        'Af Telephone (412) 393-6000 E"o*'7,', 4
'Af Telephone (412) 393-6000 E"o*'7,', 4 July 29, 1986 Shippingport, PA 15077-0004 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attn: Mr. Peter S. Tam, Project Manager Project Directorate No. 2 Division of PWR Licensing - A Washington, DC 20555
                      '*                                                                                                                                                      July 29, 1986 Shippingport, PA 15077-0004 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attn: Mr. Peter S. Tam, Project Manager Project Directorate No. 2 Division of PWR Licensing - A Washington, DC 20555
- Mail Stop 340 -
        - Mail Stop 340 -


==Reference:==
==Reference:==
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Implementation Dates of Generic Requirements Gentlemen:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Implementation Dates of Generic Requirements Gentlemen:
Attached are marked-up pages from your {{letter dated|date=April 30, 1986|text=letter dated April 30, 1986}} requesting information regarding the implementation dates of the listed generic             issues.                                             Many             of these issues did not have an actual implementation date since there were no hardware or licensing document changes.           For these issues the completion date was assumed as the date the NRC closed out the licensing issue as indicated in the column "Lic Act Complete".                                                                                                                                                                                           :
Attached are marked-up pages from your {{letter dated|date=April 30, 1986|text=letter dated April 30, 1986}} requesting information regarding the implementation dates of the listed generic issues.
Many of these issues did not have an actual implementation date since there were no hardware or licensing document changes.
For these issues the completion date was assumed as the date the NRC closed out the licensing issue as indicated in the column "Lic Act Complete".
All items have been addressed and this letter supercedes our previous submittal of June 2,1986 which provided a partially completed list which was provided as a status report.
All items have been addressed and this letter supercedes our previous submittal of June 2,1986 which provided a partially completed list which was provided as a status report.
If you have any questions regarding this information, please contact members of our Licensing staff.
If you have any questions regarding this information, please contact members of our Licensing staff.
Very truly yours, Qd. D. ieber Senior Manager Beaver Valley No. I l
Very truly yours, Qd
          %[k P
. D.
00
ieber Senior Manager Beaver Valley No. I l
%[k 00 P


Beaver Valley Power Station, Unit No. 1 i      Docket No. 50-334, License No. DPR-66 Implementation Dates of Generic Requirements cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Branch Washington, DC 20555 Director, Safety Evaluation & Control Virginia Electric & Power Company P. O. Box 26666 i           One James River Plaza Richmond, VA 23261 I
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 i
Implementation Dates of Generic Requirements cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Branch Washington, DC 20555 Director, Safety Evaluation & Control Virginia Electric & Power Company P. O. Box 26666 i
One James River Plaza Richmond, VA 23261 I
i a
i a
                  .-  ,-  ,    ----.m.   -- -- --    ,    .-, - - ------- , y
----.m.
3 y


R-1208751-001                           REGULAT0RY           INF0RMATION                   TRACKING                     S Y S 1 t: M                           PAGE NO.*     20 FACILITY         IMPLEMENTATION                                                                               03/31/86 FACILITY: BEAVER VALLEY 1 PLANT LOCATION: 5 MI E OF E. LIVERPOOL, OH                   LICENSED P0HER: 2652 MHT-DOCKET NUMBER: 050-00334                                                                                           PROJECT MANAGER: P. TAM DESIGN POWER:   0335 MHE                             BRANCH CHIEF:                 L. RUBENSTEIN ARCH / ENGINEER: S&H                                         NSSS VENDORt   HEST IE INSPECTOR:             H. TROSKOSKI LIC. ASSISTANT *                  . VACANT k'
R-1208751-001 REGULAT0RY INF0RMATION TRACKING S Y S 1 t: M PAGE NO.*
TAC NO.
20 FACILITY IMPLEMENTATION 03/31/86 FACILITY: BEAVER VALLEY 1 PLANT LOCATION: 5 MI E OF E. LIVERPOOL, OH LICENSED P0HER: 2652 MHT-PROJECT MANAGER: P. TAM DOCKET NUMBER: 050-00334 DESIGN POWER:
LIC ACT                                            LICENSEE MPA 8                 TITLE                                   COMPLETE                                   STATUS               R&l5 M07121               A-01 10 CFR 50.55 ACG) - ISI                                 12/04/79C --             tie mposT(c - - - -                   /f 77 M08132               A-02 APPENDIX I - ALARA                                     03/h/83C                  d o m#L Ls r a ,3         - - -
0335 MHE BRANCH CHIEF:
eM M06987               A-03 SECURITY REVIENS-MODIFIED AMENDMENT PLANS             02/k/79C -- C # '"# ''' 7 # D                       ~~~         #
L. RUBENSTEIN ARCH / ENGINEER: S&H NSSS VENDORt HEST LIC. ASSISTANT *
M11153              A-09  PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE                .
. VACANT IE INSPECTOR:
                                                                                                        --      0 # '"#               ~ ' ~ ## 7 7 M10474               A-10 CONTINGENCY PLANNING                                   09/12/80C -- < #-*#' d' 7#                     * - ~~~#' '#
H. TROSKOSKI k'
M10476               A-11 GUARD TRAINING PLANS                                   02/11/81C               -    C * *'' # ''" '#   - ' ~             ####
LIC ACT LICENSEE TAC NO.
M10475               A-12 VITAL AREA ANALYSIS                                                                                     - - - - #
MPA 8 TITLE COMPLETE STATUS R&l5 M07121 A-01 10 CFR 50.55 ACG) - ISI 12/04/79C --
03/27/81C         --        6 0 *"#"' '#"
tie mposT(c - - - -
M06363               A-14 10CFR 50.55 A(G) - INSERVICE TESTING                   06/29/82C           _ .. 6.c m #'* M #           '~~            # T '#
/f 77 03/h/83C M08132 A-02 APPENDIX I - ALARA d o m#L Ls r a,3 eM M06987 A-03 SECURITY REVIENS-MODIFIED AMENDMENT PLANS 02/k/79C -- C # '"# ''' 7 # D
M46811               A-16 QUALIFICATIONS OF EXAMINATION, INSPECTION, TESTING     08/12/82C         ___        C c mP'uT#D               - - - #9##
~~~
M51071               A-17 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDEN     12/30/86 . . -                 /#4 s 76 c 746 - - - /9 #9 M55010               A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43)     11/27/84C           - - -      dcmpcc-7Ed               --
0 # '"#
If IV M59070              A-20  to CFR 50.62 OPERATING REACTOR REVIENS 1
~ ' ~ ## 7 7 M11153 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE M10474 A-10 CONTINGENCY PLANNING 09/12/80C -- < #-*#' d' 7# * -
12/31/86[ .. .               ge o .,,te.rs o           _ _ _        , , ff M59941               A-21 10 CFR 50.61, PRESSURIZED THERMAL SHOCK RULE           06/30/86                 - reo .> < c,-rs o           __        - so / jg, N06405              B-02  FIRE PROTECTION                                        -'IL.Ld75 t              C LC efterj--0cmF'eT#O -- - - # 7 'T 'l M08372               B-03 PHR MODERATOR DILUTION                                 02/21/79C         _ _ _ _      e o ,,, v<,.e Ts,a         _    _ i01f M06714               B-04 REACTOR VESSEL OVERPRESSURE PROTECTION                           /83C   _ _ _        c_ o m pc<,, y,rg ,_ _                 g/pg
~~~#'
  'M07313               B-07 STEAM GENERATOR FEEDHATER FLOW INSTABILITY             02/12/79C - - - do,nacu7so __ _                                       ,9.f 9 M10837               B-15 FUEL ROD B0H                                           11/03/79C         _ __
M10476 A-11 GUARD TRAINING PLANS 02/11/81C C * *'' # ''" '#
g, o ,,tpcu M o - - - f 97 7
- ' ~
M08670               B-14 CEA GUIDE TUBE HEAR                                   07/22/80C           ___        g o ,,,p t_ce ve 3 _ _ _ j g pa M12162               B-16 EMERGENCY PLANNING AND REVISIONS                                                                                     -
M10475 A-12 VITAL AREA ANALYSIS 03/27/81C 6 0 *"#"' '#"
T4 M 1s 3)
M06363 A-14 10CFR 50.55 A(G) - INSERVICE TESTING 06/29/82C 6.c m #'* M #
W hndes       skq}e   k hlkl leffer , M $e n~ Sisist O O ce dobe , $ daf e, is 110 b Silajn{                                   s            , "c *,
# T '#
4                        M neans u t . o ,i .' s .s h y m a e,. vgc_ mies,
'~~
M46811 A-16 QUALIFICATIONS OF EXAMINATION, INSPECTION, TESTING 08/12/82C C c mP'uT#D
- - - #9##
M51071 A-17 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDEN 12/30/86.. -
/#4 s 76 c 746 - - - /9 #9 M55010 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 11/27/84C dcmpcc-7Ed If IV 12/31/86[...
ge o.,,te.rs o
,, ff 1
M59070 A-20 to CFR 50.62 OPERATING REACTOR REVIENS M59941 A-21 10 CFR 50.61, PRESSURIZED THERMAL SHOCK RULE 06/30/86
- reo.> < c,-rs o
- so / jg,
-'IL.Ld75 C LC t
N06405 B-02 FIRE PROTECTION efterj--0cmF'eT#O -- - - # 7 'T 'l M08372 B-03 PHR MODERATOR DILUTION 02/21/79C e o,,, v<,.e Ts,a
_ i01f M06714 B-04 REACTOR VESSEL OVERPRESSURE PROTECTION
/83C c_ o m pc<,, y,rg,_ _
g/pg
'M07313 B-07 STEAM GENERATOR FEEDHATER FLOW INSTABILITY 02/12/79C - - - do,nacu7so __ _
,9.f 9 M10837 B-15 FUEL ROD B0H 11/03/79C g, o,,tpcu M o - - - f 97 7 M08670 B-14 CEA GUIDE TUBE HEAR 07/22/80C g o,,,p t_ce ve 3 _ _ _ j g pa M12162 B-16 EMERGENCY PLANNING AND REVISIONS T4 M 1s 3)
W hndes skq}e k hlkl leffer, M $e n~
Sisist O O ce dobe,
$ daf e, is 110 b Silajn{
"c *,
s M neans u t. o,i.' s
.s h y m a e,.
vgc_ mies, 4


4 R-1208731-001                 REGULAT0RY             INF0RHATION                 TRACKING                       SYSTEM                           PAGE NO.       21 FACILITY         IMPLEMENTATION                                                                           03/31/86 BEAVER VALLEY l           (CONTINUATION)
4 R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEM PAGE NO.
                                                                                                        )it TAC NO.
21 FACILITY IMPLEMENTATION 03/31/86 BEAVER VALLEY l (CONTINUATION)
LIC ACT                                              LICENSEE MPA 8               TITLE                                 COMPLETE                                       STATUS           DATE M10477         B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS       03/30/82C - - - c c m p<_ u vsc,                         - - < f j g M10260         B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION     - Zg -                                     pypz e74 g _                 j9E2.
)it LIC ACT LICENSEE TAC NO.
M10323         B-21 LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANNUNCIA
MPA 8 TITLE COMPLETE STATUS DATE M10477 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS 03/30/82C - - - c c m p<_ u vsc,
                                                                                                  ^ -
- - < f j g M10260 B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION
                                                                                    .T4 Z t'is o, ; b.4.s.1c.( j M10478         B-22 C H SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL   03/30/82C -                   - _ C o mpc ere               . - /9/ L M10007         B-23 DEGRADED GRID VOLTAGE                               03/03/81C                 - --        C o m #c ("# 6 - - /97/
- Zg -
M42553         B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL POW   ; / ,e s i c l               -- - C O
pypz e74 g _
j9E2.
M10323 B-21 LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANNUNCIA
^ -
.T4 Z t'is o, ; b.4.s.1c.( j M10478 B-22 C H SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL 03/30/82C -
- _ C o mpc ere
. - /9/ L M10007 B-23 DEGRADED GRID VOLTAGE 03/03/81C C o m #c ("# 6 - - /97/
M42553 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL POW
; /,e s i c l
-- - C O
* Av 7'# o - ~ / 9/ 2.
* Av 7'# o - ~ / 9/ 2.
M10473         B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H titr21MHG                                 O#NW4 - - --- /9pA M12991         B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H     _ _-.. .                              ccmgurrea _ _                 f pg M10222           B-26 INADVERTANT SAFETY INJECTION DURING C00LD0HN         12/28/79C                       -
M10473 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H titr21MHG O#NW4 - - --- /9pA M12991 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H ccmgurrea _ _
                                                                                                                        - t o mpw. rso _ __j97y M07240           B-31 LONG SHAFT LHSI & OUTSIDE RECIRC. PUMP DEGRADATION g; } --                                       ,        p           _ , , 9.g M49417           B-32 BLOCKED SI SIGNAL DURING C00LD0HN gg?g'g                     _ _                    g 7g , ,,,,                            ,
f pg M10222 B-26 INADVERTANT SAFETY INJECTION DURING C00LD0HN 12/28/79C
M08653           B-39 PHR PRESSURE - TEMPERATURE LIMIT TECH SPECS         "=
- t o mpw. rso _ __j97y M07240 B-31 LONG SHAFT LHSI & OUTSIDE RECIRC. PUMP DEGRADATION g; } --
Z                           '"'""                '
p
M11111          B-41 Wii=TMe { }
_,, 9.g M49417 B-32 BLOCKED SI SIGNAL DURING C00LD0HN gg?g'g g 7g,,,,,
FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 03/14/83C _ _                      _
M08653 B-39 PHR PRESSURE - TEMPERATURE LIMIT TECH SPECS
e c inpce r#c           - - /9'7 7 M11685           B-42 TMI FOLLOH UP - ALL PLANTS gjjg                                         gg,rs o               - / M A M11901           B-42 TMI FOLLOH UP - ALL PLANTS ( 5 { u f u f; n )       07/17/79C               --
"=
                                                                                                                        - Q_ o m pc e 7#b - -- e9 79 M11766           B-43 PHR FEEDHATER LINE CRACKS                           02/25/80C - -- t o m # Car r,r4                                 - - e97f M43129           B-43 PHR FEEDHATER LINE CRACKS                         -trase9r006is-(s'f or./jk .DL C le.tter) , _ g m p c e 7 f ,) , __ ,pfd M30750           B-44 LESSONS LEARNED IMPLEMENTATION                     04/18/80C _- tomeceT4o                                     , -
Z Wii=TMe { }
rffo M30751           B-44 LESSONS LEARNED IMPLEMENTATION                     04/18/80C                                 f                              l
M11111 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 03/14/83C _ _
    'M30752               B-44 LESSONS LEARNED IMPLEMENTATION                     04/18/80C M30753           B-44 LESSONS LEARNED IMPLEMENTATION                     04/18/80C M30754           B-44 LESSONS LEARNED IMPLEMENTATION                     04/18/80C                                 f                            Y
e c inpce r#c
                                                                                                                                              ~ ~
- - /9'7 7 M11685 B-42 TMI FOLLOH UP - ALL PLANTS gjjg gg,rs o
M30755           B-44 LESSONS LEARNED IMPLEMENTATION                     04/18/80C                   -      00##
- / M A M11901 B-42 TMI FOLLOH UP - ALL PLANTS ( 5 { u f u f; n )
07/17/79C
- Q_ o m pc e 7#b - -- e9 79 M11766 B-43 PHR FEEDHATER LINE CRACKS 02/25/80C - -- t o m # Car r,r4
- - e97f M43129 B-43 PHR FEEDHATER LINE CRACKS
-trase9r006is-(s'f or./jk.DL C le.tter), _ g m p c e 7 f,), __,pfd M30750 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C _- tomeceT4o rffo f
l M30751 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C
'M30752 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30753 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C f
Y M30754 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30755 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 00##
~ ~


R-1208751-001                               REGULAT0RY           INF0RMATION           TRACKING                     SYSTEM                         PAGE NO.s     25 FACILITY         IMPLEMENTATION                                                               03/31/82 BEAVER VALLEY 1                         (CONTINUATION)
R-1208751-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.s 25 FACILITY IMPLEMENTATION 03/31/82 BEAVER VALLEY 1 (CONTINUATION)
LIC ACT                                     LICENSEE TAC H0.                 MPA 9                 TITLE                               COMPLETE                               STATUS           Ralf, M30756                   B-44 LESSONS LEARNED IMPLEMENTATION                       04/18/80C - - - Co a3 9 W T' O --                         /9/v M30757                   B-44 LESSONS LEARNED IMPLEMENTATION                       04/18/80C                               '
LIC ACT LICENSEE TAC H0.
M30758                   B-44 LESSONS LEARNED IMPLEMENTATION                       04/18/80C M30759                   B-44 LESSONS LEARNED IMPLEMENTATION                       04/18/80C M30760                   B-44 LESSONS LEARNED IMPLEMENTATION                       04/18/80C M30761                   3-44 LESSONS LEARNED IMPLEMENTATION                       04/18/80C                                                     y M30762                     B-44 LESSONS LEARNED IMPLEMENTATION                       04/18/80C         - - - Con?#CETE6                    - / f/C M12395                     B-44 LESSONS LEARNED IMPLEMENTATION                       02/11/81C       --            C o d' 9L L" 74 0 - - - ' M')
MPA 9 TITLE COMPLETE STATUS
M12922                     B-45 HASH 1400 EVENT V, " PRIMARY COOLANT SYSTEM PRESSUR 04/20/81C   -            -    CC "'# ''' 7" O -            '99#
: Ralf, M30756 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C - -
.                          M12598                     B-46 ANALYSIS OF TURBINE DISC CRACKS                     08/19/81C -              -  0 0 "'                  -
- Co a3 9 W T' O --
                                                                                                                                                                          ' #NI M12673                     B-47 ECCS; CLAD SHELLING AND RUPTURE                     09/12/80C -           -        tesu N W 6 - - e fh                           ,
/9/v M30757 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30758 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30759 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30760 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30761 3-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C y
M13110                     B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE   06/21/82C - --               d. c m pcteva 6    - - af/.A M11865                     B-52 REVIEN OF SAFETY ASPECT OF INADVERTENT SAFETY ACTI   02/05/81C - - - 0 0 *' # ' '' '# 0 --- ' f f' M42092                     B-57 DHR CAPABILITY                                       05/15/81C - --               t c m et e reb - - - /ff/
- - - Con?#CETE6
M42858                     B-59 MASONRY 84ALL DESIGN                                 07/12/82C   -          . tcmFC67#6         --          /f/A M42459                     B-60 ENVIRONMENTAL QUALIFICATION                         03/ 07/85C - - - e i n.p ce Tag                   - -      f fpr M42652                     B-61 LOSS OF NON CLASS IE ISC PONER (IES 79-27)               r-^^                    d c meurwa - - e f FI
- / f/C M30762 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M12395 B-44 LESSONS LEARNED IMPLEMENTATION 02/11/81C C o d' 9L L" 74 0 - - - ' M')
                                                                                                              +--53f)TC et (
CC "'# ''' 7" O -
M42722                     B-62 ESF RESET CONTROL DESIGN DEFICIENCY                 g ;;                               _ g o, p C 6 7(6 - - ' 9 PJ M43911                     B-63 INTERIM PROCEDURES FOR SHORT TERM BLACKOUT           09/01/81C - __ c. o m pu va                     --
'99#
t9PA M47146                    B-66 NATURAL CIRCULATION C00LD0HN                        08/02/83C -              -  /go /(C Tr.-4       - - /9p? [6EE F-uS)
M12922 B-45 HASH 1400 EVENT V, " PRIMARY COOLANT SYSTEM PRESSUR 04/20/81C
M46826                     B-69 IEB 80-4 MAINSTEAM LINE BREAK HITH CONTINUED FEEDH   08/04/82C   -        __ _ d o ntece7%               ^ '9Q M46598                     B-70 FATIGUE TRANSIENT LIMIT TS                                                               %              -
' #NI 0 0 "'
                                                                                                                              )
M12598 B-46 ANALYSIS OF TURBINE DISC CRACKS 08/19/81C M12673 B-47 ECCS; CLAD SHELLING AND RUPTURE 09/12/80C -
M49724                     B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16)         10/21/83C _ _ __               (o mpce ya - - / 5 / g j
tesu N W 6 - - e fh
: d. c m pcteva 6
- - af/.A M13110 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 06/21/82C - --
M11865 B-52 REVIEN OF SAFETY ASPECT OF INADVERTENT SAFETY ACTI 02/05/81C - - - 0 0 *' # ' '' '# 0 --- ' f f' M42092 B-57 DHR CAPABILITY 05/15/81C - --
t c m et e reb - - - /ff/
M42858 B-59 MASONRY 84ALL DESIGN 07/12/82C tcmFC67#6
/f/A M42459 B-60 ENVIRONMENTAL QUALIFICATION 03/ 07/85C - - - e i n.p ce Tag f fpr M42652 B-61 LOSS OF NON CLASS IE ISC PONER (IES 79-27)
+--53f)TC d c meurwa - -
r-^^
e f FI et (
M42722 B-62 ESF RESET CONTROL DESIGN DEFICIENCY g ;;
_ g o, p C 6 7(6 - - ' 9 PJ M43911 B-63 INTERIM PROCEDURES FOR SHORT TERM BLACKOUT 09/01/81C - __
: c. o m pu va t9PA
/go /(C Tr.-4
- - /9p? [6EE F-uS)
M47146 B-66 NATURAL CIRCULATION C00LD0HN 08/02/83C -
M46826 B-69 IEB 80-4 MAINSTEAM LINE BREAK HITH CONTINUED FEEDH 08/04/82C
__ _ d o ntece7%
^ '9Q M46598 B-70 FATIGUE TRANSIENT LIMIT TS
)
M49724 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 10/21/83C _ _ __
(o mpce ya - - / 5 / g j


R-1208751-001                                                     REGULAT0RY           INF0RMATION             TRACKING                   SYSTEM                           PAGE NO.       2B FACILITY         IMPLEMENTATION                                                                     03/31/86 BEAVER VALLEY 1                                               (CONTINUATION)
R-1208751-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.
LIC ACT                                       LICENSEE TAC NO.                                       MPA 9               TITLE                                 COMPLETE                               STATUS             DATE M52737                                         B-76 3
2B FACILITY IMPLEMENTATION 03/31/86 BEAVER VALLEY 1 (CONTINUATION)
ITEM 1.1 - POST TRIP REVIENs PROGRAM DESCRIPTION &   4s/20/85C -- -                   60"#W-T'du--'/f4/
LIC ACT LICENSEE TAC NO.
M52818                                         B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION & VENDOR INTER   10/31/86     -          --
MPA 9 TITLE COMPLETE STATUS DATE 3
d c W #'F WB - - e 9 /3 M52899                                         B-78 ITEMS 3.1.1 & 3.1.2 -POST MAINTENANCE TEST PROCEDU   11/21/85C               -
M52737 B-76 ITEM 1.1 - POST TRIP REVIENs PROGRAM DESCRIPTION &
O_ o m F < *" T h -- 'F/Py.
4s/20/85C -- -
M52980                                         B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO   10/31/85C       --
60"#W-T'du--'/f4/
eemPCe746            - - ' 98 5; M53061                                         B-80 ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY - VENDO   11/21/85C -- a d '*1 P ' c 7 # o                 - -- # 9#3 M53114                                         B-81 ITEMS 4.2.1 & 4.2.2 -PREVENTATIVE MAINT PROG FOR R   10/h85C --- ( m p w rca                           __
M52818 B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION & VENDOR INTER 10/31/86 d c W #'F WB
s/jy MS3166                                         B-82 ITEM 4.5 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTAC
- - e 9 /3 M52899 B-78 ITEMS 3.1.1 & 3.1.2 -POST MAINTENANCE TEST PROCEDU 11/21/85C O_ o m F < *" T h -- 'F/Py.
                                                                                                              ^
M52980 B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO 10/31/85C eemPCe746
PRodd'cTKb             -
- - ' 98 5; M53061 B-80 ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY - VENDO 11/21/85C -- a d '*1 P ' c 7 # o
f/g M54516                                         B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-   04/30/86 - - -                 /R o J te -r E3     _ _ _ , ,/ pg M53569                                         B-85 SALEM ATHS 1.2 DATA CAPABILITY                       04/30/86 - --                 ac m PL r7C6       - - /9p3 M53652                                         B-86 SALEM ATHS 2.2 S-R COMPONENTS                       09/30/86 - --                 a c mpce 7c6 -                 3/ B5 M53735                                         B-87 SALEM ATHS 3.2.1 & 3.2.2 S-R COMPONENTS             11/21/85C -~                   d o ntpct"rvA , _
- -- # 9#3 M53114 B-81 ITEMS 4.2.1 & 4.2.2 -PREVENTATIVE MAINT PROG FOR R 10/h85C --- ( m p w rca s/jy MS3166 B-82 ITEM 4.5 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTAC
5/j,                 .
^
M53818                                         B-88 SALEM ATHS 3.2.3 T.S. S-R COMPONENTS                 10/31/85C - -- g e oi pcg7s o
PRodd'cTKb f/g M54516 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-04/30/86 - - -
___          , 9 p3 M53901                                         B-89 SALEM ATHS 4.2.3 & 4.2.4 LIFE COMPONENTS             12/31/86                 _ p40J M #b -                   - g/g M55348                                         B-90 SALEM ATHS 4.3 H AND B&H T.S.                       06/30/86
/R o J te -r E3
                                                                                                                                  -- /403I6Tro                 - - - 9g M54045                                         B-92 SALEM ATHS 4.5.1 DIVERSE TRIP FFATURES               11/21/85C - -- c o n,pce 7q                         -
_ _ _,,/ pg M53569 B-85 SALEM ATHS 1.2 DATA CAPABILITY 04/30/86 - --
fpjg M53962                                         B-95 SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERNATIVES           01/31/87     _      __      p fe,jge 7 f,3   , , _      ,2 7'y 7 M12188                                         C-01 PHR SECONDARY HATER CHEMISTRY MONITORING REQUIREME   01       80C     - - - d ont pce r,r3             ,_ ,_
ac m PL r7C6
                                                                                                                                                                            ,pfg M08596                                         C-03 QUALIFICATIONS OF RADIATION PROTECTION MANAGER       03/27/79C WW - - d e m pce rsg                         _ _,,p77 N08594                                          C-06 PUMP SUPPORT-LAMELLAR TEARING                      R.   .I.d.lb MC  C - -- den 1PceTr3                       .    .fpjo M08593                                         C-07 FUEL HANDLING ACCIDENT INSIDE CONTAINMENT           12/12/79C - --                   d o ns pceno           _ ,fv79 M07972                                         C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE   12/20/84C       -- -
- - /9p3 M53652 B-86 SALEM ATHS 2.2 S-R COMPONENTS 09/30/86 - --
(cim pcv7a g _ . , ,g'f g M43646                                         C-14 AUXILIARY FEEDilATER SEISMIC QUALIFICATION           01/11/82C - -                     ccmpcevcc             , , f pg MS2208                                         C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPA   06/28/,85C       . - - dompC<'rsc                       _,,4[,g u Ah WRC f)les . Ak l clu.r wiuf +hls clafe re{ers fo,
a c mpce 7c6 -
3/ B5 M53735 B-87 SALEM ATHS 3.2.1 & 3.2.2 S-R COMPONENTS 11/21/85C -~
d o ntpct"rvA, _
5/j, M53818 B-88 SALEM ATHS 3.2.3 T.S. S-R COMPONENTS 10/31/85C - -- g e oi pcg7s o
, 9 p3 M53901 B-89 SALEM ATHS 4.2.3 & 4.2.4 LIFE COMPONENTS 12/31/86
_ p40J M #b -
- g/g M55348 B-90 SALEM ATHS 4.3 H AND B&H T.S.
06/30/86
-- /403I6Tro
- - - 9g M54045 B-92 SALEM ATHS 4.5.1 DIVERSE TRIP FFATURES 11/21/85C - -- c o n,pce 7q fpjg M53962 B-95 SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERNATIVES 01/31/87 p fe,jge 7 f,3
,2 7'y 7 M12188 C-01 PHR SECONDARY HATER CHEMISTRY MONITORING REQUIREME 01 80C
- - - d ont pce r,r3
,pfg M08596 C-03 QUALIFICATIONS OF RADIATION PROTECTION MANAGER 03/27/79C WW - - d e m pce rsg
_ _,,p77 R..I.d.lb C - -- den 1PceTr3
.fpjo N08594 C-06 PUMP SUPPORT-LAMELLAR TEARING MC
*M08593 C-07 FUEL HANDLING ACCIDENT INSIDE CONTAINMENT 12/12/79C - --
d o ns pceno
_,fv79 M07972 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 12/20/84C (cim pcv7a g _.,,g'f g M43646 C-14 AUXILIARY FEEDilATER SEISMIC QUALIFICATION 01/11/82C - -
ccmpcevcc
,, f pg MS2208 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPA 06/28/,85C
. - - dompC<'rsc
_,,4[,g u Ah WRC f)les. Ak l clu.r wiuf +hls clafe re{ers fo, 1


R-1208751-001                                                         REGULAT0RY       INF0RMATION           TRACKING                           SYSTEM                               PAGE NO.       2C FACILITY       IMPLEMENTATION                                                                             03/31/82 BEAVER VALLEY 1                             (CONTINUATION)
R-1208751-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.
TAC NO.                                                                                               LIC ACT                                          LICENSEE MPA W                                                         TITLE                         COMPLETE                                     STATUS           DATE
2C FACILITY IMPLEMENTATION 03/31/82 BEAVER VALLEY 1 (CONTINUATION)
(,Ict[fr M58045    C-16          UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERN                            :( _. ., #c DLC le tieg. ~ 'OM74M7'b                             - /9JY stum genentou M07861   D-02           ECCS ZIRC CLAD MODEL ERROR-COMPLIANCE HITH 10 CFR-                           01/09/80C - - - e o m pcc-rso                                 -/9/o M07830   D-03         PRESSURIZER HEATUP RATE ERROR                                                 G3/27/79C - - - E c " #c e 7#r)                           --t17?
LIC ACT LICENSEE TAC NO.
M08597   D-10         ASYMMETRIC LOCA LOADS                                                         03/31/86 -               -- /1 4 c- M c T c.3                           /
MPA W TITLE COMPLETE STATUS DATE
                                                                                                                                                                              ._<f       /g 2.S' M08974   D-11         FISSION GAS RELEASE                                                           02/3r/80C         - -- - d c m P< ev,o                       _ -,ygo M12263   D-15         HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL                           d_!             *
:( _.., #c DLC le tieg. ~ 'OM74M7'b
                                                                                                                                                          ~~
- /9JY
                                                                                                                                                                                    ~ ~ ' 9'T T M12769   D-16         REVIEN OF CORPORATE MANAGEMENT CAPABILITY                                           /81C -                -
(,Ict[fr M58045 C-16 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERN stum genentou M07861 D-02 ECCS ZIRC CLAD MODEL ERROR-COMPLIANCE HITH 10 CFR-01/09/80C - - - e o m pcc-rso
                                                                                                                                                      - c.o mpc crs h       - - - f f gf M43002   D-17         DEFINITION OF OPERABLE                                                                   S ~ ~ -~ ~~ i c o:Pc6TEC                             -
-/9/o M07830 D-03 PRESSURIZER HEATUP RATE ERROR G3/27/79C - - - E c " #c e 7#r)
                                                                                                                                                                                          -f9po M55838   D-19         DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15)                                                                     ~ ~ 0" ##M - - / FN M10386   E-05         H N-1 LOOP OPERATION                                                         07/2 /84C -              -- -
--t17?
PacJcc rsb - -- / 4 37 M44002   F-01         I.A.1.1                   SHIFT TECHNICAL ADVISOR                             01/49/82C       - - -
M08597 D-10 ASYMMETRIC LOCA LOADS 03/31/86 -
c ompcevr o         -        ..fppf               .
-- /1 4 c-M c T c.3
M44070   F-02         I.A.1.3                   SHIFT MANNING                                                     '                -'-        d "#'#7#0       - -            ,ff3 M44141   F-03         I.A.2.1                   UPGRADING OF RO AND SRO TRAINING                   11/15/82C         -        - _
._<f
d e m ece 7Cd         ---
/
                                                                                                                                                                                              # 9p a.
2.S'
M44212   F-04         I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC                           Og .       -
/g M08974 D-11 FISSION GAS RELEASE 02/3r/80C
                                                                                                                                                      , _ g pcg7,o                   _
- -- - d c m P< ev,o
M44282   F-05         I.C.1.2/3.B PROCEDURES GENERATION PACKAGES (NUREG                             10/01/86 - -
_ -,ygo M12263 D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL d_!
M47195    F-06
~~
__ c , m#ce 74rb       - --
~ ~ ' 9'T T M12769 D-16 REVIEN OF CORPORATE MANAGEMENT CAPABILITY
6/pg I.C.5                   FEEDBACK OF OPERATING EXPERIENCE                     11/18/81C - - - - co m /cu Tr o                         . _ _ _
/81C -
f9g F-07                                                                                       'dJ M47267                  I.C.6                   CORRECT PERFORMANCE OF OPERATING ACTIVITI           L _LlLLC - - - - dom #ce746 _ __ fpp4 M51141   F-08         I . D.1.1 DETAILED CONTROL ROOM DESIGN REVIEH PROGRA                                   84C -             ~ -
- c.o mpc crs h
dem/ceT#o - --                     < , [pg M51221   F-09         I.D.2                   SAFETY PARAMETER DISPLAY SYSTEM                     10/30/86
- - - f f gf M43002 D-17 DEFINITION OF OPERABLE S ~ ~ -~ ~~ i c o:Pc6TEC
                                                                                                                                  - - __ pg,,jge,rsb                       ---              , o/ ff,
-f9po M55838 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15)
          'M44353     F-10         II.B.1                   RCS HIGH POINT VENTS                                 09/08/83C -               - -- d enspce rc6 M47919   F-11         II.B.2                   PLANT SHIELDING                                     11/08/82C g/N d em/ce rro . . _ fpgg M44421   F-12         II.B.3                 POST ACCIDENT SAMPLING                               09/07/84C           _ __            ,      g (,q       _,,            ,
~ ~ 0" ##M - - / FN M10386 E-05 H N-1 LOOP OPERATION 07/2 /84C -
M44491   F-13         II.B.4                 TRAINING FOR MITIGATING CORE DAMAGE                   11/15j82C         - -- - d o mpuen                       -,,m
PacJcc rsb - -- / 4 37 M44002 F-01 I.A.1.1 SHIFT TECHNICAL ADVISOR 01/49/82C c ompcevr o
..fppf M44070 F-02 I.A.1.3 SHIFT MANNING d
"#'#7#0
,ff3 M44141 F-03 I.A.2.1 UPGRADING OF RO AND SRO TRAINING 11/15/82C d e m ece 7Cd
# 9p a.
M44212 F-04 I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC Og.
, _ g pcg7,o M44282 F-05 I.C.1.2/3.B PROCEDURES GENERATION PACKAGES (NUREG 10/01/86 - -
__ c, m#ce 74rb 6/pg M47195 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 11/18/81C - - - -
co m /cu Tr o
'dJ f9g L _LlLLC - - - - dom #ce746 _ __ fpp4 M47267 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVITI M51141 F-08 I. D.1.1 DETAILED CONTROL ROOM DESIGN REVIEH PROGRA 84C -
~ -
dem/ceT#o - --
<, [pg M51221 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM 10/30/86
- - __ pg,,jge,rsb
, o/ ff,
'M44353 F-10 II.B.1 RCS HIGH POINT VENTS 09/08/83C -
- -- d enspce rc6 g/N M47919 F-11 II.B.2 PLANT SHIELDING 11/08/82C d em/ce rro.. _ fpgg M44421 F-12 II.B.3 POST ACCIDENT SAMPLING 09/07/84C g (,q M44491 F-13 II.B.4 TRAINING FOR MITIGATING CORE DAMAGE 11/15j82C
- -- - d o mpuen
-,,m


R-1208731-001                   REGULAT0RY             INF0RMATION           TRACKINO                         SYSTEM                                 PkGENO.       22 FACILITY         IHPLEMENTATION                                                                             03/31/80 BEAVER VALLEY 1             (CONTINUATION)
R-1208731-001 REGULAT0RY INF0RMATION TRACKINO SYSTEM PkGENO.
TAC NO.                                                                 LIC ACT                                        LICENSEE MPA 9                   TITLE                                 COMPLETE                                 STATUS             DATE M44562     F-14 II.D.1     RV AND SV TRAINING                         03/31/86       -
22 FACILITY IHPLEMENTATION 03/31/80 BEAVER VALLEY 1 (CONTINUATION)
                                                                                                            - fe e J uc Tec ro f/pg M44632     F-15 II .E.1.1 AFH SYSTEM EVALUATION                         02/02/82C         -
LIC ACT LICENSEE TAC NO.
                                                                                                            - (c M PCar Tr b             -
MPA 9 TITLE COMPLETE STATUS DATE M44562 F-14 II.D.1 RV AND SV TRAINING 03/31/86
efjA M44674     F-16 II.E.1.2.1 AFM SYSTEM INITIATION                         07/Sk82C -                 - G o n1 #c e re s         --
- fe e J uc Tec ro /pg f
                                                                                                                                              <9p3 M44711     F-17 II.E.1.2.2 AFH SYSTEM FLOW INDICATION                   07/S$/82C -               .
M44632 F-15 II.E.1.1 AFH SYSTEM EVALUATION 02/02/82C
gompCW7#b         - --        ifp3 M44759     F-18 II.E.4.1       DEDICATED HYDROGEN PENETRATION         - - -    ~ ^ ^ '
- (c M PCar Tr b efjA M44674 F-16 II.E.1.2.1 AFM SYSTEM INITIATION 07/Sk82C -
M44830    F-19 Gild hii.ag , but ela se,q} - e cmpc.a r.:<3 - - ? 9)o II.E.4.2       CONTAINMENT ISOLATION DEPENDABILITY       07/19/82C -           __
- G o n1 #c e re s
c c ,vt Fce rrb . -,pyg M44901     F-20 II.F.1.1       NOBLE GAS MONITOR                         11/b81C , DLC lef f e,-                 - dom pcerse . - f fyg M44972     F-21 II.F.1.2       IODINE / PARTICULATE SAMPLING             11/09/81C , M C I e He,- - ~ d o m P( r7E 6 - / 9 M M45043     F-22 II.F.1.3       CONTAINMENT HIGH RANGE MONITOR           12/24/81C           - - - - ocmpce7eo - . .. f 9 g M47580     F-23 II.F.1.4       CONTAINMENT PRESSURE INSTRUMENT         05/17/83C -                     - - c o m #ce7so -                   .f9p3 M47651     F-24 II.F.1.5       CONTAINMENT HATER LEVEL INSTRUMENT       05/17/83C       -          -
<9p3 M44711 F-17 II.E.1.2.2 AFH SYSTEM FLOW INDICATION 07/S$/82C -
                                                                                                                - 0.c m pcarr.rb - - - / 913                           .
gompCW7#b ifp3 M44759 F-18 II.E.4.1 DEDICATED HYDROGEN PENETRATION
l M47722     F-25 II . F.1. 6   CONTAINMENT HYDROGEN MONITOR             05/17/83C - - - - d Cm ett'T# o                             -- - f9/3 M45114     F-26 II.F.2         INSTRUgENg,F0,R ETECTION ON INADEQUATE   07/31/86 -               - - ~ ggcj ec_ys,)               ,    ,_ fppp M46878     F-30 II.K.2.13     THERMAL-MECHANICAL REPORT               06/15/S4C - - - - d * *'#cc 7J~d                         - -          6 /yy M47792     F-33 II.K.2.17     POTENTIAL FOR VOIDING IN RCS             12/19/83C - -                -
~ ^ ^ '
d om9certh         - -              , pf 3 M45229     F-36 II.K.3.1       AUTO PORV ISOLATION                     09/14/83C - --                     0 MSf#cerco             -
Gild hii.ag, but ela se,q} - e cmpc.a r.:<3 - - ? 9)o M44830 F-19 II.E.4.2 CONTAINMENT ISOLATION DEPENDABILITY 07/19/82C -
fg M45275     F-37 II.K.3.2       REPORT ON PORV FAILURES                 09/14/83C - -- - d c .vs pcerst                                     .
c c,vt Fce rrb. -,pyg M44901 F-20 II.F.1.1 NOBLE GAS MONITOR 11/b81C, DLC lef f e,-
                                                                                                                                                    ,9f3 M45323     F-38 II.K.3.3       REPORTING SV AND RV FAILURES AND CHALLE 03/04/82C -               -- dom pte r.r.6                 --
- dom pcerse. - f fyg M44972 F-21 II.F.1.2 IODINE / PARTICULATE SAMPLING 11/09/81C, M C I e He,- - ~ d o m P( r7E 6 - / 9 M M45043 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 12/24/81C
ef/3 M45392     F-39 II.K.3.5       AUTO TRIP OF RCPS
- - - - ocmpce7eo -... f 9 g M47580 F-23 II.F.1.4 CONTAINMENT PRESSURE INSTRUMENT 05/17/83C -
  'M45441      F-40                PID CONTROLLER
- - c o m #ce7so -
                                                                                  }/-                                                             ,,j II.K.3.9                                               11/18/81C - _ _ _                 g         g   , , _
.f9p3 M47651 F-24 II.F.1.5 CONTAINMENT HATER LEVEL INSTRUMENT 05/17/83C
M45471     F-41 II.K.3.10     ANTICIPATORY TRIP MODIFICATIONS           01/26/83C           --            e o ,v,pce -rso -            -
- 0.c m pcarr.rb - - - / 913 l
f pn M45501     F-42 II.K.3.12     ANTICIPATORY TRIP DN TURBINE TRIP         04/06/83C           -        -
M47722 F-25 II. F.1. 6 CONTAINMENT HYDROGEN MONITOR 05/17/83C - - - - d Cm ett'T# o
dcwpcevXo - - - t'f/3 M45609     F-47 II.K.3.17     ECCS OUTA0ES                             08/04/,83C                         eo,
-- - f9/3 M45114 F-26 II.F.2 INSTRUgENg,F0,R ETECTION ON INADEQUATE 07/31/86 -
_ _,                    g 7% _             _, fpp3
- - ~ ggcj ec_ys,)
,_ fppp M46878 F-30 II.K.2.13 THERMAL-MECHANICAL REPORT 06/15/S4C - - - - d * *'#cc 7J~d 6 /yy M47792 F-33 II.K.2.17 POTENTIAL FOR VOIDING IN RCS 12/19/83C - -
d om9certh
, pf 3 M45229 F-36 II.K.3.1 AUTO PORV ISOLATION 09/14/83C - --
0 MSf#cerco fg M45275 F-37 II.K.3.2 REPORT ON PORV FAILURES 09/14/83C - -- - d c.vs pcerst
,9f3 M45323 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 03/04/82C -
-- dom pte r.r.6 ef/3 M45392 F-39 II.K.3.5 AUTO TRIP OF RCPS
}/-
,,j
'M45441 F-40 II.K.3.9 PID CONTROLLER 11/18/81C - _ _ _
g g
M45471 F-41 II.K.3.10 ANTICIPATORY TRIP MODIFICATIONS 01/26/83C e o,v,pce -rso -
f pn M45501 F-42 II.K.3.12 ANTICIPATORY TRIP DN TURBINE TRIP 04/06/83C dcwpcevXo - - - t'f/3 M45609 F-47 II.K.3.17 ECCS OUTA0ES 08/04/,83C eo, g 7% _
_, fpp3


D       ."
D 9
9 R-1208731-001                   REGULAT0RY           INF0RHATION           TRACKINO               SYSTEM                           PAGE NO.       26 FACILITY         IMPLEMENTATION                                                             03/31/86 BEAVER VALLEY 1           (CONTINUATION)
R-1208731-001 REGULAT0RY INF0RHATION TRACKINO SYSTEM PAGE NO.
TAC NO.
26 FACILITY IMPLEMENTATION 03/31/86 BEAVER VALLEY 1 (CONTINUATION)
LIC ACT                              LICENSEE MPA 8                   TITLE                               COMPLETE                       STATUS             DATE M48414   F-53 II.K.3.25     POWER ON PUMP SEALS                     06/24/82C - -- danSWE Teh - - / ?#J M45805   F-57 II.K.3.30     SB LOCA METHODS                         05/28/85C - -- E'##"                     -' @Y M48146   F-58 II.K.3.31     COMPLIANCE NITH 10 CFR 50.46           01/31/87 - - - Fro 3 ec v eo             - ~ ~~ ' ' M M45925   F-63 III.A.1.2     TECHNICAL SUPPORT CENTER               12/30/86   - - - - dcw' M 7#b - --/ W M45996   F-64 III.A.1.2     OPERATIONAL SUPPORT CENTER             12/30/86 - -       ~
LIC ACT LICENSEE TAC NO.
ocwfM 7#0        - -
MPA 8 TITLE COMPLETE STATUS DATE M48414 F-53 II.K.3.25 POWER ON PUMP SEALS 06/24/82C - -- danSWE Teh - - / ?#J M45805 F-57 II.K.3.30 SB LOCA METHODS 05/28/85C - --
                                                                                                                              '[%'
E'##"
M46068   F-65 III.A.I.2     EMERGENCY OPERATIONS FACILITY           12/30/86 - - - - dem A c''TE.b             --- ,[pf M46140   F-66 III.A.1.2     NUCLEAR DATA LINK                       "?     :^^       j                                     --
-' @Y M48146 F-58 II.K.3.31 COMPLIANCE NITH 10 CFR 50.46 01/31/87 - - - Fro 3 ec v eo
M46213   F-67 III.A.2.1     EMERGENCY PLAN UPGRADE TO MEET RULE     05/11/83C     -
- ~ ~~ ' ' M
                                                                                          - - ocw2Pcc7sb - -                 / j'p3 M46284   F-68 M46355    F-69 III.A.2.2 III.D.3.3 METEOROLOGICAL DATA UPGRADE IMPLANT RADIATION MONITORING 12/30/86 - - -
- - - - dcw' M 7#b - --/ W M45925 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER 12/30/86 ocwfM 7#0
02/19/82C - __
'[%'
c_ , m ec c.-Tss
M45996 F-64 III.A.1.2 OPERATIONAL SUPPORT CENTER 12/30/86 - -
                                                                                                                        - - - rh c Ompce7E6         - --rp@
~
M46426   F-70 III.D.3.4   CONTROL ROOM HABITABILITY               02/09/82C - -               den,9< na 6
M46068 F-65 III.A.I.2 EMERGENCY OPERATIONS FACILITY 12/30/86 - - - - dem A c''TE.b
                                                                                                                          - -- / 9 / A             .
---,[pf M46140 F-66 III.A.1.2 NUCLEAR DATA LINK
M56102   F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FDLLONUP TO     03/31/86   __ _ _
"?
_ gg,jgc TE 6 - - - /PPP M49695   G-01 REACTOR COOLANT PUMP TRIP (D660 - II.K.3.5)           03/31/86   _ _ __      _                              ,
:^^
e e}}
j M46213 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 05/11/83C
- - ocw2Pcc7sb - -
/ j'p3 M46284 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE 12/30/86 - - -
c_, m ec c.-Tss - - - rh M46355 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 02/19/82C - __
c Ompce7E6
- --rp@
M46426 F-70 III.D.3.4 CONTROL ROOM HABITABILITY 02/09/82C - -
den,9< na 6
- -- / 9 / A M56102 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FDLLONUP TO 03/31/86
_ gg,jgc TE 6 - - - /PPP M49695 G-01 REACTOR COOLANT PUMP TRIP (D660 - II.K.3.5) 03/31/86 e
e}}

Latest revision as of 19:12, 7 December 2024

Forwards Implementation Dates for Generic Requirements Per NRC 860430 Request
ML20205B913
Person / Time
Site: Beaver Valley
Issue date: 07/29/1986
From: Sieber J
DUQUESNE LIGHT CO.
To: Tam P
Office of Nuclear Reactor Regulation
References
TASK-***, TASK-TM NUDOCS 8608120206
Download: ML20205B913 (9)


Text

-

O

'Af Telephone (412) 393-6000 E"o*'7,', 4 July 29, 1986 Shippingport, PA 15077-0004 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attn: Mr. Peter S. Tam, Project Manager Project Directorate No. 2 Division of PWR Licensing - A Washington, DC 20555

- Mail Stop 340 -

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Implementation Dates of Generic Requirements Gentlemen:

Attached are marked-up pages from your letter dated April 30, 1986 requesting information regarding the implementation dates of the listed generic issues.

Many of these issues did not have an actual implementation date since there were no hardware or licensing document changes.

For these issues the completion date was assumed as the date the NRC closed out the licensing issue as indicated in the column "Lic Act Complete".

All items have been addressed and this letter supercedes our previous submittal of June 2,1986 which provided a partially completed list which was provided as a status report.

If you have any questions regarding this information, please contact members of our Licensing staff.

Very truly yours, Qd

. D.

ieber Senior Manager Beaver Valley No. I l

%[k 00 P

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 i

Implementation Dates of Generic Requirements cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Branch Washington, DC 20555 Director, Safety Evaluation & Control Virginia Electric & Power Company P. O. Box 26666 i

One James River Plaza Richmond, VA 23261 I

i a


.m.

3 y

R-1208751-001 REGULAT0RY INF0RMATION TRACKING S Y S 1 t: M PAGE NO.*

20 FACILITY IMPLEMENTATION 03/31/86 FACILITY: BEAVER VALLEY 1 PLANT LOCATION: 5 MI E OF E. LIVERPOOL, OH LICENSED P0HER: 2652 MHT-PROJECT MANAGER: P. TAM DOCKET NUMBER: 050-00334 DESIGN POWER:

0335 MHE BRANCH CHIEF:

L. RUBENSTEIN ARCH / ENGINEER: S&H NSSS VENDORt HEST LIC. ASSISTANT *

. VACANT IE INSPECTOR:

H. TROSKOSKI k'

LIC ACT LICENSEE TAC NO.

MPA 8 TITLE COMPLETE STATUS R&l5 M07121 A-01 10 CFR 50.55 ACG) - ISI 12/04/79C --

tie mposT(c - - - -

/f 77 03/h/83C M08132 A-02 APPENDIX I - ALARA d o m#L Ls r a,3 eM M06987 A-03 SECURITY REVIENS-MODIFIED AMENDMENT PLANS 02/k/79C -- C # '"# 7 # D

~~~

0 # '"#

~ ' ~ ## 7 7 M11153 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE M10474 A-10 CONTINGENCY PLANNING 09/12/80C -- < #-*#' d' 7# * -

~~~#'

M10476 A-11 GUARD TRAINING PLANS 02/11/81C C * * # " '#

- ' ~

M10475 A-12 VITAL AREA ANALYSIS 03/27/81C 6 0 *"#"' '#"

M06363 A-14 10CFR 50.55 A(G) - INSERVICE TESTING 06/29/82C 6.c m #'* M #

  1. T '#

'~~

M46811 A-16 QUALIFICATIONS OF EXAMINATION, INSPECTION, TESTING 08/12/82C C c mP'uT#D

- - - #9##

M51071 A-17 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDEN 12/30/86.. -

/#4 s 76 c 746 - - - /9 #9 M55010 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 11/27/84C dcmpcc-7Ed If IV 12/31/86[...

ge o.,,te.rs o

,, ff 1

M59070 A-20 to CFR 50.62 OPERATING REACTOR REVIENS M59941 A-21 10 CFR 50.61, PRESSURIZED THERMAL SHOCK RULE 06/30/86

- reo.> < c,-rs o

- so / jg,

-'IL.Ld75 C LC t

N06405 B-02 FIRE PROTECTION efterj--0cmF'eT#O -- - - # 7 'T 'l M08372 B-03 PHR MODERATOR DILUTION 02/21/79C e o,,, v<,.e Ts,a

_ i01f M06714 B-04 REACTOR VESSEL OVERPRESSURE PROTECTION

/83C c_ o m pc<,, y,rg,_ _

g/pg

'M07313 B-07 STEAM GENERATOR FEEDHATER FLOW INSTABILITY 02/12/79C - - - do,nacu7so __ _

,9.f 9 M10837 B-15 FUEL ROD B0H 11/03/79C g, o,,tpcu M o - - - f 97 7 M08670 B-14 CEA GUIDE TUBE HEAR 07/22/80C g o,,,p t_ce ve 3 _ _ _ j g pa M12162 B-16 EMERGENCY PLANNING AND REVISIONS T4 M 1s 3)

W hndes skq}e k hlkl leffer, M $e n~

Sisist O O ce dobe,

$ daf e, is 110 b Silajn{

"c *,

s M neans u t. o,i.' s

.s h y m a e,.

vgc_ mies, 4

4 R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEM PAGE NO.

21 FACILITY IMPLEMENTATION 03/31/86 BEAVER VALLEY l (CONTINUATION)

)it LIC ACT LICENSEE TAC NO.

MPA 8 TITLE COMPLETE STATUS DATE M10477 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS 03/30/82C - - - c c m p<_ u vsc,

- - < f j g M10260 B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION

- Zg -

pypz e74 g _

j9E2.

M10323 B-21 LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANNUNCIA

^ -

.T4 Z t'is o, ; b.4.s.1c.( j M10478 B-22 C H SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL 03/30/82C -

- _ C o mpc ere

. - /9/ L M10007 B-23 DEGRADED GRID VOLTAGE 03/03/81C C o m #c ("# 6 - - /97/

M42553 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL POW

/,e s i c l

-- - C O

  • Av 7'# o - ~ / 9/ 2.

M10473 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H titr21MHG O#NW4 - - --- /9pA M12991 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H ccmgurrea _ _

f pg M10222 B-26 INADVERTANT SAFETY INJECTION DURING C00LD0HN 12/28/79C

- t o mpw. rso _ __j97y M07240 B-31 LONG SHAFT LHSI & OUTSIDE RECIRC. PUMP DEGRADATION g; } --

p

_,, 9.g M49417 B-32 BLOCKED SI SIGNAL DURING C00LD0HN gg?g'g g 7g,,,,,

M08653 B-39 PHR PRESSURE - TEMPERATURE LIMIT TECH SPECS

"=

Z Wii=TMe { }

M11111 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 03/14/83C _ _

e c inpce r#c

- - /9'7 7 M11685 B-42 TMI FOLLOH UP - ALL PLANTS gjjg gg,rs o

- / M A M11901 B-42 TMI FOLLOH UP - ALL PLANTS ( 5 { u f u f; n )

07/17/79C

- Q_ o m pc e 7#b - -- e9 79 M11766 B-43 PHR FEEDHATER LINE CRACKS 02/25/80C - -- t o m # Car r,r4

- - e97f M43129 B-43 PHR FEEDHATER LINE CRACKS

-trase9r006is-(s'f or./jk.DL C le.tter), _ g m p c e 7 f,), __,pfd M30750 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C _- tomeceT4o rffo f

l M30751 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C

'M30752 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30753 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C f

Y M30754 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30755 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 00##

~ ~

R-1208751-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.s 25 FACILITY IMPLEMENTATION 03/31/82 BEAVER VALLEY 1 (CONTINUATION)

LIC ACT LICENSEE TAC H0.

MPA 9 TITLE COMPLETE STATUS

Ralf, M30756 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C - -

- Co a3 9 W T' O --

/9/v M30757 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30758 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30759 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30760 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30761 3-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C y

- - - Con?#CETE6

- / f/C M30762 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M12395 B-44 LESSONS LEARNED IMPLEMENTATION 02/11/81C C o d' 9L L" 74 0 - - - ' M')

CC "'# 7" O -

'99#

M12922 B-45 HASH 1400 EVENT V, " PRIMARY COOLANT SYSTEM PRESSUR 04/20/81C

' #NI 0 0 "'

M12598 B-46 ANALYSIS OF TURBINE DISC CRACKS 08/19/81C M12673 B-47 ECCS; CLAD SHELLING AND RUPTURE 09/12/80C -

tesu N W 6 - - e fh

d. c m pcteva 6

- - af/.A M13110 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 06/21/82C - --

M11865 B-52 REVIEN OF SAFETY ASPECT OF INADVERTENT SAFETY ACTI 02/05/81C - - - 0 0 *' # ' '# 0 --- ' f f' M42092 B-57 DHR CAPABILITY 05/15/81C - --

t c m et e reb - - - /ff/

M42858 B-59 MASONRY 84ALL DESIGN 07/12/82C tcmFC67#6

/f/A M42459 B-60 ENVIRONMENTAL QUALIFICATION 03/ 07/85C - - - e i n.p ce Tag f fpr M42652 B-61 LOSS OF NON CLASS IE ISC PONER (IES 79-27)

+--53f)TC d c meurwa - -

r-^^

e f FI et (

M42722 B-62 ESF RESET CONTROL DESIGN DEFICIENCY g ;;

_ g o, p C 6 7(6 - - ' 9 PJ M43911 B-63 INTERIM PROCEDURES FOR SHORT TERM BLACKOUT 09/01/81C - __

c. o m pu va t9PA

/go /(C Tr.-4

- - /9p? [6EE F-uS)

M47146 B-66 NATURAL CIRCULATION C00LD0HN 08/02/83C -

M46826 B-69 IEB 80-4 MAINSTEAM LINE BREAK HITH CONTINUED FEEDH 08/04/82C

__ _ d o ntece7%

^ '9Q M46598 B-70 FATIGUE TRANSIENT LIMIT TS

)

M49724 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 10/21/83C _ _ __

(o mpce ya - - / 5 / g j

R-1208751-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.

2B FACILITY IMPLEMENTATION 03/31/86 BEAVER VALLEY 1 (CONTINUATION)

LIC ACT LICENSEE TAC NO.

MPA 9 TITLE COMPLETE STATUS DATE 3

M52737 B-76 ITEM 1.1 - POST TRIP REVIENs PROGRAM DESCRIPTION &

4s/20/85C -- -

60"#W-T'du--'/f4/

M52818 B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION & VENDOR INTER 10/31/86 d c W #'F WB

- - e 9 /3 M52899 B-78 ITEMS 3.1.1 & 3.1.2 -POST MAINTENANCE TEST PROCEDU 11/21/85C O_ o m F < *" T h -- 'F/Py.

M52980 B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO 10/31/85C eemPCe746

- - ' 98 5; M53061 B-80 ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY - VENDO 11/21/85C -- a d '*1 P ' c 7 # o

- -- # 9#3 M53114 B-81 ITEMS 4.2.1 & 4.2.2 -PREVENTATIVE MAINT PROG FOR R 10/h85C --- ( m p w rca s/jy MS3166 B-82 ITEM 4.5 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTAC

^

PRodd'cTKb f/g M54516 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-04/30/86 - - -

/R o J te -r E3

_ _ _,,/ pg M53569 B-85 SALEM ATHS 1.2 DATA CAPABILITY 04/30/86 - --

ac m PL r7C6

- - /9p3 M53652 B-86 SALEM ATHS 2.2 S-R COMPONENTS 09/30/86 - --

a c mpce 7c6 -

3/ B5 M53735 B-87 SALEM ATHS 3.2.1 & 3.2.2 S-R COMPONENTS 11/21/85C -~

d o ntpct"rvA, _

5/j, M53818 B-88 SALEM ATHS 3.2.3 T.S. S-R COMPONENTS 10/31/85C - -- g e oi pcg7s o

, 9 p3 M53901 B-89 SALEM ATHS 4.2.3 & 4.2.4 LIFE COMPONENTS 12/31/86

_ p40J M #b -

- g/g M55348 B-90 SALEM ATHS 4.3 H AND B&H T.S.

06/30/86

-- /403I6Tro

- - - 9g M54045 B-92 SALEM ATHS 4.5.1 DIVERSE TRIP FFATURES 11/21/85C - -- c o n,pce 7q fpjg M53962 B-95 SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERNATIVES 01/31/87 p fe,jge 7 f,3

,2 7'y 7 M12188 C-01 PHR SECONDARY HATER CHEMISTRY MONITORING REQUIREME 01 80C

- - - d ont pce r,r3

,pfg M08596 C-03 QUALIFICATIONS OF RADIATION PROTECTION MANAGER 03/27/79C WW - - d e m pce rsg

_ _,,p77 R..I.d.lb C - -- den 1PceTr3

.fpjo N08594 C-06 PUMP SUPPORT-LAMELLAR TEARING MC

  • M08593 C-07 FUEL HANDLING ACCIDENT INSIDE CONTAINMENT 12/12/79C - --

d o ns pceno

_,fv79 M07972 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 12/20/84C (cim pcv7a g _.,,g'f g M43646 C-14 AUXILIARY FEEDilATER SEISMIC QUALIFICATION 01/11/82C - -

ccmpcevcc

,, f pg MS2208 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPA 06/28/,85C

. - - dompC<'rsc

_,,4[,g u Ah WRC f)les. Ak l clu.r wiuf +hls clafe re{ers fo, 1

R-1208751-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.

2C FACILITY IMPLEMENTATION 03/31/82 BEAVER VALLEY 1 (CONTINUATION)

LIC ACT LICENSEE TAC NO.

MPA W TITLE COMPLETE STATUS DATE

( _.., #c DLC le tieg. ~ 'OM74M7'b

- /9JY

(,Ict[fr M58045 C-16 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERN stum genentou M07861 D-02 ECCS ZIRC CLAD MODEL ERROR-COMPLIANCE HITH 10 CFR-01/09/80C - - - e o m pcc-rso

-/9/o M07830 D-03 PRESSURIZER HEATUP RATE ERROR G3/27/79C - - - E c " #c e 7#r)

--t17?

M08597 D-10 ASYMMETRIC LOCA LOADS 03/31/86 -

-- /1 4 c-M c T c.3

._<f

/

2.S'

/g M08974 D-11 FISSION GAS RELEASE 02/3r/80C

- -- - d c m P< ev,o

_ -,ygo M12263 D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL d_!

~~

~ ~ ' 9'T T M12769 D-16 REVIEN OF CORPORATE MANAGEMENT CAPABILITY

/81C -

- c.o mpc crs h

- - - f f gf M43002 D-17 DEFINITION OF OPERABLE S ~ ~ -~ ~~ i c o:Pc6TEC

-f9po M55838 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15)

~ ~ 0" ##M - - / FN M10386 E-05 H N-1 LOOP OPERATION 07/2 /84C -

PacJcc rsb - -- / 4 37 M44002 F-01 I.A.1.1 SHIFT TECHNICAL ADVISOR 01/49/82C c ompcevr o

..fppf M44070 F-02 I.A.1.3 SHIFT MANNING d

"#'#7#0

,ff3 M44141 F-03 I.A.2.1 UPGRADING OF RO AND SRO TRAINING 11/15/82C d e m ece 7Cd

  1. 9p a.

M44212 F-04 I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC Og.

, _ g pcg7,o M44282 F-05 I.C.1.2/3.B PROCEDURES GENERATION PACKAGES (NUREG 10/01/86 - -

__ c, m#ce 74rb 6/pg M47195 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 11/18/81C - - - -

co m /cu Tr o

'dJ f9g L _LlLLC - - - - dom #ce746 _ __ fpp4 M47267 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVITI M51141 F-08 I. D.1.1 DETAILED CONTROL ROOM DESIGN REVIEH PROGRA 84C -

~ -

dem/ceT#o - --

<, [pg M51221 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM 10/30/86

- - __ pg,,jge,rsb

, o/ ff,

'M44353 F-10 II.B.1 RCS HIGH POINT VENTS 09/08/83C -

- -- d enspce rc6 g/N M47919 F-11 II.B.2 PLANT SHIELDING 11/08/82C d em/ce rro.. _ fpgg M44421 F-12 II.B.3 POST ACCIDENT SAMPLING 09/07/84C g (,q M44491 F-13 II.B.4 TRAINING FOR MITIGATING CORE DAMAGE 11/15j82C

- -- - d o mpuen

-,,m

R-1208731-001 REGULAT0RY INF0RMATION TRACKINO SYSTEM PkGENO.

22 FACILITY IHPLEMENTATION 03/31/80 BEAVER VALLEY 1 (CONTINUATION)

LIC ACT LICENSEE TAC NO.

MPA 9 TITLE COMPLETE STATUS DATE M44562 F-14 II.D.1 RV AND SV TRAINING 03/31/86

- fe e J uc Tec ro /pg f

M44632 F-15 II.E.1.1 AFH SYSTEM EVALUATION 02/02/82C

- (c M PCar Tr b efjA M44674 F-16 II.E.1.2.1 AFM SYSTEM INITIATION 07/Sk82C -

- G o n1 #c e re s

<9p3 M44711 F-17 II.E.1.2.2 AFH SYSTEM FLOW INDICATION 07/S$/82C -

gompCW7#b ifp3 M44759 F-18 II.E.4.1 DEDICATED HYDROGEN PENETRATION

~ ^ ^ '

Gild hii.ag, but ela se,q} - e cmpc.a r.:<3 - - ? 9)o M44830 F-19 II.E.4.2 CONTAINMENT ISOLATION DEPENDABILITY 07/19/82C -

c c,vt Fce rrb. -,pyg M44901 F-20 II.F.1.1 NOBLE GAS MONITOR 11/b81C, DLC lef f e,-

- dom pcerse. - f fyg M44972 F-21 II.F.1.2 IODINE / PARTICULATE SAMPLING 11/09/81C, M C I e He,- - ~ d o m P( r7E 6 - / 9 M M45043 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 12/24/81C

- - - - ocmpce7eo -... f 9 g M47580 F-23 II.F.1.4 CONTAINMENT PRESSURE INSTRUMENT 05/17/83C -

- - c o m #ce7so -

.f9p3 M47651 F-24 II.F.1.5 CONTAINMENT HATER LEVEL INSTRUMENT 05/17/83C

- 0.c m pcarr.rb - - - / 913 l

M47722 F-25 II. F.1. 6 CONTAINMENT HYDROGEN MONITOR 05/17/83C - - - - d Cm ett'T# o

-- - f9/3 M45114 F-26 II.F.2 INSTRUgENg,F0,R ETECTION ON INADEQUATE 07/31/86 -

- - ~ ggcj ec_ys,)

,_ fppp M46878 F-30 II.K.2.13 THERMAL-MECHANICAL REPORT 06/15/S4C - - - - d * *'#cc 7J~d 6 /yy M47792 F-33 II.K.2.17 POTENTIAL FOR VOIDING IN RCS 12/19/83C - -

d om9certh

, pf 3 M45229 F-36 II.K.3.1 AUTO PORV ISOLATION 09/14/83C - --

0 MSf#cerco fg M45275 F-37 II.K.3.2 REPORT ON PORV FAILURES 09/14/83C - -- - d c.vs pcerst

,9f3 M45323 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 03/04/82C -

-- dom pte r.r.6 ef/3 M45392 F-39 II.K.3.5 AUTO TRIP OF RCPS

}/-

,,j

'M45441 F-40 II.K.3.9 PID CONTROLLER 11/18/81C - _ _ _

g g

M45471 F-41 II.K.3.10 ANTICIPATORY TRIP MODIFICATIONS 01/26/83C e o,v,pce -rso -

f pn M45501 F-42 II.K.3.12 ANTICIPATORY TRIP DN TURBINE TRIP 04/06/83C dcwpcevXo - - - t'f/3 M45609 F-47 II.K.3.17 ECCS OUTA0ES 08/04/,83C eo, g 7% _

_, fpp3

D 9

R-1208731-001 REGULAT0RY INF0RHATION TRACKINO SYSTEM PAGE NO.

26 FACILITY IMPLEMENTATION 03/31/86 BEAVER VALLEY 1 (CONTINUATION)

LIC ACT LICENSEE TAC NO.

MPA 8 TITLE COMPLETE STATUS DATE M48414 F-53 II.K.3.25 POWER ON PUMP SEALS 06/24/82C - -- danSWE Teh - - / ?#J M45805 F-57 II.K.3.30 SB LOCA METHODS 05/28/85C - --

E'##"

-' @Y M48146 F-58 II.K.3.31 COMPLIANCE NITH 10 CFR 50.46 01/31/87 - - - Fro 3 ec v eo

- ~ ~~ ' ' M

- - - - dcw' M 7#b - --/ W M45925 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER 12/30/86 ocwfM 7#0

'[%'

M45996 F-64 III.A.1.2 OPERATIONAL SUPPORT CENTER 12/30/86 - -

~

M46068 F-65 III.A.I.2 EMERGENCY OPERATIONS FACILITY 12/30/86 - - - - dem A cTE.b

---,[pf M46140 F-66 III.A.1.2 NUCLEAR DATA LINK

"?

^^

j M46213 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 05/11/83C

- - ocw2Pcc7sb - -

/ j'p3 M46284 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE 12/30/86 - - -

c_, m ec c.-Tss - - - rh M46355 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 02/19/82C - __

c Ompce7E6

- --rp@

M46426 F-70 III.D.3.4 CONTROL ROOM HABITABILITY 02/09/82C - -

den,9< na 6

- -- / 9 / A M56102 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FDLLONUP TO 03/31/86

_ gg,jgc TE 6 - - - /PPP M49695 G-01 REACTOR COOLANT PUMP TRIP (D660 - II.K.3.5) 03/31/86 e

e