Notice of Violation from Insp on 861008-1117.Violations Noted:Failure to Adhere to Operating Sp LOS-AA-S1, Shift Surveillance, & Checkoff Sheet for LIS-RH-312 Not Verified by Two People
ML20205T311
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 04/03/1987
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20205T250 List:
References
50-373-86-40-01, 50-373-86-40-1, NUDOCS 8704070263
Download: ML20205T311 (1)


Text

-. -

J.

o i

NOTICE OF VIOLATION s

Commonwealth Edison Company Docket No. 50-373 As a result of the inspection conducted on October 8, 1986 through j

November 17, 1986, General Statement of' Policy and Procedure for NRC Enforceme (1985), the following violation was identified:

Technical Specification 6.2.A states, " Detailed written procedures inc applicable checkoff lists covering items listed below shall be prepared, approved and adhered to....:

i Item 7:

Surveillance and testing requirements."

Contrary to the above, the following examples of failure to adhere to procedures were identified:

a.

On October 17, 1986, the checkoff list for " Unit 1 Residual Heat Test," LIS-RH-312, was not adhered to. Removal (Shutdown Co The instrument checkoff sheet in LIS-RH-312 for the Group 6 Division II s

reactor high pressure isolation instrument (PS-1833-N188) requires the instrument stop valve to be open and verified by two people.

j people did not verify that the instrument stop valve was open.Two b.

On October 16, 1986, Surveillance," (LOS-AA-SI) was not adhered to.the operating surveillance i

Step 43 of LOS-AA-S1 for identification of an off-normal indication or condition.

check was performed, but the off-nonnal indication of the Group 6 The lamp isolation light was not identified or acknowledged.

This is a Severity Level IV violation (Supplement I).

office within thirty days of the date of this Notice a w explanation in reply, including for each violation:

s further violations; and (3) the date when full complian Consideration may be given to extending your response time for good cause shown.

APR 3 1987 MAY.

A Dated Charles E. Norelius, Director Division of Reactor Projects i

l 8704070263 870403

]

PDR ADOCK 05000373 O

PDR l

-..-