NOTICE OF VIOLATION s | |||
Technical Specification 6.2.A states, " Detailed written procedures | Commonwealth Edison Company Docket No. 50-373 As a result of the inspection conducted on October 8, 1986 through j | ||
November 17, 1986, General Statement of' Policy and Procedure for NRC Enforceme (1985), the following violation was identified: | |||
Item 7: | Technical Specification 6.2.A states, " Detailed written procedures inc applicable checkoff lists covering items listed below shall be prepared, approved and adhered to....: | ||
Contrary | i Item 7: | ||
above, the following examples of failure to adhere to a. | Surveillance and testing requirements." | ||
On October 17, 1986, the checkoff list for " Unit 1 Residual Heat Test," LIS-RH-312, was not adhered to. Removal (Shutdown Co | Contrary to the above, the following examples of failure to adhere to procedures were identified: | ||
The instrument checkoff sheet in LIS-RH-312 for the Group 6 Division II reactor high pressure isolation instrument (PS-1833-N188) requires the | a. | ||
people did not verify that the instrument stop valve was open.Two | On October 17, 1986, the checkoff list for " Unit 1 Residual Heat Test," LIS-RH-312, was not adhered to. Removal (Shutdown Co The instrument checkoff sheet in LIS-RH-312 for the Group 6 Division II s | ||
reactor high pressure isolation instrument (PS-1833-N188) requires the instrument stop valve to be open and verified by two people. | |||
Surveillance," (LOS-AA-SI) was not adhered | j people did not verify that the instrument stop valve was open.Two b. | ||
check was performed, but the off-nonnal indication of the Group 6 isolation light was not identified or acknowledged. | On October 16, 1986, Surveillance," (LOS-AA-SI) was not adhered to.the operating surveillance i | ||
Step 43 of LOS-AA-S1 for identification of an off-normal indication or condition. | |||
check was performed, but the off-nonnal indication of the Group 6 The lamp isolation light was not identified or acknowledged. | |||
This is a Severity Level IV violation (Supplement I). | This is a Severity Level IV violation (Supplement I). | ||
office within thirty days of the date of this Notice a w explanation in reply, including for each violation: | office within thirty days of the date of this Notice a w explanation in reply, including for each violation: | ||
s further violations; and (3) the date when full complian Consideration may be given to extending your response time for good cause shown. | s further violations; and (3) the date when full complian Consideration may be given to extending your response time for good cause shown. | ||
APR 3 1987 MAY. | |||
Division of Reactor Projects l | A Dated Charles E. Norelius, Director Division of Reactor Projects i | ||
] | l 8704070263 870403 | ||
] | |||
PDR ADOCK 05000373 O | |||
PDR l | |||
-..-}} | |||
Latest revision as of 02:45, 7 December 2024
| ML20205T311 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 04/03/1987 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20205T250 | List: |
| References | |
| 50-373-86-40-01, 50-373-86-40-1, NUDOCS 8704070263 | |
| Download: ML20205T311 (1) | |
Text
-. -
J.
o i
Commonwealth Edison Company Docket No. 50-373 As a result of the inspection conducted on October 8, 1986 through j
November 17, 1986, General Statement of' Policy and Procedure for NRC Enforceme (1985), the following violation was identified:
Technical Specification 6.2.A states, " Detailed written procedures inc applicable checkoff lists covering items listed below shall be prepared, approved and adhered to....:
i Item 7:
Surveillance and testing requirements."
Contrary to the above, the following examples of failure to adhere to procedures were identified:
a.
On October 17, 1986, the checkoff list for " Unit 1 Residual Heat Test," LIS-RH-312, was not adhered to. Removal (Shutdown Co The instrument checkoff sheet in LIS-RH-312 for the Group 6 Division II s
reactor high pressure isolation instrument (PS-1833-N188) requires the instrument stop valve to be open and verified by two people.
j people did not verify that the instrument stop valve was open.Two b.
On October 16, 1986, Surveillance," (LOS-AA-SI) was not adhered to.the operating surveillance i
Step 43 of LOS-AA-S1 for identification of an off-normal indication or condition.
check was performed, but the off-nonnal indication of the Group 6 The lamp isolation light was not identified or acknowledged.
This is a Severity Level IV violation (Supplement I).
office within thirty days of the date of this Notice a w explanation in reply, including for each violation:
s further violations; and (3) the date when full complian Consideration may be given to extending your response time for good cause shown.
APR 3 1987 MAY.
A Dated Charles E. Norelius, Director Division of Reactor Projects i