reviewed with emphasis on consolidation or climination of unnecessary immediate steps.        Ihis effort will be completed by July 1985.
1 1
 
                                                                                                                          \~
6PPf4 .G '.-                                                        .
BESEQNSE C        .
Finding (OP.5-2)                                                                  STATUS A reduction in the number of Immediate actions has been achieved            The BECo Nuclear Safety Review and Audit in some of the procedures revised              Committee has questionef the approach PNPS is under the Procedure Update Program (PUP).        taking in reducing immediate actions in the PUP review and revision of Emergency            abnormal and emergency procedures. The Operating Procedures, coupled with use          revision process in on hold until this can
,                  of the generic guidelines, will result          be
                                                                      ~
resolved.
in additional improvement in procedure content and make possible the retirement of some procedures. Once this is accompIlshed, the remaining procedures will be reviewed with emphasis on i
consolidation or climination of 4
unnecessary immediate steps. this effort will be completed by July 1985.
i
                                                  ~
O
 
ET~ --  -
              /([,
Federal Emergency Management Agency i1                            Washington, D.C. 20472 4 .    .
                                                                            .." .y 5 IH5 HEMORANDUM FCR: Edward A. Themas, Chief                ,
Natur 1 and T chnological Hazards Olvision
      .                              en !    .
FRCH:              ..n    H.  ..  .
                              , Acting Gene    1 Counsel
 
==SUBJECT:==
Offsite Emer;ency Planning at Seabrcck Station In ycur meicrancun of January 23, 1955 to Joseon Flynn, you ccmmunicated the request of Rctert Boulay, Civil Defense Director for the Cer.ncnwealth of Massachusetts, that the federal Emergency Management Agency (FEMA) and the N. clear Regulatory Commission (NRC) review and correent upon a' memorandum of law prepare by Themas Olgnan, Ccunsel for Public Service Ccmpany of New            .
Hamoshire. In his memorandum, Mr. Olgnan addresied what he considered to be three miscenceptions accut offsite emergency res;cnse planning as it relates to the Sea:reck Statten.
I recently received a letter f ecm Ed.,ard Christer.:.:ry, Directcr ar.d Chief Hearing Counsel, Office of the Exe:stive Legal Directer (CELD) of NRC, which rescends to ycur request. A cecy of that letter is attached.        The legal discussion in that letter reflects the ccebined vie =s of cur respective effices. I concur in Mr. Christenbury's analysis of the Olgnan memorandum.
Attach ent I
l l[                                          ,
                                    .Ns Nb UI { QC Cf                                                ,
l Ih08;3'i Yh33 l
: 5. c e er
                                                                                ,                                        u.
.  /              #e,                                          UNITED STATES 8        i        A                              NUCLE AR REGULATORY COMMISSION 2    x          .
I                                      casmuctcN. O. a. zosss
    ,.....#                                                          June 18,1986 Spence W. Perry, Acting General Counsel                                                                                          -
Federal Emergency 61anagement Agency                                        ,
Room 840                                                ,
500 C Street, S.W.                                        ,
Washington, D.C.                          20472              ,                ,  ,
in the blatter of Public Service Company of New Hampshire, et al.          ~~
(Seabrook Station Units 1 and 2)
Docket Nos. 50-443 OL and 50-444 OL Dea.r Mr. Perry:
In response to a request made by Edward Thomas of FE.*ilA Region 1.                                            we have evalu a ted ,                    in conjunction with Joseph Flynn of your otDee,                          an u ndated memorandum prepared by Thomas Dignan ,of Ropes and Gray on
  ,    behalf of the applicants for the Seab rook nuclear pikt.t ("Dignan Me moran du m", a copy of which is attached                                        At tachment A).        Our evaluation is set forth in the following discussion.gs The Dignan Memorandum addresses What are described as ''three misconcep-tions" pertaining to o "f r it e emergency planning for the Seabrook nuclear plan t , an d conclu de s that they are " fals e as matter of la w " (Digr.an Memorandum at 1).                            These purported "misconceptions" are as 'fouows:
A.      That the plans must be shown to gu arantee that no                                                ;
adverse effects on the pubuc health and safety will                              ,
occur no matter what kind of accident occurs , at Seab rook.
B.      That it must be demonstrated that the plans viB assure                                                ,
that all persons loc 6ted in the Emergency Planning Zone                                              I or some certain portion of it can be evacuated in some                                      ,
l certajn time.                                                                            -
1 In particulcr. there have been assertions that the                                      i plans must assure the sheltering or evacuation of persons        from the beaches in approxima tely 1/2 hour.                                                  -
I lt should be noted, however, that under the Commission's regulations.                                      l 10 CFR I 50.3. only written regulatory interpretations provided by the Gencent Counsel will be reccgnhed as binding upcn the Commission.
                            $ /0 o wp w w n > =>
                                            ,!    e-  - x= Y
                                                                  .L -\          ,
 
Spence Perry, Esq.                                                                                                        )
l i
l That 't h e plans must be designed. end shown to be C.                                                                                                                    l able , to cope with a particular type of accident -- in                                      .
particular, one invoh-in g                        an  early        release      of radioactivity off-site.
For the reasons set forth below , it is our opinion that, with minor clari-                                                .
i fication, Mr. Dignan's conclusions are essentially correct as to items (A) and                                                l (B) above; however, his discussion of item (C) appears to contain an, error                                              ,
which requires corr,ection.
DISCUSSION                                      .
A. Absolute Assurance of Perfect Safety.
As set forth above, item (A) concerns the ' question of whether an emergency response plan must be shown to guarantee that no adverse health and safety effects, will occur, regardless of what )dnd of accident may occur at the plant.            In our opinien. Mr. Dignan correctly concludes that "[nleither the Atomic Energy              Act nor any re gulation of NRC,                            whether dealin g with emergency planning or not, requires absolute assurance of perfect safety" (Dignan Memorandum, at 1-2).                                                ,,
As you know, prior to issuance of a full power operating IIcense NRC regu-                                                    l lations require a finding "that there is reasonable assurance that adequate                                                  j protective measures can and will be taken in the event of a radiological                                                      j emergency." 10 C.F.R. I 50.47(a)(1). With respect to offsite matters, the                                                    '
NRC will base its findin g on a review of the FEMA findin gs and determinations "as to whethe.- St:te end leca] cmergency plans are adequate and whether there is reasonable assurance that they can be implemented."
Id.,      5 50.47(a)(2).              These            regulations  plainly        do  not    require any demonstration          of "absolute                  assurance" that    the        public  will be totally protected in the event of a radiologica] emergency.                                    Rather, the intent of the Commission's emergency planning regulations is to reduce the impact of                                                  I an accident and achieve "dose savings" through protective actions that take                                                  !
into consideration plant condition s , evacuation t.imes.. abelter factors, and                                              '
other conditions that may exist at the time of the accident.                                      N UREG-0C'4 /
FE.'.lA-REP-1, Rev.1 states as follows (at 6):
                            .                                                                                                              l The overa)) objective of energency response plans is to provide dose sa vings (nr.d in some cases immedjste life savin g) for a spectrum of accidents that could produce offsite doses in excess of Protective Action Guides (PAGs).
The A ppeal Board has similarly stated, "[t]he basic goal of emergency planning is . . . the achievement of cica.d. mum dose savings in a radiological                                          .
emergency." Cincinnati Gas s Elcetric Co. (Wm. II. Zimmer Nuclear Power Station, Unit No.1) A L A B -12 7 , 17 NRC 760, 770 (1983).
 
Spence Perry, Esq.                                                                                                                                                    .
s In Southern California Edison Co. (San Onofre Nuclear Generating Station,
  . Units 2 an d      3),  GLI-83-10,        57 NRC 528,                533 (1983), the Commission cummarized its ratienale for selecting an emergency planninF basis as                                                                  .
follows :
The underlying assumption of the NR C's emergency planning regulations in 10 CFR I 50.47 is that, despite application of stringent safety measures, a serious nu-
* clear accident may occur.            This presumes that offsite
            . individuajs may become contaminated with radioactive material or may be exposed to dangerous levels of radi-ation or perhaps both.            Planning for emergencies is required as a prudent risk reduction measure for those individuals .      Since a range of accidents with widely differing offsite consequences can be postulat ed , the regulation does not depend on the assumption that a particular type of accident may or will occur.                                      In fact no specific accident sequences should be specified be-cause esca accident could have different consequences both in nature and deg ee.            Although the emergency plannin g basis is independent of speelfle accident se-quences. a number of accident descriptions were con-                                                          .
sidered in development of the Commission's regulations, including the core melt accident release categories of                                                                  ,
the Reactor Safety Study (WASH-1400).
These statements demonstrate that the goal of emergency planning is to reduce the impact and achieve dose savings for a spectrum cf accidents, and that emergency planning may satisfy NRC regulations even though the pote ntial for adverse he r.J t h effcets in an emergency has not been totally o!!minated.
Notwithstanding our opinion that Mr. Dignan is essentially correct in his                                                                .
conclusion as to item (A), two statements contained in this portion of his memorandum require clarification. First , he goes too far in assertinF that                                                                  l "it has' been recognized from the outset . . . that if one assumes. a. major                                                                l accident with offsite releases , some adverse effect on the pubtfe wiD. by definition eccur" (Dignan Memorandum at 2: emphasis added). Contrary to this assertion, the occurrence of a major accident accompanied by offsite re-                                                              '
leases will not necessarily lead to adverse heaJth effects.                                        Rather, in some circumstances, emergency planning may serve to avert the occurrence of any                                                                  ,
adverse health effects.          Further, whether any such health effects occur, and the extent of any such effects, will depend upon a host of factors, such as the type and quantity of release, the plume dire tion, meteorological conditions ,    exposure      du ra tions ,  and  the  timely                            implementation of an appropriate protective response.                                                          ,
Secondly, his memorandum states that emergency planning is intended to                                                                  '
limit any adverse health effects to as low a level as reasonably possible.
    *given the facilities at hand" (!d . ) , possibly implying that add!'f onal
 
v.
Spence Perry, Esq.                                                                                      .
,                                                                                                                            l l
        ' facilities will never be required to be built or installed to satisfy NRC
    . emergency planning regulations.                In support of.this . statement, Pir. Dignan                          !
cites the San Onofre decision, supra.                        However, that, decision provides only limited support for this conclusion. There, the Commission addressed only                                            I the issue of whether additional hospital construction should be undertaken, and concluded that such extraordinary measures are not required.
E. Evacuation Within A Specific Time Period.
The second item addressed by Str. Dignan is whether the Applicants must demonstrate that all or part of the plume exposure pathway EPZ can be evacuated in some specified time ; in particular, this item addresses the question of whether the beaches in the Seabrook vicinity must be evacuated within approximately one-half (1/2) hour. It is t.ir. Dignan's conclusion that NRC regulations do not' require that an evacuation be assured within any particula.r tim e (Dignan hiemorandum at 2). We concur with Str. Dignan's                                          l conclusion as to this item.
In support of his conclusion en this matter, hir. Dignan cites two decisions:
Cincinnati Cas a Electric Co. (Wm. H. Zimmer Nucicar Power Station, Unit No. 1), ALAB-727, 17 NP.C 760, 770 (1953), and Detroit Edison Co. (Enrico Fermi Atomic Power Plan t . Unit 2). AL AB-730, 17 NRC 1057, 1069 n.13 (1983).          In Zimmer, the Appeal Beard
* stated as follows:
The app!! cants are . . . correct in their insistence that the Commission's emergency planning requirements do not prescribe specific time limits governing the evacua-tion of plume EPZs.        The matter of the time in which evacuatien can be acecmplished is left to be determlncd                                          '
on a case-by-case basis upon consideration of all rele-vant conditions prevalling in the specific locality. But                                          l I
it does not follow, as the applicants would have it, that                                          l a particular evacuation plan need not be concerned with                                            i the efficiency with which evacution                mlF ht be accom-                              ,
plisbed give.n t.be conditions under which it must t a.ke                          -
place (n. 16 ] . Indeed, the Commission guidelines sug-gest the contrary. . . .                If the responsible govern-me n tal officials are to make an in formed decision respectin g whet is appropriate protective action in a given radiological emergency, they must have avajlable to them time estimates which are realistic appralsals of the minimum period in which, in light of existing local condition s ,  evacuation could reasonably be accom-plis he d . And, the nearer to the plant the area that might have to be evacuated, the greater the importance of accurato time esti; cates.
: n. 16/      Those conditions include, for example, the size and    nature    of    the      popu*ation,            the            avajlable
 
1 Spsnee Perry, Esq.                        .
1 1
tran sportation fa c!U tles ,  the existing road network.                -
  .              topographical features and political boundaries.            . . .          .
Zimmer, aupra, 17 NRC at 770-71.            Similarly, in the Ferm! decision the Ap-peal Board stated:
                  . . .    [T]he Commission's emergency planning regula-tions do not specify the time within which the plume                                  .
EPZ must be evacuated in the av.ent of a nuclear emer-gency. 10 C.F.R. Part 50, Appendix E, f IV, requires only that appucants provide "an analysis of the time required to evacuate and for taldng other protective                                              ,
actions for various sectors and distances within the                                              l plume exposure pathway EPZ for transient and perma-nent populations."                            .
Fermi, supra , 17 NRC at 1069 n.13.            Thus, there is no requirement that an evacuation be accociplished within 30 minutes.              While some other functions nust be capable of being accomplished                within that time fram e .          those functiens    gennally invc!ve      the noti 5 cation of appropriate government al officials and netiSestion of the pubuc.          See 10 C.F.R. Part 50, Appendix E, I IV.D.
C. Plannine for A Particular Type of Accident.
The third issue addressed by Mr. Dignan is whether a facility's emergency plans must be designed to cope with a particular type of accident and , in particula r , an accider.t involving an "early release of radioactivity off-site."
Two conclusions appear to be reached by Mr. Dignan in th'is regsrd:                            (1) that while emergency plans must be designed to cope with a spectrum of acejden t s , they need not be designed to cope with a specific accident or "an y worst      case accident"    (Dignan Memorandum at          4),    and  (2)      that emergency plans are not required to be designed to cope with an early release of radioactivity (!d., at S-3).        While we agree with the first of these                        l conclusions , the second. conclusion is incorrect and requires clarification.                                  l l
First, Mr. Dignan is correct in stating that the emergency plans must be de-signed to cope with a spectrum of accidents, but are not required to address any particular accident sequence or a "worst case accid e n t . "
The              l Commission has decided , on a generie basis , that compUance with its emergency planning regulations provides the reasonable assurance required by 10 C.F.R.        I 50.47(a)t accordingly , offsite emergency plans are not                                )
required to address particular accident sequences.                In the Statement of Consideration pubushed upon adoption of the Commission's final emergency planning regulations, the Commission stated as followat The Commission recognizes that no single accident scenario should form the basis for choice of notification                                      . I capabiUty requirements for offsite authorities and for
 
Spenc2 Perry. Esq.                                                          perf e :t safe y.                    Indeed, at has been recog.. :od fr=. the ca se          of the for..ulattor. of the cur e--                                                  e                                                      '
the public.            Emergency plans musfle Te#Mo'p*eh                                        v                    3ikit'n                9
      . r e r.:l a :i ewWI -hws $be oSaxiN1Jhetp pn:syg :reporjgt,'to                                                                    ,4,  yrjde                                ,
spectrum of accidents. This wide specir'um of' pot'ehtial effs::e re@f 4ga,t5, airo.e            c . re/le.c es.3gn e tghe, app                          p offsite not!Scation capability. . . . gp, giayp~~-                                      ,
u,g ,ofe t.M            -- .-            DY det:n::'en,                eccur.        The        -- ese et Any accident invo VME                          severe [u"ii.          'd k.M. aff o, $ ".e . r. .ebre
                                                                                                                                                        , 8          "
nave in peshte Spinteinues .5:piggif(can}e[qv,eptgrigg
: r.                                                                      of Jssion.                                .
products in the containment ~ wotad' trarfatt %nedfile *V''
:n'orde: publjs e:noMedificgif f g,rgd 3 cgusipgrgtgp,iirtlyas4,dreton%ctive                                                            the particufar circum stances , of approp                                                                  p
:e a s c r.a:1 pc)f os sit tc.ap sa . o( J hr.
tainment bu!!cf.ing." In"poteluial        ad dTtio~n*,'      .f,or'(eakagg[of,,the fMe waThid
                                                                                                                                ~
                                                                                                                                                , con-ttme MM * 'n C a 1 : .'::r.: able : fee r.ttt*. . pupffp". to take aqtion gay ,be substantially le ss than tne total tir:ie' VeIwe'e'n''the oMEIWl'friif'iting C st:en. trNset EncketJte itime-46.whi_ch-signif! pan! Tadioagtjyt re-
                                                      ~
leases take plac'e'. ''.' ." Thf rc'dijciibn Bf nottWcaf f,ef.:. .4                                                                      -
S e :: . dimes s fre,e Jhm. . .se.V,e,rg) . . ppucq,                  .                              reguired                    for s t r e e t - b y - s t r e e t" ni:diMit t'l65 "t o''thiriu ti's' wfD 'N} dnffh:fantfy' I
:. c                                                                  a,bje .as    a prptp.ci!ve aetions. un-
:..s :::. ine  deren    e the:
severe        pp:ioru 'c'en accide'n't      ayaj{ditioris'."'                  TMs'e''#ittibi'.s# i:o6?t'Il- n                                                      I areas w:: {DAlusiec Etoyirls indagr.s irkf hg cyg_of,,a . release that                                                          t 11as aJready occurred'c'r' 'a pFe'fa'utfoifai y e9detfitidn ill tW -            3
                                                                                                                                                                                        )
        "'t.e A.p r e a ' cec a p(; s a epotential .r.eltaet. thought to beg a, few })gurs I
away.        A c cidi."t's t6af Yo''ni:N resuit 35 cfrU cielt" r:fa~y Y                                                  I                              !
a r. :  w ::. :Wst::qp.use :r_Matively gulch. relpaset.,for which ,.protectjve 2PY actichs, at leist"'for 02 VM L7 ^ J'd C TJ Cpla F
        . w-      -i .      :vicirity.c r    p a tde snr.bj        e, e . . . . . .
: e.    . ..-
        ;15:;fsd i f.eg--;5 40;2- g3 9 50 h. . Situtt!y.                ' ' ' ' ' ' bT.R.E.q-Of                    5..I / TD1            A R ey .j , R e v .                    1, provid e s a s follow s (at 6 -7 )l' '                                        - -" - ''' ~-                          i'5#;:- 3'rr; A ::. .: c :-: er            ..a.
                                                                                                                                                  .,.t.
No single . specific :a)c'c icie~n:t seciu'e'nce sh'6tt1d-be isohtted-r 13 (ice 9s                trig,:gW for .                                                                                      accident could have dif fe r, ent    r ychc'cm.,.to,s e q 0.glan      . b,ec au.s,o . e achEbth-'in nature and e ric^e's'.
r e ga1 a . :nde EtteM f futther. .(he. xagge .of pots,1ble,. select,,ien for a platining basfi'li vert'IaYge!'stirting"etth*a rero point a : :: . ; ; : :..*( . .r$q.u.i. rim no,13 12ncing. a.t , all beeau se .s.1g plSennt off-                                                              ,
alte radjologicid acei'd'edi co~nsiqueMes"'are un8kelf to '':
        .- :s        1. .                    a                                                                              accident , re-                                  -
:.5Mi9.ug.:.t,o gardless of itsplanning extre:019"164  for ths..yotst, IIXe"Ifhobts  popsib)e,the  .~                    #1 1110/EFA
        !..7.I    - 0 5 5 4.Taghe F,qp,qe /Jql .n sequence or even'gt. stte;np,t.1qe d_en,.ne .a single accidenta'lff:iitid tillbib
                  ..:rt ert.44 identined.the. bopods q.f tt e.l parametprs for which
                                'planninF f.s''reciniriencfed',' bIhid ett; fen
* kWewie6(e of %6:                                                                A2
::      n =c:ra r.c poAMtial corlsepecem !!;rJn g ,, ,and., rel_ ease characterf s-
                              ' tics' of a spect rui::"of"ac'eide nt'n 'Nthmfg~tt tt.i:ss!Ected
* pe
: a r:: c u i a quences, r Platini,ng,.; bast,s. .is ,ingepgngnt ,of, specinea w erenumber t'e n-        oi adc1cerit' cre sidercu in the devc!opment of the guide.nce, including 1
 
1
                      .                                                                                                                                                                    1 That prepositzen as net Spence Perry. Esq.                                              ~7- only bad Icv. It is directly l
de.          cen.rary to the theery cf the NR                                                                                                                                I emergency planning crateria.                      The theery upon whic'                                      he of' TEEI hM6ftit. Were based the core melt accident release categorfes V 85s fie bf *S ttuly i W ASEe H o gn e u t e e e n , g , 7                                            ,  ,pe,.,..,,,.,.,.,. c .,
Accord . a 5KA CIMd#e , Ebp rk.e 3171 F%Eatt g.                                                                  ong, Island Lightine Co.
(Shoreham Nuclear Power Station), LBP-85-12.2 Eb(rt                                                    N          .SW31""8685 31595)1(asee le
                                                                                                  %.Aqsy                            nissed a contantion as-in DignM41tWtR*Mlemeit r+k.u019.Jitags!serting                                                          eo that the emergency                      ar9/amsrut    plans
: "m case ac6HieM*-(tMcM4nuolhyngetM: Ms.sible                                                          sCBh pffsite                                    the Board stated, "NUREG-0654                        does not require an a equafe                                      Ma%, nsk'              power)t Y811 ft hina twors t possible8 :46dident' at Shorehsm.                                .    .                  ."        In sum, these regulatory pronouncements and decisions clearly demonstrate that emergency pinnning for a nucle s.r plali6 thc enet rR9R4i rgd Lo beqdggi e to cope with any particular accident. h(detrce:erc                          a        therit gygen .l'Eg Jh2ffflayrespect, we
* concur with Mr. Dignart'alstentaqq%m.re y.al a tion hoes                                                                      7'' '
ceFer.6 cr. the The Dignan Memornadcmedt airt'tMtf t e                                                                Ntf *'itst/(d"f8      conclusion                  that the emergency plans stecarot regulfsd- ato s                                  s'fi(SCV.eh"                                                        6EpWMh~~-.
an early          c 1
release of radioactistty.(Digriaq, Ale,m,                                        u rEgt2    pradlhe
                                                                                                                      ;! M ) .:d(s  . * *lHii eWror. ap p e a rs t o                        ;
have resulted by esclusieg:b% "mbpc77g15 a(8)dEhf'"fVr any accident                                                                                                      l involving an early cr1M T.; e.4creikc Q e "% cts t.
an early release M :r.adigActiyif ye-j&e                                  V                  .'le,p.p.hMe n,.*
                                                                                                                      ~ ,(, efi        aESFeMs        'a~pd* mightden t"also    could inl
                . result in early ralva aese ntM- were JrhWdct " 'htnn ihe")MaMters which established the Ces@eicndt ,e'rge'r,byy [p[.aYnj #$frfi,s~- The Statement of FConsideration , quctede :a.tmYt e..g!e% ! ye rae.cgrJt                                                  *(firt; "early releases" may
        ,        occur; it is for tidevedasone .ip part...,M,Qq'~                                                          psey is required to notify offalte au t horities t edt.hin. ; M, sminute s . . s ft.et ]                                          'II'censee h ts declared an emergency, and t.tti: : net p o.n!Ne['(f'l'i                                                                                                  capabilit y to notify the pubite kithin :1:5 sirp4tp a;fm,Ii"lutJi,                          .t f.p{ ,,,; t Mcei                  [c.idg''hif
                                                                                                                                              %d netification    e ; a from the licensee of an eme:gency conditien.                                        *                        "''--'
                                                              ':: was nev.-
                                                                                        -w
                                                                                                                                    ,t The fellowing guictmy:.e . fa pseyis'.pd.%.,.                      ,N ME %. . 31F
                                                                                                                        . '~. . f.t! A %p . 1. Rev.1 (at 13-14):                              :nd:. ec:1y that state a..h1cea~'
TCVerr ents acept ex- a-.a..
The ranpa e6:tircqs hsty,ecg                      e tge.,MuE.f.)I*,$~cTdent condi-
                                                                                              ~
tjens anttidbe:at.m q(-a..mafgr rV s'p!
one-halt'h rto:agvdhgG ~s [.g 'Id(1J[cf*                                                            tfie order
                                                                                                                      ; hi$lic6Te~ntC                      (imeof period pienorhisb.ra4]osctive                            y}eHF'?!Mf                  3:Cak  h5    b' FP'eted D die'a(short-
                                                                                !or'cf m.pf                    g* d -
                          . to termberefease          21e4.knus      ed aise 96 M"lG@s.(con,1fgf, *i'elelle f.n .
                                                              .to p :(e.w        ~
i
[, Ic.-Nis h#capaSMi&...bee 68used in deveddhings&t.e:.gpf 4Q1222 e z ta ssw,y: ifr,7 2
j!I a ,$!.{rdt esa        8 k' rey] rat (![Gluid nstifieatlon capablinich-decimi,e fasti'r-mpder~it '' r et eu s e s for wh;.h protective actions are desTraMe 'a'hii the need for sub-                                                                                                    !
atantial lead times to carry out certajn protective mea-tures, cuch as cvecuation, when this is indiented by plant conditions.)                                                                                                                                        . l It should be noted that the responsible offsite authorities are not necessarily required, in ajl cases, to notify the pubtle within 15 minutes after they have l
l i
    - - -                              - - - - - - - .  .              , - -            , - - - - , . - - . _                    -      - - - - . _ -              - - - - - - ,    -g,
 
Spence Perry. Esq.                                                                                                                                                                                                                            l l
  ~
I received notification by the licensee.                                Rather, the time in which the public
    -    is not!5ed will range from immediate notification (within 15 minutes after state and local officials are notified that a                                        situation exists which requires urgent action) to the more Ukely events where there is substantial time available for them to make a judgment as to whether or not to activate the public noti 5 cation system.                            Also , it should be noted that the 15 minute criterion  refers    only to the time in which the public is to receive notification, and does not refer to the time in which protective actions are to be completed.
In sum, responsible offsite authorities must have received notification of the emergency situation within 15 minutes after the licensee has declared an emergency, and the offsite authorities must have the capability to notify the pubuc within 15 minutes after they have received notification from the licensee. Emergency planning for accidents involving "early releases" is required  --
although the protective action recommendations may be issued be fore , during or after the occurrence of an offsite release of radioactivity.
There is no requirement that protective actions be completed within 30 minutes after the licensee has declared an emergency.                                                                                                                l l
l
_C O N C L U S I O N                                                        ,
For the reasons se' forth above, the foUowing conclusions are offered as to                                                                                          ,
i        the matters referred to in the Dignan Memorandum:                                                                                                                    l
: 1. The basic goal of emergency planning is to reduce the impact of and achieve dose sa vings for a spectrum      of                  accid er,t s :      however,              there        is , no requirement that absolute assurance be provided that                                                                                                    l adverse radiological effects wiu not occur.                                                                                .
l
: 2. The Commi.ssion's emergency planning regula-tions do not require that the evacuation of all or part of a plume exposure pathway EPZ be completed within                                                                                    -
any pa.rticu.lar time.
: 3. The emergency plans must comply with the Commission's emergency planning regulations and there-by shculd be capable of responding to a wide spectrum                                                                          '
of accidents; however, the plans are not required to be designed for any specif:e accident sequence or a "worst case accident."
e
 
1
                                                                                                                                \
Spanee Perry, Esq.                                                ,
l
              -                              4.      Accidents involving early releases are within
                .                      the Commission's emergency plann!nr basis, however, the regulations do not specify a time within which the recommended protective actions are to be completed.
Sincerely.
Edward 5. Christenb[
Director and Chief Hearing Counsel Enclosure cc:  J. Taylor                            ,
E. Jordan T. Murley 6
l l
                                                                                                                                \
i l
l 5
 
MEMOP.ANDUM
    '.                                                                                                          t This memorandum addresses three misconceptions which have arisen as to the standards to which state and mun cipal I
l emergency plans will be held in an NRC licensing proceeding.                                        '
These misconceptions are:              .
1 A. That the plans must be shown to guarantee that no                                        1 1
adverse effects en the public health and safety                                          j will eccur no matter what kind of accident occurs at seabrook.                                                                              J B. That it must be demonstrated that the plans will assure tha    a.1 persens 1ccated in the Emergency                                      l l
Plant.:nq 2:nc cr seme certain portien of it can be evacuated in some certain time.
In par :cular, there have been assertions that the plar.s mus: assure the sheltering er evacua ::.. cf pers:r.s frcm the beaches i r, apprcximately 1/2 heur.                                                              I 1
C. That the pla..s must he d 'igned, and shown te be able, to cepe wit.) a par :cular type of accident                      --
in particular, one involving an early release of                                      ,,
radioactivity eft-site.        ,
Each of these prepositzens is false as a matter of law.
First, the issue cf absolute safety:        Neither the Atomic Energy Act ner any regulat:en cf NKO, whether dealing with eme rgency plar.r.ing or ne t, r e qu: r e s absolute assurance of
 
m, perfott cofo:y.      Indaad, it hos baen rocognizod from tho                          i outset of the formulation of the current emergency planning                            l regulations that if one assumes a major accident with offsite releases, some adverse effect on the public will, by                          ,
definition, occur.      The purpose of emergency planning is to                      )
have in place means and methods of coping with such an event in order te keep those effects to as low'a level as reasonably pc3*:ble given the facilities at hand.                    Southern          )
Califernia Edisen Co. (San Onofre Nuclear Generating                                    1 Station, Un::s 2 and 3), CL:-53-10, 17 NRC 528, 533 (1963).
1
                  ,s e e e n d , as to the prepes:::en that the plans must be                        !
demons trated .:e be capa:1e cf assuring evacuatien cf certa n areas withi.. a certain time:        This simply is not the law.
The Appeal Boards of the C mmissien have so held - flatly                                ;
and w: heut equiveca:Len.      Cincinnati Cas & Electric Cem=any (Wm. H. Zimme r Nuc lea r F cve r S taticn, Un : No.      1. ALAS-727, 17 URO 760, 770 (19EO); Cr. e Ce:re:: Ed:sen Ce. (Enrhco Term:
Atomic Power ?).4.t. Unit 2). ALA3-730, 17 NRC 1057 1069 n.13 (19E3). Indeed. the cnly activ ty which the regulati:ns specifically require to be capahle ci-acceeplishment an one-half hcur is public notification.                    And        - '
1 it is in that centent the 1/1 hcur ' rule is discussed in                                \
trJ7EG-0654, the NRC energency planning guid a nc e document.
Third , the prop satten that the plans will be judged as to adequacy av      nst a certain type of accident and in particular c..e  involv:nq a release as socn as 1/2 hour:
4 2-
 
That proposit::n 10 not only bad low. it as dirtetly                    ;
der    contrary t      the                                                    {
theory of the NRC emergency planning criteria.
The theory upon which the regulations were based 1
was that                                                                {
the planners should consider a spectrum of                  !
accidents.                                                              !
The key is that the plan he shown to be flexible '
and capable of reducing the adverse effects to the greatest extent reasonably possible.
The Commission itself has stated:
                            "Since a range differing offsite consequences can beof accidents with wid
                          . postulated, the regulation does not depend on the assumption that a particular type of accident may or will occur.      In fact, no specif c accident seguences sneuld be specified because each ace: dent cculd have different conseguances both :n nature and degree.
Althcugh the emergency planning basis is independent of specific accident 3
sequences, a number of accident develcpment were c'ensidered in descr:ptions of the Commission's regulatzens. :ncluding the core melt accident release caceg:r:et of the Eeact:r Safety Study (WAfM-1400).                *
                                  *1:
was never the intent of the regulation indirectly that to require directly or state and local governments adept extraordinary                                i measures, such as construct en of additzenal hospitals er recruitment cf subs antial acditional medical a      p  e rs accidents.
plant    o r.n e l , just to deal with nuclear p ru d e n t              The emphasis is on              '
risk reduction measures. The of resourcesdoes requiatacn              not require dedication to handle every possible accident that can be imagined."
CL1-83-10, 17 NRC at 533.
's
 
    ~
                "Thero 10 no cuandard time requirod to                '
bo mot for ovacuation in a radiological
  ,              emergency.        Estimates are necessary to determine accurately the actual time requi. red for evacuation.        These estimates are needed to aid in
* protect:ve action decasion=aking.
                "No massive investment of resources (stockpiling of supplies or construction of hespitals) are required for emergency p l a r.r.i n g . We will apply a practical star.dard of efficience of utilization of existing resources (such as roadways and manpower) in evaluating the acceptability of the evacuation plan. "
LSP 85-12 at 782.
h e
O 4
9 5-
 
e . . . ..
                                  .ic.~.                                                                                                                                                                          ....
                                              . .hElfGINdY PNEhe'..'hdDN lf., N.. .
: '.2@, R'0 CESS lFOR C051MiRClAL NUCI. EAR 'P'0WElf                                                                                                                                                                                                                                      '
                                                                                                                                                                              ~
                . ..:.M. . . . . ..R.
                                                    . E.ACT.0. RS. :n. . .'.:. .1. , . ...'. ; .. ' ..:. .G. . i: ,.                                                                                                              .
:' ..:      . '. r
                                                                    . ..                .        . . ... s:.. . ,. .                                        ...        . .                -: .                    .
s..
                                .          .....                  .          . OVERSIGHT. HEARING.
                                                                                                                                              ..nrou m
                                            . .s . . , - . .i l/
                                        '. : . ". . '1.'i.                            .
                                                                                                    . '. shiconITTEE of                                                                                                                            f. .
                                                                  , . OVERSIGHT AnINVESTIG'ATIONS                                                                                                                                                      '
                                                                                                                                  .,            ; ,, m                      .-
001DUTTEE ON
_                                                            INTERIOR AND INSULAR AFFAIRS .                                                                                                                                                                  l IIOUSE OF REPRESENTATIVES                                                                .
NINETY. EIGHTH. CONGRESS                                                                            -
                                                                                                  . +            .'        .
T1.P.ST SESS!ON
                                                                                                                                            .            CN l                  ,
                .                                                                          THE SilOREHA.N!                                      Ntl CLEAR POWERPLANT                                                                            .-
                                                                                                                                                                                                                                                                                                                ~
IIEAR*NG HELD TN WA!}!:NCTCiN . rc AT Ril h, lh,3 Serial No. 9S-52
              .                                                                    ~ -                                                                                                                                                                                                        .
                              ,.                                                                                                                PA.RTI                                                                -
                                            .'                                                        e                .
                                                      , ,                                                          ' Printed fer the iae of the                                                                                                        .
                            'i-                      ,
                                                            ,                              ,'Ce.ortittee en laterice sed fr.sw!ar ATTa;n                                                                                                                                            .
                                  .            s                                                                                                    ,                                .                .
                                                                                                                                                  . y , ,.'                                                                                                                          '
                                                .s                                                .
c , cs.', . . - .. :t.    .
                                                                                                                                    .                                    .    . . s.,                              .
                                                                                                                            .                                s                                                                    ,
                    .,,.(
s
                                                                                                                                                                                                                                            .s.....                                                        .
r.. (:.    * . ,.
L.                      .
                                                                                                  .  .      '    .      . c        <      e        .  .    .    .n        :    .  .-
r                                                                                                .                                      -
                                                                                                                                                                                                                              ''  . i      r.          m
                                    . r.
                                                                            '.    ,.  .                      ;;                              .;f .. . - . .. .. , . . .. .
                                                                                                                                                                                                                                      . . . . ...+ ..                    .
                                                                                                      . ,., . 1. e .1.
t : . . : . . :. . ..,. s . e      .
                                                                                                                    . r . ,.;. ..j...
                                                                                                                                                                                                      ' .. .. . lg: 1.; ... ,. ., i.
      . '. . . ; . 2,.r ; . ; . . . .. . . . . :; : , i.- l. . . -
: e.                                          ...                                  ..,...'.                                . . ..
d_                                                                                                                                                                                                                                                Y$
 
175
                            , ~                                                                                                                                                      I
                            'ere 100                                                  A larger EP2 vow 1d te feasitte trwt at        the                                          \
price of added compleatty and cost to          a va-                                        l
{ Aa Dr.                                                    riety of local agencies eveh as the
* schools. frsphasis added]                                                              l  l
                        ,, elle t?I*                                  Tr. 15.                                                                                                  l see of                                                                                                                                                I
                      ',g eng a 6 0                                          C.
_$ee f f,,.. elee f eal sad Psvemelettes) fesues In t rie rce a e v
                      ,    fr. 1142                                                  g, i
q
{nalessee*                                                              overresetlea sad the tweevetica Fredew t h e m e=* e a ea
                  'ye a 10                                                Cee of the key isswes confronting the Cownty's planners                  ,
                                                                ,'which generated a significant eet thsete of                                                                              apowns of dis;wasion during the V#,'
i pre 11.
Le;t,elatswe hearings, was the qwestion of hev pec;1e will te-have dsting a rednolt;ical energency.
pe,a 1C*P13e                                                                                              It was an isswe which
          , hg n :            te                                  place! tre wateesses prof fered ty LILCD in clear d!sagreemeet
                                                                    =ta=                                                                                                              d te C:.*ty's es;erts.
                                                                                                                                                                            ) d one fP1, they s9owld                                            L:L*0 asserief an tcte its wrnsten swt=&ssion te                the Le;-                        E,
: 3. swcm en islaure a*d d rtri tPe attwal testiremy of its e s,erta                    that h.=6*  t o e.s v a c t gly increase the                                                            ices met vary tietween dif f erent types of dises.                          '*.
ters.                                                                                                              ,
ogical e=e rge *tra                                            Based on research of disasters sweh as ficots, hwrri-tares sad tPePital s;111s. L:LCO'a esperts testif ned th at pec-t, g stief so                                                    ;h es;erte ca ; a raf aele;: cal e or; ems / wi;l te t to                  react te;*;/ a
* f:..:. e.t*.cratstive                                                                      ,)              '
Y ti ettate i.
ar e.t s i!# cf et*'
erters. L:'**.Tre;aref state-                    ..
pode detect etie                                                      at 43 61. Gat Tr. 146 346,                                                                            ')
J pe rt *
* t c>ance                                  '                                                      t?.treftre, tPey ceme:wie, a                        .'
tatic c;1 cal e*erge=ef res; case plan esed net                                                    l}
{gatle.Sc he Echance P A S r e-                          .
take into actowns                g
                                                    ',,                                                                                                          g f                                                            a*/ ;ttemtnal overreaction or dnsstedeemce to teattwettoas.                                        h i
that level of                                    k1          tr. 3al Ja*.                                                                                    l,1!
  ' A lo clle tPt.                                    .-                                                                                                        e4
  .e rne e.-e e r ef                                0                                                                                                              -
m ie, et t*e
                                                '0 l4 H. '                                                                                                              ;
5                                                                                                          '
                                                                                                                                                                  )
s g                                                        -u-t                        *
                                              . ).se      <
                                                                                                                                                                ?
l
                                                  .Y t        . .' I'a
(
                                          ,      4 8.', , 6                                                                                                j 1 /'t                                                                                                  <
                                          .        .b L
                                        '            l }A                                                                                                                  h 8                                                      i 4.
w o.s                                                                                                      ;.        '      a.
m-                                              ,
 
                                                                                  .+.- c-        . . .
s...:. s,
_ .;r
                                                                                                                                                                ;      -- . ..                .-        r.            -
                                                                                                                                                                                            , y
* y, . ,. _,... -. ' ,.-.    , -_ .. ,:. -
s  .;.
                                                                            - 4 ... :nf.i>s,,%_
                                                                                                            ,. ;i.s,4r -:  . y,-
r ..      3. . . ,' .- V_
::e g                        .                          -. e
        -                                                  ti                                                                                      176 that
            -*,'%        - - ''                      ' ''                                                  The Cownty's esperts, however, take a different approach,
                                                                                                                                                                                                                                                  'I L supported by their stwdnes of TMI. the dnsaster related litera-ture, and the actual studies which have teen performed on Long                                                                                  I""'
                                                                                                                                                                                                                                                  "h' Island. The testimony of Dr. Susan Seegert. Professor of Envt=
* stud rompental Psycholegy at City University of New York, was typ!=
8'    I cal of the County esports' waanimous position on the isswet b' ell I think that the sessage that 1 think
              , ... , . .                                              .                                            wowld to clearest in psychological liters-                                                                                    This ture is that there are aspects of nwelear hasards wPich make then different in pe o-                                                                                    ,g, ple's perceptions than ether kinds of basatts and these teclude the pore involum-tary, pere dreaded. . ..
perceived as bele; ewt cf control, per-pore feared, 3,g, telved as toim; unamewn both by lay pes;1e and by st.lentists, and pertelved as teirt                                                                                    ccv 4
2 hard to accate teth iceset and offsitel.
T'ese t'aracteristirs *see it cere litelv
          , f* x fv' d.'f ,\
            ,r , - 4. . y fg
                                                          ~
trat get;;e m;;. everreert t a                    t'. rest.                                                                  ;.,
fr. 1121 11:2. As Ct. J e P e s e s c f '.
[                                ,
                                                                                                                                                            '.A a r.d t r . S e t s l e r c f C1 C                                                g,g.
M*191em Umaversity testifted, radiation is wedrtectable by                                                                                      swrv hw:=an senses. as sweh. It cowses a greater fear in pec;1e.                                                                                    rose
                                            ..                                                    term owt of wrcertainty, cowsis; them to overestimate the                                                                                      th,
: y. " ; '                                                        der;er of a mwelear accideet sad thws to overreart. Tr. 1C35.
y,gg
          , },[ [.[ f                                                                            1:!* Attac -e** I at la see als: testa ==?y cf Cr. trinsen,                                                                                    g;e,
      ~
                                                                                                  **
* 1*4*.
: e.                                                        -
1 ti TPe cert 1wsicas dre.m t,          Crs. Jtemssa a*d ten;*er are eet                                                                  p, ,
tened om steewletiem, bwt em their detailed siwdies of hwan                                                                                    p,7
                                      ~
g                              tehavict t'e t h at Three Mile Isleed am Loag talard. At Three                                                                                  dee:
Male Island, the Coverret of Pemesylvania isswed am advisery                                                                                    int-8, 3                                                                                                                                                                                                                        $
        ....,.j.t U-e
                                                    ^
                .                                    .                  e
                      .-        ,i            ,
                                  #          . -                                                                                                                                                                                  g
            ".                  /                                      g
                                          **                                                                                                                                                                                      g
                                                        .'g    .
            ?
* g .* ~                                        j i
V.                , .                  ,a t Q.                                  A
[,%Th j d 'L ' q [gdej4lff. ;Ef: * ,%. n. .s G' Y ? ,C--:; 3..[. , '> =< y_ .:n.          .
3 1 g
w.. .
                                                                                                                                                                                                                    . . f
                                                                                                                                                                                                                            !?.
e] p. . . y . f ^, .
                                                                                                                                                                                                                                            ''r']
,                _ .                                            ..            .. ...      s.                .          . .                            ..          .                      .                              .
 
                                                        . . . - _ _mm F
t
.  ,
* 177 J
2a '
he that pregnant woner and pre.achool aged ch!!dren within 5 elles of the plant should evarwate. An estimated 2,500 persons with=                            ,
                              ,ite ra a 18*f in the five o!!e area around TM! fit that este(. ye bowever, grei-            the studies of Des. Johnson and teigler, as well as two other studies (fr. 1100), revealed that over 144,000 persons livin0 tTPl *                                                                                                      ,
s es far as 15 r!!es free the plant in fact evacawted. Tr. 1037, 1099# see also testimony of Dr. Stanislaw cast, fr. 1399.
s' This tendency for persona in a radiological emergency to evacw.
f                    ate in great nweiers, tr.owgh not advised to do so, has been                              '
lateled the 'evacsat ten shadow phenenenon.'
                          .A mandt. of this octwtreece et Tnt, the Steering Coesittes              l
                        ,                      covissioned a alvdy to investigate whether such 24havist sigP c                                                                      e
* ce:sr en Leag Islemd in t**      event of an accident at SPeret.am.
f,                      ime stsfy, c:*:.ete! gra arily ty *ts. Jernsea, t r i a s c r. ,                      ,
et Cid teigler, ard Cole, ete.sisted Jf a tardem sa ple tele; Pone Vf a by swrvey of Pere t'.se 2.lCC Long Island residents. Cr. Cole's le.                                                                                              .
researth f i ts . Setial Cata Analysts, administered the swrvey, e'
tPs reswits of which are contained in Decaments 4 and 5 of ti.* 10 31.
vglw.e lit cf ee Ctwnty's ptrP. Tne focws of t*.e stwdy was                  ,
asen.                  y;e, g.,,, ,,,;,,, ,,,gg,3, ,,,,,7gg,
                  \.                                                                      peg,g ge ,,g.
                                                                                                                                        ]
1*ters e.**.
                                                                !* tre art; c*e, es:n 1* tern e.ee ses atett <* a t              .gs are ret                                                                                                    ,,s he er sPe et.1d oc if there was er official advisery tP.at human p,,,,,, ,;,3,,    , g ,;g, ,,ggy, ,, g3, p3,,g ,g,,gg ,,,y g,,
detts.
he oee was afvtsed to evaewate. Tre res;emses of tPe
                        '''I intervlevees infatsted 45st 211.000 fa*'lles, or atewt see g
i                            4 I                                      30 s
          ')
t                              .                                                                                      l s
I                                                                                                                i 4                                                                            j
        ;                                                                                                              e ; m:s
      .,                                '                                                                            {      38 i-A'                                    b  6 ki f
 
    .                                              170 qwarter of the popwlation of Long Island, vow 1d attempt to evaewate. Tr. 1040.
Scenario Two was patterned af ter the TN! accident where a partial evacuation out to $ miles from the plant was advised.
wnile auch an advisory would cover only 2.100 f amilies in swffola Cownty, responses indacated that 209.000 families wcwid attempt to evaewate. fr. 104).
In scenarie Teree, en evaewatica was ordered owt to 10 elles frem Shoreham. Tetrty-cre thewsand families live within that. area. twt the owrvey diseevered that 430.000 f amilie s --
atowt half the ;e;d;attom of Lee; Isleed -- in. ended to leave their boaes in asch a essa. T r . 10 4 ; .
A t**de ty 1: ever'.ste vel.atarily in swe'. lar;e s-ters Pas erv;:.: a f severe 1 ;11:st      *s fer eaerge !/ ;.a**. g
              =>tch, caetrary to the seatissery a;;rtsch cf L:L*C's es;erts and its wes.tPeriset sipF. cameet be igested.        Cr. Je*mstm sum-      -
varised the.e le;11 cat toms and tPeir censideration ty t%e Cose.
ty's esperts ir. ecatritwties to the definition of detteing the 4
Ccue ty's 2 * -11e EP: as follows:
                                  ! t*t e ge*erally say deftmitica ef a te    ::e 171 6;*eres w*st we Pave def;*ef es t'e e.st.atace s* ate.  'e***eaca. t'a'    .
ts. t*e to teacy f or sec;;;e teire! a des t;-          ,
eatef dae;er soee to overreact and arcata-eec. sly evacwate, kcw the silmifteamte of this evat.a-t:ca stefo< p*eme e en is t>at yev're q:le; to Feve all of teose peo;1e om tPe evassa.
tiem revtes as well as the pee;;e frea witht* the desigmated daeger scee, and t>e m
 
i                                                                        179 se
                                ;                                                  traf slow  fic t* yond the ten nile tPt  ..  . towld ist.atedor danger hinder the evacuattom from sone.                the des.
                                ,*ere 8                                                                                                                      ,
our purpose in redefining the 272 for
                          -,delsed.                                            twenty elles is to accesemodate the evaews.
tion shadow phenomenon t>ecause we acknow1          .
es in                                                  edge or realtse that that traffic is golmg                                  I to have seae ef fect    on evsewating the des.
[3les vowld                                            Ismated some, however it's def.*med.
e Tr . 10 ''l -10 72.
In shert, if people beyond 10 miles f roa the plant are gelet to evacwate in Crest nwebers, there owst t.e em EP: pre.
                  -                                            porttemately evt% !arger than that in order to provide police ef to le8'e
* tre!!!c control and other pre-planned peaswres designed to
              ''                                              es;edite the a*.tleigated traf f te flow                                                  f as e.ch as pess1Dje. The 3arge eg=te r s                                                                                                                          !
            ?
20 elle 172 t*ws is based not only on the amties;sted desea cf
* rettetter<        t*st ts* to es;ettet in
      *-                                                                                                    a radiolesteel e ert. ty.                                ,
        .y;;;'s ei;e r t s                                  1. 9 aise rett; ises t?e Peef te 5 a* f ar tre orac.atace s *.a t e .
gr. JePesem se                                      6 F emeaemea.
j,, gy g3, g,yn.
Ia N ''!''8~-8                                                        '
      ') ' de h mi P g W                                            t e.
tier to t.ttress its ar;weemt that pes;1e vill behave
          ,,                                                calely aad rettemally dwrin; a rattolo;ical ewergemey. t!LCC                          !
g,,,;                                                      cf feret t e eaa ;;e cf a train accident in Massissetwa.Cesario, w m ca.se. e :en.e ,,e to estare i,te t e .t e.,,e,e.
l g ;,g,5-                                                  rei.: . t ere ..e a, a
: v.                                                  ,                                  . s.:te.sf.: e,at.at. r cf e,er :: .:::                '
ple .,.. a us
                                                                                                                                    ;e:-
                                                                                                                                                                '"j
  ,y''";;,                                            I                              ss.s,e t oe.e e, area o e, the e.w,se or is heers. t u:: rre,aree si.ie emt
  ',','"",                                                                                                .t u.se. pe:yte; os t e    e..                                  '
  .,d i,e                                                  serie c. ei ..ssisses.a. tue: wries that am e,ana n en is tes g
* ast-4 l
I s
4
                                                                                                                                                                  )
\                                              '
1 t                    k              -
a I e? ' +
h# i l
                            <              t
 
                                                            . -                                                                      ': -      r    -%                  - .
                                                                                                                        .        ..,...,,;>,.. . i,, _' . . _..                _. .              ,
t-                                                                                                          .
i                                        ..
e 4                  -
a 1
e E
e e            .-                                                                                                                                                                          i
: s.                                                                                                                                                                                    '. :
L i
r-''.'_'                                                i)~                                                                                                                                                '
                            ~
                                            .'    's-4.X                            , ,:u :- 5                                                                                                                                                              ;
3                                                                                                                                        ..
                                                                            .                                                                                                                                        4
                  .'                    .'      ..t            .
                                                                ~-
y
            . . i ,'                      .c            .
I                  k ',                    ,.
4
* f.
rs '                                                      ,                                                                                                                              . .
9                                                                                                                                      G
                                                                  ,
* e 9
O                                                                                                                                                                            &
                                                                            .                                                                                                                                    i
                                                                - 7 k
                  .                                                      e                                                                                                                    e        o              I eqi p
8 S            e
                                                                                                                                                                                          . s
      . . P. ',.                      .- 7'              .j                                                                                                                                  -
                                                                                                                                                                                                        .M
                                                                                                                                                                                        .~          (*              e
                                        .."                    ...                                                                                                                                    -T s                                                                                                                                              ''              '
  \.                            - -
                                              .g              s.                                                                                                                              .,
lt ' .?e      e m
                                                                                                                                                                                              ,' g...              *
      's j'.'g..\        E, .' '
M.*                                        g-            %                                                                                                                                  g l
3e.?.'y'. ? , .;. T y
* _ s. f,=f. ' *
                                                                                                                        .? ty; r y        \f      y( ,is',91Q,f_}y" f . .'.                        . ~t4
          . 4                  3
                                                ,            - *          . *        *[,,
                                                                                        .          .- V ,* .          3 '.: - ;- i(    _' '; ' ? ,, ., ?
                                                                                                                                            .                - * ' , f i*
 
                                                                                                    .'g                      . . . . ..j_. ; *
                                                                                      ^
x : ;    .7.        - .3  ., - _.;~      r i
4
, .                  )                                                                              181                                                  ,
ee    sore
* diffleult.                              g      gg,        ,,    ,      ,          ,
                    -                                                  phased over a relatively relased period of
                ;                                                      20 howrs or even scre, and that's a lusury am                          that oee dare not assume that one wowld h8,gssagwa is nct                                        have in the event of a poteittal .. f uture Ie 8 ,,g ,ang g, ,                                            accident involving radiation. The people of Mississagwa, during the whole of that                                        ,
evaevation, had no reason to suppose that I,,d th a t po s i t i o n i n                          they were in grave danger at the moment.
        ;j' -                                                          (tw;hasis added).
        /\ ,,,,,,,
* Thus, he comelvded, Suf folk Cownty would be t>etter served by g,                                heedteg the studies done in Swifolk Cownty pertainte; to a
              ,,M,*,'                                    radiciogiesi e.orge ,cy, rathe, than the ..rerience of h"                                P asatssagwa, the relevance of which to dwbiows to radiological
                # '''                            ,      emergemey reopense plammieg om Lent Isised.              Tr. 1610 see also
                'g  ,
Tr. 1064*1066.
[,h f'                                                3. Pole Ceafliej                                                                  I As disewssed earlier, Swffolk Cownty also was ececerned istNe                  .
and t' e f- e t -
* w . t s t ?.e ise.e cf
* Pet *er e=ergemey gerscarel wit? fa*ilaes ahs p r e s t a t ,
                  ,,. i, 'v tf est we.1d te availatte for dwty dwrim; a radic4csical emet;emey in u      e.,  la
                      ,;,,.                                **.ich swch persemmel wowld have two eenflietteg dwstes, one to
            '( w g e n                                    their jet ord the other to their families. Tr. 1067                The i begam at                                prstle* is tsown le sociolegiest terms as ' role conflict.'
ee sit of si the                                      tach dwty is eqwally netle, b n many workers wowld te espected
            'J 3dJiress                                  te rescive t*e com!!act in favcr et t*ett fa-tites, partlewlar-
              **erf teef 1 e, err altesty                                li le a raf.cle-ital eaergeaty v'ere t?e daa;er is ett eas!1y of Jith eest                                    detectatle and therefere more feared.            Tr. 1044.
8%t t>e evt.                                      tes, tritsen and Cole perforved two swrveys to deterwies 49 oveh all eg g,                                  to what esteet, if sey, t*e proble= of role comf11ct si;*t te I
(                                                                              e41 J
I
                                                '                                                                                        e e
a P,
        )
              ''.                              6
: e.                                .
c .*
              !,                              l s    .
 
                                                                                  ~t 7
( * $ ". - ' .- ( . (. ~.;"_,
                                                                                                                                          .r    .'....'.'''
4 182 hamper the Cownty's response to a radiolegical emergency.                The                  '
first survey etwdled the attitudet of school RNe drieers in suffolk CownW, who mmtd have a major role in evaeusting e
school children and et.ere from the EPt. The second survey etwdied role confilet emeng eelunteer firemen serving fire die.                                              -
tricts close to the shorehas plant. Dwring a radiological s
v-                                        emergemey welvateer firemen would else be espected to perfors varlows evaewation dwties.                                                                        6 The details of the role conflict studies are containet in                                  u Ve1 wee Ill. Document 4 ('aesponses of trergemey Personnel To A possible Ateldent At The shoreham Plant ').              Tney reveal that 68 percent of tPe Isre*em
          ')                                                                                                        swrveyed tediested t'er wow 1d first sete
        ;                  .' . ' - ' "t
                              'm                      a    '
ftr t%e                                                                                                    ..
safety et t*eir laailles a*d tPereftre wcw!d ett          te                                  .4 av2ilatie ter 17.=ediate emergeecy dwty.            Atewt Je percemt indi.                                    . a,  p ested tPey wcwid met to availatle at all. fr., Jan. la. 1943.                                            1-            E Attachremt C et 6.
9 nt a t h respect to school bws drivers. 69 pertemt indicated that they vow!d not
                                                          -                                                                          report to dwty wat11 they were certain tP.at t>eir families were safe. Tr.. Jam. 24
  . S *.                    '
1981. Atter? eet 06a 7
:. .~
1 . ...        ''
                                            '. s:.                                                                                                                            '
    .*'...8 '/., *f,-
i,          l',A Pn;*'1;'t:a; t%e *;1:cetteep cf t'est res 4ts fer t eno&c;; cal e.er O
                                                                                                                                                                                            .'A
                                                                                                                                                                                          = v imey plernim;. cr. grimsoa concawde1              '
                                                                                                                                                                            ?
                                                          '                                                ese are strities and leportant find-legs. They ledneste in the sher;est way tPat it is teetless to assw-e that o'ergem-cy perse* eel tem to towated om to re; ort to dwty im e $*ereSam eaergemey withewt aaswr.
amees that their families are safe. Nor showld we to swrprised. for, if scelal and behavnettal teneettsts ame, saythirg. It is t
                                                                                                                          =43-                                                I e
t          .
                                                                                                                                                                              <      ( g4 4            .r                    ' ' -
* 1''*.=e" -
f.
1                                                                                                                                          .
b f,                  .
se            .
      .        a j _ ' ' '' T                            ..A ,* 7 t''.,C ,1
                                                                      ,                  '' f-    'fU"#'T'    -        ~  *#'''''''-          '"      '
                                                                                                                                                              ~
 
183
      \.                            "'
s          "''8'**#*                                      that pe o ple lastimetively turn first to the                                  g
        *'al                                                      mee4s of their own offspring.                                                  ;
              ,w,g,g,,,,        gn                                                                                                                    [
Tr.. Jam. 24, 1983. Attachment C at 7.                                                      f      i a oesewating
          ).oecond survey L! Leo, preferring to refer to the probles as ' role                                  l strain.' testified that in all other emergencies. persommel
      ' '(* ,4rving fire die, g ,edioleg'ical perforusJ adequately end that therefore they cowld tw ervected to do so in a radiolosteal emergency. L1LCo prepared statement
[*peetedtoperfor,
          .**                                        tt 70 79: Tr. 179-200. Tmat position, however. temores the                                        '
findimos of the Cownty's esports that a radiolegical emergency                              I e4 o.
ore contained in                                                                                                              ~
is not itke other energencies due to its undetectable natwre.                              $'
          'ery Pe r se mae l to A See, e.e.. fr. 1048. Moreover, the presemee of a potential pey reveal that og                                                                                                                        ,
role comf atet pretten among suffolk Cownty esergerey persommet w y would .'i r s t care M*, ,,, : ,,c t to
* e s e t
* f t r- e d t y t P e testiecey of the Cov issiocer of the
              **g gg p,eg,.        g.;,.            8.f!G* Cc.rty police ce; art?ent, set t*e Cterasster,ers of                                  ,
            '', ,' J e n  34, 39,3, st e a l t P. , $senal services er,d P.tlae herb s. all of whom es;tessed                    <
f sedrivers.4, sisgivings stewt the availatility of .%eir persemmel dwring a
              'te d u t y w e t i t t P e y          radiolo; teal e*ergeecy.          fr. 1210. 1285. 1290. 1292: Swffolt                      !
Cownty Fallo C+part. rent prepared otat<. ment therelmafter SCPD
[f't..Jan. 24.                                                                                                                ,
statemeat) at 11 12.          As Covissiemer 211=crth cf the swf f ola novits fer                              Cc wa.ty Psa tt e cig a rtre mt testifted:
(.;                                                        Lies, t*cse w*c are at P:=e er cf f d.ty.
coac1.g 33
        ~4                                                        a* t?e great pre;crtner et c.r perscoel                                                ,
t fled.                                        witSim tee 571, we vow 1d certately see scae at rey                                                r:1e coe.f* set. It is our c;imlom t ?.a t energea.                                            treat comf14ct wcwid te a coral res;cest-
_ h Po r t to                                            tility to their twtite daties aed trent assur-                                        fa*tly dwtita, sed they wowld first provide for trear families.
            ,la. 4 r l sad
              ,. It is 8
l l                                        -44*
l t                                                                                                                  .
              .h r                                    i i
I                                (
              ')                                  l
                .                                  6 Y                                  l s.
r        " % * * ** '
t
 
c            '
l
                                                                  , B4 Tr. 1220.
Owlte obviewely, role conflict As a problem which esists and swst be resolved in order to have an effective emergemey r e s pon s e .
Until the problem le resolved, aey attempt to Laple-ment a plan withcwt en asswrance of odequate erergency person =
nel wow!d threaten the sa f ety of suf folk County's residents.
4 ether social and Povekrieeleal feswee in additism to the problems of the evacuation shades phe-nomenca sed role conflict noted above, Professor Saegert of the City University of New Terk noted other important problems in
'                plannleg for a radiological erergemey. For instance, stressfwl sitwattoes sit *t arise during an ovatwattom in faffelt Cowety
            .    **.tet to.1d lest it a:errams vaclert er irratsees; te*avser t ?.a t  tow!d ha ;er am ef fective res;erse:
Tre other problem that I think shewld t+
a ;*asised is the difftewlty test tris partiewlar site presents for coordiPating am evaewation to the person who's faced with trytes to deelde what to do. The i                              lleen1 of alternative rowtes, possitte ter-
* esivet time presswee. the possleility of ca ecise; a rowte and fledteg it to te
  .                              ve s se re s s f.1. ekee s ir; a arthe r res t e a nd fast;*t is to te umswetessfwl. are the kttfs  of tate;s tPat tar t'aage tme inteat evat. ate le a= cr forly f as?;ca latt se
* t1 1rratatr.41 kand of tJnavner.
Tr. 1122 1121. Comeerms atout disorderly behavior were also raised wy tPe Sw!! alt Cownty Polite Departeemt. fr. 1212 1229 1221s 1248 see also SOPD statement at 32.
el-A        A'
 
185 N.
                  \                                              In addition. wh!!e it has teen swegested tPat pwtite                                                    J
              . esists                                  edweation about radiation and radiological emergencies mit.it reduce disobedience to orders free puplle of ficiale or police, rtency to teFle*                              studies indicate that pwelle edweation say, in fact, heighten persea-                            contwston eed fear showt rediologiest scrifents and cause nn tests.                                Ameresse in vedesirstle behavior.                      Tr. 10gl. Accordingly, it is met clear that tre difflewlt isswes awraewmding preparedness
                              ,                      for sr.oreham -- evacuation shadow, role confilet, and the                                                      ,
J others - are a-enable to asolution by educatica evem with a total ec+ritaee.t of Ccwety recewrees.
rtressful                                      rimally, Professer Saegert wr;e
* that the Cowaty show1d be
: a. ore of set centermed with the pretters of Icas term stress
                    ,,,,                            . . , s . i s e , u l t e t . , e . . i t , e , ,, i e . a . , , s . , e e ,, .. . d :. r e e . o e isla*d.      Tr. 1:49      1**0.
                  , e,                                                S. T*e Va!se ef 5.rvevs
                      .*                                      As disc.ssed ateve, scre of the coeclustees drawn by the Co.ety's es;eits atewt hvean tehavier derive free scientific g                              .
stwdies of s.ffolk Cownty's t esidents and emerge 9ty persamael.                                      .
* t.
: i.                                Lit:0 Pas attacked tre Cowaty's etwdies as irrelevaat, tattes l-
          , *f!;a'                                  IPe ;te:tica that s.f tys careet afet.ately predict f.twre                                                      9 D                                                                                                                                                            '
e g, ,
i t.*s* te*ar. r.            L*;** ;re;ared state-e** at 8* I;r TV. 1*9 h4                            Im essence. L1L 0 wtges that the Cowety showld forse upon hw mam f
a og behavier le etPer, ecm.ewelear, disastc;s set i;ecre tPe lefer.
                  '- , '                          retica offered by its c.m residemts.
0      .
e';
y                                                                              +46*
g y
k k'
i l
0                  l 6;                    e
                      =
                        ^
                      .8 y                  I w                    I b,                  e l
                                          -k              , -      .
                                                                                                                                                                  .a,
                                      '5        .
                                                                                                                                                                  -}
 
          ~                                      _
SAIC
(.
October 1, 1985 Mr. Peter Agnes, Assistant Secretary
              ,0ffice of Public Safety The Commonwealth of Massachusetts Executive Department 1 Ashburton Place              21st Floor Boston, MA 02111
 
==Dear Mr. Agnes:==
Enclosed is a recent publication describing the State of Illinois Nuclear Emergency Early Warning System presented at a recent American thicicar Society reeting. This supplerer.ts the inforcatien I sent to you in August. I plan to call you in the near future to obtain an update on your current plans for possibly implementing a similar system in Massachusetts.
!              Sincerely yours,
    ,        SCIEtiCE APPLICAT10f45 ItiTERt4ATlotiAL CORP.
g /. ed.:/
Victor J. Orphan                                                                                        *
]              Corporate Vice President l
i              VJO/ks l
)              Enclosure l
1
)
l l
I i
4 1
3                                  * \', '' 3'
* t g l ' n" i k " I' Q.'
                                    .                                        A * ' ' . l ' '.' ' r '.4 J a y t *y i                                                                                                          ,
              ..*.,4.s.,      ..4      4 p      4. p.      *
: a.  .. g ..s '
                                                                                          ,a c- V...          *.4"      .'
                                                            . 4.-                                              w.4      . . . .-
l
 
          ._ _ - _ -                                          _ _ -                                -. .=          -      _ _ _ .      -__- __.          . _ _ _ _              _      _ _ _____ _ _ _ _.
G'df.10i2 MONITOR!NG OF
        ,                                                                                                                                      NUCLEAR POWER REACTORS
: l. . '
                                                                                    .-                              <g /                                              4..'
i                                                                                            Y 'o                                                              sV a. s 4 (oot) s Data Unk                      -
                                                                                              -            e.t.F...A-m                                              <,                                -
                                                                                                                                                          .~              N.
w a
hk                                        1  1                                                                      n                      fi
                                                                                                            !  .                                                                                                r, Nu N%                                                                        CD
                                                                    \.                s.<                                          - n                a                  ,c
                                                                                                                      ,p                        -
                                                                                                                                                        ,                  . Emironmental c1                                                                '
4              ;.
n                  c    hws                                    --
'                                                                                                                        s          I R.E.A.C. Radiologk:al j                                                                                                  .Emerpancy
                                                                                        ._.. m--                                                                              .A r s,+-t
                                                                          .-                                                                                                    Centar WW        -
l
                                                                                                    'h u,
__ [
                                                                                                                                                          .C          _.
                                                                                                                                                                          '~~a]t-
                                                                                                                                                                                      ~~
                                                                      )                /',                                Cm 1y                                              a.                                  ~
1 i
I                                                                                                ILLINOIS DEPARTMENT OF NUCLE AR S AFETY 1035 OUTER PARK DRIVE SPRINGFIELD, ILLINOIS 62704 (217).546 8100 TERRY R. LASH, OlRECTOR 4
 
l 1
* A STATE.OF.THE. ART APPROACH TO EMERGENCY
            ''                                            PREPAREDNESS..
          .                    REMOTE MONITORING OF HUCLEAR POWER PLANTS                            l JAMES A. BLACKBURN, ASSISTANT MANAGER OFFICE OF NUCLEAR FACILITY SAFETY AND MICHAEL C. PARKER, CHIEF                              i DIVISION OF ENGINEERING                              1 ILLINols DEPARTMENT OF NUCLEAR SAFETY 1035 OUTER PARK DRIVE SPRINGFIELD, IL 62704 l
ABSTRACT                            ,
immediately following the nuclear accident at Three Mile Island, the State of Illinois began to design a state of the art emergency preparedness system for the thirteen nue,4 ear power reactors within i
its borders. This system incorporates an on i;ne reactor parameter cata communicar.:n link, an on line automated isotopic gaseous effiuent monitoring system, and gross gamma monitors installed around each site. Liquid effluent monitors will soon be installed also.
!                      The sensitivities and capabilities of this remote monitoring system have been clearly demonstrated both during abnormal events at the reactor sites and during emergency preparedness exercises. These a
experiences readily illustrate the system's ability rapidly to provide comprehensive, technical data to the Dspartment's staff should an accident occur at an Illinois reactor site,                              ,
PresSntet. at the Amerlesn Nuclear Sc:lely Tepleal Mettin2 on Radic!cgical    *
* Accidents 15 September    . Perspectives and Emergency Planning. Bethesda, Maryland.
17, 1986
 
i                                                                                                                                                            .
INTRODUCTION                                                                  .
Immediately following the nuclear accident at Three Mile Island in 1979, the State of Illinois began to design a state of the art emergency properedness system for the 13 nuclear power reactors being operated or constructed within its borders, in 1980, the Illinols Department of Nuclear Sa'ety (IDNS) was formed, initially by Executive Order of Governor James R. Thompson, then by confirming legislation. An immediate challenge was to provide a mechanism whereby governmental agencies would receive more timely and accurate information regarding both the radioactive composition and the magnitude of any accidental release of radioactivity to the environment.
The initial goals of the Remote Monitoring System (RMS), in the event of accidents, were: to analyze as accurately as possible the discrete radioactive                                                      !
'                                    components being released from the reactor site; to assess the magnitude of their radiological impact on the populace, and to transmit the results of the                                                      l analyses to the Departmental decisionmakers as rapidly as possible, it was quickly rea!!aed that pred:cting rad:ation deses to members of the pub!:c was j
alm 0st irhp.:ssib'e without aed.tional knowledge of reactor cend.tions. Since 1984, the RMS has been significantly enhanced and expanded by                                                                      !
Incorporating on line information regarding the status of essential safety                                                          i systems at the plant. Crucial factors in the RMS design were to provide                                                              !
i re!: ability in the acquisition and transmission of data and to minimize the                                                  ,
amount of time required of utility staff for collection and transmission to IDNS.
The current objectives of the RMS are threefeld: early warning of nuc' ear reacter events hav;rg a pctential off s!!e impact; fast risk ana!ysis of reac ct systems; and rapid identification, quantification, and verification of a radioactive
  )                                  release to the environment. Each of these objectives plays an essential role in                                                      f t
assunng the abit;ty to recommend prompt off site protective actions.
I i
SYSTEM DESIGN j
The Illinels Department of Nuclear Safety's Remote Monitoring System
]                                  incorporates three major components: gross gamma detectors radially j
l positioned around each nuclear pov9r station; on line automated, Isotopic gaseous e!!!uent monitors, which sample from major engineered release points; and an on line reactor parameter data communication link to each lacility's on site computer, in addition, on line liquid effluent monitors, which
)
i will be located at each plant's liquid dischage points, are scheduled for installation at two sites within the next year. All RMS components are 1
j                                  connected, through dedicated data communications links, to the IDNS                                                              .
Radiological Emergency Assessment Center (REAC) located in Springfield, tilinols. There, a technical staff comprised of nuclear engineers, health j
physicists, and other nuclear safety speciahsts reviews the data and performs i
i l
l,
                                                      . _ .        ____.._._____..______.,,,._.___,,____,_____.__m, _
 
analyses of plant conditions. This REAC staff is divided into two cnalytical groups: one concerned with the status of reactor safety systems, the other with environmental assessment.
E Confirmation of a gaseous release to the environment is accomplished by a network of up to sixteen pressurized ion chambers installed radially around each plant at a, distance of approximately two miles. These monitors hav3 a dynamic range of 10 6 to 101 Roentgens per hour (2.6 x 1010t o 2.6 x 109 X units per hour ). The siting of these instruments involved a balancing of many factors, including maximizing the probability for plume detection, while minimizing plume transi? time to the detector and the potential error, either due                                  l to observing building shine from the containment or sky shine from an elevated plume. Using typical Illinois atmospheric conditions, the off site system will detect a plume with a centerline reading of two milllRoentgens per hour approximately 90 percent of the time. This criterion for detection requires one monitor to report values double the levels associated with natural background.
Non detection is limited to extremely stable conditions with wind directions bisecting the distance between adjacent detectors. Since these atmospheric conditions can be easily described, the Department is planning to develop settware, to reccgni:e such cond.tiens rapidly and disp!ay an apptcpriate warning fer the analytical staff.
Quantification of a release is accomplished through radiological analyses of data supplied by the IDNS gaseous effluent monitor. This monitoring system is complicated, incorporating high purity germanium detectors and gamma spectrcscopy to identify and quantify components of the isotopic source term, i.e., those raC.cactive contaminants released into the environment, whether
'        par,iculates, dynam:c            volatile range cf 10'13  iodines,  to 10- 2or noble gases. TUs          instrumentation 2
has a
!                                                            uCi/cc (3.7 x 10*9        t o 3.7 x 10 B cc) for the paniculate and iodine stations, and of 10'9                  t          o4 10 uCl/cc (3.7 x 10g' x 3.7 x to
,          108 Sq/ce) for noble gases. The radiological data gathered by this gaseous eftluent monitoring systerr is continually received and updated by a combination of PDP 11/34 and 11/70 computers. Software has been developed to compute atmospheric dispersion and postulate environmental I
exposures from a release, based upon current meteorological conditions and effluent radioactivity levels.
Early warning and risk analysis of reactor events are accomplished utilizing the IDNS Data Link (DDL). DDL receives approximately 1200 to 1500 Irey reactor I
and engineered safety system parameters every two to four minutes directly i        from each reactor's on site computer. Early warning of abnormal reactor j          conditions will soon be provided through software which will monitor each
]          plant's engineered safety system configuration, identify the presence of key abnormal events, and indicato proper operability of enD incered safety systems.                                    .
Additionally, IDNS is researching the use of expert system technology to develop a decision aide to diagnose reactor system status dudng abnormal I  ,
2
 
events and to apprise the REAC team of possible sequences leading to a release of radioactivity.
The analysis of the liquid effluent streams may use only gross gamma monitoring rather than complete isotopic analysis, Such a reduction of complexity and cost is being considered due to the longer lead time before the onset of exposure to the general public by the water pathway and the relative ease with which such exposure can be reduced or averted.
CURRENT STAlgg At the present time, the gamma mor...      are installed and operating around all reactor sites, providing baseline data for t. )se facilities still under construction.
A gaseous affluent monitoring system has been operational at LaSalle since 1982. Additional systems are currently under construction for installation later this year at Zion and Dresden. The contract has been signed for fabrication and installation of systems at Quad Cities, Byron, Braldwood, and Clinton during the next four years. The IDNS data link is installed and operational for all reactors except Braidwcod. Braidwood will be incorporated into the DDL network prict to initial lead ng r.,f fuel. As previously mentiened, the liquic ett;uent monitoring systems are currently undergoing initial review as a pilot                                        '
project for the Zion and Dresden facilities. Upon satisfactory completion of that evaluation, meditional systems will be procured 2nd installed at all Illinois reactor f acilities.
DDL SOFTW ARE DEVEl.OPMENT                                                                        I A'thcugh the DDL ana'ysis schware is on!y in the first of three deve!comental stages,it has already become a major facet of the Departmental approach to                                        .
4 Emergency Preparedness and Response. The initial phase in DDL scftware I            development was to estab!!sh a data base with access to both historical and
!                                                                                                                                    l j            current data. At the present time, a four day data base is available for instant access. The basic capabil,ty is to display data for up to seven signals chosen at                                      '
random from among the 1200 1500 points available from each reactor. These data may be either sequential two minute measurements or samples chosen at i
spec 4fied intervals. The user is also allowed to track real time trends of the chosen signals. Under this mode, the oldest data, approximately forty minutes 8
old, automa!!cally scrolls 01 the terminal screen as the current information is received. An afternate format allows real time display of the current status of up                                      i to twenty different signals, although the trending capability is sacrificed. This                                        ;
latter format is truly user selectable, having the flexibility to group points                                            '
associated with a given subject, a given reactor, or seler:ted at random from the l          system at large.
The second phase of schware development for the DDL system will be to design an 'euly warning" alarm into the system. This feature will consist of                                        ,
k 3
 
software programs which will constantly monitor various data packages for                                                        !
Indications of abnormal conditions, such as loss of off site power. Although not                                                    l I-      necessarily an indication of accident conditions, such degradation is important                                                  i i
;
* to assess the ability of the facility to respond adequately in the event of an                                                    !
accident. The Departmental response to such an alarm will be to alert the reactor analysis staff to ensure its awareness of the situation.
i j
4 The third and final phase of DDL software development is presently envisioned                                                    l I
as an expert system to aid the reactor analyst in his ability to determine the                                                    ;
current status of reactor safety systems, project in a faster than real time i
l              environment the possible consequences of the abnormal events and advise on l                                                                                                                                              }'
protective measures off site, it is not the intent or the desire of the Department
;            to direct utility remedial actions based on this data. IDNS will use this I                                                                                                                                                l information only to the extent that likely consequences of an event can be
;            analyzed in support of off site protective actions.                                                                                  l
[
TECHNIC AL DIFFICULTIES
/
~
i j            The development and operation of such an extens:ve remote monitoring                                                                1 system tas had its s .are of technical difficulties anel challenges. The off site l
l men; tors, for example, require the use of a 300 volt battery which is both                                                        !
relatively expensive and short lived, in addition, impenci.79 failure is characterized by erroneous indicistions of increasing radiatics levels,                                                            ;
sometimes as high as ten to fiheen times normallevels. Additional prcblems                                                          :
I
'            encountered with the off site detectors include loss of electrical power, failure of                                                l I
the telecommunications link to Springfield, vandalism, and susceptibility of the                                                    :'
2 electrenic ccmponents to pcMr surges caused by lightning.
,                                                                                                                                                  i i
Despite these d.fticutt:es, over the past year (July 1985 throug'h June 1986), the off site component of the system, comprised et 96 detectors with thalt modos,                                                        t
;            approximately 2130 kilometers (1325 miles) of telecommunications lie.;, two i
computer systems with attendant hardware peripherals and required software, achieved a system wide operability factor (availability of data for display in
{            Springfield) of 93.1 percent.                                                                                                        ;
!            To increase the reliabEty cf the eff site monitors even further, the Department is i
developing a 300 volt power supply to replace the dry cell battery. Josearching the ability to use solar collectors for back up power, and evaluating radio communications to a central collection point rather than leased lines to a telecommunications bridge, in addition, the Department has piready installed l
electrical surge protectors on the power supplies to reduce susceptibility to lightning.
l
!            The complexity cf the isctop!c gasecus et!!uent men!!oring system creates
* complicated prob' ems. A major cause of system failure is failure of off the shelf components and a lack of environmental support systems, rather than problems 4
J
!~
i a
_ _ _ _ _ _ _ _ _ _ _ , _ _ _ ~ , _ _ _ . . . . . . , _ , . . . _ _ _ _ _                          _
 
'            with the custom designed components. For example, the system has failed several times following faiNro of the air conditioning system for the Technical Support Center (TSC), the location for the system's on site process computer.
Although a TSC is required by NRC regulations, apparently the operability of its          (-
support systems is not. Sometimes substantial effort is required to obtain repair of this essential support system by the utility,                                        ,
A recent failure of the effluent monitoring system was the result of loss of electricity to the TSC. Although supplied with back up generating capability,                  ,
the circuit breaker feeding the system had been manually thrown due to a
* noisy transformer" which was annoying a worker in the area.
To eliminate these types of operational problems, the Department is requiring the construction of a dedicated building on site. This building will house the entire gaseous' effluent monitoring system, including its process computer and dedicated support equipment such as back up power supplies, heating and air conditioning, and ihstrument air.
J Not all of the problems with the effluent monitoring system are the result of vanab!e in p! ant environmental cond;tions. A substantial amount of d;fficu'!y 1
was finally traced to microphonics in the coaxial cables connecting the gress count rate meter to the multi channel analyzer. Since this gross indicator is
;            designed to signal the system to rapidly increasing radiation levels within the 4
l sample, the presence of these spurious signals caused the system to decrease the analysis times and consequently the system's sensitivity. Although the                  ,
system never specifically failed due to this problem, the ability to detect i          radioactive contaminants being released into the environment was substaa.tiaHy impaired.
In spite of these difficulties, the gaseous effluent monitoring system has performed well, panicularly for a prototypical system. Over the past year (July i
l        noble gases, were            t    opera)ional 86.7,83.3, and 89.8 percen
  !        In contrast to the approach used for the off site and the gaseous effluent monitoring systems, the DDL incorporates no State owned sensors or
!          instrumentation, relying exclusively on utility installed and maintained
'          Instrumentation. The Departmental components to the system a'e limited to a pair of statistical muttiplexors, dedicated telecommunication links, and the REAC computer system. To minimize the cost and time required for system installation, this component is currently limited to a subset of the signals                      ,
presently residing on the utility's computers at the various reacier sitos. Such                  l I
an approach minimizes the direct responsibility for proper operation and reliability, a!thcu;h at a sacrifice of control and assurance that the system will              -
be functional when needed. The utility's computers, for example, may be l        removed from service for preventive maintenance with little, if any, advance                      !
(
l                                                5                                                          '
i i
i t
 
j -.
l 4
                                                                                                                              )
notice to the Department or Departmentalinput, in addition, utility personnel                        !
j                      have, on occasion, unilaterally altered the contents of the transmitted data                          i j    ,
stream, adversely impacting the Department's data analysis capability.                                L 4
}      .
OPER ATION AL R EEtJLTS 1
The primary intent of the RMS is to provide the capability of independently                            !
i assessing the possible off site impact of an accident at a nuclear power reactor, j                      Such a capability is a major support to the recommending of specific protective
;                      actions for the general public. Since monitoring effluent streams during normal                        i operations is of secondary importance, only a limited amount of data analysis                          l l                      has been performed to date. Gaseaus effluents from the reactors have                                  j remained below the minimum detectable levels of the off site monitoring                                !
system. Environmental radiation levels nominally average between seven and                            i ten microRoentgens per hour due to natural background. During times of                                  l precipitation, however, the ambient levels are elevated, chen reaching as high                          !
j                    as fitean to twenty microRoentgens per hour. (See Figure 1)                                            .
i The data generated by the gaseous effluent monitoring system has routinely                              '
j                    ind.cated the presence of radicactiv;ty in each of the three stations, when the reactor is at power. Typical fission products including isotepes cf Coba!!,
j Manganese, Sodium, iodine, Krypten and Xenon, for example, were identified j
by the system during May,1986. Research is being done to match the ongoing                              i results obtained from the gaseous effluent monitoring system and the daily grab samples gathered by the utility, as a portion of its Appendix i requirements.
Although not yet available for publication, these comparicans appear to correspond remark 7.bly v, ell, considering the variation in methodology used for obtaining and analyzing samp!as. (See Figures 2,3)
Late in January,1986, a smallleak developed in one or more of c reacter's fuel rods. The IDNS Gaseous Effluent Monitoring System readily identified both increast d levels et radioactivity and additional nuclides within the effluent stream. The noblegas station, for example, reported effluent concentrations j '                  averap:ng 7.4 x 10' uCi/cc (2.7 x 10'1 Sq'ec) for the 64 analyses performed between January 23 and Februay 1. This compares with an average of 9.4 x 10'8 uCl/cc (3.4 x 10 3 Eq'ce) for the 96 analyses obtained betw3en January 1 and January 15. (See Figure 4)            By combining these data with DDL l                    parameters, such as off. gas radiation levels and the readings from the utility's ettluent radiation monitors, the Department was able to verify the presence of j                    this leaking fuel.
I i
The DDL was directly utilized by the Department during the feedwater transient event at the LaSa!!e station on June 1,1986. The system cid not document the water level as being less than the low water level scrum setpoint, due to the                          ,
translent's short duration when compared to the two minute sampling frequency. However, the system clearly showed the initial downward trend of i
6                                                                  I i
i
 
l l
the water level and other affected parameters, both during the initial event and the subsequent manual shutdown of the reactor. During this event, the util;ty                        !
telephoned the REAC at hourly intervals, indicating the power levels and the
(" I reactor status. By monitoring DDL, technical staff within the REAC were able Independently to verify the status of individual control rod banks, reactor power j                                                                                                                          ;
levels, reactor water levels, etc. (See Figures 5,6,7)
.                                                                                                                          J i
EMEAGINCY USE OF THE RMB l                                                                                                                          i i
Although the RMS monitors the activities of the lilinois reactor facilities during                      l 1
              '  normal operations, its purpose is to provide data during emergency conditions                            !
l                  at a nuclear power reactor. During a major accident, the REAC staff would j                                                                                                                          {
initially analyze the various DDL parameters for trends and diagnose the                                ;
!          .      problem. The reactor analysis staff would concentrate on the status of the
{                  reactor's engineered safety systems in an effort to predict key trends and their consequences, while the environmental analysis staff would focus on i
j containment radiation levels, area radiation monitors, and effluent                                      !
concentrations. In anticipation of a possible radioactive release into the j                  environment, the environmental analysis staff would also calculate dose                                  l
)                  reduct;cn fa: cts due to atmospheric dispersion, using the meteorologir:a!
l                parameters availab's item the DDL. If the situation warrants, calculat!:ns                                l would be performed to determine the protective actions which would give the j                                                                                                                          l least dose to the general public living in the immediate environs surrounding                            !
the faci!!ty.                                                                                            l i                If a release occurs,its presence would be verified by both the DDL and the gaseous efUuont mcnitoring system, and the postulated impact en the general                              l l
public calculated. Using the isetcpic source term provided by the gasecus                                !
i i
eftluent monitcring system, the environmental analyst would'also be ab!e to
!                predict the presence of released radionuclides which would contribute to ground contamination. Verification of the wind direction and the anticipated
;                otf site radiation levels would be available from both the environmental j
monitors and the Department's field teams dispatched to the area. Following                              l 4
the termination of the release, the isotopic source term, in conjunction with                              !
I                contamination readings obtained from the mobile field teams, wculd be used to                              !
dstermine and document the integrated dose to the offsite population.
l Although the Remote Monitoring System does not solve all problems associated with assessment of reactor accidents and their impact upon the 1                general public, the !!!inois Department of Nuclear Safety believes that this                              !
l                approach is a technological advancement in providing accurate and timely                                  l 3                information to decision makers during a radiological accident at a nuclear power reacter.
4                                                                                                                          I
)
4 7
\
 
      .                                                                                                                                                            E.
                                                                                                                                                              .e.
I E        l
                                                                                                                                                              ~
l E
5 e                                              '
c                                                                                                                                          g      tt 9                                                                                                                                              -
                                                                                                                                                                        >i p                                                                                                                                          f,      t i a                                                                            >                                                                    C
                    =
8              .
                                              ,                  M'                                                                                            3 a
w    .
w c    O                                                                                                                                    g O  ~
                        ~    '
              "    e                                                                                                                                        'N e    *
* w  =    1                                                                                                                                            M n                                                                                                                                              = g
              =
p  =
a
                  '=
E 0                                                                                                                                  .W
                                                                                                                                                              ". e ar 6        =                                                                                                                                            O
                  .C.L -                                                                                                                                            2 U  =
e                                                                                                                                    e i
g                                                                                                                                          =
w  T g,    W                                                                                                                                    W c.
                  =
E E
a                                                                                                                                        6 m                                                                                                                                        -
U e                                                                                                                                                  w
                  **                                                                                                                                        3          >
1 W                                                                                                                                      .
2          g C
E              i i
d              l I
I              l
                                                                                                                                                        ~J
,i
                                                                                                  ,5                                                                        1 i
e.s j
                                                                                                                              '                            g        .
C2'th C ; * [1 t ; ' l 't 4
l                                                (2*El                        G C ' I '!                0;'4  It'C            OG'l  Ol'8 1
) '
    ,                                                                          Jy/Wn s
l
 
I
    ,                                                                                                C. .. ,
1 Figure 2 Comparison of Results from IDNS                                    l lootopic Ef fluent Monitors and CECO Effluent Reports Xenon 133      Releasse      Jan iets - May se II 'I
                                                                                          , itI '
IDNS e                  ,
i                t          Ceco +
ll        ,                                                                      t
                                                                                          ,13 I
j  18'      ,
                                                                                        ,  13' 2                                        I                                                      i e                                                                                              '
sc ll                                                                              7 0            r
                                                                                      '    *g a                                                                                                I l
ll      ,
                                                                                    ,    12" t,
l it'                                                                          13' 5                18          15            24 l
Jan 65          lA a y 0 5        Oct 05      IA a r 8 0  Aug 80 I
:                                                                                                        l r                                                                                                        :
l l
l.
1 I
I
 
I, .
Figure 3 Comparison of Results from IDNS isotopic Ef f'. snt Monitors and CECO Ef fluent Reports lodine              131  Releasee                  Jan 85- May84 5
11                                                                                                                                      =
r
                                                                                                                                                              ,13
* IDNS e                        .
CECO (                                                                                                                      l
:l "    ,
                                                                                                                                                            ,13' s
e e
s                                                                                                                                                {
I 1                                                                        -
;                        13 g                                                                                          3 h/ \
                                                                                                                                                          .      3 S                                \
                                                          \=
                                                                                                \                          .
                                                                                                                                                                          )
l
* 14      7                                                                                                                                t
                                                                                                                                                        ,  to l
31'                                                                                                                                      l I                                                                                                                                                      _ga 3                            Il                  13                          21 l                                  Jan 35                            May 85                          Oct 85            Mar 86                Aug 86 1
 
l l                                                                                                                                                              Figure 4 Effects of Pinhole Leaks on Noble l' '  '
r                                                                              Gas Effluent Concentrations                                                                          . se '
                                                                                                                                                                                                                                                                ~
l                                                                                                                                                                                                          .
                                                                                                                                                                                                                      ~
                                                                                                                                                                                                            /                                  ,...
N o
o h
a s
is ''                            _,                                                    ;=                                                                    N                                      ,,-7
                                                                                                                                                                    ~
3s''                                                                                                                                                                                                            -s
                                                                                                      ,                        ,        ,        .                                                                                          se 3                      6                        3          12      is              s's    in            is                  it          is
                              ._                                                                                                                            January 1986                                                                                                  -
i                          .
n
 
            .*                                                                                                                                                                                                                                                                                            l E
                                                                                                                                  .  .................................w.
                                                                                                                                                                                              .                .                                                                            ~ t.D
          ,                                ,. . 3
                                                                          ,        . , . y . ,. . ,                                          g . ,..                                          .
                                                                                                                                                                        .,. 3 .. ,. . , . . g . , . . . , .
                                                                                                                                                                                                                                                                                          . CD
                                          .                                                                                                                                                                                  .                              .                                  i
                                          ,..                . . . ....... . . , . . . . . ...,                                                  . . .. . . . .. . . ,. . . . .. . . ,. . . . .. . . .                                                                                    E.
                                                                                                                                                                                                                                                                                        ..Q32
                                          ,t..g..., . . . , . . . ...,..~q....,...,...{......t..g...
                                                                                                                                                                                                                                                              ....y.. . .e
                                                                                                                                                                                                                                                                            .                3. 7.
e                  ,.                    . ..            ..        .      , . ..                        l+                          ;
                                                                                                                                                                        ..                  l
                                                                                                                                                                                                      .. .                  l                              l
                                                                                                                                                                                                                                                                      ..                        E9
                                                                                                                                                                                                                                                                            .                3
                    .e e                    .
                                                                                                                        .... . . . . .. . . . .... . . . . .. . . . ... .. . . . . .a o
                    >=
l.3 l.
                                                                              .    ,    . 4      .
                                                                                                        .  ..        . l      . 3            s
                                                                                                                                                            ,.        .    .    .    <          .    .      .  .      .      s      .    .,.          .
                                                                                                                                .                            .                                                              .                              .                                E 6
e                        ..
                                                                                                                                                ..                ......, . . . . .. . . . , . . . . . .....                                                              ....            .g 1                ~
e      -                                                                                                  .                            .                              .
g        e                .
3 j        e                                                                                                                              e                .      .c                                    .              .                .            .
:. . . . . .:. . . ,. . . .:. . . . . . ,s . . ...l...,..g...,...t......l...,...<c.
m  g        ,,        .                              .
                                                                                .. . ,. .. . ... . . . , . . . 3 ,,.. .. ..
                ,          e a      w          e                              .
                                                                                                                              .          .                .                . a,                            .                            .                              .                    to
                $          8          6
                                                                                                                                                                                                                          .                                                                E. g
                  .o                        ..*. .'........'.....*+......**
o  -      D                          .                            .
                                                                                                                                                                          . c.
                                                                                                                                                                                  . =    . *      .  .  .
                                                                                                                                                                                                                                                          .  . .  .  *    . . <-U          3 g  ,e,,    t.
o
                                            .      g          .      ..
                                                                      ,        . , .          3
                                                                                                          ..*..g
                                                                                                                                                    .    , . . ,                      5
                                                                                                                                                                                                                        .. g .,. . , .
o g
M                                                  .                                                      .
                          =.          .                              .                                                                                                                    .                              .                                .                                E
                                                          **a.......*m.......e..
g      U g
                                                                                                                                                                                              . . ......e.. . . ....+......                                                                *.
I E      g                                        .                          .                            .                          .
: i.            4 . .                                                                                                                                                                                                .
i                a      C          .                              ..        . . .
: e. . i. ...                  .
s . ..                        .i. ,                                                                        ... . . ,
J y
O                '              .                .
                                    '....,...l...'....'...,...t......'...4.;......t......'....
                                                                                                                                                        .              . d . ... ...*  .                .
                                                                                                                                                                                                                                                        .              .                  I 1
                                                                                                                                                        .              ,C .
                                                                                                                                                                                                          ,                                                                  . . .    .g 9                                                                                                                                                                                                    .
                  =g                . .
4 i
;                M                                                                            .                          .                            .                              .                              .                                .
e e                6
                                    .      . 4    .      .  ...
                                                                            . 6      .  . .
                                                                                                    .    . .i.        . 6
                                                                                                                                                      ....6.....i.....s......6.....g a                .              .                .            .            .            .                          .              .                .                              .            .                .
: l.            g          .
                                                                                                            .,_. M + l=                                          ... .l . ,. . ,
* 3 . l.
l
                                  .                                                                                                                                                                                  .                                .                                e 1                                                      . . ... . . . .. . . , . . . . .....,..
                                                                                                                                                                                            . . . ........                                              ......                                              \
a.
                                                                                                                                            . . . . . . . ....                                                                                                        ....              g
                                                                                                        .............a.
<                                .. 4 . ;                                    . . .
                                  .                              ..                        s.                                                                                                  . .. . . . ,                                        i        . . . ,
                                                                                                                                                                                                                                                                                                            ~
l...g...l..7......,...t......'.......'...,....)....
                                                                                                                                                                                                                                                      ,'. . . , . . . .y 3                  ;
l i
I                                                          .
g                                          e, C 2 ' It %              Cd'CM                        E2*9C                                                                                                                                                                  i                                  e tt'it                    CC'32                          00'1                              d8'OR                        ta'el                        ra'tt S3HONI
,    (
)
1 4
 
l l
l 1
l Figure 6 LaSalle County Station Feedwater Tranelent e,
n s                                                                                              Total Reactor Feedwater Flow w.=..~._.=.
                                        ~. . . . . . . ........
                                        ~            . .
n                  .            .          .
n                                .                        .                        .                  .
                                                          .                        .                      .                        .        :                      E .~ . n n .......                                            :                *
                                      ~
s 1                                  .
                                                                                                .                                            ....... ........ . . ~ . . . . .
                                                                                                                . , 1. .
I        . ... . ...
                                                                                                                                                                                                                                                                                        ...a..........                                        ... ...
a                                                                                                            . . . . . . . . .                                                                                                                      .
o                .          .            .              .        .              .        .
so              .
                                      ..a
: 2. .                            ..                        ..                  ..
i...
u..
n..                      .
n..
n..
Mouns                                                                                                                                                                            .
01-JllN-RGG
 
Figure 7 LaSalle County Station Feedwater Trenelent Activation of Motor Driven Reactor Feedwater Pump a                                      . .. . . . . - . . . . . . . .                                      . . . . . ..                                                                    .        .      .          .        .          .        .
(ON) "
                            . . . . . . . . . .                      s (O F F) ;''                    *                  *          *        *        *
* _ ...................,..............                                                              ..'... ,'...*...'....'...~...'... ,'.......'
: j.      .        .        .        .          .        .      .        .        .        .        .        .        .                                                                          . . . . . . . ..
i        -        -
i.. -
a..
s..
: i. . .
: c. ..
a.. a.. a..
: e. ..
: c. ~
i.. .                12. .              i. . .
HOURS
                                                                                                                                                                                                                      @]-JUN-86
 
    .                ,.                                                                                                                                                                                                                  *.          1
                                                                                                  .i                                                                *
                                                                                                                                                                                                  .'          . . . .                .1.'.-
                                                                                                      ' ifQ ' g**%%TpV.tK:7s*Nth . . ;'.$' G* 7,1,,W-n  *. *d.;.'..
                                                                                                                                                                'i' . ( .
  ,                                                                                              tit                        .
                                                                                                                                                                                                                        . c '.'
                                                                                                                                  & h. . . h. k                                  hYYO$                      ' ? 5. ..?Ys'?..
      ,.                                                                                                                                                                                                                              .,.. e.,'
                                                                                                          ~A b. t.LgMw.wR.
a .p. ir~ecia..rs,    . . In c.
: s. . .
            .                                                        ss                                                f7.t.>g:  4 s                                    -
iLG.                                wGhM:EB,..d..Vlg ,Q. . ..                                                                                                    .      ..
.        n
                                                            &y 1
g.
6                                                                                                                                                  Conf. Publication e84 3
: w. 2. 4. ..;
c y..,p<"$'.
                                                              ;1                                                                                                                                                                                        ,
!'3[rMi ;                                                                                                                        16th ANNUAL                                                                                                          I
:      T..$.ki,h                              .
NATIONAL CONFERENCE
    . .%,,. . ... g. . 3; ON
            ..;' . . z. c ,                                                                        .
              . '..'  . . . .'. .              M.        . ,                                            AADIA"lO,N CO N TROL l                                                                1 i
                                            ,                  k
                                                            .i l
1
                    . .: M. .:.''3; Radiation Decision Making
              . . .                      . ..;h ;
l
                                      ',-)
                                  . .' . .j I        ' ' .'.'.. . . . c" ' f. !' fi                                                                                                May 2124,1984                                                                          .
1 M. #W ' il. 'd
        -                                                                                                                            Des Moines, Iowa ass                                                                                                                                                                                                  l l . . , yr .          ..        .
s1-                .,                                                                                          .
,                    . . .n                              ,. o                                                                                                                                                                                          l
    .* . * . 4 4. % * ' .' '.' e'i 1                                                              <
j      .
l*.*f*..    ,                    ,;
                                                                                                                                                                                                                                                      . i
:                    .g...,                '
perii o e, CC*'t'f *tt C' A 04OSCS CCittet P c;eam 0ite:ters, tec                                                                  -
                    .(. g \.'. i' l p .. ;'%
                      , sidi. d6 i(
; a..y.fRB.
        ..:+                          *
                                                '."x                                                                                                                                                                                                    \
il -.. fo.9 ' ,,,m*p!]'%'.
                                        ..A..
t'.o h
                                                                                                                                    .                                                                                                                  l
 
                                                                                                                                                              \
1 l
;  i.
{                                            ILI.DCIS' EXFD.!DQ with MDUFE ME3f!TCRING
                                                                                .f NUL. LEAR EIAm! CAL CEMERATDc FACILITIES i
!                                                      James A. BlacAburn, Assistant Minager Of fice of Nuclear racility safety Department of Nuclea.r safety 1
INFR3DUCTICH Pollcwing the nuclear accident at three Mile Island, staf f in the                                                          I
)                      Department of Public Nealth. Division of Nuclear safety, were requested by i
the Sovernor's oifice to roccamend injrreved methado100iee by which nuclear Powe r plants could be monitored.                                Recomme ndat ter,s of that staf f wors 4
subsequently codified into the Nuclear safety Treparedness Act Wich I
required the establishment of "A Reacto Effluent 'enitoring system (PJ:xs) capable        of continuously ide ntifying and qua'.tifying the radioactive i
cce,ponents of all e f fluents f roa nuclear faci 18.sies to the environment."
During the 198 2 C1tC'PD me t t ing he ld in Po rt land , Mai ne , ! reviewed the status of this reacte acni:oring project up to that time.                                                                  As a conrequence, today's presentation will primarily dwell upon orpansions to the systes as well as cuc experiences sir.co that date. To refresh your
: f. ,
svamary,    and to lay the groundwork for those unable to attend the Portland j
theeting, the Illinois Famote Ef fluent Monitoring System consists of six (6 )
identifiable cce,ponents.
: 1. At the heart of thi system is a Radioactive Chaecus Effluent Honitoring system (R.cDCs) which utilises high purity germaniumn de t ectors and game spectroscopy to identify and quantify the l                                  isotepic coeponents                .if    gaseous ef fluents whether partseviates, iodine, or noble gases. ghe RACC O is provided with isokinetic 1
sampling probes in each engineered release point so that all j                                    gaseous of flus r.t streams are continuously sampled and analysed.
1 i
j                              2. To assure capability of pertos,etng atmospheric transport and                                                            {
]                                    ditsusion vedeling, the RDO acquires a real-time meteorological inforw tion consisting of wind sp**d and direction at threv levels, adiaNtic lapse rate, and precipitation free the LaSalle station Meteoro1cq1 cal Tower.                                Each of these parameters is i                                    updated on a minute-t'y-minute basis.
\
j                              3. To provide the ear 11eet possible indication of an accident
;                                    condition as well as supply essential paraaisters for source term                                                        '
calculations,              the    systen                  also            acquires cert ain plant                    , i
!                                    inat twe ntation signals.                        Twsoe signals include contairument                                    l l  ,                              radiation levels, effluent flo., rates, and effluent radiation                                                          l l
1evels.            Both the meteorological information and the plant status j  t,                              inforu tion are provided to the syntes through a data interface i                                  with the utility's ccepter system.                                                                                      ,
I
  !                                                                                $11                                                                        l 1
j
: 4. To provide an independent confirmation of a release, verify C.*            w teorological parame t e rs , and provide some limited capability                          l for assessing the environmental impact of a release through a                              e
                    .nonengineered pathway, the system also includes a ring of gross environmental monitors. Wis ring is coesprised of up to eirteen                            i  ,
pressurised ion chambers installed approximately 2 - 2 1/2 miles
* tros the plant.
S. To      manipulate        and analyse this massive data base          in an appropriate time frame requires dedicated computer facilities and                            I sophisticated modeling software. W ie component is (* signed to
* acce pt , manipulate, display, and store the resniting 2 formation both during normal ope rations and under accident conditions.                                I We se computer facilities include an on-site coe6Nter within                              -    i htnich the PACDO, meteorological, plant etatus, and environmental
* data ara originally collected and stored.                A central computer                  l f acility is located in the Department headquarters in springfield which is connected to the 1,a3411e computer by a dedicated, high-speed      telecoccunicatten        igne. At the central facility, rwathesatical e.am pu la t t e ns    involving attesphe r ac dirpgrsion ard the projected environnental censeque.sces are perforwd.
: 4. Since the prir.ary purpose nf this system is for use during accident conditions, the output must ba eas uy and rapidly                            j cceprehensible.          As a consequence, siignificant tine, ef fort, and            l
[                    resources have been spent developing an output sedule meeting these criteria,              nts redule consists of two (2) graphics generators and eight (8) color renitors, each of wtsich can be dedteated to displaying sene f acet of the eme tt ency data base.
The      software p r eg rar.s uttitre trending histegrams gnd two
( 2 )d tze n s tena l    plots    overlaid    un    a  digitized    aerial representation of the e nvironme nt to depict the geographical distrabutton and environnental ispact of the release.
CFERATING E%FERIEN::2 l
J              Throughout the          las t  few years, the C4partment has amassed a rather
* j        10rge ope rational data t>a.se for the radiation monitoring instru:entation incorporated into this Eerete Mnitoring Ef fiuent Systers. Assessing ar.d                                  i l
cvoluating this ope rating experience of necessity reflects upon the l        Cpecific instrumentation chosen as cecponents to the rystem.
Although no o rders ement is being given for any of the instruments                                  l wtsich will be discussed, rwajor eccponents will be identified for ease of Corusunication.
2nyi enme nt a l veni t e rig;.-,-Jte r/
* t o e g As discus sed in our previous presentation, the initial environnental
* installation was comprised of seven (r) pressurized ion chanbers which werv
          .m talled in the sa.all pepulation centers within the plume omrgency
          'lanning zone Arourd the L.13411e County Station, for et.se of cperation.
Mse    ins t rume nt s are usually installed at facilities cw ed by 1ccal l(
                                                          $72                                                      l l
l r  ,
 
                .                                                                                                    *..      1 l
l i          g gen rrimenta.1 entitiese          nort frequently on the radio antenna tewers i                    operated by the police or fire depanments,                  subsequent installations have j*
been a.ltered to utilize a Nema-12 cabinet installed on a conente pad.
his inatA114 tion configuration was chosen to allcw ease of maintenance and accessibility, while providing an appropriata operating environment for the
,                      twtherproofod electronics.
l                            he groes envirorsa ntal acnitors chosen are a mixture of peuter stokes
:    8 pressurised ion chambers, sentry models 1011 and loit. D e loll's are the older versions which comprised the pilot project and a subsequent order for prseden.        Two (2) major problems with the 1o11 eystems require mentioning.
he first is the equipment's relattw intolerence to voltage fluctuations.
!                    Due to our original installation design, such instruments were frequently
      ,              visited by lightning, much to the distress of the instrument. me Mesaa-12
:              installations han been less frequent targets, houwwer the 1011's tend to l  .                drop of f-line whenever the power level fluctuates. Althouth the instrument i
can be reset easily, this amist be done manually which requires a technician I
to travel to the site.
E The uneced penhien with the 1011's is their inability to nepond p rope rly      after    !=ing      off    line for a period of' time.              CNe to telecommunications and/or cocputer problems, a specific instrwient may not be polled for a substantial pericd of time--seve ral mir.utes to hours.
Unless a signal is sent to reset the equipment, the initial poll af ter a                    reertablishing coas:vnications will be erroneously high, apparently due to the instnament failing to account for the tapee since the previous poll.
]
* g          RAM 11y. both of these problems han koen corrected in the Model 1012.
1 We M: del 1o12 appears to han its cwn set of dif ficulties, although
    .                the entjer enes tsay have been resolved. It appears that we vers the first
      !              large-s c ale      installation of th i.m equipame nt .          Several buge required j    ]                elia.ination and/or proper tra.ining, The initial pretlee encounter *d with j                the 1012's was an extrwee ser.sitivity to action, ne slighteet physical 3
movement,      such as caused by the vind, resulted in vildly fluctuated
]                    re ad ing s . nis problem was ctrrected with a modification of the detector j                    e lect ronics ,      no e* cord proble s involved the itsware programmed into t se                        I nad only amucry. On f r*quent intervals, the clock would etep, ef fectively 4
d ropping the insttunent off-line.                  Wie problems was tosolved through a nprograssaing of this memory.
l j                            Department et a f f have been agrehe nsive throughout this project                                !
;                    rege rding the potenttal aid frequency of varujalieu. Although we have p ro ** nt ly                                                                                            l e                                  exportoneed an roximately 65 inet rumme nt-ye are of operating                          i
  !                  history, we have encountered only a few instances of vandalise. We enest:                                !
I dramatic was when same irdividual attoepted to dismantle the low-leve3 l
1 detector frtue a 1011 unit. For somme reason, the vardal(s ) stepped upon                                -
i                    reaching the tCo-volt detector. Since the electrvnics were lef t esposed to the elements, howwver, substantial corrosion occurred, necessitating aspair i                    of the detector.            21s detector was refurbished ard recalitrated by the
* sunnu f actu re r f o r a t ot a l co st o f 3 25 0. aid is new back in s e rv ice .
1 1                                                                                                                          l i                                                                                                                              !
:                                                                                                                            1
!                                                                                                                              I i
1
                                                                      $73                                                      i 1
 
                                                                                                      - 1 S
M ee re i ed i en t 1 Plant Status f n f e rmat i r.n One of the nors perplex.ing and frvatrating esperiences with the entire Famote Etfluent Monitoring system has been the inability to gain trve cooperation from the u t t ',ity.          Since the meteorological and plant status            I signals are pr7vided from the utility's Paine compJter, these signals are                        I I
frequently interrupted, sometimes for extended Periods of time. For eaamplo, early this month, the utility was modifying the entire prime                            l computer system.          As a conseque nce , this portion of the eyeten, wam                    l non-ope rat ioAal for approximately two weeks. 31nce we were not notified een the sodifications wre cospleted, it was almost by accident that the Departme nt learned that the utility system was again operational, but due                      l to taprope rly clonnected cabling, we wre not recgiving the data stream.
Since the instrsmentation originating these signals is owned and operated by the utility, the Department has limited control over this segment of the system. For example, the wind speed sensor installed at 375 feet has been non-ope r at iona l since early February,1984.          It appears that thest signals ass considered non-critical for powr plant operations he nce , they do net receiue the maintenance priority allocated to essential systems.
N. M                                                                                              1
            'It s ope r ating expe rie nce with the MC Ks ratuf actured by Science Appiteations Inc. (SAI) mingles varying ascunts of frustration and success.
This untque s t at e-o f- t he-a rt system was custem designed to match the
,    effluent streams present at the tasalle county station. 'Ite system was delivered to the station precisely on schedule, something unheard of in nuclear Mwer plant constrv tien. As previovsly descrLbed, this systes is l
a cceplex instrunent requiring centinuous attention by the onsite ceter.
      'It t s cc ;Nter centinuously checks the status et the vasteus parts cf the systen as wil as the gross count rate f rom the noble gas channel.                                l l
Although the De Mrtme nt leadership viewed the MCIX5 with e geo$                          1 degree of sk e pt ic t ra.      both tcvards its cambilities and its reliability, the custos designed coaponents h.sve appeared to be more reliable than ce rt atn s t anda rd of f-the-shelf iterm incorporated in the design. 'th;s is not to say that such a systes can be installed and forgotten. LtAe the o f fice copying machine with Wich w ars au tco f amiliar, the McDO requires f requent ad jus tr.sent and attention.        Liquid nitrogen euant be added            ,
to maintain tha detectors at the prcret tezperature. Presh cartridges must                        l bs ins e rt ed into the herrers, and used cartridges reseved.            Char:oal dust            l need s    to be reseved free rhotoelect ric light sources and s e nsors .                        '
Pneumatic seate erust be reintained to assure their integrity, etc.
            'th e talor disappointeant with the MCIKS eP1Fu nt has been the dit ficulty in cbtaining sof tvare support for its convoluted process control programs.        Since the SA! Division manafamuring the McDCs is 1ccated in San Diego and has a limited staff with sof tware e Ter41se, et taining kncwledgeable supMrt hss f requently been dif ficult.                                        '
Another problem involves the dif f teulty of saintaining an ardequate environrent for the on-site coefvter etat; tent. Tne McDC is insta11aJ in the firct sub-Irvel directly beneath the station vent. 'Its onsite ccupate r is installed contiguous to the 'Ischnical Suttert center (TSC) affroxtrately e 7J
 
V                                                                                                ~.
t
(  ,
2000 feet awey.          A.1though both of these installations are provided with onsite becanap electrical power, such power comes from two ditforent eyetens.
his aituation was unforeseen whon the RACEMs aoftvars was written.      Ao a consequenos, additional logic must be designed to address the probloes encountered with loss of power at the RAGEMS without a corresponding loss to the computer.
Deajor  ditficulty has been experienced in keeping the Tsc air conditioning system in an operable condition. Foresee 1ag a potential heat
            ,  problem, the design of the inCEMS includes a small air conditioning unit.
No such provision en.ists for the on-site computer. Since the TSC air conditioning systen is non-sa fety related, its failure does not require shutting down the reactors. As such, the priorit/ level ass 1Tned to its repair has been rather low, hence, the on-ette computer has been rendered inoperable on several occutons due to high-temperatures in the TBC. such a situation would be further aggravated during an actual incident due to the      nsambe r of people prssent within the TSC.                    We Department is contoeplating installing a stand-by air conditioning unit in the ta.salle Ceaputer Center, to maintain an operable envirorument for this equipment should the      C air coMitioning system fail.
In spite,of the prchlew outlined above, the RAC::M3 hu proven itself to be a highly depeMable a.nd capable eyetou. An ertensive evaluation of its capability was concluded by De partze ntal s t a f f in Decembe r o f 1983.
In the initial pha,ses of this remote monitoring project, opinions were g              frequently expressed by utility personnel that such a concept "will not work".      Possibly the createst compliannt to the system has been the gradual erceion of this position to the current s t ance ,
* 1t 's not nece s s ary * ,
Recent results of effluent analyses teveal er.all amounts of Iodine-131, I cd i.n e- 13 3, and ! cd i n e-13 5, a.s w il as Arvon-41, K.r /7t o n- 87, Krypton-8 0 aM Xe non-13 5 m.      Wese results are not unus ual . De concentrations being toleased are small, howerer are elearly identif table by our eyetes.
PRE.stprf 37Mus
                      'the Remote Effluent Manitoring systese is virtually complete for the 143.a 11e county station. As previously indicated, this system consists of the RA:ZMS. a estoorological and eyetum status interface, aM sixteen pressurised icn char.bers in the environment, l
Pollowing ctumpletion of the pilot project at tasalls, our efforts were                    I directed tonrd instrumenting the rema.ining facilities. It was recommeMed that the initial phase of this expansion consist of installing the                                  i envirorumental ion chambero around all operating f acilities first, then those uMer construction. During the past two (2) years, an addittorial 64 ton chambers have been 3 tocurvd aM installed around the operating nucleas facilities at tion, Dresden, aM Cordova, and the plant being conettveted near IPyron,      Illinois.      'thirrieu additional detectore are awaiting inst allation arcuM Clinton AM Braidwood.                  It is aM icipated that this
* Th&M of the            system will be ocapisted during 1994. To usure that the entiti eystem will not 1:e affected by failure of either the err-atto cougNte r or the t e leccummunications link with the central facility, the environmental detectors are Folled directly frtas the Springfield ccupater via a se<cM t61ecau.unications lira rather than 1.y the crr-site ocspJter.
9
                                                              $75
 
(              Due to the trous ndous costa of the Radioactive m='=                                                  Monitoring System (at least for a radiological health budget ) the Departament refrained irta procuring additional syyt ow unt11 the tasalle syntes had toon inatalled and had campiled an ertensive operating history. Inatalled in April,1992, this evaluation continued through December,1993. The results of that evaluation and a ocuparison of its capabilities with those of typical utility systems, are the subje:t of a tectutical report entitled, "Isotopic Effluent Monitoring for Nucioar Power Plants A Comparative Analysis      between    the        Radiosative                      Effluent    Manitoring Systems of e - nwealth Edison aM the 1111nois Department of Muclear safety". Draft copies of that report wre distributed to various entities with knowledge and interest in the area of envirorumental monitoring. Although various
* entities indicated that the cost for such a system oudweighed its tenefits, no one challenged )ts t echnic.t1 capability.                                      Cceements regarding the technical merits of the system included the following:
                        ""the two systems are cocpared on the basis of A)                                                      isotopic capability,      3)        ope rating range, and C) timeliness of isotcpic analysis. . . . the tcss system clearly is surerior."
C Wayne Karr, Director 01 fics of state Programe U.S. Nuclear Regulatory Ccessission "Cur    staff agrees that thJ proposed equipment has a greater 4
      -                  caMbtlity than Edtson's curri t installeJ equiFunent."
Ce tell Psed, Vice-President Cec onwalth Edtsen CecMny me      proposed    systou for ,easuring radioactive affluents and Projecting offsite doses wul represent a significant advamco over present practices."
Cot an 'thcapoon. D . ' I'h il con ultant in Enervy/ Environment
                        "...ynis  represents      impressiv . techno1cqy that is more advuced than existi.ng systems.*
                                                              .7r . Magd i Ma gh eb Muclear Engineering Program                                                      ,
University of 111&nois 1
1 Such exce rpts sheuld not he taken to imply that all the twviewrs endorsed the expansion of this systes.                                      For er.asple, toth the Nuclear R*Vulat o ry    CcomLission and e m nwealth Edison Coupany orpressed the position that ex.1 sting systems wrw suf ficient.                                                                                                    l
                        *In terms of protecting the health aM safety of the sublic, Edisen's                                                          -
acnitoring equipment is sors than adegaate."
          .                                                                                      Cordell Paed I
I i                                                                                                                                                                    l
                                                                                  $76                                                      .
                                                                                                                                                                      \
                                                                                                                                                                  ..0
 
                                                                                                                                          ,      l l
l l
I    4 .*
i
    =                    *kHC staff has not considered the benefits sufficient to justify j
requi' ring such relatively expensive of fluent monitoring systems =
: c. weyne Kerr As a      result of that analysis, and the commmente received from various entities,      the Departvent ham decided to proceed with procuring and installing systems for each nuclear facility in filinois.                                                With the                ,
concurrence of covernor n orspoon,              (MS) 3 cts was introduced and is being                                            I conside red by the t3rd General Assembly. (see Attachment ).                                        Wie proposed legislation increase s the fees which provide the budgetary resources for the Nuclear safety program,            and increaras the nwber of systou status signats that are to be incorporated into the system.                                                                              l Passagt, of House sill (Hs) sose in its present condition will allow procurement of a FACDCI-type rystes each year for the next six (6) years.
The tentative schedule for installation of this equipment is as follows:
Eton ( NIS ), Creeden (ns6), Cordova ( rye 7 ), Braidwood ( rye t ), Byron
( rYs t ),  a,nd Citnten (n90). n as installatten sequence is ba. sed upon the                                                  i pc Wlation denetty wtthin the I:re rgency Protection 2.cne.                                            Obviously,                I unfore seen cirew.s t ance s ray alter this sequence.                            In anticiation of passage,      De prtre nt    staff  are      pre s ently        pr e paring the technical speci fications so that a Rsquest for Proposals can be issued early next fiscal year.
ne second runnr th rus t of this legislative proposal involves the provision of plant status information. Although Illinois has installed a dedicated        t eleccaunicat ions      itrk      with  each nuclear facility for tranytstting in t e rr.a t, t e n during esergency conditions, the timeliness of incident notificat nons bas been poor. Since July 1,1982 ' forty incidents have bee n repo rt ed . Although incident notifications are to he given within fifteen (1S) ainutes of the incident classification, such notifications have taken as long as tsve (5) hours.                        During FYO3, only S.7% wori transmitted to the state within the required time limit.                                                  An equal percentage required over 120 minutes for such notification.                                    (See Table 1).
As a result of this record,              NB 3098 conta. ins the provision that a signals Wich inttiate eme rgency s et ' o n level declarations,                                          actuate accident atttgation, and provide attigation vertitcation shall be provided in    a    manner and at a frequency specified by the Department                                            for incorporation into and augmen*,ation of the assete Effluent Monitoring sYetes.*        We eight (t) grcups of signals listed in Table 2 cosPrise the buh of this data package. specific signale may be deleted or augmented based upon plant design and ease of inecrporation.
e
                                                              $77
__      __ _. __- -.  -.                _____ _ _    __- _ _-__ -_ _ __ ~                      __
 
    \.
TAa!2 1 Incident Notification Times (FT 83)
TN f nt e rv4                              Nur.be r o f                      Percent of                                              l pqgu*rePeen                        St ati cecurre neem                                    )
i 1
ell minutes                                                      2                  5.7%                                            !
16-30 atn.                                                      6                17.1%                                              '
31-45 min.                                                        8                22.9%
{        44-6 0 min.                                                      10              28.6%
61-73 min.                                                        5                14.3%                                              1 76-90 min.                                                        2                  5.7%                                            '
eM min.                                                          2                  5.7%
l
,1                                                                                                                                            i l
l                                                                                                                                              l I
I TMt2 2 Plant status siguls to be Mded to Roc 34 actor Pow e 1. ave 1 1
Seactor Ve e ae1 Coolant Leve 1 Reactor Cooling systto Proeeute Temporatun P.adiation taveis. &                                                      -
wyd m en Cenenntretten P r im.ry Co n tAirm n t P re s s u re s . Tempe r a t ure , & P,a.d La t i o n ta v o l e status of toelation Valvees safety Amitet                                  valves statue of toervency Core Cooling tyetens statue of Vital Po ors A/C & 0/C                                                                                                    '
)        Noble cas Corwentraticn in secondaty Contairseent. Aw(111&ry Building, &
Puel MaM11ng Areg.                                                                                                            I i                                                                                                                                          .
l I                                                                                                                                              l lg                                                      ..........                                                                            I i
l
                                                                              $78 i
 
(                                                                                                                      -
WTUNE FtJJr3 As    previously                            irdicated,          the Department anticipates procuring additional                      PAczxs-type                                  systems for each reactor site in 1111nois.                                                            l Discuestona                      erith utility personnel have renaled that adequate and                                                                                            !
appropriate                      space is ranly available within the facility. Two majur problems                      appear to be mrtually esclusive.                                            W avoid plate <mt of
,            particulatee aid iodines, the sample linee need to be as shert as poesible.
In aMit ion, sample lines need to be maintained in a vara environment to prvnnt cenoensat ton,                                                          ainoe these same phencesna also affeet ut111ty i
;            e yet eus,                    epace is virtually rionesistent in close proximity te release                                                                                          :
points of effluent streams.                                                          We only open area, in Illinois plante at                                                      !
least,                    is on the tuttine deck. Wie ans, howver, is required as a lay-down are a durittg aujer repairs.                                                              As a consequence,      the utility is                                                i urde rstarsiably hesitant to allocate this are a for installation of the                                                                                                            ;
stat e 's ar> nit o ring syst em.                                                                                                                                                  l M alternative affroach is the cout:Netion of a small dedicated                                                                                              l f ac t i tty tamed Lat e ly ad j ace r t t o t he re act o r bu ild i n g . nis f acility wuld house the on-site etapit e r,                                                          the effluent monitJring eyeten, a small, e
star 2y electrical generator. A'.though this apptcach has been mentioned to the utility staff,                                      the desirability of this alternative has not been decided.                          Wie approach would cropli tate the plate out probles, but would                                                                                    I
(      e ase maint c nance o f the rys t se ard d a partas n t a 1 acce e s .                                                                                                              I i
,                                    ne s+cerd na$or area of conevntration during the Lamnediate future is                                                                                    I
;          the ders lepe nt aid re finement c f the syet es so f tvsre . Pro 7 tame need to be                                                                                                        {
I a
de vo leped eich will cc rrelat e pro 3 *et ions with data c.btained f rta the                                                                                                              I i        e nvirorme nt , whether frue the meute r-stoke s envirvrumental detectors or                                                                                                      !
cther inst rume nt at te n.                                                        M11ttenal wrk will also be performed to utilize                                                  i acre                        fully the plant status signals incorporated into the system.                                                                                            I il j
t l
]
l                                                                                                                                                                                      !
i l                                                                                                                                                                                      ,
I i
)                                                                                                                                                  -
i l
\                                                                                                                                                                                                    l l                                                                                                                                                                                  ,
l i
j                                                                                                                                                                                .
                                                                                                    .                                                                                                l
)
1 4                                                                                                                  .
1 f
)
                                                                                                      .,e                                                                                            4 I
 
e                                                                                        *.
LXCLRPT DLSC,ftIBING THL' ILLINOIS SYSTEM
    .                                                                                                    i Radioactive Casechs gffluent Henitoring Systems Illinois has a much more comprehensive and sophisticated system for                    ,
monitering the LaSalle nuclear reactor and its emissions than at Pilgrim or Yankee Rove.        The primary detector is the Radioactive Caseous Effluent Honitoring System (KACEMS) which utilises germanium detectors and genna spectroscopy to identify and quantify radioactive particulates, todine and                      k coble gases.      Isokinetic nampling probes allow continuous sampling and analysis of gaseous enissions.
Atoespheric transpert and diffusion modeling is acceeplished        ,
by integrating up t'e the rinute retecrological data into a eteruter monitoring j
system. To provide early varning of accident conditions, key reactor conditions are also integrated into the computer system.        A ring of 16 pressurised
_, ton chambers conitors radiation levels 2 miles frem the reactor. A dedicated cc puter with se;histicated nedcling'scf tware rapidly analyses this cassive data base.      The  reactor nenitoring system is hoaked up to a central Digital                !
Equipment computer in the state capital where mathematical sanipulations                          '
involving atnespheric dispersion and projected environmental ccesequences are perforced to deterrine when and what kind of energency response actions                        I ore appropriate.II        (Similar ronitoring systers hav; been installed at eajor f
chenical plants across the country. including Union Carbide in Institute.
* i W. Virginia.)                                                                                      I In case of an accident and release of radiation a' 9 rfa s s 4 t hu s e t t a roactor, DPH is responsible for prompt analysis of cen4.sion: and recoreendation                    l l
      'I"Illinois' Emperience with Remote Henitoring." er. cit y p. 90.
l i
l l
l
 
1 of protective actions including the timing and extent of any evacuations.
Present ' utility ef fluent detectors asonitor only gross radioactivity--not the radioactivity and type of specific particulates, noble gases and radiciodines simultaneously which are all hazardous to human beings.12 The NRC acknowledges that there are "very large uncertainties" in the release rates for specific radionuclide species during an accident.13 The characteristics of accident releases are not only unpredictable, but they also change duries the course of an accident l4 (e.g.. the radiciodines are generally released earlier i
than less volatile radionuclides).
The rate of release and types of radioacs          e emissions are essential information for determinir.; what protective actions are necessary and appropriate.
The failure to delineate the isotopic nature of the release can lead to "an error f actor of two or greater in of f-site protective action decision-making."15 Here accurate menitoring systems enable vsore informed emergency response decisten mavir.g vbich could save lives and unnecessary costly evacuatter.s.
This new system also provides DPH ic=iediate infor=ation on reactor conditions and emissions without having to wait for BEco's notification.            NRC and Comonwealth Edison officials concede the RACEMS system is superior to the present            utility system but do not think the price tag ($1.3 to $2.2 elllion per reactor)16 12"Isotopic Effluent Honitoring for Nuclear power Plants:            A t.omparative Analysis between the Radioactive Effluent Honitoring Systems of Commonwealth Edison and the Illinois Department of Huclear Safety," Cary Wright and James Blackburn, Illinois Dept. of Nuclear Sa fety,1984, p. 91.                  -
{
13"Isotopic Effluent Monitoring," on, eft., p. 90.                                                l I'"Isotopic Effluent Honitoring,"_op.      eft., pp. 75, 76.
15"Isotepte Effluent Honitoring," on. cit.,          p. 91.
16"Isotopic Effluent Henitoring," _nt. cit.,          p. 92.
\                                                                                                          1
 
y                                                                                      _ _ _ - - _ , ,
                                                                                                              ~.
As worth the extra protection.17 The Illinois legislature, however, decided
              $1.20 per ratepayer 18 was not an excessive assessment for the additional protection afforded and ordered RACEMS for all 8 lilinois reactors.            Furthermore, Illinois' pressurized ion chamber field monitors are more qualititively and quantitatively sensitive than our TLD's.19 Feroknendatiensi A primary purpose of state and federal legislation governing nuclear reactors is the protectlon of the public health and safety from the associated dangers. Although the likelihood of a major release of radiation is small, the disastrous consequences justify existin, monitoring and emergency planning requirements.20 Tith increasing evidence of the hs:stds of low level radiation, it is alsv important to monitor closely the routine emissions from operating reactors.
Numerous studies have documented the inadequacy of existing emergency response plans, and we have reperted cut S. 137 to improve emergenty preparedness.
I In order for the DPH to recen=end the appr:priate protective action for                                j the public in res;ense to a radiation relesse (either indoor sheltering or evacuation of specific areas) prompt and precise information on the size, type and timing of the release is essential.          Illinois has decided to install 1
the RACEMS syste      in all of its reactors, because of the ic=ediate, expanded 1
i 17"!!!inois Experience with Remote Monitoring," op. cit., pp. 576 577.                                  l 18"Isotopic Ef fluent He,itoring," or. c i t . , p. 92.
l 19"Isotopic Effluent Honitoring " co. cit., p. 45.
20 A Congressional Analysis based upon NRC data h.is concluded that a .najor                          .
meltdevn at Pilgrim could kill 3,000 people, injure 30,000, cause an additional 23,000 f atal cancers and cause ptepe rty damages of $80 billion.
                "Calculation of Reactor Accident. Consequences For U.S. Nuclear Power                              i Plants Conditional on an $$71 Sclease," U.S. Ilouse of Representatives                              l Cenmit tee on Interior and Insula r Af f airs, Subcommittee on Oversight and Investigations, 198?, p. 9.                                                                      ,
1 1
                                                                                        -g__
 
j(L      W1 '[* -
INTERNAL MEMORANDUM l
TO:          Robert J. Boulay, Director i
FROM:        Edward S. Frttto    .h ~*
DATE:        July 31, 1986                                                I
 
==SUBJECT:==
Estimated Geographic and Population Character *=t*cs          l of Expanded E=ergency Planning Zones As per your request, I have prepared the Co_11owing preliminary Onalysis regarding the subject matter:            --
ESTIMATED GEOGRAPHIC AND POPULATION CHARACTERISTICS 1
OF EXPANDED EMER3ENCY PLANh1NG ZONES EPZ RADIUS          NUMBER OF
      'LANT            (=iles)
COMMUNITIES)      POPULATIONp Pilerim              10                  5              65,000          I 20                  22            231,000 40                  94          2,102,000 l
Seabrook              10                  6              48,000            1 20                  19            184,000      ,
40                71            1,560,000 Vermont Yankee        10                  6 25,000 20                  22              71,000,        .
40                  89              553,000 e e 4
 
m.
EPZ RADIUS        NUMBER OF P' * %T            (miles)          COMMUNITIES t    POPULATION 2 a Yankee      10                  11              37,000 20                  29              93,000 40                  91            454,000 NOTES:
: 1. Censiderable "professional judgement" was used to calculate those numbers. ' Actual determination of EPZ com= unities would
* Involve factors that were not considered in this analysis. In the case of Vermont and Rowe Yankee, especially, there is a Iorge number of communities that lie within both EPZ's due to thG close proximity of the two plants. (See attached map).
For the purposes of this analysis, however, each plants' EPZ was considered separate ar.d net affectLng one another.        Due to these and other* factors the nu:ber of EPZ co=munities are sub-joct to change and considered preliminary estimates only.
: 2. These figures are based on the 1980 Census of Population, and
      *ounded to the nearest thousand. For the reasons stated in
'      1) above, these numbers are also subject to change and con-
      .dered prell=inary estica tes only.
=c:    John Lovering, Deputy Director                            '
Buzz Hausner Attachment                                                                                !
(
l i
I.
 
                                                                                                                                                                                    -                                  ~
                                                                                                                                                                                                ,                                                              ,                                  =
                    .,                                                                                                                                                                                          ,.s . . . ..
m ,-                                                            .
T                                                                                                                                                                                                                                                                            , r' J '. i                                l ', {
                                                      .                          R.      .
W                                          r I l.')                          T                          -
                                                                                                                                                                                                                                    ...D t'.el M        l..
o.lr            'Y hs,l'-'.5-                                    -                                                                        /. .i. :
                                                                                                                                                                                                                      .... v. 7
                                                                                                                                                                                                                                                                                .i                        .
                                                                                                                                                                            .. q' l i.'. ......l.Y ... ' .:. 2,:
lN.) Q.IE r[l.)G
                                                                .                                                                            v?[.t              'CI rl                                      ik i.s i
                                                            ;. 1...%:-4 .
P ..j. Q .>                              .
s y.i.
                                                                                                                                                                                                                    ,IiD}.I      fijik            mi                        @p. l,;                        ,
                !!:.GO';/,ti :.!.Fl
                    .                        r ,
                                                                                                      .. .l.$
                                                                                                                                                                                      . .o                      ,
M.                                                  i l
l
                .i .Gl.~ .r '.....
i
                                                                                . '. . i ' ' >                                                  i' . .l,'.=.    .
                                                                                                                                                                            !.                e>,l ..U'    . .I '' N                                            .
N,;i                                    ,t..      "i5l      ]-            I'      [fi.        y      .        .
                                                                                                                        ,j.lI.ll    I,I.                      ;.d,M,..                          l zd i" II                              )Ic..^';[.a I > x..S.$..!.                                        i tir p a ...                                            5,,y...,..g,J .w. .
                                                                                                        .g,l.I                  .,..                . p f iI , g l l
                                                                                                                                                            -                    i
                                                                                                                                                                                                      .                              2.-
:              i-                                  .
e .l.L-.:t,l.                                                      :
1
                                                                                                . i, [ ,l g " ;.l                                                          ,
                                                                                                                                                            ', ..g                                                      . . _ . . - . . _ . .
                                                                                                                                                                                                                                                                            ,:. l                      ;
                                                                                                .,.,l,.,... I,3.1.,.i._.._...._.
qI. .... . .. .x..                                  .
i ;g::. ..-
                                                                                                                                                                                                    ;... l                            :
                                                                                                                                    .,.f,:                                        }. . * *... .i (:,. t I                                                                                              .,                                                                  ,..'..'...,"t.
4..l r ,- m                                              s. *6,..*. .. ., .* i                                  .
                                                                                                                                                                  ,s              ,l s
I'
                                                                      . 4,pl                                                                                      .                                          .l.,l,        .                                                                      ,'
                                                                                                                                                                            .l .
                                                                                                                      .                :,..                          .          ...                        ,........                                                                            r
[. l.Jy                                                                  ..,. . . . . . . . . . -. . l . .g.
                                                  .--                                                                                                                                                l r l.-i
                                                                          .. . .,;:.,. .'. I l :.,,j.                                                                            ,. ,, . ::l '.,.. -l,.l.od A.. q.
j.;                                                                                        .                .. i                                                                            ,.
                                        .e'                                      ..g                                                                  ..*                                      "l                      :
l l
l.a.. i 1                    t            4 N,I : .%                                                                                                ..
                                                                                                                                                                                                ...c...l...:
m                      ,'        .
l
                                                ....                                                                                  7 .i      ..
                                                                                                                                                                .'. . .(/l.....
i              i n..e  :.
e ;.                                                  O i
                                                            .... J- I ;..sN.                                                                                              . .,."                                                                      >.
                                                                                                                                                                                                                                  -                                                                    l
                          /
v            a                                  ,
                                                                                                                                                  .<                                                                                                                s J, ".. (,,. .i                                      .;- 1l*.,                ..    "b.\.    . : . :.). . . . .'.i.i.
                                                                                                                                                          . l;.
                                                                                                                                                                    -                .l I,-"i-l-i:
i . .: %. . . . . . ,l ..                            z w
                                                                                                                                                                                                                                                                    =
                                                                                                                                                                                                                                                                    ~                      ,
l
: p. t ij
                                                                                                      ,:: , i e -                                                      -
ij i                                                            e            3 E'. J f .,                                                                                                                    ;.:                Ml. 7gd'I.'I                                              -                            j            "
j ar i        r . ..l
                                                                          .        4
                                                                                                    .!.l. 9.
                                                                                                            .t........
1
                                                                                                              ,      u,, . . e ,
                                                                                                                                              , . , -,~,
                                                                                                                                                                      .i ,. 7 3 . %a. ,. , g y      ....                    .
s m
m e
5 a
t
:,                                                                            l..                                  : .....                                    w            a                      ,
y
                                                                                                                                                                              .! l . . "' $. ,ll ,J
[;f.I.,^l"..".p, e,p; . i.,,'
J                        4l;
                                                                                                  !,, 4...! ,..Il .!...
5      a      -l                                  i,
                >l-                                  I n ./.....:                                                                                                                                                                                      5 l                .
: lv.,
                                                                                                              .8
                                                                                                                            . :A.
* I :! >"
I::l4.i.        :
a c            8
                                                                                                                                                                                                      . . . ;. .\. ,\ ;                        8                  e ..
: g. !,:.                                                                              !;;.t..;..:I..\.,.....
l;                    ~
                                                                      "''                                              s                                                                        I                            :                y                    a                                                  -
            ~v ,                                                                          .4 ~l i ;3.ii. .. . a . ;!.
i                                                                                              :" - : i q!l:....... .'                      :              e                    a                    "
f
                                                                                                                                                                    !l Ei
: z. .., l = ;: , l '.                                                            c. :. . -
l                                                                                                                                                                    s .. . .              [
                                            ..            ~...1
* a l :, , . y J p ,i.f+..                                                              .
l
                                                                                                                                                                                                                .. . . . , i a . l i..l..                                        ;:: l,1 l4'*                        ::, I .3n h                                                                                                                                                                                                                  -
                                                                                                                          --                  s.l-        . - t
                                                                                                                                                                                          .3-  . . ._.      : " .:- ,                                      t
      *e
                                                                                                                                                                                                            - * ' - - - * " - - - - - ~ " ' - - - - * - ' " - - ~ ' " " ' ''                              ~ ~ ~
                                                                                                                                                                                                                                                                                                ~
        , _ _ _ _ _ _ _ _ _ _ _ _ - ,                                              . . . - - - - - - - - _ - - . - - - - - - - = - - - . - -                              -
 
M ERGENC PREPAREDNESS AND THE LICENSIN '
liOCES$ F0'R CONfsRClAL NUCLEAR 10WER              '
                                                      &. .. . '.R.5. A'C.T.O. R5C.9.,.4'W..
                                                      .. =
                                                                                                                                                                                                                                                    . .                                                g.
f.'. . G. A E
                                                            ..            .                    ;r s.*g.                                                      -
c.
                                                                            ' 'c .
O ERSlGHT H. EiRIN. G. '          ,..
                    '      ,                                              ...G-
                                                                                                                            .y
                                                                                                                                                                                                                                ,arrons ins *.
c:.,. i.
                                                                        ,g.                                        .. ,                i..I. .[, 'SUB003DIITTEE 0N
                                                                                                                                                                                                                                                                                                                          ,,                          N J ' :2 y ,'' ,, ' '
                                                                                        ~
                                                                                                        . .:                        0.VERSIG.                    .,.                                        HT A. ,ND INVEST.IGATIOY                    -                                                                                                                                      J , ,. . ..
a                      -
                                                                                                                                                                                                                                                                                                                                        ~.
                                                                                                                                                                          .        1
                                                                                                                                                                                                                                            . or rue                                                          -
                                                                                                                                                                  / .dO., MIITTEE ON d                                ..                                                                .
                                                                                    ... INTERIOR MTD INSULAR AFFAIRS .. '                                                          '
IIOUSE.0F REPRESETATIVES .
                                                                                        .' .- ' . . .c                                          . NINETY. EIGHTHr-CONGRESS
                                                                                                                                                                                                                                                -                                                                                                                                              .                /                                    .
                                                                                                                                                                                                  ,                                                                                                ,,                                                                                              y                                                  -
                                                                                                                                                                                  ~.                                                                                                                                        .                                                                                            ,
* FIRST                                SESSION
                                .                                                .~                                                                      -                    .
                                                                                                                                                                                                                                                                                        .                                  s                                                      .
c
                                                                                                  .g ON I.:                                          ,
w
                                                                                                                                                                                                                                                                                                                                                                                          .c.
THE SHOREHAM NU. CLEAR POWE.RPLA.
                                                                                                                                                                                                                                                                                                                                                                                            ." NT.                .
                                                                                                                                                                                                                                                                                                                      .                                                  ,                                                                                  a              *
* HEARING HELD IN WASHINGTON, DC                                                                                                                                                                                -            -
                                                                          '. .''                                                                    d
                                    ...l-
                                                                                                                                                                                                                                                                                                      .f ' \ .
APRIL 18,1953
                                                                                                        ^ :.. . .
:., - .. y r...
                                                                                                  . . . . . , . . . . ..~.S.er.ial N. o..;.                                                                                                                                                  . e .. S.:, .52
                                                          ..                                                                                                                                                                                                                9
                                                                                                                                                                                                                                                                                                                                                                                                        . /.
:-                                    i.
3.'                                                      ..
2
                                                                                                                                                                                                                                                                    .  .                                  . . ...- n.
                                                                                                                                                                                                                        , P. ART I                                                                                                                                                                '' <
                                                                                                                                                                                                                                                                                                                                  ~                                  '                                                            .                            .
f                                                      .                                                                                    -                                                .
                                                                                                                                                                                                                                                    ..r                                    .
                                                                                                                                                                                                                                                                                                                                                                  ,. (.
                                                                                    <                                        .' n                    .
g,Pr.inted for.                                                                                                                          ..
                                                  .,                                          .-                                                              nmittee                                      on Inten,the use.cf the'                                                                                                                                                          '.
: t.  , , . - s, .)g.
                                                                            \ .. * -
                                                                                                                                              .,Cor.
: r. : . :. .. ., ,* s <; . ,                                          .
or and ins 01ar Affairs '                                                .
                                                                                                                                                                                                                                                                                                                                                                                                                                  '/i  -
                                                                                                                                          .y '.y
                                                                                                                                                                                                                                                                                  . . . . ., = . . ~,                          ,                                                                                                ..
s r..              .
1 g
                                                      * , ., ; s,,, . ;. .q. .                                                  ,                      .                  .n                                    .
                                                                                                                                                                          *              *s                                                                                                                                                                                                              .
                                                                                                                                                                                                                                                                                                                                                                                                    , . ~ * .- r
                                                                                                                                                                                              ~ '
                                                                                                        'c[. ', . .,'.'s..
                                                  . r . ? , , '., ..'                                          .*. ,',?
                                                                                                                                                                  .,',,i,.                                            .. ,
                                                                                                                                                                                                                                                              , 'i
                                                                                                                                                                                                                                                                                    , r.                      :... . ,.                                      t r, '. / .' *; ' .                                  *:. , -
                                                                                                                                                                          .t ., , . .
f.. ..6.).
                                                                                                        ,,R                                                                                                                                                                                                                                                                                                                                                          .. 4
                    ,.                      . .t.. ,...;s.              ..' *..T .,,.;                          . ,, .f... . .un-
                                                                                                                                                          .. .. %,    s ... :.                                :      .        ,          ..        ..      '.            ..,.;..:          .. ....            .
1; :                          :                      .  .-                        .-
                                                                                                                                                                                                                                                                                        . s.      . i.    .      ..      .
                                                                                                                                                                                                                                                                                                                                          ~
t    .        ..t      .    ;    '.      '  .      .      y        .  .      s,          .
                                              */.jl/.J*h
                                                                              ,                    ,p        .          , . '' . p */ /, ,. g .                                      I        * *
                                                                                                                                                                                                                                                                        ,i ':'                                            . ,
                                                                                                                                                                                                                                                                                                                                                                        ' .,/~.*'.*;*''..,*,.
S4              ,'
                          .                  .*,,-                        l.,.,                            <
0 , ., -                                                                                                                            .',            ..,        .        .*                                                                                        *
                                                                                                                    ''.'.,3. .:.. l, . ;.. ;.,' t. . , .\ , ;s. ' . .o ... ..,
                                                                                                                                                                        . .. , \ g
                                                                                                            ,.                                                                                                  . i. ,                                                                                                                                                                                                                ,
1.
                                                                                                                                                                                                                                                                                                                                          ...                l                        \                                              * *' '
                                                                                                                                                                                                                ... .g . . . .3. .. . . . . .
                                                                                                                                                                                                                                                                                                          .      ,      '  .    .      .        .    '  .    :.:        ::    '.    .,.        .      \                            '
                                      ... . ;. . .. 'c. G.                                              c.                g
                                        .g . . . . . . .                                                                                                                        ..
: f.                                                                                  .
4 v            .
                                                                                                                          . ,'.,    .. .. .... .. , r *, ~,. . ,.k                                  .. . ,. v . y,.                                      . o :*          ,. v.:,-.
                      .                                                                                                  .                                                                                                                                                                                            .      f.,                    \
* g:      p    ,.,.                .              ..
                                                                ....:                        e.                                                                                                .
                                                                                                                                                                                                          .8              :..                                                                                    .    . r      .:4.                n.:.              .    .    *
                                                                                                                                                                                                                                                                                                                                                                                                .    {                                                                        ,
                                                                                                                                                                                                                                                    . m e ... . .                                                                                                          c< m. :,> .:
                                                                                                          .                                        .                                                                                                                                                                                                                                                                                            .                  ~,      ..
                                                                                                                              , .,.'*, f ',' ' [ l
                                                                  .' . ' ' ~.#.,                                                                                                                                                                                                                                                                            .
                              ,      ' t *j                                                                                                                                                                          '
                                                                                                                                                                                                                                                                                                                                                          -, k 4., f t h. . .. ., '., .' ,.' ',, ..', * , /
                                        .. . . . . . . : ' ,.,:.                                                                . ,; .' * :.u.,.                                                                          ,. .% :l:%. . [%. [.. . p ,, .,l) j ,, , ll,.
          ,                      .;i                        :~; .                                                                                                                                                                                                                                                                    ,
                                                                                                                                                                                                    ... . . :. ...                                                                                                              :.. .. s...r .z. .Q, g. : :;.                                                                                            .[,
l
  %. -.ph"                                                                                                                                  ,                      pe-g w i                          Fk        '""                        * - - - - -                                                                                            _,,,ww-r-- -
                                                                                                                                                                                                                                                                                                                                                                  - - ' - " - "                  ~                                                                                    _
 
(                                                                                                                                                                                t b
STATEMENT OF SUFFOLK COUNTY                                                                                                  t EXECUTIVE PETER F. COMALAN                                                                                                  &
BEFORE THE SUBCOMMITTEE ON                                                                                                  L OVERSIGHT AND INVESTIGATIONS Or                                                                                                  9[
I                                        THE INTERIOR AND INSULAR AFTAIRS COMMITTEE,                                                                                            h U.S. BOUSE              OF REPRESENTATIVES                                                                                      3 I
REGARDING                                                                                              h OFFSITE EMERGENCY PREPAREDNESS FOR THE SHOREHAM NUCLEAR POWER STATION                                                                                                    Q
                    !.                Preface Mr. Chairman and Subcommittee Members, I wish to extend                                                                                        '
you a warm welcome to Long Island on behalf of the 1.3 million                                                                                                    /4 citizens of'Suffelk' County when I have beten elected to serve as County Executive.                                                                                                      ,
f As you are aware, a centroversy is raging on Long Island concerning the feasibility of adequate offsite emergency                                                                                                            j preparedness for the shoreham Nuclear Power Station, which the                                                                                                      ,l Long Island Lighting Cempany (LILCO) is constructing within i
Suffolk County.                    The focus of the debate is the Suffolk County                                                                                    )
(
Legislature's determination,)/ in a 15-1 vote which I                                                                                                              j cm;hatically su;;crted, that crer;ency preparedness to prctect                                                                                                    f a
the public welfare io not possible for Long Island and that,                                                                                                    j therefore, the County will not adopt or implement any radiological emergency response plan (RERP).
l F
jf                      Pesolution No. 111-1983 (Exhibit 1) adopted on Feburary 17, 1983,                                                                                                                                i I
i E
e
:                            1 l
l>
 
168                                          '
A. The Emerceney Plannino tone (EP2)                                                  .
The EP2 developed by the County's experts relies largely upon the conseque ce analysis performed by Dr. f'inlayson, the health effects expertise of Dr. Radford, and the need to accom '
modate the evacuation shadow phenomenon studied by Drs. Johnson, zeigler and Cole (see below). The EP2 consists of an area ap-proximately 20 miles in radius from the Shoreham plant, divided into 7 sectors, see Herr, Discussion overview (Exhibit 7) at'4.
The first sector is the so-called "inner sector" which is an area approximately five to seven miles in radius from the                                                        f Shoreham plant. The remaining six sectors are approximately 3C                                                  '
j degree segments that radiate fre.* the outer boundary of the                                                          s inner secter to the outer beundary of the EP2 With res ect te radiatien doses and the health effects of                                    I such doses, the characteristics of the EP2 were develeped according to the following criteria.                                          It was the overall objective of the planning ef fert to limit doses to the popula-                                                g      l tien as much as pessible. Fer very serious accidents, the first priority was to prevent the public free receiving life-                                                      q threatening deses.                  In the case of less severe accidents, the goal was to limit doses belew those that would cause early injuries (vomiting, fatigue, etc.). REPP, Vol. II, Document 2 (Finlayson and Padferd, Basis For Selection of Emergency Plan-                                                l ning Zones for the Shoreham Nuclear Power Plant)fhereinafter                                                I Finlayson and Radford) at 47; Tr. 1131, 1185.
* 0 3
(
1
                                                                                                                      ,,-,,n.,n
 
              --            .                                                      ~ ' ' - - ' - " ' '                ___
                                                                                                                            '                                (
[                  The 20-m11o autor limit of the EP2 secks to cacot both of J          these criteria. Two hundred rems to the whole body is the level
                '        at which early deaths (those occurriag within several weeks of
          ,                                                                                                                                                  l exposure) occur. As the EP2 is presently structured, during se-l vere accidents the chance of receiving such a potentially fatal i
dose of radiation outside of the CP2 (i.e. bayend 20 miles) is l
very small. 2d. at 48: Tr. 1132. Thirty rems to the whole body
                      - represents the point at which detectable physical damage can occur. Tr., Jan. 27, 1983, Attachment A at 4.1/ In the case of p
a less severe cora melt accident, there is no more than a i percent chance of receiving more than 30 rems outside of the i
            ;            EP2. Finlayson and Radford at 48 Tr.1131 'L5us , the 20 mile i
EP2  is required to provide protective actions for those actually in danger.of sufferin; aarly injuries or fatalities in.the event of an accident at Sherehan.
that I                      The existence of the inner mone reflects the f a'.t
    '                      those clor,est to the plant are in the greatest danger. The time i
                    >      allowed for people to take protective action within abis sene will be relatively trief tecause the wind (which wculo carry ra-                                                                .
dioactive particles during a severe accident) often blews at a                                                                  .
I 2/              In addition to oral testirony, the !.egislature received j
written statements f rem most of the witnesses who appeared before it. In rest cases, those statements were included in the transcripts of the hearing as attachrents. State-l                          ments bound into the transcripts will be cited by I
transcript date and alphabetical designation (Attachrent A, Attachrent B, etc.).
4 l
1 l                                                                                                                                              1 i
I I,
1 1
                                ------- - - - - - - - - ,                                              '''*W"''^m~"-w        -,,--,c_ , _ _ _ , ,  __
 
1        '.                                                                                                1
                                                                                                        't j'
      #            speed of ten ellos per hour or more in the shorehem vicinity and shifts direction frequently. Thus, if ovacuation was deemed l
      '          necessary, the entire inner zone would always be evacuated to                          '
1 ensure that wind shifts would not catch part of the population within the inner zone unprepared. Id. at 50.
The six sectors between the inner sector and the outer boundary of the EP2 provide flexibility in the emergency re-l sponse.
Since a plume of fission products' released from the Shoreham plant would follow the direction of the wind, protec-tive actions would be recommended for the sector along which the wind was traveling, as well as both adjacent sectors. Jd. at
: 50. The other sectors, whose population would be in no im,sediate danger, would not be ordered to take protective actions such as evacuation or sheltering (but note the problems of the evacuatien shadow phenemenon described below).
It is important to note, however, that the development of the EP2 and protective actions within the EP2 do not guarantee I
freedem from risk. Tr. 1135                  Dr. Finlayson's consequence analysis determined that esen where protective actions are taken, the core pretable of ths severe cere melt ace.idents ceuld cause a maximum of $77 early fatalities within the EP2 with a mean .turber of 15.2.
The same accident could cause a maximum of 1,270 early injuries within the EP2 with a mean of 18.                  Failure to take protective actions would increase these numbers substan-tially.            Finlaysen e.d Padford at 35.8/
i
                                                                                                          \
8/
In centrast, ecr;are the results of a study conducted by Sandia National Laboratories (Technical Guidance for (Teotnote cont'd next page) 1 e
m=."  "                    _      _      _      ---    -
 
avt                                                                                  ,
h Cancer fatalities would also occur within tho EP2, ranging                                                                                            I
    /                      from a few to over 1,700, depending upon delay time (time between public notice of accident and taking of p'rotective action) and evacuation speed.                                            Id. at Table 8. It is also in-                                                    :
teresting to note that most fatal cancers, up to 7,000, will                                                                                                ;
occur outside the EP2, whether protective actions are taken or                                                                                                  l not,    fd.
B. _The inadecuaev of a 10-Mile EP2.
e                LILCO, in its testimony before the Legislature on January                                                                                                !
i      1 l          18, 1983, was critical of the dimensions of the County's EP2,                                                                                            I urging that the County adopt an EP2 of only 10 miles in radius,                                                                                          ,
such as presented in LILCO's unauthorized submittals to the DPC.                                                                                                1 i
h        l LILCO prepared statement at 33-41:1/ Tr. 175-177.                                            However,                                                            j
[            LILCO's criticism appears to be based in large part on a lack of                                                                                        <
l
{
ur.derstanbir.g cf the risk criteria by which the County derived                                                                                        '
the EP2.                                                                                                                                                ,
i i
I s-.      s t                                                                                                                                                                    .
l            (Teotnote cent'd frem previews page)                                                                                                                    .
            '                                                                                                                                                                    t t                    Siting Criteria teveleprent, NUREG/CR-2239, SANc81-1549)                                                                                        i
* which concluded that a 'wcrst case' accident at Shoreham                                                                                                  l weuld result in 40,000 early deaths, 75,000 early injuries
            ,                    and 35,000 cancer fatalities.
(
9/    As part of its presentation to the Legislature, LILCO sub-i mitted an 85-page document explaining its position on emergency planning into the record.                                          That document, though not included in a transcript, becare part of the hearing record. It will be cited as *LILCo's prepared statement.'
i 0
i                                                                                                      '
4 1
0 K
4 h
e
'e
 
      -      -        -~        ~    ~ ~  ~      _ _ _ _ _      _                  - - -
I 172                                        .
i i
In criticizing the 20-mile zone, LILCO stated that:
The County consultants ussd 200 rems as the dose above which early deaths from radia-                                              l tion can occur.      They then chose a it con-J 1
ditional probability as their criterion and                                          . '
i found that, according to the plot, the chance of receiving 200 rems would be only 1 An 100, even assuming a core-relt                                                      ,
accident occurs. _This analysis produced                                't I
_the 5-7 mile ' inner rino."                                                  i This "inner rino," it is important to
    -                reecentre, corresponds in concept to the Federal coverneent's 10-mtle EP2            The 1
reason the former is 5-7 mt tes in radius                                      '
while the latter is 10 miles is that the                                                    i calculated results of accidents at the Shoreham plant are less severe than the                                      .            1 results calculated in NUREG-0396. In other                                    '
l werds, had the County planners used the                                                      i same ris< criterton that the Federal                                          t              )
government used, but with the Shorenem-seeet!1e draft PRA, they would have cew? 'n witn an eser;eney planntnc zone of suestan-
* _t_ t a ' l v less_inan tne 10-mile EF: reeutred by the Pederal cegetnrent. IImpnasts accec.)                                                                                .      ;
LILCO prepared statemert at 39.            As is clear f ren. this explana-
* tien of the County's EPI criteria, LILCO has misunderstood the use of the 200 ren dose level. Contrary to LILCO's characte.
1:atien, the inner secter was not based on any dose level at all, but rather was an atte ;t to identify an area where rapid                        '
l protective respenses were rest essential, due to its proximity to the plant.
Actually, the 200 ren dose level _for the most                                    l severe cere celt accidents was one of the criteria for establishing the eutar edce of the EP2, not the.5-7 mile inner sector.
LILCO's misunderstanding of these essential factotw                      l l
6
 
4 173                                                        :
                                                                                                                      \
i
  <                                                                                                          '        l i
1ed it to conclude erroneously that the 5-7 mile zone
[          "corresponds in concept
* to a 10-mile EP2, which it clearly y
does not.
More importantly, however, LILCo's above testimony asserts that  if the County's planners had used federal risk criteria,                                    i the EP2 they would have calculated would be less than 10 miles.
J
                                                                                                              $      l Again, LILCO's assertion is inaccurate. Tederal risk criteria                                      I      1 as set    forth,in NUREG 0654 provide that projected doses beyond (PAG)          ,
the EP2 should be belcw the EPA's Protective Action Guide The upper bound of the PAC levels. Se. NUREG 0654 at 12.
levels is 5 rees to the whole body. If the County pisnners had                                      l the EPZ at a point rigidly adhered to those guidelines and set where there was less than a 1 percent chance of exceeding 5 EP2 would have been approxiestely 60 miles in radius, rees, the not less than 10 miles. See Finlayson and Radford, Tigure 12.10/
  --              It is evident      frem the County's analyses that nothine less j
than a    20 ette t;2 will effer ade:vate protectien to the l
LILCo also      testified              the County's experts failed to 10/
              ~~
account    for the  1 ewerthat potential dose levels caused by the "scrubbing action
* of Shorehan's suppression pool (a t
feature of boiling water resators) and by LILCO                  the interaction prepared of fission products with other However,            eierents. as Dr. Tinlayson testirony at 42-52: Tr. 253.
testified, beth f actors were secounted for in the Cour.ty's analyses. Tr. 1144.        Indeed, it should be borne in mind l
that the    fission product release values used by the Coun-g            ty's experts are precisely those thit were derived by LILCo's own consultant, science Applications, Inc.                                ,
t
                                                                                                                  . e 4
 
174                  .
public.
The consequences of an EP2 less than 20 miles are too severe to justify a smaller EP2 such as LILCO suggests. As Dr.
Finlayson testified, if the County were to adopt a 10 mile EP2, in a severe accident there would be a 35 percent chance of receiving 200 rems (enough to cause early fatalities) and a 60 percent chance of receiving 30 rems outside the EP2. Tr. 1142 see also Finlayson and Radford, Figure 11.                        Even in a less se-vere core melt accident, a 10 mile EP2 would provide a 50 percent chance of receiving 10 rems and a 20 percent chance of receiving 30 rems.                    See Finlayson and Radford, Figure 12.
Clearly, th'ese risks are unacceptable. Therefore, a 10-mile EP2, and indeed anything less than a 20-mile EP2                                          would be ill-advised.
If any adjustments should be cade                  to the EP2, they should be directed outward.                      Tr. 15; see also Tr. 1459. Such an outward adjustment, however, would significantly increase the complexity and costs of planning for a radiological energency.
i As Mr. Herr testified:
Stated ancther way, the EPZ is sized so that in the event of a cere-melt accident,                                  .
early it,          fatalities will not occur outside of exposure high enough to make detectable blood changes has only a one percent chance of happening inside of it, and the EPA pro-tective of  beingaction            threshold has a 50-50 chance exceeded.
I l
No safety  smaller outside  EP2ofwould  allow that level of the zone. _A 10-mile EP2,
_for exar-le, wculd place a lar;e nunter cf persens at substantial risk outside of tne
                                                    .t F : .                                                                    ~
I
. . , , - . - - - - . . _ ,,,,.,y,._,-        -                ___ _,__ ,,-_                    _    _,-.r  - - - _ _ _ . _ - _      y m w m_ - ,,_    _ , _
 
T 3                                            . . . ,
O A,1crgor EP2 would be foosiblo but at tho price of added complexity and cost to a va-riety of local agencies such as the schools.    [ Emphasis added]
(
* Tr. 15.
C. seelolecical and Psycholecical ,3ssues In Emercency Planntne
: 1. Overreaction and the Evacuation shadow Phenomenon one of the key issues confronting the County's planners, which generated a significant amount of discussion during the                              .
Legislative hearings, was the question of how people will be-have during a radiological emergency. It was an issuu which placed the witnesses proffered by LILCo in clear disagreement                                  l l
with the County's experts.
LiLCO asserted in both its written submission to the Leg-islature and during the actual testimony of its experts that human behavior does not vary between dif f erent types of disas-ters. Based on research of disasters such as fleeds, hurri-                                  !
canes and chemical spills, LILCo's experts testified that peo-pie experiencing a radiological emergency will tend to react calmly and fellow authoritative orders.      LILCO prepared state-ment at 63-65. 84: Tr. 345-366. Therefore, they conclude, a radiological emergency response plan naed not take into account i    any potential overreaction or disobedience to instructions.
Tr. 346-347.
e I                                                                                                ,
I                                                                                .
l                                                                                                                                              .  .
l 1
I e
1
 
Tie 77"0FY OF FICP/El S. PUVAVT?                                                      t Gryrprep C0f'"Cf1lEALTP OF P/FFANilSFTTF PFFCPE THE JOTFT 00f'"TTTEE Of' Ef'FPGY CF TPF MA'SACPUFETTS LF07FL ATUPE PECEPDFD 17. 1960 t
PEP 0(SENTATIVE /LEXAPDE*, FEMATOP COSTELLO. .LHD MEMBEPS OF THE COMPITTEE. THANK YOU FOP THE OPPOPTUNITY TO PAPTICIPATE IN TODAY'S HE' JPG ON THE D7LGPIP PUCLEAP POWEP STATION.
i I WAVE E'.'70YED WOPKING WITW YOU ON TWE WIDE PANGE OF Et!!PGY
    !!!UES THAT FACES "ASSACHUSETTS.        PILGPIP APD THE FUTUPE OF NUCLEA*                                    ;
ENEPGY APE  NEEDLESS TO SAY. A CPITIC ALLY IMPORTANT ELEMENT IN THE DEPATE. D!$CUSSICH APD PLA'NIMG THAT PUST TAKE PLACE MOW IT WE ACE TO ENSU8E THAT ffASS ACHUSETTS AND PEW ENGL AND HAVE AN ENEPGY FUTURE TH AT PUILDS ECO'!OWIC GPOWTH APD VIT A LITY WHIL E PPOTECTING Ol'8 HEALTH. SAFETY AND ENVIRONMENTAL QUALITY.
THE PRC'S DISCLOSuot E APLIEP THIS YE AD THAT THE DILGPIM PLA"?
HAD ONE OF THE WOPST OPEPATING DECODDS OF ALL COMMEPCIAL REACTORS IN THE COUNTRY WAS STAPTLIFG PEWS. PADTICULAPLY IN LIGHT OF THE TPAGFBY AT CHEPNOBYL.
l l
_ , _ _ _ ,, , , _ - , - - . - - - - - - - ~ ~
 
l l
l                                              .s.
WHEN THE P'PC AND PnSTon rDr$0 3 S U B S E OU E *.''t Y ave 00"Cro Tur l    T E"POD A DY SHUT 004"' 0F THF P'LGDIF PLAHT. T SAI? THAT THE PILGPIP            l l    FACILITY SHOULD NOT GO PAcr ON LINE UNLESS ALL PEACTOP SAFETY .tSSUES l
AND P AM AGEME *'T DEFICIE NEIE S t'f or FUL L Y PESOLVED APD UP'TIL ) E0VATE T
EMEPGENCY PESPONSE PL ANS WEDE IN PL ACE.            N SHODT. PUBLIC HEALTH AND SAFETY FUST BE THE PRIF0tPAL CPITEDIA THAT GOVIPN DECISIONS PEGARDING THE PESTAPTING OF THE PILGPIM FL ANT.            MY POSITION HAS NOT CHA NGED AND HIL L NOT CH At'GE l'FTIL A L L THPE E A PE A S A CE ADDPESSEO FULLY.
l UNFORTUNATELY. Tut r0MPONWEALTH HAS NO            IGAL AUTH0 PITY OVEP A F ACILITY THAT IS ALDE AD* FUL L Y LICENSEP RY THE "DF.          FEDEPAL LAW PPOVIDES THAT TWE PEGULATIO" 0F A L ICE NS ED MUC'.E A P FACILITY IS THE I
SOLE PESPOPSIA7LITY OF TWT rFPFDAL GOVIPMMEPT.              CTATE JUDISOICTION OVEP THESE MATTEPS HAS BEEP CONSISTENTLY AND SEVEPELY LIMITED BY 9OTH COPGPE S S At'0 THE COUST!.      PPT PE B0 Haur THE o!GHT--A PB TPF        '
pt SPONS t OIL ITY--T0 INSIST TW A T THE FACILITY FE PANAGED WELL:
COMST0VCTE D OP
* ECON!70VCTE P To PD0 VIDE THE PAv7FUM DEGPEE OF
    *EACTOP SAFETY: AND THAT EVA UAT!0t! PLANS Ac! ADE0VATE TO PDOTECT THE PUBLIC HE AL TH AND Sar[Tv.
l I
1 l
l i
1 l
 
TO *E SUDE. TWEer WAVE FEEN SUEST ANTI AL po03*FSS IN PECEP' MOPTHS. POST 0" C0! SOP dAS TAf8" S0"E IPPODTANT STEPS TO CODDECT Tur SEPIOUS MANAGEMENT AND S AFETY P90PLFMS THAT HAVE PL AGUED THE PILGo!."
FACILITY SINCF 77 orose corea yco yo 197?,
I ASSUME THAT THIS EFFOPT WILL Bi THE SUB2ECT OF EDISON'S TESTIPOMY HERE TODAY.        WE WILL BE LISTENING CLOSELY FOR SIGMS OF PERMANENT IMPPOVEMENTS.        f!EVEPTHELES3    THE STAKES ARE VERY HIGH. A ND THE PURDEN OF PPOOF CONTINUES TO PENAIM WITH THE COMPANY YD DEMONSTRATE THAT THE PILGDIF FACILITY C AN PE S AFELY MANAGED.
OPEPATED. AND FAIPTA!PEO.                                                        ,
OUALITY PEACTOP DESIGP. prLIABLE CONTAINMENT. SOUND
    ~
FAINTEMAPCE. pporE SSIC" A L P A" A GEFF"T. AHD p;su OPEPATIONAL STAP0APnS AFE ESSENTIAL If WE APE TO Po0TECT THE SAFETY OF OUP CITIZENS.
T Art F00 F.vAFotE TWE 00"*POVEDSY OVED TWE STDUCTUDAL INTEGPITY OF THE D!LGeIP Paer T CONT AINME NT VE S!!L .        THAT ISSUE CA"PCT 9E SATIScACTCc!'V    .
                                      *E SFL VED Ir THIS ISSUE "UST NEVEP BE Of'E WH E R E T H E t'PC R E OUI o E S 0':. v P:e!PA. IMPPOVEMENTS TO BE CONSTPU0TED F0P VESSELS OF THIS KI'?.
i
 
                                                              -l'-
7t' HIS PEF APKS OP' A VISIT POSTOP SEVE P A L CE EKS AGC. f'PC COMMISSIONEP JAMES /SSELSTINE CPITICIIED THE FPC FOP LEANING TOWAPP PECUIPIMG ONL Y MIP'OP CH A NGE S CHE tl POPE FAJ0P PETP0 FITTING APPEAPF NECESSARY TO MAXIMIZE PLAFT SAFETY.          ASSELSTIPE SUGGESTED THAT THE COST BENEFIT ANALYSIS BEING l' SED PY THE FPI TO APRIVE AT THF LESSFP PEQUIPEMENT DID NO7 TAKE INTO ACCOUNT THE COST TO THE SURPOUNDING ENVIPONMENT OF AN OFF-SITE PELE ASE IN THE EVENT OF A CONT AINFEPT FAILURE.      IF SUCH COSTS APE T AKEN INTO ACCOUNT. /SSELSTINE SAID. AD    l EXPENDITt'PE FIVE TO TED TIMES GPE ATE D PEP PLAPT WOULO BE JUSTIFIEP.
I CLEARLY. IN THE CASE OF PILGoIM. THE PUBLIC HAS A RIGHT TO FMOV THE FlllL P A PGE OF OPTIOPS TH AT APE AV AIL ADL r TO 2PP00VE THE STcUCTUPAL INTEGPITY OF THE CONTAINMENT VESSEL AND TO BE ASSUPED            ,
l THAT EDISOM IS PDEPAPED TO Fart THE HECESSAPY CHANGES. NO MATTEP WHAT THE COST.
                              "0DE0VEF. TWEPE APE KEY S T E P S T W A T M L' S T PE TAKEN NOW TO  l A!!UCE REACT 00 SArETY APD PPOPfe y a ,' A G EM E t'T :
i i
 
_r_
POSTON FOIS0t: SH0VLD rest rfvrt 0D A c0*ooruturive PtsTanT PL AN THAT WILL IPCLUSE A COPP L ET E A S SF S.tFE t'T OF P A ST DEFICIENCIES IN Tut AprA 0F PLANT MAtlAGEMENT AND REACT 0P S AFETY AS WFL L A S A DETAILEP QESCDIPTION OF ALL PEASUPES TO PE TAKEN TO GUAPANTEE TWAT EPPOPS OF THE PAST WILL NOT RECUP.
POSTOP fDISON SHOULO EST APLISH AS PAPT OF THE PEST APT PL AN A COMPPEHENSIVE Mot'!TCDING SYSTEM THAT llILL PROVIDE E APLY DETECTION OF PPOPLEP APEAS IM PEEP OF IMMEDIATE ATTENTION.
POSTON EDISON bHOULD AGDEE TO SUBMIT THE RESTART PLAN TO THE GEf'EP A L PUPLIC F00 PEVIEP ANB C0FMENT.
THE PPC SHOULO HOLO A FULL PUBLIC HEAPING BEFOPF THE COMMISSIONE8S Ot' THE ADE0VACY OF IDISON'S PEST APT PL AN.
POSTON EPISON ANr Taf t'PC SHOULD PoEP Apr A DETAILED SITE SPEtyrIC eEper      +
wE C0po' .ET E D A PG E Or CONSTDUCTIO" ALTEPNATIVES AVAIL 15'.E TC IPPDOVE Twt D ILGoIP CONTAINMENT VES$!L.
AL L CONT AI'lP.E NT A M A'.Y SE S S HOUL O B E P A 0E A V AIL A BL E FOP PUBLI PEVIEU At'e COMPE "' .
 
                                            -c.
THE PPC SHOULD INSTITUTE A SPECIAL "WATCwSOG" PROGPAM WITW STATE PAPTIr7DATION IN STEPPED UP OF SITE INSPECTIONS.
E MPTWEPPORE. IT IS ESSENTIAL TH A T A DE0L' A *! EME PG E NC Y R E SPONS r PL AMS TO PE IN PL ACE PEFOPE ANY CONSIDEPATIOF IS GIVEN TO PEST APTIFS THE PLANT. L AST ?UNE. 7 ASKED SECPET APY BAPRY TO ASSESS THE ADE0VACY OF EMEPGEPCY PPEPAPEONESS AT PILOPIM AHD TO REPORT HIS FINDINGS TO ME BY THE END OF THIS YEAP.        SECPFTAPY BARRY'S EVALUATION IS NOW COMPLETE APD AT THIS TTME .T WOULD LIXE TO SHAPE THE RESUL TS OF HIS ANALYSIS WITH YOU.
l THE REVIEW CONDUCTED FY SECPET APY PAPRY INCLUDED A THOPOUGH ANALYSIS OF THE EXISTIPG EMEPGENCY PESP0 HSE PL A*.'9 WHICH WEPE SUBMITTED BY THE COMMONWEALTH IN 1981.        THESE PLANS HAVE BEEN GPANTED INTERIM APPPOVAL ON FOUP SEPAPATE OCCA3 IONS PY FEPA SINCE THAT TIME.
TWE FINDING? CONT AINED IN THE PEPORT CLE ARLY IDENTIFY A HUMPED OF MA70P DEFICIENCIES. THEY INCLUDE:
OUTD ATEo a 90 ;Nc0*Dt Ett tv AcuaTION TIME EstrMATEs e ASED 04 1970'S cEMSUs DATA.    (ETE DATA LACKS INFOPrATION rop EACH SUBSECTOP OF THE EPA (I.t. BEACHES) UNDE' VARYING CONDITIONS (I.E. VFATHEP. TPAFFIC. TIME OF YFAD. ETI.))
l
 
THE AP?fncr er A enwoo;wrustyr pWrtTre scovrv.
INADE0VATE ATTENTION 'O Tut _VULHEoAfftITY Or TWF oEACW-GOING P000LAT70H.
LACK OF ATTENTION TO NEEDS OF THOSE WHO CANNOT EVACUATE TuEMSEL VES INC,L UDING SCHOOL CHIL DPE 5'. HAP ^ICAPPED, AND ELDERLY.
LACK OF AGoEEMENTS WITN OPGANIZATIONS EXPECTED TO SUPPLY PESOUPCE S APio PEDSONFE L FOP EVACUATIOu IMADE00ACIES IN EP.toGENCY C0tiMUNICATIONS. PUBLIC NOTIFICATIO AND PUPLIC EDUCATICN SYSTEFS.
LACK OF 0FF-SITE FON:T0cING.
l l
i                  AS IT STANDS TODAY. tut EXISTING CMFrGEM0v PFSPONSE PLANS F00 i
PILGPIP 00 NOT SATISFY Frpt: AL SAFETY STAPDAon! AS WE INTEPPoET THEP.
1 IHEPEFOPF. BASED O'l TWE NUMEPOUS DEFI"!EPCIES OUTLINED BY l
SECPETAPY PAPPY'S PFPO*T. I HAVF ASKF0 THE FFCDETAoY 70 FDPPAoD l
l            COPIES OF HIS PEPOPT IMMET: ATELY 70 ff"/ A*l7 THE "PC. AND I ASSUME AND EXPECT THAT THEY UILL of3P!DE POSTON FDISOP TO PPEPADE THE DATA l            AND A"$WEP THE OVE!TIONS C A!!EP PY FE CoET ac A' 2A 0Y'S PEPO *T.
 
s
                                      .o.
It) CLOSING. I WANT TO EMPHASIIE THAT 0U0 PUPSUIT OF TWE HIGHEST STANDAPDS OF PUBL!C Pr AL TP AND S AFETY OAP' NEVEP BE COMPr0MISED AS WE ADDRESS OUR MUTUAL Cf)NCERNS PE6ARDING MAN PEACTOP SAFETY. AND EFEDGENCY PDEPAPEDNESS AT ?ILGRIN. PHILE OllP OPTIONS UNDEP FEDERAL LAW ARE LIMITED 6 WE HAVE A SOLEMN OBLIGATION TO DO EVE *YTHING W7 THIN OUP POWE P 70 l'POTECT THE HE ALTH. S AFET WELL-BEING OF OUP CITIIENS.
THAHx YOU.
i 1
l
-                                                                          \
 
  ,                                                                                  (1)
Qp            4C
_        ~
                  \    t            %      b              IN d, WhihAt!w, r*      dih key k.<
      .          s %A h >-m                  a5                ma
        .              T%%\s      9    .k      psch-ew-              > n
                                                                      -n          %
cwd9&D            by      % %Ca                    L    w it( M
                  %      N9E, h?T* +csl        a      in T s a                      med-ed w          k w h+ O?"                      f MW                q 5 mpple-4 M , a owh>t 6 T''e"* **      ad4w+'*7-i erh (Qe e1%y Doss Ad47 cv 7 N beh dh,- w Be h of @ o be, 1 Imay
                ,      9-e Cc  44 M g & cVr*                  W O E b ** '    '#
ewpJ.n              n , w .. d, m - .        wm, A,,ej,y
                                          \)
i i
i r/W
 
t l
1 a
t Ydl-                ----- b eb              (                            ..
O
                                        .        t een-    g y.,
                                                          * " 6                      m,wa._e%,        ,
                                                                            *NNe              ehwe
                                                                        *M MM          MM,      wm p e-                        4 em
    ''
* bWe            -  w      ,
            -e.hhe      w.--        m    ,. ,
        *        -wehe      ae--
1
 
l tl M lI]
i l
i
                                                                                                                                            )
                              .QONTENTS                                                                                                    \
i
                                                                                                  '                                        l EX EC UTIVE S UMMARY.. ..... ... ........... ...... ........... .. ... .          1 CHECKLIST PROGRAM OBJECTIVES.................                                      2 i
CH EC KLIST FORM AT..............................................                  3 ITEM SELECTION GUIDANCE................................                          4 l
CH EC KUST DEVELOPM ENT..................................                        5 C H EC KLI ST U S E . . . . . . .. . . .. .. . .. . . . ... . . . .. . . .. . .. 7. . . . . . . .. . . . . . . . .. . .            :
CH E C KLI ST D ESIG N. ... . ... ..... . . .. . .. . . ... .. .. .. . .. .. . ..8 ..... .. ..
IN FORMATION SOURC ES.......................................                      10 i
f CH EC KLIST H EADING S......................... ......... ........                11 GENERIC AND SPECIFIC CHECKLISTS.............                                    12 C H E C KLI STS. . . . . . . . . . . .. . . . . . .. . .. . . . . . . . . . .. . ATTACHMENTS l
l                                                                                                                                          r r/41
 
I EXECUTIVE
 
==SUMMARY==
 
Checklists were first used during RFO #6 for the Rectro Pipe Replacement                ;
work; based on this effort Plant Operational Condition Change Checklists                I were created to provide a management tool that aids in trackin.g RFO #7+
tasks and issues. The checklists incorporate as many tasks and issues as possible in one location and provide an additional check on important                  i itemc. Attempts have been made to make the checklists as comprehensive                I as possible without being overly redundant with existing plant tracking                l systems.                                                                                1 Checklists have be n developed for eight (8) plant outage milestones. Each milestone has its own unique items to be accomplished, but the majority                ;
of items on all checkflats are items that are common to all eight                      '
checklists. For example; the completion of Appendix R required modifications will appear on each checklist, but the actual completion of the modifications is not required until plant startup. This was done to ensure that the ongoing Appendix R project work did not interfere with the              :
cc,.1pletion of a particular milestone.
Status updates of checklist items are distributed on a weekly basis to all managers and personnel responsible for the completion of enecklist items.
Daily checklist status meetings are held when the milestone                    is approaching to more closely follow items that may become impediments to                  I accomplishing the milestone. Informal spot auditting of the completion of required formal documentation is performed to verify the closeout of                    l checklist items. Section Manager concurrence with the completion and                      '
disposition of each item on a checklist is required before tho checklist is              ;
signed by the Director - Outage Management for presentation to the Plant Manager. This presentation is one of the Director's means of ensuring the readiness of the plant to enter the milestone and is meant to aid the ORC in reaching the decision to authorize entry into the Plant Operational Condition.
At this time the Checklist Program is informal in that it is not an 1
approved plant prugram.          RFO #7+ is being used as a trial outage to determine the usefullness of the checklists. A determination of the usefullnes.)
* d continued use of the checklists will be made at the end of RFO #7+.
1 1
 
PLANT OPERATIONAL CONDITION CHANGE CHECKLISTS                              pag 3 2 CHECKLIST PROGRAM OBJECTIVES Tne program objectives are broad enough in scope to allow the program to encompass all outage related work and any other committments that must be completed for particular milestones during an outage. To allow construction of a comprehensive checklist very general Checklist Objectives were defined,      to identify all the areas that might contain                                  l items of interest or concern for the outage a very detailed Checklist Format was designed, and to allow in. corporation of nearly any item on the checklists a very broad Checklist item Selection Guidance was designed.
l CHECKLIST OBJECTIVES
: 1. Provide management a tool to aid evaluating outage progress.
: 2. Provide a means of breaking down the outage into distinct milestones.
: 3. Provide a TICKLER FILE for items to be accomplished prior to performing milestone activities.
: 4. Provide a final management check on required work prior to Management      authorizing  per'orrrance                  of milestone          activities.
: 5. To preclude running into an insurmountable number of items to be accomplished just prior to entering a Plant Operational Condition                                .
Change.                                                                                          I
<                                                                                                          l 4
1 l                                                                                                          l
: l. _
 
f PLANT OPERATIONAL CONDITION CHANGE CHECKLISTS                                      pag 3 3 CHECKLIST FORMAT A. HARDWAREITEMS A 01 Applicable Systems / Equipment A.02 Plant Modifications (PDC'S)
A.03 Plant Temporary Modifications (TM'S) (TM Log Book)
A.04 SystenvEquipment Maintenance Requests and Procedures, including Preventive Maintenance (PM)
A.05 Failure and Malfunction Reports (F&MR's)
B. _ SOFTWARE ITEMS B.01 Operating / Maintenance Surveillance Procedures (ST's)
B.02 Temporary Procedures (TP's)
B.03 New or Revised Operating / Surveillance / Maintenance Procedures l
B.04 Deficiency Reports (DR's)
B.05  Non Conformance Reports (NCR's)                                                    ;
B.06  Potential Conditions A&erse to Quality (PCAO's)                                    l B.07  Training B.08  Engineering Support Requests (ESR's)
B.09  Drawings and Vender Manuals (Associated with Modifications)
B.10  Operating Experience Rev!ew (OER), including ' Conditional
* Saiety Evaluations B.11  Stop Work Orders E,12  Management Corrective Action Reports (MCAR's)
C. TECHNICAL SPECIFICATION ITEMS C.01  Technical Specification Concems D. NRC RELATED ITEMS D.01  NRC CommitmentvConcems and Ucensee Even Reports (LER's)
E. EMERGENCY PLAN ITEMS E.01  Emergency Plan issues for Criticality / Power Operations F. BACKLOG PROJECT ITEMS F.01  Baddog Recommendations G. PROGRAM ITEMS (nad Protection, Fire Protection, Security, Housekeeping,Decon, etc.)
a  H.  "P_pNCHLIST" AM[LOTHER ITEMS
 
PLANT OPERATIONAL CONOITION CHANGE CHECKLISTS                  pag 3 4 CHECKL!ST ITEM SELECTIO.N GUIDANCE
: 1. Any    uncaptured items you know or believe arn necessary to "COMPLETE" prior to beginning a Plant Operational Condition Change (Checklist Milestone).
: 2. Any required and "Tracked"    items which, because of their substantial multidisciplinary review and approval process, require increased management attention to insure completion of all facets of the item, Usually an item of this type will have multiple checklist entries that cover the major events within the single work package.
: 3. Any items that historically have been items that have caused problems or delays in reaching plant milestones.
: 4. Surveillance procedures required to be performed prior to plant milestones, including MSTP scheduled procedures, i
: 5. Any item that the Checklist Team (OMG) wishes to follow due to potential for delaying a milestone.
l
: 6. Any item for which you are responsible and wish to be reminded.
l There will be eight (8) checklists used during RFO #7+. These checklists correspond to the major milestones that will ocurr during the outage. The titles of the checklists are:
: 1. REFUEL BRIDGE TESTING COMPLETE OFFLOAD CORE                      !
: 2. COMMENCE RELOADING FUEL                                          l
: 3. RELOAD COMPLETE ASSEMBLE VESSEL & CONTAINMENT
: 4. PLANT HYDROSTATIC TESTING                                        l
: 5. INTEGRATED LEAK RATE TESTING
: 6. PRE CRITICAL TESTS / PLANT STARTUP
: 7. PLANT HEATUP & TESTING
: 8. POWER ESCALATION & PHYSICS TESTING l
 
PLANT OPERATIONAL CONDITION CHANGE CHECKLISTS                    pago 5 CHECKLIST DEVELOPMENT Checklists were developed using the defined plant milestones (Operational Condition Changes) as guideposts for identifying items to be incorporated      {
i into each checklist. Checklist #1 Refuel Bridge Testing Complete / Offload      l Core was initially developed and used as a reference for the other              l checklists. Many of the items on Checklist #1 appear on the other checklists due to making #1 as comprehensive as possible. Items were identified by reviewing the P2 outage schedule, program tracking systems, and work tracking systems; in addition to asking all groups involved with the outage to contribute items. Items were then classified using the Checklist Format and reviewed for applicability to the checklist. Items were then assigned to sections within the format and determinations made on the responsible Approvers and Doers.          Attempts were made to make the initial checklist as comprehensive as possible by including items that          ;
were not necessary to complete for this milestone but important enough for the outage to bring people's attention to the itams very early in the outage. A complicating factor was that the INSERVICE INSPECTION PROGRAM began prior to moving fuel which raised a number of system operability concerns that would normally have been identified after the fuel had been offloaded.
The initial checkhst was widely distributed for review, comment and revision with regards to incorporated items and assignment of responsibility. After comment review and checklist revision the initial distribution for uso was made on December 1. Two different distributions have been made each week: an Open items List sorted by Approver, and a full Status Update on all checklist items. When the Refuel Bridge became available for operator training daily checklist status meetings were held to focus closely on the items to be completed before fuel movement could begin. At this time daily checklist status updates were produced that allowed responsible personnel to focus in on the items remaining to be completed. Section Managers were required to review the completion and disposition of checklist items, prior to authorizing fuel movement, to provide an additional level of management review.          A similar sequence of events is planned for the other checklists.
 
i PLANT OPERATIONAL CONDITION CHANGE CHECKLISTS                                                                  page 6 i
Checklist #1 items that have been dispositioned as Not Required for Offload will be cascaded to Checklist #2 and subsequent checklists until the item is completed.                            Checklist #1 items that have been dispositioned as Complete will be reviewed for applicability to Checklist #2 and subsequent checklists. items that are required for multiple' milestones will also be cascaded to Checklist #2 and subsequent checklists. This will cause all items to be reviewed for applicability to each of the checklists so that the checklists for RFO #8 will be much easier to assemble.
Use of Checklist #1 will stop once the movement of fuel begins.                                                              At that time Checklist #2 will be issued and items on that list will begin being tracked. This will be possible only because of the relatively long timeframe between offload and reload. Subsequent checklists will have to be issued prior to reaching the previous milestones to allow adequate lead time for the checklist to be effective. One to two weeks prior to reaching a specific milestone is a minimum required iead time for issuarice of the applicable checklist.                          If a review and comment period is desired an additional week should be provided for in issuing checklists.
It is anticipated that future outage checklists w;ll be handled in a similar manner so that items that appear on the first checklist for an outage will be reviewed for applicability to the subsequent checklists for that and future outages. The intent is to identify tasks with milestones so that future outage checklists can be built using the plant's computerized                                                                                ,
planning capabilities.                        Although each outage is unique the vast majority of outage activities are repetitive in nature which wou'd allow th9 plant's                                  .
planning program to produce the baseline checklists for future outages.
The outage unique items could then be added to the appropriste baseline checklist for use during that outage.
Although the checklists are repetitious of already existing tracking and
)  planning tools, they are unique in that it is presently the only system that
;  crosses all boundaries by incorporating items from essentially all of the l
plant's tracking and planning systems. This coridition will exist unti! the new Relational Database Program is installed on the PS & CC mainframe
;  computer.
l
,                                                                                                                                                      I i                                                                                                                                                      l i
 
7 PLANT OPERATIONAL CONDITION CHANGE CHECKLISTS                page 7 CHECKLIST USE The checklists are best used as a management tool for tracking the status of work items for particular outage milestones. Effectiveness requires a great deal of front end work and continual updating. The checklist is a dynamic tool that changes daily as new Items are identified and the status of existing items changes. This information must be assimilated in an organized fashion and disseminated expeditiously in order for it to be an effective tool.
The ability to add items to the checklist at any time is of utmost importance.        As a milestone approaches it is important to hold daily checklist update meetings; in order for these meetings to be effective the checklist must have been updated since the last meeting.          The checklist has been designed to facilitats rapid turn around of update information. A complete checklist can be updated and printed in 2 3 hours, i
Checklist items were initially identified by a two man team, who i
reviewed scheduled outage work and other available work documents and tracking systems to identify potential checklist items. Items were then categorized using the checklist format and computerized using a database program. Plant management and supervision were then asked to review the checklist items for ac. uracy and applicability to the checklist milestone.
The checklist was then revised and distributed for use. New items were added to the list as they were identified. Weekly update reports were i
distributed until the milestono was eminent; at which time daily meetings began.
Checklist items can be added at any time,              items deemed to be Not Required for a particular milestone can be cascaded to the next checklist.
Items are not removed from the checklist; items are dispositioned as COMPLETE, NOT REQ'D, CLOSED, or DELETED. COMPLETE means that an item is field complete, NOT REO'D means the item is not required for this t
'                    milestone, and CLOSED means that all necessary paperwork has been completed.          DELETED is normally only used for items that should not have been on the checklist, such as duplicate items. An exception to this is the l                    Operations and Maintenance Surveillance Procedures. For surveillances the          :
status block contains the required frequency of the surveillance and the date it was last performed.
l 4
                                    - -,          ~      ~-v'
 
(
PLANT OPERATIONAL CONDITION CHANGE CHECKLISTS              p:g3 8 CHECKLIST DESIGN Checklist design was accomplished by considering all possible work groups, work and committment tracking systems, outage plannk1g systems, and past outage experience.        This lead to designing the Checklist Information Sources organization chart on page 10 and created the subsections of the Checklist Format on page 3.
Because of the large number of organizations involved and the varied types of information that was being gathered it was decided that the checklist design must be easy to use yet flexible enough to handle complex issues.
This was accomplished by breaking down complex issues to smaller tasks and categorizing the tasks according to the checklist format with one major item that was a final check that the issue was completed.
The checklist has nine (9) Headings under which information is entered.
Those headings are as follows:
ITEM NUMBER ENTRY DATE SYSTEM PROJECT NUMBER REFERENCE DOCUMENT ITEM SUBJECT PRODUCTS NEEDED OR JUSTIFICATION APPROVERS DOERS STATUS - DATE An explanation of each of the headings is included on page 11 under CHECKLIST      HEADINGS. Sufficient space was allotted to each heading to  ,
allow for inputting enough information to ensure the item was fully        ;
understood by everyone involveo with the checklists.
1 To provide for rapid turn around of updated checklists the checklists were computerized using a dedicated computer terminal. Updated checklists can be produced within an hour of receiving update information, although updates are normally printed once per day.
l
 
1 PLANT OPERATIONAL CONDITION CHANGE CHECKLISTS                page 9              l l
I The checklists can be printed in many different forms. The normal method is to print all the items on a checklist with the status of each item. A    ,
very useful printout has been a checklist with just the open items, i.e. the    !
items that have not been completed or dispositioned as no.t required for      I the milestone. Capabilities have also been provided to allnw printing the checklist sorted by any of the headings. This gives the checklist program          ,
enough flexibility to be able to handle any type of special request for        j analysis of data.
l In order to standardize some of the terminology used when reporting            !
status of items it was decided to use the term COMPLETE to mean field complete, CLOSED to mean documentation complete, and NOT REQ'D to mean        '
not necessary for the milestone. By standardizing the terms used for l'
dispositioning items, the program now has the capability of sorting the checklist items by status, i.e. If an item does not have a status of one of    ;
the three terms above then it is an open item. Another useful printout        ,
would be to print the checkilst sorted by system number. That report            ,
would provide a sequential listing of all the items required to be            i completed for a system during the outage.                                      t l
To provide a final check on the ooerability of important systems a number      !
of checklist items were added that require the checklist user to verify        i that required system MR's are completed or that the system meets                i operability requirements. The systems included on a particular checklist l
are those that are required by Tech Specs or through experience have been      }
necessary to support the operability of required systems for a plant            j milestone. For example, the HPCI system is not en the Offload Core          i Checklist but will be on the Heat Up and Power Escalation Checklists.          ,
Future checklists should be developed using the checklists used during          !
RFO#6 & 7 and the Generic Checklist to arrive at an outage specific            j checklist based on the tasks to be accomplished during the outage.              l Consideration should also be given to developing a master checklist for          l each outage and using that single checklist for the entire outage, items on the checklist could then be specified as to the milestones that the item would be required to be completed.
i 1
 
k 1
CHECKLIST INFORMATION SOURCES DOOM                                                                                O
  ,                                                                                                                                                                              o
  !                                                                                      K_ P. Roberts
                                                                                                                                                                                ]
d sn> ch.ckrist                                                                          @
:                                                                                            Manager W.H. Darm g
O z
O
__                                                                                                q CMG e gg                    gg    ->                                                                                                    TECH Z
l                                      ,                  OPS,                                      MMG          JC            MAINT                        gyg D u.n. L Vanae        par NED              Habor1                                    ' Akhtar        Famulari      Mormrta,      P. Smith    A Morisi        I r  s.a                                                                                                                                    z
:                                  u;,n.,                                                                                                                                    O c,. _                                                                                                                                      m I
m O
COMP                    REGULATORY                          "paacna'dt 1> pan arr Tc-x EMER          e    NSRAC      RFFRIRS AND                          m-                    D *'d TRNG        *tDAR' PLAN                                                                "'" "'"'                "N"                NMSD ADMIN                      PROGRAMS frmN                    R EHn+ ,                                    ROOM M6R        $
R Selva  E Graham  A Batta              J D Keyes                  rw pnnTrcTrw          F.Wozniak srm sarTy              C. Hionens          McDonakf    Balfour    R Grazio    J Geroty arwunnr n            R votar FPic cnMP            C. Mmott                                                              V
                                                                                ,,,AN&[(E TnP SY D. Rechard                                                                  m
                                                                                                                                                        ,                    e vi.ivf trrTrn        W ctancv                                                              e H?.M?O CHFM          B. Tucker                                                              ^
;                                                                                nynr_s                WJ. Armstrorn                                                        O 1
r-rwy * = = $s cr    S Thannenn RADWARTF RTT          V. Sf20 W 2 SrJTTNHDiff            S M. Morb I
 
1 PLANT OPERATIONAL CONDITION CHANGE CHECKLISTS                                  page 11 CHECKLIST HEADINGS ITEM NUMBER                                                                                        !
A Sequential number assigned to each line item that f .cilitates categorizing each line item. The number is comprised of the checklist number followed by the section number fro'm the checklist j
format followed by a three digit sequence number that is just the order the item was entered.      ,
l ENTRY DATE                                                                                          '
The date that the line item was entered into the checklist.
SYS PROJ#                                                      -
                                                                                                      )
i The code used to identify systems or projects. Note that the system numbers are the normal number codes used for identifying systems.
SUBJECT                                                                                              1 The system or issue to be addressed by the line item. This should include enough information so that no confusion is created in !dentifying the task to be accomplished.
PRODUCTS NEEDED OR JUSTlFY IF NOT REQ This Is the end product needed to satisfy the objective of the checklist. On cchecklist #1 it is tne product needed to perform a core offload, i.e. the systems, procedures, evaluations, and conditions that must exist in order to offload fuel, if the item is not required then sufficient information must be given before an item will be signed off or authorized for transfer to a following checklist. This oolumn only needs to be filled in if the product is not obvious.
l APPRVR                                                                                              l i
This is the initials of the person responsible for approvat of the line item task. Persons' initials l
will be followed by a period, organizations, such as GE, will have the abbreviation listed.
DOER This is the person assigned by the APPROVER to either perform the assigned task or to tupervise the cc.mpletion of the task.
ST ATU S-D ATE A completed item should be marked as complete with the date of completion. The official status will be that posted in the tracking systems maintained by Nuclear Management Services.
Additional information can be provided to aid in identifying problem areas and in resolving issues in a timely manner.
 
PLANT OPER ATIONAL CONDITION CHANGE CHECKLISTS              page 12 GENERIC AND SPECIFIC CHECKLISTS A G.ENERIC    CHECKLIST has been developed which should be used as the bateline checklist for each outage milestone. This checklist encompasses items that should be considered when getting ready for' any plant operational condition change. The majority of the items on this generic checklist are confirmatory items that require the verification of the operability of required systems. The generic checklist thus becomes an outline on which to base the development of milestone specific checklists.
SPECIFIC        CHECKLISTS      are checklists that contain all the items required to be performed or completed before entry into the milestone should begin. The specific checklist contains the generic items as they pertain to the specific milestone plus those items that are milestone specific.
Included with this Checklist Package are a series of checklists. The first checklist is the generic checklist followed by the actual Checklist #1.
The generic contains approximately 200 line items. From that initial 200 items, checklist #1 developed into a comprehensive checklist of nearly 700 items. Many of the items on checklist #1 will be cascaded on to the following checklists because they were deemed not required for fuel offload. The additional checklists are lists of those items that have been identified to be completed for the particular milestones. Each of the milestone specific checklists will be constructed as that milestone approaches by combining the generic checklist, cascaded items from previous checklists, and the milestone specific items. Thus, each checklist will be a comprehensive checklist of the items to be considered for entry into the milestone.
Each checklist will be used as a dynamic tool for evaluating and following the progress towards achieving a particular milestone. Although the checklists are not a work planning system they are used to identify important and necessary work to be completed prior to entering a milestone and thus will become an important management tool throughout RFO #7 and future outages.
l l
l i
 
_ . --. _ _ . . . - d .. . , _ a 4Au 4.  .-m.mL  =e_..W _s _ -- 3 _ .- - - .a,__w_LC--maa m -_-_  AAm _ _.w au sw -5_w.- +. . - . .- . -
i l
i e
GENERIC 1
CHECKLIST
 
CHECKLIST # G            GENERIC CHECKLIST A. HARDWARE ITEMS                                                JAN 26 87      Page: 1 A.01 APPUCABLE SYSTEMS 1 EQUIPMENT 4W      ENTRY                                                          PRInJCTS M CR NUWSER      DATE  SYS#RCue PEFUENCg rrre uyf                                                                                  {
SUtKCT            JUSTFY F NOT PEQ      APPRWL 00ER STATU$.DATE      j Q A bi001 CEC 186      14      T3 Pg 103122 SPECS  2 COM $ PRAY SYS or i      OPER COPE 4 SLPPMS  SDM Piu
                                  &5 6 4 5 A.R.F.H    COPE SPRAY & LPCI(3      POOL COCLNG $LWW                                  l VPNE 86-54      PUWPS)
Q A 01002 DEC 186      11      T8 ps H 102 $PECs  STAN00Y UQUO              OPERATCHAL SSLC      SDM PLM 3 414 4 A.B.C      CCNTROL 84 TEM                                                              '
i G A01CC3 OEC 186      03          CPER 10          CONTROL ROO CPWE SYS      P M &tLR2E0 SYSTEM    SDM PLM NCL$0V O A01004 CEC 196        60      TS De ise SPEC 3.7  SECOPCARY CCNTApe4ENT    CPEMaL CONTAPA*ENT SD M PLu 4474                                      FOR FUEL HAPOLD43 4 80 WAAGN
                                                                                                                ~
G A 01006 CEC 1 e6      30      Ts pg 10s.107 SPEC $ 2 PSCCW $Y$TEMS          CPERAaL1 CORE &      SD M PiW 3 $ & 4 &3                                  W E& SON 500L C00LN3 SLS$YSTEW8 C A01006 CEC 186        29      iS pg 106107 SPECS  2 $ ALT MRVCE            OPERA 8LICCFE Aec    SDM Piu 3 5 4 4 &B        WATER LOCPS              SLPPRE&$ON PO3, 000 LNG SLSSYSTEMS G A 01007 CEC 1 M      61      SUPPORTS $11TEW    2 DESEL GENERATORS        OPEMaLE OGs FOR      SDM P L'A
                                                                                                                          ~
TECH SPECS                                  PECL SAFETY SYSTEMS O A 010:s CEC 1 e6      48      T$ pg 154-15AA SPEC  STANC8Y GAS TREATWENT    CPEMaLi taGT3 w6tN SDM Piu 3751&4752                                    MC CCNT NTE(sRITY 5 PEQUPED G A 010C9 CEC 186      24        78 pg 1548154C                              OPEMaLE 683T CONTMDL ROOM (WPdSt3T)                          SD M Piu                  ;
EPE C 3 7 8 2 &                              W4N SEC CONT                                    '
47B2                                      5 MOURED 1 010 CEC 1 as  44        SLPPORT5 SYSTEM T3  125v E4TTERES A 4 8
                                                                                                                          ~
SaFEQUAA38 LOC'c4    SDM Piu SACXUP SCMM G A09 011 CEC i e6    44        Sifr+GiTa $YSTEM T3 2SCV EATTER ES            RPS VTT AL SERvCE    SDM Piu 680 SET G A01012 CEC 1 e6      46        SLF+OiTa $YSTEM is  NV EATTER48 A & B        NEUTM3N WChfTCRP43    LDM Piu GA01013 CEC 1 e6      46        SLFPORTS $YSTEM T5  DJESEE AS A4 31.94,817    SUPPORT OPERAS 4JTY  SDM PLM                    i Si8894,818R20.828829      OF PEO.mED SWTEMS G A 01014 CE C 1 e6    el      TS sg 43 4 99 $PECS  MFVEL FLOOR              OPFWL H5TR M4CH      &DM Piu
                                                                                                                          ~
                                $2Di442D14          EJHAUST WONffy0RS        NftuTE 54 CCNTRCLS                              i TABLES                                    A PFOTECTM FUNC 5A010il CEC 18E        48        OPER10.CPER25      MFUEL FLCOR AREA          OPERAal ARusON        SDM Piu
                                                                                                                ~~~
RAD W3NTTOR$              MFLEL FLOCR                                        !
G A01016 CEC 186      13        SLPPCET $T&TEW T5  DELUGE SY5 DGs 4 $93TS    $n CPERAaLITY REQ    &D H Piu G A01017 CEC 1 e6      45        TF W SPEC          700 WORTW Whos2EA        REACTMTV CONTROL    SDM Piu
                                                                                                                          ~
33ha44',63                                                                                      I G A01018 DEC 186      el        Tr Pg ,640 TASLE    MACTCR PR3TECTON SYS
                                                                                                                              ~
NETR & AS40CETED    SDM PE u Ju                                        DEWES W6CH NT.
A Rs SCAAW G A01010 CEC 1 se      12                            REACTOR w ATER            w ATER PURITY        SDM PEu CLIAMJP SGTEW G A01020 CEC 186      SJ                            Mm1C1 AR SY3TEW          Mm1CE AR FOR        ED H Piu REntth30PSTCCLS i 021 CEC 186    31                            H5TMJHENT AR $Y$TEW      $LPPORT SYSTEW      &DM Piu
                                                                                                                    ~
CPERABLITY MQ
 
CHECKLIS1D 0            GENERIC CHECKLIST A.      HARDWARE ITEMS                                              JAN 28 87        Page: 2 A.01 APPUCABLE SYSTEM &f00PW4T
            .M      ENTRY PR X Ml'f5 4 E 5 0 CR MJWER        DATE    SYS N fEPWENIM 00CLAENT          SUBJECT          JUBTFY F NOT MQ        APPRVR DOER STATUS DATE G A S1022 CEC i es      21                        DEueERAUZED WATER        REFLAL FLOOR          SDM PLM WATER MEDS G A@t 023 C4C 16 04    10,14    46 615 fed f5    Ih80pE OPUuatJTY 0F      OPERe100a5RS          SDM Pl i t
                                                                                                                              ~
FORM S AND      DJAD R00W MEA CoalRS CORE SPRAY                                                        .
G A 01 C24 JAN il e7    30                        TUpe*E RJLDNQ CLO6&D    COOLee WATER 8CR      SDM PLM q                                                        C00LDC WATER SYSTEM      AUMLIARY EQUPMENT G G81 c25 JAN to 47      2                                                                                            ~
PEACTor REC #%UL.ATON                          SDM PIM SYSTEW G A 01 Cit JAN TO47      4                                                                                            ~
PEACTOR FEEDWATER SYSTEM OPERAaLE PPPC TO      SOM Piu SLPPORT RWCU OUR*C MW i
I                                                                                                                                I I
l i
l l
I 1
i 4
I 4
l 1
(                                                                                                                                  1 1                                                                                                                                  !
i 1
i
 
                - _ _ _ - _  ..        . _ _ .      _..  . _ - - _ _ = _ - =                _.  -..            __. __ -
CHECKLIST # G                    OENERIC CHECKUST A. HARDWARE ITEMS                                                    JAN 28 47    Pa0e:S                                    !
A.02 PLANTM00iFICATIONS(PDC 1) 1
          ,W        ENTRY NWER          DATE MEIluCMMCR SYS# Acus PEPt e r400CL44NT                SutJECT    JUSTFY F NOf fEQ      APPMW 00EA          STATUS-Datt O 8 62 001 DEC 1 as                PDC PAOrAoEs        PDC woRR DEacmFi@      PDC CLQBEQUT          R&A Pu i
i i
I
)
j i                                                                                                                                        .
9 j                                                    .
t i
1                                                                                                                                      i l
  !                                                                                                                                      l
-                                                                                                                                        l i                                                                                                                                        :
l l                                                                                                                                        t i                                                                                                                                      '
I
)
i e
I i                                                                                                                                        l i                                                                                                                                      1 i                                                                                                                                        i I
I                                                                                                                                        !
l                                                                                                                                        1 i
l i                                                                                                                                        !'
k                                                                                                                                        l i
1                                                                                                                                        i
  )
1 i
i i
1 l
1
 
t L
CHECKLIST # 0                        OENT.RIC CHECKLIST A.          HARDWARE ITEMS                                                                              JAN N 87            Page:4
,                    A.03 PLANT TEMP M00$ (TMS)(TM LOG DCXX) l
!      .M              ENTmy NLWAER PMa u:Tl m CR DATE          SY1-PACus PEPERENCE n W              SUENCT                                      JATFY F NOT MQ      APPRW DOEM STATUS Daft
[
0 A03 001 CEC 1 as                  see      OPEA to. Tws        REVEW OF EASTNQ                                    CPEAASLITY CF      PLM TlarCRARY MODFCAT1068                              fEGJFEO SYSTEME    PDA e
I 1
a i
d i
1
,                                                                                                                                                                        i
.i
)                                                                                                                                                                        !
!,                                                                                                                                                                      i
;                                                                                                                                                                        i i
I i
(
!                                                                                                                                                                        I l
l i
1, l
I 1                                                                                                                                                                          i 5
1 J
t i
I 4
s I
 
CHECKLIST # G            GENERIC CHECKUST A.              HARDWARE ITEMS                                                      JAN 28 37    Page:5                                          j A.04 hMNT REQUESTS & PROCEDURES NCL PMS i
eW                    ENTRY                                                          PRXACTS MCR                                                j nam 0ER                  DATE  SYS#RCus PEFERENCE m u NT          SUEECT                JUETFY F NOT MQ        APPRVR DXR        STATV$ 0 ATE      i G A04 001 CEC 1 as                  14                      REQ CURE SPRAY $W                                      RL&  Pu We CCMPJTED                                            EDM PLM G A 04 002 ff C 1 es              11                      PEQ $le CS                                              RLE  P1A Ws COMPLETED                                            SDM PLM G A040C3 DEC 1 as                  03                      REQ CRD SYS                                            RES  PW W eccWPJTED                                            EDM PLM G A04 004 DEC 185                  to                      MQ SEC CONT                                            RL1  PM Ws COMPLETED                                            SDM PLu                            i G A04 Oc5 CEC 1 as                30                      MQPECw84                                                RLS  Pu me COMPJTED                                            SDM PIM G A04 006 CEC 1 e6                ft                      PEQ SALT SERV WATER                                    RS    PW We COMPJTED                                            SDM PLM G A04 007 DEC 1 se                si                      REQ DESEL GEN                                          ES    PW M6 COMPJTED                                            SC H PLM
                                                                                                                                                      ~
G A 04 oce CEC 1 e6                46                      CONTRCA RCO Po$rrtN                                    ut    PW PCCATION                                                SD K P1M We COMPJTED G A04 000 DEC t se                4e                      EC StGTS We CCWLETED                                    RLS  Pu SDM PLM O A04 010 CEC 1 e6                24                      PEQ CCNTMOL RCEM                                        RLS  Pu (WN150GT4)                                              SDM PLM Ws COMPtKTED l
011 cec t u                12                      N O RWCU SYSTEM                                        RLS  PW WRs CCWPtITED                                          SDM Piu
                                                                                                                                                ~~
G A 04012 CEC i t6                46                      REQ 12Sv pTT A&8                                        RLS  PM 1
We CCMPJTED                                            SDM PLM G A 04 013 CEC i e6                de                      REQ 2SCV BATT                                          RL&  PM
,                                                                  We CCMPLETED                                            SDH PLM I
                                                                                                                                                    ~~
G A34 014 CEC 185                  46                      REQ 24v BATT                                            R&    Pu W4 CCWALITED                                            SDM PIM a      G A04 0tl DEC 1 as                46                      MQ m>&$E S A1.A4 B1.B4.                                RES  PM 017.398 814.815 R20 B24.                                EDM PLM Br4 Ws COMPLITED G A 04 cto CE C t at              45                      NO NML FLCOR                                            RLS  PM l
EDaust MONf70R                                          SDM PLM m eCCM u TtD J
    -  G a s-      1 CEC 1 st  45                      PEQ E M L W ARWs                                              Pu RLS ms CCNPJTED                                            SDM Plu G A 04 014 CEC 186                4S                      PEQ RYM W:CCNFUTED                                      R$    PW SDM PLM G A04 010 CEC 1 e6                45                      MQ PPS We CCW'LITED                                    RES  PW SDM PLM
                                                                                                                                                ~ ~ ~
l      G A04 CM CEC 1 e6                  32                      NQ SERY1CE AR SY3 TEM                                  MS    PW
'l Ws CCWPtiTED                                            SDM PLM O A04 021 C(C 1 as                31                      PEQ pssTM44ENT AR SYS                                  RLE  PW We CCMPJTED                                            SDM PLM d
a
 
                                      =__                                                                    - -
CHECKLIST # G              GENERIC CHECKLlST A. HARuWARE ITEMS                                                    JAN 24 87    Page 6 A.04 MAlMr REQUESTS & PROCEDURES NCL PMS A      ENTRY                                                              PfGLCT5 MCR
          .4E R    DATE    SYl#ROJe PERMNCE DOCUEM              SUEJECT            JUBTFY F Pe0T MQ  APPRvR 00ER  STATusDAtt i
G A04 022 M C 145      to                          MQ KC CCNT DAMMR$ &                          M.S      Pu Doors AspARED i
                                                                                                                            ~
      @ A 04 023 DEC 185      64        3 M 444 YE&&EL    PEPFCFtd PROMIUML STEP $                      RLS. CJM OPENING PREPA AATON OF ATTACHENT A PER PEFEMNED P9CCE62E O A04 024 DEC i 86    64        3 W 444 YES&EL    PEPFCred PROCE3JRAL STEPS                      Rf      CJM OPENNQ        OF ATATOedENT B PER PEFEfENCFD A BE Q 804 026 OEC 1 as    44                          8iATION 8to MLAY TEST                          RLS      PW G Q 04 027 DEC 188    46                          ACS TESTPe3 6 CChPR                            RLS      PM OVEftHAUL W16PCS 8016200 N16300.0016400.6016!co O A N 029 CEC 188      45            3 M his        PPS W SET EPA e            CNCECYCLE TEST    R11      PW
                                                                                                                            ~~
PROCEDUPE 3 W4i8 TAW 'M      CEC 186    60          VARCU$WRs      SECC804AV CONTAPedENT      SEC CONT          DAM (W4TER $LALS)              PEETtATIONS CONTRCLLID G A04 @35 DEC 1 as    21                          MQ DEMN WATER              MFUEL FLOOR        RL&      Pu h5fs COMPtKTED              WATER ME06        SDM PLM 0 AS4 078 JAN e87      84          WR as 54 20    (R 11791)PERFORW Rx        COhPLETED WR ~
                                                                                                                            ~'
REA Pu DBSA&MWOLY G God 131 JAN 20 87    30                          MQTW:CW hers Con #UTED
                                                                                                                            ~
RLS      Pu SDM 132 JAN 20 87    2                            MQ MACTOR MCRC
                                                                                                                        ~~
RLS      PW
                                                          $4 TEM M(ChFtKTED                              SD M G acdi33 JAN2007      e MQ.WXTOR FEDAA1ER                              RLS      PM SWTEM h8TS CCneuTED                            ED H l
1 i
l l
l l
l i
i i
l 4
 
CHECKLIST # G                      GENERIC CHECKLIST A.      HARDWARE ITEMS                                                                    JAN 28 87              Page:7 A.05 FAILURE & MALFUNCTION REPORTS (FMMtS)
          .M            ENTRY                                                                                                                              ~
PFCDUCT5 MEIDCR em)MER            DATE              SYS#RCue FEFEFENCE N MW                    $UWECT              JUBTM F NOT FEQ          APPR W 000t    $f ATUS DATE -
4 G AC6001 DEC 188                      si        a M 3-1. F6MR          maavE PEEDToPEPFGW              OETUtMhATION BY          AL&  P M.
                                                                                                                                                              ~
uns op cFF-snt Power            opsRATOMB CEM St.fW TEST PCLLOWNG 00 neuPCENANCE 1
I
)
I l
I a
l I                                                                                                                                                                l
!                                                                                                                                                              l 4
i
.,                                                                                                                                                              1 1
1 1
i I
1 1
1 1                                                                                                                                                            !
1 1
i
    -        - - - - - - - - - ..--, - . -      -    .u. _ _ _ - - - - . - -        _        ,_.y-    --m.-_----.-,-.w_y,,r        - m,
 
CIECKLIST# G            GENERIC CHECKUST B. SOFTWARS ITEMS                                                      JAN 28 87            P8ge: 8 8.01 OPERATINOMAINTENANCE SURV PROC.($T'S)
          .d      ENTRY                                                                PR@UCTS PEEMDCR PA445ER    DATE    SYSPROJs PEFTAENCErrri W                $UE)ECT            JUETFY F NOT PEQ                          APPRvR 00ER  STATUS-DATE G BC1Oc1 CEC 184        14      &E1J                  CORE SPRAY WCV                                                        PIM        WONTHLY ~
CPERA8LfTY                                                                        LAST 00P4 i
G S C' CCt CEC 18C      14    4 W 2 2 'O t.1          CCAE SPMY LCGC TEST                                                    PLES PW    $1ut ANNy AL~
LAST DOP4 G B C1 W3 CEC 1 es      is    a M 2 2.$0.12          CCRE SPMY LOGC TEST                                                    ALS  PW    SEWFANNUE LAST DCe4 0 8 01 Otd  DEC 1 d6    14    0 W 2 2.101.3          CCPE SPMY LOGC TEST                                                    RLS  PM    SE WL ANNu At LAST DCv4 G B Ci Cc6 DEC 1 at      14    8 W 2 2.1014            00pE SPMY LOGC TEST                                                    RL&  PM li                                                                                                                                            SEWFANNVAt LAST Dord 4 8 01 Ote DEC 186      14    8 W 2 2101.5            Cope SPMY LOGC TEST                                                  RLE  PM  EE WL ANNu4 LAST DOP4 G B 01007 ~ CEC 1 as    is    8 W 2 21014            CCfE FRAY LOGC TEST RLS  PM  SE Wk ANNU4
'!                                                                                                                                          LAST DOP4 j    G B 010C4 CEC 1 er      14      8 W 2 2.101.7          CORE SPMY LOGC TEST                                                    RES  PW  &&MbANNu4 LAST Dord G B C1000 CEC i SS      14      8 W 3 21018            CCFE SPRAY LOGC TEST                                                  PLES  Pu  $4WsANNvAL LAST DOP4 G S 01 C9 C CEC 186    14        &L15                CCRE SPRAY WOW FBOW CPCE PER it he3                            PLM        CroCL t4 WO
);                                                        ALTEPWATE SHUTDOWN PANELS
    * 'i C11    CEC 1 e6  14        8 C 13              CORE SPRAY 40tC                                                        PLW        2wCNTM V4VE LINEUP                                                                      LAST DC6E LaeC1C12 CEC 186        14        4 Ai4                CCfE SPRAY SYS NTEGR.TY                                                Piu        QUARTERLY LAST DCtd 4801013 CEC 1 a5        14        4 L18                OtfE SPM Y ST1 CSECK                                                  PLM        QNCERO V4W C*th ASUTY SA499                                                              LAST DCr4 G B C1014    CEC 185    14        2220                CORE SPRAY SYS Lp4I.85                                                Piu ATTACMMENT A.DC1)EE V4VE VERvC ATCH G B C1 Cil CEC 186    901      8102                  PERFCAW CLA&$ N 4 31 i                                                                                      PRE $7ARTVP ffEW                            J B. J$
8't1 TEM RvVROS 2APA70E0 j                                                          OUTAGE)
!  G S C1 C's  CEC i m    10                                                        1 CYCLE $QRy MERFOfW Liv TE$T CN RNR                                                JB    C L.
04)ECTON C+(CK V4VE $      CUE v44.N fNR LOCP EXPANDED OUTAGE)            LS P49 TD Bf OPERA 8LE I  G eC1C1? CEC i as      t4      8Lii                  CCpE SPRAY Pvns
'                                                                                                                                Ptu        6aw%v ~
i CPEMDLfTY 4 FLCW                                                                  LAST CCP4 MTE TEST
:  G . Cie,. CECim    ..        ...                  M m=YLoe                                                              Rts  Pu  C,aevca CubC**RGE TEST                                                              WW  LAST DCt4 i  G $ 01018    CEC 1 m  4t        8W31                  CC LCms OF CWF5fft POAUL                                              RLS  PW  CP.CECvat (WEPCS 3077500)                                                              uW  LAST DOP4 GGC1C2C CE C 186      14        4 C 22              COFE SPRAYMJ AJVR                                                      Piu        ME%Y
!                                                                                                                                            LAST DONE 1
C25 CEC 1 m    14        s C 23              CCs4 SPRAY.So asuR                                                    Pgu        gggy- - -
l-LAST DOP4 I
i 1
i 1
1                                                                                                                                                              l l
I
 
CHECKLIST # 0              GENERIC CHECKLIST B. SOFTWARE ITEMS                                                JAN 28 47    Page:9                            !
8.01 OPERATINGAMINTENANCE SURV. PROC.(ST'S)
W      ENTRY                                                          PRccuCTs eCR mR          DATE    SYS# Ram PERpsNCE rm azNT          SURACT              JusTFY F NCT MQ  APPRVR DOER  STATUS DATE G B @1022 MC 186        14          8 C.24        COM SPf%Y M&kLY LLeE                        PIM        M EKLY LAST DC*4 0 g C1 e23 CE C
* 88    14          8 C to        CORE S* RAY-                                                          '
PIM        &EW'AMewA[
SEMb ANNUAL LUGE                                        LAST DCP4 G B 01 C24 MC 188        14          4 E.14        CCRE SPRAY P45TR CAL                        ALA    PW  ONCL* Q LAST DONE G aet02$ DEC 1 e6        14          e C.is        CCRE SPRAY 410KV480V                        PLM
                                                                                                                                ~
v4 EELY twfTCHGEAA SLRVEL1ANCE B 01026 CEC 1 e6      14          0 L11        CCRE SPRAYCOLD MJTDCmN                        PLM        WONTU VALW TESTNG                                              LAST DC4.
G B 01027 DEC 186        to          4112          COPE SPRAY REMOTE                            PIM        ONC0B0 904CATICH CHECK 1
0 581 C2t DEC 186        14        e W 2-2 41  -
CCRE SPRAY MADER CELTA                        RL1    P.M OUARTERLv P TEST.OPER 1i                                          LAST DCt4 G B 01 C31 DEC 186        14        eW    2.1.1    CORE SPRAY Ms WATER
                                                                                                                            ~
RLA    Pu  wwr%Y LEWL SAFEOUAADS                                          LAST C<*4 G B 01034 CEC 1 e6        to      a W 2 21010
)
CON SPRAY TMP $YSTEW                          RE&    Pu  CNCLEO
                                        $AT1SFIES CS & Rm POWER ILS WONITOR                                        lAST DC*4 i
G 8 0t C35 CEC 186      14        8W223i SATWlES CS & R4 CCM $ PRAY AD6 PLaAP                          REE    Pu  MDNMT ~
DeCMAGE A0 NTERLCCX                                      LAST DC*4 1
Q B 01036 CEC 186        to      4W2214          CORE SPRAY Rs DRY % ELL                      RL1 PW    uDNTAv HGH PMSSLRE                                              LAST DCr4
            . C3 7 DEC 186    11          441          $8LC PVW OPERABLrrY                          PLM        uONTMy
                                                          #O FLCM RATE TEST                                        LAST DCet G 8 01034 CEC i 86      11          7.1.19        $4LC VOLLME COC.                              Piu RC    hCNNLY SOLLm0N N TANN                                          LASTDCe4 l    G S 01 C33 DEC 1 e6      11          443          smLC NLEF VALW C4CE        ONCLCM TEST        PLW G B 01040 DEC 186        11          8 L12        saLC REWTE NCeCATod        CDCLC CI TEST      Piu l                                                        CHECE G 8 0t De1    CE C 186  45          3 W 120
!'                                                      sov LEWL svCCMS                              RLS  PW  OVARTE A v OPER 10 LAST DCr4 I    G B01 042 CEC 186        46          O li2          CM MEWTE POCATCH                              PLu        ChCLtvCLE (RP 6)
I
    ~ G B 01043 CEC i a6      46          4 W i 31      SOV WNT ANQCfLAN                              RLS  Pu  CNCLCYCLE l                                                        TWPeG                                                    LAST DCr4
!    G 8 01064    CE C 1 e6  45          833            $0V %E NT AND DRAN        8LDC TEST          Piu        CNA RTE A v ~
'                                                        FUNCTCNAL TEST            PERFCRW.D wTrH                LAST DCP4 S W 121
    'a B 0 5 08 6 CEC 1 M      M          S73            SEC CONT LLAA RATE TE$T                      Piu        Ct4 LSO CPER 10 LAST CK*4 J    G SG1064 CEC 186        60          tC6            TEST or CPES crtRASUTY                        P1W        WONTRY
.                                                                                                                  LAST CCet G 8 01 De? CEC 1 e6      W          8729          CMS DAWER NEPECTON
                                                                                                    ~
PEu        EE WL AN%at G B 0108e itC 1 e6      44          87.21          883T DELT A P ACAOES PEAFO W Ce G      PiW        C*C L'14 WE
                                                          ,mR                        PE R , . .
1 4
f a
I
 
CHECKUST# 0                                  GENERIC CHECKUST B. SOFTWARE ITEMS                                                                            JAN 28 87                        Page:to                                            !
B.01 OPERATING,WINTENANCE SURV. PROC. (ST'S)                                                                                                                                  !
              .W      ENTRY PMou:Ts usmnCR NUWEER      DATE    SYS#RCus PERRENCE DOCLAENT                                          SUBJECT              JVETFY F NOT MQ APPRVR DOER              STATUSCAft (La 0 t A*8  CEC 1 as  se                            a 7.2 7                  MATA P ACROS$ CONTROL                                            PLM                      CNCE/10 WC ROOWGNYPODNENTAL SWTEM G 8 01 Cic DEC 1 as      de                            4 8 is                  800i SPRAY $YSTEM                                                PLW                      CNCECYC[I        1 (FRE WATCH)                                                          .                    LAST DCr4 l
j      G B #1 C5.9  CEC M M    e4                            47.2s                    23T $11TVW OPUW4Urv                                              PLW                                      I CNCLCVCEI
,                                                                                                                                                                                                  I LAST DC*4 I
G B C1C12 DE C 186      44                            6 7.2 J                  98GT MOTY
* HEATERS              C8C4 PER it WO OR              PLW                      CPCE 18 MO i
AFTER WTR WANT.
G S 01 CS3 C(C 1 a6      48                            8 7.2 e                  NGT CONTRCL 20 Cad                OKE PER it WO CR                PLW                      cec L'il dO~
MJWOfrY . HEATERS                AFTER WTR WANT.
      -G B C1 eta CEC 1 as      44                      8 W 21.5 4 3                  SSGT HCuTON ANO                                                  RL1                PW    SEWFANwn        '
                                                                                      % EDG 16OLATON                                                                            LAST DCed
  ,                                                                                    SY1 A940ARD t
G S 41 CSS DEC i 86      e8                      8W21644                        StGT NITaiON ANO                                                                    PW    EE WL ANNy4 RES.                                      '
{
h SLDQ ISCLATCN                                                                            LAS f DCp(
                                                                                      $YSB NGCW C b      Q S 01 C54 CEC 1 e6      30                          4til                      PS:CW PladP CPERAS4JTY            RECD. F CCNT.                  PLW                      QUARTEAY
].
                                                                                      #O CAPACfrY CMCK                  COOLNG RE2D                                            LAST DCtd
.      G S 410$7 CEC 186        30                            4 E 30                  PS:CW SY3TE.M N$TR CAL            RECD F CONT,                    RL1                PW  CNCERO COOLNG M 20                                              LAST DCr4 G B C1 CSS DEC 1 e6    33                              8 C i3 l                                                                                    RSCCW LOtC VAtW LNEUP            RECD F CONT.                    PiW                    2 EhTH ~          I CCCLH3 REDO                                              LAST DC#4 050 CEC 186      M                              4 Lit                  AB:CW COLD MJTCCWN RECD. F CCh7.                    PLW                    20NTHLv ^
VatW TESTNG                      COcue3 MOD                                              LAST CO.E G B C1063 DEC 1 at      3 *,,                          e C it                  RECW 4 itKY 40CV
                                                                                                                                                                                            ~
RECD F CONT.                    PLW                    MEnv COOLM3 MQD.                                              LAST DCed G 8 31 C41 CEC 186      30                              4 C 24                                                                                                                              i
],
PWCCW MEAY LLeE                  RECD F CCh7.                    PLW                      ME4Y COcudQ MOCL                                              LAST DONE G 8 01 of.2  CEC 185    M                              S C 29                540CW EE Wk AMeJAL LUBE          RECD. F CONT.
I                                                                                                                                                      PLW                      EE WL ANw4 1
COCLN3 MOD                                              LAST DCed
)
G S C1063 CEC 186      30                            S E 3.3                  feCCW CCNTAMENT                  MCD. F CCh7.                    PLM                      CA>ARTE R.y      !
COCL h3 VALW                      COOLNG MOD                                              LAST DCed
'                                                                                    CPER AalLTY TEST                                                                                            t G S Qi Cnia  CE C 1 e6  M                            &&34 i
PECW Ptas' . ALTERNATE DeJTDOWN PANEL TE$T MOO FCCNT COOLNG M OD PLW                    ~ ELEE LAST DCvd G tc'oss ttC i e6      30                            s L12                  Pm:CW Ma*0TI PcCADON              RECC. F CONT.                  PLW                      CNCECVCLE I
                                                                                                                                                                                                  +
CHECM                            COCudGPEQO                                              LA5700P4 2
G B C' ;W4 CE C 1 e6    29                          8&3J                      &&W PW8 CDTRASLITY                RECO. F CCNT.                  PLW                      QUA RTi% v" AND VALVE TEST                    000LNQ MOCL                                              LAST CCNE j    G S C1 "E7    CEC 1 as                                4139                                                                                                                                  !
it                                                    &&W PW ALTERNATE                  MOD F CONT                      PLM                      CNCtqVCil-DeJTDonN PANEL TEST              COCue3 MOD.                                              LAST C04 G S C1 Cs4 CEC 1 e6      at                            4 E 29                  EsW $YSTEW N6TR CAL i                                                                                                                      RECO F CONT.                    RL1                      CNCECvCil        f Co0Ln3 Men                                                (Ast Co4            i l
l    G 8 01068 CEC t a6      29                            8 1.12                  36W REMcTE NCCATON                RECQ F CCNT.                    PLM                                        I CNC& CYCLE
  ,                                                                                  o4Cx                            CoCue Moo                                                LAst Cod I                                                                                                                                                                                                    l 1
a                                                                                                                                                                                                    I 1
1 l
i i
<                                                                                                                                                                                                  l 1                                                                                                                                                                                                  1
 
CHECKLIST # G            GENERIC CHECKLIST B. SOFTWARE ITEMS                                            JAN 26 47      Page: 11 B.01 OPERATINGMAINTENANCE S'W. PROC.($T'S) a      EwTmy PecouCTs esCaoem s.#IE R    DATI    SYS#mCus PERPENCE N Mh'T        SUEJECT          JUSTFY F NOT pEQ      APPmW DOEA  STATU$.DATE o a ei 07o DEC 1 as      le        11e2          asw Cnoseone vALvis      maco. p CcNT.          Piu        oNCtmo 00CL883PEco.                      LA8T DONE c a 01071    CEC's as  45        8W2132        N ECA EN"#
WoNrfom RhCTCNg "A    *    #
LAST DONE ea 01072 CEC i as        to        e C.is      mMn (LPCn Lcnc vAtvss                          PLM        twoNTH LAST Cod G 8 01.073  DEC t m    10          e C.ie      mMR4im v4eOy            PERpomW WEEgy          PLW        veEnv Swf7CMEM BLRVEELANC4                                      LAST 00P4 G a 01074 osC i as      $0          e E.50      pHm LPCs sysisW                                us    eu  Cectso ' ~
NSM CAL. CPEA 12                                          LAST DDPd G e ot ers CEC i ss    10        asas          w LPCIPLow AATs ust                            Piu        ouAmrtn5 -
LAST DCPd 0001077 DEC i as        10          S Att        FNm LPC18YS NT10RfTY                            PLW        QUARTE 41 LAST DCPd G s ei 07e DEC i as    10        e W 215 e    LPC4cw mEssumE                                  us ex      uceawy PEmWESM                                                    LASTCord C5 91079 MC i 88        10      4 W 2-2.10 21  LPCI MCTON NT                                    PLE.1 Pu  MWwANW4 LAST DCed G S 45.0m    CEC i 88  10      8 W 2-210 2 2  LPCI MCTON NT                                  R& Pu      SEWS ANw4 LAST DCed G B Ct 0e1 CEC i es      10      4 W 2 2 to 2 3 LPCI MCTCN NT                                  RLS    PW  SEW $ ANN A LASTDCed 04J DEC i es    10      0 W 2 210 2 4  LPCI M CTON NT                                  ALS    PW  Siu-awgal LAST Dced G a 01043 CEC i e6      10      4 W 2 210 2 5  LPC4 MC7CN P(T            e k7m E E W          us    PW  SE W5 Aw;4 SETS TO PEMOfW                  LAST DOPd G S 01044    M C i86    10      8 W 2 210 2 4  L;Cl MCTON NT            e k7m PECRC W        RLS    PW  HW ANw4 SETS TO PERPORW                  LASTOced G 8 01 Del Ch 186        10      0W221027      LPC4 MCTON NT            DGED BOTW FEC8C W    RL1    PW  &EWKANw4 MT5 TO PUFORW                    LAST00Pd G S 41006 CEC i e6      10        a W 2 210 2 4  LPCI MCTON NT            DGEDBCTHIEC E ha3    RLE    PW  MWb A.Nw4 SETS TO PE8FORW                  LAST DONE G B 01007 CEC i e5      10      e W 2 210 2 e  LPCI M CTON NT                                  ut    Pu  6Ewt awJ4 LA57 CCNE 6 8 01 Det CEC i al    10      4 W 2-110 210  LPCI MCTON NT                                  RLS Pu    stW- ANw 4 LAST CCP4 6 0 01 Das CEC 188      10      4 W 22it211    LPC4 M CTON NT                                  AL&    PW  6LW.ANNbhi LAST DCed
__GS31OM      CEC 1as    10      4 W 2 210 212    LPCi MCTm NT            955D KmoECec ha3      RLs    Pu  u Woasw d SETS TO PtfrCRW                  LAST Cod G S 01 Oli CEC i st    50      0 W 2110 213    LPCI MCTCN NT                                  RLt    Pu  MW$ANwn LAST DONE G B 01002 CEC 1 m      10      4 W 2 210 214    LPCs MCTON NT                                  RLS    Pu  uW&aws4 LAST DOPd
      *OM    DEC i 88  10      4 W 2 210 2 il  LPC4 MCTON NT                                  RLs Pu    EE M' AN%4 LAST DOPd
 
CHECKLIST 0 G                    GENERIC CHECKLIST l
B. SOFTWARE riEMS                                                                      JAN 28 87        Page: 12                              '
B.01 OPE RATINGMAINTENANCE.SURV. PROO. (ST'S)                                                                                                l
                                                                              ~
I                        d    ENTRY PRIILCTS EFMDCPL AedMR          DATE      S YS-PRCbe PEPEFENCE rirYt urNT                    SUBJECT                JLETFY F esOf fEQ      APPR%14 00ER    STATUS-DATE G l e1 00s DEc l es                  10        s W 2 2. 0 216          LPCi MCTION NT                        DEED 00TH f5C#C MG    RLA      PW    MWFANNv4 SETS TO PEMofed                        LAST DCNE 4 8 0' De9 Cf C 188                  10        8 W 2-11C 217            LPCI MCTION NT                                              RL1      P.M    M WFANW4 LAST DOPE 0 801086 MC 186                    10              SE23                LPCi v4%10PEnestrry                                              -
Pin 4          WONMY LAST DO*4
'    G S 61097 DEC 1 es                  10              8 L11              LPC4 COLD 8+41TDOWd                  R600 > CONT.          PLW            WONMY VALVE TEST                            00CLM1 pEQO                          LAST DONE l    G B 01 Det CEC 186                                8W2164                                                                                          ^
10                                  LPci H 20LATioN                                              RL1    Pu    MWtANNun l                                                                              V4vtTEST                                                                    LAST Dord C.B 01 ces MC 1 as                  10          4W2154i                LPC4 M tbOLATioN                                                    PW RES            uWi ANNv4 v4YE TE5T                                                                  LAST 00Pd a e 61 too DEC 1 as                  10          8W215t                LPci M ISCLAT10N                                            RLS    PW    StW' ANN 75 V4VE TEST                                                                  LAST Dort
-I i
Q B $1.101            CEC 1 as      10          8W216&1                LPCI N GOLATiON                                            RLS      Pk    MWn ANNv4 V4YE TEST                                                                  LASTD0*4 J    Q 8 01.102            DEC 45        10            tE28                LPCs WQv ALT EQ PA>EL                PEPPOW OPCECYC11      Piu            CNCLCYCt1 LAST DONE G B 01103 CEC 1 et                  t0          8 W 2 21.7            LPCJ LOW Pas &SURE                                          PLES    PW    ouARTIRLY PERW45NT AUTO hrf                                                          LAST DCNE O O 01104            CEC 1 e5      90          0 W 2-2.t 8          LPCILCW PRE $$URE                                            RLS      PW    CuARTE RLY PE8WSSN1 PUECTICN                                                          LAST DOPK j
VALVES l
      . si 107 DEC i es                    10          8W2211                                                                            RL4 LPC4 PEACTOR W ATEA LEb1L                                            PW    MY
)
SAFE 0VAAD LAST Dord J    Q R 01,104            DEC i et      10            4W211                LPCIPC S REACTOR HG4                                        RLS      PW    ucN M Y PfESSURE                                                                    LAST DCNE G 8 01109 MC l ag                    10          8 W 2 210 31 4
LPCI CCNT AWWENT & PRAY                                      RL1      PW    $( W,. ANw4 PERWESNT                                                                    LAST Dord    !
I O 8 011to CEC 1 et                  90          8 W 2 210 3 2          LPCJ CONTA846ENT SPRAY                                      RLS      PW    &EW AN%4      j PLRWSSNT                                                                    LAST0074 0801114 CEC t et                    10              21.7              LPCl%1&ML HEAT UPCCCL                fEOD FOL CRJTAES      PLW DCmH (84A 4 0eO O4CK                  OREATER THAN 3 hc                                    )
V4VES LAUST REV TQ a
DCLOCE THE TEST)
)    G B 01 til CEC 1 as                10              4f18                LPC4LLRT OF PRICONT                                          JB      PW PENETRATICW4 4 VAL %tS WG100123 A.26A298 60, 80.8347 G S et122 CEC 1 e6                  10              8 C 24              LPCI ME 4Y Lt.4lE
                                                                                                                                                                      ^
PENOW M14Y            PLM            ME4Y LAST cod 0 8 0t 123 CEC 1 as                10              0 C 29              LPCd SEW 6 ANWAL LLSE l                                                                                                                                        PLW            $1W'ANWA[
1                                                                                                                                                        LAST cod o e et in MC t as                  to            2182                LPCa CLASS s8is wvonos                                        Ja      JS
;                                                                            M A Hs.26A 294,264 248 i
                                                                              .25A 234
;                    ' 127 CEC t es 48              8101                CPEm i4 FUEL HANC(Pc                                        ptg            gggy I                                                                            N 70443                                                                      LAST Dord I
1 i
i
 
i i
i CHECKLIST # 0          GENERIC CHECKLIST B. SOFTWARE ITEMS                                                                        JAN 28 87                  Page: 13 B.01 OPERATINGMAINTENANCE.SURV PROC.l$T'S)
W      ENTRY
* W8ER            SYS#RCue PUEFENCg rrr wrNT PRKUCT5 MCR DATE                                                          SURECT                  JUETFY F NOT REQ                                    APPRW DOEA      ST ATUS -DATE 1
Q B 0112e MC12          40        8.10 2                  CPLA 14 FUEL HMOL94G                                                                          PLM            ME4Y                  i 50VPWENTDECs3                                                                                                  LAST DCrE G S 09103 CCC 186      49        8103                    OrEA 14ML KINDLNG                                                                              PLM EOUMENT DECs3 I
G B 01.130  CEC 1 se    a8        8104 1
OPER 14ML HANDLNG                                                                              PLM EOUMENT OGC40                                                                                                                        '
l i
i  G B $1.131  DEC 188    44          8105                    OPEA 16 FULL HANDLNG PLM            MEKLv i                                                              EOURENT OGCD3                                                                                                LAST DOPA l
l  G S 01132 MC 188        45        8W11                    CPER14mus                                                                                                                            l MLS  PM      CNCLCYCLE LAST DOPd G B 01133 DEC1 m        45        eW131                    CPER 10. APRW SETDom                                                                          RLS  PW      OCLCYCLE "
LAST DCPd G e oi t34  C(C 186    el        S W 121                                                                                                                                            ~
OPE R 12. RPS CHAPedL                                                                        REE    PM l
1 G B 01 ill MC 1 as      45        4W142                    CPEA 12 4 WCOE $MTCH                                                                          REA    Pu      CH".L90 N SHJTDom                                                                                                    LAST DOPE G B 01134 M C 1as      45        4 W i.23                  OPEA 12 h MANUAL &CAAW                                                                        RL1    PM      OUAMEAv LAST DCed G 8 01187 CEC 1 st      45        4W233                    OPER 12 5AW FUNCTON4 i                                                                                                                                                            RLS  PM      CNCLCYCLE                j LAST DOPE                l 0 8 0113e CEC i ss    45          a tt                    OPEm il evW OPERA 8aLfrY                                                                      PLu o # 01.113  MC1as    el        4 W t.1                  OPE R 16. PW FL*C TIC %                                                                        RL& PW        CNCLCYCLE 1
LAST DOP4                l
    . . di 144 MC 1 e5    41          8ei                    DG OPER44tJTY SURL                                                                            PLM            L E NTH i                                                                                                                                                                            LAST DOPd G S 01 14i  CEC 186  41          493                    00 FVEL QUANTITY                                                                              PLM            WONTHLv W RFCATON                                                                                                    LAST DC*d G B 01.$43  CEC 1 es  el        4W2463                    OPEA il CDNTMDL P00                                                                            RLE Pu        EEWL AN%h R.DCK 8W LOGC OECM A                                                                                          LAST DC*4 i
. G S 01944  CEC 185    45        4W2364                    CetA it.CowmM ROD                                                                              RLS  PW      $tW+ 4N%4i
,                                                            EOCK SYS LOCC OECK B                                                                                          LA.1T DOP4 G S 01148 CEC 186      10        8&21                    LPC4PUhr CPLfu8tny                                                                            PLW            OTHLY j
LAST DOPE l  G R at i47 CEC 1 ais  el        eu14                    APmW Flow eAs &GNAL                                                                            RLs  Pu j                                                              CAleRATON j
G B C1944 CEC 185      46        &W113                    WEL M RAD CAL BR4 ION
!                                                                                                                                                            RL1  PW      OVA RTE RL v (Space' Iese Roth                                                                                            LAST Cod
{  G t0t tto MC 1 as      13        aana                    Cc seneum SnaDou A i                                                                                                                                                            Piu            CNCLCvCti PEACTION $V1 FW, TON l                                                                                                                                                                            WSTCO4 G B 01151 CEC 186      33        8 8 6C                  DG SPetMER SYS ADCW 8                                                                          PLM          O M LCYCit
),
PRE ACTON SYS FUM, TON LAST Dord
)  G 8 0 91W JAN #3 87    0          474                      CAD FLhCTOP 4L TIET                      CCu m D$uRv                                          Piu          O*CE C vCil LAST Cod G . 01.i u m 20 7      4          .W31                    =T WTiM nCosm.
i us    ,W      u u r 4P.a RNCTOMAL & CAteRATION                                                                                        LAST CCP4
,                                                              TEST muuum -
f 1
_ __.__- ____ -    . _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _              _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ - . _ _ .            m. ,_ _ _ __,        _ _ . .
 
_                .      -_-.._ _          .. .    . - _ = - - _ .
CHECKLIST # G          OENT.RIC CHECKLIST                                                                                    I
: 8. SOMWARE ITEMS                                                    JAN 24 47      Page: 14 3
S.02 TEMPORARY PROCEDURES UP8) 4  ENTen dm                                                                        recouct e maDom                                          '
DAM    SytMQJe IWWENCE DCCIAENT              SUBJECT              JUSTFY F NOT PEQ      APPRWI 00ER    STATUS-CATE        !
u...,    ...              T , . ,,,        --                                                    ,o                                ;
                                                    .T            m I
l
                                                                                                                                    )
e I
l l
l 4
P i
I i
 
I l
CHECKLIST # G                GENT.RIC CHECKUST j
B. SOFTWARE ITEMS                                                          JAN 20 47    Page: 15 5.03 NEW MEVISEts OPERSURV PROCEDURE S d      ENTRY PRutnCTS MEDEDCR esAsER    DATE    syg m MPgpWC40COMENT                      SURECT                JUSTFY F NOT MQ      APPRW CCER    STATLt 0Att G S SHi? DEC 1 es    1ce              APPEeOGER        LST NEW CR REV CPEA AND                            MMA hMNT PROC REQUWED CR,lE TO W Rte 00s l                                                                                                                                            I i
i i
I l
I I
t k
I I
I I
 
_                _ - _ = _ _ - - . _ ..
CHECKLIST # G          GENERIC CHECKLIST                                                                    !
i
!            8. SOF1 WARE ITEMS                                          JAN 28 47  Page: 14                                ;
;                  SN OEFCENCYREPORTS(OR1)                                                                                      t
;              a      SNTM)
          ..AR                                                                PRF) .it N CR j                      DATE  sv&Mcus pertpWG 00 MENT          su M CT        AastrYF:4/ftQ    APPRW DOEA STATUS.catt l 1        o e o4 oot osc i a  es      on Tmacmen sysTsw  suvawons son                            wa A t P.                      -
f APMCAKffY TO                                                          !
]                                                        hassTCM COMPLKfEN                                                      I h
,                                                                                                                                i I
I i                                                                                                                              i a                                                                                                                                !
l                                                                                                                                6 i                                                                                                                                f j!                                                                                                                              !
i 4,                                                                                                                              ,.
f I
I l
l 1                                                                                                                                l l
i e
I i
k i
1 i
i l
;                                                                                                                                  1 l
!.                                                                                                                                i 1
i 1
 
CHECKLIST 3 G              OENERIC CHECKUST j                      S. SOFTWARE ITEMS                                                                                                  JAN to 47    Page: 17 l                          B.06 NON40NFORMANCE REPORTS (NCR15)
J                  .. s u    s<my                                                                                                                                                                --
menc15,asceom                                                              I
,                DaAdER    DATE      SYSMCue PWWENCE 000A8NT                                                              SUSACT          JUBTFY F NQf fEQ                AP M W 00ER  STATUSt,atl
'                                                                                                                                                                                                                        l t1846 076 JAN 14 87    10      VAA80V8 NCAS                                                        NC8t1 PCTENTALY        CLCetGJT OP IC#5                KPA A L P.                              !
APF5CT980 CPEMAKffY                                                                              i C# PWQUfE0811 TEM 4                                                                                i l
                                                                                                                                                                                                                          \
l 4                                                                                                                                                                                                                        i I
i                                                                                                                                                                                                                        \
1 d
I l
4                                                                                                                                                                                                                        1 4
I                                                                                                                                                                                                                      l 1                                                                                                                                                                                                                        i l
}
l i
I l
i 1
I j
i j
j 1
),
I i
1
)
l l
 
CHECKLIST # G              GENERIC CHECKLIST B. SOFTWARE ITEMS                                                                                  JAN 28 87                Page: 18 5.06 POTENTIAL CONDITIONS ADVERSE TO OUALITY
      .M      LNTRY                                                                                                  PRCEUCM PEEEEDOR NUweER      DATE      SYS-PWJ REFERENCC CXUMENT                SUSKCT                                              JUSTFY F NOT REO          APPRVR 00ER                              STATUS DATE G L 06 001 JAN 15 t7 '              PC.AQs            ENSURE PCAOS AFFECTNG                                                                    Rvf. DAW
                                                                                                                                                                                                    ~ ~
fECU5ED SYSTunJ ARE                                                                                            WR CCMPLETED e4mus I
1 l
                                                .                                                                                                                                                          l l
l t
                                        -,r-_____,- ,. ,_  -m,_---    _ _ _ , . _ . _ _ _ _ _ _ _ - _ - _ _ _ _ _ . - _ _ . - - - .        .._y- , , , - - - , _ _ - - - - . , - - . - - .
 
1 CHECKLISTD G                              GENERIC CHECKUST B. SOFTWARE ITEMS                                                                              JAN 28 87                        Page: 19 8.07 TRAINING NEEDS AND REQUIREMENTS
            .M      ENTRY NUMBE R PR3 DUCTS MOR DATE                  SYS-PROJs REFEMNCE DOCUMENT                  SUEJECT                      JUSTFY F MDT REQ                      APPRVR DOER STATUS CATE G B C7.001    DEC 185                    de      ' PROC &4 0,4 2.OPER                                                                                                        ~
TRAN UC OPS PER80PedEL              COhPLETIO TRA8dNG                    MAR 0a 25.5.4 3,4.3(APP.A)        CN GEMM ERELNG O*ER 10-18,0.901-6        PROCEDr.RES W
M 4
f 1
)
  - . , - _        ~ . . - - . - . . - - - - - .                  . - .    - - -                    - - - - - - - - - - - - ~ - - - - - - - - - - - - - -
 
CHECKLISTD G            GENERIC CHECKLIST B. SOFTWARE ITEMS                                            JAN 28 87    Page: 20 8.08 ENGINEERNG SUPPORTREQUESTS(ESRS)
A      ENTRY PICOUCT5 Pssrsncs usdBER    PATE    SYS#fule REFERENCE N m W      SUS /ECT            JUSTFY F PCT MQ      APPRVR 00EA STATUS DATE G B.00 001 DEC1#                ESR u.YYY    ENG9EERNG SUPPCRT OF                          CM TEW$NC CHANGES PEEDED FOR CUTAGE ACTMTES GB C8 0C2 DEC 1 M              ESR M ZZZ    SAFETY EVALUATIONS ON                          RVI,
                                                                                                                  "~~
OPERA 8tffY OF REQ SYS S
 
CHECKLISTD G          GENERIC CHECKLIST B. SOF1 WARE ITEMS                                            JAN 28 87    Page: 21 B 09 DRAWING & VENDOR MANUAL CHANGES (MOOS) 4W    ENTRY                                                      MEX)UCTE MCR NUW9ER    DATE  SYS#ROJs REFERENCE m adcNT      StWECT              JUSTFY F NOT REQ    APPRVR DOEA STATUS-0 ATE G BD9OC1 DEC 1 as  et        PDC PACMGES    LPDATE OF PRIORITY 'A'                        h1MA J C.
D6 COWUTE O
i e
l l
 
CHECKLIST l) G                      GENERIC CHECKLIST B. SOFTWARE ITEMS                                                                          JAN 28 87            Page: 22 B.10 OPERATING EXPER1ENCE REVIEW (OERS)
      ..fM          ENTRY PRX)UCT5 Pssrsnm NL.NGER      DATE              SYS#RCue PEFUENCE DnriasNT                SueKCT                          JUSTFY F NOT FSO    APPRW DOER STATUS-DATE G B 10 001 DEC 188                10        SERS, SOERS              COMPTTE REVEW AND
                                                                                                                                                                    ~
SER EVALUATION MEMO PDS SSW ACTCN FOR SERS
                                                                          &SOER1 O B 10 005 JAN 22 87              45      PC67 TRP REVEW            ComeETE PO6T TRP                      COMPLETED 8EVEW
                                                                                                                                                                  ~
AEP. SDH                        i REVIEW PRCR TO STARTUP                                        -                              1
_m I
l l
l 1
i 1
1
 
CHECKLIST # G                    GENERIC CHECKLIST B.                      SOFTWARE ITEMS                                                                    JAN 20 87                                Page: 23 B.11 STOPWORKORDERS                                                                                                                                                        j J                            ENTRY                                                                        M pgEEEDM                                                            ~ ~ ~
NR                                  DATE          S M RCus PEFEPENCE N MNT            SlalECT                    JUSTFY F NOT fEQ                                APPRVR DOER    STATUS DATE
                                                                                                                                                                                                              ~'
G B 11 001 DEC 188                                    49      STCP WORK Cfr ~AS
                                                                                          . Cl. EAR APPLCABLE SWCTS            CLOSEOUT CF SWO                                KFa A LP.
PROR TO MLASTOPES l
I l
1 r
1 i
I
.I i
  .l
_ _ _ . _ _ _ _ . , _ _ . _ _ _ _ _ ~ _ _ _ _ _ _ _ , -                --        ..        - . . . , _ , - - , - '  - - - - ~ . , - - - - - - - - - - - - - - - - -          - ---  ------------1      --
 
CHECKLIST # G          GENERIC CHECKLIST B. SOFTWARE ITEMS                                          JAN 28 87      Page: 24 B.12 MANAGEMENT CORRECTNE ACTON REPORTS (MCAR S)                                                          ;
      .M      ENTRY                                                    PIECUCTS PEEDEDOR reANER      DATE    SYS#ROJs PEFEFENCE N uNT      SURECT            JUSTFY F NOT REO      APPRVR 00EA STATUS CATE G B 12 001 JAN 20 87            WCARS        PESPONSE AADCORRECTME                          AEP.
ACTION TO WCARS
                                                                                                =                      l i
l l
l
                                                                                                                        \
l l
l l
l i
l l
l l
1
 
CHECKLISTD G              GENERIC CHECKLIST C. TECHNICAL SPECIFICATION ITEMS                                JAN 28 87      Page: 25 C.01 TECHNCAL SPECIFCATION CONCERNS
      .M      ENTRY PRODUCTS PEECEDOR
                                                                                                                          "^
m488ER      DATE    SYS# Raw FfFERENCE ryys a5W      SURECT              JusTFY F NOT REO      APPRVR DOER ST Atut; DATE G C 01.003  DEC 186    10          POC4        f4ESOLW TECH SPEC DEO
                                                                                                                          '~~
TECH SPEC CHANGES    A EP. JDK FOR PLANT WOOS G C 010'0  CEC 30 06  117        IE CO F.XX,YW  NAG mt)E SUPP. S IET*
                                                                                                                              ~
NRC APPROVA1 PRIOR    RVF. JDK EVAL CN h4APLNGR FOR      TO STARTUP SUSWITTAL NRC
                                                                                                        ~
O 1
i 4
l l
1 1
1 1
 
CHECKLIST # G            GENERIC CHECKLIST D. NRC RELATED ITEMS                                                  JAN 28 87      Page: 26 0.01 NRC COMMITTMENTS, CONCERNS, LERS 4W      ENTRY                                                              PRODUCTS PE.EDEDCR NUMBER    DATE    SYS PROJs PEFUENCE rvv1 W            SUSKCT              JUSTFY F NOT REO      APPRVR DOER STATUS-CATE GD 01002 DEC 186                NRC NSPECTON        CChPETE RESPONSE.                                E.T.a &Sw
                                                                                                                              ~
REN)RTS            ACTON MOURED PROR TO WLESTONES G D 01004  DEC 1 e6  46          LER'S              REVEW ERS APO COfmECT      LER UPDATE            LTG    BL CUTAE RELATED WORK TO      SWfTTED TO NRC
* COMPLETE ER COWWITTW.NTS G 0 01.054  JAN 18 87  til      1BXX S ALP, NRC tP4SP                                                                      ~
TECHNCAL SPECFICATON        NSPONSE TO PAC        RVI. JDK REPORT, POC$        CHANGES TO SUPPORT PLANT    M9PECTION REPORT            P.TA                              !
STARTUP                    (NAC APPROVED TS CHANGE) 2 l
 
CHECKLIST # G          GENERIC CHECKLIST 1
E. EMERGENCY PLAN ITEMS                                                                                                                                                        :
JAN 28 87                              Page: 27                                            i E.01 EMER PLAN ISSUES FOR CRITICAUTY/ POWER OPS ITEM      ENTRY pgxxLmmocg4 NLMSER          DATE    SYS#ROJs fEFEfENCE N W                          SUMCT                    JUSTFY F NM REQ                              APPRVR DOER            STATUS CATE G E 01.001            JAN 147  999      EAG4GENCY PLAN 4                EVALUATE EAEf4GENCY Pt.AN                                                    R1 FESPCPM PROCECWES 88UES FOR CRIT 1CAUTY.
POWER OPEAATIONS D
4 i
I
  , . - - - - - - , . .          -    - , - .      . - - - - - - - . - - - .        , . . . . , , _ - . _ .    . _ - . - , , . - . . , , - - - , .              - , - -,  -,-v.,m..        -. ,.-. _
 
l CHECKLISTD G                    GENT.RIC CHECKLIST                                                                                              t l
F. BACKLOG PROJECT ITEMS                                                JAN 28 87          Page: 28 F.0t BACKLOG RECOMENDATIONS                                                                                                                    i
            .M    ENTRY                                                                                                                                        l PRODUCT 5 PEEEEDOR                                                    '
NUW8ER    DATE    SYS N NRPENX OOCIAENT                  SURKCT                JustFY F NOT PEQ          APPRVA DOER            STATUS-DATE G F.01.001  DEC 1 as        q          SA1 EFa                                                                                                --
REG JP.o N E W MOURED MoonMitioN DURec CyrAoE PEnco                                                                                      l l
1 1
1 1
I 1
l l
i l
l f
                                                                                                                                                                )
t
 
CHECKLISTJ G          GENERIC CHECKLIST G. PROGRAM ITEMS (RAD PROT, FIRE,SEC, HOUSE,DECON)                JAN 28 87    Page: 29
                                      ~
M      ENTRY                                                          PP G UCT5 M CR                                j ER      DATE    SYS SAOJs PEFUENCE N a*NT          SUWECT              JUSTFY F NOT MQ    APPRVr1 DOER  STATUS CATE
~E G U1001 DEC 186    See                        PHASE le MANT                                  MMR RES PROGRAMMATC 68UES QuC1004 DEC 18s      33                          EST.T Mer FRE WATCH                            RV.
PATROLS N KEY PLANT AREAS
{
G G ot 006 JAN 19 87  48                          WPROVE RELIABLfTY OF                            RN S. J P.
WF$rrE PCWER SUPPLY FOR PPPS BYDECREASNG mEQ AND DURATION OF PWR LC6S l
I i
j l
l 1
l
                                                                                                                            )
 
CHECKLIS'ID G          GENTRIC CHECKLIST                                                                                        '
H.    *PUNCHUST* AND OTHER ITEMS                                    JAN 28 87                Page: 30 W      ENTRY                                                          PRODUCTS EEMDCR
                                                                                                                                            ~
        .M R DATE  SYS-PRCue EFUENCE DCCUE.NT          SUBJECT            JUSTFY F NOT MQ                APPR W COER    STATUS.DAT[
G H 01 Cc2 DEC 186    42                          OECMOUT 8V7 N NCAT.                                      CJ.R      OE
                                                                                                                                      ~
Q K015)3 CEC 186      48                          FFF SERW E8 DECKOUT.                                      C.1M    CJ M ELIC WATER. AR G H01Cc4 DEC 196      49                          NSTALL REFLEL DRIDGE                                      CJM      TECH
                                                                                                                                        ~
CC64ANCAT10NS CA8LE AND REEL Th 01.006    DEC 186  64          P2              LNCERWATER TV CAMERA                                      RES. PM O G O(CUT # O REPAR G H 01007 CEC 186      10          P2              fESTORE ALL R$ OUADRANT                                  WJA      GE "NTERFERENCES*(LET                                                                      ,
ITEMS AS APPROPRIATE) j G H 01000 DEC 186      64          P2              NSTALL CATTLE CHUTE                                      CJ M    CJM
                                                                                                                                      ~'
                                                                                                                                      ~
G H 01.009  DEC 186  106        POCPS          EXHSIT 9. OPERATKNAL        NO NTEFIFENCES WfTH          KPA WMA TUNCMR DOC 1)MENTATON        SYSTEMS NCURED                AE.P.
FOR WILISTCNES OR COMPLITED PDC G K01.021    DEC 186  09                        CHANGE CUT DW AREA                                        RES      PM CCCLIR FLTERS FCR tRT G H 01022 OEC 186      50                        SEC. CONT. PEET1%T1CNS      CONTROLLED                    PLM PLUGGED                      PEETRATICNS G H 01024 DEC 5 06    993                                                                                                        ~ ~ ~
WATER AVALAB:LTV TO          SUFFCENT WATER                SDM PEM FLOCO PCCL CAvmES
  * " 01 025 OEC 8 86  49                          ENSURE 145 DOUBLE BLADE
                                                                                                                                          ~'
SPECIAL BCLTS 6              RES. PW GUDES AAE AvALABLE FOR      NIJTS TO MA4 0000LE RJLL CCRE CFFLOAD            BLACE GUCES G H 01026 CEC 0 06  31.32                                                                                                        -
                                                    !LAMPLE AR FROM CUTPUT                                    RE$      Pu CF AR CC64PRESSCAS FCR                                                                    '
AAR QUALITY G H 01033 JAN 7 87    45                          CHANCE SETPONT CN                                          RES      PM REFVEL FLCCR (11P) APM FOR REFUELNG ACTIvmES
 
                ,.                a.a__ _ v --        s-- -- -                              - - - -
b J
CHECKLIST # 1 OFFLOAD CORE 1
l
)
l i
  , . . - . _ - , - ... .~ . - -              - --            - - - - - -- ~~~~  - --'*' '
 
THE          ENCLOSED                    PACKAGE CONSTITUTES THE NORMAL WORKING CHECKLIST DISTRIBUTED FOR CHECKLIST #1 ACTIVITIES-FUEL OFFLOAD l
 
ATTACHMENTI EXPLANATION OF CHECKLIST HEADINGS ITEM NUMBER A Sequential number assigned to each I'ne item that facilitates categorizing each line item. The number is comprised of the checklist number followed by the section number from the checklist format followed by a three digit sequence number that is just the order the ' tem was entered.
ENTRY DATE The date that the line item was entered into the checklist.
SYS-PROJ#
The code used by the ' WAR ROOM' to identify systems or projects. Note that the system numbers are the normal number codes used for identifying systems.
SUBJECT The system or issue to be addressed by the line item. This should include enough information so that no confusion is created in identifying the task to be accomplished.
PRODUCTS NEEDED OR JUSTIFY IF NOT REO This is the end product needed to satisfy the objective of the checklist, in this case it is the product needed to perform a core offload, i.e. the systems, procedures, evaluations, and conditions that must exist in order to offload fuel, if the item is not required then sufficient information must be given before an item will be signed off or authorized for transfer to a following checklist. This column only needs to be filled in if the product is not obvious.
APPRVR This is the lnitials of the person responsible for approval of the line item task. Persons' initials will be followed by a period, organizations, such as GE, will have the abbreviation listed. A complete list of initials used is provided in ATTACHMENT ll.
DOER This is the person assigned by the APPROVER to either perform the assigned task or to supervise the completion of the task.
ST ATU S-D ATE A completed item should be marked as complete with the date of completion. The official status will be that posted in the tracking systems maintained by Nuclear Management Services.
Additional informailon can be provided to aid in identifying problem areas and in resolving issues in a timely manner.
1 I
t                            _ - _ _ _ - _ - _ _ - _ -
 
ATTACHMENT 11 CHECKLIST APPROVERS & DOERS INITIALS            M                INITIALS                            M J.A.              J. ABOLTIN          M.M.A.                            M.M. AKHTAR P.T.A.            P.T. ANTONOPOULOS    W.J.A.                            WJ. ARMSTRONG H.R.B.            H.R. BALFOUR        A.B.                              A. BALTA J.B.              J. 3ELLEFEUILLE      T.M.B.                            T.M. BENEDUCI H.F.B.            H.F. BRANNAN        M.N.B.                            M.N. BROSEE P.T.C.            P.T. CAFARELLA      R.C.                              R. CANALAS W.C.              W. CLANCY            J.C.                              J.COUGHUN S.D.              S. DASGUPTA          R.V.F.                            R.V. FAiRBANK F.N.F.            F.N. FAMULARI      E
* GENERAL ELECTRJC J.P.G.            J.P. GERETY          D.G.                              D. GERUTS E.T.G.          ET. GRAHAM          R.EG.                            R.E GRAZ)O DH                D. HEARD            J.E.H.                            J.E HOWARD S.D.H.            S.D. HUDSCN          D.H.                              D. HUGHES J.J.              J.JER2              J.D.K.                            J.D. KEYES      '
D.K.              D.KUBA              D.L                              D. LONG B.L              B. LUNN              MAINT                            F.%)NTENANCE M.M              M. MACUIRE          C.J.M.                            CJ. MARTIN P.E.M.            P. MASTFMNGELO      D.A.M.                            D.A. MILLS C.M.              C. MINOTT            P.M.                              P. MORAITES A.V.M.            A.V. MORISI          J.W.N.                            J.W. NICHOLSON NED              NUC.ENG. DEPT.      J. P.                            J. PAWLAK A E.P.            AE. PEDERSCN        J.E.P.                            J.E. PETERS H.D              H. POSTIN            W.R.                              W. RIGGS K.D.R.            K.P. ROBERTS        J.R.                              J. ROGERS D.A.              D.RYDMAN            J.S.                              J. SABINA J.A.S.            JA.SEERY            R.E.S.                            R.E. SHERRY R.S.              R. SILVA            N.S.                              N. SIMPSON P.D.S.            P.D. SMITH          T.LS.                            T.L SOWDEN V.S.              V. STAGUOLA          W.S.                              W. SULUVAN J.B.S.            J.B. SUTTON          R.N.S.                            R.N. SWANSON TECH              TECHNICAL            LV.                              L VALLEE R.V.              R. VELEZ            D,A.W.                            D.A. WHITNEY P.W.              P. WILLARD          M.W.                              M. WILLIAMS S.S.W.            S.S. WOLLA%N        F.W.                              F. WOZNIAK E.J.Z.            E.J. ZIEMIANSKI
 
ATTACHMENT lli PLANNED CHECKLISTS                                                                              l
: 1. REFUEL BRIDGE TESTING COMPLETE - OFFLOAD CORE
: 2. COMMENCE RELCADING FUEL l
: 3. RELOAD COMPLETE CHECKUST
: 4. HYDRO CHECKLIST
: 5. ILRT CHECKLIST
: 6. PRE CRITICAL CHECKLIST
: 7. HEAT UP CHECKLIST
: 8. POWER ESCALATION CHECKLIST 1
I l
l I
i 1
 
ATTACHMENT IV CHECKLIST FORMAT                                            '
CHECKLIST #1- REFUEL DRIDGE TESTING COMPLETE / OFFLOAD CORE A. HARDWARE ITEMS A.01  Applicable SystemWEquipment A.02    Plant Modifcations (PDC'S)
A.03    Plant Temporary Modifcations (TM'S)(TM Log Book)
A.04  System / Equipment Maintenance Requests and Procedurcs,            ~
including Preventive Maintenance (PM)
A.05  Failure and Malfunction Reports (F&MR's)
B. SOFTWARE ITEMS B.01  Operating / Maintenance Surveillance Procedures (ST's)
B.02  Temporary Procedures (TP's)
B.03  New or Revised Operating / Surveillance / Maintenance Procedures B.04  Defelency Reports (DR's)
B.05  Non Conformance Reports (NCR's)
B.06  Potential Conditions Adverse to Quality (PCAO's)
B.07  Training B.08  Engineering Support Requests (ESR's)
B.09  Drawings and Vendor Manuals (Associated with Modifications)
B.10 Operating Experience Review (OER), including ' Conditional
* Safety Evaluations B.11  Stop Work Orders B.12  Management Corrective Action Reports (MCAR's)
C. TECHNICAL SPECIFICATION ITEMS C.01  Technical Specification Concems D. NRC RELATED ITEMS D.01 NRC Commitments / Concerns and Ucensee Event Reports (LER's)
E. EMERGENCY PLAN ITEMS E.01  Emergency Plan issues for Criticality / Power Operations F. BACKLOG PROJECT ITEMS c 01    Backlog Recommendations G.
ESQGRAM ITEMS (Rad Protection, Fire Protection, Security, Housekeeping, Decon, etc.)
H.    "PtJNCHLIST" AND OTHER ITEMS
 
ATTACHMENT V CHECKLIST OBJECTIVES
: 1. Provide management a tool to aid evaluating outage progress.
: 2. Provide a means of breaking down the outage into distinct milestones.
: 3. Provide a TICKLER FILE for items to be accomplished prior to performing milestone activities.                            -
: 4. Provide a final management check on required work prior to Management      authorizing  performance    of    milestone  activities.
: 5. To preclude running into an insurmountable number of items to be accomplished just prior to entering a Plant Operational Condition Change.
I l
CHECKLIST ITEM SELECTION GUIDANCE l    1. Any    uncaptured items you know or believo are necessary to l        "COMPLETE" prior to beginning a Plant Operational Condition Change (Checklist Milestone).
: 2. Any required and "Tracked"    items which, because of their substantial multidisciplinary review and approval process, require increased management attention to insure completion of all facets of the item.
Usually an item of this type will have multiple checklist entries that cover the major events within the single work package.
: 3. Any items that historically have been items that have caused problems or delays in reaching plant milestones.
: 4. Surveillance procedures required to be performed prior to plant j        milestones, including MSTP scheduled procedures.
t    5. Any item that the Checklist Team (OMG) wishes to follow due to potential for delaying a milestone.
: 6. Any item for which you are responsible and wish to be reminded.
l l
1
 
PLANT OPERATIONAL CONDITION CHANGE CHECKLISTS CHECKLIST #1- REFUEL BRIDGE TESTING COMPLETE / OFFLOAD CORE l
: 1. Items marked as "COMPLETE" have been completed to the necessary degree for this milestone and that degree of work has been accepted by the final signator in the applicable work process, i.e. ,the work is "Fleid Complete". In many cases the work is finished including the documentation.
: 2. Items marked as "NOT REQ'D." have been determined to be not required for this milestone. These items will be cascaded to the next checklist and carried until completed for the appropriate milestones.
: 3. A number of items are entered on the checklist as final checks on the condition of a system just prior to authorizing entry into the milestone. Examples of this type of item are those items in section 1.A.01, which are a final check that the required systems meet operability requirements and those items in section 1.A.04 that refer to the completion of required MR's for required systems. It was the intention of the checklist team for these items to be on the checklist to provide a last minute "Stop and Think".
: 4. The Surveillance items in section 1.B.01 w;ll not be marked as complete but instead provide the required frequency and the Last Done Date as a means of checking on the completeness of required surveillances. Surveillances not required for this milestone were marked "NOT REQ'D.".
: 5. A few items had to be marked as Working Not to Affect Offload so that the potential to affect offload would be recognized and to provide a means to instigate a final check that no interferences with required systems exist.
: 6. Section Managers will be asked to confirm that they agree with the disposition of NOT REO'D ltems. Carefull consideration has been given to all items dispositioned as NOT REQ'D, but it is felt that Section Manager concurrence with those dispositions is necessary prior the ORC receiving this checklist for review.
enclosure 1
 
{
CHECKLISTJ 1              REFUEL BRIDGE TESTING COhTLETEOFF LOAD CORE A. HARDWARE ITEMS                                                    JAN 30 87      Page:1 A.01 APPUCABLE SYSTEMSEQUIPMENT
- (TEM          ENTRY PRCDUCTB PEEDEDCR
                                                                                                                              ~~
NUW9ER      DATE  SYS-PRCUS PEFUENCE rm asNT            SUEECT              .AAITFY F NOT EQ    APPRVR DOER  STATUS-DATE 1.A 01001    OEC 188    14    TS Pg 1@122 SPECS      2 CORE SPRAY SYS or 1      OPER CON 4 $4PPMS  SDM PLM      CCWPLETE "
15445AREH            CORE SPRAY a LPCI(3        POOL CCCLNG SLWY1                1/2687 VPNE 88-64        PUMPS)                      (UCENSNGWCFM 00 4) 1 A 01002 DEC 186      11      TS P0 85102 SPECS    STANCSY UQUO                                                          ~
OPEAATONAL $8LC    .&DM  PLM 3 4 8 4 4 A.RC      CONTROL SYSTEM 1 A 01003 DEC 186      C3          OPEA to          COPITROL ROO CFWE SYS        PNSSUR2EDSYSTEM    SDM Piu HCLSOV                      CPEMR.E CfC SYSTEM 1 A 01.004  OEC 186    50      TS pg 19e SPEC 3.7  SECCDCARY CCNTAMENT          OPEAAEL CONTAN4ENT SDM PLM      COMMETl
                                      & 4.7 C                                      FOR REL H40 LNG &                tt$ 37 SO WAAON 1a 01.005  CEC 186    30      T8 pg 104107 &PFCS    2 RSCCW SYSTU45 S S & 4 59 OPEAAaLE CCRE S    SDM PLM SLPf4ESSON POCL COOLNG Sta8YSTEMS 1A et004 DEC 1 a6      29      TS pg 104107 SPECS                                                                        ~~
                                    &&4458 2 SALT SERVICE WATER        OPEMBLE CON 40      EDM PLM LOOPS (How wy pumps?)      SLPPRESSON POCL COOLNG Sta643TEMS 1 A 0100? DEC 1 as    41      SLsPCRT3 SYSTEM      2 DESEL OENERATORS TECH SPECS CPEMBLE D3s FCH    SDM PLM      NEED Q PEQ $4FETY SYSTDeS              FUSE $ FCR BE00 1 A01.0C0    OEC 186  48      TS pg 150154A SPEC    STANC8Y GAS TNATMENT        CPEMaLE SSGTS WEN SDM PLM 3.7 Et 4 4.7.82                                                                    CCNRETE SEC CONF NTEGRfTY                1/2587 B NOUFED E9 CEC 186      24        TS pg 15f&154C      CCNTROL ROOW                CPEMaLICES          SDM PLM      PEED TS CHG SPEC 47 82 &        EWBCMENTAL SYSTEM          WM.N SEC CCNT 47Et                                                                          CR TEMP M 5 NOUfED 1A 01010    CCC 196  44      844%ms SYSTEM TS      125V SATTERES A & B        SAFEGUARDS LOGC 4  SDM PLM      COMRETE SACXUP SCAAM                    172617 (POWEA SLPPLY) 1 A01011    CEC 186  44      SL5hesia SYSTEM TS  250V EMTTER ES              APS VTTAL SERVCE    SDM PIM      CCNRETE WG SET                            17617 (PO%EA SLPfU) 1 A 01012 CEC 186      44      Stim. viia SYSTEM TS 24V BATTERES A & B          NEUTBCN WCNfTORPG    SDM PLM    CCM%ETE~
(POWEA SLPPLY)                    07& 47 1801013 CEC 186        46        SGhriia SYSTEM TS    IRJSSES- AS A4.81.36.817,  SLPPCRT CPERAat.ffY  SDM PLM B18.014.815.8J0 Ste.829    CF PECLUED SYTTDel (PO%EA SLFPLY) 1 A 01014    CEC 186  45      TS pg 43 4 80 SPECS  NFVEL FLOCR                CPfGL H5TR WCH      SDM PLM S10.14410.14          E.WAU57 MONflYORS          NfrMTES4 CONTRCES TABLES A PROTICTM FUNC.
1 A Ct015 CEC 1 as    45        OPER 10, CPE.R 25    NRAL FLCOR AAEA            OPERAoLE AAWsCN      SDM PLM RAD WOMTORS                EF1EL FLOCR 1 D 01014 CEC 1 as    St      SLPPCRT SYSTEW 15    OE.LVQF SYS DCis & SAGTS    SYS CPYAABLfTY NO    SDM Piu                    '
1A01017      CEC 186  45        TSpg82$PEC          700 WORTH WheEER            REACTMTV CCNTROL    SDM PLM S38364383 1 A O t 018  LEC 1 se  45      TS Pg 2640 TASt1                                                                                '
EACTCR PROTECTICN SYS      D4STM & A&&OCATED    SDM PLM S.1.1                                        DE W 4 8V H CH H T, A Ra SCAAM 010  DEC186    12                            NACTOR WATER                WATER PURITY        SDM PLM    CCNPJTE~
Q.INAJP SYSTEM tt687
 
CHECKLIST # 1          REFUEL BRIDGE TESTING COMPLEIEOFF LOAD CORE A. HARDWARE ITEMS                                              JAN 30 87      Page: 2 A.01 APPUCABLE SYSTEMS 40VIPENT
  ' .. [W        ENTRY                                                        MCOUCT5 M CR MMBER      DATE    SYS#RaJe MFUedCE DOCLAENT        S M CT            JUBTFY F M7T MQ      APPRVR DOER STATUS CATE 1 A 01.020  DEC 1 as  32                        SUMCE AR SYSTEM          SERVICE AR FOR        8.DM  PEM  CCNPLETE~
REF1.ELDdQ CP& TOOLS              1/26 t7 1DS1 C21 C2C 186      31                        H57RUWENT AR SYSTEM      $@PORTSWTEM          SDM PEM    CCNPLEli.~
CPE N REQ                        1/26e7 1 AD1 C22 DEC 1 es    21                        MMPERAu2ED WATER          REFLEL FLOm SDM PEM    CCNPLETE WATER Mi.EDS 9 A01 C23 DEC 15 86    10,14    SLPPORT SYSTEW T5 ENSLIE OPU%8tJTY OF      OPERMEK CO3.ERS      EDM PEM FOR Rm AND      CRJAD ROCW ANA COOLIRS CORE SPRAY 1 AD1.024  JAN 16 87  30                        TuesE SADNO CLOSED        COOLM3 WATER FCE      SDM PEM    CCNPLETE CCCEM3 WATER SYSTEW      AUX 44RY EOUPWENT                1/26/67 1 A 41.025 JAN 20 87  2                        NACTOR RECRCULATCN        OPUuSLE PPH3 TO      SDM PIM SWTEM                    $@ PORT OFFLOAD 1A 41C26 JAN 20 87    4                        FOCTOR REDWATER $WTEM OPEAMLI PPPG TO          SDM PEM
                                                                                                                        ~
SLPPORTRW DURH3 OFFLOAD i
1 l
l 1
l l
l l
i
 
CHECKLIST # 1          REFUEL BRIDGE TESTING COMPLEEOFF LOAD CORE A. HARDWARE ITEMS                                              JAN 30 87        Page:3 A.02 PLANTM00tFICATIONS(PDCS)                                                                                  1
        ..tW                                                                                                                    l ENTRY                                                        PRXRK;T3 pmsnOR M NGER      DATE    SYS-PRGJe PEFENINCE N uNT        SUEJECT              JUETFY F NOT MO      APPRVR DOER  STATUS.DATE 3 01001 CEC 186            10      PDC 36-33    FNR WNNUM FLOW              PDC rs rusOLIT      RES    P.W  NOTREOD      1 OR WANUAL                        PDC on HOLD NfT1ATON OF                      per ORC      !
WW FLOW 1 A 02 OC2 CEC 1 se      10      POC e6-30    FNR NSTRLNENTAT10N (CAL      FCC CLOSEOJT        RES. P,M COMRETE 86-10)                      OR war 4R                        PRCC REO BY CPS & OSS    .
1 AC2 003 OEC 196      45,116    POce547      MACTOR WATER LEWL            POC CLOGEOl/T er    DAM  JEP. WCAKtG EQT  j W REQUND SY5 TEM                TO AFFECT    i NTIMEMNMS                        OFFLOAD      {
1.A C2 004  DEC 186  45.116      POC M 70      ANALOG TRP SYSTEM            POC CLOSEOtJT or    DAM J LP. WORKhG-NOT NoMOUND SWTEM                    TO AFFECT    I NTEMEMNCES                      CrFLCAD 1 A 01005 OEC 186        61        POC 8547      DESEL CEFEMNTML            PDC CLCEEOJT          RfA    PM  COA %ETE 1 A C2 OC*  M C 186    61        POC 3530      00 A&8 JUMPER 1&2 ANNUN. PCC CLCEEOJT          RE&    P.M  CQJPLETE 1 A C2 007 DEC 186      104    PDC BSSI A FW D E.PC TIE INS                NO
* MOUND SY3*      DAM JEP. WCAKh3 NOT NTEFFEMNMS FRCN                  TO AFFECT E.PC CUTCM.RS                    OFFLCAD 1 A C2 Oct CEC 186      de        POC 6554      COMPLETE FOC to M.          POC CLCEECUT          PM    W C. COMPLETE ~
E* BIT s7MFUEL DROGE        (WAJOR FRN)                P.W  PARTIAL EmerT #7                          ExHs?
1 A C2 OC1 CEC 186      de        POC 85 54    W.R FY MFUEL PLATTORM      PDC CLOSECl/T(hCO    PM    P W. COM%ETE~'
3L 244        POSIT 1CN INTER.OCK        TO PRENT.NT MED TO                NCLN CBCUriRY WCRK NCLLEED      AMPER NTERLCOQ                    PDC 8554 N PCC 4554 1 AC2.Cic CEC 186        14        POC 06-30                                                                            ~
                                                    $EAL WELD ADAPTCH FtATES    POC CLOSEOJT          RE1  P.M  CCNPt.ETE FCR WC 100 4 A&B            Ot*E C4WGCtJT                    1547 PRc670SM NSP REPORT & RESPONSE                              i SENT TO hED                                    I 1 AC2.011    CEC 186    10        POC 06-20    CAP RFE >E.AD $ PRAY        WC5E COE. FfW PCT    REA  PM    NOTPEOD TO SE EISUED UNTL                FCR Cff LOAD 1/27/87 1 A 02 012 DEC 9 86      33      POC4341        3 HCt.R E4RRER LFORACE I
PCC CLCCECtJT        MWA        CCUPLETE FOR FM PROTECT 1CN          OR WAf4R                          FCR CrFLCAD 43419 OCNE 1 A C2 013 DEC 17 46    33      APPEFOCKR      EEWFY MOUMD WCOS            CCWFtETE APP R WOOG  R V.
FOR A19EPCIX R MOURED      NOME FOR REL          LJJ.
FOR FUEL CmCM              OFRCAD OR CCN#VMS*TDRY WEA4MEE W PLACE 1 A C2 014  CEC 10 66  99)      CAD 061229    MTEPMtE MED TO REC. NO. 46406 ESIOtW TO CA NC      KPA DAW    PoiPEOt~
PENCRW FNAL SAITTY          LONG ftM EVAL.                    FCR CrFFAD EVAL FOR POC Pm8 WTH hAATM1 SAFETY EVA13
                                                    &CR WAJOR FRYS.
 
CHECKLIST # 1            REFUEL BRIDGE 1TSTING COMPLETE /0FF LOAD CORE A. HARDWARE ITEMS                                                  JAN 30 87      Page: 4 A.03 PLANT TEMP MOOS (TMS)(TM LOG BOOK)
      ..tu    ENTRY                                                            PRIFJCT360R NUW9ER    DATE  SYS-PRC1W P8799Cgrw1 W                Sug)ECT            JUSTFY F NOT NQ        MPRVR DOER STATUS.DATE 1 A03 001  DEC 186    81        TW 0505          ACN 1250 EWOVE WCO                                PA1      PCTRECO e606 DG DAWPER(WISPCS                                      FOR OFFLOAD 0010233) 1 A 03 002 DEC 186    999        CPER 10, TVS      % Ve n G D STpvG          OPERA 8tfTf CF        PLM.      CCMPLETE TUFORARY WOCFr ATCNS        MQUFED SWTEbel        PA1      TCH 87 34 1 A03 003 DEC 186      18          TW              REL POOL COCLPs3 PLW        WETY RELATED          PAS      TW BErvo WOTCN PCHOED FRW            -)WER SLPPLY                    CRAFTED SAFETY RELATED PWR SLP      NEADLY AVAR.A8LE A2 PRE APPROYED TW 1 A 03 004  DEC 186  44          P2              WOC $18 4#V WC1DED CASE    NO m rsnCASE          RES P W. WORE PGdT' BREAXEA TEST (PART 1)      MEAMER TEST 8 TMT                TO AFFECT AFECT OFFtDAD                    CTFLOAD 1 A03 005 CEC 9 e6    14          TW 9637          fEWChi TEMP WOO TW 06 37 RLS  P.M CCNPLETE 1L'11/M
 
_______l CHECKLIST # 1        REFUEL BRIDGE TESTING COMPLEIEOFF LOAD CORE l
A. HARDWARE ITEMS                                                JAN 30 87      Page: 5 A.04 MAINT REQUESTS & PROCEDURES NCL PMS
        .iEM        EPITRY                                                        PRCRCTS MECEDCR NUMBER      DATE  SYS-PfCJs PEPEM NCE N W          SUWECT              JUETFY F NOT MQ      APPRVR 00EA STATUSCATE 1.A 04 001    CEC 186  14                      MQ CORE SPf%Y SYS            WR$ PREWNTNG        RLS  P.M                          l We COMPLETED                OPEAASUTY            EDM PLM                          I COMPtKTED                                              l 1.A 04 CC2 DEC 1 as    11                      MQSaf4                      WRS PREVENTNG        RES  PM Ws COMPLETED                OPERA 8UTY          SDM  'LM COMMITED 1.A 040C3 CCC 185        03                      PEQ CRD SYS                  WRS PREWNTNG        RE&  PW                          1 Ws CCMPLETED                CPEAABUTY            &DM PLM                          f CCunstED
                                                                                                                      ~~
: 1. A 04 CC4  CEC 1 as  50                      MQ SEC CONT                  WRS PREWNTPG        RL& Pu ms COMPLETED                OPERA 80TY          SDM PEM CO4PLETED                                              1 1
1 A 04 CC S DEC 186      30                      MQ RECW SYS                  WRS PREWNTPC        RE1  P.M Ws COMPLITED                CPERABUTY            EDM PLM                          )
COMPLETED                                              '
1 A04 006 CEC 186      29                      MQ MLT SERV WATER            WRS PREWNTPC        REA PM                            l Ws CCMPLETED                OPEAA8UTY            SDM Piu                          '
COMPtKTED                                              l 1 A04 OC7 CEC 1 as      41                      MQ CESEL QEN                WRS PREWNTNG        RLS  P.M We CCNPLETED                TLILL Pr            SDM PLM NDCATON                                                l CCMPLETED                                              l I
1 A 04 008 CEC 186      45                      MQ CCNTBCL ROO              WRS PREW.NTPG        RES  P.M  Mt4N RE Q PC6ff CN PGCATCN            CPERASUTY            SDM PLM    FCR CFFLCAD WTe COMPtITED                CCMPLETED A OC3 CEC 186      4e                      MQ SeGTS We CCwtERD          WRS PREENTPG        RL& Pu
                                                                                                                            ~
CPERA8UTY            $DM PLM CCNRITED 1 A 04 0 t 0 CEC 1 e6  24                      REO CONTRCA ROCM            WRS PRE AMTPG
                                                                                                                          ~
RLS. PM EMPC*ACNTAL SYSTEM          CftAA8UTY            SDM F */A                        i We CCMPLETED                CCNPtKTED 1 A04 011 CEC 186        12                      MQ RVCu b fSTEM              WRS PP&WNTPC        RL1
                                                                                                                          ~
P.M We CCMPtETED                CPEAAaOTY            $DM PLM CCMPtKTED 1 A 04 012 CEC 1 as    de                      MQ 125V MTT AaB              WRS PREWNTPG        RLS  P.M WTs CCs#tETED                CPEAASUTY            EDM PLM CCNMITED 1 A cc ota CEC 186      44                      REQ 2scv sATT                                    Pott  pu WRS mEWNTPG                                            f We CCMPtKTED                CetRAaCTY            EDM Plu                            !
CCMRITED 1 A 04 014    t(C 1 as  44                      REQ HV sATT                  WRS PMWNTPG          RL&  PM
                                                                                                                          ~
We CCNMITED                  CPERAAUTY            SDM P E.u COMPtKTED 1 A 04 0tI CEC i et    48                      MQ BUSSES ASA4 81.88        MRS PREWNTPG        RIS  PM j
B17. Bit.514 815.BP0 828. CPERaJutlTY          SDM PEM                            ,
Rf6 We CCWPLETED            CCNRITED                                                l i
inc4 01s CEC 1 as      e5                      PEQ MML FLCCe                WRS PREWNTPG        ALS  PW j
EJoeU$T WCNrtCH              CPEAAaUTY            SDM PIM Ws CCMPLETED                CCMRITED
          '.017  CEC 1 e6  45                      PEQMREOLO@ A/Ws
                                                                                                                          ~
WPr$ PMENTPG        RLS  PM We CCWetETED                CPERARfrY            SDM PLM CCNRITED l
l I
                                                                                                                                        \
 
CHECKLISTD 1            REFUEL BRIDGE TESTING COMPLEIEOFF LOAD CORE A. HARDWARE ITEMS                                                JAN 30 87      Page: 6 A.04 WNT REQUESTS & PROCEDURES NCL PMS
    .i EW      D(TRY                                                          PRCOLCTS 6CR NUMER        DATE  SYS#RQ)# MPUENCE ryrs a8WT          SUSJECT              JtJETFY F NOT MO    APPRW COER  STATUS DATE 1A04018 MC 186          45                          MC RMA tRs CCnRETED        WRS PREWNTNG        R11    PM Op9uSE. fry          LD 4 PLM 4WPLETED 1 A 04018 DEC185        45                          MQ RPS We CCnPLETED        WRS PREVENTNG        RE.A  P.M OPUMBUTY            EDM*
PIM COMPLETED m04 C20 CEC 186          32                          M Q SERVQiAR SYSTEM        WR$ PREVENTNG        RES    PM Ws CouptETED                OPUMBUTY            EDM PLM COMETED 1 A 04 C21    CEC 186  31                          MQ NSTRthaLNT AR SYS        WRS PREVENTNG        REA    P.M Ws COMPtKTED                OPAASUTY            SDM PLM CC %ETED 1 A 04 C22 CEC 186        60                          MQ EC CCNT DueERS &        WRk "5EVENTNG        KE&    PM
                                                                                                                            ^~
DOORS REPAftED              OPEA .BUTY COMPLETED 1 A 04 C23 CEC 186        H        3 W 448 VESSEL    PENOmd PROCEILfML STEPS COs# LITE PROCED.fML    RLS. CJM CC&8PtETE CPENed3 PREFAAATEN CF ATTAO4ENT A PCR          STEPS FOR WSSEL PUDENCED PROCEDlKE          OPEMNG 1AC4324        CEC 186  H        $W448 VESSEL      PUFOW Perrm s%L STEPS COhrtKTE PMDLf91 RES CJ M            CCadPLETE CPENNG          CF ATATCledENT S PER        STEPS FOR WSSEL MFUENCED P9rrm st          OPOeNG 1.A04C25        CEC 186  10        WR H+31          f0R HANGER REFAR            CPERAAI HMCEA CH    REA    P.M OPEAASUTY EVALUATON 026 CEC 186      44                          ETAT 10N 850 RELAY TEST                          RLA    PM  NOTRECQ FCA CSFLCAD 1 A W C27 CEC 186        44                          AC8 TESTH3 & COFft                              RE.S. PM  tCTREGO CMRK4UL MSPCS 8316200                                      FCR CWFtCAD 4016300.601&&00.6014500 1 A C4 C28 CEC 18e '    44          WR              ROOTCAUSE ANALYS8          CPEAARIBRENER                PM RES.      NOTRECD~
ERE.AKEA BBC3 FALURE                                        CPER BbR    l N P(ACE 1 A 04 C23 CEC 188      45          3 WS14                                      3 MS2e 6 FPS WG SET LPA e                                RL1    Pu  NOTAECD PICCEDUfE SMS18            SO{DAED                          OC TE$T 1.A 04 030 CEC 186      48                          CCNTHC4, ACCN              WR1 THAT AMECT        RL1    PW  CCWR$
CEFCK4CES411CTRCAL        fEQURED S4TTEM        RDM PLM    THAT AIFECT OPEAAaOTY                        CTFtCAD 1A to 031      CEC 1 #  4S                          CCNTBCE. ROCN              WR1TH4T AHFECT        Ria    Pu  CCWRS CEFCCHCES-14C              MCURED SYSTEM        SDM PIM    TWAT AIFECT CPtNnUTY                        C#ftCAO tA04C32 CEC 186          800                          msFOO10 CCNTBCL ROCN      WM1 THAT NTECT        RLS    PW  CC WR$
CEFCENCES                  PECURED Ff1 TEM      SDM PIM    TWAT AFFECT OPEAA8UTY                        CFFLCAO 1A04033 CEC 186          10          P2              PERTOSA PsA,N6PECTICH &    CPEMALK WGN          RES    PW  WORE 9,Gidt MST) on EO Wov(EM)                                          To AFFECT CSFLOAD 1 A 04 034 DE C 188      50        VARCUS WRs        SECOOARY C4NTA964ENT        SEC CCNT            DAM (WATER SEAS)                POETRA704 SEAID 1 035 CE C 186  21                          MQ CEMN WATEA              MR$ COhrtKTED TH4T  RLS    PW We COMFUTED                SLPPORT MAEL        SDM PLM FLCCM WATER)EEIt
 
CHECKLIST # 1          REFUEL BRIDGE TESTB'G COh&LETEK)FF LOAD CORE A. HARDWARE ITEMS                                                                JAN 30 87      Page:7 A.04 MAINT REQUESTS & PRCCEDURES NCL PMS
- eTEW          ENTRY PRCOUCTS DEEIEDm
                                                                                                                                              =.
NUW8ER    DATE    SYb#RCue PETERENCE N u MT        SUBJECT                              JUET7Y F NOT 7EC    APPRVR DOER      STATUS DATE 1 A04 034 DEC885        41                      NPLACE T DG AIR START                        EW STMA PESS SW      &DJt    Pi.u  $URV E%ERY PRESSURESWffCH                              &CR DETERWHATION                    46ftBEto OF OPEAABEJTY FOR                    DCPE OFTLCMD tA 04 037 CEC 0 06      13                      fE. ACTOR WATER CLEANUP                      fEPLACDENT Ptar
                                                                                                                                              ~
R14      P.M. NOT RECQ FETER DEWN                                  ANDOR WOTOR CA                      FCA CFFLCAD HCtDec PUw                                  SWTEM CPERAaLE TO WANTAN WATER                                    ,
PUPJTY                                          J 1 A 04 038 CEC is a6    10        CWG          DeLAE CCPE MuYAft Of                        WOM COFLETED TO      WJA.      E    COMPLETE WORK 8 TOWPLETE' &                          A44tRE SysTIM 604ED CFF BY CSTAm.3HD                      OPEAASUTY CCNTMOL SYSTEWS.
(GE TMAWLERS. ETC )
1604 C39 JAN $87        3        WR SC 340 ,    VALVE 165 A (CAD CD)                        CCwtETED WR          RLS      PM    NOT RECO~
WNt41.4d FLOW L9E HAS                                                            FG CTFLCAD FALID 1604043 JAN S $7        3        WR 06 344    CRD PWP B D6CHAAGE LIAM CN ptET FITTING CCEPLETED WR          RL1 PM        NOTAEC I CR CPEMaLE EOUP.                    F@ CFTLCAD 1A04041      JAN 5e1    3        WR 86-345    CRD PWP e EXCESSM                            CCwtETED WR          RL1 Pu        NOTRECO V1BRATION                                    CR CPEJWL1 ECUP.                    F G OFFLCAD 1A04042 JA5se1          3        WR e6425      CR3447 LEST CAD)                            COWLETED WR          RE.1    P.u  NOTREQQ      l fFR SCCYSCCY VALW LEM                        Os % A4.L N                          FG CFTLCAD
  '* N 043 JAN 547      3          WR 45 3 34    CR3411 (C9CS) CR3411
                                                                                        ' ~
CO8MITED WR          R.E.1    P.u  tcTRECO PRNTS 90. REPAR                              OR CA FIAL N                        FCP CF8LCAD z
W C44      JAN 567    3          WR85321      CRh15 (PNL 905) RCO                          CCW6 N WR            RL1      PM    NQTREQQ.
CRFT N 44 PC4fT10N                          CHCA ML N                            FG C#FLOAD
: 1. A 04 04 5 JAN et?    6          WR 453 J2    ROO1615(Csos>>c                              CCwtETED WR          RLS Pu        NOT REOD      {
8CAAM T546 NO '4' DGff                      OR CA FLAL N                        FM C(FLCAD    l NDCATICH                                                                                      I i A 04 Ces JAN s e7                Wa 853 ts 3
RCO nts (Cecs) NO sca m T u NOPCs u CCwtrTED WR          Rh        ru  ectstoo '
eR Ca Fm N                          F m CtrLeAD NDCATION                                                                                      j 140404? JAN t t7        3        WR evs.37        C0 R.m.1410    (C9,0,5)                        CC.wtE,TED    WR    RLS      Pu MATE    m TCN                        CC -                                N,OT  'lECO C,-
1 A C4 044 JAN l87      3        WR 85 3 31                                                                                                    I ROO 1010 (C006) NO                          CChetETED WR          RE.4      Pu  tctP(Ct      !
SC M edTmE NO PC6 44                        CH CA FLt.1 N                        FCf C(FLCAD NOCATICH                                                                                        '
1A04048 JAN 6e1        3        WR skv10      RCC 44 30 (CR)                              CCwtKTED uR          RLa Pu        tcT Rt3D DM ST10ATL9tf PAft                          OR CA 6 Lt1 N                        F G CFFLCAD PF PRCet 1 A 04 0$4 JAN &87      3        WR M479        RCO Mit (C405) NO
                                                                                                                ~
CCwtETED WR          RLS      PM  NoT RECO N ftE to POS e4                            CR CA FLA.L N                        FCR CFFLCdD DOCATICH 1 A 04 CL1 JAN 847      3        WR 8k3-30      RCO 16 23 (CDOS) NO                        CCmMITED WR          RLt 7u        NOT RECO SCAAMT5E POS34                              OR CA FTAL N                        FG CfiLCAD DOCATON BAD 9 A C4 01J JAN 547      3        WR 45314      RC014t ? (C405)                            CCWtKTED WR          RLS      Pu  tcTatOO ~
DMSTMP&M PO4 ND                            OR CA Fu.1 N                        Fm C#FLCAD 053 JAN 847      3        WR to 310      RCC 3011 (Cecs) DRIFT                      ConeGTED WR          RL1      Pu  NOT Rt00~
ALARM 4 RJhAA 9 POS 44                      OR CM FL11 N                        FCR CfFLCAD
 
CHECKLIST # 1          REFUEL BRIDGE TESTING COMP!EIEO"F LOAD WRE
            $. HARDWARE ITEMS                                                JAN 30 87          Page: 8 A 04 kWNT REQUESTS & PROCEDURES NCL PMS (TE W    ENTRY                                                          PFCDUCT5 DEEDEDOR NLAAER      DATE    SYl#RCus IEFEfENCC h uNT        SUBJECT              JutTFY F NOT PEQ          APPAVR 00ER  STATUS-DATE
                                                                                                                                    ~'
os 064  JAN 587    3        WR 88-340    ROO 3018 (C805) ORFT              COwLETED WR            R1A PM      NOT REQO AuRW i n u. Fet                  oR CR FRt N                        FCaemCe 9604055 JAN 587        3          WR E 7      ROO 1647 (C805)                  CowLETED WR            RE&    PM    NOT RECQ~
NVESTMPAR ORFT                    OR CR F(Al N                        FCA CFFLOAD ALARW AT POS 44                                            -
1.A 04 054 JAN 5 87    3          WR 884-24    ROO 34-36 (C806) NO FULL          CCwlETED WR            RE& PM      CCNPLETE N POCATION                        OR CR FR1 N 1 A04 057 JAN 587      3          WR 86444    NCU ACCUW 3647 (23 Rs)            CorLITED WR            PLE.S. PM    NOT REQD EXCESSM LIMAGE                    OR CR FML N                        FOR CfTLCC 1 A 04c58 JAN 587      3          WR 864-22    VAmaOUS NO FULL N IND.            CCW W 40WR            R11    PM    COMPLITE ON VARCUS RODS                    O' CR FLA1 N 1 A04 0S8 JAN 567      45        WR and5 25    ROD 1623 (UNDER YESSEL)          CCardTED WR            RL1 PM      NOT RF0D I
NO FML CUT N) POS 4              OR CR FLLL N                        FOR CFFLCC 1.A 04 Of,0 JAN 587    45        WR 86 44243  P9A 806 DGfT CF UPPER            COwtETED WR            RES
* I NOTRECD ROC PCSfT10N K.ACK              OR CR FR' N                          FOR CFFLCC
                                                                                                          ~            ~
1 A 04 061  JAN 887    10        WR 861040
'                                                  67C (A FNR QUAD)                CCwLETED E                          *CMNETE~
PDC 85-30 NSTALL                                                      11/1586 NYPASS CEC 4 VALVE 1.A 04 062 JAN 187    10        WR881047      A RNR TRAN (00 W RW)            CCwtKTED WR            RLS    Pu    NOT RECD W POC 88 30 PRESS GAGE 5                                              N TESTM 1.A 04 063 JAN 887    14        WR 8614 31    WO*140044 (Rs BLDG)              CCwtKTED WR            DAM          SHOULD K WOPE MQURED FOR APP R                                                OtrE 1/21 87
  '1 A 04 064    JAN 487    14        WR 86-14 32  60140048 (Rs BLDQ)              00wlITEDWR              DAW          SHOULD E WCfE MOURED FOR AFP R                                                DONE V22.17 1a 04 ot t JAN 887      1          WR86129      3" WAN STEAM DRAN                CCwlETED WR            REA Pu      MAY NOT BE
($TW TVN) RPL DRN LN PNT        OR SEC CO(T                          RECFD F peR B OL,rT                      ESTAGUBE D                          SECCoiTCM 1.A 04 OE4 JAN $87      24        WR 8524406    WoM4 ATE UNff 4 (PS6CC)          CCwtETED WR            Ria PM      PCTREQQ N5T AUTO CONO PUWP              CR NO M*ACT ON                      FOR CfTLCC SYSTEW OPERA 84EY 1804067 DAN 487        37        WR 85 'e718  P403 8 (B RHR 00) PE RF        COPLETL;WR              RE& Pu      COMPdTE LLE OL SAWLNG PW B                                                    MW OL N S n TEW 1a04 000 JM87          37        WR 85-3718    P 203 0 (t RHR QD) PERF        CCwtITEDWR              RES    PM    CCNRETE LLE OL LAMPLNG PW D                                                  Ew C% N
.                                                                                                                        Sn%W l  1 A04 CJS JAN 887      37        WR 864717                                    CO rtITEDWR P403 C L4 RHR 00) PERF                                  R11    PM    CCWRITE l                                                  LOWE OL SAMPLNG PW C                                                  Ew OL N SnTEu i A04 070 JAN 887      37        WR 85 3714                                    CowuTED WR P 215 8 (B RHR CO) PERF                                  RLS Pu      CCpFLETE LLSE OL SAMPUNG                                                      M WC4 N          .
CORE SPRAY                                                            SnTEM
!  ta04 e7i JAN s87        37        WR 8s 3711    x 107 s (a est otN) PtRF        CCwtrTED WR              Ru Pu                            '
CCu a tTE LLSE OL SAMPUM3                                                      Ew OL N SYSTEM            ;
072 JAN 6El    37        WR 85 3710    x 107 A (A DSL GEN) PERF        CCW%ETED WR              REA Pu      CCMAETE~
LLSE 08. SAMPLNG                                                      Mw OL h
                                                                                                                          $n.IW
  ~
1
    ,      q            ,    --        - - - -
                                                                          -_n.  - - -          -    -                                , a
 
CHECKLIST # 1        REFUEL BRIDGE TESTING COMPLE1EOFF LOAD CORE A. HARDWARE ITEMS                                                                JAN 30 87      Page:9 A.04 WNT REQUESTS & PROCEDURES NCL PMS
~ niu        ENTRY                                                                          PRX)LCTR EEIEDCR MJWER      DATE  SYS-PRCue NHNNCE DOCLSENT                      SUBJECT                JUETFY F NOT MQ    APPRVR CCER      STATUS-DATE 1 A 04 673 JAN 687    44        WR 46 4 344                  (WAW DESEJ SAMPLE              CCMUTED WR          RiA    P.M      COMMITE CEMATER TEST                                                      EW OL N SWTEu 1 A 04 074  JAN687    46        WR 8546 25                  (WN DSL B) SAMPL104.          COhPLETED WR        RLS    P.W      CCM%ETE ~
WmTEST RUN                                            ,            MW OL N 84TEW 1 A04 075 JM667      46        WR 864G77                    A C1 AWWTR                ,
COhfuTED WR        RLS    PW      CCNPLETE ~
('94. C 003CM)                                                    12/4 86 CALeRATE 1 A04 076 JAN $87      48        WR 9643                      ($1 TB StGT RW) RESN          CChrGTED WR        REA    PM      7".STWG N '
P6P EED6 TD DE CCAP                                                P90GREss COMPLETE 1 A 04 077 JAN 847    61        WR854164                    P1419(06L 3 RW) REP CABLE      CChe'LETED WR      DAW            CON $TRUCT CCWRETED
                                                            ~
1 AC4 078 JM667      64        WR 85 6418                  EW FUEL AS8                    CCheUTED WR        RLE    PM      NOTREQQ (Rs BLDQ 117)                                                      FOROFTLOAD P4SP6C6%NNL NW LNRAD M.
1 A 04 078 JAN 607    64        WR e6 64 20                  (Rs 11791) PERFORM RX          Coh5MTED WR        Ria    P.M      CCN%ETE D6&ASMMR,Y 1 A 04 063 jai 407    48        WR 8646-10
                                                                                                                                          =
NFULL ORDO (R8117 NL          ConsMTED WR        PDA            CCs4PLITE BRDO) NST PER PDC 4554 1 A 04 081 JAN607    40        WR 86 4 18                  RFL SRDG W AST (117)          CCheUTED WR        RLS    PW      CCN%ETE REPAR LAW ESR 86-01                                                PdST EED MW MAST e 082 JAN 647    48        WR 86 4 14                  NW RFL ORDCmRFt RA)            CCn5UTED WR        MMA            CCW%ETE ~
TEST WL 500 PROC TP86127 1 A 04 043 JAN 487    45        WR 8644                      A ERM (CR PNL DOS)            CChfMTED WR        RLS    PM      CCW %ETE NOT REAM CCRECTLY 1 A 04 064 JAN 687    46        WR 86 44 557                                                CohfUTED WR A C 4 AWWTR (PNL C803)                            DAM            CCb 4ETE CAL 81 RATE . KED FIE WATCH VEN HOLI DRE11D 1 A 04 085 JAN 647    46        WR 88-44 552                BRA R20SMCC 510s8 SWGR        CCnfuTED WR        REA    PM      Cow &ITE RX 23W) TEST FDR CRI 1 A 04 064 JM647      44        WR 8t-46 551                BRK B2%WCC 014(5 SWGR          COh5MTED WR        RLS    PW      Cou RITE B AUX BAY) TEST FDR CSL                                            1%17 1 A 04 047 JAN 647    46        WR e644411                  WCC 818 (% M WORK              CCa#UTED WR        DAM            CCPcTMT MOURED FCR APP R                                                  CCadPLETE 1 A04 064 JAN 607    46        WR8644410                    ha:C Bio (Aux E4Y B) ALL      CohfUTED WR        DAW            CCNETET WCRC MOUWED FOR APP R                                              CChMITED 1 A 04 088 JAN687    46        WR8644400                    D8125 VDC (R123) ALL          CCheUTLD WR        DAM            CONSTRUCT WCfE MOUWED FOR AM R                                              CC6M ITED 1 A C.4 C90 JAN 687  24        WR 84 24127 TCH 87 34 AO4128 (3 DESEL)              CChMITED WR        k .1  PM        NOT REQQ KWOVE TEWp WOO 8645            CR NWW OF TW                        FCR OFTLCAD 1 A 04 001 JAN 447    24        WR 86-241D3                  N106H113 (C7) RESTORE          Coh5MTED WR              PM REA            CCn4%ETE RJ6EL 4 PWR CliAR Tu a2445 092 JAN647      10        WR 4416-10                  LS4811 (SKihWER) REPLACE      CChfuTED WR        RL1  PM        VCRKh3 LOW LVL ALARW                                                      11117
 
I CHECKLIST # 1          REFUEL BRIDGE 'ESTING COMPLEEK)FF LOAD CORE A. HARDWARE ITEMS                                              JAN 30 47      Page: 10 A 04 MMNT REQUESTS & PROCEDURES NCt. PMS
          .W      ENTRY                                                      PRCDLCT5 PEEMD CR NUWeER    DATE  S M RCus RGUENCpvvi urNT          $UEECT            JUSTFY F NOT PEQ      APPRVR DOER  STATUS-DATE 1.A04 003 JAN 847      10      WR85101        FUEL POOL FLTR) EPLACE    Ota5 U TED WR          DAM        TESTN3 TO PER PDCR stas                                                aE COtetETE t"lit?
1.A 04 004  JAN 487    14      WR 861413        NSULATON WORK TO          COhPLETED WR          RL1 PM      PCTREQQ SUPPORT RFOs? ISb                                          FCR CFFLOAD LNEAR DCCATION (OC
* HOLD)NOTHNQ TA00ED i A 04 095 JAN s87      14      WR e614-33      W(>1400 248 (RX SLDG)    CowuTED WR            DAW        TESTN3 TO ALL VCPM PEQUPED FCF1                                      IE CChMITE APP R                                                      t1L 87 1.aC4 094 JAN 687      14      WR 8614 34      COPE SPRAY PP S (9 R>ft    COhMITED WR            DAM        CCNPLETE 174) WK TO SUPT APP R                                      t12'47 1 A 04 097 JAN 847    14      WR e6-14 37    Ae07# tine (9 SMR RW      CCheUTED WR            RL1 PM    CCMPLETE B fNR 00) TEST 6MV                                          t?/PF FOER CAL M 04 CSS JAN 887      11        WR 8611-8      SEE PPNG (DW) FE NST      COhMETED WR            RLS  PM  PCT REOD NSUL FOR ISI P6P                                            FOR CFFLCAD 1 A 04 069 JAN 687    11        WR 86118      A SLC PWP (RE 01) PMP      CChfMTED WR            RL1 PW    CCNPLETE LIAKNQ POSS STWT OOX                                        1/1617 1 A 04100 JAN 687      10      WR 641444      (HQ DRAN W) NO HANO        CCa#UTED WR            RL1  PM  NOT REOD '
WEEL (NCEDS OC)                                              FOR CFFLCAD M40WEELS DCN CF 2SA) 1 101  JAN 447    10      WR e610 72      R>ft (VARCUS) RWV RENST    COhfMTED WR            RE.1  PM  NOT RECD NSUL & PANT FOR El                                          FCR CFTLCAD 1 8 04102 JAN 4 37    10      WR 861483      W410017A (8 RHR 00)        COh5MTED WR            RLS  PM  WORKS.4 PC T MRFORM hCV PW                                                70 A/7ECT CFTLOAD 1 A 04103 JAN 4 87    10      WR es 14102    WO 100124A (Rx 81)        COhfuTED WR            RLS  PW  VCRKt4 PCT PERFCfW haw PW                                              TO AITECT CFTLCAD 1 A 04104  JAN 687    to      WR es 1010s    Wo 1001 tsEL8 RHR W RW)    CoatITED WR            RL1  PW  REA15E Wikh3 PERFOfW WCN PW                                                N TE$TWG 1 A04105 JAN 647      10      WR 8610122      he>1001238 (RX SLDQ)      CObeUTED WR            DAM        CONSimCT      ,
ALL WOFM SEQUPE.D FOR      TESTNG PDO943                    COWFMTED      l APP R                      RESOLLITCN CF NEMLR SETTNG 1 A04106    JAN 687    in      WR se 10 ite    H.101018 (9 RHR 00)        CChfMTED WR            RL1  Pu  EMNEEAt.3 614 LNGTH 41/t CCW                                          TO RESOL)E ON WLD O fHR TN 1A04107 JAN 447        10      WR to 10179    M M631P2038 (a FDel        CObeUTED WR            DAu        TESTN3 TO      ;
174) WC REQ TolVPT                                          9E CCMUTE AFP R                                                        L1217 1 A 04100 JAN 687      10      hft 8610131    A405#2033 (0 $WG R RW      COheUTED WR            RLS PM    CCNPJTE        i 8 M 00) TEST EMY                                            tat?
FCER C8LK 1.A 04109 JAN 647      10      WR46i&1M        FIS 1044A,1030A            COh8MHD het C74      RL1 Pu      PCT RECO PS 100174A (TRS RW)        NO V5UAL LE.AKS                  FOR OFTLCMD PERF PT Nsp Y JAN 487      10        WR 8610135      FES 10488.10508          CoheuTED het OR        RL1    Pu  DCT RECD PS 100174B (TRS RW)        NO v5UAL LE.AKS                  FCA CFTLCAD PERF PT NSP
                                                                                                                                ]
 
CHECKLIST 01          REFUEL BRIDGE TESTING COMPLEIEOFF LOAD CORE A. HARDWARE ITEMS                                              JAN 30 87      P8pe: 11 A.04 E!NT REQUESTS & PROCEDURES NCt.PMS
        . . a.W    ENTRY                                                        PRXACT5 MEEEDCR MJWER        DATE    SMMCue MCE DCl:L6ENT              SL4 JECT          JUETFY F NOT PEQ      APPRVR DOER STATUS CATE 1 A 04111    JAN 687    6        WR 84443        it" FWT PNT (STW TN)      CCRMITED hR CR SEC    MA    P.u WAY NOT BE PPMIPL Rm BT TO CAO        CCNT ESTAEEED                    MEDED F BAY WSFW                                                      MC CCNT CM i A 04.112    JAN 68?    10      WFi 51446      1001730 (B R>m CD)        COhPLETED WR          RLS    PW  PCTRioD NEPECT WN ROW                                                FCR CETLOAD 1 A 04113 JAN 68?        10      WR 86144?      1001730 (t RHR 00)        CChPLETED WR          R1A    P.u NOT REQD M8PECT WN RChv                                                FCR CWTLCAD 1.A 04114      JAN 66?    10      WR 8810104    ha>1001268 (M 23 TP)        CObetKTED WR          RL1    Pu  NOT RECD PEAFORM WOV PW                                                FCR OFFLCAD 1 A04 ill JAN88?          14      WR 8614 20    CA Mt214 (B C0) DEC        Conf %ETED WR          MA    PW  NOT REOD.
I                                                    WLMN CFF PT STEM 4 STEW                                      TEMP LCD MJT WS 1 A 04116    JAN 68?    33        WR 88 33101    FTE PP WTTRY ($Gtpe46E)    OPEMBLE EATTERY.      MA    Pu  NOT REQU A SATTERY N8                TEhPEMTWE P90 AIM                SATT ARE 8C 14IL3                    nWWES ML LOOK SAO                CPEM&E 1 A 04.117    JAN 487    33        WR 88 33182    (SCRNH6E) 8C 144 3          OPEAASLI SATTERY . RLS    PW  NOT REQD 1.8 VOLTS                  VCETAGE PflORIM N                BATT. 85 ONE C&lt                          OPEAAaLI 1 A 04 tit JAN 607      33        WR 9533 225  FIRE OR ett (RK SLDG 23)    COhPLITED WR          DAW        NOT RECD PEPLACBENT DOOR                                                FCR OFRCAD 1.A 04118 JAN 48?        66        WR 86 54-64  PP $UPPORT(RX B 00)          COhrtITED WR          M.&    Pu  CCMUTE ff9 RGO STRt/T A&&EWEY
  ~
120 JAN 687    41        WR 864128    (At D6L GEN) COCLANT        CCaf%ETED WR          RL1    Pu  CCWPLITE LLSE OL SAMPLIS                                                EW C6. N 84 TEM 1 A 04 iti    JAN447    45        WR864485      RW G (PNL 80$) RPR          CCartETED WR          ALS    Pu  COWRITE ERMTC NDCATON I  1A04122 JAN48?          45        WR 8HS24 7    RW CH E(Cc8C5) CAUSP*3      COhPLETTD WR          MA    Pu  CCh R ill ~
l                                                    spumous tt aCMMs i A 04123 JAN 68?        45        WR 8644        A SRW (CR PNL 806) NOT      COhrtKTED WR          RLS    Pu  NOT RECD l                                                    FEAD90 COfEECTLY                                              SAME A3 l                                                                                                                  1A 04063 1 A 04124    JAN 48?    45        WR 86438      APRW D (CR PNL 805) DOES    COhP(ETED WR          PLES  PW  CCMUTE~
NOT LOHT 1 A 04126 JAN 6 8?      24        WR 88 24 272  V55103A (C7 CONTRCE RW)    CCafuTED WR        ~~~ RLS  PW  CCMMTE NOT WORP@e3 REE ECmN 1 A 04126 JAN 687        61        WR 864111      S C45EL OEN) PEP AIR        OPEM5LE 8Y5 TEM        Ris    Pu  PCT RECD CL LEAK CN OCMRNCR                                            FCA CFFLCAD 1 A 0412 ? JAN 6 87      41        WR E4121      06L AA8 (D$L GEN BLDG)      COhfGTED WR            DAW        CCNSTRUCT.
fEh015EINCER                                                  COWRITED DRAN LNE 1 A 04128 JAN66?        81        WR864144      06L GEN 3 R1078 (27 EL)    COhfMTED WR            DAW JS$    CCNSTRUCT PEACE PM & hsLL                                              COhfuTED 1 A 04 itt JAN 48?      $1        WR 864152      C A B P91(00 B EL F3)      CChPLITED WR          DAW        CONSTRCT SdFtEhENT hCDFCATON                                          COhf MTED 1 A04133 JAN 487        61        WR 864164      Aso64102 (s $WCA 8 D$L      COhrtETED WR          RLS    PW  CCWMTE ftt, TEST 9(V FDER C&I l
I I
l l
 
l CHECKLIST # 1          REFUEL BRIDGE TESTING COhF1.ETEOFF LOAD CORE                                                                                                              t i
            \. HARDWARE TTEMS                                                                        JAN 30 87              Page: 12                                                            1 A.04 hMNT REQUESTS & PROCEDURES NCL PWS                                                                                                                                          i ITEM      ENTRY PNGDUCTS 84EEDCR NUMGER    DATE    SYEMCue PEFUWQ DOCLMNT                                    GULIECT              JUBTFY F M7T MC                  APPRVR 00EA                      STATU$CATE 1.A 04131 JAN 20 07  30                                        EQ TECom ters QQtfMTED                                                REA Pu SDM 1.A 04132 JAN 20 07  2                                          ftQ MACTOR MC#tC                                                      RLA      PM SWTEMhfrt OcarWTED                                                    SDM 1604133 JAN 20 87      4                                          PEC MACTOR FEDWATEM                                                    RAA PM i
SWTEM hfflCOPWTED                                                      SDM L
4 J
l 1
1 l
1
{
i l
l l
j                                                                                                                                                                                                  l l
1
.f I
i 1
l i
l
'l 1
                                        ,          . - - . - - _ _ _ _ _ - . , - _ .            , , --- - -          - , - . .  .-.----,.r.      , - - . , , , , , - , - - , .          . - , , -
 
CHECKLIST # 1          REFUEL BRIDGE TESTING COMPLe~rE/OFF LOAD CORE t    HARDWARE ITEMS                                              JAN 30 87      Page: 13 A.05 FA! LURE & MNCT10N REPORTS (F&MRS)
~
MW        ENTRY                                                        PRXLCT5 PEEMDCR NUWER      DATE    SYS#RCue PEPWeim Nv1 W          eLEECT              ASTFY F >eOT PEC      APPRW 00ER  STATUS-DATE 1.A Cl 001  DEC 188    10        F4W 88110    m W WITH M SYSTEW          RESOLUTCN CF M        fLEL P M. MAYBE POC 84-33    W R N3TO WEETSMOLE          See.E FALURE          CM        MT EQD FALURE CAffERIA            PROELEW OR MANJAL                PCC ON HXD F6W 80 110                  Nff.OF WN R OW 1 AC5 0C2 OEC 188      44        F6W te 1M    RESPOND TO F6W 86136        OPERA 8LA Y 10        JP G        PCT REQD PANEL Y.10 AUTOMATICALLY                                      F4WR D6P.
TRAMFEMED                                                    LATER 1 6 85 0C3 DEC 186    81    8 M F1,F4W 85350 fESCLVE EKD TO PENGM        MTUt40EDTOE          M&    P 64 CCWPLETE 10$$ OF OFF SITE POWER'      REQUPED PERPEM                  MustBE SURV TEST POLLOWNQ                                            PENORMED 00 MANTENANC4 1 A C1004  DEC 0 88  to      F&WR as 3ee    RPM SNUSSER H 141 SS 23    OPERARI SNI.WER      PLL&  PW  W)T REQD ~
FCR CFFLOAD t a010C5 CEC 0 BS      14      F&WRes.M29R    LOCEE BOLT 5 ON            OPERARICOFE WHAY      PLES< PD.S  CCN MITE '
G H 73      M14044A                                                      FCA CFFLCAD TCH8719                                                                    F4WRD69 LATE R 1 A C1CO4 JAN tl 47    24        F&WR 8714    PEED F&ne FOR F A&lDE CF                          R.E1  PW  WFUTE T CfES SYSTEW TEST                                            F&WR 8714 1.A C& OC7 JAft 22 87  45        F4W ee 347    PE.SCLW EED TO NMAN        F6M D6P OURNG MJ      SD)(        PCT REOD N CCLD SHJTDCMH CEA TO                                        FOR OFFLCAD FALUPE OF WEL PRESS ee00s N RUN WOCE
 
CHECKLISTD 1            REFUEL BRIDGE 175I1NG COh@LE'IEOFF LOAD CORE B. SOFTWARE ITEMS                                                JAN 30 87        Page: 14 B.01 OPERATINGMAINTENANCE SURV. PROC.(ST'S)
        .itW      ENTny                                                                                                          ~
PYCOLCTSDEECED m MJWGER    DATE    SYSMKuo REMPENE N uNT              SURJECT            JUSTFY F NOT REQ      APPRVR DOER    STATUS DATE 1.8 01 001 DEC 1 st    14      &E14              CORE 8PRAYWOV                                    PLM          MONTHLY        r OPERA 4UTY                                                    LAST DONE v15's?
18 St.002  CEC 1 as  14    8 W 2 2.101.1      COPE FRAY LOGC TES f                              RL&    P.M  M WhANNVAL' LAST DONE 11/17/06      !
t 8 @t 003 MC i e6      14    8 W 2 210.1.2      CofE FRAY LOGC TEST                              RL1    PW    M WF ANNv4 LAST DCNE 1iMW i 8 @1 004  M C 188    14    e W 2 2.10.1.3      COPE SPYMY LOGC TEST                              RL1    PM n                                                                                                                      M WhANNuAL LAST DONE      !
11/17. 4 18 01 OCS DEC 186      14    8 W 2 210.14        Cope FRAY LOGC TEST                              ALS    PW    SE Wk ANNu4 LAST DCe4 11/17.a6 1801004 DEC i 86        14    8 W 2 2.10.18      CCNE SPRAY LCGC TEST                              RLS    PM    M Wi-ANNv4 LAST DCt4      5 11@ e6        I 180100? DEC 186        14    4 W 2 210.16        COPE SPRAY LCGC TEST                              RL&    PM                    '
SE Mb ANNV4 LAST DCr4 1111W j  i 8 01 004 DEC 186      14    8 W 2 2.10.1.7      CCFE SPRAY LOGC TEST                              RES. PM    M MFANNUAI, LAST DC*4 1672 %
          .009  DEC 186    14    4 W 2 2 t0.1.8      COfE SPRAY LOGC TEST                              RLS    P.W  SE Wk ANNV4 LAST DCr4 11/17 36 1801010 DEC 1 as        14      L E1.8            COPE FRAY hCV FMON        CNCE PER 10 WQ.        PLM          PCT REQU        l ALTEM(ATE SHUTDOWN                                            NA CptCC        '
PANELS C*CE/14 ho      p 1801011    DEC t as    14 8 C.13            CORE SPRAY 4QtC VALVE LNEUP PLM        TWO LAST DCt4 1,1517 1801012 DEC i a6        14      4 A 18            CCFE SMuY SYS NTEORffY s
PIM          OUARTE RLY i
PA$TDUE                            LAST DONE        ;
at$m 8 LOOP E7517            l l
18 @t 013 DEC 1 a6      14      4Lil            COE SMMY SYS DECK                                  PLM          C*CERO          I VALW OPERA 8UTY SAata                                          LAST CK*E        I
]                                                                                                                    &?$14            I Ya 010t4    DEC 186    14      22 20            CCPtf SPRAY SYS LNELP.                            PLM ATTACMdENT A.DOUSLE                                            LASTDCPE I
VALVE VERFCATION                                                81.1117          {
A t/17,87        I I  1801Gil DEC 1 as 101      & t.8J          PEMORW CLASS a a Bt        PESTARTVP ffEW          J&    JS    SCT RECD SYSTEM WVDROS (UPAPCED    WCW TO 04Cp15T 4 OUTAGE) 4 1801016    DEC 1 e6  10                          PENOped LEAK TEST CN %    1 AYCLE SURV          J&    DL    NOT RECO DOECTON C44C8t VALVES    DUE WEN H LOOP DPANDED OUTAGE)            E D6R 70 SE j
OPERA 8LI hCYE To CHEC80ST 2 1
i
 
CHECKLIST # 1            REFUEL BRIDGE TESTING COh&LETEOFF LOAD CORE B. SOFTWARE ITEMS                                                  JAN 30 47        Page: 15 B.01 OPERATINGMAINTENANCE.SURV. PROC. (ST'S)
          ..EW      ENTRY                                                            PRCOLCT5 PEECEDCR NUWER        DATE    SY D RCue PEF 9 9dtkrrrimsyT          SUsECT            JUSTFY F NOT REQ      APPRW CCEA  STATUS DATE 1 e @t.017    DEC 1 a6  14          a 11.1          COE SPRAY PUW                                      PLM        MONTHLY OPERAaUTY 4 FLOW                                                LAsT DONE RATE TEST                                                      1/1617 1301018 DEC 186        44          8ee            RATTERY LOAD                                        RL1  PM  CNCLCYCLE C# CHARGE TEST WW  LAST DONE I
1417.16 1801010      DEC 186    41          4W31          CX3 Lost OF OFF9fTE PCMEM                            RL&  PM  ONCECYCLE (W1SPC4 3077300)                                          WM  LAST CCNE 1214 14 1 Bot.020    DEC 186    14          8 C 22        CCFE SPRAY 44 WWR                                    PLM        MERY LAST DOPE t/26 87 1 8 01.021  DEC 186    14          8 C 23        CORE sehAY40 *FwR                                    PLM        ME r.Y LAST DONE L1617 1801A22 CEC 186          to          8 C 24        COFE FRAY.M14Y LUBE                                  PLM        ME4Y LAST DCP4 L1187 1881C23 CEC 186          14          4 C 28        CORE SPRAY a                                        PLM        &EW6 ANNJAL SEWkANNUAL LUBE                                                LAST Dorn 1&1316 1881024 DEC 1 e6        to          8 E 14        CORE SPRAY P6STR CAL                                PLEA  PM  ONCERG LAST DOP4 111686 02$ CEC 186    to          8 C.it        CORE $ PRAY 4.10KV40CY                              iPLM        ME4Y
                                                          $WTTC>CEAR SLRWELANCE                                          LAST DCNE V2617 58@)024 CEC 186            14          P L11          CCFE FRAYCCX.D SHJTDC4sN                            PLM      643NTWY VALW TESTM                                                    LAST DONE iW1336 18 01 C27 DEC 186        14          8 til          CG1E SPRAY. REMOTE          PEMOF1W C2JRM          PLM      NOT REQO POCATON C>iECE              RFOs7                            KR CFFLCC OPCEM t 8 81020 CEC 186        to        4W2-241          CORE SPRAY m DELTA                                  RL1  Pu  QTRLY        ,
P TE ET. OPER 12                                              LA$T DOPK    '
itMs6 1 B 01029 MC 186        14        4 WJ 2.1.10      CORE SMAY An A4 4KV          &4ME AS(TEW            RLE. PW  hs3NTHLY SATISFES CS 4 R*  EhERENCY R.5 CEGMDED        1.E 01105                        LAST DON 1    i VOLTAGE                                                        111116        I i
18 e1 CSC CEC 185        14        8 WJ 2 til      CORE SPRAY A5 At 4KV        COLED CAdEE LO64 CF    Ri1  PW  PCTRECO SATISF13 CS & R$  EAEMENCY RA CEG%CED          STATEsd PO4ER                    FCR CFTL*4 WLTADEMED SACKSCUTTL4 SAME AS rTEW                            CAN WJT CC 1 E01.106 LAST DO*eE &W j~    1801031      CEC 1 a6  14        8 W 341.1        CORE SPRAY . Mi n AT1.R                            Ri1 Pu    hscwTHLY LIWL SAFEOUARDS                                                LAST DONE t S17 1 B 01032 CEC 186        14        4 W H.7                                                                                    ~
SAT 15FES CS & R$
CCfE SPRAY CaCS              &AME AS ITE W          RL1  Pu  ha.w tRT PUw DescaAME                110titi                          LAST DOP4    i i
.                                                                                                                        tn &17 l            m CEC 1 6        14        .WH.            CCM ., RAY wEm              . AM u rit u                Pu
                                                                                                                                  ~
'                                                                                                            u&        uc =Y
                                        $4TISFIES CS & Rm  AREA HoH TE6FERATLRE        1 E01.112 LAST DCP4      l tant?
l i
 
CHECKLIST # 1          REFUEL BRIDGE 1ESTING COh&LEIEOFF LOAD CORE B. SOFTWARE ITEMS                                              JAN 30 87        Page: 1e 8.01 OPERATINGMAINTENANCE SURV. PROC. (ST'S)
        .W      ENTRY                                                        PYGLCTE MEmDCm ender      DATE    SYS+RCue fEFWENCE N W              SUEJECT          JLATFY F NOT FEQ        APPRVR 00ER STATUSCATE 1 e 91034  OEC 1 as  14      8 M2-2.10.10    CON SPRAY TRP SYSTEM      SAME A8 ffEW            RLA  P.M  ONCERO SAT 10FES C4 4 Rm POWER BLA WONff0R          1.1 01.113                        LAST DCK 11418 1501035 CEC 188        14      8 W 2 2.31      COM GPRAY AOS PM          SAME A8ITEW            RL1  P.M  WONTRY SATISFES C8 & R4  DeCHm0E AC NTERLOCK        1.E 01.124                        LAST DONE 12,761s 1801034 OCC 1 es      to      e W 24.14        Com hPRAY Rs ORYMLL                              REA  PM  MONTRY W PT.S&LfE                                                  LAST DONE t?it?
I 8 01 037 CEC 1 as    11        04.1          SEC PUhr OPEAASLITY                              PiM        MONTR Y MC FLOpt MATE TEST                                          LAST DONE v1617 1001034 M C 1as        11        7.1.18        SEC VCLladE CONC 4                                PLM R C. 6CNTMY
                                        .          SCLL/ TION N TANK                                            LAST DONE 1/1617 1801038 OEC 1 es      11        842            M.C NLEF VALW OECM        CNC& Cit 2.E TEST      P1R        NOT RECO.
FOR COLCAD 1001040      CEC 1 as  11        4L12          anLC ROCTE NDCATON        OPCEC11:LE TEST        PLM        WT REOD CHECK                                                        FOR OFFLCAD
~1801041        DEC 1 as  45        & W 120        SOY LEWL SWTTOES                                  REA  PM  QT4Y CPER 10                                                      LAST DOPE 11/1718 1801042 CEC 1 as      e5        4 L12          CfC PEWOTE DOCATON        PEPForld OURNO          PLM        NOT RECD (RPB)                    RFOs7                              FOR OFTLCAO CPCECYCLE
~
1801043 MC i es        45        S W 131        SDV WNT AND DRAN                                  RL& PM    CNCECYCLE TIMIPe3                                                      LAST DOP4 42b38 1801064      CEC t es  el        433            &UV WNT ANO CWWN          F1NC. TEST              PLM        QUARTE RLY FUNCTCML TEST            PUFCFMD WffH                      LAST DOPE 4 W IJO                            t?t17 1801045 CEC 1 as      50        873            EC CONT LIAK RATE TEST                            PIM        CNCERO CPE R 10                                                    LAST COE V2117 10 01 Gas CEC 1 as    to        &C4            TEST OF CMS OPERAatHY                            PIM        6CNTRY LAST DONE 1517 1801047      CEC i ss  to        4729            C7ES DAwtR p6 PECTEN                              PLM        M Wi- ANNU(
LAST DONE PA&&ED SURv FALID TS 1 B 01044    CEC 1 es  44        87.21          843T DELTA P ACAO&&      PUFCfte CPCE            PLM        PCTREOS FLTERS                    PER 18 bc                          PART OF L7.2 $
' i B 01 Dee OLC 1 as    4e        t 7.2 7        CELTA P ACRO && CN                                PLM        CNC(/18 W3 ROCad EW4CPedENTAL                                          LAST DOPE SYSTEW                                                      PAESED SI#/
FALIDTS 1901050 CEC 1 as      44        4 B 18        SS3T SPRAY $11TEW                                PLM        QNCECYCLE (FFit WATCH)                                                LA$TDCNE
 
CHECKLIST # 1            REFUEL BRIDGE 1ES11NG COMPLETEOFF LOAD CORE B. SOFTWARE ITEMS                                            JAN 30 47      Page 17 B.01 OPERATINGMAINTENANCE SURV. PROC. (ST'S)
          ..tM      ENTRY                                                      PPODUCT5 PEEMDCR NJWER      DATE    SYS#RCue PEFUENCg m uWT        SLMCT            JUSTFY F NOT MC      WPPM DOCR  STATUS.OATE i B C1.C51    DEC 30 96  44        & T.2 4      23T SYSTEW OPERAasJTY                          Piu LAST DCNE 10 91 C12 CG 186          44        &7JJ          SaGT N M A' 'S          CNCE PER 14 WCL CE    PLM      PCT RECO AFTER HTR MANT.                SCM CHLCAD 18 01 c53 DEC 1 as        4e        a 7J e        seGT CONTMCL ROOW        OM:E PER 10 WC1 OR    Piat      NOT RECQ HJWOITY NTERS            AFTER HTR MANT.                FCR CMLCMD 1 8 01.054  DEC 188      de      aW21.543      SeGT NffMTON AND                                RLS  PM  SE Wh ANW4 m EDO GOLATON                                            LAST DONE SYS A NGCARD                                              t n s?
18 01 Cll DEC 186        44      gW21.644      SaGT NfTMTON ANO                                R11  PW  SE WF ANNy4 h kDG ISOLATON                                          LAST DONE SYS B N0040                                              tM17 1901056 DEC 186          M        &E31          PW:CW PWP CFEMSLlTY      RECO F CCNT.        PLM      OuARTE Av 40 CAPACITY CJECK        COOLM3 M00                    LASTDCtX 1 a 61.057    CEC 1 e6    M          e E 30      PWCCw SYSTEM PETR CAL    RECD F CONT.        plLS  PW  OPCERO COOLN3 MOD                    LAST DONE 1811153 1801454 DEC 186          30        0 C.13      PWCCW LOtC VAlb1 LNELP    RECO F CONT.        PLM
                                                                                                                &WC#.TH COOLN3 MOTL                    LAST DOP4 17587 18 01 C53 CEC 186        30        4 L11        m CQD3>4JT3:mN            RECO F CONT.        PLM      WONTHLY V4%T TESTING              COOLN3 REOD.                  LAST CCNE 1t16 as 063 CEC 186      30        8 C.10      RSCCW 41SKV>4Ocv          RECD F CONT.        PLM      v4EqY COC1H3 ECD.                    LAST DCfE 47917 i 8 C1041    CEC 186    30        t C 24      PECW WELAY LLSE          RECO F CCNT.        PLM      V41qY COCLN3 MQQ                    LAST DC#4 tn17 1801062 CEC 1 E          M          S CJG        PWCCW SEWh ANWAL LUGE    RECD F CONT.        P1W      SE WL ANNV4 COOLN3 MOD                    LAST DOPK 1801063 CEC 1 to          M        &E33          PWCCW CONTANENT          RECO F CCNT.        PLM      OJARTE4Y COCE D63 VAL %T          COOLM3 MOD                    LAST DONE OPERAaETY TEST                                          6% e6 1001064        CEC 186    M        &138          PW:CW PUhr.M TERP6 ATE    RECO F CONT,        PLM      CNCLCYCLE MJTDCmN PANEL TEST        COOLM3 McQ                    LAST DOPd 18 81 MS CEC 186          M          SL12        P40CW REACTE DOCATEN      RECD F CCNT.        PLW      CHCECYCLE OECK                      COOLM3 MQQ                    LAST Cord 9 8 01064 CEC t 36        29        &L32          &S W P W P GFT RASL m    REQQ F CONT.        Piu      OJARTE4v AND b AL)T TEST          COOLH3 MOD                    LAST DCr4 l  1B 1 04 ? CEC 1 as        29        4L30          &SW Plaap ALTERNATk      RECD F CONT.        PLM      ONCECYCLE ~
MJTDCmN PANEL TEST        COCL9e3 MQo                    LAST DCtd 18 01 M4 DEC 186          29        SEJ9          &$w $YSTEM NETR CAL      RECD F CCNT.        R,LS      CNCECYCLE COOLM3 MQQ                      LAST DCr4 RFC e6 i  1801Ma CEC t es            at        8 1.12        asW REMOTE DCCATON        REQQ F CONT,        PLM.      CHCECYCLE i
04CE                    COOLM3 MQQ                      LAST DOPE 0 70 CEC 186      29        2.182        &BW CNtR b 4L%%5        RECO F CCNT.          Piu      CNCERO CCOLN3 MQO                      LAST DCr4 i
 
CHECKLIST # 1          REFUEL BRIDGE TESTING COMPLETFsOFF LOAD CORE B. SOFTWARE ITEMS                                            JAN 30 47      Page: 14 8.01 OPERATINGMAINTENANCE.SURV. PROC.($T'S) 4W      ENTRY                                                      PMIluCT5 PEEDCft 14AAKR    DATE    SYS#RCue PERPD G rW W CNT        SUE, LECT        ARTFY F le0T PEQ      AP*RW CCEA      STATUSCATE 1881071 CEC 1 as    4s        a K21.3 2    MFUEL PLOOR exhaust                            RLA. PM      WONTRY W0edTOR FWCTIONAL                                              LAST 00P4 1rt&'s?    ,
1001072 DEC 1 es      10          0 C.13      RHR (LPCt) LCKC VALVES                          PLM.          49eONTH
                                                                                                        ,          LAST DONE  t 1/2697 1 ILot 073 DEC 185    10          6 C 18      PlHR 4.10KV>440V          PEPFCPtd MDLY        PLu            ME4Y SydTCHMAR SLe%TL1ANCE LAST DONE t7st?
1881074 CEC 186        10          8 L10        M LPCa SYSTEW            Pe8TMmENTSFOR        RL1  PR      ONCEMO    i DelTR CAL.OPEA 12        CPERA'MJTY ON R>ft                  LAST DO*E AME DOPE                            Witte t B 01076 DEC 1 as    10          &L21        M LPCa RJ05YS OPEMAI                            Plu            NOT RECD SAWE AS 1 8 01.145 1891074 CEC 1 et      10          &E2J        M LPCI FLCwt RATE TIST                          Piu            QuARTEfty LAST DONE V1517 1801077 CEC 196        10          S Ait        PHR LPC18Y3 NTEGNTV                            PLM            OUARTEFLY LAST DOPE 11/1116 t 8 81078 CEC 1 as    10        0W2218        LPCa LOW PREstuff.                              RLS  PW      WONTRY MRW$$NT                                                        LAST DONE t7117 I
078 CEC 1 m    to        4 W 2 2 10.2 1 LPCI M C7 > P(T                                RLA  Pu      M Wk ANW4 l                                                                                                                  LAST DCf4 11 S1e 18 01 CN Cf C 185      10        0 W 2 210 2 #  LPCI MCTON PdT                                  RL1  PW      H WF AN%4
!                                                                                                                  LAST DONE 11sts I    t 8 01041    CEC 1 e6  10        8 W 2 210 2 3  LPCI MCiON pdf                                                            I t
RfA  PM      M uk ANw4  l LAST Cod    i j                                                                                                                    tig es
]    i 381 ca2 CEC i es    10        8 W 2-210 2 4  LPCa MCTON NT                                  RfA  PW M Wk ANW4 LAST DONE j
11518 l  ' s ai en Ce C i =
i 50        e W 2 2 to ti  Lrci MCTc= pai            eamucetW              Rts  PW      u WsANwn KT3 TO FUFORM                        LAST Ocfd it1115      ;
i    1891044      CEC 186  10        6 W 2 310 2 6  LPC4 MCTON pdf            DEEDDOTHPECec W      RLS  PM
'                                                                                                                  M WLuw Ai SET 5 TO PDFCpW                      LAST Dord vints i
t501 col CEC 1 as      10        8 W 2 210 2 7  LPC4 M CiON NT            DGED a:Rh SEC# C W    RL1  PW      M W6 ANW4 SET 5 TG PUFCftd                    LAST DOrd    )
mu          j 1801C44 CEC 188        10        8 W 2 21014    LPC4 M CTON pdT
* EEL BOTk PEC80 W    RL1  PM      M WF ANW A  i MT5 TO PEMCFW                        LAST CCPE 61110 1401C47 CEC t as      10        4W2tiO29      LPC4 M CTON NT                                  R.L&  PW      MWFANWAi LAST DONE 6136 f
 
CHECKLIST # 1            REFUEL BRIDGE TESTING COMPLETEOFF LOAD CORE B. SOFTWARE ITEMS                                              JAN 30 47        Page: 19 B.01 OPERATINGMAINTENANCE SURV. PROC.(ST'S)
A    ENTRY                                                        PIECUCTS PEECEDCR MR        DATE    8vl#RC# IEFUENC& rm asWT          SURACT            JUSTFY F NOT PEQ        APMtb4 00EA STATU$CATE 18 01 ces MC 1 as      to      e W 2 t10.2.10  LPC4 M4CTON NT                                    REA    P.W M Wb ANNV4' LAsT DONE 12/tres 1 4 41.044  C G 1 a6  10      8 W 2110 211    LPG 4 MAGTON IPs T                                RfA Pu    M WFANNUAt LAST DONE 12/17 86 1501090 DEC i 88      to        a W 2110 212    LPCI MCTON Psf            PEED SON PECPC WO      R11    PW  MW&ANNv4' MTSTOPUroped                      LAST DCPE 61606 1801091 DEC 1 M      10        0 W 2 210 213    LPC4 MACTON NT                                    RLS    PM  M ML ANNV4 LAST DOM 61666 1 8 01.092 CEC t es  10        8 W 2110 214    LPCI MACTON NT                                    RLS    PW  M Wh ANNv 4 LAST DONE
                                                  ,                                                              12/1&W 1 B 01083 DEC 188    10        8 W 2110 2 il    LPCI MACTON NT                                    REA    PW  M WF ANNU AL LAST DCNE 12/1645 1801064    CEC 188    to        S W 2 110.294    LPCI MACTON NT            PEED BOTH PECfC MG      REA    Pu  SEW > ANNUAL MTS TO PENCRW                      LAST DCtA tM17 10 0100$ CEC 1 as    10        $ W 2 2.10217    LPCI MACTON NT                                    RLE    Pu  SEWLANNV4 LAST Cord tM17 M6 DEC i m    10          4123          LPCI V4%1 CPE RA84.fiY                            Piu        WONTHLY LAST DC#4 0 LOOP vist?
8 01 047 DEC 186    10          4411          LPCICCLD $4JTDOM4        REQO. F CCNT.          PLM        bChTHLY V4VE TEST                COCEN3 MOD.                        LAstDOE LPC4 VAL %ES TESTED                1tt& es M85114 4122 1001094 DEC 1 as      10        t M 21 &4      LPC1 PHR IKLA TON                                RLS    Pu  SEwtANNUAL v4VE TEST                                                    LAST Dort itse6
'i 8 01 044 CEC 188      10        4 W 21 & 4.1    LPCI PNR IbOLATCH                                RLA    PW  MW ANNU4 V4YE TEST                                                    LAST DONE 12/1615 01.103  CEC 1 M    10        8W21El          LPCIfHR 4&cLATON                                                          l REE    PW  &E WE ANNv 4 N4VE TEST                                                    LAstC0 4    '
11598 i B 01101  CEC t 86  10        4 W 21 E.5 i    LPC4 PNR IKa.ATON                                R1A    Pu  M W5 ANNv4 '  l V4VE TEST                                                    LAST DONE    I 111115 1801102 CEC t es      10          Stil          LPCl6CV ALT &O PA4L      PENCred CN1 CYCLE      Piu        PCT RECD.
PCR OFFLOAD i 8 01.103  CEC 1 sE  10        8 W 2-117      LPC4 Low PRESSURE                                RL1    Pu  CTRY PLAW6Shi Al/TO Nff                                          LAST 00t4 V1117 104 CEC 186    10        0 W 2114        LPCs LOW PRES $vRE                                RL1    #u  CTRY PEN 65N190ECTON                                              LAST DONE VALVES                                                      17517
 
CHECKLISTO 1              REFUEL BRIDGE TESTING COMPLEIEOFF LOAD CORE B. SOFTWARZ ITEMS                                                  JAN 30 87      Page: 20 B.01 OPERATINCLWINTENANCE.SURV. PROC. (ST'S)
A    ENTRY                                                          PRCCUCTS NESCEDOR MR          DATE    SYS#ROJs PEPUEMM DCCUENT          SURJECT              JUETFY F NOT FEQ      APPRVR DOER    STATUS-DATE 1.s @i.ics  M C t es  10        S WJ 21,10      LPC4 AS A4 0EORADED VOLT    SAME A8 ffEW          RL& PW        NOT RECD SAT 1erES CS a Mm                              1.a01.02e                          SAME AS 1.s 01.eks 1.10 u 06 M C 1e6      10        8 W2 2.1.11    LPC4 An A4 MJ MWR          SAME AS TTEW          RE&    PM    NOT REQD SAT 18FES CS 4 Rm  CEGRADED NOLTAGE            1.E01(20                            SAME AS 1.s 01.030 1 e Guer DEC i a6      10          W 2.t u      LPCs mACTOR WATER LEWL                            RLS    PM    E WTHLY SAFEOUARD                                                      LAST DCr4 1417 1 8 81.104  MC1SS      10        4 W.21.1      LPC1PCS REACTOR HGH                                RL&    PW    WONTHLY PfESSURE                                                        LAST DCf4 12/11 W 1 5 01.109  MC 186    10        8 W 2 2.10 31  LPC4 CONTAMsENT SPRAY                              RE&    PW    SEWL ANNUAL PERWESN1                                                        LAST DONE 1174 06 1 8 @i.110  DEC 186    to        4 W 2 210 3 2  LPCI CONTAmeENT SPRAY                              RE&    PM    SEWFANNVAL PEAW6SM                                                          LAST DONE 111416 1.8 01.111  CEC 186    10        8W227          LPCICSCS Ptne DeckWGE        SAME AS fTEW          RL1    P.M    NOT RECO.
SATISFES CS & Rm  WONITOR                      1.E01.032                          SAME AS 1.8 01 032 1891112 M C 186        to        8W229          LPCI SVEQUMO AmA HCaH        EAWE ASITEW          RL&    PW    NOT RECO
                                      &AT)$FES CS & R$  TEWPERATUFE                  1.E 01.033                          SAME AS 1.8 01 033
    ~      ~
1 113 CEC 186    10        4 W 2 21010      LPCITRP SYSTEW OUS I                                                                                  SAME ASITEW          RLS    PW    NOT REQD 5ATISFES CS & Rm  POMR WONfTCR                1.1 01.034                          1AME AS 18 010M 18 01 i ts  CEC 1 se  10          2.1.7        LPCI W&&EL HEAT UPCOCS.      REQQ FOR CUTAGES      PLM          NOT RECO U0#464A&tasCHECK            UrtEATERThnN 3 WO                  FOR OFTLCAD VALYES. LATEST REV TO DCLUDE TH6 TEST) 1 8 01.116  DEC 1 e6  10          t F,16        LPCA LLRT OF PR CONT                              J&    PW      COM MITE PENETRATIONS & VALW$                                            7P 2,4 d e j                                                      WO 100123A.26A.298.50, or Not Ret
)                                                      90.&3.47 j    18 Out! CEC 1 as      to          S C 24        LPC1ME4Y LLSE                PUT0fte M14Y          PLM          MErly I
LASTC4',E 1130?
18 @U23 DEC 186        10          4 C 29        LPCJ SE WI MMJAL LUBE                              PLM          SE WL ANNV AL LAST DCf(
i 10/15 a6 1801124    Ctc 186    10        4W213i          LPCJ ADS PUw D6C&WGE        SAME ASITEW          ALE  PW  ' NOT REQD 8 ATISTES CS & Rm AC NTER 0CK                  1.801.035                          14af AS 1801035 l
i 1 B @utt DEC 1 e6      10          2182          LPCI CLASS EA:s H1tROS                            J&    JS      NOT REOS RHR A Hm.26A 26A.M298
                                                        .26A 23A l
18 Ou 26 MC 1 a6      to          873          CPEA to.SEC CCodT                                  PLu          M3T RECD.
SAME AS 1.8 01.045
  ~
127 DEC 186    49            8101        0FTR14TUELHANOth0                                  PLM          MEKLY EQUfMNT C1ECO                                                    LAST DC#E
 
i i
CHECKLIST # 1                    REFUEL BRIDGE ESTING COMPLETEOFF LOAD CORE
.,          B. SOFTWARE ITEMS                                                        JAN 30 87        Page: 29
;              8.06 NON-CONFORMANCE REPORTS (NCR$)
        ..iM      ENTRY                                                                  PIEDLCTB DMEDCR MJMSER      DATE          SYS PA0Js MRMMCE DOCIAENT            SUEJECT            ASTFY F NOT PEQ        APPRWL 00ER STATU$-DATE i
  )  1SClC23 JAN 14 07            49          NCR 87 40        PEFWLNG5405v4LI4          NCR CLCECUT            KFA AL P. CCMPLITE DAW 18 ClC24    JAN 14 47        44          NCR 87 M        FEMLS83 W400E v4LDu        NCR CLCEOL/T          KFA  ALP. CCMPLITE ~
DAW 1
1.8Cl02$    JAN 14 87        10          VAACutNCR$        LARGE Nm W ERS            CLC200VT CF NCR'S      PLV7,      WPLETE l
POTENTALLY AFPECTING                                                      I CPEMBLfTY OF REQURED
,                                                              SYSTEMS POR OPMDAD r
4  1805026 JAN 16 87            41          NCR 87-81        T DE8EL GEN                NCR CLOECUT            KFA  ALP. CCWPLETE PLES
. i8ClC27 JANil67                            ER 62 444        SHAFTCCUPLNG APO          NCA PEVEW MATERAL      KFA  ALP. NOT RECD      I i                                                                sTtFFWG ASSEhSLES          N WAPEHOUSE                      FOR OrFLCAD a    18 @lC24 JANilt?                          DeCR 01004      1*.Y40E VALVES            NCA PEYEW MATER AL    KFA  ALP. NOT MCO N WAPEHOUSE                      FOR CFFLCAD  !
l    18 C 5 029 JAN 15 07                      NCR 4F065        1* Y OLOSE VALVES          NCA PEVEW MAMR AL      KFA  ALP. M3T REOD CCWVAL (MRR W it)          N WAFEHOUSE                      FOR 0rFLCAO i
18 CS C30 JAN tl87            23          NCR 83-009      TWLST RDeG FOR            WCA fEVEW MATERAL      KFA  ALP, NOT RE00 Mckracr 3                  N WAPEHOLSE                      FOR OFFLCAD 1895031 JAN tS47              23          NCA kot3        NAMCO LNrf SWfTCH          NCA FEVEW MAMRAL      KFA  ALP. NOT RE00 N WAfEHOLSE                      FCR orFLCAD  l t
t B C5032 JAN 15 87                        NCR 84-003      >F A MLAY CopMASON KfT    NCR MVEW hA44RAL      KFA  ALP. NOT MOD N WAPEHOLSE                      FOR OFRCAD
;            333  JAN in 87                    E R k iet        CAPACITOR $                NCA PEVEW MARRAL      KFJ  ALP. NOT RECD I
N WAPENOLSE                      FOR OFFLCAD 19 ClC34    JAN il 87        45          NCA es 147      LPRM CMOS                  NCA FEVEW MATERAL      KFA  ALP. NOT RECD f
N WAfEHOLSE                      PC8l0FFLCAD 8
1805035 JAN 15 47            45          NCR k150        L78%f CMOS                NCR PEVEW MATERAL      KFA AL P. PCT MOD q                                                                                          N WAfEHOUSE                      FCR CFFLCAD  I s
18 C5 034 JANtl47            45          NCR k ite        MLAY CARD                  NCA PEVEW MATERAL      KFA  ALP. NOT RECD l,
N WAPEHOLSE                      FOR OFFLCAD 1 B C5 037 JAN il 47          45          NCA kite        LEWL SWTTCH                NCA PEVEW MATEAAL      KFA  ALP. NOTRE 00 N WAfEMOLSE                      FCR OFFLCAD I
i    1 S C5 034 JAN tl 47          45          NCR 84-203 I
AAW'LF ER FOR QEMAC        NCA MVEW MATERAL      KFA  ALP, NOT RECD
,                                                                                          M WAfEMOLAE                      FCR OFRCAD 1SCSC30 JAN 15 47            45          NCR 94 306      DaZAT10N DETECTQfe        NCR #EVEW MATERAL      KFA  ALP. NOT MOD j                                                                                          N WAfEHOLSE                      FCR OFRCAD
  ; i e C5 040 JAN il 47          23          NCA k221        >@C4 LEWL SWTTC48        MCA fEVEW MARRAL        KFA  ALP. NOT REQD j                                            kt>104          FWLM44 AND 450            N W4fEHOLat                      FCR OFFLCAD I
j  18 CC041    JAN tl87          1            NCA k-223        hSAV SCETS                NCA PEVEW MARRAL        KFA  ALP. NOT MCD.
N WAfEHOLSE                      FOR OFFLCAD i  1 8 01042 JAN ill?                        ER 64 224 1
MSRVs. 900Y 3 N 10.      psCA fEVEW MATEAAL      KFA A L P. N3fREOD
}'                                                              BASE &N 118.              N WAfEHOLSE                      FOR OFFLOAD SASE SH 131 1
18 C5 043 JAN tl 47                        E3 DS CC2                                                                                    l l                                                              CAAPEThG N CONTROL        NCR PEVEW              KFA A LP. NOTRE 00      1 ROOM AfD Afon NSTALLED    MEDS FCELOWAP                      FOR CFFLCAD j                                                              WffMCt/T PECEPT NSP.
I 1
s l
l
 
CHECKLIST 01            REFUEL BRIDGE TESTING COMPLETEOFF LOAD CORE B. SOFTWARE ITEMS                                                  JAN 30 87      Page: 30 B.05 NON-CONFORAWJCE REPORTS (NCRS)
      ..iW      ENTRY                                                            PYC0UCT5 PEEEEDCR NUWKR      DATE    SYS#ROJe MTUDQ DOCL&ENT          SUEUECT              AETFY F NOT KO                WPRVR DOCA    STATUSCATE i 8 Cl 044  JAN il 87            NCA 84004      &SW SUCTION BERS              EA EYEW 144 TERA              HFA  ALP. NOTRECD N WAMHCUSE                                  FCR OFFLCAD 1SC5MS JAN 1847                    M A 46014      1* ecos MRQTE5T VALVE
* NCA RE VEW WATERA              KFA AL P. PCT REQD~
ESR 45434                    N WAMHOUSE                                  FOR CFFLCAD 18 Cl C46  JAN il 67    3C        NCR e644 A    EACESSNE CONO6CN ON                                          KFA A L P.
NCR CLC6ECRJT                              vosxCoA THE BASE PLATE 40 NUT        NED DEPOSfnCN CF                            t787 CN AKHCR EELT 6 LOOGE        NCA 8644 ON 1011 1805047      JAN tl 87    i        NCR0647      CCLD SETT N3 P6TCN            NCA CLOSECE/T                  KF A  ALP. RES WR864147      D6TNG CH lNLSOER              OR OPCAAatRY                                TO C6P.
NED44505                                    RE)TW 1.8 CS D48  JAN il 87    i        KR8640        MALI T A3 FOR FLUO            NCA CLO6ECrJT                  KFA  ALP. CCMPdTE WR K4147      LETTL RDOP*3S 6              OR OPERAAUTY WESNG                        RE%TW i 8 C5 04 9 JAN 158?      1        NCR8449        PLATES NOT ALG4ED            NCA CLO6CCan                  KFA A L P. RES WR W4147                                    OR OPERABUTY                                TOD6P.
reb 1W i 8 Cl Cic  JAN 16 s7    i        MR e680        IKLT ON PFS Ct.AWP 6          ER CLO6ECRJT                  >J A ALP    COnuTE WR864147      PCTTG4TDED                                                                17687 18 Cl Cl1    JAN il07    55      KR 6641        F ALIO TEST ACCEPTAKE.        NCA CLOGECUT                  KF A  ALP. RES WR844544      FALID TO SUPPLY              OR OPERA 8Lfry                              TO D6P.
DOCLAENTATICN . SMODER        reb EW 6 PCT NSTALLED 1 8C5052 JAN ils?          C2      P4CR e652      TmEA CEFC DC E.3 94fE        P8:R CLCEEOUT                  KF A  ALP. CCwPLETE WR864216      FOLNO                                                                      179 t?
4 Cl3  JAN il 47    C2      NCR 66la      FOUR MfTS AAE W64NG          NCR CLO6EOUT                  KFA AL P. RL5 WR864210                                    OR COEMaWTY                                TO D6P.
RENTW i 8 C&Cl4    JAN tl87    C1        ER 8657      WR 96-0147                    NOR CLCEEOUT                  KFA    ALP. TO R E &
WR864147      LNEAR tosCATON ON              OP OFTAA8tffY                              70067 MLDS 1 A4 519A1                REVEW                                      t14 87 i8C1Cil JAN il 87          C2        NCR86la        TCKL uaAK.5 v4.AE FCLDO CN    NCA CLCriCRJT                  KFA    ALP. RE$
WR 964210      TT PSTCN OF l#ARER            OR CFTRAAUTY                                TO D6P.
REbTW 18 5C54      JAN ill?    C1        KRM43        thACCtPT AJL1 LPE.AA          NCA CLQ6E QUT                  KF A ALP    PCT RE00 WR364147      PosCATON vi AS                CAOPERAAUTY                            CH  FCR CFFLCAO EENTW ED CW MLD 1 Aa          REVEW i e C s Cl?  JAN i597    C1        NCR664i      PAM.BCut RCLKED WR864147 MA CLOE4 CiLfr                  KF A ALP    WTPEO E DOCATENS MN FOL90            OR CPUUetRY                            CH  FOR C#FLCAO T4tCLO4 Calf LAAWhATO4        RE VE W AALA CN MLD 1 A7 18 ClCl4 JANil47          Ci        EA 06M2      THNILK AAPOCAT0+5              PCR CLO6ECRJT                  KF A A L P. WORK C64~
WR864147      MM FCLs0 ALCpc AR6 CF        OR OFT RASUTY PPE                          RE41W i 8 CS Cl4 JAN 18 87      01        ER te 0E4    LDC64 IKLTPol                KR CLOGEOUT                    KF & ALP    RE1 WR864147      CBSTRUCTchs PFtitNTP*3        OR Cf1RAa urf                                TO C67 FFE! hsCNT6ENT CF PWG R      RE)1W 10 C5063 JAN il e ?        C1      Ka stc67 ua    LOCr4 EKLT N1 CLAMP          NCA CLOELOUT                    KFA A;P      Gm M to41-4 7    IKLTP*3 6 LCC54              OR CF4MALfrY RI)1W Mi  JAN i 5 47  64        NCR 44 C?$    CEFECTS MN FCLIO,            NCR CLOE40VT                    H    4 L P. 42 W'F      5 WR466418      EXC11%E RFRIS ON CtE          OR CPERABLfrY                                FUCL C+M.
SOE UO NTIAMLLY              RE)1 W                                      E N VP' 4 *.
t
{                e                            !
 
CHECKLIST 01                                  REFUEL BRIDGE TESTING COMPISIEOFF LOAD CORE B. SOFTWARE ITEMS                                                                      JAN 30 87      Page: 31 B.C6 NON CONFORN%NCE REPORTS (NCRS) au    D(TRY PEDET5 EEIEDCR M,AAGER    DATE    SYS#RCue RERMNCE OCCAENT                              SUBKCT              JUSTFY F NOT EQ        APPAW 00ER    STATUS @ ATE 1 B Cl 062 JAN 15 67    64                            NCR 84074      RKL CHANNEL 9667T M                              WA NCR CLO6EC41T              ALP. FLEL CWA WR86$414        CC MRK NSTR,10.12          OR CPERA8tJTY                      B N WRHSE MV.1. A DENT N DCESS        REVEW CF SOC', CN THE FLAT SUFFACE CF CNE 1 B Cl De3 JAN 15 47    23                            NCR e6-04i      FCUR CCPUETE FASTDEAS      NCR CLCEECUT          WA    ALP.
WR e6 2342      00 NOT HAvt T4              CA CFTAAatfrY NOUfED TM 64/T3 EACM        REVEW PLATI MD EXCESSST Co mC6CN 18 Cl064    JAN il47    C2                            NCR 960s3      TWO >AJT5 ON TW TOP CF      NCR CLO6EOUT          WA  AEP. RE$
baR 864210        TK SuTORT AM WESNG          OR CMMaLfrY                RES    TO D6P.
REVEW i 8 C5 045 JAN il 47    C2                          NCR 96-064      COTTER PN DCT FLAREO        NCR CLCEEOUT          WA A L P. PCTHE00 CPEN Pf0T. FLY. W ASDERS    OR CPERABLITY              RLS.
(                                                                            CN DE THE PM CLAAP          REVEW ARLA NOT NstALLED PfDTRLY4PA41AER 18 C S C44  JAN 1687    23                          NCRtoCe6        GfoJT743 ARCANOILASE        NCR CLOE&Cm/T        WA    A L P. COdFuTE WR e6 2342        PLAT 1 WA5 DAMAGED          OR CMRAsuTY REVEW i 0 Cl 047  JAN 1687    23                          NCR 84-00?        MLD MATTIR A/C              NCR CLCEEOUT          WA ALP      NOT RFCO b4R 86-23-72      STRD13. (POCMUT ON        OR CMRASUTY                  RLS MLD PFEitNTS NSPECTON        REVEW i S C5 044 JAN 95 87    06                          >CR 06-009        FOLR CESCFUAtCE S DCTU      NCR CLCEECnJT        KFA A E P. RLS WR8646'50                                    OR OPERA 8LITY              RLS    TO D6P.
REVEW
  'i 8 C5 040      JAN 16 87  24                          >CR te 101        13 CRPet GEAAS RfACTED    NCR CLOE40VT          KF A ALP    COJ5uTE KACALEE CF CJWXS N                                              1M17 T4 OEAR TIITH AFE A-PART5SCAantD 3Cl C 7C JAN il47          12                          NCR e4102        LOCEE NL/T5 Ato IKAT5 CN    NCR CLOSEOUT          KFA AL P. RES WRe61214          DE CLAMP CF EPRH3          OR CMRA8LffY                RL1    TO O6P.
rue 3ER N-12-14e w AM      REVE W
                                                                            >+3 N 4149) i B CSC7t    JAN 15 87  01                          NCR84103          LOOSE DA/T5 A10 0CLTS      NCR CLOCECLIT          KF A ALP    RES WRe64147          WUE RICOFOCD                CR CFTRAALJTY                RES    TOD6P RE%T W i 0 Cl C 72  JAN il 47  C1                          NCR 96104        LOCEE DA/T5 Ato KLT3 bsR a64147 NCR CLOSEOUT          KF & ALP    SACKTs MJE >CTEOCN TM F1T          OR OPERAaLJTY                RLS    REE CLAMP                      reb 1 W i 8 C& C 71  JAN 1567                                NCR te105        WRONG Elf 4ATCN            NCR CLOSEC11T          KFA AEP      TORE $
OR CMRA8UTY                  RLS    FOR REWCM REVE W                              1D & t6 10 C&C74      JAN i50?    O1                          NCR SG 106        Eea.BBC R F A11O VEUAL      PG CLOGECn17          KFA  ALP. DCTRECO WR86414T            NSPECTCN                    CR CFtMaLfTY                RLS    FCR CWL04 NED 644G L                                    RE gTW 18 C1075 AN il e?                                    NCR e6107          bb4TE RA DO NOT HA41        PsCR CLO6EOUT          KFA A E P. CO # TETE WR 86-b:c        TMOE ABLfTV
            ~
RL&    tM17 5 8 C1C76 JAN il 87      10                        NCR84904          $NLESE R F A110 460AL      NCR CLCEECRJT          KFA A L P. RL4 MR e64T2            DAWhATot                    OR CMRAauTY                  RLS    TO C6P.
RIVEW
 
CHECKLIST # 1            REFUEL BRIDGE TESTING COMPLETFAFF LOAD CORE B. SOFTWARE ITEMS                                              JAN3047        Page: 32 B.06 NON-CONFORMANCE REPORTS (NCR$)
          .W      ENTRY                                                        PetExcTs>= m nCR NLNER      OATE    SYS# Acus PEFWWCg hnri urNT      SUEJECT          JUSTFY F NOT MO        AMRi9 00ER  STATUS CATE 18 CD 077 JAN il 47    06          NCA es100      SPRNO HANGER H+1107      NCR CLOECUT            KFA ALP    RLS WR 8646-94      FALID NSPECTION          OR CPERABUTY                REA  TO D6P.
REVEW t a CD07s JAN il 47    e          NCA es 116    Hus01A F ALLD VSUAL      NCA CLOeECUT          MA    ALP. NOT REOD EXAWNATION              OR OPEAAstfrY
* RLS MWW 1 s CD 078 JAN il 87    0          NCA H 111      HueGER F ALED VIEUAL    NCR CLOeECUT          KFA ALP    PCT REGO E14MNATION              OR OPERA &EJTY              RLS MVEW j
1805000 JAN il 47      14          KR ed til      LIAMOFT CCBM FMCM        NCA CLQeECUT          K7A  ALP. CCNPL&tE WR 84473      6014004 A WAS DAMAGED                                RLS  titt e?
1 B Cl041 JANil87      02          NCA 90114      $NLSSER F AUD WUAL      NCA CLOeEOUT          K7A  ALP, RES WRes4210        peSPECTm                OR OPEAABUTY                RLS  70 06P.
DEED 64 tel                            MWW 1866042 JANil87        C2          NCA estil      4NL 88ER F ALID V5U4    NCR Ct .1eEOUT        K7A  ALP, RES WR 884219      peSPECTON                OR OPERASUTY                RLS  TO D 67,
!                                      NED k les                              MWW l  i & CS C43  JAN 16 e?  C2          NCAestil      SNLS K A7ALID V5U4      NCA CLOKOUT            MA    ALP. RES WRas4210        peSPECTON                OR OPEAABLfrY                RLS  TO D6P.
NED N tel                              MvEW i 0 01 C64  JAN il87  C2          NCAse117      $NLSAER F AL10 V5u4      NCA CLCSEQUT          K7A ALP    RES WR884210        94&PECTON                OR OFEAASLfrY                RLS  TO D67, MVEW
* Cet JANil87    02          NCA 44110      SNUDER F ALID VEU4      NCH CLOSECUT          KFA  ALP. RES WR as42.it      St&PECTICN              OR CPEAASLfTY                RLS  TO DEP.
MMW 18CSCM      JAN tl47  C2          NCA e6 til    SNLeeEA F ALED V5UAL    NCA CLOeECRJT          M7 A  ALP. RE&
WR864210        pe&PtCTLW                OR OPERABLJTY                RLS  TO D6P, MWW i B Cl 047  JAN il 47  C2          NCRest20      6MLeaER F ALAD VEU4      NCR CLCSECRJT          KFA A L P. RE$
WRst4210        peSPECTON                OR OPEAAALITY                RLS  TOD6P PEYEW t 8 01 C6a  JAN 15 47  C2          NCA 80121      DNUDGER 7 ALID Y$uAL    te(R CLOSECUT          K7 A ALP  R F. &
WR as4210      pe6PECTON                OR OPERASLffy                RLS  TOD6P M YEW i 8 CS Cet JAN il 87    02          NCA eEr122    SMAeER F A&ID YEU4      NCA CLOeECRJT          KFA ALP    RE&
WR864218      DeSPECTCat              OR CPEAASUTY                RLS  TOD6P MWW i 8 cl 060  JAN Il 47  06          NCR88123      $PRp$3 KUGR M41 112      NCR CLCNEC1/f          KFA ALP    RE&
WR es44 94    F ALID %EU4 94PECTCH    OR OPERAAUTY                RLS  70 06P.
;                                                                              MWW 18 CS C41  JAN il 87  14        NCAte128      th4CCAPT AA.E LPE.AA    M:A CLOSECUT          K7A ALP    RE&
I' WR es-1413    DOCATCH                  OR OPEAARLfrY                RLS  T0067        l MMW                                            l 5801042 JAN 16 e7      10        NCA es ise    HUsosaFALIDYsV4          NCR CLOSECUT          Kf A  ALP. CCp %ETE peePECTON                                                                l
;                                      WR e614T2                              ORCPEAABUTY                  RLS  WHf MVEW 1 B C1063    JAN tl87  3          NCA 06127      HANGER F A LED VEUAL      NCR CLCEEOUT          M7A ALP    RE&
DdPECTCN                OR CPEAA8UTY                RLS  TOD6P MVEW l
l
 
CHECKLIST # 1          REFUEL BRIDGE TESTING COh&LETEOFF LOAD CORE I
: 8. SOFTWARE ITEMS                                              JAN 30 87      Page: 33 B.06 NCNCONFORMANCE REPORTS (NCR$)
        . sW    E8(TMV                                                      PUCERKilp6EEDOR MIMER      DATE    wYSMcJe PEPWENC$ DCCla4NT      SL& LECT          ARTFY F NOT MQ        APPMW ODER  STATV$CATE 1805004 JAN ile?      3          NCe s>1ts    tWGA F ALID VsuAL          NCA CLou0i/T          MA    ALP. Ris MSPECTON                  OROPUMSUTY                  RLS  TOD67 REWW 1845006 JAN 14 47    01        NCA E120      SPmpe MANGEMfA410          NCR CLontoff          MA    ALP. REs Wmes4147      VEUAL MPECTION            OR OPUu8417Y
* RLS  7006P        i MWW 18 05 0M JAN1547      01        EA es 150    DPmM3 HAMJEA F ALED        NCA CLOSE0i/T        MA    ALP. RES Mmas4147      VsUAL MPECTCH            CR CPUust JTY                RLS  TO D6P.
MWW 1
180606? Jeh il af    01        EM ee 131    SPmfeG HAM 3/A F A41La    NCA CLOMOLIT ~        MS ALP i                                                                                                              RES WR W4147      V50AL MP(CTION            OM OPERABLffV                RLS  70 06P.
REWW 1 B C6094 JAN tl 47  61        DeC4 94132    NCN O f UMS P4IALLIO N                                                  ~
umas41te NCR CLoeEOJT          MA ALP    can1TE STTTEM EOLeNG Q FUM$                                  RLS  t?S e7 J
l 18 C1099 JANil4?      49        PeCA 90133    W41f4 DO NOT 84.ET        teCA CLOSEOJT          MA  ALP,  COW %ITE
!                                    W9 86 4 tl    AW5 01.i ite0 MCT. 815                                RLS  t?tt?
i 1 8 @S100 Jah 15 47            NCA 80154      OAwEAS FCR POC 8014      NCA CLOIfOJT          MA    ALP. CNRITE        j t76 87 1806101    JAN FC 47  F3        teCR 87 52    MANGER N 71122 1
PeCA CLO3(Q/T        MA    ALP. NOT RIOC
)                                                                                                              FOR C&TLCAD    I i
l i
l
$                                                                                                                              l l
i I
i i
)
I a
b l
J l                                                                                                                            l i                                                                                                                            l l                                                                                                                          l
 
CHECKLIST 01          REFUEL BRIDGE *!ESTING COhTLEMOFF LOAD CORE B. SOFTWARE ITEMS                                                                                                  JAN 30 07      Pego: 34 B.04 POTENTML CONDITIONS ADVERSE TO OVALITY
    ..au    ENTRY F9CmJCTlelCE00R PA.M8ER  CATE    SYS#RCue MMNNX 00M.              SURACT                                                                JLSTpY F NOT MQ        APMMt 00EA  STATUS-DATE 18 M 001 JANil47      14      PCAQs Q4D e6 33  CCM GPRAY Spa.aER                                                            SN NOT MOD            Rvf. DAW  M3TRfCD' ~
ESR e7417      6+1417$                                                                      POR CPEMANUTY                WR  FOR CFFt0A0 M Ototel                                                                                      M MFUEL 1 8 U CC2 JAN il 47  30      PCAOrQAD86i3      ABCCW HANGER 43411M ESM as-877 OPERAEA HWsMR          RV7. DAW  PCTRECD ESR DeP. 00 pe07              04
* WOYE TO Fed 0 OPERA 8UfY                  USTe4 CONCSMt i8 M OC3 JANil47      #      PCAQs OAO 8814    MCM HANGEA                                                                    WERARA >WGA            RV7-  CAW  CCNPLETE ~'
ESR 86 la$      H314418, SNVMER$                                                                                          JJ.
H 21485,7.8,12.15 t 5 M OTA  JAN il 87  to      PCAQs OAD 9616  RHR MANGER Hibi 80 ESR 87404 CPER4EAtweQ&R          Rv7. DAW  P4.0 WCes.r4 OR OPERAKffY                JJ.
EVALUATION i S M CCl JAN il l?  3      PCAQsOADe&17    CROSVPPORTS ESR 87 0064304 OPERARI HWGER        R VI. CAW NLO WORa te OR OPERA 8tJTY              JJ.
EVALUATCN i 8 M 004 JAN il 47  01      PCAQs CAD 46 it  leAJN STEAM SN@SER                                                            SitTIM NOT MOD        RV7,  CAW teOTREQD Det0 64.nel    411401                                                                        #CINLMER heCf REO            CH F m orFtcAO FOR OPEMA8 duty h MFVEL
 
CHECKLIST 01                REFUEL BRIDGE TESTING COMPLEIEOFF LOAD CORE B. SOFTWARE TTEMS                                                      JAN 30 87        Page: 35 0.07 TRAIN!NG NEEDS AND REQUIRDENTS
    ..cW      ENTRY                                                                PICDl. CTS PEEED CR NUWER      DATE    SYS-PROJe fEPWGMCthN N NT              GUBJECT              ASTFY F NCIT fEQ        APPMW DOEA STATVS-CATE 1807cci CEC 1 as        se    'PMcC44 0.4 2.0PER    TRAN UC OPS PERSONNEL        'AD0m0NAL PROCS        MAR D4    COMPLETE tt.l 4 3.4 3( APP. A) CN Qi4ML fEMAthG            43.12.7tTECM OPER 1414.410.14      PROCEDL848                    SPEC 44 WAACH.itto RUVELN3 DCOENT.
PRODCCMPL 77NG i s c7 Oct cec i es    ses          SERawa          UC OPERATOR TRAhNQ          CPERATOR AVA4.          KR& DM DCT RE00 FCR CULCAO 18 87E3 CEC 185          000          SCER 8&O6        UC OPERATOR TMAhhG          84E0 LEVEL 1 PRA        KPLA DM  PCTRECD (ON D4E JOB TMcG)            REfL000N3 AML,                    et To j
CHKLSTpl      ;
10 C 7 004  DEC 188    10          PDCe640          fH) CUT L1AM OPV TRPe3                              KAA OM    CcwuTE '
1 B 07.0c6    CEC i 86  ee          PDCekte          PtAPOS ON T*NO FCR LC OP    CCwdTED TMs0            KR& DG    Pd PROCESS ~
4 REFLK1 FLOOR SLPfWSRS                                                    '
(SRCrl.RC78)
TMdC ON P90C CHAM 3ES PER POC e4to i
i 8 C7 004 CEC 186      10          PDC 8633        LEEN6ED OPERATCE            CowdTED TMe3            KAR      NOT REOO STA T7WNhG                  Wmt POC TUMotR                    PDC NOT ESVED 18 47 0c7 CEC 11 to      al      POC k70 PDC e507      PERNRW OPS & WANT TN#3      CCwdTED TMAhM3          KR&      PCTREOQ ON 4W fu W ATER GWL          WmiPDC TUPNCMR                    et TO 2ERO48YST1W. M                                                CHKLST e4    {
AMLOG TRP SYSTEW i
i l
l 1
l J
 
CHECKLIST # 1            REFUEL BRIDGE TESTING COMPLE'IEOFF IDAD CORE B. SOFTWARE ITEMS                                                JAN 30 87        Page: 36 8.08 ENGNc~ERNG SUPPORTREQUESTS(ESRS)
        .W      (NTRY                                                          PMOUCT5 PMEDCR MJWK R      DAlt    8YS#Rcus PUUENM DCOAENT          SUEJECT              ASTFY F NOT PEQ        APPRVR DOER  STATU$CATE
~
1864001 CEC 186        to        ESR akt es    54/ETY EVAL FCR b8E CF      SWITY EVALUATXM4        J&          CCW5MTE LCW PM&S LNE8 FCR H MC CHECK VALW TEST 1304002 DEC 1 as        10        ESR es ite    RHR vALW8 aos a age          40MaPoe6 To            && W.      CouPL,ETE LEAEAGE EVALUATION          ESR 86120 19 De 0c3 CEC 1 as      100        ESA es-278    M700 70 kmc QUESTOS          CCarGTED St.7W OR      ALP. Tua  TAsooACE '
MDiduO        M 8LA1WE1ANCE T15TN3        LETTER DU90N3          RV7,        VCRoe%ED (94CLUDN3 PLAG TECH          EJUSTNG TESTS                      EVALCCuPL MC REWW MPORT) 1304004      C(C t es  41        E59 8610s    DO SYNCHONIZATON            880T AN RFO s7 TA&M    PDA    J P. NOTREOC ERP 122 et 1304005 DEC 188          10        ESR et t74    M MPQ1ER v4.AA hs45          CCaMUTE MRJLD 4        WJA PW      CCN % ETE h4ANTENANCE                    OM  AN ALY5 t$
RE NG DCr4 ON CLD RMS 1304004      CE C 1 as  10        E$R et.itt    WC>10013&A 5 E. FOR U$E ~    ORC M M M.D W          R.LA  PM  CCNPLETE OF ALTERet4TE El AT          EVALUATON t S 04 00? CCC 1 e6    14        ESR ab167    ADAFTOR AND DAT FAILURE      CLCEEOUT OF            RL1    Pu  CCN AITE h4014004 A                  PDC 0632 18 04 OC8 CEC 1 as      10        ESA e6134    ROOT CAUSE 4 CCfvECTW        CWSEOLrt OF            Pl.1  Pu  CCM UTE ACTON FOR W31001304          POC e630
                                                    &P90 ANO lA>1001-408
  * # 04 Oc9 CtC 1 as    45        ESR8644      MvisON TO T5                APPR'M DT5CHANE        RVf. J P. NOTPECQ CR1447      TARE 3JB                    SWTEM PCT MGJPED              40K. FOR CFFLCAD 6AAN STEAW SETPONT          FOR OFit0AD 18080'0      CEC i s6    44        ESR e6 70    PHP$ RELAY                  ACCEPT ANC& CNTER.A    RL1    J P, DCTRE00 TEST PROCEDLsE              DR 1574,1447                        FOR OFFLCAO g&CCEPTANCE CRffERLA) 1804011      Ctc 1 as    14        ESR e6431    CHECK VALW 14535A&R          84STAu1D TEMP CKaE      JE    WW  >CTRECO ET OPERASUTY                FM Pfu CCHT CNLY              &D  FOR CFFLCAO i B C8 01# CEC 1 e6      10        ELR 80#78    ACCEPTANCE CRfrERA Rm        CohrtETED ESH          J&          PCT RECD MC DECM VALW TEST 5          PESPONEE FOR PRI                    FCR CFFLCAO CCNT ONLY t 8 Os 013 CEC 1 et      10        ESA st it3    CELTA P RATN3 EVAL FCR      het FOR FVEt            RLS  P IA  NOTREQD M100144 AAB AND              OFTLOAD                      WR    FCA Cf FLCAO M100147450                  Rn 9 411d08 P9tESS 15 C4 014    JAN 147    24        E ER *H36    CONTROL PCOL                LETTER PEOK5th3        RVf.        CCN %ETE M CO 2 47.007  ENWCNWENTAL                  T5 CHANGE                          t'27 67 ACCEPT ANCE CRfTERnA 13 ?a til J AN 1147      48        M PRN TO      PESCLUT04 CF DDLTP*G"                                CW    PW    CCNPLETE PDC 0554      MSCM. PAPS'E $ KR DEW PE M LGPKKE
 
CHECKLIST # 1          REFUEL BRIDGE TESTING COMPLEIEOFF LOAD CORE                                                                                        I
: 8. SOFTWARE ITEMS                                                                  JAN 30 47            Page: 37 8.00 DRAWING & VENDOR MANUAL CHANGES (MOO'S)
      .EW        ENTRY M,aAER                                                                                          MtXACT3 MEEEDCR DATE    SYS-PRCue fEFEPOMM W h8NT        SUSACT                                      JUSTFY F NOT NQ        APPRW DCER    STATUS DATE 1809001 CEC 186        de        PDC 4&te      LPDATE OF PRORITY 'A'                                                      MMA J C-    C W RETE DAQ& COh#GTE                                                                            NoDWG1 N CD.
t 8 Os Oct CEC 186    4 L116      POC4547      LPOATE OF PRORfTY 'A'                              NO E04 A712%26          MMA J C. NOT REQD Dn0& CohrtETE                                      PDC NOT OEH3              .        FCR OFFLOAD bdPLAhsr.NTED 1804003 CEC 186        106        PDC 64430    (PDATE PRmffY A D946                                UPDATED ORAwtOS        CM    J C. NOTREQD E7.EO.E13.E4CLE303 beses 1 A2A08,108                                                                      WORAiOCAtt
                                                                                                                                          .orR CAD 1800004 CEC 186        106        PDC k43F    LPDATE PRmlTV A DwGS                                UPDARD CRAmeGS          CM    J C. C @ MITE EJ7.EJ03&mtAE303Sm2A &                                                                  t7t 47 66 22 18 De Del CEC 1 e6    10        PDC to 30    UPDATE PmoRrrY ADwGS                                UPCMTED CRAnect          CM  J C. C4NFtETE '
W241 b 1 & 2                                                                            t?& 47 18 C8 Oct CEC 186      10        PDC 0633      (PDATE PeCRITY A DwGS                              LPOATED Dm04 9 alAu      CM  J C. PCT RECD We+2 4.E216.W 2418m142,                            Plut E.226 hec 441,4                POC NOT W849.WlH16-4.WH14 7,                                E2JES$64490                        ES4XD WPl1111.WPS12 0, WPlid 12,WPl150, t 8 08 007 CEC 186      41        PDC ekM      LPDATE OF PRORITY 'A'                                                      WMA J C. CCN*LETE DnGE COhrtKTE                                                                          1t/1to 18 0e oce DEC t es      at        PDC e647      LPOATE oF PeoRITY 'A'                                                      uuA J C. CCW%KTi DAQ& CChFtITE                                                                          141116
~
      '009    OEC 1 a6  10        PDC e6 32    LPOATE OF PRORrrY 'A'                                                      uWA J C. CCMSLETE DWG& CChetETE                                                                          NO PRfA' 0 Funds 1809010 CEC 1 a6        10        POC 86-20    LPOATE OF PRORtry 'A'                              EID LM #7 EED6          W MA J C. CCN MITE DnOS CChFtITE                                      M F7N                              CwoPsCM 1809011      CEC 188  4Liit      POC 64 70    LPDATE OF PRORITY 'A'                                                      WWA JC      NOT RECD DG CChetITE                                                                            FCR OFFLCAD 1808012 CEC 186        104        PDC 43 81    LPOATE OF PRORITY 'A'                                                      uuA J C. tcT MCD -
DmG1 CohetITE                                                                          FOR C5 FtCAD 18090t3 Of C 186      46 RESOLL/ TON OF v4LD                                                        Cu    PW    CCW%ITE DRA*983 CESCREPANCE$                                                              J C.
FOR ww NAEL WLOCE 1809014    JAN 22 87 106        PCC 64-03E    EMBE PRCRITY 'A' DWGS                              LFOATED CRA **GS        WWA JC      NOTRICD wm4 PDC TUlveMR                    F<R CFFLCAD
 
1 CHECKLIST # 1        REFUEL BRIDGE TESTING COMPLEITAFF LOAD CORE 8,    SOFTWARE ITEMS                                            JAN 30 47      Page: 38 8.10 OPERATNG EXPERIENCE REVEW(OERS) 4W      &NTRY M,aE R                                                                PRXECTS MCR DATE  SYS#RCue PEFEPENCE W uNT          SUEJECT          JL2TFY F NOT MQ      APPRVR ODER  STATUS CATE 9 010 00 t  M C 1as  10      SER SW,42      M SYS MIRLCQ4            SE.R EVALUATON MEAS 0 PLM $8W    NOT REQD ~
DuDWRTANT W86EL                                            FCR OFRCAD OfwNee0 1810 oc2 MC 1 as      e1      SER es 25      EVALDO U MCil            M A FOR PNPS          J&    D K. mi RECO
                                                                                                  ,        reRorrLcAo  1 1.3 10 003 C(C t es  to    $ER it te.SOER R? EVAL FCR P9PS FALUM OF    NED ESPONSE YW        PDA        COMPLETE M VALW8                  NED te N1,792,1248                TCH47W EBR88F(OKFOR ONLCAD4s0ftup OR PMSS PRouttus) 1890004    DEC 188  41        SER SHS        REWW DQ L0aO SECMMA      TCH 07 30            PAS        CCad8uTE APPLCABLE TO P*PS                TCH4P14 PROC AND DOCS AM ADE3JATE                                      !
1010 DCS JAN 22 6?  el        P06T TRP        CartETE Post TRP          CChPLETED MWW        ALP. LDK  N37 RECD REV1W 8644      REYit W G&004 PRCR        PRCR TO W                        FOR OFFLCAO TO $TARTUP l
i l
1 1
1 l
 
CHECKLIST # 1        REFUEL BRIDGE 7ESTING COh@LEIEOFF LOAD CORE
: 5. SOFTWARE ITEMS                                    JAN 30 87      Page: 39 8.11 STOPWORKORDERS MadeEm      DATE  S 4 PACue fEPWEME Dool,%:          ' AECT  JJETFY F M0f MQ        APmVR 00ER STATWDATE 1 a 11 con DEC 1 es  se        stop work    ~ ludstse encos    a riman rt a gao      upA  ALP. CouruTE CADEA#41
 
CHECKLIST # 1            REFUEL BRIDGE TESTING COMPLETEOFF LOAD CORE                                                :
C. TECHNICAL SPECIFICATION ITEMS                              JAN 30 87      Page: 40 C.01 TECHNICALSPEClFICAT)ONCONCERNS                                                                                  '
i
      .(W    EcRy PUCULCTIPEACEDCR M. uter    DATE    SYSMWe PEPEPENCa rrys asM        St.WECT            JUSTFY F NOT fEQ APPRm 00E4        STATUS-DATE t C 01,001  CEC 1 es  et      NED8L #3C27    44CLW PE10 FOR TS                              fLV5.            C W PLETE PELEF TO WCNE FUEU OLAetf REL EDCLE N SFP 1 C 01 Oc2 C(C 1 as  tot                      PL40 TECM SPtc            henc FRtm 64D e      ALP. JR      84DMtu3 PEPORT PEVIEW            KPA ACTCH                    tthit    COMPL.. tit TO R v5.                      7.M t    i 8 04 oc3 1 C 01003 CEC 1 m      10        PDC ss-M      mt0LW TECM tPbC fE0      TUCH SPEC CH6ME      ALP.              MAy Not SE" 40%                    (
POR PNM WhMUW FLCW                                                Al0D f M CHLOAD i C 010Cd    Ctc i m    et                      WAN STEAM Low PRE 46LRE    UPDATED TS            Rys. 4 0 k.      PCT RECC '  -
SET PONT CH4NGE (TS)      (PRCR 70 &M                            FCR CULCAD  !
1 C 01 CC5 CEC i m    100        84373        ft N 60T3OWG              NOCM WCm WITH        Rv7, J D z.      DCTRECC ~
FOR FULL LOAD 94G          FLEL M WatEL OR                        FCR CHLCAO TDCH IPlc CHWoE i C 01006 CEC e a      to        Esm a us      CCRE SPRAY LOW RCW
                                                                                                                              ~
POTENTWL TECH SPEC    PLVs. 40%        NOT PE0t EVALUATCNAESOLUTCN        CHWQE FCR OPEAAT.                      FOR CHLCAD PCR OPERATICN              AFTEA CofE RELCC i C 0100 ? Ctc 8 m    el        NRCasi1es      PEsan DEC KM LOGC          COdPtKTED TA&M
* ALP. TM&      N P$ioGAtst  l SYS Fl#C TEST CoteAinEc    FCRCE STt0Y          KPA              EJPECTED CMR et TS TO PPCW                                                  tritt?
ECC4 CPEf%3UTY KF0fE FUEL OFTLCAD 1C 01OC4 CEC e to      60      et CO 2 87 007  CCNTRA MOOM                                      ALP, NPC APPRChTO                          LTR At Nec EPATC6edENTAL fCRES)      TS CHANGE            KPA              t'37 47 T5 CHANGE EFCAE FUELOfTLCAO i C Ci 004 CEC ti M    86        PDC 44 70    TECH SPEC CH4CE            #pll N io TECM        ALP.          ~ 'CTKLCO APPROVAL BY Pec FCm THE    SPECTODJPPORT ATS    K.P A            FORCHLCC      '
AMLCG TRP SYSTEW (PDC k70) scc 1cio CE C n es    ti?        TEteo t?      hA3 Pachts swP svETy      NmC aPProv4L PmCR    R Vs. J o m. 93 Tat:0      i KC0 t es iM    EVAL. ON WAPLHGM FOR      70 $TARTUP                            FCR CnLOAD SutW:TTAL Nmc              WCM TO C.cstsT se
 
1 l
CHECKLIST 01              REFUEL BRIDGE TESTING COMPLEEOFF LOAD CORE D. NRC RELATED ITEMS                                                  JAN3087        Page: 41 0.01 NRC COWATWEES, CONCERNS, LERS
            .W    ENTRY                                                              PFCOLET5 PEEMDCR M,adetR    DATE    SY$#RCue MRPgig rvv1 W                SUEKCT              JUSTFY F NOT MQ            APPRWI COEA          STATUS DAT(
l 0 01.001  C(C 1 es    40          LER as t1        MSCLW OPUICONC47N OF        SE $3C27 SeGT CK            ALP.      J PL    COWRITE                      i NE0 061034        4NOLE ACTM FALURE'          FOR MRAL. LEA              LTCL                                            1 CN 6tGTS                    REMAN 5 CPEN PlfeDee33807 M004 10et0C2 CEC 1 e6        10        HRC es 1744      ACTCN FOR WONrTORNO 4                                  LT&      13 w      tofPict CAL 0610          A8&El8NG CCpFRECTM
* F@ CFFLCC                  i ACTON RL PHR PM&&,
MbtE ET Pyrw srn m l    t C 61003 CEC 1 to      41          LER to 13        PEPLACE CE TWE CFD          LER UFCATE                  LT a      EL      COAPLETI '                  i j                                                          PELAYS wrTH MST. SA 1      StaWffTED TO NPC                                                            '
EtMQ DEXL CM P9CT.
    ~t001Cc4      CCC i 86  46          LER 9616          CAtatRAT14i80V GUS Al &    LAR UPDATE                  LTa        &L      COJPLET{' ~
                                                                                                                                                        ~
4 A4 UncER vCLTAGE RELAYS    &LaWW TO Nft" 1001005 CEC t 88        100        ES es c2          MSN*C TO EUuirN MF.        BULLETH MVIEw AND          JD m-      80      cod %ETI- '
;                                      DECC 2 84111 '    STATC 0*RNO DP SMTCHS      MSPOSE TO NRC                                  to A FOA eNPS 1 D 61006 C(C 186      44            PsRC            DCA MLAYS E&Ut              MSPOet TQ NRC              A (.P. J P. RE S P, 91'31 id WAROE                                        PAPRWKi(
'                                                                                                                                                                  1 1001OC7 JAN 14 47      el        NHC NVECTON        M)ME PNCEDLRt 8 4.143      PpOCEDLfE Me$ON            &Dn Piu            NOTRICO                      '
REPORT 6510        W4AtonN F7CW OJTSCE                                                        FG COL *.A0 CAI Ct.K TO FRE OR NMA&iABLITY OF C.W 1 D 01000 JAN it 07    1il      1965 &ALPARC DHs    Lm W m 9 CF triteKD        PESPCNR4 TO **C            Rv7< &DM            tot R&OV CPERATOR$                  PerECTION MPORT                                FG CFFLCC 1            Cc6  JAN it 87  116      1ets S ALP,6AC 46-06 LACE CF STAFT &LF90RT                                  Rv7. &DM            6CTRIOD FM CPERATICNS              MSPOSE TO PC                                    FCA COLCC CEP ARTW NT                NEPECTMN MPCRT i    1 0 01.010  JAN1867    til      1til SAiP.NRC that  EMR CERTDE ComCL            ESENIE To **C              Rv7.      ALP      PCT RE.7 4515.46-37                                    psePECTEN MPORT                      Ir.P A    FOR CFRCAD 9001011      JAN tta?  til        NRC ee 37        LNRUDASLE STATMN            PESPCNid io teC            Rv7. LJ2            NCT RIOD CMA*MS                      hePECTEN MPORT                                  F @ CFFLC C l  1001012 JAN1847        ill      hRC A07, et ti,                                SEbPCPet TO teC            RV7.      TLS      DCT R100
                                                .          CONTMJpc xut          WRAPMS&E.S ToraCM1W    n  h  PECTth MPmT                                  F@Cmee RADCLOGCAL CONTMCLS
,                                                          PROGAAM i    10 Cl 013    JAN 19 47  til        NRC $644          WCMR ATTm,[E TCmeM:15      PESPONME 70 Dec            Rv7. Ttt            6CTREOp                    .
}                                                          RADtATON PUCTICTON ANO      DNPECTCN MPORT                                                            I FOR CMC 4 J                                                          ACCCUNTAS(fry l
                                                                                                                          ,                            M i
to awm:PeaTAt Tto          eartCTxN MPmt                                  Fm Cmee PROGRAW 1001015    4AN iS87    til      NRC eH4. es il      remm e sICATEN IETwtime    MSPONtE To tfC              Av7 TLS            PCT RICC M DE.ALTW PtMc3 QPOLP      penPECTEN MPORT                                FQR CMC 4 WO OTE R LEENELE CEPT 3 1
10410'4    JAN1087    1il        NRC eH4          uANTEweC4 $UPERvEm          KnPCNid TQteC              P.y 7 uhl          PCT %7
                                                          $T AMDe3 VACANC E $        pdPtCTON PEPCRT                                Fm CMCC l  1001017 JAN 1887        til        NRC e6t3          LN rto wa wT1we:( .        pESENat To >#C              Rv7. u%&            6CT 47
!                                                        CHRATONS NTWACK            DerECTDd PEPCRT                      EDM      F@ CMC 4
    * * *1 014  JAN 9007    it5    1645 &ALPARC to #7    Seu WENT4 TEN C#          M SPONDE 70 Dec              AvF uha            tot E'O WANTENANCE PLANhNQ          DesPECTEN EPORT                                KR CMCC CPIOUP S C LCG OIGPO&fTON) l l
 
CHECKLIST 01                  REFUEL BRIDGE TESTING COMPLETEOFF LOAD CORE D,    NRC REL'TED ITEMS                                                              JAN 30 87      Page: 42 0.01 NRC CCMATTMENTS, CONCERNS,LIRS (W      LNTRY                                                                                                    ~
PRXnKT5EEOEDCR 4MEER      DATE    SYS#RCue REFEMPCE DOC 144NT                              SURKCT      ASTFY F NOT MC        APPRW 00EA      STAfusCATE 1 D 01018 JAN it6?        ill      1P46 & ALP,NRC Sb20    FCRMAL2ATON AND                    MSPONIE To mC        Rys, upta 6530 DCT Mco' trLIWENTATON CF                  NW FTOM EPORT                        Tm 0FTLCdC PNVENTATM MANTINANCE P900A4M 1Dit C2C JAN 10 87      1tl        NRC eros 8543,        ATW5 MC#C P18(T FE.1D              PESPO eETo m C
                                                                                                                                                          ~
ab to, 46 21, 06 #4    WWAEER FALUMS Rvt uka        N3T MOO NePECTEN PEPORT                J P. FOR Cf7tCAD (DECscN Aeo ACToNFoR M4 1 C C1 C21 JAN 10$7      til          NRC 8814          IPENI.R KTTM3 ANO                  FESPCNEE TO NMC      Rvf. ENS      NOT MCD, COORONATCH                          NePECTON KPORT                      Fm CrnCdc truCATICN8 CF TM LOLS i
OF SVTTY tus 810 1 D 01.C22  J AN 10 67    til        NRC 8814,06 25                                          PESPCHE TQ pfC uhed.M FLOW PROTICTON                                    R VJ. ENS      PCT Mco j
FOR Rm PWPS                        MGPECTCM REPCRT                      FCR CFRC4 i D C1 Ct3 JAN tt87      til      NRC 4529, ebts,      G%CMD 94.LIG MC LCoat                PESPONSE TO*C        R YI,  MNS    PCT REOQ              '
04 54          BOLTE N LOW P9ESSLRE                MePECTCN PE.PCRT                    FOR OFTLCAD t                                                            ECC8 BYETiWB 10 Ci c24 JAN tes?        115        NRC ee-te. es44    CCM amAY CHCM VALW                  PESPONIE TQ mC      R Vf. uNS    NOTRECO APO uOV PRohlut                      MrECTON PEPCRT                      Fm OrFl0AD I
10 CI C26 JANiS47        11%        NRC04tS            64.Af mW TO pre 4AAY                MSPCDM TQ pfC        R VI,  ukt    NOT MCQ.              !
CONTASWENT ECLATON                  NFECTON KPCRT                      FCR CFRC@            '
8YSTEidCAAL9*3 t@et CM JAN is 67        til        PsRC e521. e4 25    EECOCAAY CCNTADMENT MSPONEE TOWC          R VI,  MN4    PCT MQQ D4MPER F ALUPE8                      NSPECTON PEPCRT                    FCR CtTLCdC C27 JAN it 87    til          NRC0844            & ALT SERvCE W ATER i                                                                                                M&PCNIE TO WC        ttV7,  uNB    NOT REOD PF983 CORIC61CN                      MSPECTCM PEPORT                    FOR CTTLCAO i C 41.cs s  JAN iss?    ill          NRC 88 25        POTENTW. CCff0&ON CF                PESPCNEE TO ##C      RV7,  MNR    SCT MCD P9UuARY CONTAD48ENT                  D8FECTEN PEPCRT                    FOR CFTLCAO ECLATICH VALVES 10 C1 C29 JAN 16 4 7      1tl          NRC0625          CESdQN CE8 CEPCY N                  PE5PopeE To nfC
[
Rv1. uNt    PCT MCD NTEftdEDATE RANGE                    NrtCTON PEPORT                      FCR CfTLCC DEUTTEN 6CHITOR PCmtR j                                                            SUPPLY 1401CM JAN ite?          til        NM 86 21, te 26. Ptft Mc COPE SPRAY PWP              MSPONEE TQ mC 8444 KV7. ukt    PCT RECO              i DePECTON RESLAT5                    SerECTON FEPORT                      Fm CFTLOAD            I to gt Cat    JAN ie47    til        N% as 31, a6 37    CEssGN Cap cE)CY                    PEnPCMaE TO >fC      RVJ. EN&    PCT M00 N THE StGT1                          McPECTON MPORT
;                                                                                                                                    FOR CFRCC 1061C32      JAN 10 47    til          NRC 8881          Po*ENTML COPCETE                    PE4POM 70t#C          Rv7. uNS    SCT RECD W ALL E4UE                          pertCTCM PENRT                      FCR CFTLCM l
iD Ct eu Jo i . . r      tii        SC . is t>x        CEuw Coc..cV N w                    ,E.c:.M To.fC l                                                                                                                    Rvi. uN.    ,CT                    l
                                                            .Ca                          T mnW  . m CTuN,EPCRT                      F Moo  CFFteo 10 Ci Cu JAN ie67        ti5          NHc te u          LCos4 wire.3                        MPcNes To ##C        Rvi. uma      *CT Moo NytCTON MPCRT                        Fm 0FRCd3 10 41 C36 JANtt87        1tl        NRC at 41, as ti,  La4 Cf M ES M C WCTai                fESPCNEd TopfC es fl                                                                      R v7. uNS    DCT MOD
'                                                          teas N CcNTn0L                      MSP(CTON REPORT                      Fm onLCAD CdRCulTS i
1DetCM Je is 47        115            NRC 4487          SEEMC OJALF CATON CF                PEldOef TOefC        RVp.
j                                                                                                                            uNB ~'PCTPEOS                  j H3A RELAYS                          MrtCTEN PEPORT                      FOR CFTLCM            '
{        13? JAN 1087    til          NRC 46 C3,86 41    SJr%E1APC4 KafinADe3                E SPON E TQ*ec        RvJ. LJ1    PCT RECD 8H4              V4 h M S&ES                          DerECTON FEPCRT                      FCR CFTLCM i
i 4
 
CHECKLIST # 1          REFUEL BRIDGE 1ESTING COhTLETEOFF LOAD CORE D. NRC RELATED ITEMS                                              JAN3087        P&ge: 43 D.M NRC COMMITTMENTS, CONCERNS, LE R13 iW      ENTRY                                                          McCACT5 DEEEED OR NLNER      DATE    SYS#RCue MMPENC1fMKNT              SUEKCT              JUSTFY F NOT MQ            APPmTI 00E.R    STATU$ 4 ATE i D 61 CM JAN 10 87  til        HRC 86f t        ECCSTJT AOGOUACY          MSPCNBE 70 mC              RVI.      uNS  NOT RECO NytCTEN MPORT                              10R OFT 10AD 1001038 JAN1887      ill      NRC etil,e6ts    CAteRATCM AND TESTNQ      MSPONIE. To mC            Rv7. WNS        NOT RIOD OF PROTECTM MLAYS 40      NOPECTON MPCRT                            FOR OFRCAD DM APIAS                                                .
                                                                                                                                      ~
4 1 D D1.H3  A il 67    til        NRC 8014        CO(TROL CF MEASLRNQ OC    MSPCNBE To t#C            Rv7. ENS        NOT REQQ TEST Ecurt4NT              NePECTON MPORT                            FOR OFRCAD 1001041    JANtt87    til                        LOCAL LAM RATE filf        MtPOetTOPfC                Ryf. JAS        NOT MCQ PROJW ADMNMRATON          NetCTON MPORT                              FOL OFRCAD 1001Ni JANit4?        til      hRC sarti, e6 25  MCumpC' LOCAL LAM          fE SPCNEE To mc            RVI. JA8    NOT MCC RATI TlST FALURES          NFECTON MPORT                              FCR OFRCAD 10 61 W3 JANtt87      til        NRC0063          GAGMEPCY PLAMAENDCY MSPONht 70mc                      RVJ.      R1    N3T MCD.
ACTON Liitt MVEW          HrECTCH MPORT                              FCR OFROAD 10 01 k4    JANII67    til      NRC m 32.46 H. CCNTHJp4 V4APM46El N      MSKNBE TO t#C              Rv7. EJL        PCT MCD e637            Faif>94 LP CN PROELIMS    HSPECTCH MPORT                            FCR OFTLCAD VdTH TM SECURITY PROGRAM l' 1091045 JAN 19 et      ill      NRC OHe,8428.      PRCRITOTCN C#              MSPONIE To mC              RVJ. uNA  NOT MCO 0642            SECWTY MANTU6ANCE          NytCTION MPORT                            Fm OF71 CAD 1001044    JAN1887    itt      NRC aus. 86 28. TIM 8DdTM CF T4 JbE        ESPOPsIE To n#C            Rv7. EJJ. NOT RIOD 8642            OF LCMS TEMA              NOPECTON MPCRT                            FCR OFRCAD COMPDEATCRY bdEA5UMS N asCwry moor.M                                                                      I 04?  JAN1087    til      NRC e6 21. a6 26. h40ECUATE F FE ORGM        MSPCMETQ *C                RV7, ts M, e6 37. as 34 EDM    NOT McQ DRE.18 ANO TRANH3          NIPECTON MPORT                    E.J1  FCR OFRCAD 1 0.01 044  JAN i887  115      NRC 8625. SS M    heftOUAit USE CF          MAPONRE TO 8ec            RV7,    KF A  #CT R&CQ t                                                    CORMCTM ACTON              NrECTON MPORT                            FCR OFRCAD l                                                    PROGR8*8 1001046 JAN i047      til      NRCe64,t&14        F*CelTOTON C# F RE        RE SKNSE TO Pe4            Rv7. MN4      PCT RECC to M.to M        MCTIC' A N MANTENAM E      DertCTON PEPORT                          FGt CmCAD 10 et C!c  JAN1847    til      NRC e64.9621      E1NTFCATON CF FRE          PE SPOSE TQ me            N. J . EJ 1. N3T MOD Str 54          EMPEM AND RESOLLfTON      HSPECTON MPORT                            FOR CnLO80 OF PEPETRATON DECMPANC4S i 0 Ct ett JANis67    its    i365 SALP.NRC 804  V4.APM &S N RE SPOC*C      M &M 70 *ec                JLK KFA        NOT MCO T0 04 FN0stell            N9PT CTON MPORT                            FOR OFFLCAD i
l t D Si t12  JAN 19 8?  115        1986 & ALP      HCUEMIP983 QWTTt:A        MN TQlfC                  RV7. MNR  'tCT RECQ 3                                                                                  DetCToN MPCmf                              FCR CnteeD
  ! 10 at CS3  JAN 1047  til        NRC06 H          MalVTON CF NEEA1C4        MaPCNat TQpeC RVs. KFA        6CT MCO DeptCTEN DC4              DetCTON M PORT                            FCR OFRCAD DC4CATENs ON LATETV IELATID P99 4 4 0 Locad PP94 &(.PfCRTS 100i&64 JANt047        1t6    1665 SaiPVC e&t$    TEChedCAL SPECF CATCN      M SKNhi TO pfC            RVF, 40 k.      Mli PLCQ M 29 E U LTY EV*1  CH4CES TO SJNORT P 44T    NAP (CTCH MPORT                      PTA  FOR OFTLCAO 2CR PDC 06%      STA/ITtP                  NC AP99CNED TS C+dNCE) 1 1
I 1
I
 
CHECKLIST # 1                                                    Rhr"JEL BRIDGE'ESTING COMPLE'IEOFF LOAD CORE                                                                      I E. EMERGENCY PLAN ITEMS                                                                                    JAN 30 87      Page: 44 E 01 EMF 9 PLAN ISSUES FOR CRITICAUTYSCWER OPS N.      ENTRY                                                                                                  PRXII.CT5 MEEDCR
    .MER      DATE                    SYS PRCue F4FEFENCg rvys asyy                                sugJECT        JLETFY F NOT FEO                      APPRVR DOER          STATUS DATE 1 E.8121                                    000                                                                                                                R1              NOT REOD.
EAAMPLE T4M e
B i
I d
)
y  -- -
                  , , , , - , , . , - - - - , - . , , , . - - , . - - - - - -            ~- - - - .-        - - ,            --,
                                                                                                                                        - - - . . - - . - , - - , , - - _ - - , -,          --w
 
l CHECKLIST # 1          REFUEL BRIDGE 'IESTING COMPLETE /OFF LOAD CORE F. BACKLOG PROJECT ITEMS                                      JAN 30 87      Page: 45 F.01 BACHLOG RECOMOOATIONS
        .M    ENTP't PREUCTS MCR aller    DATE    SYS#ROJe NFEM NCE N W          8'JRJECT          JUSTFY F NOT MO            APPRW DOER            STATUSCATE 1 F.01.001  DEC 186    49      SL 374        MSALENED ORFICED FUEL                                                      COMPLETE SLPPORT PECE                                                              SEE ITEMS E03 014-20 1 F 01.002  DEC 186    de      SL 244        MFLEt MOGE POSITCN                                                        COMPLETE NTEPtOCK(TO PREVENT                                                        SEE frEM EED FOR JAPERN3)                                                          1 A.02 000 TF        J  DEC 3 e6    19      SL es        NSPECT Rs CAv!TY ORANS    SCREENS N PLACE                                  CCSAPLETE ^ l NSTALL SCREENS F NODE    WO4 TO CplST#2                                  SEE ITEM N PtACE                                                                    1.H 01.023 i F 01.004  DEC 9 86    we      &L 350        ECSMMCAL (SPRN3) CORE    DETUWNATION OF            PD1                  NOTRECO.
ESR 86-565    S& PORT PLATE PLUGS -    EEDTO E DCPE                                    FCR OFFLOAD NSPECT EFGE COM          RFO se (TCH es 335)
ELOADTO DET. PEED TO MPLACE DURNO RFOs0 1 F.01004    DEC 913    45      8 L 275 51    SRM RM DET.NSERT.                                    RES  P.M            NOTRECO NTRACT ECH QEAMOX                                                                      {
F G OFFLCAD I LUBE. KO PROC REV 4 REV l
TO SPARE PARTS LET                                                                      l 1 F 01007    MC 0 e6    of                                                                                                            I SL 186 $6    NSPECT SRV ICOES -                                    RES. P.M            NOT RECO. i HOT TEARS N TARGET                                                        FCn CfFLCAD  l ROCK SRV 800Y CASTNGS*                                                    CCMPL 190    i 1 F.01.008  DEC 10 to  01      8L 17s        TMRMOCCUM CESON 4          CObFtETED DRYWEli          RES  P.M.          NOTRECO SRV LEAK DETECTICN .      NSPECTCN OF                                    FCR CFFLOAD  l PERfCfW WAUCC%N CF SRV    TMPam SLES                                                  l TERMCCCUPLES                                                                            !
079 CEC 3 e6    100      SL 372        NCChe4}CEDTS CHANGE        REVISE 0 TS                                    COusuTE FCR FUEL LOAONG                                                            SEE rrtu 1.C 01.005 1 F 01010 JAN 887      43      SL247        ILACE GUCE H4CLES          CCNFLETED FFC 86          RE.&
CRACKNG ANO BREAXNG APART
 
CHECKLIST # 1          REFUEL BRIDGE TESTING COMPLETEOFF LOAD CORE G. PROG RAM ITEMS (RAD PROT, FIRE,SEC, HOUSE.DECON)                JAN 30 87      Page: 46 W    ENTRY                                                            PFEX1rTS PEEDEDOR ABER    DATE  SYS-PRCus FUUedCE rvvs w            guaJECT              JUBTFY F NOT NQ        APPRVR DOER            STATUS DATE 1.0 01.001  DEC 186  See                          PHASE le MAWT              SLAaAARIZE ACTIONS    604& RE&              NOT RECO.
PROGRAMMATIC BSWS            NECESSARY FROW                            FOR OFFLCMD W WEEK PtM 10 010C2 DEC 1 K      48                          FRE WATCH FOR 883TS CtK    EED CONTRCL FBE        PER TO DELUGE SYS SOLATON      WATCH PROR TO OFFLOAD 1.G 01.003  DEC 186  909        TCH e6-364        E 203 WA11CCmm;ONCERNS      WAMDOWN CONCERNS      PDS                  COMPLETE GASED UPON FNONGS          EVALUATON                                  TCHM 364 NOFNONGS 1.G 01004  DEC 186  33                          EST.T WIPr FRE WATCH                              R.V.                  NOTRECO.
PATROLS N KEY PLANT                                                      FOR OFFLCAD AREAS 1 G 01006 JAN1987    46                          htPROVE REUABLITY OF                              KNA J P.              NOTRECO CFTSITE PCMER SUPPLY FOR                                                FOR OFFLOAD P9PS BY CECREASNG FNEQ ANO DW110N OF PWA LOSS
 
CHECKLIST # 1          REFUEL BRIDGE TESTING COMPLEIEOFF LOAD CORE H.    'PUNCHUST' AND OTHER ITEMS                                    JAN 30 87      Page: 47 "M      ENTRY PRODUCTE PEEEEDCR KR      DATE  SYSPRCue 8EFEFENCE m uNT            SUEUECT            .AJETFY F NOT NQ      APPRVR DOER  STATUS CATE 1 n 01.001  DEC 188    21      RFF P UST        h@ ROW WATER SUPPLY FUR                        CJM    E    CCNPLETE DATED 11/1246      $PRAYNQ DRYER 4EPARATOR 1 H 01.002  DEC 186    42                        OEOCUT M N WAT.                                CJK    E    COMPLETE 1 H.01.003  DEC 186  49                          M nRW:ES OfCKOUT.                              CJK CJM    COMPLETE ELEC. WATER, AR 1 H Q1.004  DEC 186  49                          96 TALL REF1AL NUDGE                            Cd TECH    CCadPLETE CObeANCATCNS CAR.E AND NEL 1.H Q1.005  DEC 186  999    REYSED PROC CHANGE  $A TEST DR REVEW &                              AEP.        NOT REQS PFwm PER AEA      APPRCNAL OF PREOP TEST D6CMPANCES 1.H 01.006  OEC 196    64        P2              LNDERWATER TV CMdERA                            REi    PM  CCad*LETE CHCKCUT MC REPAR 1 H 01.007  CCC 186    10        P2            ESTORE ALL R$ CUADRANT
                                              '                                                      WJA E      CCadPLETE
                                                    'WTERFERENCES*(LST                                                        l ITEMS AS APPROPRATE)                                                    I 1 H 01004 OEC 186      64        P2              NSTALL CATTLE CHUTE                              CJM CJM    CCadPLETE 1 H 01000 DEC 186      106      PDC H43A        EXHBIT 9. OPERATONAL        COtFLETED O0t se      KPA MMA TUWOWR m a4ENTADON          OR APPRCPdDWAfdR      AEP.
1 H 01010 CEC 186      106      PCC 44438        EuBfT 9 OPERATANAL          CC6FLETED E)04 se    KPA MMA TUWOWR 00CLMENTATEN        OR APPRCPdD WAf4R    AEP.
I H 01011    CEC 1 e6  106      PDC 64-C00      EXHBiT 9. OPERATONAL        COe4MTED EJ0i se      KPA MMA TNER DOCLMENTATCN          OR APPROWD WAAER      AEP.
012 DEC 186    106      POC 4403E        EXHBff 9.OPERATONAL        COe4MTED EJ0i se    KPR MMA TtfMR DOCLNENTAT10N        OR APPROWDWAfdR      AEP.
1 H 01013 CEC 186      106      POC H43F        EXHBiT 9 OPERATONAL        CCbMETED E)01 se    KPA MMA                  l TtRNCPdR M WNTATTN          OR APPROWD WAAER      AEP.
1 H 01014    DdC 186    61      PDC 8530        EXHBIT 9. OPERATCNAL        COhMITED E)ot se    KPA MMA    WAITNG ON TtfWCPdR m m3ENTATEN        OR APFROVED WAfdR    AEP.      CPS PROCS I N 01.015  CEC 186  61        POC 6547        EXHBfT 9. OPERATICHAL      COhMETED EJ0t se    KPA MMA    EXHBIT r9    l TUNCPdR N wNTATCH          OR APNTD WANER      AEP,        KPGPROO 1 H 01016 CEC i es      48        Pf4 6M4          EXNSIT D . OPERATCNAL      CChMETED DM ee      KPA MMA    WANER TUNCPdR DOCutENTATION      OR MPRCPdD WAfdR    AEP.
1 H 010 t ? CEC 186      10      PDC 66 30        F wHBfi g . OPE RATCHAL    CCe@LETED E)0t se    KPA MMA    WAJNG ON TtFNOWR DOCLNENTATYJN      OR APPROWD WAMR      AEP.        PROCEDL.RES 1H01018      00C 186    10      PDC 06-33        EXNBff 9.OPERATCNAL        CC&RETED EJ04 se    K.PA  MMA  NQTRECD TUNCPAR DCOLMENTATEN        OR APPRCP4D WAATR    AEP.        PDC NOT S$UED 1 H 01019 CEC 186      104    POC SSSI A PN D    EXH Bri t . OPERATICNAL    COhMETED DM r)      KPA MMA    NOTRECO TUNCPAR rrrs uENTATICN      OR APPRCPdD W AfdA  A EP.      FCR CFFLOAD 1.H 01020 DEC ie6        10        POc e6 20        EXHBf' t . OPE RATICNAL    COnFLETEDOtt se      KPA MMA    NOTREOD.
ftfN O dRrres W ATCH      OR APPROWD WAfdA      AEP.        FRN TO BE ESUCD 14?
1 H 01021 CEC 186        09                        CHANE OUT DW AREA                                RE.A  PM  NOT RECD.
COOLER FETERS FOR ERT                                        FCR Cf710AD 1 H 01022 CEC 186        50                        KC. CONT. POETRATICN5      CONTRCE. LID          PLM        COMRETE PLLOGED                    PEPETRATONS                      SEE ffEM 1.A04 034
 
CHECKLIST # 1          REFUEL BRIDGE TESTING COheLEROFF LOAD CORE H,    'PUNCHUST' AND OTHER ITEMS                                  JAN 30 87      Page: 48 i.M      ENTRY                                                        PRODI. CTS EEMDCR IGER    DATE  SYS#ROJs FEFENHCE NY1 W          SUEECT              JUSTFY F NOT NQ        APPRW DOER STATUS-CATE 1.H 0102C DEC 4 86      19        SL 06        NSPECT Rs CAVfTY DRANS      NETALLED SCREENS      PER      NOT REOD.
MANT..NSTALL SCREENS        NED ESR OR PDC                  PEFFCRM FOR VESSEL AS$u 1.H 01024    CEC 5 as  see    820 WEETING 121  WATER AV ALA8%TY TO        SUFFCENT WATER        SDM PLM  CCm4 RITE ROCO POOL CAVTTES 1 H 01.025    DEC 8 86  49                      ENSUN 145 DCA.ER.E EADE    SPECML D3LTS &        RE.1  PM NOT REOD.
t QUDES ARE AVALA8LI FOR      PA/TSTOMA4 m n 8                TOBEGN RLL CCRE OFFLOAD            EADE OUOES                      OFFLOAD 141 DOUBLE 4 SNGLE                          I ARE AVAA.ABLE 1 HB1026 DEC 9 86      31,32                    SA4FL1 AJR FROM OUTPUT                            REA    PM NOT RECO
                                                    & AR COWNSSORS FCR                                          FCR OFFLOAD AJR OVALTTY 1 H 01027 DEC 9 06    45.46      OMG e6 234    EVAL 4 $UBSEQUENT          NOURED EFORE SV        SDM PijA  NOT RECO.
M130 f.;ABLE  WAUCOWN CF ALL CONOUTT/                                      WOVE TO    I DEGRADATCN    WRNG THATIS ANALYZED                                        CHKLST#2 TOIE VFECTED BY HICH EERGY/ TEMP PPNG 1.H.01.020    DEC 9 86 4146        O MG 86 238  E.O. PR3ECT PEPFORA        NOURED KFORE SV        CM    SD  NOT RECO.
M130 CABLE    EVAL AND REVIEW VALIDfTY                                    WOW TO DEGRADATEN    & EQ CUAL N UCHT CF                                          CHP2.ST #2
                                                                                                                              )
CABLE DEGRAWTICH 1 Hci 029 CEC 9 86 ~  4146        O WG 44 234  PRCR TO &V, NSPECT &        NOURED BEFOE SV        RE.S  PR  NOTRECO.
M130 CABLE    REPAR MANUAL ISCL VALVE                                      FCR OFRCAD DEGRADATCH    N VICNfTY CF SUBKCT CARE
          ' 030 CEC 9 86  45.46      CWG 86 234    MNSULATE VALVE / PIPING    NOURED KFORE &V        RLS  PM  PCTRECO M130 CABLE    N VENITY CF CAaLE                                            FCR OFFLOAD DEGRADATON 1 H 01031    CEC 9 86 45.46      O MG 86 234  CERN3 E.ATVP, NSPECT        NOUFED EFORE SU        SDM PEM  NOT RECO.
Mi 30 CARE    VALVE.PPNG NEAR CABLE                                        WCrv'E TO DEGRADATICH    FOR SGNS OF STEAM                                            CHKLSTs2 LE.AXAGE 1 H 01032 CEC 3166      46                      QECM 8 ECCS WOTCR 5kV                              RES. PM VCRX UNTL LEAD 6 FCR PRCPER RAY                                        OFRCAD OEM $ PUCES PRICR TO FUEL CFFLOAD 1 H 01.033    JAN 7 87  45                      CHAN*E SETPCHT CH                                  RE.1  PM NRJEL FLCCR (117) AAM FCR RERJELNG ACTMT1ES 1 H 01034 JAN 80'      999                      NPAR DAMAGED SH:HE                                REA PM    NOTRECO FRONT EROGE (POTENTLAL                                      FCR CFROAD SAFETY HA1.ARD)
H 01035 JAN 7 87      999                      ESTAREH DC684ETRY                                  T.LS.
Tape:3 PCUCY 4 FRCCEDLNE FOR REREL FLCCR WCWE 1 H ot 034 JAN 887      27                      NSPECT & REPAR AS                                  RLS    PM NOT RECO
                                                    $8M AAARY COP (EMER                                          FCR CfTLOAD CELTAY ELEMENTS (DSCHAAGE CANAL) 1 H 01037 JAN 14 47      10        WR E-XX      NST ALL HSL4.ATON CN        D6TALLID NSUL.        WJA
                                                    *A' Rm LOOP                OR EVALUATON
 
CHECKLIST]1            REFUEL BRIDGE TESTING COMPLETEK)FF LOAD CORE
        .  'PUNCHLIST' AND OTHER ITEMS                                    JAN 30 87    Page: 49 W    ENTRY                                                          PRCDUCT5 6CR alER  DATE    SYS-PRCus FEFU4ihCE W u YT        SUBJECT            JUSTFY F NOT NQ    APPRVR DOER    STATUS 4 ATE 1 H 01038 JAN 15 87    10                      A & C Rm PLAdP WOTOR                            M.A    P.nr  NOT RECO.
LEADS Mi.ED N8PECTION                                        SAME AS maE.DONFNONG80F                                              1.R 01.032 V R$ WOTOR 1.H.01.039  JAN 15 47  41                        EVALUATE CHARED WWES                            E            COMPLETE ON T 00 CABwET                                    .          PER NCR CLO6ED 1 H.01.040  JAN 27 87  de                        ADAJSTRFILEL MOGE          WOfNNG nEETNG      PM            CCNPLETE aft 6ED TO ACCEPTA112      DFO 1/29                          1/2S 87 LEVEL 1.H 01.041  JAN 27 87  48                        PSTALL WAITtR SHELDS TO                        PM PYOENT KREL MOGE CONTAMHATCH
 
CHECKLIST # 1            REFUEL BRIDGE TTSI'ING COMPLETFX)FF LOAD CORE H.  "PuNCHusT" AND OTHER ITEMS                                        JAN 30 87  Page: 50 R        SYS-PROJs      EFEFENE W1W              SURKCT                      PEQ      APPHVR DOER      STATUS-DATE CHECKLIST
 
==SUMMARY==
: 1. TOTAL NUMBER OF LINE ITEMS                      . _fififi'                .
: 2. TOTAL NUMBER OF REPORT PAGES _ _!iQ _
                    ' LNE ITEMS WTTHOUT ENTRY DATES AAE COWTED N THE TSTAL CT T        GE TO NT                          ES.
The following information is an analysis of the Checklist Line Items to provide a more thorough understanding of the STATUS of'the Checklist with regards to being ready for the MILESTONE:                                                                                                1 Of the      666 Checklist items:
1'4 Items are COMPLETE 243 Items are NOT REQ'D. for this milestone                                              l 269 Items are OPEN Of the 269 OPEN items:
119    Items are Surveillances which are not statused as COMPLETE or NOT REO'D. but info on the Date Last Done is provided.                                                      ]
42 Items are OPEN NCR's 26    Items are Checks on the Operability of                                            l Required or Needed Systems.
26    ltems are checks for completion of MR's on Required or Needed Systems.
7    Items are being Worked Not To Affect the Milestone.
 
CHECKLIST # 2 COMMENCE RELOADING FUEL 9
 
CHECKLIST 0 2          COMMENCE RELOADING FUEL A. HARDWARE ITEMS                                              JAN 28 87              Page: 1 A.02 PtANTMOOlFICATIONS(PDC 3)
    ..tM      ENTRf PRCOUCT5 PEEEDCR j  NJMeER      DATE    SYS#RCue MFERENCE Dm KMT      SUSKCT              JUSTFY F NOT MQ              APPRVR 00ER STATUSCATE 2A02.002    OEC 186  45        PDC e6 27    PENCFW UYW CHANOGOUT        PDC CLOSECI.TT              RE& PM PER PDC PACKAGE                                                E 2 A 02 003 OEC 186    03        PDC e617      MPFCFW C@ CCMECTOR          PDC CLOSECUT                RLS. P.M AND CABLE REPt.ACEMENT                                          GE PER POC PACKAGE l 2A03 004    DEC 186  45        PDC 06-23    PERFORM LPRM CCPNECTOR      PDC CLOSEOJT                RLS. P.M l                                                ANo CAaLE REPtACEMENT                                          E I
1 PER PDC PACKAGE 2 A 03 CC5 CEC 186    22        PDC 4653      PENFORM POST ACCOENT N2 PDC CLCEECUT                RES  PM VAPCRIZER TESTNG APC                                            E TURNOWR 2 A 02 006 DEC 186    22        PDC M-51      06ECT TORUS VENT            POC CLOSEOJT                RLS  P.M TESTING & TUPHOVER                                              E 2 A 02 007 CEC 1 as  33,10      PDC 46 52    FIRE WATER TO              POC CLC6EOUT                RES  P.R CCNTANMENT SPRAY                                              CE TESTING & TURNOVER 1
l l
l l
l l
1
 
CHECKLIST 0 2          COMhEN      RELOADING FUEL A. HARDWARE ITEMS                                            JAN 28 87      Page:2 A.04 mm REQUESTS & PROCEDURES NCL PMS
      .W      ENTRY PfECLCTS PEEEEDCR MJulER    DATE    SYS#RCue FEFEFENCE W uNT        SLEECT            JUSTFY F M37 FEQ    APPRVR DOER Stalls-DATE 2 A04.1H    JAN 20 87    03        P2          PliPFGW CfCCHANCEOLIT                        RES. P.R AM)REPAR PER P2                                    E 2 A 04.135  JAN 20 87  45,03      P2          PERFORM PC6mCN
                                                                                                                  -~
RES    P.M NDCATOR PROSE (PP)
PREWNTM MANTENANCE                              .
          .                                                                                                        ~
0 0
l l
l I
 
CHECKLISTD 2                  COMMENG RELOADING FUEL B.      SOFTWARE ITEMS                                                                          JAN 28 87    Page: 3 B.01 OPERATING / MAINTENANCE SURV. PROC.(ST'S) ad                  ENTRY NUMBER                                                                                                  PRODUCTS PEEEDCR DATE  SY5 PRCue MFENSCE rW1 asNT                            SUEECT          JUSTFY F NOT MQ    APPRVR 00ER STATUS DATE 2 9 01.154          JAN 20 07      03          P2                                  PENCFW CR0 FRCTICN                        RE&    PM TESTNG OF ALL DRNES                        ADM PLM aB01.156 JAN 20 47                03          P2                                  PUFOfW SMOLi RCO                          RES. PM SUSCRITCAL TESTNG                          SDM PLM J E,,
 
CHECKLIST # 3 RELOAD COMPLETE ASSEMBLE VESSEL AND CONTAINMENT 1
    - - - - - - - - - - - - - - - - - - - - , - , . -        _-.--,.r,,    ,,,---.m  --  _ , ,, , _ ,, -        _nn., ---r      - - - - _ , - - , , .n-,-_,,-----
 
CHECKLIST # 3 RELOAD COMPLETE ASSEMBLE VESSEL & CONTAINMENT B. SOFTWARE ITEMS                                                                  JAN 28 87        Page: 1 B.01 OPERATING / MAINTENANCE SURV. PROC. (ST'S)
  ~ (TEM        ENTRY NUW8ER    CJTE                                                                            PRDUCT5 PEEEEDCR SYT PfH:Ur REFEMNCE DCCEAENT              SUNECT                        JUSTFY F NOT FEQ      APPRm DOER  STATUS DATE 3 8 01.156  JAN 20 87  03            P2                  VWUAL ANDDOCUhENTED                                        SDM PEM VERFFCATION OF CORE                                          J&  M W.
3801157 JAN 20 87      50            P2                  TYPE C LLAT OF AR TO                                        SDM PLM CRYMLLVACUVW BFEAERS                                      .J&    WW RES. P M.
3 0 01.154 JAN 20 47  54            P2                  P4 TALL MACTOR PMSSURE                                      SDM Pila VESSEL HEAD                                                REST  P.M 3 8 01.153 JAN 20 87  50            P2                  PERFORM TWE B L1RT OF                                      SDM PEM DRWELL MAD ACCESS                                          RE&. PM MATCH                                                      J&
3 8 01.160  JAN 20 47  50            P2                  NSTAU. CRYWELL MAD                                        SDM PEM REA    P,M l
l i
l 1
 
l l
l CHECKLISTD 3          RELOAD COMPLETE ASSEMBLE VESSEL & CONTAINMENT H.    *PUNCHLIST* AND OTHER ITEMS                              JAN 28 87      Page: 2                          l A    ENTRY                                                    PR:CLCTS PEEDEDCR
      .aER  DATE    SY$#RCue MFERENCErvy asNT      SURECT            JUSTFY F M37 MQ    APPRW DOER ST ATUS 0 ATE 3 H 01.034  JAN 7 47  48                      MMOW. CATTLE CHUTE                          C.lu  PM
~3 H.01.035  JAN 7 47  45                      PETAU. MACTOR PNS$URE                        RE86  PM W.SSELTEMAOCOLfuS 3 H 01 C36 JAN 7 87  50                      C106EOUT ORYWEU.                            RES  PM 3 H 01.C37  JAN 7 87  54                      P4STAU HEADSPRAY AND
                                                                                                                ~
RE.S. PM WNT PPING l
                                                                                                                  ~
 
:'M CHECKLIST # 4
~
PLANT HYDROSTATIC TESTING
 
,i CHECKLIST # 4          PLAF; h~YDRO3TATIC TESTING A. HARDWARE ITEMS                                                      JAN 28 87      Page: 1 A.04 MAINTREGUESTS
* PROCEDURES NCLPMS
        .M    ENTRY taAER                                                                          PICCUCT5 PEEDEDCR DATE    SN fEFERENCE N K NT                      SURECT            JUBTFY F NOT fEQ    APPRVR DOER STATUS DATE O.A 04.1M  JAP' h 17  AU.                              ConsuTE HRS ON $YSTEMS                        m      PM PECESSARYTO SLPPORT PtANT HYDRO t
4
 
CHECKLIST # 4          PLANT HYDROSTATIC TESTING B. SOFTWARE ITEMS                                              JAN 28 87    Page: 2 B.01 OPERATING / MAINTENANCE SURV. PROC,(ST'S)
    .M      ENTRY                                                        PR00UCT5 EECEDOR NUMBER    DATE    SYS#RCus MFEM.NCE W W            SUEJECT          JUSTFY F NOTMO      APPRVR DOER STATUS CATE 4 8 01.181  JAN 20 47  $0        P2            PEMOfW TYPE B LLRT                          SDJi PLM RE.1  PM e 8 01.162  JAN 20 87  898        P2            PERFORM SYSTEW VALVE                        SD)( Piu LNELP 04 CMS                                RES    PM 4 8 01.188  JAN 20 87  10        P2            PEMORW ACOfTONAL                            SD    PEM SURVEL1ANCES ECESSAAY                        RES. PW TO SUPPORT HYDRO 4 801189 JAN 20 87    ALL        P2            COMPETE LLRT'S                              SDM PLM ECESSARY TO St.PPORT                        RES    PM              l HYDRO l
i i
                                                                                                                    \
 
CHECKLIS'ID 4        PLANT HYDROSTATIC TESTING H,                      'PUNCHUST* AND OTHER ITEMS                                                    JAN 28 87      Page:3 M                      ENTRY                                                                                                                            ~
PRXACT5 >E.EDED OR JER                        DATE  SYS-PROJs MFERENCE e u NT                            $UWECT            JUSTFY F NOT E0      APPRVR 00ER      STATUS-DATE 4 H 01.034                        JAN 787  03          P2                              PERFORM VISUAL                                            PM
                                                                                                                                                                ~~
PLE.&
NSPECTION 08 CfC1                              FA F.
C.H 01.045                        JAN 747  21                                          ENSUN SUFMCE.NT RX                              RLS      PW ORADE WATER AVALAm.E                            SDM PLM FORWVDRO d.H 01.046                        JAN 747  50                                          N5 TALL RPWT EOUPWENT                          REk      P M.
N CCNTRCL ROOM                                  SDA PLM 4 H 01.047                        JAN 787  50                                          EN60RE TEN (10) VT 2                            F.M F.                                  !
E.XAkhERS ARE AVALABLE O H 01048 JAN 747                          50                                                                                                                        ~
ENSLRE TORUS WATER LEWL                        SDM PLM E 84.000 TO 84.000 CUSC FEET 4 H 01 c43 JAN 7 47                        50                                                                                                                        ~
ENSURE FO.10WNG OPEN                            SDM PEM                                  )
A0 22444. MO 202-4A,48 l
4 M 01050 JAN 787                          50                                          ENSURE CMCK VALW5
__          l SD K PEM                                l 23017 4130150 ARE                              RLS      PW EOCsGD CPEN 4 H 01051 JAN 787                          50                                          TORUS TEMP 804 &
                                                                                                                                                                      ~
SDM PLM Wa$EL HEAD & FLANGE e504 4 M 0105J JAN 787                          50 EPC TIE.NS OPERAT10NAL                          $DM PLM TO SUPPORT WO 4 H 01053 JAN 787                          50                                          RELEF VALWS FCA MSN
                                                                                                                                                                          ~
SDM PLM ACCUEA ATION h$7ALLED                          RE.1      Pu 0 54                  J4d ? $7  50                                          CC WAFY PRESS & TEMP
                                                                                                                                                                    ~
FR F.
AT TBE CF WO 4 H 01055 JAN 7 57                          50                                          CC W AFY 4 HXR HCLD                            FA F,
                                                                                                                                                                      ~
TWE PRm TO STAAT CF                                                                      l NSDECTCH
 
1 l
l CHECKLIST # 5 INTEGRATED LEAK RATE TESTING l
1 l
l i
i 1
I J
't I
 
CHECKLIST # 5                            NTEGRATED LEAK RATETESTING A. HARDWARE ITEMS                                                                        JAN 28 87                    Page: 1 A.02 PLANTMOOlFICATIONS(PDCS)
      .M      ENTRY                                                                                      N M OR
                                                                                                                                                                                              ~
NUW8ER    DATE  SYS-PRoje FWiFUENCE DOCUMENT                              $UBJECT                    MFY F W REO                  APPRVR DOER                            STATUS DATE 9 A C2 022 JAN 747    50                                                PDC reb 1W FOR                                                  ;Au APPLICA8tiTY 70 RAT b
e i
1 l
I I
l l
l l
i l
 
CHECKLIST 0 5          INTEGRATED LEAK RATE TESTING A.        HARDWARE ITEMS                                                                            JAN 28 87            Page:2 A.03 PLANT TEMP MOOS (TMS) (TM LOG BOOK) aM          ENTRY PRCOUCT5 PEEEDOR
                                                                                                                                                                        ~~
NLM9ER        DATE    SYS#RCus MFUENCE N KNT                                                  SUEJECT    JUSTFY F NOT REO          APPRVR DOER        STATUS DA1E SA03 C22 JAN 7 81        90                                                    TBeORARY MOO REVEW FOR                                P.3&
APPLICASUTY TO UtT i
I L
i 1
J l
1 l
l 1
l l
l_        _ _ _                            . _ _ _ , _ . . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ . ,                  _ _ _ _ _ .
 
CHECKLIST # 5          INTEGRATED LEAK RATE TESTING A. HARDWARE ITEMS                                          JAN 28 87    Page:3 A.04 MAINT REQUESTS & PROCEDURES NCL PMS
    .W      ENTRY PFCOUCTE MOR NUMER      DATE    SYS-PRCue MFEMNCE Dm uNT        SUBJECT        JUSTFY F NOT MC  APPRVR DOER  STATUS.0 ATE 5 A 04 C22 JAN 7 87    50                                                                                    ~ ~ ~
REYEW WR15 FCA                          PLM JM APPLCABLITY TO ERT                      R.E1  P M.
G i
                                                                                                                    )
1 l
1 I
1 l
1 1
l 1
1 1
i i
j
 
CHECKLIST # 5          INTEGRATED LEAK RATE TESTING B. SOFTWARE ITEMS                                                    JAN 28 87        Page: 4 B.01 OPERATING / MAINTENANCE SURV. PROC.(ST'S)
      .M    ENTRY                                                              PR'OLCTS Pssrsn CR NUM9E R    DATE      SYS N MFERENCE DoctAENT            SUEECT              JUSTFY F NOT MO        APPRVR 00ER  STATUS DATE
$ 8 01.163  JAN 20 87  9M        P2                PERFORM SYSTEM VALVE                              SDM PEM LNELP CECMS                                        REA    PM S O 01.164  JAN 20 87  999        P2                FtRFOmd EXCESS FLOW                                SDM PEM CHECK VALW TESTING                                RLS    Pu
                                                                                                                            ~
5 8 01.165  JAN 20 87  61        P2                LOSS OF CFFSTTE POWER &                            SDM PEM SEQUE)CE LOADNG OF                                RES    PW DIESELS
                                                                                                                            ~
5 B 01.190  JAN 20 47  ALL        P2                COMPLETE LLAT'S                                    SDM PEM ECESSARY TO                                        RLS    PM S N ^'RT                                                                    ;
S B O'.191  JAll 20 87  ALL        P2                EVE W PRMARY                                      SDM PE M COKTANIENT SURWJLLANCE                            RLS    PM TESTS FOR LAT l
l 1
1 l
l l
 
CHECKLIST # 5        INTEGRATED LEAK RATE TESTING B. SOFTWARE ITEMS                                                                                                JM' ?8 87          Page: S 8.03 NEW/ REVISED OPERSURV PROCEDURES
    .w      surnY
  ..MSE R                                                                                                                  maoucTassosooR DATE    SYS#hGJe fGEFENCE m um              SUSACT                                                            JUBTFY F NOTitro          APPRVR DOER STATUS-DATE 6 8 C3 022 JAN 7 87    to                      ORC REVEW OF LRT                                                                                        JAS uMA PROCEDURES
 
CHECKLIST # 5          INTEGRA*ED LEAK RATE TESTING B.          SOFTWARE ITEMS                                                                                    JAN 28 87          Page:6 B.09 DRAWING & VENDOR MANUAL CHANGES (MODS)
                                    .M              ENTRY                                                                                                  M4CEM;T5 PEEMDCR NR                        DATE  Sys#ROJs fEFERENCE N u MT                    SUBJECT                                            JU5TFY F NOT fEQ  APPRVR DOEA          STATUS-DATE 6 8 09 C22                    .lAN 787      SC                        NTED DRAW 92                                                                          CM      JC.
PEQUIMD FOR LRT f
j i
4 l
j i
f
                                                                                                                                                                                      ,---.--,---,7-        - - - - - , n- -
 
CHECKLIST # 5                      INTEGRATED LEAK RATE TESTING H.    *PUNCHUST* AND OTHER ITEMS                                            JAN 28 87    Page:7 M      ENTRY                                                                                                                      ~
AER PPCCUCT5 mCR DATE  SYS#RCue FEFUENCE m uNT                    SUEECT              JUSTFY F NOT fEQ      APPRW DOER            STATUS-DATE 5 H 01058 JAN 747    60                                  PERFmW LOOP CALBRAT10N                          REE                PW MCK ON LRTDEWCELS 6.H 01057 JAN 787    to                                  PEMORM LOOP CALSRATION                          AE.A              PM CECK CN ERT RTDS
              & K01.0W    JAN 787  50                                  N6 TALL TORUS V ACUUM                            FLL&              PM WEhGA WEDGES FOR RAT SH01CW JAN F87      60                                  hsTALL ANOTEST                                  RE&                PM
                                                                                                                                                      ~
TEMPORARY AM CCNPRESSOR 6 H 01060 JAN 787    60                                  CRYAELL M OHT F ACTOR                            JAS                MW
                                                                                                                                              -~~
DETERMHATON (STA1)                              JB S H 01041  JAN F87  50                                                                                                                  ~
TOAus WATER LEVEL N.000                          SDM PIM TO M 000 CUBC FEET 6 H 01042 JAN 7 87  50                                  TORUS TEWLVT9RE atN l                                                                                                                        SDM PLM S H 01043 JAN 787    80                                  PREPAAE VALVE LNEUP                              SDM PLM FOR LRT (PROYCE DALY TARGET ANO 8TATVS) l l
1 1
l l
l l
l 1
l l                                                                                                                                                          l I                                                                                                                                                          l
?
l 1
l I
 
h CHECKLIST # 6 PRE-CRITICAL TESTS PLANT STARTUP l
I i
i
 
CHECKLIST # 6          PRE CRITICAL TESTS - PLANT STARTUP O.      SOFTWARE ITEMS                                                          JAN 28 87      Page:1 8.01 OPERATING / MAINTENANCE SURV PROC.(ST'S) d    ENTRY                                                                  PRCOU:lT5 PEEDIDOR mR          DATE    SYS#ROJs N ner' u NT                          SUEJECT        JUETFY F NOT MiQ          APPRVR DOER  STATUS-DATE SJ1;1.164              JAN 20 8?  22        P2                          PEMCfW ORYWELL                                    SDM PIM AIR SALANCE                                        RL1 PM 6 8 51.167            JAN 20 81  22      P2, OPER 2                    hfTIATE OPEA 2                                    SDM PLM CHECKUST 5 0 #1.164            JAN 20 87  809        P2                          PERFCfW PRESTAARP SLAMLLANCE TTSTIPC 3$ Piu d.?.5. PW                        1 ASS 1.168              JAN 20 87  809        P2                          FWWCfW SMW WAUCCW46                    ~' ' ' SDM PEu ANO NDEPDCENT                                      RL1 PM VERFCATION CN SWTEM j                                                                          VALW LNEUPS l
l i
k l
 
CHECKLIS1D 6                                    PRE CRITICAI TESTS o PLANT STARTUP B. SOFTWARE ITEMS                                                                            JAN 28 87                  Page: 2                                              l 8.07 TRAINING NEEDS AND REQUIREMENTS
            .M      ENimy                                                                                      spuCUCTS PEEEED CR
                                                                                                                                                                                          ~
MR        DATE    SY$#ACWe 85HPENCE N uMT                                          SUEJECT          JUSTFY F NOT 8EQ                    APPRvM 00EA                  STATUS-Of ft i 8 8 07 OC2 DEC 185      to                          CONTApodENT PCCS    OPERLTOR TMJapG FOR            C N nTM49dN3                          MA.E        04 CCpnA84 ANT Ep44ANCEENT WOOFCATONS t
i l
I i
i I
I 4
l n
!                                                                                                                                                                                                I 1
l I
i 1
4 1
i
)
5 I
4 i
l i
                                                                                                                                                                                                  \
i 3
 
CHECKLIS'ID 6        PREcCRmCAL TESTS o PLANT STARTUP H.    *PUNCHLIST* AND OTHER ITEMS                                JAN 28 87    Page:3 w      ENTRY                                                      PRODK4 MCpt ER    DATE  SYl#RCus PEFEPENCE wn nsNT      SUEECT              JUBTFY F NQT fEQ  APPRVR 00ER STATUS-CATE 6 H 01039 JAN F47  01          P2          PEfWCret VISUAL                              REA  P.M
                                                                                                                    ~
DePECTION OF hlAN STEAM                      FXF, AND IELEF VALvl 30LT9se
                                                                                                            ~ ~ ~ ~ ~
  & H 01340 JM F 41  el          P2          haXE SELEC1CR SyHTCH TO                      SDM Pind STARTUP
 
1 1
l i
1 1
I 1
1 a
I                                                                                                                                        l I
t                                                                                                                                        1 i
CHECKLIST # 7 I
l 1
l i
PLANT HEATUP & TESTING 1
l 4
1 i
l 4
i i
s I
f 4
a l
l, Y
1 1
1 1
          - - , - . . - - . - - - . . , , - -        --. . _ <--      _,          -  ,,    ,-,m.,        .
 
CHECKLIST # 7                                                                  PLAM HEAT.UP & TESTING B. SOFTWARE ITEMS                                                                                                      JAN 28 87                                  Page: 1 8.01 OPERATINMAA!NTENANCE.SURV, PROC (STS)
        .M    ENTRY PIEOUCTSIMEDCR MAIER      DATE                        SYSMCus PERP9 G N W                                                    SUSACT                  JUSTFY F NOT MQ                            APPRVM DOER    STATUS-CATE 7 8 01.170  JAN to 87                        See                                        P2.0 PEA 2        CChPLETE OPER 2                                                          scM Pig 0500,57
  ? 8 01.171  eAN2041                          See                                      P2, CPfA 1                                                                                                          ~
NTTMTE CPER 1                                                            SDM PIM CHECKLET                                                                                                  '
F 8 01112 JAN2087                              45 SDk Piu
                                                                                                                                                                                                              ~
P2              PEPFORM ALTUNATE MITDOWN PMELTESTNG F S 01.173 JAN 20 87                          01                                        P2              MAMJAL TESTNG CF                                                                                ~
SDM PLM MUEF VALVES                                                              RLs    Pu I
4 i
i r
d I
J l
l 1
i l
l l
l
                                                                                                                                                                                                                  ,_ - l
 
CHECKLIST # 7                        PLANT HEAT UP & TESTING H. PUNCHUST* AND OTHER ITEMS                                                                                      JAN 20 87    Page: 2 AR      DATE        SYS N PEMtMCE D00AeNT                                  SUEJECT                                  JUSTFY F W pEQ                  APPRVR DOEA          STATUS DATE F H Q1041  JAN 737          gg8              P2                        MMM OF STWS$                                                                          m py STEEL PPfeQ PER hit                                                                    FxF, F N 01.042  JAN FSF          to              P2                        Nm                                                                                    m              px EDM Piu F H ot 543 JAN F87            el              P2                        PUhCE WOCE SELECTOR                                                                    gay ptg SWITCH N RUN                                                                                                                  i t
I I
)
1 4
!,                                                                                                                                                                                                                    l 1
I i
i l
l l
1 i
l l
1
 
i F
1                                                                                                                                              -
j
,                                                                          CHECKLIST # 8 POWER ESCALATION i
                                                                        & PHYSICS TESTING
;                                                                                                                                                                              1 i                                                                                                                                                                              l
;                                                                                                                                                                              1 l
:                                                                                                                                                                              I I
l a
l, i
l l
J i
l l
J l
d
_ _ _ - - _ _ _ _ _ . - . _ _._-_ -_,_.,_._.____ _ _ - ...-, _. _ _      _ . _ , . _ _ - . _ . _ _ _ - . . - , . _ , , , _ , . -  .,_y__.  . . _ _ , . , - - - , - - . - -
 
CHECKLIST # 8                POWER ESCALATION & PHYSICS TESTING B. SOFTWARE ITEMS                                                        JAN 28 87          Page: 1 B.01 OPERATINGAAANTENANCE SURV, PROC.(ST'S)
J    ENTRY                                                                        PFCCUCTB MCR
        .AR        DAll    sTsnoJs psPeecum wgr                        sutKCT                  JUSTFY F NOT MQ            APPRVR UDER            STATUS CATE 8 8 01.174  JAN 20 87    46            P2                CAumATE Nr8                                                    &DM PIM REA            P.M
                                                                                                                                                              ~
880t17$ JAN 20 07        23            P2                M'CA FLCM RATE TEST                                            SDM PLM AT 1000 PSI                                                    RES            PM 8801174 JAN M 87          F3            P2                WC4 CERSPEED TEST                                              EDM PLM AT 15% POWER                                                  RE1 PM S 8 81177 JAN 20 47      884            P2                NfTATE OPER 6                                                  EDM PLM 4801178 JAN 20 87        117            P2                PENCFed STARTVP PHYSCS                                        SDM PLM TESTNG AT 28% POM.R                                            PM JA 4 8 01.178  JAN20Of      117            P2                PERK 4td KT PVhe                                              SDM PLM CALBRATON AT 40% POMR                                          PM JA 8801163 JAN 20 af        117            02                NACTOR thGedElRed3                                            &DM PLM TEST 5 29%                                                    PM JA 88of141 JAN 20 87        117            P2                PENCFed KT Pune                                              SDM PIM CALSRATON AT 60% POMR                                        PM JA 4801142    JAN 20 87  'O                P2                NACTOR ENOf4ElRed3                                            SDM PLM TESTSTh                                                      PM JA 8801183 JAN 20 47
* P2                JET PUMP CALBRATON 80%                                        &DM PLM PM J1 4 8 01.184  JAN 20 87    117            P2                AT PUWP CALBRATCN IC%                                        EDM PLM PM J A.
    ~
185 JAN 20 87    117            P2                KACTCH f.NGNEIRPe3                                            SDM PIM TESTS "C% POMR                                                PM JA 8 8 01.184  JAN2087      13            P2                PCC ILilM RATE TEST AT                                        EDM PLM 1000 PSI                                                      RL1            PM 8801187 JAN 20 87        il            P2                RCC CMASPEED TEST AT                                          EDM PLM 19% PCWER                                                    RL1 PM                                ,
.l I
4                                                                                                                                                                      ;
J i
 
CHECKLIST # 8          POWER ESCALATION & PHYSICS TESTING D. NRC REl.ATED rrEMS                                                                              JAN 28 87    Page:2 0.01 NRC COhMTTMWIS, CONCERNS, LERS J      ENTRY NLAER    DATE    8'itMICue PEFUENCg e asNT PRIM l"f5 MCR SUBJECT                                                  ARTFY F NOT 750  APPRVR 00ER STATUSCATE 8001055 JAN 18 47  it?        CAL e510      PERFORM CAL 8810                                                                SDJ4 P1&&
POWEA TESTNG                                                                    PA& J A,
 
CHECKLIST # 8        POWER ESCALATION & PHYSICS 17. STING H. PUNCHUST* AND OTHER ITEMS                        JAN 28 87    Page:3 i    exmv                                              putouetsmatuo m KM    DATE  SMMKus fWWENCE DOCMENT    GUEJECT          ASTFY F NQf fE0  APPRvM DCEA STATUS CATE a H e t.oes  w r et  30          P2        pePECT ORYWEu gim                      gay pgg REA    P.R 4
0 l
 
        -    . _                                  _ - _ _ _ _ - _    -        __. _ . _ . - _                                                                        .    . = . .-
I                                                                      v                                                              v SAFETY ENHANCEMENT PROJECT STATUS l                                                                                                                      FEBRUARY 2,1987 4
1987 l
t JAN                FEB              MAR        APR          MAY        JUN
;                                                          8ACKUP NITROGEN                                y , , , , , , , , , , , , , , , , , ,,,,,,,,,,,,,                ,
CONTAINMENT SPRAY ENHANCEMENT NOZZLE MOD                        pm                                                  m
;                                                                      FIRE WATER TIE-IN                g                        g                          w]                                        -
DlESEL F1RE FUMP                  y , , , , , , , , , , g , , , , , , , y , , ,,,,,,,,              g j
FUEL TRANSFER                    gg,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,_                                              ,
4 TORUS VENT                                      g                        rfffff, ,      ,,          w                  i LEGEND
                                                                                                                                                                    %    DESIGN
: j.                                                                                                                                                                  '#' ' SITE REVIEW l        W                                                                                                                                                              CONSTRUCTION L L
  ,                                                                                                                                                                        TURNOVER lm. _ _        - - - - _ - _ _ - - _ _ _ _ _ _ - _ _ -                                      _ --__                            __        _ __                    _            _
 
6 e
s t
a r I L Gr< I t1 M AFJ:- I CO'JT A l tit 1EtJT EtJH AtJCEMEtJT 3 ti. Mcirida February 19C7 Z/n
 
y FIC1                                              M$ti!Fil:W                  ffAtt/ttn6TW 6641            tirect ver.t free the torus to the sair statt. fie vent mill  Mar 6 / 5 ens use ai e41 sting penetration ci the tcrus (cr the stantby gas treatment systes (Slifl. An t inch pipe mill tap into ertstie; ;l;itt tetmeen to: ::stainte t it:lati:s valvss at! ty; sis tre $lif. An atfiticral inclation valse mill te irstallet in tte re lir.e. httro;ei ell! te sailled to syntes valves to that the vest path can te used during daring a statico tlackest. tre vent rath .111 enly to 6ted eith senior esmagesent 4: prev 1.                                        ,
16 4 :4          Costatrient spray ts:21e stdificatien. Sin ci seien nctries    Par 1 / 5 als in each dry. ell syay cluster mill te plug;ed to refute este' ilos during an accidant. This stil prevent the i,                        creatien cf a ccataiteent istu6e during actsation ci                          <
i                        drieell spray. Flee to the fictiles sill be refuted free                        '
five thcasand to cne thcusand gallent per einste.
l I
        !64:t,t d i        Firt sater intertie to tre residual tent rencol (M)            Rat 1 / 6 ell systee, the site fire mater syntes mill te tied te the        (intertiel 54 systes via a resovatle spect piece. The spost piece                    *
}                        sill est te insta!!ed d6 ting neraal c;eration. A second
!                                                                                      Par 27 / 3 als diesel ! riven fire pas; sill te affed tc the currently        (nee fire peep) irstalled diesel and electri: drives fire pSe;s to prevtfe tes starten of (cr.taireta.t 1; ray that sill te indesentent  May I / 2 ell cf etsite a.c. p: tr. Fire mater tai also te injected into the (fueltres,a:t.1 j                        isntter vessel via tSe $4 s)ttee crcsttle. Wyfraulicall) c;erated (6el traetfer pse;t stil te installes en the too Clesel fire p.e;s. The fire ester sistea is su;;11e3 mater
~                        free too casite fire mater tails and fres a ea!cipal ester su; ply. The cresitie sill allen a fire truth to toply eater to the M systes, a third sethed that is inte;esdest of cisite 4.c. pc.er.
(643            Intlep riitro;en supply (cr dry. ell irstratettatien and      Far 11 / ! els j                        tertain other critical air c;e'ated tes; rents. A tattup
!                        litaid nitrogen supply mill te placed insite ci a trailer, tottled nitrc;ei eill als te installed. 'te nitre;es n!!!
1                      te ispplied to tte instrusetti via to tt9taireent
]                        atecipere ditwtion (C80 systee. Manal 6445: valves sill te installed arcat the C4 cartaineent inclation
  ;                      vahti te sale the entrc;en i4 ply inte;eettet cf q                        c* site a.C. ;ceer.
s l      I646            A trird diesel geteratce. A es. f.cn4 diciel generater mill    Par 20 / I ett te c:nstructed costte. It oill te alle tc le aanually tied inte either of the tea safety tutti free the etntrtl rete.
i                      It all! have attut 71 el the ca;atity cf cre cf the current distal generaters. It mill n:t repire a separate
] ,                      scerte el tecling enter and eill have as independent l                        teits tay L.el su;;ly.
l
 
I e
8                                                                                                                                                        l 1
difittilCN3 TH47 ATFICT CCWTA!N'Ini 516N!FICANT EVthTS                                              l
'')                                                                                                                                                              I o
FOC i                                                    ttSCA!Fi!CN                  STAti/LthiTH 36 73          Aztesatic depressaritation systes IA!!) legit e:difications.          Par 6 / 4 ski            l Fcur e:fifitations eill te sade to tre Att systeer !!!
l sa%al it.hibit seitetes mill te installed hr the 120 setend-j                                                              tiser, (2) sa m t typass tients all! te installed to allce                                        ,
depresiu'itatici en testeined les eater level althout high                                      !
derell pressure, (3) ennual typass tisers allt te                                                i irstalled to alles a It. pressere ICCS put; to start                                            ;
!                                                            eitheat sustained les reacter pressure, and l                                                              14)aby;asssillteinstalledtcallestepressuritation i                                                              alt'out a Ice pressare ICCS pus; running.
4
                                                $675          Standty litaid centrcl actificaticas. The I 10 errittaent              Mar 2 / 7 els            ;
)                                                            in the teren sclutten in the stanity ligati control systes                                      ;
,                                                            sill be increases, this eill c:stle tre capacity cf the estrent systes ard eliefnate the r.eed for heat trating.                                          '
l i
8703          Patiu; d.c./a.c. pteer supply. A res t 2:0 vit tattery eith            Apr 15 / 5 ans          :'
charger nr.d tr.ierter mill te installed to satply critical q                                                              480 v!C aad 120 VA: c:e;oetnts Grieg a statici blaticut.
The Scott supply sill te sanaally initiated dering a l'
blatlat. Tre tattery charger elll te tied to the diese!
tereratcr in the technical sap;crt tester.
f l                                                                                                                                                                l i                                                                                                                                                                :
0 j
5 1
k i
l i
 
p                    PROPOSED WETWELL VENT                                              s_
t                                                                                      N m    ,  m                                                                                -
4 I
t
[*li H
a DRY                +ki / / / / / / ,          I l l /      ////
* k          WELL                -                                                  /
f b                        b            / taED gi g            - 91                        vw',        '
2si        ,
L          y            N1 '    D,1                    SBGT                ,/ //
20,g PIPE DUCT _
                                            -b1                        bt*'
g                        g
      ,                      7                                                                -
__ DUCT PIPE _
WET WELL_
EXISTING                .
                                                  / / //NEW PIPE sf/ M E & J.
 
                                  ~
T Q
y h
                                                                                  .gl c
8                                                            #
/    _
c4:__
r.
w-                  g A4 n' e
    ;, ..                                          (
                                                                                                            /      5 r
4
                                                              ,h                    l m' b
I 5*
                =
N (EHg
            ;h    '
                                                                              @f
                            ".                                                  '                    4 c%
Q wM, cA
: .-f'm ak                                    ~
                +            :. er y
d,uwgn                  o
                        .p.
3                        "
gvn                                                            \
                        'M . m
                                            'tk; s                  y,        ,
I    +
5%jg;                                          o                                      f
                ~~      :      3 59 f
                                                            'r =
* ia                              'Ql a Se                        A      a Dh                                  4 q
2                        '
r    TV Ns M
                                %""-              h                C l$    >
p:+ O
              'Z
                                ?Me@ '
Cize.-
ff      g1 gg:O
                                              +                    e            \
m                              \                  w <E m                                                l    f r          O                                              /
                                                                      ~-
kl l,:.        T o
o
                                                  "'I  N;-l    l o
                                                                      - ,    =
w
                                                                                        \
! p'.y,c                                                                      -
                                                                                        @)
y i [,
if                                            Cit
(                                    NE k        Sh                    ~
l                                                  v                              QQ                                        ,
b3              m                                            -
I,3              W                                                              .
                                                        . a a                g                                                          Se
 
N                                                                                                                                                                                              1 I
',                                                                                                                                                                                              i l
9 e
p
                                                                            =              .s
                                                                                            %    NN e1                        b m
I gg p        .
O                ?.,                                            I 4                n m i n . -. .        r a
3 9              4 i,.3              .,
SA                'E;      -GD k@
e A;
    -                                -                [=.                                    .
a                  sa                                                                .
__L r ,-
        ,0,,^--                            .
                            %                                            4            S
                                                                                                    .      1          . _.
0                _ _. 'g8                              Dj              -
g h-
                        =
4                            'i  *%
                                                                                        ~
                                                                                                                                                        "O              c
      @G                    T          '      %"                                  $ph-@                % = b= a I
i 2'                                                                                            hhip*~                                                              5        i,-
n x. m k.g, w
                        ,  dE."b                                        r-      ,
i n                                r
                                                            %e                    "
                                                                                                        #6                      rRwM.,;                                    Wg
                          .esa                  e          1
: m. . . $.(
                                                                                                                                    ., .w ,..,.- . I 2
      .............r.,g.
I j
* It
                                                          '                                                5            S$
* Y                                                                      '
bs$.ik.k(I$                      f! .
($g%W                  5k?
i
      .                                        g          n$~~  0                                3                                                    L w &7&t =GT-2 JR &~'
ee D.........          2        M !%        n            _.          9 h, E            ,li i s Wg                                ~
g                )
                                                                                                                                                                                  / )/
a... 7.. m.o ..                                                      .~ q, .                                                                      )
A r.                                                                                    rglik,.a  9
: 1. 2 M..
        .......    . ,. ,.a ,. g ... ..... . . . . . . . . . . . . . . . . . . . .                              -r      ..                                    ,          ,
t    a'    /
MW                                                                                                h      1 5              ))        '
                                                                                                                                                                            ?
V
                        &,)              . . , _
h        ,s t                                                            -
                                                                                                                                                        ;_ s{-,/  ./
N'                                                                                                                (b110 A9 Obi,15 4'J116Wh p,                          ,,
          )                            .
                                                  .L l                                                                              ,
i Et                      $) w' "@                                                                                              l;'
          %2
          +)k,'.[$/@'%@k.,g;%3;G"o@.,c                                                                                                          $
                                                                                                                                                ,.y. s u,eO a nen~
n ,_.9F.        v                    p . . . . . . ..                                                                      -
4 y...,gp.. .ni e rl-            -                                                        . . . ; . . . . c ..                              I; . . . .,
            ,,        Q;''''ia, p< ?A 11, W,?yn%. {L A -w.-- . -            r,
                                                                                                                                @ s.    ,,._
                                                                                                                                          ',      n n          ,L.
                                                                                                                                                        ...,.L            ..  .
 
OFFICE OF INSPECTf0N AND ENFORCEPENT ACTHS J
0FFICE OF VHE DEPUTY O! RECTOR
: 1. IE ACTION NUMBER    87-111 (EDO 2654)              _
: 2. CATE:    3na/g7        __
: 3.
 
==SUBJECT:==
ENCLOSES LETTER FROM CIT!ZENS URGING RESPONSIBLE FNFRF,Y (Chpri er SAFETY ISSUES RE PILGR!M NUCLEAR PLANT                                                      ._
: 4. AECUESTOR:
: 5. ACTION REQUESTED:  Provide responst
                                                                                        % $ $. ',J' a,,                          .
(,'/ V),l,) ( ,i.b ' , .V p '' q
                                                    ,l,,, YlLk b " h E {!L ' !.\f ' $A .',
                                            / t"                    /        t i?',,/pl(((,Qe.Y
: 6. AS$1GNED TO:    Jo_rd / 2                                                    1
: 7. EXPECTED COMPLET!0'I      c , d due to frcnt offica 4/1/97                      L S. EXTENDED COMPLET!0N DATE:      4!.2c/gf                                      (
: 9. COMPLETION DATE:
: 10. DOCUMENTATION OF C0tiPLET!0N:                                                                      1
: 11. CETURN TH!$ FORT! TO DEPUTY DIRECTOR'S OFFICE WITH COMPLETED eCT!0'1
                    .6 &Y            t'              ?            (  ;;r 9 w s N m ~ 0 , f2flg,7 1
                                                  .Q      4
                                                                                                  .r/r/
 
_ _ __ _ . _ _ _ _ _ _ _ _ . _ _ _ - - - - - _ - - - - -                                  - - - - ~ ~ - - - - - - - - - - - - - - - ~ - - - - -                                                                                        ~~~~~                    ~~ ~~
                                                      #                          %,,                                                                                    UNITED 8TATES
                                                !"3 j
NUCLEAR REGULATORY COMMISSION
[                                                                                                            wAswiNotcN. o. c. rous g
s                                                                                                                                                                                                      ,
                                                    %, o . . . * .#.
I I
EE9 [D3UbE0h E95f!E9995fS! 99EIRgg                                                                                                            d FROMt                                                                                                                                  DUE: 04/06/87                                                  EDO CONTROL                        002654 REP. GERRY E. STUDDS                                                                                                                                                                            DOC DTt 03/06/87 FINAL. REPLY TO:
I                                              CHAIRMAN 2ECH
;                              FOR S10 NATURE OF                                                                                                                        **        GREEN              **
i                                                                                                                                                                                                                                            SECY NO: 87-275 EXECUTIVE DIRECTOR I-                              DESC's ROUTINO:
ENCLOSES LETTER FROM CIT 12 ENS UROINO RESPONSIBLE                                                                                                                                        TAYLOR I                                            ENEROY tCURE) RE SAFETY ISSUES RE PILORIM NUCLEAR PLANT                                                                                                                                                                                      NORRY DENTON                                        'l DATE: 03/20/07 ASSIGNED ,TO: -RTN h
j                                                                                -
CONTACT EnLe.r .                                                                                                                                                    t
]                            SPECIAL INSTRUCTIONS OR REMARKS                                                                                                                            a.
e  ,
!                                                                                                            .a                                                      ,....c.                                      -
c~ g'y 1
                                                                                              .:.s                                                                                                                          .,..;->-                                          ..
I                                                                                        .[
                                                                                        .u . . . c ...
                                                                                                                                                                            ' ' '.. c.
a.
                                                                                                                                                                                                                            .N'
                                                                                                                                                                                                                            . a .' , .
                                                                                                                                                                                                                                                                        ,5.l.      .
                                                                                                                          't,                                            (        9!N                                                *
                                                                                                                                                                                                                            . it* .[=i, g) '                    .g f ,A
                                                                                                                        -e                                        .              + , . . <                                    .
g4..,                                      .                                  3.'s                      ,.                                -
ca.n'
* g. , - .
: e. st e,.. 3 J,
: m.          -
                                                                                                                                                                                                                                                                          .. .m;.
Wh;N
                                  .--                                                            I                    ,f I [ ',i                                        ~, y 8              3 i
                                                                                                                                                                                                                                                      ,s                          lI
* l
                                                      . -s x:                                    .; L ..                      v..
                                                                                                                                                                  %                = & . ; w ' M L n y & . h i'                                                            ? y,.            .
jf.y-t.,                                                                                                                                                                                                                                                                          \~
l *4 A
                                                                                                                                                                                                                                                                                          ^
                                                                                                                                                                                                                                                                            ;            f
                                                                                                                                                                                                                                                                                          .~
4
 
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER:    CRC-87-0275                            LOGGING DATEt Mar 19 87 ACTION OFFICE:    EDO AUTHORt          G.E. Studds--Const Ref AFFILIATION:      U.S. HOUSE OF REPRESENTATIVES LETTER DATE:      Mar    6 87      FILE CODE: ID&R-5 Pilgrim SUIk7ECT:        Criticizes the Commission's regulation of the nuc power industry ACTION:          Direct Reply DISTRIBUTION:    OCA to Ack SPECIAL HANDLING: Nohe
* NOTES DATE DUE:
SIGNA 7URE:        .
DATE SIGNEDt AFFILIATION:
Rec'd Off. EDO Date        d*M-f7 Time -        / A #f A Y
kDO            '
002654 b}}

Latest revision as of 19:33, 7 December 2024

Speech Entitled Implications of Chernobyl Accident for Us Nuclear Power Program. Related Info Encl
ML20204K042
Person / Time
Site: Pilgrim
Issue date: 06/09/1986
From: Asselstine J
NRC COMMISSION (OCM)
To:
Shared Package
ML20204J386 List:
References
FOIA-88-198 NUDOCS 8810250327
Download: ML20204K042 (249)