s NOTICE OF VIOLATION Commonwealth Edison Company Docket No. 50-373 j
o i
;                        As a result November        of the 17, 1986,                inspection conducted on October 8, 1986 through General       Statement of' Policy and Procedure for NRC Enforceme (1985), the following violation was identified:
NOTICE OF VIOLATION s
Technical Specification 6.2.A states, " Detailed written procedures incl applicable approved  andcheckoff adhered to          lists
Commonwealth Edison Company Docket No. 50-373 As a result of the inspection conducted on October 8, 1986 through j
                                                                ....: covering   items listed below shall be prepared, i
November 17, 1986, General Statement of' Policy and Procedure for NRC Enforceme (1985), the following violation was identified:
Item 7:   Surveillance and testing requirements."
Technical Specification 6.2.A states, " Detailed written procedures inc applicable checkoff lists covering items listed below shall be prepared, approved and adhered to....:
Contrary towere procedures      the identified:
i Item 7:
above, the following examples of failure to adhere to a.
Surveillance and testing requirements."
On October 17, 1986, the checkoff list for " Unit 1 Residual Heat Test," LIS-RH-312, was not adhered to. Removal (Shutdown Co s
Contrary to the above, the following examples of failure to adhere to procedures were identified:
The instrument checkoff sheet in LIS-RH-312 for the Group 6 Division II reactor high pressure isolation instrument (PS-1833-N188) requires the j                            instrument stop valve to be open and verified by two people.
a.
people did not verify that the instrument stop valve was open.Two
On October 17, 1986, the checkoff list for " Unit 1 Residual Heat Test," LIS-RH-312, was not adhered to. Removal (Shutdown Co The instrument checkoff sheet in LIS-RH-312 for the Group 6 Division II s
: b.     On October 16, 1986, i
reactor high pressure isolation instrument (PS-1833-N188) requires the instrument stop valve to be open and verified by two people.
Surveillance," (LOS-AA-SI) was not adhered                                 to.the operating surveillance Step 43 of LOS-AA-S1 for identification of an off-normal indication                                       The lamp or condition.
j people did not verify that the instrument stop valve was open.Two b.
check was performed, but the off-nonnal indication of the Group 6 isolation light was not identified or acknowledged.
On October 16, 1986, Surveillance," (LOS-AA-SI) was not adhered to.the operating surveillance i
Step 43 of LOS-AA-S1 for identification of an off-normal indication or condition.
check was performed, but the off-nonnal indication of the Group 6 The lamp isolation light was not identified or acknowledged.
This is a Severity Level IV violation (Supplement I).
This is a Severity Level IV violation (Supplement I).
office within thirty days of the date of this Notice a w explanation in reply, including for each violation:
office within thirty days of the date of this Notice a w explanation in reply, including for each violation:
s further violations; and (3) the date when full complian Consideration may be given to extending your response time for good cause shown.
s further violations; and (3) the date when full complian Consideration may be given to extending your response time for good cause shown.
:                    APR       3 1987 Dated                                                              MAY.                 A Charles E. Norelius, Director i
APR 3 1987 MAY.
Division of Reactor Projects l             8704070263 870403
A Dated Charles E. Norelius, Director Division of Reactor Projects i
]             PDR           ADOCK 05000373 O                         PDR l
l 8704070263 870403
__ . .      . . - -                      - . - - _ - _ .              -  .-. -_                  -.      .    .-_- -        -..-}}
]
PDR ADOCK 05000373 O
PDR l
-..-}}

Latest revision as of 02:45, 7 December 2024

Notice of Violation from Insp on 861008-1117.Violations Noted:Failure to Adhere to Operating Sp LOS-AA-S1, Shift Surveillance, & Checkoff Sheet for LIS-RH-312 Not Verified by Two People
ML20205T311
Person / Time
Site: LaSalle 
Issue date: 04/03/1987
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20205T250 List:
References
50-373-86-40-01, 50-373-86-40-1, NUDOCS 8704070263
Download: ML20205T311 (1)


Text

-. -

J.

o i

NOTICE OF VIOLATION s

Commonwealth Edison Company Docket No. 50-373 As a result of the inspection conducted on October 8, 1986 through j

November 17, 1986, General Statement of' Policy and Procedure for NRC Enforceme (1985), the following violation was identified:

Technical Specification 6.2.A states, " Detailed written procedures inc applicable checkoff lists covering items listed below shall be prepared, approved and adhered to....:

i Item 7:

Surveillance and testing requirements."

Contrary to the above, the following examples of failure to adhere to procedures were identified:

a.

On October 17, 1986, the checkoff list for " Unit 1 Residual Heat Test," LIS-RH-312, was not adhered to. Removal (Shutdown Co The instrument checkoff sheet in LIS-RH-312 for the Group 6 Division II s

reactor high pressure isolation instrument (PS-1833-N188) requires the instrument stop valve to be open and verified by two people.

j people did not verify that the instrument stop valve was open.Two b.

On October 16, 1986, Surveillance," (LOS-AA-SI) was not adhered to.the operating surveillance i

Step 43 of LOS-AA-S1 for identification of an off-normal indication or condition.

check was performed, but the off-nonnal indication of the Group 6 The lamp isolation light was not identified or acknowledged.

This is a Severity Level IV violation (Supplement I).

office within thirty days of the date of this Notice a w explanation in reply, including for each violation:

s further violations; and (3) the date when full complian Consideration may be given to extending your response time for good cause shown.

APR 3 1987 MAY.

A Dated Charles E. Norelius, Director Division of Reactor Projects i