1 Northern States Power Company
1 Northern States Power Company
(
(
414 Nicollet Mall Minneapoks. Minnesota 55401 Telephone (612) 330-5500 f
414 Nicollet Mall Minneapoks. Minnesota 55401 Telephone (612) 330-5500 f
June 2, 1986 Director Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT DOCKET NOS. 50-282         LICENSE NOS. DPR-42 50-306                   DPR-60 Information Related to Implementation of Generic Requirements - Plant Specific Review The purpose of this letter is to provide information reques-ted by the NRC Staff in s {{letter dated|date=April 30, 1986|text=letter dated April 30, 1986}} from Mr Dominic C DiIanni, Project Manager, Project Directorate
June 2, 1986 Director Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT DOCKET NOS. 50-282 LICENSE NOS. DPR-42 50-306 DPR-60 Information Related to Implementation of Generic Requirements - Plant Specific Review The purpose of this letter is to provide information reques-ted by the NRC Staff in s {{letter dated|date=April 30, 1986|text=letter dated April 30, 1986}} from Mr Dominic C DiIanni, Project Manager, Project Directorate
      # 1, Division of PWR Licensing-A, USNRC.
# 1, Division of PWR Licensing-A, USNRC.
Attached is the plant-specific list for the Prairie Island Nuclear Generating plant with the status of each item noted.
Attached is the plant-specific list for the Prairie Island Nuclear Generating plant with the status of each item noted.
In some cases additional notes have been provided to provide more detailed status information.         In other cases, additio-nal information is needed for us to identify the table entry. We will discuss these items with the NRR Project Manager for Prairie Island, Mr Dominic Dilanni, and attempt to get more detailed information concerning them.
In some cases additional notes have been provided to provide more detailed status information.
In other cases, additio-nal information is needed for us to identify the table entry.
We will discuss these items with the NRR Project Manager for Prairie Island, Mr Dominic Dilanni, and attempt to get more detailed information concerning them.
Please contact us if you have any questions related to the information we have provided.
Please contact us if you have any questions related to the information we have provided.
Dd du s David Musolf Manager Nuclear Support Services c:   NRR Project Manager, NRC Hesident Inspector, NRC Regional Administrator, Region III, NRC G Charnoff sgae12888:8t8tlie2 Q **'
Dd du s David Musolf Manager Nuclear Support Services c:
P J
NRR Project Manager, NRC Hesident Inspector, NRC Regional Administrator, Region III, NRC G Charnoff Q **'
sgae12888:8t8tlie2 P
J


                                                                                                                                        .        -r
-r
                                                                                                                                                    ~.
~.
R-1208731-001                     REGULAT0RY               I !! F 0 R H A T I O N     TRACKING     SYSTEH                       PAGE N3.s .382 FACILITY           IHPLENENTATICH                                                     05/31/84 FACILITY: PRAIRIE ISLAND 1 PLAtlT LOCATI0tle 28 HI SE OF HIllNEAP'0LIS, HINN         LICEllSED POWER: 1650 MHT             PROJECT MANAGER: D. DIIAtlHI             .
R-1208731-001 REGULAT0RY I !! F 0 R H A T I O N TRACKING SYSTEH PAGE N3.s.382 FACILITY IHPLENENTATICH 05/31/84 FACILITY: PRAIRIE ISLAND 1 PLAtlT LOCATI0tle 28 HI SE OF HIllNEAP'0LIS, HINN LICEllSED POWER: 1650 MHT PROJECT MANAGER: D. DIIAtlHI DOCKET flut1BER: 050-00282 DESIGN Poller:
DOCKET flut1BER: 050-00282                               DESIGN Poller:   0530 Mile           BkANCN CHIEF:         G. LEAR ARCN/ EllGIllEER : FPI                                   NSS3 VENDORS     llEST               LIC. ASSISTANTS P. SHUTTLEHORTH IE IllSPECTOR:     C. FEIERABEllD LIC ACT                     LICENSEE TAC No. HPA 8                   TITLE                                         COMPLETE               STATUS       DAIE H06336     A-01   10 CFR 50.55 A(G) - ISI                                     11/14/80C           Note 1       11/80 (Complete)
0530 Mile BkANCN CHIEF:
MO8289     A-01   to CFR 50.55 A(G) - ISI                                     01/01/70C           Note 2       --
G.
H08151     A-02   APPENDIX I - ALARA                                           10/21/82C           Note 1       1/83   (Complete)
LEAR ARCN/ EllGIllEER : FPI NSS3 VENDORS llEST LIC. ASSISTANTS P. SHUTTLEHORTH IE IllSPECTOR:
H06949     A-03   SECURITY REVIEllS-HODIFIED AMENDHENT PLANS                   03/14/79C           --
C. FEIERABEllD LIC ACT LICENSEE TAC No.
3/79   (Complete)
HPA 8 TITLE COMPLETE STATUS DAIE H06336 A-01 10 CFR 50.55 A(G) - ISI 11/14/80C Note 1 11/80 (Complete)
H05250     A-04   APFEllDIX J - CollTAltlHElli LEAK TESTING                   02/23/830           --
MO8289 A-01 to CFR 50.55 A(G) - ISI 01/01/70C Note 2 H08151 A-02 APPENDIX I - ALARA 10/21/82C Note 1 1/83 (Complete)
2/83   (Complete)
H06949 A-03 SECURITY REVIEllS-HODIFIED AMENDHENT PLANS 03/14/79C 3/79 (Complete)
H06853     A-08   ECCS EVALUATI0ll-GEllERIC PER 50.46 COMPLIANCE               12/01/81C           --
H05250 A-04 APFEllDIX J - CollTAltlHElli LEAK TESTING 02/23/830 2/83 (Complete)
12/81   (Complete)
H06853 A-08 ECCS EVALUATI0ll-GEllERIC PER 50.46 COMPLIANCE 12/01/81C 12/81 (Complete)
H11387     A-09   PRESSL'RE VESSEL BELTLIllE MATERIAL SURVEILLANCE             02/27/81C           Note 2       --
H11387 A-09 PRESSL'RE VESSEL BELTLIllE MATERIAL SURVEILLANCE 02/27/81C Note 2 M10398 A-10 CONTINGEllCY PL AtillIllG 02/25/81C Note 1 2/81 (Complete)
M10398     A-10   CONTINGEllCY PL AtillIllG                                   02/25/81C           Note 1       2/81   (Complete)
H10402 A-11 GUARD TRAINING PLAlis 02/25/81C Note 1 2/81 (Complete)
H10402     A-11   GUARD TRAINING PLAlis                                       02/25/81C           Note 1       2/81   (Complete)
H10400 A-12 VITAL AREA AllALYSIS 04/12/82C Note 2 H11429 A-14 10CFR 50.55 A(G) - IllSERVICE TESTING 01/04/83C Note 1 1/83 (Complete)
H10400     A-12   VITAL AREA AllALYSIS                                         04/12/82C           Note 2       --
H47399 A-16 QUALIFICATI0tlS OF EXAMINATION, INSPECTI0tl, TESTING 08/12/82C 12/83 (Complete)
H11429     A-14   10CFR 50.55 A(G) - IllSERVICE TESTING                       01/04/83C           Note 1       1/83   (Complete)
H51122 A-17 IllSTRUMEllTATION TO FOLLOH THE COURSE OF AN ACCIDEN 10/18/85C 6/87 (Proj ected)
H47399     A-16   QUALIFICATI0tlS OF EXAMINATION, INSPECTI0tl, TESTING         08/12/82C           --
H55731 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 06/25/85C Note 1 6/85 (Complete)
12/83 (Complete)
H59130 A-20 10 CFR 50.62 OPERATIllG REAC10R REVIEHS N//S /
H51122     A-17   IllSTRUMEllTATION TO FOLLOH THE COURSE OF AN ACCIDEN         10/18/85C           --
5/87 (Projected)
6/87     (Proj ected)
H59974 A-21 10 CFR 50.61, PRESSURIZED THERHAL SHOCK RULE Note 3 1/86 (Complete)
H55731     A-18   TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43)           06/25/85C           Note 1       6/85     (Complete)
* &587 B-02 FIRE PROTECTIO!I 09/16/79C Note 4 6/85 (Complete)
H59130     A-20   10 CFR 50.62 OPERATIllG REAC10R REVIEHS                     N//S /               --
Mo H08394 B-03 PilR H0DERATOR DILUTIO!!
5/87     (Projected)
11/26/80C Note 2 N06620 B-04 REACTOR VESSEL OVERPRESSURE PROTECTIO.?!
H59974     A-21   10 CFR 50.61, PRESSURIZED THERHAL SHOCK RULE                                     Note 3       1/86   (Complete)
01/01/70C Note 2 H06807 B-04 REACTOR VESSEL OVERPRESSURE PROTECTIO!I 08/03/79C Note 1 8/79 (complete)
*Mo&587       B-02   FIRE PROTECTIO!I                                           09/16/79C             Note 4       6/85     (Complete)
H08394     B-03   PilR H0DERATOR DILUTIO!!                                     11/26/80C           Note 2       --
N06620     B-04   REACTOR VESSEL OVERPRESSURE PROTECTIO.?!                     01/01/70C           Note 2       --
H06807     B-04   REACTOR VESSEL OVERPRESSURE PROTECTIO!I                     08/03/79C             Note 1       8/79     (complete)
NSP PAGE 1 OF 14 L
NSP PAGE 1 OF 14 L


R-1208731-001                     REGULAT0RY           INF0RHATION           TRACKING   SYSTEM                           PAGE NO.s .383 FACILITY         IHPLEMENTATION                                                 03/31/86 PRAIRIE ISLAtID 1           (CollTINUATION)
R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEM PAGE NO.s.383 FACILITY IHPLEMENTATION 03/31/86 PRAIRIE ISLAtID 1 (CollTINUATION)
LIC ACT                   LICENSEE TAC t10. MPA e                     TITLE                                 COMPLETE             STATUS         'EalE N07278     B-07   STEAM GENERATOR FEEDilATER FLOH INSTABILITY             09/13/79C         --
LIC ACT LICENSEE TAC t10.
9/79 (Complete)
MPA e TITLE COMPLETE STATUS
M08752     B-14   CEA GUIDE TUBE IIEAR                                   05/04/81C         --
'EalE N07278 B-07 STEAM GENERATOR FEEDilATER FLOH INSTABILITY 09/13/79C 9/79 (Complete)
5/81       (Complese)
M08752 B-14 CEA GUIDE TUBE IIEAR 05/04/81C 5/81 (Complese)
M12348     B-16   EMERGENCY PLANNING AND REVISIONS                       04/01/81C         Note 2       --
M12348 B-16 EMERGENCY PLANNING AND REVISIONS 04/01/81C Note 2 M08754 B-17 TECH SPEC SURVEILLAtlCE FOR HYDRAULIC SNUBBERS 10/28/81C Note 1 10/81 (Complete)
M08754     B-17   TECH SPEC SURVEILLAtlCE FOR HYDRAULIC SNUBBERS         10/28/81C         Note 1       10/81 (Complete)
M10269 B-20 CollTAIllMENT LEAKAGE DUE 10 SEAL DETERIORATION 08/25/80C Note 2 M10333 B-21 LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANNUNCIA 02/28/82C Note 2 M08756 B-22 TECH SPEC SURVEILLAtlCE REQUIREMENTS FOR MECHANICAL 08/14/81C Note 1 8/81 (Complete)
M10269     B-20   CollTAIllMENT LEAKAGE DUE 10 SEAL DETERIORATION         08/25/80C         Note 2       --
M08734 B-23 DEGRADED GRID VOLTAGE 07/28/31C Note 1 7/81 (Complete)
M10333     B-21   LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANNUNCIA     02/28/82C         Note 2       --
M10045 B-23 DEGRADED GRID VOLTAGE 01/01/70C Note 2 M10156 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H 08/25/80C Note 2 M10157 B-24 VEllTIllO AllD PURGIllG CONTAIt4MENTS HHILE AT FULL PCH 01/01/73C Note 2 l
M08756     B-22   TECH SPEC SURVEILLAtlCE REQUIREMENTS FOR MECHANICAL     08/14/81C         Note 1       8/81       (Complete)
M42592 B-24 VEllTING AND PURGING CONTAIllMENTS HHILE AT FULL PDH ' 09/09/82C 9/84 (Complete)
M08734     B-23   DEGRADED GRID VOLTAGE                                   07/28/31C         Note 1       7/81       (Complete)
M10231 B-26 INADVERTANT SAFETY IllJECTION DURING C00LDOHti 12/28/79C 12/79 (Complete)
M10045     B-23   DEGRADED GRID VOLTAGE                                   01/01/70C         Note 2       --
M49429 B-32 BLOCKED SI SIGNAL DURING C00LD0llN 02/23/83C Note 2 N08665 B-39 PilR PRESSURE - TEMPERATURE LIMIT TECH SPECS 11/13/80C Mote 2 M49949 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 04/09/84C Note 2 M11094 B-41 FIRE PROTECTI0ll - FIllAL TECH SPECS (INCLUDES SER S 05/04/83C Note 5 5/83 (Conplete)
M10156     B-24   VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H     08/25/80C         Note 2       --
M13126 B-42 TMI FOLLDH UP - ALL PLANTS 06/15/81C Note 2 M11694 B-42 THI FOLLOH UP - ALL PLAtlTS 06/15/81C Note 2
M10157     B-24   VEllTIllO AllD PURGIllG CONTAIt4MENTS HHILE AT FULL PCH 01/01/73C         Note 2       --
'M11773 B-43 PilR FEEDHATER LIllE CRACKS 02/06/80C Note 2 M43147 B-43 PHR FEEDHATER LIllE CRACKS 05/25/82C Note 2 M30708 B-44 LESSONS LEARilED IMPLEMENTATION 04/18/80C Note 6 4/80 (Complete)
M42592     B-24   VEllTING AND PURGING CONTAIllMENTS HHILE AT FULL PDH ' 09/09/82C           --
H30709 B-44 LESSails LEARilED IMPLEMEt4TATION 04/18/80C 4/80 (Complete)
9/84 (Complete)
NSP PAGE 2 0F 14 I
M10231     B-26   INADVERTANT SAFETY IllJECTION DURING C00LDOHti         12/28/79C         --            12/79 (Complete)
1
B-32   BLOCKED SI SIGNAL DURING C00LD0llN                     02/23/83C         Note 2       --
M49429 B-39   PilR PRESSURE - TEMPERATURE LIMIT TECH SPECS           11/13/80C         Mote 2           -
N08665 M49949     B-41   FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S     04/09/84C         Note 2       --
B-41   FIRE PROTECTI0ll - FIllAL TECH SPECS (INCLUDES SER S   05/04/83C         Note 5       5/83       (Conplete)
M11094 M13126     B-42   TMI FOLLDH UP - ALL PLANTS                             06/15/81C         Note 2       --
M11694     B-42   THI FOLLOH UP - ALL PLAtlTS                             06/15/81C         Note 2           -
  'M11773     B-43   PilR FEEDHATER LIllE CRACKS                             02/06/80C         Note 2       --
M43147     B-43   PHR FEEDHATER LIllE CRACKS                             05/25/82C         Note 2       --
M30708     B-44   LESSONS LEARilED IMPLEMENTATION                         04/18/80C         Note 6       4/80 (Complete)
H30709     B-44   LESSails LEARilED IMPLEMEt4TATION                       04/18/80C         --            4/80 (Complete)
I NSP PAGE 2 0F 14 1


R-1208731-001                                   REGULAT0RY                 INF0RHATION         TRACKINO SYSTEM           -
R-1208731-001 REGULAT0RY INF0RHATION TRACKINO SYSTEM
                                                                                                                                                              . PA2E NO.s .34 FACILITY       IMPLEMENTATION                                           03/31/t6 PRAIRIE ISLAND 1                             (CONTINUATION)                                                                                       !
. PA2E NO.s.34 FACILITY IMPLEMENTATION 03/31/t6 PRAIRIE ISLAND 1 (CONTINUATION)
LIC ACT               LICENSEE TAC No. MPA 9                                   TITLE                                     COMPLETE           STATUS     RME M30710       B-44                     LESSONS LEARNED IMPLEMENTATION                           04/18/80C         --
LIC ACT LICENSEE TAC No.
4/80 (Complete)
MPA 9 TITLE COMPLETE STATUS RME M30710 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 4/80 (Complete)
M30711       B-44                     LESSONS LEARNED IMPLEMENTATION                           04/18/80C         --
M30711 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 4/80 (Complete)
4/80 (Complete)
M30712 B-44 LESS0!IS LEARNED IMPLEMENTATION 04/18/80C 4/80 (Complete)
M30712       B-44                     LESS0!IS LEARNED IMPLEMENTATION                         04/18/80C         --
M30713 B-44 LESSONS LEARNED IMPLEMENTATI0ft 04/18/80C 4/80 (Complete)
4/80 (Complete)
M30714 B-44 LESS0lls LEARNED IMPLEMENTATION 04/18/80C 4/80 (Complete)
M30713       B-44                     LESSONS LEARNED IMPLEMENTATI0ft                         04/18/80C         --
M30715 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 4/80 (Complete)
4/80 (Complete)
M30716 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 4/80 (Complete)
M30714         B-44                     LESS0lls LEARNED IMPLEMENTATION                         04/18/80C         -
M30717 B-44 LESSONS LEARilED If1PLEMENTATION 04/18/80C 4/80 (Complete)
4/80 (Complete)
M30718 B-44 LESSONS LEARNED It1PLEMENTATION 04/18/80C 4/80 (Complete)
M30715         B-44                   LESSONS LEARNED IMPLEMENTATION                           04/18/80C         --
M30719 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 4/80 (Complete)
4/80 (Complete)
M30720 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 4/80 (Complete) i M30721 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 4/80 -(Complete)
M30716         B-44                   LESSONS LEARNED IMPLEMENTATION                           04/18/80C         --
M12932 B-45 llASH 1400 EVENT V,
4/80 (Complete)
" PRIMARY COOLANT SYSTEM PRESSUR 04/20/81C Note 1 4/81 (Complete)
M30717         B-44                   LESSONS LEARilED If1PLEMENTATION                         04/18/80C         --
M42116 B-46 ANALYSIS OF TURBINE DISC CRACKS 04/01/81C Note 2 --
4/80 (Complete)
M12591 B-46 ANALYSIS OF TURBINE DISC CRACKS 09/01/81C 10/81 (Complete)
M30718           B-44                   LESSONS LEARNED It1PLEMENTATION                           04/18/80C         --
M12683 B-47 ECCS; CLAD SHELLIllG AND RUPTURE 07/30/80C Note 2 --
4/80 (Complete)
M12966 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 10/29/82C 10/82 (Complete)
M30719         B-44                   LESSONS LEARNED IMPLEMENTATION                           04/18/80C         --
M13038 B-49 PilR CONTROL ROD HISALIGNMENT 07/28/81C Note 1 7/81 (Complete)
4/80 (Complete)
M11874 B-52 REVIEH OF SAFETY ASPECT OF INADVERTENT SAFETY ACTI 10/23/80C Note 2 --
M30720           B-44                   LESSONS LEARNED IMPLEMENTATION                           04/18/80C         --
*M42898 B-59 MASONRY HALL DESIGN 09/12/83C 9/83 (Complete)
4/80 (Complete) i M30721                         B-44                   LESSONS LEARNED IMPLEMENTATION                           04/18/80C       --
M42500 5-60 ENVIR0llMEllTAL QUALIFICATION 03/25/85C 11/85 (Complete)
4/80 -(Complete)
M42699 B-61 LOSS OF NON CLASS IE ISC PDHER 07/28/82C Note 2 --
M12932           B-45                   llASH 1400 EVENT V, " PRIMARY COOLANT SYSTEM PRESSUR     04/20/81C       Note 1 4/81       (Complete)
M42770 B-62 ESF RESET CONTROL DESIGN DEFICIENCY 04/30/81C Note 7 --
M42116           B-46                   ANALYSIS OF TURBINE DISC CRACKS                           04/01/81C       Note 2 --
M12591           B-46                   ANALYSIS OF TURBINE DISC CRACKS                           09/01/81C       --
10/81 (Complete)
M12683           B-47                   ECCS; CLAD SHELLIllG AND RUPTURE                         07/30/80C       Note 2 --
M12966           B-48                   ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE         10/29/82C       --
10/82 (Complete)
M13038           B-49                     PilR CONTROL ROD HISALIGNMENT                           07/28/81C         Note 1 7/81       (Complete)
  ;            M11874             B-52                     REVIEH OF SAFETY ASPECT OF INADVERTENT SAFETY ACTI       10/23/80C       Note 2 --
M42898             B-59                     MASONRY HALL DESIGN                                     09/12/83C         --
9/83 (Complete)
M42500             5-60                     ENVIR0llMEllTAL QUALIFICATION                           03/25/85C         --
11/85 (Complete)
M42699             B-61                     LOSS OF NON CLASS IE ISC PDHER                           07/28/82C         Note 2 --
M42770           B-62                     ESF RESET CONTROL DESIGN DEFICIENCY                     04/30/81C         Note 7 --
NSP PAGE 3 0F.14 L
NSP PAGE 3 0F.14 L


R-1208731-001                 REGULAT0RY               INF0RHATION           TRACKING SYSTEM                   PAGE NO.s   385 FACILITY           IMPLEMENTATION                                         03/31/85 PRAIRIE ISLAND 1           (CONTINUATIDH)
R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEM PAGE NO.s 385 FACILITY IMPLEMENTATION 03/31/85 PRAIRIE ISLAND 1 (CONTINUATIDH)
LIC ACT               LICENSEE TAC 130. MPA 8                 TITLE                                   COMPLETE         STATUS       PAlf M43927     B-63 INTERIM PROCEDURES FOR Sii0RT TERM BLACK 0UT           01/22/82C       --
LIC ACT LICENSEE TAC 130.
1/82   (Complete)
MPA 8 TITLE COMPLETE STATUS PAlf M43927 B-63 INTERIM PROCEDURES FOR Sii0RT TERM BLACK 0UT 01/22/82C 1/82 (Complete)
M47150     B-66 flATURAL CIRCULATION C00LD0liti                         07/18/83C       --          7/83 (Complete)
M47150 B-66 flATURAL CIRCULATION C00LD0liti 07/18/83C 7/83 (Complete)
M46853     B-69 IEB 80-4 MAINSTEAM LINE BREAK HITH CONTINUED FEEDil     10/25/82C       --          10/82 (Complete)
M46853 B-69 IEB 80-4 MAINSTEAM LINE BREAK HITH CONTINUED FEEDil 10/25/82C 10/82 (Complete)
M46630     B-70 FATIGUE TRANSIEllT LIMIT TS                             05/25/82C       Note 2     --
M46630 B-70 FATIGUE TRANSIEllT LIMIT TS 05/25/82C Note 2 M49750 B-72 flUREG 0737 TECN SPECS (GENERIC LETTER 82-16) 01/15/83C Note 8 4/83 (Complete)
M49750     B-72 flUREG 0737 TECN SPECS (GENERIC LETTER 82-16)           01/15/83C       Note 8     4/83 (Complete)
MS2789 B-76 ITEM 1.1 - POST TRIP REVIElls PROGRAM DESCRIPTION &
MS2789     B-76 ITEM 1.1 - POST TRIP REVIElls PROGRAM DESCRIPTION &     06/01/84C       Note 9     8/85   (Complete)
06/01/84C Note 9 8/85 (Complete)
M52870     B-77 ITEM 2.1 - EQUIPMElli CLASSIFICATION & VENDOR INTER     06/01/84C       Note 2     --
M52870 B-77 ITEM 2.1 - EQUIPMElli CLASSIFICATION & VENDOR INTER 06/01/84C Note 2 M52951 B-78 ITEMS 3.1.1 & 3.1.2 -POST MAlllTENAllCE TEST PROCEDU 06/01/85C Note 10 5/85 (Complete)
M52951     B-78 ITEMS 3.1.1 & 3.1.2 -POST MAlllTENAllCE TEST PROCEDU   06/01/85C       Note 10   5/85 (Complete)
M53032 B-79 ITEM 3.1.3 - POST MAINTEllANCE TESTING - CHANGES TO 06/01/84C Note 11 10/85 (Complete)
M53032     B-79 ITEM 3.1.3 - POST MAINTEllANCE TESTING - CHANGES TO     06/01/84C       Note 11     10/85 (Complete)
M53089 B-80 ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY - VEllDO 06/01/85C Note 10 5/85 (Complete)
M53089     B-80 ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY - VEllDO     06/01/85C       Note 10   5/85 (Complete)
M53142 B-81 ITEMS 4.2.1 & 4.2.2 -PREVENTATIVE MAIllT PROG FOR R 10/17/85C 10/85 (Complete)
M53142     B-81 ITEMS 4.2.1 & 4.2.2 -PREVENTATIVE MAIllT PROG FOR R     10/17/85C       --          10/85 (Complete)
M53188 B-82 ITEM 4.3 - AUTOMATIC ACTUATION OF SNUNT TRIP ATTAC 06/01/84C 3/85 (Complete)
M53188     B-82 ITEM 4.3 - AUTOMATIC ACTUATION OF SNUNT TRIP ATTAC     06/01/84C       --
M53622 B-85 SALEM ATHS 1.2 DATA CAPABILITY 06/01/84C Note 12 M53705 B-86 SALEM ATHS 2.2 S-R COMP 0HEllTS 06/01/84C Note 13 M53788 B-87 SALEM ATils 3.2.1 & 3.2.2 S-R COMPONENTS 05/13/85C 5/85 (Complete)
3/85   (Complete)
M53871 B-88 SALEM AIlls 3.2.3 T.S. S-R COMPONENTS 06/01/84C 10/85 (Complete)
M53622     B-85 SALEM ATHS 1.2 DATA CAPABILITY                         06/01/84C       Note 12   --                    .
M53929 B-89 SALEM ATHS 4.2.3 & 4.2.4 LIFE COMPONENTS 10/31/86 Note 14 M55370 B-90 SALEM AlliS 4.3 H AND B&H T.S.
M53705     B-86 SALEM ATHS 2.2 S-R COMP 0HEllTS                         06/01/84C       Note 13   --
06/26/85C Note 2 6/85 (Complete)
M53788     B-87 SALEM ATils 3.2.1 & 3.2.2 S-R COMPONENTS               05/13/85C       --
M54098 B-92 SALEM ATils 4.5.1 DIVERSE TRIP FEATURES 05/13/85C 5/85 (Complete)
5/85 (Complete)
'M54015 B-93 SALEM ATHS 4.5.2 3 4.5.3 TEST ALTERNATIVES 06/01/84C Note 14 M06486 C-01 PHR SECONDARY llATER CHEMISTRY MONITORING REQUIREME 03/28/78C Note 2 M07614 C-01 PilR SECollDARY llATER CHEMISTRY MollITORING REQUIREME 11/13/81C Note 2 11/81 (Complete)
M53871     B-88 SALEM AIlls 3.2.3 T.S. S-R COMPONENTS                   06/01/84C       --
M08748 C-06 PUMP SUPPORT-LAMELLAR TEARING 09/15/81C Note 15 A
10/85 (Complete)
NSP PAGE 4 OF 14
M53929     B-89 SALEM ATHS 4.2.3 & 4.2.4 LIFE COMPONENTS               10/31/86         Note 14   --
M55370     B-90 SALEM AlliS 4.3 H AND B&H T.S.                         06/26/85C       Note 2     6/85 (Complete)
M54098     B-92 SALEM ATils 4.5.1 DIVERSE TRIP FEATURES                 05/13/85C       --        5/85 (Complete)
  'M54015     B-93 SALEM ATHS 4.5.2 3 4.5.3 TEST ALTERNATIVES             06/01/84C       Note 14 M06486     C-01 PHR SECONDARY llATER CHEMISTRY MONITORING REQUIREME     03/28/78C       Note 2     --
M07614     C-01 PilR SECollDARY llATER CHEMISTRY MollITORING REQUIREME 11/13/81C       Note 2     11/81 (Complete)
M08748     C-06 PUMP SUPPORT-LAMELLAR TEARING                           09/15/81C       Note 15   --
A                                                                                            NSP PAGE 4 OF 14


REGULAT0RY             INF0RHATION               TRACKING SYSTEH                       PAGE No.:   386 R-1208731-001 FACILITY         IHPLEHENTATION                                             03/31/86 .
R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEH PAGE No.:
PRAIRIE ISLAND 1                 (CONTINUATIDH)
386 FACILITY IHPLEHENTATION 03/31/86 PRAIRIE ISLAND 1 (CONTINUATIDH)
LIC ACT               LICENSEE i TAC HO. HPA 8                       TITLE                                     C0f1PLETE         STATUS         EAlf H08750     C-07       FUEL HANDLING ACCIDENT INSIDE CONTAINHENT                   02/02/82C       --          2/82 (Complete)
LIC ACT LICENSEE TAC HO.
N07298     C-09       PHR AUX FH PUHPS                                             08/14/80C       Note 16       --
HPA 8 TITLE C0f1PLETE STATUS EAlf i
H08075     C-10       CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE           06/06/83C       Note 17 6/83 (Complete)
H08750 C-07 FUEL HANDLING ACCIDENT INSIDE CONTAINHENT 02/02/82C 2/82 (Complete)
N07298 C-09 PHR AUX FH PUHPS 08/14/80C Note 16 H08075 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 06/06/83C Note 17 6/83 (Complete)
H43657 C-14 AUXILIARY FEEDilATER SEISHIC QUALIFICATION 06/16/83C 12/84 (Complete)
+
+
H43657    C-14      AUXILIARY FEEDilATER SEISHIC QUALIFICATION                  06/16/83C      --
H52260 C-15 CONTROL OF HEAVY LOADS - Pl!ASE II (FOLLOHUP OF HPA 06/28/85C Note 18 6/85 (Complete)
12/84 (Complete)
Note 2 --
H52260     C-15       CONTROL OF HEAVY LOADS - Pl!ASE II (FOLLOHUP OF HPA         06/28/85C       Note 18 6/85 (Complete)
H58080 C-16 UTILITY RESPONSES TO STAFF RECOHHENDATIONS CONCERN H07872 D-02 ECCS ZIRC CLAD H0 DEL ERROR-COMPLIANCE HITH 10 CFR-04/20/79C Note 2 --
H58080     C-16       UTILITY RESPONSES TO STAFF RECOHHENDATIONS CONCERN             -            Note 2 --
PRESSURIZ'R HEATUP RATE ERROR 11/01/78C Note 1 11/78 (Complete) 2 H07854 D-03 H08351 D-05 PLANT UPI H0 DEL PROBLEH l t[j /j/Fj"c ***+ ****
H07872     D-02     ECCS ZIRC CLAD H0 DEL ERROR-COMPLIANCE HITH 10 CFR-         04/20/79C       Note 2 --
Note 2 --
H07854      D-03      PRESSURIZ'R 2 HEATUP RATE ERROR                             11/01/78C       Note 1   11/78 (Complete)
H08751 D-10 ASYHHETRIC LOCA LOADS g-/g 42r24 469 Note 2 H08995 D-11 FISSION GAS RELEASE 02/22/80C Note 2 H12273 D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEH FAIL 12/01/80C Note 2 --
H08351     D-05     PLANT UPI H0 DEL PROBLEH                     l t[j /j/Fj"c ***+ ****       Note 2 --
H43033 D-17 DEFINITI0H OF OPERABLE 07/28/81C Note 1 7/81 (Complete)
H08751     D-10     ASYHHETRIC LOCA LOADS                               g-/g 42r24 469           Note 2   --
H55892 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15) 09/06/85C Note 2 --
H08995     D-11     FISSION GAS RELEASE                                         02/22/80C       Note 2   --
H10727 E-03 CORE RELOADS REQUIRIllG PRIOR HRC APPROVAL 04/27/79C Note 2^ --
H12273     D-15     HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEH FAIL           12/01/80C       Note 2 --
H44050 F-01 I.A.1.1 SilIFT TECittlICAL ADVISOR 07/06/82C 1/80 (Complete)
H43033       D-17     DEFINITI0H OF OPERABLE                                       07/28/81C       Note 1 7/81       (Complete)
H44119 F-02 I.A.1.3 SHIFT HAHHING 04/06/83C 4/83 (Complete)
H55892       D-19     DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15)           09/06/85C       Note 2 --
H44190 F-03 I.A.2.1 UPGRADING OF R0 AND SRO TRAINING 12/14/82C 12/82(Complete)
H10727       E-03     CORE RELOADS REQUIRIllG PRIOR HRC APPROVAL                   04/27/79C       Note 2^ --
H44261 F-04 I.C.1.2/3.A EHERGEllCY OPERATING PROCEDURES GENERIC 06/07/84C 6/84 (Complete)
H44050       F-01     I.A.1.1     SilIFT TECittlICAL ADVISOR                       07/06/82C       --
'H44331 F-05 I.C.1.2/3.B PROCEDURES GENERATION PACKAGES (NUREO 04/61/86 Note 19 --
1/80 (Complete)
H44119       F-02     I.A.1.3     SHIFT HAHHING                                   04/06/83C       --      4/83 (Complete)
H44190     F-03     I.A.2.1     UPGRADING OF R0 AND SRO TRAINING                 12/14/82C       --
12/82(Complete)
H44261     F-04     I.C.1.2/3.A EHERGEllCY OPERATING PROCEDURES GENERIC         06/07/84C       --
6/84 (Complete)
  'H44331       F-05     I.C.1.2/3.B PROCEDURES GENERATION PACKAGES (NUREO           04/61/86         Note 19 --
6 3 //o/ 9']
6 3 //o/ 9']
M47244       F-06     I.C.5       FEEDBACK OF OPERATING EXPERIENCE               01/04/82C       --
M47244 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 01/04/82C 1/82 (Complete)
1/82 (Complete)
H47316 F-07 I.C.6 CORRECT PERFORHANCE OF OPERATING ACTIVITI 01/04/82C 1/82 (Complete)
H47316     F-07     I.C.6       CORRECT PERFORHANCE OF OPERATING ACTIVITI       01/04/82C       --        1/82 (Complete)
H51192 F-08 I.D.1.1 DETAILED CONTROL R00H DESIGN REVIEH PROGRA 10/10/84C Note 20 --
H51192     F-08     I.D.1.1 DETAILED CONTROL R00H DESIGN REVIEH PROGRA           10/10/84C       Note 20 --
l NSP PAGE 5 OF -14
l NSP PAGE 5 OF -14
                                                                                                                                                  /
/


R-1208731-001                     REGULAT0RY             INF0RHATION           TRACKINO SYSTEH                   PA!E N0.8       387 FACILITY         IHPLE!!ENTATION                                       03/31/86 PRAIRIE ISLAND 1             (CONTINUATIOH)
R-1208731-001 REGULAT0RY INF0RHATION TRACKINO SYSTEH PA!E N0.8 387 FACILITY IHPLE!!ENTATION 03/31/86 PRAIRIE ISLAND 1 (CONTINUATIOH)
LIC ACT             LICENSEE TAC fl0. HPA 8                     TITIE                                   COMPLEH         STATUS       PAH H51272     F-09 I.D.2         SAFETY PARAHETER DISPLAY SYSTEM             07/15/85C       Note 21   12/86 (Projected)
LIC ACT LICENSEE TAC fl0.
H44398     F-10 II.B.1       RCS HIGH POINT VENTS                         09/19/83C       --
HPA 8 TITIE COMPLEH STATUS PAH H51272 F-09 I.D.2 SAFETY PARAHETER DISPLAY SYSTEM 07/15/85C Note 21 12/86 (Projected)
9/83 (Complete)
H44398 F-10 II.B.1 RCS HIGH POINT VENTS 09/19/83C 9/83 (Complete)
H47967     F-11 II.B.2       PLANT SHIELDING                             10/12/83C       --
H47967 F-11 II.B.2 PLANT SHIELDING 10/12/83C 10/83 (Complete)
10/83 (Complete)
H44469 F-12 II.B.3 POST ACCIDENT SAMPLING 11/23/83C Note 22 11/83 (Complete)
H44469     F-12 II.B.3       POST ACCIDENT SAMPLING                       11/23/83C       Note 22 11/83 (Complete)
M44540 F-13 II.B.4 TRAINING FOR HITIGATING CORE DAMAGE 12/14/82C 12/82 (Complete)
M44540     F-13 II.B.4       TRAINING FOR HITIGATING CORE DAMAGE         12/14/82C       -
H44610 F-14 II.D.1 RV AND SV TRAINING 01/30/86 Note 23 H44647 F-15 II.E.1.1 AFH SYSTEH EVALUATION 03/22/82C Note 24 3/82 (Complete)
12/82 (Complete)
M42541 F-16 II.E.1.2.1 AFH SYSTEM INITIATION 03/22/82C 3/82 (Complete)
H44610     F-14 II.D.1       RV AND SV TRAINING                           01/30/86       Note 23   --
M44726 F-17 II.E.1.2.2 AFH SYSTEM FLOH INDICATION 03/22/82C 3/82 (Complete)
H44647     F-15 II.E.1.1 AFH SYSTEH EVALUATION                             03/22/82C       Note 24 3/82 (Complete)
H44808 F-18 II.E.4.1 DEDICATED HYDROGEN PENETRATION 06/01/82C 6/82 (Complete)
M42541     F-16 II.E.1.2.1 AFH SYSTEM INITIATION                           03/22/82C       --
H44879 F-19 II.E.4.2 CollTAINHENT ISOLATION DEPENDABILITY 09/09/82C 9/82 (Complete)
3/82   (Complete)
H44950 F-20 II.F.1.1 NOBLE GAS H0HITOR 11/09/81C 4/82 (Complete)
M44726     F-17 II.E.1.2.2 AFH SYSTEM FLOH INDICATION                     03/22/82C       --
H45021 F-21 I I. F.1. 2 IODINE / PARTICULATE SAMPLING 11/09/81C 9/82 (Complete)
3/82   (Complete)
H45092 F-22 II.F.1.3 C0ilTAIHHEHT HIGH RANGE MONITOR 01/28/82C 2/82 (Complete)
H44808     F-18 II.E.4.1       DEDICATED HYDROGEN PENETRATION             06/01/82C       --
M47628 F-23 II.F.1.4 CONTAlllHEHT PRESSURE INSTRUMENT 04/21/83C 1/82 (Complete)
6/82   (Complete)
M47699 F-24 II.F.1.5 CONTAINHENT HATER LEVEL INSTRUMENT 04/21/83C 12/81 (Complete)
H44879     F-19 II.E.4.2       CollTAINHENT ISOLATION DEPENDABILITY       09/09/82C       --        9/82 (Complete)
H47770 F-25 II.F.1.6 CONTAIIIHEHT HYDROGEN HONITOR 04/21/83C 12/81 (Complete)
H44950     F-20 II.F.1.1       NOBLE GAS H0HITOR                         11/09/81C       --
H45162 F-26 II.F.2 INSTRUMEllTS FOR DETECTION ON INADEQUATE 07//f/(h Note 25 --
4/82 (Complete)
6/84 (Complete)
H45021     F-21 I I . F.1. 2   IODINE / PARTICULATE SAMPLING             11/09/81C       --
H46899 F-30 II.K.2.13 THERHAL-HECHANICAL REPORT 06/06/84C
9/82 (Complete)
* 47813 F-33 II.K.2.17 POTENTIAL FOR VOIDING IN RCS 12/30/83C 12/83 (Complete) l1 H45244 F-36 II.K.3.1 AUTO PORV ISOLATION 09/16/83C 9/83 (Complete)
H45092     F-22 II.F.1.3       C0ilTAIHHEHT HIGH RANGE MONITOR           01/28/82C       --
H45290 F-37 II.K.3.2 REPORT OH PORV FAILURES 09/16/83C 9/83 (Complete)
2/82 (Complete)
H45372 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 03/03/82C 3/82 (Complete)
M47628     F-23 II.F.1.4       CONTAlllHEHT PRESSURE INSTRUMENT           04/21/83C       --
1/82 (Complete)
M47699     F-24 II.F.1.5       CONTAINHENT HATER LEVEL INSTRUMENT         04/21/83C       -        12/81 (Complete)
H47770     F-25 II.F.1.6       CONTAIIIHEHT HYDROGEN HONITOR             04/21/83C       --
12/81 (Complete)
H45162     F-26 II.F.2         INSTRUMEllTS FOR DETECTION ON INADEQUATE   07//f/(h         Note 25 --
H46899     F-30 II.K.2.13       THERHAL-HECHANICAL REPORT                 06/06/84C       -        6/84  (Complete)
*l147813    F-33 II.K.2.17       POTENTIAL FOR VOIDING IN RCS               12/30/83C       --
12/83 (Complete)
H45244     F-36 II.K.3.1       AUTO PORV ISOLATION                       09/16/83C       --
9/83   (Complete)
H45290     F-37 II.K.3.2       REPORT OH PORV FAILURES                   09/16/83C       --
9/83   (Complete)
H45372     F-38 II.K.3.3       REPORTING SV AND RV FAILURES AND CHALLE   03/03/82C       --
3/82   (Complete)
NSP PAGE 6 0F 14
NSP PAGE 6 0F 14
                                                                                                                                        /
/


TRACKINO                         SYSTEM                         PAGE NO.       ',388 R-1208731-001                    REGULATCRY          INF0RHATION FACILITY         IMPLEHENTATION                                                                                         03/31/8)
R-1208731-001 REGULATCRY INF0RHATION TRACKINO SYSTEM PAGE NO.
PRAIRIE ISL AND 1           (CollTIllUATI0il)
',388 FACILITY IMPLEHENTATION 03/31/8)
LIC ACT                       .
PRAIRIE ISL AND 1 (CollTIllUATI0il)
LICENSEE COMPLETE                                                       STATUS         PAIE TAC HO<   MPA 8                   TITLE                                                                                                                                             .
LIC ACT LICENSEE COMPLETE STATUS PAIE TAC HO<
02/08/83C                                                    Note 19          --
MPA 8 TITLE M45407 F-39 II.K.3.5 AUID TRIP OF RCPS 02/08/83C Note 19 11/30/81C 11/81 (Complete)
M45407     F-39   II.K.3.5     AUID TRIP OF RCPS 11/30/81C                                                     --
M45456 F-40 II.K.3.9 PID C0flTROLLER M45486 F-41 II.K.3.10 ANTICIPATORY TRIP MODIFICATIONS 11/30/81C 11/81 (Complete)
11/81   (Complete)
M45516 F-42 II.K.3.12 ANTICIPATORY TRIP DN TURBIllE TRIP 11/30/81C 11/81 (Complete) 08/11/83C 8/83 (Complete)
M45456     F-40   II.K.3.9     PID C0flTROLLER 11/30/81C                                                    --            11/81  (Complete)
M45658 F-47 II.K.3.17 ECCS OUTAGES l M48428 F-53 II.K.3.25 PONER ON PUMP SEALS 06/17/82C 6/82 (Complete) 06/06/85C 6/85 (Complete)
M45486     F-41   II.K.3.10   ANTICIPATORY TRIP MODIFICATIONS 11/30/81C                                                     --
M45855 F-57 II.K.3.30 SB LOCA METHODS M48194 F-58 II.K.3.51 COMPLIAllCE HITH to CFR 50.46 01/15/87 Note 27 4/86 (Complete)
11/81   (Complete)
Note 28 12/83 (Complete M45974 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER y/f/f(CN M46045 F-64 III.A.I.2 OPERATIONAL SUPPORT CENTER g&86 12/83 (Complete)
M45516     F-42   II.K.3.12   ANTICIPATORY TRIP DN TURBIllE TRIP 08/11/83C                                                     --
M46117 F-65 III.A.1.2 EMER0EllCY OPERATIDHS FACILITY y /f/rtc 084fP86 Note 28 12/83 (Complete) 07/30/82C Note 2 M45189 F-66 III.A.1.2 NUCLEAR DATA LIllK M46261 F-67 III.A.2.1 EMERGEllCY PLAN UPGRADE TO MEET RULE 05/13/83C 5/83 (Complete)
8/83   (Complete)
M46333 F-65 III.A.2.2 METEOROLOGICAL DATA UPGRADE j/g(earsiiss 12/83 (Complete)
M45658     F-47   II.K.3.17   ECCS OUTAGES 06/17/82C                                                      --          6/82    (Complete) l M48428     F-53   II.K.3.25   PONER ON PUMP SEALS 06/06/85C                                                     --          6/85   (Complete)
M46404 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 03/02/82C 3/82 (Complete) 2/84 (Complete)
M45855     F-57   II.K.3.30   SB LOCA METHODS 01/15/87                                                      Note 27      4/86    (Complete)
M46473 F-70 III.D.3.4 CONTROL ROOM HABITABILITY 04/09/82C 4MW Note 29 M56154 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEH (FDLLOllVP TO of//J~/7"C M49663 G-01 REACTOR COOLANT PUMP TRIP (D660 - II.K.3.5) 44,4984 Note 19 M/1//rG NSP PAGE 7 0F 14 p
M48194     F-58   II.K.3.51   COMPLIAllCE HITH to CFR 50.46 Note 28       12/83 (Complete M45974     F-63   III.A.1.2   TECHNICAL SUPPORT CENTER         y/f/f(CN 12/83  (Complete)
M46045     F-64   III.A.I.2   OPERATIONAL SUPPORT CENTER               g&86                                                             --
y /f/rtc 084fP86                                                          Note 28      12/83   (Complete)
M46117     F-65   III.A.1.2   EMER0EllCY OPERATIDHS FACILITY NUCLEAR DATA LIllK 07/30/82C                                                       Note 2       --
M45189     F-66   III.A.1.2 05/13/83C                                                        --          5/83    (Complete)
M46261     F-67   III.A.2.1   EMERGEllCY PLAN UPGRADE TO MEET RULE 12/83 (Complete)
M46333     F-65   III.A.2.2   METEOROLOGICAL DATA UPGRADE           j/g(earsiiss                                                         --
03/02/82C                                                        --          3/82    (Complete)
M46404     F-69   III.D.3.3   IMPLANT RADIATION MONITORING                                                                                                   (Complete) 2/84 CONTROL ROOM HABITABILITY                  04/09/82C                                                        __                                    .
M46473     F-70   III.D.3.4 4MW                                                             Note 29     --
M56154     F-71   I.D.1.2 DETAILED CONTROL ROOM REVIEH (FDLLOllVP TO     of//J~/7"C REACTOR COOLANT PUMP TRIP (D660 - II.K.3.5) 44,4984                                                         Note 19     --
M49663    G-01 M/1//rG NSP PAGE 7 0F 14 p


INF0RHATION               TRACKINO   SYSTEH                       PAGE N0.8 .389 R-1208751-001                        REGULATORY IMPLEMENTATION                                              03/31/86 FACILITY FACILITY: PRAIRIE ISLAtID 2 LICENSED P0HER: 1650 MHT           PROJECT MAtlAGER: D. DII AllNI PLAtli LOCATI0!l: 28 HI SE OF HINHEAPOLIS, HIHit                          0530 Mile           BRANCH CHIEF:     G. LEAR 050-00306                          DESIGN P0HER:                                          P. ShUTTLEHORTH DOCKET NUllBER:                                            NSSS VENDOR:   HEST               LIC ASSISTANT:
R-1208751-001 REGULATORY INF0RHATION TRACKINO SYSTEH PAGE N0.8.389 03/31/86 FACILITY IMPLEMENTATION FACILITY: PRAIRIE ISLAtID 2 PLAtli LOCATI0!l: 28 HI SE OF HINHEAPOLIS, HIHit LICENSED P0HER: 1650 MHT PROJECT MAtlAGER: D. DII AllNI DOCKET NUllBER:
ARCH / EllGIllEER s    FPI IE INSPECTOR:         C. FEIERABEND LIC ACT                     LICENSEE TAC No,                                 TITLE                                   COMPLETE             STATUS       MIE MPA B A-01   10 CFR 50.55 A(G) - ISI                                 03/31/81C           Note 2       --
050-00306 DESIGN P0HER:
H08309 10/21/82C           Note 1       1/83   (Complete)
0530 Mile BRANCH CHIEF:
H08152         A-02   APPENDIX I - ALARA 03/14/79C            --
G. LEAR ARCH / EllGIllEER s FPI NSSS VENDOR:
3/79    (Complete)
HEST LIC ASSISTANT:
H08758         A-03   SECURITY REVIEllS-HODIFIED AMENDHENT PLANS 02/23/83C            --
P. ShUTTLEHORTH IE INSPECTOR:
2/83    (Complete)
C. FEIERABEND LIC ACT LICENSEE TAC No, MPA B TITLE COMPLETE STATUS MIE H08309 A-01 10 CFR 50.55 A(G) - ISI 03/31/81C Note 2 10/21/82C Note 1 1/83 (Complete)
H08729         A-04   APPENDIX J - CONTAINHENT LEAK TESTING 12/01/81C            --
H08152 A-02 APPENDIX I - ALARA H08758 A-03 SECURITY REVIEllS-HODIFIED AMENDHENT PLANS 03/14/79C 3/79 (Complete)
12/81  (Complete)
H08729 A-04 APPENDIX J - CONTAINHENT LEAK TESTING 02/23/83C 2/83 (Complete)
H08746         A-08   ECCS EVALUATION-GEllERIC PER 50.46 COMPLIANCE A-09   PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE         05/19/80C           Note 2       --
H08746 A-08 ECCS EVALUATION-GEllERIC PER 50.46 COMPLIANCE 12/01/81C 12/81 (Complete)
H11370 02/25/81C           Note 1         2/81   (Complete)
H11370 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE 05/19/80C Note 2 02/25/81C Note 1 2/81 (Complete)
H10399         A-10   CONTINGENCY PLANNING A-11    GUARD TRAINING PLANS                                    02/25/81C           Note 1         2/81   (Complete)
H10399 A-10 CONTINGENCY PLANNING 02/25/81C Note 1 2/81 (Complete)
H10403 A-12    VITAL AREA ANALYSIS                                    04/12/82C           Note 2         --
H10403 A-11 GUARD TRAINING PLANS 04/12/82C Note 2 H10401 A-12 VITAL AREA ANALYSIS H11223 A-14 10CFR 50.55 A(G) - INSERVICE TESTING 01/04/83C Note 1 1/83 (Complete)
H10401 A-14     10CFR 50.55 A(G) - INSERVICE TESTING                   01/04/83C             Note 1       1/83   (Complete)
H47400 A-16 QUALIFICATIONS OF EXAHINATION, INSPECTION, TESTING 08/12/82C 12/83 (Complete)
H11223 QUALIFICATIONS OF EXAHINATION, INSPECTION, TESTING     08/12/82C             --
H51123 A-17 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDEN 10/18/85C 6/87 (Projected)
12/83   (Complete)
H55732 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 06/25/85C Note 1 6/85 (Complete)
H47400          A-16 10/18/85C            --
H59131 A-20 10 CFR 50.62 DPERATING REACTOR REVIEHS N//S /
6/87    (Projected)
3/88 (Projected)
H51123         A-17     INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDEN 06/25/85C             Note 1        6/85    (Complete)
H59975 A-21 10 CFR 50.61, PRESSURIZED THERHAL SHOCK RULE Note 3 1/86 (Complete) 09/16/79C Note 4 6/85 (Complete)
H55732         A-18   TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43)
N08730 B-02 FIRE PROTECTI0li i
N//S /               --
*08395 B-03 PHR MODERATOR DILUTION 11/26/80C Note 2 H
3/88  (Projected)
H08338 B-04 REACTOR VESSEL OVERPRESSURE PROTECTION 08/03/79C Note 1 8/79 (Complete)
H59131         A-20     10 CFR 50.62 DPERATING REACTOR REVIEHS 10 CFR 50.61, PRESSURIZED THERHAL SHOCK RULE                                 Note 3         1/86   (Complete)
H07829 B-07 STEAM GENERATOR FEEDHATER FLOH INSTABILITY 09/13/79C 05/04/81C H08753 B-14 CEA GUIDE TUBE HEAR NSP PACE 8 0F 14 b
H59975        A-21 09/16/79C             Note 4       6/85     (Complete) i N08730         B-02     FIRE PROTECTI0li B-03                                                             11/26/80C             Note 2       --
  *08395 H                      PHR MODERATOR DILUTION 08/03/79C             Note 1       8/79   (Complete)
H08338          B-04    REACTOR VESSEL OVERPRESSURE PROTECTION B-07   STEAM GENERATOR FEEDHATER FLOH INSTABILITY             09/13/79C H07829 B-14   CEA GUIDE TUBE HEAR                                     05/04/81C H08753 NSP PACE 8 0F 14 b                                                                                                                                               --*


SYSTEM                    PAGE H3.s .390 R-1208731-001                     REGULAT0RY             I N F 0 R H A T I O fl TRACKINO 03/31/86, FACILITY        IMPLEMEilTATION PRAIRIE ISLAllD 2           (CollTIllUATIOff)
R-1208731-001 REGULAT0RY I N F 0 R H A T I O fl TRACKINO SYSTEM PAGE H3.s.390 FACILITY IMPLEMEilTATION 03/31/86, PRAIRIE ISLAllD 2 (CollTIllUATIOff)
LIC ACT             LICENSEE TTTLE                                    COMPLETE       STATUS       I!Alf.
LIC ACT LICENSEE COMPLETE STATUS I!Alf.
TAC HO. tif1_1                                                                             Note 2       --
TAC HO.
EMERGENCY PL AHilIllG AtID REVISI0lis 04/01/81C H12349     B-16 10/28/81C      Note 1        10/81- (Complete)
tif1_1 TTTLE Note 2 04/01/81C H12349 B-16 EMERGENCY PL AHilIllG AtID REVISI0lis H08755 B-17 TECH SPEC SURVEILLAtlCE FOR llYDRAULIC SilUBBERS 10/28/81C Note 1 10/81- (Complete)
H08755     B-17   TECH SPEC SURVEILLAtlCE FOR llYDRAULIC SilUBBERS 10/02/80C      Note 2        --
H10270 B-20 C0HTAIHMENT LEAKAGE DUE TO SEAL DETERIORATION 10/02/80C Note 2 H10334 B-21 LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANHUllCIA 02/28/82C Note 2 H08757 B-22 TECH SPEC SURVEILLAllCE REQUIREMENTS FOR HECHANICAL 08/14/81C Note 1 8/81 (Complete) 07/28/8tC Note 1 7/81 (Complete)
H10270     B-20   C0HTAIHMENT LEAKAGE DUE TO SEAL DETERIORATION 02/28/82C      Note 2       --
M08755 B-23 DEGRADED GRID VOLTAGE 01/01/70C Note 2 M10044 B-23 DEGRADED GRID VOLTAGE M11330 B-24 VEHilllG AHD PURGIllG CONTAIHMEllTS HHILE AT FULL Poll 03/05/81C Note 2 H42622 B-24 VEllTIllG AllD PURGIllG C0llTAIllMENTS HHILE AT FULL P0li 09/09/82C 9/84 (Complete)
H10334     B-21   LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANHUllCIA 08/14/81C     Note 1       8/81   (Complete)
H10232 B-26 IHADVERTANT SAFETY INJECTIDH DURIllG C00LDollH 12/28/79C Note 2 02/23/83C Note 2 M49430 B-52 BLOCKED SI SIGilAL DURING C00LD0Hil M08680 B-39 Pi!R PRESSURE - TEMPERATURE LIMIT TECH SPECS 11/13/80C Note 2 M49950 B-41 FIRE PROTECTI0li - FIEAL TECH SPECS (IllCLUDES SER S 01/09/84C Note 2 Hf1095 B-41 FIRE PROTECTIDH - FIllAL TECH SPECS (INCLUDES SER S 05/04/83C Note 5 5/83 (Complete) 06/15/81C Note 2 M13127 B-42 TMI FOLLOH UP - ALL PLAllTS 06/15/81C Note 2 M11695 B-42 THI FOLLOH UP - ALL PLANTS 02/06/80C Note 2 M11774 B-43 PHR FEEDilATER LINE CRACKS 05/25/82C Note 2 1143148 B-43 PIIR FEEDHATER LINE CRACKS 04/18/80C Note 6 4/80 (Complete)
H08757    B-22    TECH SPEC SURVEILLAllCE REQUIREMENTS FOR HECHANICAL 07/28/8tC     Note 1       7/81   (Complete)     .
H30722 5 44 LESS0!IS LEARilED IMPLEMEllTATI0li 04/18/80C l1 4/80 (Complete
M08755     B-23   DEGRADED GRID VOLTAGE 01/01/70C     Note 2       --
* 50723 B-44 LESSOUS LEARilED IMPLEl1EHTATIDH 04/18/80C 4/80 (Complete)
M10044     B-23   DEGRADED GRID VOLTAGE 03/05/81C      Note 2        --
M30724 B-44 LESSONS LEARilED IMPLEMENTATI0tl 04/18/30C H30725 B-44 LESSONS LEARNED IMPLEMENTATION gg 04/18/80C H30726 B-44 LESSullS LEARilED IMPLEMENTATION 4/80 (Complete)
M11330     B-24   VEHilllG AHD PURGIllG CONTAIHMEllTS HHILE AT FULL Poll 09/09/82C      --
9/84  (Complete)
H42622     B-24   VEllTIllG AllD PURGIllG C0llTAIllMENTS HHILE AT FULL P0li 12/28/79C    Note 2        --
H10232     B-26   IHADVERTANT SAFETY INJECTIDH DURIllG C00LDollH 02/23/83C     Note 2         --
M49430     B-52   BLOCKED SI SIGilAL DURING C00LD0Hil 11/13/80C    Note 2        --
M08680     B-39   Pi!R PRESSURE - TEMPERATURE LIMIT TECH SPECS 01/09/84C    Note 2         --
M49950     B-41   FIRE PROTECTI0li - FIEAL TECH SPECS (IllCLUDES SER S 05/04/83C      Note 5        5/83  (Complete)
Hf1095     B-41   FIRE PROTECTIDH - FIllAL TECH SPECS (INCLUDES SER S TMI FOLLOH UP - ALL PLAllTS 06/15/81C     Note 2         --
M13127     B-42 THI FOLLOH UP - ALL PLANTS 06/15/81C     Note 2         --
M11695     B-42 02/06/80C     Note 2         --
M11774     B-43   PHR FEEDilATER LINE CRACKS PIIR FEEDHATER LINE CRACKS 05/25/82C     Note 2         --
1143148   B-43 04/18/80C     Note 6         4/80   (Complete)
H30722     5 44   LESS0!IS LEARilED IMPLEMEllTATI0li 04/18/80C     --
4/80   (Complete
*l150723    B-44   LESSOUS LEARilED IMPLEl1EHTATIDH LESSONS LEARilED IMPLEMENTATI0tl 04/18/80C       --
4/80 (Complete)
M30724     B-44 04/18/30C                       gg H30725     B-44   LESSONS LEARNED IMPLEMENTATION                                           __
LESSullS LEARilED IMPLEMENTATION 04/18/80C                     4/80 (Complete)
H30726    B-44                                                                              --
NSP PAGE 9 OF 14 O
NSP PAGE 9 OF 14 O
s
s


R-1208731-001                         REGULAT0RY                 INF0RHATION           TRACKINO SYSTEH                   PAGE NO.     - 391 FACILITY       IHPLEHENTATION                                       03/31/8Ti PRAIRIE ISLAllD 2                 (C0HTIllUATI0ti)
R-1208731-001 REGULAT0RY INF0RHATION TRACKINO SYSTEH PAGE NO.
LIC ACT               LICENSEE T A C 110. HPA 8                       TITLE                                     COMPLETE         STATUS     MIf, H30727     B-44   LESS0tlS LEARilED IMPLEMEllTATI0tt                             04/18/80C       --
- 391 FACILITY IHPLEHENTATION 03/31/8Ti PRAIRIE ISLAllD 2 (C0HTIllUATI0ti)
4/80   (Complete)
LIC ACT LICENSEE T A C 110.
H30728     B-44   LESS0!!S LEARilED IllPLEHENTATI0tt                             04/18/80C       --
HPA 8 TITLE COMPLETE STATUS
4/80   (Complete)
: MIf, H30727 B-44 LESS0tlS LEARilED IMPLEMEllTATI0tt 04/18/80C 4/80 (Complete)
H30729     B-44   LESSONS LEARHED IMPLEMEllTATION                               04/18/80C       --
H30728 B-44 LESS0!!S LEARilED IllPLEHENTATI0tt 04/18/80C 4/80 (Complete)
4/80   (Complete)
H30729 B-44 LESSONS LEARHED IMPLEMEllTATION 04/18/80C 4/80 (Complete)
H30730     B-44   LESS0HS LEARilED IMPLEMEllTATION                               04/18/80C       --
H30730 B-44 LESS0HS LEARilED IMPLEMEllTATION 04/18/80C 4/80 (Complete)
4/80   (Complete)
H30731 B-44 LESS0HS LEARllED IMPLEllEllTATI0li 04/18/80C 4/80 (Complete)
H30731     B-44   LESS0HS LEARllED IMPLEllEllTATI0li                             04/18/80C       --
H30732 B-44 LES50tlS LEARHED It1PLEf1ENTATI0!l 04/18/80C 4/80 (Complete) 1130733 B-44 LESS0llS LEARHED IMPLEMEllTATIDH 04/18/80C 4/80 (Complete)
4/80   (Complete)
H30734 B-44 LESS0llS LEARHED IMPLEMENTATION 04/18/80C 4/80 (Complete)
H30732     B-44   LES50tlS LEARHED It1PLEf1ENTATI0!l                             04/18/80C       --
H30735 B-44 LESS0tlS LEARilED It1PLEHEHTATION 04/18/80C 4/80 (Complete)
4/80   (Complete) 1130733     B-44   LESS0llS LEARHED IMPLEMEllTATIDH                               04/18/80C       --
H12933 B-45 IIASH 1400 EVEllT V, " PRIMARY COOLANT SYSTEM PRESSUR 04/20/81C Note 1 4/81 (Complete)
4/80   (Complete)
H42117 B-46 AHALYSIS OF TURBIllE DISC CRACKS 04/01/81C Note 2 H12592 B-46 ANALYSIS OF TURBIllE DISC CRACKS 09/01/81C 10/81 (Complete)
H30734     B-44   LESS0llS LEARHED IMPLEMENTATION                               04/18/80C       --
H12684 B-47 ECCS; CLAD SilELLIllG AtID RUPTURE 10/02/80C Note 2 H12947 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 10/29/82C 10/82 (Complete)
4/80   (Complete)
H13039 B-49 PHR C0!ITROL ROD HISALIGilHENT 07/28/81C Note 1 7/81 (Complete)
H30735     B-44   LESS0tlS LEARilED It1PLEHEHTATION                             04/18/80C                           (Complete) 4/80 H12933     B-45   IIASH 1400 EVEllT V, " PRIMARY COOLANT SYSTEM PRESSUR         04/20/81C       Note 1       4/81   (Complete)
H11875 B-52 REVIEH OF SAFETY ASPECT OF IllADVERTENT SAFETY ACTI 10/23/80C Note 2 H42899 B-59 MAS 0tlRY HALL DESIGH 09/12/83C 9/83 (Complete)
H42117     B-46   AHALYSIS OF TURBIllE DISC CRACKS                               04/01/81C       Note 2       --
H42501 B-60 EllVIR0tlHENTAL QUALIFICATION 03/25/85C 11/85 (Complete)
H12592     B-46   ANALYSIS OF TURBIllE DISC CRACKS                               09/01/81C       --
H42700 B-61 LOSS OF 11011 CLASS IE I&C P0llER 07/28/82C Note 2
10/81 (Complete)
* 42771 B-62 ESF RESET CONTROL DESIGN DEFICIEllCY 04/30/81C Note 7 H
H12684     B-47   ECCS; CLAD SilELLIllG AtID RUPTURE                             10/02/80C       Note 2       --
H43928 B-63 INTERIH PROCEDURES FOR Sil0RT TERM BLACKOUT 01/22/82C 1/82 (Complete)
H12947     B-48   ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE             10/29/82C       --
H47151 B-66 NATURAL CIRCULATI0il C00LD0HH 07/18/83C 7/83 (Complete)
10/82 (Complete)
H46854 B-69 IEB 80-4 MAIHSTEAM LINE BREAK HITH CONTINUED FEEDH 10/25/82C 10/82 (Complete)
H13039     B-49   PHR C0!ITROL ROD HISALIGilHENT                                 07/28/81C       Note 1       7/81   (Complete)
H11875     B-52   REVIEH OF SAFETY ASPECT OF IllADVERTENT SAFETY ACTI           10/23/80C       Note 2       --
H42899     B-59   MAS 0tlRY HALL DESIGH                                         09/12/83C       --
9/83   (Complete)
H42501     B-60   EllVIR0tlHENTAL QUALIFICATION                                 03/25/85C       --
11/85 (Complete)
H42700     B-61   LOSS OF 11011 CLASS IE I&C P0llER                             07/28/82C       Note 2       --
      *H42771      B-62   ESF RESET CONTROL DESIGN DEFICIEllCY                           04/30/81C       Note 7       --
H43928     B-63   INTERIH PROCEDURES FOR Sil0RT TERM BLACKOUT                   01/22/82C       --
1/82   (Complete)
H47151     B-66   NATURAL CIRCULATI0il C00LD0HH                                 07/18/83C       --
7/83   (Complete)
H46854     B-69   IEB 80-4 MAIHSTEAM LINE BREAK HITH CONTINUED FEEDH             10/25/82C       --
10/82 (Complete)
NSP PAGE 10 0F 14
NSP PAGE 10 0F 14


REGULAT0RY             INF0RHATION           TRACKING SYSTEH                       PAGE No.:   392 R-1208731-001 FACILITY         IHPLEHEilTATION                                         03/31/86-PRAIRIE ISL AllD 2           (CONTIllUATION)
R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEH PAGE No.:
LIC ACT                 LICENSEE TITLE                                  COMPLETE        STATUS        EALE TAC 110. HPA 8 M46631     B-70   FATIGUE TRANSIEllT LIMIT TS                             05/25/82C       Note 2       --
392 FACILITY IHPLEHEilTATION 03/31/86-PRAIRIE ISL AllD 2 (CONTIllUATION)
H49751     B-72   IlUREG 0737 TECH SPECS (GENERIC LETTER 82-16)           01/15/83C       Note 8       4/83     (Complete)
LIC ACT LICENSEE TAC 110.
H52790     B-76   ITEM 1.1 - POST TRIP REVIEH; PROGRAM DESCRIPTION &     06/01/84C       Note 9       8/85     (Complete) 1152871     B-77   ITEM 2.1 - EQUIPHENT CLASSIFICATION & VEllDDR INTER     06/01/84C       Note 2       --
HPA 8 TITLE COMPLETE STATUS EALE M46631 B-70 FATIGUE TRANSIEllT LIMIT TS 05/25/82C Note 2 H49751 B-72 IlUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 01/15/83C Note 8 4/83 (Complete)
H53952     B-78   ITEMS 3.1.1 & 3.1.2 -POST HAINTEllANCE TEST PROCEDU     06/01/85C       Note 10       5/85     (Complete)
H52790 B-76 ITEM 1.1 - POST TRIP REVIEH; PROGRAM DESCRIPTION &
H53033     B-79   ITEM 3.1.3 - POST HAINTENAllCE TESTIllG - CilANGES TO   06/01/84C       Note 11       10/85   (Complete)
06/01/84C Note 9 8/85 (Complete) 1152871 B-77 ITEM 2.1 - EQUIPHENT CLASSIFICATION & VEllDDR INTER 06/01/84C Note 2 H53952 B-78 ITEMS 3.1.1 & 3.1.2 -POST HAINTEllANCE TEST PROCEDU 06/01/85C Note 10 5/85 (Complete)
H53090     B-80   ITEM 4.1 - REACTOR TRIP SYSTEH RELIABILITY - VENDO     06/01/85C       Note 10       5/85     (Complete)
H53033 B-79 ITEM 3.1.3 - POST HAINTENAllCE TESTIllG - CilANGES TO 06/01/84C Note 11 10/85 (Complete)
H53143     B-81   ITEMS 4.2.1 & 4.2.2 -PREVENTATIVE HAINT PROG FOR R     10/17/85C       --
H53090 B-80 ITEM 4.1 - REACTOR TRIP SYSTEH RELIABILITY - VENDO 06/01/85C Note 10 5/85 (Complete)
10/85   (Complete)
H53143 B-81 ITEMS 4.2.1 & 4.2.2 -PREVENTATIVE HAINT PROG FOR R 10/17/85C 10/85 (Complete)
H53189     B-82   ITEM 4.3 - AUTOMATIC ACTUATI0li 0F SilUNT TRIP ATTAC   06/01/84C       --            10/85 (Complete)
H53189 B-82 ITEM 4.3 - AUTOMATIC ACTUATI0li 0F SilUNT TRIP ATTAC 06/01/84C 10/85 (Complete)
H53623     B-85   SALEM ATHS 1.2 DATA CAPABILITY                         12/31/85         Note 12       --
H53623 B-85 SALEM ATHS 1.2 DATA CAPABILITY 12/31/85 Note 12 H53706 B-86 SALEM ATils 2.2 S-R COMPollEllTS 06/01/84C Note 13 H53789 B-87 SALEH ATils 3.2.1 & 3.2.2 S-R COMPollEllTS 05/13/85C 5/85 (Complete)
H53706     B-86   SALEM ATils 2.2 S-R COMPollEllTS                       06/01/84C         Note 13       --
H53872 B-88 SALEH ATilS 3.2.3 T.S. S-R COMPONEllTS 06/01/84C 10/85 (Complete)
H53789     B-87   SALEH ATils 3.2.1 & 3.2.2 S-R COMPollEllTS             05/13/85C         --
H53930 B-89 SALEM ATHS 4.2.3 & 4.2.4 LIFE COMP 0llENTS 10/31/86 Note 14 H55371 B-90 SALEM ATHS 4.3 H AllD B8H T.S.
5/85     (Complete)
06/26/85C Note 2 6/85 (Complete)
SALEH ATilS 3.2.3 T.S. S-R COMPONEllTS                 06/01/84C         --            10/85 (Complete)
H54099 B-92 SALEH ATHS 4.5.1 DIVERSE TRIP FEATURES 05/13/85C 5/85 (complete)
H53872    B-88 H53930     B-89   SALEM ATHS 4.2.3 & 4.2.4 LIFE COMP 0llENTS             10/31/86         Note 14       --
H54016 B-93 SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERilATIVES 06/01/84C Note 14 H08733 C-01 PilR SECollDARY HATER CllEHISTRY HONITORIl10 REQUIREME 11/13/81C Note 2 11/81 (Complete)
B-90   SALEM ATHS 4.3 H AllD B8H T.S.                         06/26/85C         Note 2       6/85     (Complete)
H08749 C-06 PUNP SUPPORT-LANELLAR TEARIl10 09/15/81C Note 15 H08751 C-07 FUEL IIAllDLIl10 ACCIDEllT INSIDE CONTAINHENT 02/02/82C 2/82 (Complete)
H55371 B-92   SALEH ATHS 4.5.1 DIVERSE TRIP FEATURES                 05/13/85C         --
H08747 C-09 PilR AUX FH PUNPS 03/05/81C Note 16 H08076 C-10 CollTROL OF llEAVY LOADS OVER SPENT FUEL POOL (PilASE 06/16/83C Note 17 6/83 (Complete)
5/85     (complete)
H43658 C-14 AUXILIARY FEEDilATER SEISHIC QUALIFICATI0ll 06/16/83C 12/84 (Complete)
H54099 H54016   B-93   SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERilATIVES           06/01/84C         Note 14       --
NSP PAGE 11 0F 14
C-01   PilR SECollDARY HATER CllEHISTRY HONITORIl10 REQUIREME 11/13/81C       Note 2         11/81   (Complete)
H08733 H08749   C-06   PUNP SUPPORT-LANELLAR TEARIl10                         09/15/81C         Note 15       --
* 02/02/82C         --
2/82     (Complete)
H08751    C-07    FUEL IIAllDLIl10 ACCIDEllT INSIDE CONTAINHENT C-09   PilR AUX FH PUNPS                                     03/05/81C           Note 16       --
H08747 06/16/83C         Note 17       6/83     (Complete)
H08076    C-10    CollTROL OF llEAVY LOADS OVER SPENT FUEL POOL (PilASE AUXILIARY FEEDilATER SEISHIC QUALIFICATI0ll           06/16/83C           --
12/84   (Complete)
H43658    C-14 NSP PAGE 11 0F 14


R-1208731-001                     REGULAT0RY             I !! F 0 R H A T I O N       TRACKING SYSTEH                         PAGE No.s.393 FACILITY           IHPLEHENTATION                                                 03/31/46 PRAIRIE ISLAND 2             (CONTINUATION)
R-1208731-001 REGULAT0RY I !! F 0 R H A T I O N TRACKING SYSTEH PAGE No.s.393 FACILITY IHPLEHENTATION 03/31/46 PRAIRIE ISLAND 2 (CONTINUATION)
LIC ACT                   LICENSEE TAC H0. HPA 8                   TITLE                                       COMPL ETE           STATUS       EAlf H52261     C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF HPA             06/28/85C         Note 18       6/85       (Complete)
LIC ACT LICENSEE TAC H0.
H58081     C-16 UTILITY RESP 0HSES TO STAFF RECOHHENDATIONS CONCERN                               Note 2       --
HPA 8 TITLE COMPL ETE STATUS EAlf H52261 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF HPA 06/28/85C Note 18 6/85 (Complete)
H07873     D-02 ECCS ZIRC CLAD H0 DEL ERROR-COMPLIANCE HITH 10 CFR-           04/20/79C         Note 2       --
H58081 C-16 UTILITY RESP 0HSES TO STAFF RECOHHENDATIONS CONCERN Note 2 H07873 D-02 ECCS ZIRC CLAD H0 DEL ERROR-COMPLIANCE HITH 10 CFR-04/20/79C Note 2 H07855 D-03 PRESSURIZER llEATUP RATE ERROR 11/01/78C Note 1 11/78 (Complete)
H07855     D-03 PRESSURIZER llEATUP RATE ERROR                                 11/01/78C         Note 1         11/78 (Complete)
H08471 D-05 PLANT UPI H0 DEL PRUILLEM f 2 /.)//7.52* 997Hr84 Note 2
H08471     D-05 PLANT UPI H0 DEL PRUILLEM                   f 2 /.)//7.52* 997Hr84               Note 2       --
,fpf/pg -tAwaar H08732 D-10 ASYMMETRIC LOCA LOADS Note 2 H08996 D-11 FISSIDH GAS RELEASE 02/22/80C Note 2 H12274 D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL 12/01/80C Note 2 H55893 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15) 09/06/85C Note 2 H10904 E-03 CORE RELOADS REQUIRING PRIOR NRC APPROVAL 04/20/79C Note 2 a
H08732     D-10 ASYMMETRIC LOCA LOADS                         ,fpf/pg -tAwaar                    Note 2       --
) H44051 F-01 I.A.1.1 SHIFT TECHNICAL ADVISOR 07/06/82C 1/80 (Complete)
H08996     D-11 FISSIDH GAS RELEASE                                           02/22/80C         Note 2       --
H44120 F-02 I.A.1.3 SHIFT MANNING 04/06/83C 4/83 (Complete)
H12274     D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL             12/01/80C         Note 2       --
H44191 F-03 I.A.2.1 UPGRADING OF R0 AND SRO TRAINING 12/14/82C 12/82 (Complete)
H55893     D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15)             09/06/85C         Note 2       --
M44262 F-04 I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC 06/07/84C 6/84 (Complete)
a      H10904     E-03 CORE RELOADS REQUIRING PRIOR NRC APPROVAL                     04/20/79C         Note 2       --
H44332 F-05 I.C.I.2/3.B PROCEDURES GENERATION PACKAGES (NUREG th.
) H44051         F-01 I.A.1.1     SHIFT TECHNICAL ADVISOR                           07/06/82C         --
Note 19 H47245 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 01/04/82C 1/82 (Complete)
1/80       (Complete)
H47317 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVIII 01/04/82C 1/82 (Complete) 2 H51193 F-08 I.D.1.1 DETAILED C0llTROL R00H DESIGN REVIEN PROGRA 10/10/84C Note 20
H44120     F-02 I.A.1.3     SHIFT MANNING                                     04/06/83C         --
) H51273 F-09 I.D.2 SAFETY PARAHETER DISPLAY SYSTEM 07/15/85C N(.te 21 12/86 (Project 4d)
4/83       (Complete)
] 'H44399 F-10 II.B.1 RCS HIGil POINT VENTS 09/19/83C 9/83 (Complete)
H44191     F-03 I.A.2.1     UPGRADING OF R0 AND SRO TRAINING                 12/14/82C         --
H47968 F-11 II.B.2 PLANT SHIELDING 10/12/83C 10/83 (Complete)
12/82 (Complete)
H44470 F-12 II.B.3 POST ACCIDENT SAMPLING 11/23/83C Note 22 11/83 (Complete)
M44262     F-04 I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC             06/07/84C         --
H44541 F-13 II.B.4 TRAINIllG FOR HITIGATING CORE DAMAGE 12/14/82C 12/82 (Complete) l NSP PAGE 12 0F'14
6/84       (Complete)
H44332     F-05 I.C.I.2/3.B PROCEDURES GENERATION PACKAGES (NUREG                   th .         Note 19       --
H47245     F-06 I.C.5       FEEDBACK OF OPERATING EXPERIENCE                 01/04/82C         --
1/82       (Complete) 2      H47317     F-07 I.C.6       CORRECT PERFORMANCE OF OPERATING ACTIVIII       01/04/82C           --
1/82       (Complete)
H51193     F-08 I.D.1.1 DETAILED C0llTROL R00H DESIGN REVIEN PROGRA           10/10/84C         Note 20       --
) H51273         F-09 I.D.2       SAFETY PARAHETER DISPLAY SYSTEM                 07/15/85C           N(.te 21       12/86 (Project 4d)
] 'H44399         F-10 II.B.1       RCS HIGil POINT VENTS                           09/19/83C         --
9/83       (Complete)
H47968     F-11 II.B.2       PLANT SHIELDING                                   10/12/83C         --
10/83     (Complete)
H44470     F-12 II.B.3       POST ACCIDENT SAMPLING                           11/23/83C         Note 22       11/83     (Complete)
H44541     F-13 II.B.4       TRAINIllG FOR HITIGATING CORE DAMAGE             12/14/82C         --
12/82     (Complete) l NSP PAGE 12 0F'14


4 R-1208731-001                                   REGULAT0RY               INF0RHATION               TRACKING       SYSTEM                         PAGE N0.8 . 394 FACILITY           I M P L E M E N T A T I O 11                                       03/31/86 PRAIRIE ISLAllD 2                         (CollTIllUATI0ll)
4 R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEM PAGE N0.8 394 FACILITY I M P L E M E N T A T I O 11 03/31/86 PRAIRIE ISLAllD 2 (CollTIllUATI0ll)
LIC ACT                           LICENSEE TAC 110.         MPA 3                           TITLE                                       COMPLETE                     STATUS       DAIE M44611             F-14 II.D.1           RV AllD SV TRAlllIllG                               01/30/86                 Note 23       --
LIC ACT LICENSEE TAC 110.
M44648             F-15 II.E.1.1 AFH SYSTEM EVALUATION                                       03/22/82C                 Note 24         3/82   (Complete)
MPA 3 TITLE COMPLETE STATUS DAIE M44611 F-14 II.D.1 RV AllD SV TRAlllIllG 01/30/86 Note 23 M44648 F-15 II.E.1.1 AFH SYSTEM EVALUATION 03/22/82C Note 24 3/82 (Complete)
M44688             F-16 II .E.1.2.1 Afil SYSTEM IllITI ATI0li                                 03/22/82C                 --
M44688 F-16 II.E.1.2.1 Afil SYSTEM IllITI ATI0li 03/22/82C 3/82 (Complete)
3/82   (Complete)
M44727 F-17 II.E.1.2.2 AFil SYSTEl1 FLOll IllDICATIDH 03/22/82C 3/82 (Complete)
M44727             F-17 II.E.1.2.2 AFil SYSTEl1 FLOll IllDICATIDH                             03/22/82C                 --
M44809 F-18 II.E.4.1 DEDICATED llYDROGEN PEHETRATION 06/01/82C 6/82 (Complete)
3/82   (Complete)
M44880 F-19 II.E.4.2 CollTAlllMEllT ISOL ATI0ll DEPENDABILITY
M44809             F-18 II.E.4.1             DEDICATED llYDROGEN PEHETRATION                 06/01/82C                 --
~09/09/82C 9/82 (Complete)
6/82   (Complete)
M44951 F-20 II.F.1.1 fl0BLE GAS M0llITOR 11/09/81C 4/82 (Complete)
M44880             F-19 II.E.4.2             CollTAlllMEllT ISOL ATI0ll DEPENDABILITY       ~09/09/82C                 --
M45022 F-21 II.F.1.2 IODINE /PARTICUL ATE SAMPLIllG 11/09/8tC 9/82 (Complete)
9/82   (Complete)
M45093 F-22 II.F.1.3 CollTAIllMEllT HIGil RAllGE M0llITOR 01/28/82C 2/82 (Complete)
M44951             F-20 II.F.1.1             fl0BLE GAS M0llITOR                             11/09/81C                                       (Complete) 4/82 M45022             F-21 II.F.1.2             IODINE /PARTICUL ATE SAMPLIllG                   11/09/8tC                                       (Complete) 9/82 M45093             F-22 II.F.1.3             CollTAIllMEllT HIGil RAllGE M0llITOR             01/28/82C                                       (Complete) 2/82 M47629             F-23 II.F.1.4             CollTAIllMENT PRESSURE IHSTRUMENT               04/18/83C-               --
M47629 F-23 II.F.1.4 CollTAIllMENT PRESSURE IHSTRUMENT 04/18/83C-1/82 (Complete)
1/82   (Complete)
M47700 F-24 II.F.1.5 CONTAIllMEllT llATER LEVEL IllSTRUMEllT 04/18/83C 12/81 (Complete)
M47700             F-24 II.F.1.5             CONTAIllMEllT llATER LEVEL IllSTRUMEllT         04/18/83C               --
M47771 F-25 II.F.1.6 C0HTAIllHEllT HYDROGEN MONITOR 04/18/83C 12/81 (Complete)
12/81 (Complete)
M45163 F-26 II.F.2 IllSTRUMEldTS FOR DETECTI0li 011 IHADEQUATE 87[/ N fI Note 25 M46900 F-30 II.K.2.13 TilERMAL-MECilANICAL REPORT 06/06/84C 6/84 (Complete)
M47771             F-25 II.F.1.6             C0HTAIllHEllT HYDROGEN MONITOR                 04/18/83C                 --
M47814 F-33 II.K.2.17 POTEllTI AL FOR VOIDIllG Ill RCS 12/30/83C 12/82 (Complete)
12/81 (Complete)
M45245 F-36 II.K.3.1 AdTO PORV ISOL ATI0ll 09/16/83C 9/83 (Complete)
M45163             F-26 II.F.2               IllSTRUMEldTS FOR DETECTI0li 011 IHADEQUATE     87[/ N fI                 Note 25         --
M45291 F-37 II.K.3.2 REPORT Dil PORV FAILURES 09/16/83C 9/83 (Complete)
M46900             F-30 II.K.2.13           TilERMAL-MECilANICAL REPORT                     06/06/84C               --
M45373 F-38 II.K.3.3 REPORTIllG SV AllD RV FAILURES AND CHALLE 03/02/82C 3/82 (Complete)
6/84   (Complete)
M45408 F-39 II.K.3.5 AUTO TRIP OF RCPS 02/08/83C Note 19
M47814             F-33 II.K.2.17           POTEllTI AL FOR VOIDIllG Ill RCS               12/30/83C               --
*M45457 F-40 II.K.3.9 PID C0!! TROLLER 11/30/81C 11/81 (Complete)
12/82 (Complete)
M45487 F-41 II.K.3.10 AllTICIPATORY TRIP MODIFICATI0lis 11/30/81C 11/81 (Complete)
M45245             F-36 II.K.3.1             AdTO PORV ISOL ATI0ll                           09/16/83C               --
M45517 F-42 II.K.3.12 AH'TICIPATORY TRIP DN TURBINE TRIP 11/30/81C 11/81 (Complete)
9/83   (Complete)
M45659 F-47 II.K.3.17 ECCS OUTAGES 08/11/83C 8/83 (Complete)
M45291             F-37 II.K.3.2             REPORT Dil PORV FAILURES                       09/16/83C               --
9/83   (Complete)
M45373             F-38 II.K.3.3             REPORTIllG SV AllD RV FAILURES AND CHALLE       03/02/82C                                       (Complete) 3/82 M45408             F-39 II.K.3.5             AUTO TRIP OF RCPS                               02/08/83C               Note 19         --
M45457             F-40 II.K.3.9             PID C0!! TROLLER                               11/30/81C               --
11/81 (Complete)
M45487               F-41 II.K.3.10           AllTICIPATORY TRIP MODIFICATI0lis               11/30/81C               --
11/81 (Complete)
M45517               F-42 II.K.3.12           AH'TICIPATORY TRIP DN TURBINE TRIP             11/30/81C               --
11/81 (Complete)
M45659               F-47 II.K.3.17           ECCS OUTAGES                                   08/11/83C               --
8/83   (Complete)
NSP PAGE 13 0F 14
NSP PAGE 13 0F 14


R-1208731-001                   REGULAT0RY             INF0RHATIOH           TRACKING       SYSTEH                     PAGE No.:.391 FACILITY         IflPLEHENTATION                                                 03/31/8T PRAIRIE ISLAND 2             (CONTIllUATI0ll) s LIC ACT                         LICENSEE TAC H0. MPA 8                   TITLE                                 COMPLETE                   STATUS     RAlf M48429     F-53   II.K.3.25   P0llER ON PUNP SEALS                     06/17/82C               --
R-1208731-001 REGULAT0RY INF0RHATIOH TRACKING SYSTEH PAGE No.:.391 FACILITY IflPLEHENTATION 03/31/8T PRAIRIE ISLAND 2 (CONTIllUATI0ll) s LIC ACT LICENSEE TAC H0.
6/82   (Complete)
MPA 8 TITLE COMPLETE STATUS RAlf M48429 F-53 II.K.3.25 P0llER ON PUNP SEALS 06/17/82C 6/82 (Complete)
M45856     F-57   II.K.3.30   SB LOCA METHODS                         06/06/85C               --
M45856 F-57 II.K.3.30 SB LOCA METHODS 06/06/85C 6/85 (Complete)
6/85   (Complete)
H48195 F-58 II.K.3.51 CollPLI ANCE lIITH 10 CFR 50.46 01/15/87 Note 27 4/86 (Complete) o k for /9'4 0 M45975 F-63 III.A 1.2 TECilllICAL SUPPORT CENTER 98f'-5tred g g C, Note 28 12/83 (Complete)
H48195     F-58   II.K.3.51   CollPLI ANCE lIITH 10 CFR 50.46         01/15/87                 Note 27       4/86   (Complete) o k for /9'4 0 98f'-5tred M45975     F-63   III.A 1.2   TECilllICAL SUPPORT CENTER                           g g C,       Note 28       12/83   (Complete)
H46046 F-64 III.A.1.2 OPERATI0llAL SUPPORT CENTER 48 4
H46046     F-64   III.A.1.2   OPERATI0llAL SUPPORT CENTER             48       4 g   f.- ,
g f.-
12/83 (Complete)
M46118    F-65    III.A.I.2    ENERGEllCY OPERATIONS FACILITY          96 1766                  --
12/83 (Complete)
12/83 (Complete)
H46190     F-66   III.A.1.2   flUCLEAR DATA LIllK                     07/30/82C               Note 2         --
M46118 F-65 III.A.I.2 ENERGEllCY OPERATIONS FACILITY 96 1766 12/83 (Complete)
05/1 / C                                        (Complete)
H46190 F-66 III.A.1.2 flUCLEAR DATA LIllK 07/30/82C Note 2 H46262 F-67 III.A.2.1 EMER0EHCY PLAll UPGRADE TO HEET RULE 05/1 / C 5/83 (Complete) p (,
H46262     F-67   III.A.2.1   EMER0EHCY PLAll UPGRADE TO HEET RULE p (,           --
H46334 F-68 III.A.2.2 NETEOROLOGICAL DATA UPGRADE 4
5/83 H46334     F-68   III.A.2.2   NETEOROLOGICAL DATA UPGRADE             4   im                 --
im 12/83 (Complete)
12/83 (Complete)
H42405 F-69 III.D.3.3 IMPLANT RADIATI0ll MONITORING 03/02/82C 3/82 (Complete)
H42405     F-69   III.D.3.3   IMPLANT RADIATI0ll MONITORING           03/02/82C                 --
H46474 F-70 III.D.3.4 CONTROL ROOH HABITABILITY 04/09/82C 2/84 (Complete)
3/82   (Complete)
H56155 F-71 I.D.1.2 DETAILED CollTROL R00H REVIEll (FOLLOHUP TD p(se40xtsw &
H46474     F-70   III.D.3.4   CONTROL ROOH HABITABILITY               04/09/82C                 --
NOLe 29 ag /fr/y i H49664 G-01 REACTOR COOLANT PUIiP TRIP (D660 - II.K.3.5)
2/84   (Complete)
GW t*19" N***
H56155     F-71   I.D.1.2 DETAILED CollTROL R00H REVIEll (FOLLOHUP TD   p(se40xtsw ag /fr/y &              NOLe 29        --
l9
i H49664     G-01   REACTOR COOLANT PUIiP TRIP (D660 - II.K.3.5)         GW t*19"                 N*** l9       ~~
~~
of,lt./)'f(
of,lt./)'f(
NSP PAGE 14 0F 14
NSP PAGE 14 0F 14


Notes:
Notes:
: 1. This item was a license amendment, ASME Code Section XI relief request approval, or other required NRC approval item. The item can be considerer " complete" on the date licensing action was complete (i.e. the date in the "Lic Act Complete" column is also appropriate for the " Licensee Date" column.
: 1. This item was a license amendment, ASME Code Section XI relief request approval, or other required NRC approval item.
The item can be considerer " complete" on the date licensing action was complete (i.e. the date in the "Lic Act Complete" column is also appropriate for the " Licensee Date" column.
: 2. Not enough information is provided for this item and we cannot readily identify it.
: 2. Not enough information is provided for this item and we cannot readily identify it.
: 3. Required action completed.       Awaiting NRC review.
: 3. Required action completed.
Awaiting NRC review.
: 4. Correct date is 9/6/85.
: 4. Correct date is 9/6/85.
: 5. This item is NRC SER on Appendix R exemption requests.
: 5. This item is NRC SER on Appendix R exemption requests.
: 6. It is not clear if these are separate requirements.       All Category A TMI Short Term Program Items complete by 4/80, however.
: 6. It is not clear if these are separate requirements.
7.
All Category A TMI Short Term Program Items complete by 4/80, however.
to beThe  date of the NRC SER related to this issue is believed 8/23/82. By letter dated 3/7/86, NSP requested a deviation from the NRC Staff findings in this SER.         NRC Staff review in ongoing.       Other requirements related to this issue are complete.
: 7. The date of the NRC SER related to this issue is believed to be 8/23/82.
By letter dated 3/7/86, NSP requested a deviation from the NRC Staff findings in this SER.
NRC Staff review in ongoing.
Other requirements related to this issue are complete.
: 8. Generic Letter 82-16, 9/20/82, Technical Specification changes requested on 1/14/83 and issued by NRC on 4/6/83.
: 8. Generic Letter 82-16, 9/20/82, Technical Specification changes requested on 1/14/83 and issued by NRC on 4/6/83.
: 9. NRC SER date is 8/5/85.
: 9. NRC SER date is 8/5/85.
10.NRC SER date is 5/13/85.
10.NRC SER date is 5/13/85.
11.NRC SER date is 10/18/85.
11.NRC SER date is 10/18/85.
: 12. Action is complete.     Additional commitments to computer logging made by NSP to be completed by 1989. No NRC SER issued yet.
: 12. Action is complete.
13.INPO NUTAC report issued.       We believe no further actions are needed.     NRC review not completed.
Additional commitments to computer logging made by NSP to be completed by 1989.
No NRC SER issued yet.
13.INPO NUTAC report issued.
We believe no further actions are needed.
NRC review not completed.
: 14. Undergoing NRC Review.
: 14. Undergoing NRC Review.
15.The date cannot be identified. Generic Issue A-12 has been resolved by the Commission and this item is considered complete with no backfit requirements (NUREG-0577, Revision 1).
15.The date cannot be identified.
16.It is unclear what this item specifically refers to.         The auxiliary feedwater system was thoroughly reviewed under the TMI Action Plan at a later date.       Required action was
Generic Issue A-12 has been resolved by the Commission and this item is considered complete with no backfit requirements (NUREG-0577, Revision 1).
16.It is unclear what this item specifically refers to.
The auxiliary feedwater system was thoroughly reviewed under the TMI Action Plan at a later date.
Required action was


completed or sceduled for integration with control board human factors modifications.
completed or sceduled for integration with control board human factors modifications.
: 17. Phase I only.
: 17. Phase I only.
: 18. Phase II dropped by NRC.
: 18. Phase II dropped by NRC.
: 19. Awaiting NRC review. Procedures complete and in use at plant.
: 19. Awaiting NRC review.
Procedures complete and in use at plant.
: 20. Detailed Control Room Design Report submitted 12/85.
: 20. Detailed Control Room Design Report submitted 12/85.
Awaiting NRC review. Modifications scheduled out to 1990.
Awaiting NRC review.
Modifications scheduled out to 1990.
: 21. Safety Parameter Display System to be installed by 12/86.
: 21. Safety Parameter Display System to be installed by 12/86.
: 22. Complete. Procedures and training being improved based on quality assurance audit.
: 22. Complete.
: 23. Analyses and modifications complete. Awaiting NRC review.
Procedures and training being improved based on quality assurance audit.
: 23. Analyses and modifications complete.
Awaiting NRC review.
: 24. Complete with exception of control board indicator improvements being integrated human factors modifications.
: 24. Complete with exception of control board indicator improvements being integrated human factors modifications.
: 25. Complete with exception of upgraded display units.
: 25. Complete with exception of upgraded display units.
Line 519: Line 398:
: 27. Small break LOCA analysis found acceptable in SER dated 4/3/86 based on previously approved model (NOTRUMP SER dated 6/6/85).
: 27. Small break LOCA analysis found acceptable in SER dated 4/3/86 based on previously approved model (NOTRUMP SER dated 6/6/85).
: 28. Complete with exception of enhancement with SPDS and Regulatory Guide 1.97, Revision 2, instrumentation.
: 28. Complete with exception of enhancement with SPDS and Regulatory Guide 1.97, Revision 2, instrumentation.
: 29. Report Submitted. Undergoing NRC Staff review.}}
: 29. Report Submitted.
Undergoing NRC Staff review.}}

Latest revision as of 02:43, 7 December 2024

Forwards Info Re Implementation of Generic Requirements,In Response to NRC 860430 request.Plant-specific List Encl, W/Status of Each Item Noted
ML20205T543
Person / Time
Site: Prairie Island  
Issue date: 06/02/1986
From: Musolf D
NORTHERN STATES POWER CO.
To:
Office of Nuclear Reactor Regulation
References
TASK-***, TASK-TM NUDOCS 8606160037
Download: ML20205T543 (17)


Text

_____

o_

1 Northern States Power Company

(

414 Nicollet Mall Minneapoks. Minnesota 55401 Telephone (612) 330-5500 f

June 2, 1986 Director Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT DOCKET NOS. 50-282 LICENSE NOS. DPR-42 50-306 DPR-60 Information Related to Implementation of Generic Requirements - Plant Specific Review The purpose of this letter is to provide information reques-ted by the NRC Staff in s letter dated April 30, 1986 from Mr Dominic C DiIanni, Project Manager, Project Directorate

  1. 1, Division of PWR Licensing-A, USNRC.

Attached is the plant-specific list for the Prairie Island Nuclear Generating plant with the status of each item noted.

In some cases additional notes have been provided to provide more detailed status information.

In other cases, additio-nal information is needed for us to identify the table entry.

We will discuss these items with the NRR Project Manager for Prairie Island, Mr Dominic Dilanni, and attempt to get more detailed information concerning them.

Please contact us if you have any questions related to the information we have provided.

Dd du s David Musolf Manager Nuclear Support Services c:

NRR Project Manager, NRC Hesident Inspector, NRC Regional Administrator, Region III, NRC G Charnoff Q **'

sgae12888:8t8tlie2 P

J

-r

~.

R-1208731-001 REGULAT0RY I !! F 0 R H A T I O N TRACKING SYSTEH PAGE N3.s.382 FACILITY IHPLENENTATICH 05/31/84 FACILITY: PRAIRIE ISLAND 1 PLAtlT LOCATI0tle 28 HI SE OF HIllNEAP'0LIS, HINN LICEllSED POWER: 1650 MHT PROJECT MANAGER: D. DIIAtlHI DOCKET flut1BER: 050-00282 DESIGN Poller:

0530 Mile BkANCN CHIEF:

G.

LEAR ARCN/ EllGIllEER : FPI NSS3 VENDORS llEST LIC. ASSISTANTS P. SHUTTLEHORTH IE IllSPECTOR:

C. FEIERABEllD LIC ACT LICENSEE TAC No.

HPA 8 TITLE COMPLETE STATUS DAIE H06336 A-01 10 CFR 50.55 A(G) - ISI 11/14/80C Note 1 11/80 (Complete)

MO8289 A-01 to CFR 50.55 A(G) - ISI 01/01/70C Note 2 H08151 A-02 APPENDIX I - ALARA 10/21/82C Note 1 1/83 (Complete)

H06949 A-03 SECURITY REVIEllS-HODIFIED AMENDHENT PLANS 03/14/79C 3/79 (Complete)

H05250 A-04 APFEllDIX J - CollTAltlHElli LEAK TESTING 02/23/830 2/83 (Complete)

H06853 A-08 ECCS EVALUATI0ll-GEllERIC PER 50.46 COMPLIANCE 12/01/81C 12/81 (Complete)

H11387 A-09 PRESSL'RE VESSEL BELTLIllE MATERIAL SURVEILLANCE 02/27/81C Note 2 M10398 A-10 CONTINGEllCY PL AtillIllG 02/25/81C Note 1 2/81 (Complete)

H10402 A-11 GUARD TRAINING PLAlis 02/25/81C Note 1 2/81 (Complete)

H10400 A-12 VITAL AREA AllALYSIS 04/12/82C Note 2 H11429 A-14 10CFR 50.55 A(G) - IllSERVICE TESTING 01/04/83C Note 1 1/83 (Complete)

H47399 A-16 QUALIFICATI0tlS OF EXAMINATION, INSPECTI0tl, TESTING 08/12/82C 12/83 (Complete)

H51122 A-17 IllSTRUMEllTATION TO FOLLOH THE COURSE OF AN ACCIDEN 10/18/85C 6/87 (Proj ected)

H55731 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 06/25/85C Note 1 6/85 (Complete)

H59130 A-20 10 CFR 50.62 OPERATIllG REAC10R REVIEHS N//S /

5/87 (Projected)

H59974 A-21 10 CFR 50.61, PRESSURIZED THERHAL SHOCK RULE Note 3 1/86 (Complete)

  • &587 B-02 FIRE PROTECTIO!I 09/16/79C Note 4 6/85 (Complete)

Mo H08394 B-03 PilR H0DERATOR DILUTIO!!

11/26/80C Note 2 N06620 B-04 REACTOR VESSEL OVERPRESSURE PROTECTIO.?!

01/01/70C Note 2 H06807 B-04 REACTOR VESSEL OVERPRESSURE PROTECTIO!I 08/03/79C Note 1 8/79 (complete)

NSP PAGE 1 OF 14 L

R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEM PAGE NO.s.383 FACILITY IHPLEMENTATION 03/31/86 PRAIRIE ISLAtID 1 (CollTINUATION)

LIC ACT LICENSEE TAC t10.

MPA e TITLE COMPLETE STATUS

'EalE N07278 B-07 STEAM GENERATOR FEEDilATER FLOH INSTABILITY 09/13/79C 9/79 (Complete)

M08752 B-14 CEA GUIDE TUBE IIEAR 05/04/81C 5/81 (Complese)

M12348 B-16 EMERGENCY PLANNING AND REVISIONS 04/01/81C Note 2 M08754 B-17 TECH SPEC SURVEILLAtlCE FOR HYDRAULIC SNUBBERS 10/28/81C Note 1 10/81 (Complete)

M10269 B-20 CollTAIllMENT LEAKAGE DUE 10 SEAL DETERIORATION 08/25/80C Note 2 M10333 B-21 LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANNUNCIA 02/28/82C Note 2 M08756 B-22 TECH SPEC SURVEILLAtlCE REQUIREMENTS FOR MECHANICAL 08/14/81C Note 1 8/81 (Complete)

M08734 B-23 DEGRADED GRID VOLTAGE 07/28/31C Note 1 7/81 (Complete)

M10045 B-23 DEGRADED GRID VOLTAGE 01/01/70C Note 2 M10156 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H 08/25/80C Note 2 M10157 B-24 VEllTIllO AllD PURGIllG CONTAIt4MENTS HHILE AT FULL PCH 01/01/73C Note 2 l

M42592 B-24 VEllTING AND PURGING CONTAIllMENTS HHILE AT FULL PDH ' 09/09/82C 9/84 (Complete)

M10231 B-26 INADVERTANT SAFETY IllJECTION DURING C00LDOHti 12/28/79C 12/79 (Complete)

M49429 B-32 BLOCKED SI SIGNAL DURING C00LD0llN 02/23/83C Note 2 N08665 B-39 PilR PRESSURE - TEMPERATURE LIMIT TECH SPECS 11/13/80C Mote 2 M49949 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 04/09/84C Note 2 M11094 B-41 FIRE PROTECTI0ll - FIllAL TECH SPECS (INCLUDES SER S 05/04/83C Note 5 5/83 (Conplete)

M13126 B-42 TMI FOLLDH UP - ALL PLANTS 06/15/81C Note 2 M11694 B-42 THI FOLLOH UP - ALL PLAtlTS 06/15/81C Note 2

'M11773 B-43 PilR FEEDHATER LIllE CRACKS 02/06/80C Note 2 M43147 B-43 PHR FEEDHATER LIllE CRACKS 05/25/82C Note 2 M30708 B-44 LESSONS LEARilED IMPLEMENTATION 04/18/80C Note 6 4/80 (Complete)

H30709 B-44 LESSails LEARilED IMPLEMEt4TATION 04/18/80C 4/80 (Complete)

NSP PAGE 2 0F 14 I

1

R-1208731-001 REGULAT0RY INF0RHATION TRACKINO SYSTEM

. PA2E NO.s.34 FACILITY IMPLEMENTATION 03/31/t6 PRAIRIE ISLAND 1 (CONTINUATION)

LIC ACT LICENSEE TAC No.

MPA 9 TITLE COMPLETE STATUS RME M30710 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 4/80 (Complete)

M30711 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 4/80 (Complete)

M30712 B-44 LESS0!IS LEARNED IMPLEMENTATION 04/18/80C 4/80 (Complete)

M30713 B-44 LESSONS LEARNED IMPLEMENTATI0ft 04/18/80C 4/80 (Complete)

M30714 B-44 LESS0lls LEARNED IMPLEMENTATION 04/18/80C 4/80 (Complete)

M30715 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 4/80 (Complete)

M30716 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 4/80 (Complete)

M30717 B-44 LESSONS LEARilED If1PLEMENTATION 04/18/80C 4/80 (Complete)

M30718 B-44 LESSONS LEARNED It1PLEMENTATION 04/18/80C 4/80 (Complete)

M30719 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 4/80 (Complete)

M30720 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 4/80 (Complete) i M30721 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 4/80 -(Complete)

M12932 B-45 llASH 1400 EVENT V,

" PRIMARY COOLANT SYSTEM PRESSUR 04/20/81C Note 1 4/81 (Complete)

M42116 B-46 ANALYSIS OF TURBINE DISC CRACKS 04/01/81C Note 2 --

M12591 B-46 ANALYSIS OF TURBINE DISC CRACKS 09/01/81C 10/81 (Complete)

M12683 B-47 ECCS; CLAD SHELLIllG AND RUPTURE 07/30/80C Note 2 --

M12966 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 10/29/82C 10/82 (Complete)

M13038 B-49 PilR CONTROL ROD HISALIGNMENT 07/28/81C Note 1 7/81 (Complete)

M11874 B-52 REVIEH OF SAFETY ASPECT OF INADVERTENT SAFETY ACTI 10/23/80C Note 2 --

  • M42898 B-59 MASONRY HALL DESIGN 09/12/83C 9/83 (Complete)

M42500 5-60 ENVIR0llMEllTAL QUALIFICATION 03/25/85C 11/85 (Complete)

M42699 B-61 LOSS OF NON CLASS IE ISC PDHER 07/28/82C Note 2 --

M42770 B-62 ESF RESET CONTROL DESIGN DEFICIENCY 04/30/81C Note 7 --

NSP PAGE 3 0F.14 L

R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEM PAGE NO.s 385 FACILITY IMPLEMENTATION 03/31/85 PRAIRIE ISLAND 1 (CONTINUATIDH)

LIC ACT LICENSEE TAC 130.

MPA 8 TITLE COMPLETE STATUS PAlf M43927 B-63 INTERIM PROCEDURES FOR Sii0RT TERM BLACK 0UT 01/22/82C 1/82 (Complete)

M47150 B-66 flATURAL CIRCULATION C00LD0liti 07/18/83C 7/83 (Complete)

M46853 B-69 IEB 80-4 MAINSTEAM LINE BREAK HITH CONTINUED FEEDil 10/25/82C 10/82 (Complete)

M46630 B-70 FATIGUE TRANSIEllT LIMIT TS 05/25/82C Note 2 M49750 B-72 flUREG 0737 TECN SPECS (GENERIC LETTER 82-16) 01/15/83C Note 8 4/83 (Complete)

MS2789 B-76 ITEM 1.1 - POST TRIP REVIElls PROGRAM DESCRIPTION &

06/01/84C Note 9 8/85 (Complete)

M52870 B-77 ITEM 2.1 - EQUIPMElli CLASSIFICATION & VENDOR INTER 06/01/84C Note 2 M52951 B-78 ITEMS 3.1.1 & 3.1.2 -POST MAlllTENAllCE TEST PROCEDU 06/01/85C Note 10 5/85 (Complete)

M53032 B-79 ITEM 3.1.3 - POST MAINTEllANCE TESTING - CHANGES TO 06/01/84C Note 11 10/85 (Complete)

M53089 B-80 ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY - VEllDO 06/01/85C Note 10 5/85 (Complete)

M53142 B-81 ITEMS 4.2.1 & 4.2.2 -PREVENTATIVE MAIllT PROG FOR R 10/17/85C 10/85 (Complete)

M53188 B-82 ITEM 4.3 - AUTOMATIC ACTUATION OF SNUNT TRIP ATTAC 06/01/84C 3/85 (Complete)

M53622 B-85 SALEM ATHS 1.2 DATA CAPABILITY 06/01/84C Note 12 M53705 B-86 SALEM ATHS 2.2 S-R COMP 0HEllTS 06/01/84C Note 13 M53788 B-87 SALEM ATils 3.2.1 & 3.2.2 S-R COMPONENTS 05/13/85C 5/85 (Complete)

M53871 B-88 SALEM AIlls 3.2.3 T.S. S-R COMPONENTS 06/01/84C 10/85 (Complete)

M53929 B-89 SALEM ATHS 4.2.3 & 4.2.4 LIFE COMPONENTS 10/31/86 Note 14 M55370 B-90 SALEM AlliS 4.3 H AND B&H T.S.

06/26/85C Note 2 6/85 (Complete)

M54098 B-92 SALEM ATils 4.5.1 DIVERSE TRIP FEATURES 05/13/85C 5/85 (Complete)

'M54015 B-93 SALEM ATHS 4.5.2 3 4.5.3 TEST ALTERNATIVES 06/01/84C Note 14 M06486 C-01 PHR SECONDARY llATER CHEMISTRY MONITORING REQUIREME 03/28/78C Note 2 M07614 C-01 PilR SECollDARY llATER CHEMISTRY MollITORING REQUIREME 11/13/81C Note 2 11/81 (Complete)

M08748 C-06 PUMP SUPPORT-LAMELLAR TEARING 09/15/81C Note 15 A

NSP PAGE 4 OF 14

R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEH PAGE No.:

386 FACILITY IHPLEHENTATION 03/31/86 PRAIRIE ISLAND 1 (CONTINUATIDH)

LIC ACT LICENSEE TAC HO.

HPA 8 TITLE C0f1PLETE STATUS EAlf i

H08750 C-07 FUEL HANDLING ACCIDENT INSIDE CONTAINHENT 02/02/82C 2/82 (Complete)

N07298 C-09 PHR AUX FH PUHPS 08/14/80C Note 16 H08075 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 06/06/83C Note 17 6/83 (Complete)

H43657 C-14 AUXILIARY FEEDilATER SEISHIC QUALIFICATION 06/16/83C 12/84 (Complete)

+

H52260 C-15 CONTROL OF HEAVY LOADS - Pl!ASE II (FOLLOHUP OF HPA 06/28/85C Note 18 6/85 (Complete)

Note 2 --

H58080 C-16 UTILITY RESPONSES TO STAFF RECOHHENDATIONS CONCERN H07872 D-02 ECCS ZIRC CLAD H0 DEL ERROR-COMPLIANCE HITH 10 CFR-04/20/79C Note 2 --

PRESSURIZ'R HEATUP RATE ERROR 11/01/78C Note 1 11/78 (Complete) 2 H07854 D-03 H08351 D-05 PLANT UPI H0 DEL PROBLEH l t[j /j/Fj"c ***+ ****

Note 2 --

H08751 D-10 ASYHHETRIC LOCA LOADS g-/g 42r24 469 Note 2 H08995 D-11 FISSION GAS RELEASE 02/22/80C Note 2 H12273 D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEH FAIL 12/01/80C Note 2 --

H43033 D-17 DEFINITI0H OF OPERABLE 07/28/81C Note 1 7/81 (Complete)

H55892 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15) 09/06/85C Note 2 --

H10727 E-03 CORE RELOADS REQUIRIllG PRIOR HRC APPROVAL 04/27/79C Note 2^ --

H44050 F-01 I.A.1.1 SilIFT TECittlICAL ADVISOR 07/06/82C 1/80 (Complete)

H44119 F-02 I.A.1.3 SHIFT HAHHING 04/06/83C 4/83 (Complete)

H44190 F-03 I.A.2.1 UPGRADING OF R0 AND SRO TRAINING 12/14/82C 12/82(Complete)

H44261 F-04 I.C.1.2/3.A EHERGEllCY OPERATING PROCEDURES GENERIC 06/07/84C 6/84 (Complete)

'H44331 F-05 I.C.1.2/3.B PROCEDURES GENERATION PACKAGES (NUREO 04/61/86 Note 19 --

6 3 //o/ 9']

M47244 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 01/04/82C 1/82 (Complete)

H47316 F-07 I.C.6 CORRECT PERFORHANCE OF OPERATING ACTIVITI 01/04/82C 1/82 (Complete)

H51192 F-08 I.D.1.1 DETAILED CONTROL R00H DESIGN REVIEH PROGRA 10/10/84C Note 20 --

l NSP PAGE 5 OF -14

/

R-1208731-001 REGULAT0RY INF0RHATION TRACKINO SYSTEH PA!E N0.8 387 FACILITY IHPLE!!ENTATION 03/31/86 PRAIRIE ISLAND 1 (CONTINUATIOH)

LIC ACT LICENSEE TAC fl0.

HPA 8 TITIE COMPLEH STATUS PAH H51272 F-09 I.D.2 SAFETY PARAHETER DISPLAY SYSTEM 07/15/85C Note 21 12/86 (Projected)

H44398 F-10 II.B.1 RCS HIGH POINT VENTS 09/19/83C 9/83 (Complete)

H47967 F-11 II.B.2 PLANT SHIELDING 10/12/83C 10/83 (Complete)

H44469 F-12 II.B.3 POST ACCIDENT SAMPLING 11/23/83C Note 22 11/83 (Complete)

M44540 F-13 II.B.4 TRAINING FOR HITIGATING CORE DAMAGE 12/14/82C 12/82 (Complete)

H44610 F-14 II.D.1 RV AND SV TRAINING 01/30/86 Note 23 H44647 F-15 II.E.1.1 AFH SYSTEH EVALUATION 03/22/82C Note 24 3/82 (Complete)

M42541 F-16 II.E.1.2.1 AFH SYSTEM INITIATION 03/22/82C 3/82 (Complete)

M44726 F-17 II.E.1.2.2 AFH SYSTEM FLOH INDICATION 03/22/82C 3/82 (Complete)

H44808 F-18 II.E.4.1 DEDICATED HYDROGEN PENETRATION 06/01/82C 6/82 (Complete)

H44879 F-19 II.E.4.2 CollTAINHENT ISOLATION DEPENDABILITY 09/09/82C 9/82 (Complete)

H44950 F-20 II.F.1.1 NOBLE GAS H0HITOR 11/09/81C 4/82 (Complete)

H45021 F-21 I I. F.1. 2 IODINE / PARTICULATE SAMPLING 11/09/81C 9/82 (Complete)

H45092 F-22 II.F.1.3 C0ilTAIHHEHT HIGH RANGE MONITOR 01/28/82C 2/82 (Complete)

M47628 F-23 II.F.1.4 CONTAlllHEHT PRESSURE INSTRUMENT 04/21/83C 1/82 (Complete)

M47699 F-24 II.F.1.5 CONTAINHENT HATER LEVEL INSTRUMENT 04/21/83C 12/81 (Complete)

H47770 F-25 II.F.1.6 CONTAIIIHEHT HYDROGEN HONITOR 04/21/83C 12/81 (Complete)

H45162 F-26 II.F.2 INSTRUMEllTS FOR DETECTION ON INADEQUATE 07//f/(h Note 25 --

6/84 (Complete)

H46899 F-30 II.K.2.13 THERHAL-HECHANICAL REPORT 06/06/84C

  • 47813 F-33 II.K.2.17 POTENTIAL FOR VOIDING IN RCS 12/30/83C 12/83 (Complete) l1 H45244 F-36 II.K.3.1 AUTO PORV ISOLATION 09/16/83C 9/83 (Complete)

H45290 F-37 II.K.3.2 REPORT OH PORV FAILURES 09/16/83C 9/83 (Complete)

H45372 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 03/03/82C 3/82 (Complete)

NSP PAGE 6 0F 14

/

R-1208731-001 REGULATCRY INF0RHATION TRACKINO SYSTEM PAGE NO.

',388 FACILITY IMPLEHENTATION 03/31/8)

PRAIRIE ISL AND 1 (CollTIllUATI0il)

LIC ACT LICENSEE COMPLETE STATUS PAIE TAC HO<

MPA 8 TITLE M45407 F-39 II.K.3.5 AUID TRIP OF RCPS 02/08/83C Note 19 11/30/81C 11/81 (Complete)

M45456 F-40 II.K.3.9 PID C0flTROLLER M45486 F-41 II.K.3.10 ANTICIPATORY TRIP MODIFICATIONS 11/30/81C 11/81 (Complete)

M45516 F-42 II.K.3.12 ANTICIPATORY TRIP DN TURBIllE TRIP 11/30/81C 11/81 (Complete) 08/11/83C 8/83 (Complete)

M45658 F-47 II.K.3.17 ECCS OUTAGES l M48428 F-53 II.K.3.25 PONER ON PUMP SEALS 06/17/82C 6/82 (Complete) 06/06/85C 6/85 (Complete)

M45855 F-57 II.K.3.30 SB LOCA METHODS M48194 F-58 II.K.3.51 COMPLIAllCE HITH to CFR 50.46 01/15/87 Note 27 4/86 (Complete)

Note 28 12/83 (Complete M45974 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER y/f/f(CN M46045 F-64 III.A.I.2 OPERATIONAL SUPPORT CENTER g&86 12/83 (Complete)

M46117 F-65 III.A.1.2 EMER0EllCY OPERATIDHS FACILITY y /f/rtc 084fP86 Note 28 12/83 (Complete) 07/30/82C Note 2 M45189 F-66 III.A.1.2 NUCLEAR DATA LIllK M46261 F-67 III.A.2.1 EMERGEllCY PLAN UPGRADE TO MEET RULE 05/13/83C 5/83 (Complete)

M46333 F-65 III.A.2.2 METEOROLOGICAL DATA UPGRADE j/g(earsiiss 12/83 (Complete)

M46404 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 03/02/82C 3/82 (Complete) 2/84 (Complete)

M46473 F-70 III.D.3.4 CONTROL ROOM HABITABILITY 04/09/82C 4MW Note 29 M56154 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEH (FDLLOllVP TO of//J~/7"C M49663 G-01 REACTOR COOLANT PUMP TRIP (D660 - II.K.3.5) 44,4984 Note 19 M/1//rG NSP PAGE 7 0F 14 p

R-1208751-001 REGULATORY INF0RHATION TRACKINO SYSTEH PAGE N0.8.389 03/31/86 FACILITY IMPLEMENTATION FACILITY: PRAIRIE ISLAtID 2 PLAtli LOCATI0!l: 28 HI SE OF HINHEAPOLIS, HIHit LICENSED P0HER: 1650 MHT PROJECT MAtlAGER: D. DII AllNI DOCKET NUllBER:

050-00306 DESIGN P0HER:

0530 Mile BRANCH CHIEF:

G. LEAR ARCH / EllGIllEER s FPI NSSS VENDOR:

HEST LIC ASSISTANT:

P. ShUTTLEHORTH IE INSPECTOR:

C. FEIERABEND LIC ACT LICENSEE TAC No, MPA B TITLE COMPLETE STATUS MIE H08309 A-01 10 CFR 50.55 A(G) - ISI 03/31/81C Note 2 10/21/82C Note 1 1/83 (Complete)

H08152 A-02 APPENDIX I - ALARA H08758 A-03 SECURITY REVIEllS-HODIFIED AMENDHENT PLANS 03/14/79C 3/79 (Complete)

H08729 A-04 APPENDIX J - CONTAINHENT LEAK TESTING 02/23/83C 2/83 (Complete)

H08746 A-08 ECCS EVALUATION-GEllERIC PER 50.46 COMPLIANCE 12/01/81C 12/81 (Complete)

H11370 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE 05/19/80C Note 2 02/25/81C Note 1 2/81 (Complete)

H10399 A-10 CONTINGENCY PLANNING 02/25/81C Note 1 2/81 (Complete)

H10403 A-11 GUARD TRAINING PLANS 04/12/82C Note 2 H10401 A-12 VITAL AREA ANALYSIS H11223 A-14 10CFR 50.55 A(G) - INSERVICE TESTING 01/04/83C Note 1 1/83 (Complete)

H47400 A-16 QUALIFICATIONS OF EXAHINATION, INSPECTION, TESTING 08/12/82C 12/83 (Complete)

H51123 A-17 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDEN 10/18/85C 6/87 (Projected)

H55732 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 06/25/85C Note 1 6/85 (Complete)

H59131 A-20 10 CFR 50.62 DPERATING REACTOR REVIEHS N//S /

3/88 (Projected)

H59975 A-21 10 CFR 50.61, PRESSURIZED THERHAL SHOCK RULE Note 3 1/86 (Complete) 09/16/79C Note 4 6/85 (Complete)

N08730 B-02 FIRE PROTECTI0li i

  • 08395 B-03 PHR MODERATOR DILUTION 11/26/80C Note 2 H

H08338 B-04 REACTOR VESSEL OVERPRESSURE PROTECTION 08/03/79C Note 1 8/79 (Complete)

H07829 B-07 STEAM GENERATOR FEEDHATER FLOH INSTABILITY 09/13/79C 05/04/81C H08753 B-14 CEA GUIDE TUBE HEAR NSP PACE 8 0F 14 b

R-1208731-001 REGULAT0RY I N F 0 R H A T I O fl TRACKINO SYSTEM PAGE H3.s.390 FACILITY IMPLEMEilTATION 03/31/86, PRAIRIE ISLAllD 2 (CollTIllUATIOff)

LIC ACT LICENSEE COMPLETE STATUS I!Alf.

TAC HO.

tif1_1 TTTLE Note 2 04/01/81C H12349 B-16 EMERGENCY PL AHilIllG AtID REVISI0lis H08755 B-17 TECH SPEC SURVEILLAtlCE FOR llYDRAULIC SilUBBERS 10/28/81C Note 1 10/81- (Complete)

H10270 B-20 C0HTAIHMENT LEAKAGE DUE TO SEAL DETERIORATION 10/02/80C Note 2 H10334 B-21 LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANHUllCIA 02/28/82C Note 2 H08757 B-22 TECH SPEC SURVEILLAllCE REQUIREMENTS FOR HECHANICAL 08/14/81C Note 1 8/81 (Complete) 07/28/8tC Note 1 7/81 (Complete)

M08755 B-23 DEGRADED GRID VOLTAGE 01/01/70C Note 2 M10044 B-23 DEGRADED GRID VOLTAGE M11330 B-24 VEHilllG AHD PURGIllG CONTAIHMEllTS HHILE AT FULL Poll 03/05/81C Note 2 H42622 B-24 VEllTIllG AllD PURGIllG C0llTAIllMENTS HHILE AT FULL P0li 09/09/82C 9/84 (Complete)

H10232 B-26 IHADVERTANT SAFETY INJECTIDH DURIllG C00LDollH 12/28/79C Note 2 02/23/83C Note 2 M49430 B-52 BLOCKED SI SIGilAL DURING C00LD0Hil M08680 B-39 Pi!R PRESSURE - TEMPERATURE LIMIT TECH SPECS 11/13/80C Note 2 M49950 B-41 FIRE PROTECTI0li - FIEAL TECH SPECS (IllCLUDES SER S 01/09/84C Note 2 Hf1095 B-41 FIRE PROTECTIDH - FIllAL TECH SPECS (INCLUDES SER S 05/04/83C Note 5 5/83 (Complete) 06/15/81C Note 2 M13127 B-42 TMI FOLLOH UP - ALL PLAllTS 06/15/81C Note 2 M11695 B-42 THI FOLLOH UP - ALL PLANTS 02/06/80C Note 2 M11774 B-43 PHR FEEDilATER LINE CRACKS 05/25/82C Note 2 1143148 B-43 PIIR FEEDHATER LINE CRACKS 04/18/80C Note 6 4/80 (Complete)

H30722 5 44 LESS0!IS LEARilED IMPLEMEllTATI0li 04/18/80C l1 4/80 (Complete

  • 50723 B-44 LESSOUS LEARilED IMPLEl1EHTATIDH 04/18/80C 4/80 (Complete)

M30724 B-44 LESSONS LEARilED IMPLEMENTATI0tl 04/18/30C H30725 B-44 LESSONS LEARNED IMPLEMENTATION gg 04/18/80C H30726 B-44 LESSullS LEARilED IMPLEMENTATION 4/80 (Complete)

NSP PAGE 9 OF 14 O

s

R-1208731-001 REGULAT0RY INF0RHATION TRACKINO SYSTEH PAGE NO.

- 391 FACILITY IHPLEHENTATION 03/31/8Ti PRAIRIE ISLAllD 2 (C0HTIllUATI0ti)

LIC ACT LICENSEE T A C 110.

HPA 8 TITLE COMPLETE STATUS

MIf, H30727 B-44 LESS0tlS LEARilED IMPLEMEllTATI0tt 04/18/80C 4/80 (Complete)

H30728 B-44 LESS0!!S LEARilED IllPLEHENTATI0tt 04/18/80C 4/80 (Complete)

H30729 B-44 LESSONS LEARHED IMPLEMEllTATION 04/18/80C 4/80 (Complete)

H30730 B-44 LESS0HS LEARilED IMPLEMEllTATION 04/18/80C 4/80 (Complete)

H30731 B-44 LESS0HS LEARllED IMPLEllEllTATI0li 04/18/80C 4/80 (Complete)

H30732 B-44 LES50tlS LEARHED It1PLEf1ENTATI0!l 04/18/80C 4/80 (Complete) 1130733 B-44 LESS0llS LEARHED IMPLEMEllTATIDH 04/18/80C 4/80 (Complete)

H30734 B-44 LESS0llS LEARHED IMPLEMENTATION 04/18/80C 4/80 (Complete)

H30735 B-44 LESS0tlS LEARilED It1PLEHEHTATION 04/18/80C 4/80 (Complete)

H12933 B-45 IIASH 1400 EVEllT V, " PRIMARY COOLANT SYSTEM PRESSUR 04/20/81C Note 1 4/81 (Complete)

H42117 B-46 AHALYSIS OF TURBIllE DISC CRACKS 04/01/81C Note 2 H12592 B-46 ANALYSIS OF TURBIllE DISC CRACKS 09/01/81C 10/81 (Complete)

H12684 B-47 ECCS; CLAD SilELLIllG AtID RUPTURE 10/02/80C Note 2 H12947 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 10/29/82C 10/82 (Complete)

H13039 B-49 PHR C0!ITROL ROD HISALIGilHENT 07/28/81C Note 1 7/81 (Complete)

H11875 B-52 REVIEH OF SAFETY ASPECT OF IllADVERTENT SAFETY ACTI 10/23/80C Note 2 H42899 B-59 MAS 0tlRY HALL DESIGH 09/12/83C 9/83 (Complete)

H42501 B-60 EllVIR0tlHENTAL QUALIFICATION 03/25/85C 11/85 (Complete)

H42700 B-61 LOSS OF 11011 CLASS IE I&C P0llER 07/28/82C Note 2

  • 42771 B-62 ESF RESET CONTROL DESIGN DEFICIEllCY 04/30/81C Note 7 H

H43928 B-63 INTERIH PROCEDURES FOR Sil0RT TERM BLACKOUT 01/22/82C 1/82 (Complete)

H47151 B-66 NATURAL CIRCULATI0il C00LD0HH 07/18/83C 7/83 (Complete)

H46854 B-69 IEB 80-4 MAIHSTEAM LINE BREAK HITH CONTINUED FEEDH 10/25/82C 10/82 (Complete)

NSP PAGE 10 0F 14

R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEH PAGE No.:

392 FACILITY IHPLEHEilTATION 03/31/86-PRAIRIE ISL AllD 2 (CONTIllUATION)

LIC ACT LICENSEE TAC 110.

HPA 8 TITLE COMPLETE STATUS EALE M46631 B-70 FATIGUE TRANSIEllT LIMIT TS 05/25/82C Note 2 H49751 B-72 IlUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 01/15/83C Note 8 4/83 (Complete)

H52790 B-76 ITEM 1.1 - POST TRIP REVIEH; PROGRAM DESCRIPTION &

06/01/84C Note 9 8/85 (Complete) 1152871 B-77 ITEM 2.1 - EQUIPHENT CLASSIFICATION & VEllDDR INTER 06/01/84C Note 2 H53952 B-78 ITEMS 3.1.1 & 3.1.2 -POST HAINTEllANCE TEST PROCEDU 06/01/85C Note 10 5/85 (Complete)

H53033 B-79 ITEM 3.1.3 - POST HAINTENAllCE TESTIllG - CilANGES TO 06/01/84C Note 11 10/85 (Complete)

H53090 B-80 ITEM 4.1 - REACTOR TRIP SYSTEH RELIABILITY - VENDO 06/01/85C Note 10 5/85 (Complete)

H53143 B-81 ITEMS 4.2.1 & 4.2.2 -PREVENTATIVE HAINT PROG FOR R 10/17/85C 10/85 (Complete)

H53189 B-82 ITEM 4.3 - AUTOMATIC ACTUATI0li 0F SilUNT TRIP ATTAC 06/01/84C 10/85 (Complete)

H53623 B-85 SALEM ATHS 1.2 DATA CAPABILITY 12/31/85 Note 12 H53706 B-86 SALEM ATils 2.2 S-R COMPollEllTS 06/01/84C Note 13 H53789 B-87 SALEH ATils 3.2.1 & 3.2.2 S-R COMPollEllTS 05/13/85C 5/85 (Complete)

H53872 B-88 SALEH ATilS 3.2.3 T.S. S-R COMPONEllTS 06/01/84C 10/85 (Complete)

H53930 B-89 SALEM ATHS 4.2.3 & 4.2.4 LIFE COMP 0llENTS 10/31/86 Note 14 H55371 B-90 SALEM ATHS 4.3 H AllD B8H T.S.

06/26/85C Note 2 6/85 (Complete)

H54099 B-92 SALEH ATHS 4.5.1 DIVERSE TRIP FEATURES 05/13/85C 5/85 (complete)

H54016 B-93 SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERilATIVES 06/01/84C Note 14 H08733 C-01 PilR SECollDARY HATER CllEHISTRY HONITORIl10 REQUIREME 11/13/81C Note 2 11/81 (Complete)

H08749 C-06 PUNP SUPPORT-LANELLAR TEARIl10 09/15/81C Note 15 H08751 C-07 FUEL IIAllDLIl10 ACCIDEllT INSIDE CONTAINHENT 02/02/82C 2/82 (Complete)

H08747 C-09 PilR AUX FH PUNPS 03/05/81C Note 16 H08076 C-10 CollTROL OF llEAVY LOADS OVER SPENT FUEL POOL (PilASE 06/16/83C Note 17 6/83 (Complete)

H43658 C-14 AUXILIARY FEEDilATER SEISHIC QUALIFICATI0ll 06/16/83C 12/84 (Complete)

NSP PAGE 11 0F 14

R-1208731-001 REGULAT0RY I !! F 0 R H A T I O N TRACKING SYSTEH PAGE No.s.393 FACILITY IHPLEHENTATION 03/31/46 PRAIRIE ISLAND 2 (CONTINUATION)

LIC ACT LICENSEE TAC H0.

HPA 8 TITLE COMPL ETE STATUS EAlf H52261 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF HPA 06/28/85C Note 18 6/85 (Complete)

H58081 C-16 UTILITY RESP 0HSES TO STAFF RECOHHENDATIONS CONCERN Note 2 H07873 D-02 ECCS ZIRC CLAD H0 DEL ERROR-COMPLIANCE HITH 10 CFR-04/20/79C Note 2 H07855 D-03 PRESSURIZER llEATUP RATE ERROR 11/01/78C Note 1 11/78 (Complete)

H08471 D-05 PLANT UPI H0 DEL PRUILLEM f 2 /.)//7.52* 997Hr84 Note 2

,fpf/pg -tAwaar H08732 D-10 ASYMMETRIC LOCA LOADS Note 2 H08996 D-11 FISSIDH GAS RELEASE 02/22/80C Note 2 H12274 D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL 12/01/80C Note 2 H55893 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15) 09/06/85C Note 2 H10904 E-03 CORE RELOADS REQUIRING PRIOR NRC APPROVAL 04/20/79C Note 2 a

) H44051 F-01 I.A.1.1 SHIFT TECHNICAL ADVISOR 07/06/82C 1/80 (Complete)

H44120 F-02 I.A.1.3 SHIFT MANNING 04/06/83C 4/83 (Complete)

H44191 F-03 I.A.2.1 UPGRADING OF R0 AND SRO TRAINING 12/14/82C 12/82 (Complete)

M44262 F-04 I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC 06/07/84C 6/84 (Complete)

H44332 F-05 I.C.I.2/3.B PROCEDURES GENERATION PACKAGES (NUREG th.

Note 19 H47245 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 01/04/82C 1/82 (Complete)

H47317 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVIII 01/04/82C 1/82 (Complete) 2 H51193 F-08 I.D.1.1 DETAILED C0llTROL R00H DESIGN REVIEN PROGRA 10/10/84C Note 20

) H51273 F-09 I.D.2 SAFETY PARAHETER DISPLAY SYSTEM 07/15/85C N(.te 21 12/86 (Project 4d)

] 'H44399 F-10 II.B.1 RCS HIGil POINT VENTS 09/19/83C 9/83 (Complete)

H47968 F-11 II.B.2 PLANT SHIELDING 10/12/83C 10/83 (Complete)

H44470 F-12 II.B.3 POST ACCIDENT SAMPLING 11/23/83C Note 22 11/83 (Complete)

H44541 F-13 II.B.4 TRAINIllG FOR HITIGATING CORE DAMAGE 12/14/82C 12/82 (Complete) l NSP PAGE 12 0F'14

4 R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEM PAGE N0.8 394 FACILITY I M P L E M E N T A T I O 11 03/31/86 PRAIRIE ISLAllD 2 (CollTIllUATI0ll)

LIC ACT LICENSEE TAC 110.

MPA 3 TITLE COMPLETE STATUS DAIE M44611 F-14 II.D.1 RV AllD SV TRAlllIllG 01/30/86 Note 23 M44648 F-15 II.E.1.1 AFH SYSTEM EVALUATION 03/22/82C Note 24 3/82 (Complete)

M44688 F-16 II.E.1.2.1 Afil SYSTEM IllITI ATI0li 03/22/82C 3/82 (Complete)

M44727 F-17 II.E.1.2.2 AFil SYSTEl1 FLOll IllDICATIDH 03/22/82C 3/82 (Complete)

M44809 F-18 II.E.4.1 DEDICATED llYDROGEN PEHETRATION 06/01/82C 6/82 (Complete)

M44880 F-19 II.E.4.2 CollTAlllMEllT ISOL ATI0ll DEPENDABILITY

~09/09/82C 9/82 (Complete)

M44951 F-20 II.F.1.1 fl0BLE GAS M0llITOR 11/09/81C 4/82 (Complete)

M45022 F-21 II.F.1.2 IODINE /PARTICUL ATE SAMPLIllG 11/09/8tC 9/82 (Complete)

M45093 F-22 II.F.1.3 CollTAIllMEllT HIGil RAllGE M0llITOR 01/28/82C 2/82 (Complete)

M47629 F-23 II.F.1.4 CollTAIllMENT PRESSURE IHSTRUMENT 04/18/83C-1/82 (Complete)

M47700 F-24 II.F.1.5 CONTAIllMEllT llATER LEVEL IllSTRUMEllT 04/18/83C 12/81 (Complete)

M47771 F-25 II.F.1.6 C0HTAIllHEllT HYDROGEN MONITOR 04/18/83C 12/81 (Complete)

M45163 F-26 II.F.2 IllSTRUMEldTS FOR DETECTI0li 011 IHADEQUATE 87[/ N fI Note 25 M46900 F-30 II.K.2.13 TilERMAL-MECilANICAL REPORT 06/06/84C 6/84 (Complete)

M47814 F-33 II.K.2.17 POTEllTI AL FOR VOIDIllG Ill RCS 12/30/83C 12/82 (Complete)

M45245 F-36 II.K.3.1 AdTO PORV ISOL ATI0ll 09/16/83C 9/83 (Complete)

M45291 F-37 II.K.3.2 REPORT Dil PORV FAILURES 09/16/83C 9/83 (Complete)

M45373 F-38 II.K.3.3 REPORTIllG SV AllD RV FAILURES AND CHALLE 03/02/82C 3/82 (Complete)

M45408 F-39 II.K.3.5 AUTO TRIP OF RCPS 02/08/83C Note 19

  • M45457 F-40 II.K.3.9 PID C0!! TROLLER 11/30/81C 11/81 (Complete)

M45487 F-41 II.K.3.10 AllTICIPATORY TRIP MODIFICATI0lis 11/30/81C 11/81 (Complete)

M45517 F-42 II.K.3.12 AH'TICIPATORY TRIP DN TURBINE TRIP 11/30/81C 11/81 (Complete)

M45659 F-47 II.K.3.17 ECCS OUTAGES 08/11/83C 8/83 (Complete)

NSP PAGE 13 0F 14

R-1208731-001 REGULAT0RY INF0RHATIOH TRACKING SYSTEH PAGE No.:.391 FACILITY IflPLEHENTATION 03/31/8T PRAIRIE ISLAND 2 (CONTIllUATI0ll) s LIC ACT LICENSEE TAC H0.

MPA 8 TITLE COMPLETE STATUS RAlf M48429 F-53 II.K.3.25 P0llER ON PUNP SEALS 06/17/82C 6/82 (Complete)

M45856 F-57 II.K.3.30 SB LOCA METHODS 06/06/85C 6/85 (Complete)

H48195 F-58 II.K.3.51 CollPLI ANCE lIITH 10 CFR 50.46 01/15/87 Note 27 4/86 (Complete) o k for /9'4 0 M45975 F-63 III.A 1.2 TECilllICAL SUPPORT CENTER 98f'-5tred g g C, Note 28 12/83 (Complete)

H46046 F-64 III.A.1.2 OPERATI0llAL SUPPORT CENTER 48 4

g f.-

12/83 (Complete)

M46118 F-65 III.A.I.2 ENERGEllCY OPERATIONS FACILITY 96 1766 12/83 (Complete)

H46190 F-66 III.A.1.2 flUCLEAR DATA LIllK 07/30/82C Note 2 H46262 F-67 III.A.2.1 EMER0EHCY PLAll UPGRADE TO HEET RULE 05/1 / C 5/83 (Complete) p (,

H46334 F-68 III.A.2.2 NETEOROLOGICAL DATA UPGRADE 4

im 12/83 (Complete)

H42405 F-69 III.D.3.3 IMPLANT RADIATI0ll MONITORING 03/02/82C 3/82 (Complete)

H46474 F-70 III.D.3.4 CONTROL ROOH HABITABILITY 04/09/82C 2/84 (Complete)

H56155 F-71 I.D.1.2 DETAILED CollTROL R00H REVIEll (FOLLOHUP TD p(se40xtsw &

NOLe 29 ag /fr/y i H49664 G-01 REACTOR COOLANT PUIiP TRIP (D660 - II.K.3.5)

GW t*19" N***

l9

~~

of,lt./)'f(

NSP PAGE 14 0F 14

Notes:

1. This item was a license amendment, ASME Code Section XI relief request approval, or other required NRC approval item.

The item can be considerer " complete" on the date licensing action was complete (i.e. the date in the "Lic Act Complete" column is also appropriate for the " Licensee Date" column.

2. Not enough information is provided for this item and we cannot readily identify it.
3. Required action completed.

Awaiting NRC review.

4. Correct date is 9/6/85.
5. This item is NRC SER on Appendix R exemption requests.
6. It is not clear if these are separate requirements.

All Category A TMI Short Term Program Items complete by 4/80, however.

7. The date of the NRC SER related to this issue is believed to be 8/23/82.

By letter dated 3/7/86, NSP requested a deviation from the NRC Staff findings in this SER.

NRC Staff review in ongoing.

Other requirements related to this issue are complete.

8. Generic Letter 82-16, 9/20/82, Technical Specification changes requested on 1/14/83 and issued by NRC on 4/6/83.
9. NRC SER date is 8/5/85.

10.NRC SER date is 5/13/85.

11.NRC SER date is 10/18/85.

12. Action is complete.

Additional commitments to computer logging made by NSP to be completed by 1989.

No NRC SER issued yet.

13.INPO NUTAC report issued.

We believe no further actions are needed.

NRC review not completed.

14. Undergoing NRC Review.

15.The date cannot be identified.

Generic Issue A-12 has been resolved by the Commission and this item is considered complete with no backfit requirements (NUREG-0577, Revision 1).

16.It is unclear what this item specifically refers to.

The auxiliary feedwater system was thoroughly reviewed under the TMI Action Plan at a later date.

Required action was

completed or sceduled for integration with control board human factors modifications.

17. Phase I only.
18. Phase II dropped by NRC.
19. Awaiting NRC review.

Procedures complete and in use at plant.

20. Detailed Control Room Design Report submitted 12/85.

Awaiting NRC review.

Modifications scheduled out to 1990.

21. Safety Parameter Display System to be installed by 12/86.
22. Complete.

Procedures and training being improved based on quality assurance audit.

23. Analyses and modifications complete.

Awaiting NRC review.

24. Complete with exception of control board indicator improvements being integrated human factors modifications.
25. Complete with exception of upgraded display units.
26. SER is dated 6/11/84 not 6/6/84.
27. Small break LOCA analysis found acceptable in SER dated 4/3/86 based on previously approved model (NOTRUMP SER dated 6/6/85).
28. Complete with exception of enhancement with SPDS and Regulatory Guide 1.97, Revision 2, instrumentation.
29. Report Submitted.

Undergoing NRC Staff review.